Preparing for the unexpected: Transmission Planning in ERCOT

Size: px
Start display at page:

Download "Preparing for the unexpected: Transmission Planning in ERCOT"

Transcription

1 Preparing for the unexpected: Transmission Planning in ERCOT 2014 Transform TX January 29, 2014 Hala N. Ballouz, PE Electric Power Engineers, Inc.

2 In business since 1968 Consulting to electric utilities and private generators Transmission grid deliverability analysis Management of grid interconnection Congestion and curtailment analysis Market pricing and nodal analysis Design & Equipment grid compliance Owner s Engineer, testing, inspection

3 s ERCOT Generation Interconnection Customer: Hey, I have a 50 MW generator at Friend Ranch ISO We should be fine, plenty of capacity there..will run a study anyways!

4 4 Screening Study delivered to IE 2014 ERCOT Interconnection Process IE commits to proceed FIS Scope agreed upon (IE and TSP) FIS complete IA signed by TSP and IE ERCOT Standards Review delivered to IE GINR Request (FEE) Screening Study (SSR if required) 90 Day Limit 45 day target Resource Decision to Proceed 180 day limit FIS Request (Fee) FIS Scope Meeting Full Interconnect Studies SS; Fault Dynamic; Fac. <Economic>; <SSR> TSP ERCOT Review FIS & ERCOT Approval Negotiation Of Interconnection Agreement 180 day limit ERCOT Assess standards 60 day limit Registration of RE (IE Transitions to an RE) Proposed Energization Date (PED) identified Model Ready Date (MRD) identified RE submits RARF EPS meter design proposal from TSP QSE Pts list received from QSE based on Scada Plan Telemetry Additions set up for MRD EPS meter design proposal date ESIID active In Loadstar Outage Scheduling Coordinated & Commissioning Plan submitted Meteorological tower requirements are met Compliance with Operating Stds. checked SCADA Confirmed Request to commission POI approved Request For initial synch. approved Test Reactive Capability Request To begin Commercial Operations approved First time to be energized Initial Synchro nization Source: ERCOT Guide To The Interconnection Process Version 1.0 Commercial Operation Date (COD)

5 5 1990s Technical Grid Requirements Are the conductors large enough?

6 Technical Grid Compliance Requirements 1. Thermal Limitations (Are the Conductors Large Enough!) 2. Voltage Ride-Through (VRT) Requirements for IRRs (Nodal Operating Guides Section 2.9) 3. Frequency Relaying Requirements (Nodal Operating Guides section 2.6.2) 4. Reactive Power Support Requirements (Nodal Protocols section 3.15) 5. Ramp-up Rate Requirements (Nodal Protocols section ) 6. Primary Frequency Response (PFR) Requirements (Nodal Protocols section ) 7. Sub-Synchronous Interaction (SSI) Section 5 of ERCOT Planning Guides

7 IA: Interconnection Agreement FC: Financial Commitment COD: Commercial Operating Day 7 Panhandle Wind Signed IA Projects IA Capacity (MW) FC Capacity (MW) IA Signed Projected GINR ProjectName County Date COD 11INR0050 Moore Wind 1 Crosby /12/2012 8/8/ INR0005 Conway Windfarm Carson /24/ /1/ INR0023 Longhorn Energy Center Briscoe /10/ /1/ INR0030a2 Panhandle Wind Carson /19/2012 8/1/ INR0010a Mariah Wind Parmer /31/ /30/ INR0010b Mariah Wind Parmer /31/ /31/ INR0010c Mariah Wind Parmer /31/ /31/ INR0048 Spinning Spur Wind Two Oldham /27/2013 6/1/ INR0012a Miami Wind 1 Project Gray /1/2013 7/31/ INR0012b Miami Wind 1 Project Gray /1/2013 8/15/ INR0059a Hereford Wind Castro /10/2013 9/4/ INR0059b Hereford Wind Castro /10/2013 4/15/ INR0029 Comanche Run Wind Swisher /24/ /31/ INR0030b Panhandle Wind (Ph2) Carson /2/2013 9/1/ INR0032a Route66 Wind Randall /31/ /1/ INR0018 Pampa Wind Project Gray /12/2013 3/31/ INR0053 Spinning Spur Wind Three Oldham /10/ /31/2014 4,516 2,505

8 8 Roadmap- Panhandle Export Limit Transmission Upgrades needed

9 Large Generator Interconnection Process Issues? 9 Time Cost Transmission Reliability Limitations

10 Resource Mapping 10 Collaboration In Resource Development Map the Resources Provide Ancillary Services OPTIMIZE

11 Resource Side Planning Lessons Learned 11 Levelized Load Cycle Actual Load Cycle STORAGE DISCHARGE STORAGE CHARGE ENERGY STO R A G E HOUR OF DAY Understanding of the intricate interconnection process and requirements is key to project success Being informed about the transmission grid present and future limitations for choosing LOCATION for a resource Collaboration amongst all Resource Sectors in sketching a map for successful co location of resources

12 QUESTIONS 12 Hala Ballouz, President

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

Generator Interconnection Process. Wholesale Transmission Overview

Generator Interconnection Process. Wholesale Transmission Overview 1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent

More information

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements Facility Connection Requirements LST-FAC-001-PRO-Facility_Connection_Requirements Document Control Document Owner: Name: Mathew Gomes Title: Director of Development & System Planning Change History: The

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

LCRA Transmission Services Corporation. Facility Connection Requirements

LCRA Transmission Services Corporation. Facility Connection Requirements LCRA Transmission Services Corporation Facility Connection Requirements May 2018 Table of Contents 1.0 INTRODUCTION... 3 2.0 Facility Connection Requirements... 3 2.1 Summary of Basic Interconnection Requirements...

More information

Agreements & Queue Management

Agreements & Queue Management Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process

More information

LCRA Transmission Services Corporation. Facility Connection Requirements

LCRA Transmission Services Corporation. Facility Connection Requirements LCRA Transmission Services Corporation Facility Connection Requirements April 2017 Table of Contents 1.0 INTRODUCTION... 3 2.0 Facility Connection Requirements... 3 2.1 Summary of Basic Interconnection

More information

ELECTRIC POWER SYSTEM

ELECTRIC POWER SYSTEM FUNDAMENTAL CHANGES TO THE ELECTRIC POWER SYSTEM POST-2018 BY MARK SIIRA, ComRent International This article gives a glimpse of some significant changes that will occur in electric power system testing

More information

Grid Interconnection of Renewable Generation

Grid Interconnection of Renewable Generation Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection

More information

Small Hydro Regulatory and Permitting Requirements California

Small Hydro Regulatory and Permitting Requirements California Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator

More information

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 2014 Electric Power Research Institute, Inc. All rights reserved. Meet the Challenge An Integrated Grid 2 Interconnected

More information

CenterPoint Energy P O Box 1700 Houston, TX

CenterPoint Energy P O Box 1700 Houston, TX CenterPoint Energy P O Box 1700 Houston, TX 77251-1700 IF YOU ARE APPLYING FOR DISTRIBUTED GENERATION, PLEASE FOLLOW THE INSTRUCTIONS IN THE PARAGRAPHS BELOW. YOU WILL NEED TO COMPLETE AND SIGN AND THEN

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

DSO for Republic of Ireland. Supplying every home in the country

DSO for Republic of Ireland. Supplying every home in the country Coordinated Planning in Ireland & Active Voltage Management using Wind Generation ESB Networks About ESB Networks DSO for Republic of Ireland Supplying every home in the country Asset Owner Transmission

More information

New Resource Implementation & Market Modeling

New Resource Implementation & Market Modeling New Resource Implementation & Market Modeling Resource Interconnection Fair February 24, 2016 Page 1 Topics Discuss the New Resource Implementation (NRI) process. Structure and timeline for any resource

More information

Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1

Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1 Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms May 22, 2009 Slide 1 FACTS Applications Flexible AC Transmission Systems May 22, 2009 Slide 4 System Studies - Grid Codes

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

Interconnection Re-MAT September 11, 2013

Interconnection Re-MAT September 11, 2013 Interconnection Re-MAT September 11, 2013 2013 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Distribution System Interconnection Processes Rule 21 - Governed by CPUC Wholesale

More information

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS STATE OF MINNESOTA DISTRIBUTED GENERATION INTERCONNECTION TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues and Technical Requirements

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

Overview of DSASP; Telemetry/Communication Alternatives

Overview of DSASP; Telemetry/Communication Alternatives Overview of DSASP; Telemetry/Communication Alternatives The New York Independent System Operator Price Responsive Load Working Group May 12, 2010 Agenda Overview of DSASP Market Rules Current Communications/Telemetry

More information

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER WELCOME Draft Energy Storage Roadmap Draft Matrix Stakeholder Call November 3, 2014 San Francisco SAFER, SMARTER, GREENER Alignment of Proposed Actions to Storage Configuration and Use Cases Robert Anderson,

More information

9 February 2017 Part 6 distributed generation applications. Ron Beatty Principal advisor

9 February 2017 Part 6 distributed generation applications. Ron Beatty Principal advisor 9 February 2017 Part 6 distributed generation applications Ron Beatty Principal advisor 1031043 1 EMBEDDED GENERATION TRENDS Fuel type Embedded generation ICP Installed identifiers capacity in MW % of

More information

Title. Critical Infrastructure Protection Getting Low with a Touch of Medium. CanWEA Operations and Maintenance Summit 2018.

Title. Critical Infrastructure Protection Getting Low with a Touch of Medium. CanWEA Operations and Maintenance Summit 2018. Critical Infrastructure Protection Getting Low with a Touch of Medium Title CanWEA Operations and Maintenance Summit 2018 January 30, 2018 George E. Brown Compliance Manager Acciona Wind Energy Canada

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Oncor Application for Interconnection of Distributed Generation

Oncor Application for Interconnection of Distributed Generation Oncor Application for Interconnection of Distributed Generation Operating Mode: Parallel Operation Longer than 100 milliseconds (07/11/2018) This application is for generator systems that synchronously

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

Written Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator

Written Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities

More information

PG&E Transmission Interconnection Handbook

PG&E Transmission Interconnection Handbook Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

ERCOT MARKET. PNUCC Larry Weis June 2, 2017

ERCOT MARKET. PNUCC Larry Weis June 2, 2017 ERCOT MARKET PNUCC Larry Weis June 2, 2017 1 AGENDA Overview Evolution ERCOT Wholesale Market/COUs Business Change Questions and Wrap-up 2 ELECTRIC RELIABILITY COUNCIL OF TEXAS (ERCOT) Manages the flow

More information

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs) Appendix A DSO Functions (Version 7) No. DSO Functions 1 System Coordination Description Activities Description Operate local and regional areas and co-ordinate energy and power transfers with other networks

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

From: Laura Manz, Vice President of Market & Infrastructure Development

From: Laura Manz, Vice President of Market & Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional

More information

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug. Update History PG&E Transmission Interconnection Hbook Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug. 11, 2004 Parallel/Parallel Test Procedure. Addition of F-35 GE device to Table G2-4

More information

Standard INT Interchange Authority Distributes Arranged Interchange

Standard INT Interchange Authority Distributes Arranged Interchange Standard INT-005-2 Authority Distributes A. Introduction 1. Title: Authority Distributes 2. Number: INT-005-2 3. Purpose: To ensure that the implementation of between Source and Sink Balancing Authorities

More information

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE Rob Stephen President Cigre AFSEC conference March 2017 CIGRE Founded in 1921, CIGRE, the Council on Large Electric Systems, Our Mission:To be the world s foremost

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Power delivery Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Forward-thinking power grid design This evolution has

More information

Specific topics covered in this brief include:

Specific topics covered in this brief include: April 2008 Summary Welcome to the Fifteenth National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 28, 2008, Transmission Update conference

More information

RPS Quick Reference Guide

RPS Quick Reference Guide The RPS Quick Reference Guide was designed to help users navigate through the Renewable Energy Facility Application Tracking System while highlighting important notes and features. Table of Contents Logging

More information

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection

More information

SIGUARD System for Phasor Data Processing

SIGUARD System for Phasor Data Processing SIGUARD System for Phasor Data Processing Real Time Visualization and Disturbance Recording Dan Murray Siemens Energy, Inc. System Description SIGUARD is a software-based Phasor Data Concentrator Data

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Public Table of contents 1 Connection Framework... 3 2 Connection Types...

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1 OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling

More information

Web Page. Advertisement for SCADA System Manager post

Web Page. Advertisement for SCADA System Manager post Web Page Advertisement for SCADA System Manager post SCADA System Manager Closing Date: 9 June 2017 Job Category: Technical Job Location: Sophia, Georgetown Job Schedules: Employed --- Contents ---------------------------------------------------------------------------------------------------------------------

More information

Studies Overview and Data Requirements. Robert Pan

Studies Overview and Data Requirements. Robert Pan Studies Overview and Data Requirements Robert Pan Outline 1. Introduction 2. BC Transmission System 3. BCTC Studies for Clean Power Call 4. Data Requirements for Interconnection Studies 5. Application

More information

JEA. Facility Connection Requirements

JEA. Facility Connection Requirements JEA Facility Connection Requirements April 2008 January 14 th, 2006 1/22 JEA Facility Connection Requirements TABLE OF CONTENTS 1.0 Introduction and Scope 1.1 Generation Facilities 1.2 Transmission Facilities

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

Pierre Sebellin. Systems Technical Officer International Electrotechnical Commission

Pierre Sebellin. Systems Technical Officer International Electrotechnical Commission Pierre Sebellin Systems Technical Officer International Electrotechnical Commission Introduction IEC is a global organization that publishes consensus-based international Standards and manages Conformity

More information

WN U-60 Original Sheet No. 152

WN U-60 Original Sheet No. 152 WN U-60 Original Sheet No. 152 Table of Contents INTERCONNECTION WITH ELECTRIC GENERATORS 1) Introduction Sheet 152-A 2) Attachments Sheet 152-A 3) Definitions Sheet 152-B 4) Applicability Sheet 152-H

More information

Internal Audit Follow-Up Report. Multiple Use Agreements TxDOT Office of Internal Audit

Internal Audit Follow-Up Report. Multiple Use Agreements TxDOT Office of Internal Audit Internal Audit Follow-Up Report Multiple Use Agreements TxDOT Office of Internal Audit Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously communicated

More information

Introduction to Generation Availability Data System (GADS) Wind Reporting

Introduction to Generation Availability Data System (GADS) Wind Reporting Introduction to Generation Availability Data System (GADS) Wind Reporting Registration and Reporting Fundamentals Donna Pratt, Performance Analysis Manager-Data Analytics NERC Webinar April 26, 2017 Topics

More information

State of Minnesota Interconnection Process for Distributed Generation Systems

State of Minnesota Interconnection Process for Distributed Generation Systems State of Minnesota Interconnection Process for Distributed Generation Systems Introduction This document has been prepared to explain the process established in the State of Minnesota, to interconnect

More information

SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR

SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR TM A N A LY T I C S S O F T WA R E S U I T E GridMaestro SCADA GridMaestro Master Controller GridMaestro SSE - Stacked Services Emulator

More information

State of Minnesota Interconnection Process for Distributed Generation Systems

State of Minnesota Interconnection Process for Distributed Generation Systems State of Minnesota Interconnection Process for Distributed Generation Systems Introduction This document has been prepared to explain the process established in the State of Minnesota, to interconnect

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted By Company Date Submitted Shannon Eddy (shannon@consciousventuresgroup.com) Rachel Gold (Rachel@consciousventuresgroup.com) Large-scale Solar Association (LSA) December

More information

New Brunswick 2018 Annual Implementation Plan Version 1

New Brunswick 2018 Annual Implementation Plan Version 1 New Brunswick Energy and Utilities Board Reliability Standards, Compliance and Enforcement Program New Brunswick 2018 Annual Implementation Plan Version 1 December 28, 2017 Table of Contents Version History...

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

Go SOLAR Online Permitting System A Guide for Applicants November 2012

Go SOLAR Online Permitting System A Guide for Applicants November 2012 Go SOLAR Online Permitting System A Guide for Applicants November 2012 www.broward.org/gogreen/gosolar Disclaimer This guide was prepared as an account of work sponsored by the United States Department

More information

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

Software Technologies

Software Technologies The Power of Trust. The Future of Energy. MAINTAINING GRID SECURITY Analysis tools for off-line and on-line Dynamic Security Assessment 02 Maintaining grid security is a fundamental requirement for power

More information

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network

More information

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Minnesota DER Interconnection Process Kristi Robinson, P.E. Minnesota DER Interconnection Process Kristi Robinson, P.E. 6841 Power Lane SW Alexandria, Minnesota Tel 320.762.1697 Fax 320.762.1479 www.star-energy.com eee@star-energy.com Spring 2017: Petition made

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

Description of the Application Process for Small Embedded Generators

Description of the Application Process for Small Embedded Generators Description of the Application Process for Small Embedded Generators This document describes the Application Process for Small Embedded Generators (as required under section 5.3.3A of the National Electricity

More information

DVB S OPERATOR STANDARDS FOR THE INTEGRATED GLOBAL DATA DISSEMINATION SERVICE (IGDDS)

DVB S OPERATOR STANDARDS FOR THE INTEGRATED GLOBAL DATA DISSEMINATION SERVICE (IGDDS) WMO CGMS DVB S OPERATOR STANDARDS FOR THE INTEGRATED GLOBAL DATA DISSEMINATION SERVICE (IGDDS) Version 1, April 2009 Table of Contents 1 INTRODUCTION... 3 1.1 Purpose and Scope... 3 1.2 Structure of the

More information

Facility Connection Requirements

Facility Connection Requirements SEMINOLE ELECTRIC COOPERATIVE, INC. Facility Connection Requirements BULK ELECTRIC SYSTEM FACILITIES Facility Connection Requirements Page 1 of 19 Table of Contents 1. GENERAL CONNECTION REQUIREMENTS...

More information

DS3 Ambitious approach to future network requirements. Mo Cloonan Commission for Energy Regulation, Ireland

DS3 Ambitious approach to future network requirements. Mo Cloonan Commission for Energy Regulation, Ireland DS3 Ambitious approach to future network requirements Mo Cloonan Commission for Energy Regulation, Ireland 1 Overview Irish/N.Irish power system and policy objectives Operational challenges for Ireland-

More information

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide REVISION HISTORY VERSION NO. (Must match header) DATE REVISED BY DESCRIPTION 1.0 6/6/2016 EDAS Created Document 1.1 6/29/2016 EDAS Updates to include all Meter Work and instruction 1.2 8/29/2016 EDAS Included

More information

A Regulatory Perspective on Distributed Generation

A Regulatory Perspective on Distributed Generation A Regulatory Perspective on Distributed Generation Southwest Electrical Metering Association Spring Meeting Galveston June 10, 2015 Darryl Nelson Rates and Regulatory Agenda Why Rules are Needed Texas

More information

Glencoe Light and Power

Glencoe Light and Power Glencoe Light and Power REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS 1 Table of Contents Page I. INTRODUCTION...5 A. Authority... 5 B. Objectives...5 C. Interconnection

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

Bay Area Regional Bicycle Share Pilot Project. Karen Schkolnick, BAAQMD SPUR Evening Forum: Bike Sharing Around the Bay June 25, 2013

Bay Area Regional Bicycle Share Pilot Project. Karen Schkolnick, BAAQMD SPUR Evening Forum: Bike Sharing Around the Bay June 25, 2013 Bay Area Regional Bicycle Share Pilot Project Karen Schkolnick, BAAQMD SPUR Evening Forum: Bike Sharing Around the Bay June 25, 2013 1 Overview Pilot Project Background and Goals Roadmap, Regional Process

More information

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document Western Area Power Administration (WAPA) Transmission System Policy Document This Business Practice documents the Western Area Power Administration (WAPA) policy, as implemented by WAPA s Power System

More information

TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM

TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM Version 1.2 May 28, 2009 Transmission Planning Department Revisions Rev. No. Date Description By Approval 1.0 8/10/06

More information

THE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM

THE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM CUSC EXHIBIT W THE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM DIRECTLY CONNECTED POWER STATION EMBEDDED POWER STATION INTERCONNECTOR OWNER DISTRIBUTION INTERCONNECTOR Please

More information

Electric Utility Facility Connection Requirements

Electric Utility Facility Connection Requirements City of Coffeyville Municipal Light and Power Electric Utility Facility Connection Requirements Approved: Date: Version Date Change Tracking Reviewer/Editor 1.0 June, 2010 Original document. Steve McGie

More information

Settlement Agent Self Registration User Guide. Settlement Agents step by step action guide for Agency Registration

Settlement Agent Self Registration User Guide. Settlement Agents step by step action guide for Agency Registration Settlement Agent Self Registration User Guide Settlement Agents step by step action guide for Agency Registration 8/31/2015 Table of Contents What is Closing Insight 2 Agency Registration..2 Next Steps.20

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting August 22, 2017 Julia Payton BPM Change Management Process BPM_CM@caiso.com Agenda BPM Change Management Meeting, August 22, 2017 Topic Introduction/meeting overview Discussion

More information