Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release

Size: px
Start display at page:

Download "Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release"

Transcription

1 Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release : September 6Feburary 6,

2 Revision History Date Description 10/23/ Initial document release related to the Spring 2014 Release (FERC764 and RIMPR projects). This is red-lined based on the CMRI Fall/December 2013 Release GMT Implementation document. 11/20/ Eliminated the retrieveeirforecast service from the spring 2014 CMRI API specifications document. DA & HA forecasts will be from the PIRP system. 03/31/ Fall 2014 Changes. 1. RequestMarketAwards_v3.xsd Added new enumeration value IEEA for product Added new enumeration value for RTD for executiontype 2. MarketAwards_v3.xsd Added new enumeration value IEEA for product Added tiepointusedforflow element Added new enumeration value for RTD for executiontype 3. RequestSchedulePrices_v3.xsd Added new enumeration value IEEA for product Added new enumeration value for RTD for executiontype Added new enumeration value GHG for pricetype 4. RequestMarketSchedules_v2.xsd Added new enumeration value IEEA for product Added new enumeration value for RTD for executiontype Added tiepointusedforflow element 5. Added new service for EIM Transfer Results 6. Added new service for EIM Test Results 7. Added new service for Load Base Schedules 8. Added new service for EIM Entity market base schedules 9. Added new service for Market Base schedules 10. Updated resource id description for all the services. 04/29/ Additional Fall 2014 Changes 1. Added new service for CMRI Inter-tie resource transaction id 2. Added new service for EIM Entity CMRI Inter-tie resource transaction id 3. Updated EIMTranferResult service 4. Updated EIMTestResult service 5. Updated LoadBase schedule service 6. Updated EIM entity market base schedule and market base schedule services 7. EIM Transfer results has been renamed as EIM Transfer 8. Updated the service Retrieve Convergence Bid Awards 06/17/ Additional Fall 2014 Changes 1. EIM Test Results -added inputtimetype element enumerations Page 2 of 175

3 Date Description 2. EIM Transfer - Removed resource, and scheduling point elements 3. Updated EIM market base schedule and market base schedule services to add note on execution type element description. 4. Updated Market Schedule service to remove the RC enumeration for product element. 5. Update CMRIInterTieResourceTransactionID request to remove datetimestart and End and markettype elements. 08/12/ Additional Fall 2014 Changes 1. Updated schedule price request and response element tables to change the markettype value from RTD to RTM 2. Updated Load Base Schedules request and response sections to add inputtimetype element. 3. Changed executiontype element to optional element in EIM Entity Market Base Schedules Response. 4. Changed executiontype element to optional element in Market Base Schedules Response. 5. Updated both EIM Entity CMRI Inter-tie Resource Transaction ID and CMRI Inter-tie Resource Transaction ID Response sections for the following changes AlternativeSchedulingPoint/mrid - remove PrimarySchedulingPoint/mrid - remove sequenceidentifier - remove PrimaryFlowgate/mrid - add, required SecondaryFlowgate/mrid - add, optional purchaseserviceentity - add, required 6. Added a note to the Market Schedules Request End element. 7. Added a note to the Market Awards Request End element. 8. Added a note to the Schedule Prices Request End element. 03/31/ Fall 2015 Changes 1. Updated EIM Test results serive to include two additional optional elements (additionalincrementalrequirement and additionaldecrementalrequirement), updated MessageHeader as required element and major version is now v2 2. Added a note to the EIM Transfer service to indicate that this service no longer provides data beginning Fall 2015 deployment 3. Added new service for EIM Transfer Limit 4. Added new service for EIM Bid Capacity Percentage Page 3 of 175

4 Date Description Convergence Bid Awards Response 08/14/ Document modifications include: 1. te: There is no xsd change under Fall 2015, only documentation update in this document revision. Corrected primaryschedulingpoint to flowgate name under the Response section, to align with its corresponding v2 xsd released back in Fall Updated section 1.1 Purpose, from "CAISO" to "Customer" Updated section 1.2 Related Documents, to refer to the release planning page Updated section 2.1 Document Release notes Corrected the request and/or response schedulingcoordinator element document description to be the EIM entity ID for the following services: o EIMTransfer o EIM Test Results o EIM Load Base Schedules o EIMEntityCMRIIntertieResourceTransactionID o EIMEntityMarketBaseSchedules o BidCapacityPercentage te: These are all document text updates only, existing service output value have no changes. Corrected the HighLimit description on the EIMTransferLimit service Added the EIMEntityTransferLimit service Added notation on the request.start and request.end for the EIM Bid Capacity Percentage service 02/03/ Added the RetrieveEIRForecast service which provides the day-ahead/hour-ahead Eligible Intermittent Resource forecast 04/11/ Fall 2016 Release changes Updated MPM Results service to include RTD 5 min market values Updated Expected Energy Allocation details service to add a new enumeration value (FCS Forecast) to market service type. Updated Schedule Prices service to include additional product enumeration values and also pricetype enumeration values Updated MarketAwards to add FRU/FRD product enumeration; CLEARED scheduletype enumeration Added the following new services: o retrievegreenhousegascapdata o retrieveeiminterchangescheduledata o retrieveelectricitypriceindex o retrieveresourcelevelmovement o retrieveresourcemovementpoint 06/02/ Fall 2016 Release additional changes Updated MarketSchedules to add FRU/FRD product enumeration; CLEARED scheduletype enumeration, to both request and response; For requestmarketschedules version 3, header is required Updated EIMTestResults, to add requirementamount on all of the tests except the Transmission test 07/20/ Fall 2016 Release document corrections/updates SchedulePrices response - removed the Product enumeration values: FM,FMU,FMD,UM,UMU,UMD Page 4 of 175

5 Date Description EIR Forecast request - updated the SC list definition, to either be the SCID or the ACL group identifier EIR Forecast response - updated the SC definition, that the SCID will be the owner of the resource 08/16/ Fall 2016 Release Updated the SchedulePrices v4 service, that request for RTUC/15min results is max of one hour only 10/31/ Production vember 2016 Release Updated ResourceMovementPoint and ResourceLevelMovement API service request, to be a maximum of one hour only. 04/12/ Fall 2017 Release Added Daily Electricity Price Index service ( Part of BREB ) Added Actual Limitation Values service ( Part of CCE 3) Added Resource Opportunity Cost ( Part of CCE 3) Added External Default Commitment Cost ( Part of EIM 2017) Updated Document Release tes section to include service versions and upcoming changes. Added XML Element Data type section to list frequently used elements and data types 04/24/ Fall 2017 Release Second Iteration Added GasBurnResourceData service ( Part of Gas Burn & GenDB ) Added GasBurnSummaryData service ( Part of Gas Burn & GenDB ) 06/27/ Fall 2017 Release Third Iteration Updated Resource Opportunity Cost Request to add markettype element Updated Resource Opportunity Cost Response to add schedulingcoordinator element Updated DailyElectricityPriceIndex o Removed timeperiod element o Added markettype element to request and response o Added intervalstarttime and intervalendtime to response Updated GasBurnResourceData and GasBurnSummaryData Response schema s gasburn element type to float Updated EIMEntityMarketBaseSchedules Request and Response to add resourcetype element Updated MarketBaseSchedules Request and Response to add resourcetype element 10/26/ Fall 2017 Release Fourth Iteration Page 5 of 175

6 Date Description 11/06/ Winter 2017 Release Added EIMBidCapacityPercentage_v2 service ( Part of EIM 2017 ) Updated GasBurnSummaryData Request and Response to add valid enumeration values for executiontype and added gascompany element to the Response xsd Updated GasBurnResourceData Request and Response to add valid enumeration values for executiontype Updated ResourceOpportunityCost Request xsd to add opportunitycostgranularity element and updated markettype element in response xsd from required to optional. Updated MarketBaseSchedule and EIMEntityMarketBaseSchedule request xsd specifitaion to indicate valid resourcetype enumeration values Added Resource Ramp Capacity service 01/31/ Winter 2017 Release Second Iteration 8/13/ Fall 2018 Release Updated ResourceRampCapacity response to add configuration element ResourceOpportunityCost_v1.xsd Add element opportunitycostgranularity ResourceOpportunityCost_v1.xsd Update element uselimittype to include TRANSITION Production data availability Information Flexible Ramping Constraint Capacity - Data will not be available starting 11/1/2016 (Fall 2016) HASP Schedules - Data will not be available starting 5/1/2014 (FERC 764 Spring 2014). RTD Resource Level Movement - Data will not be available starting 11/1/2016 (Fall 2016) EIM Transfer - Data will not be available starting 11/4/2015 (Fall 2015) Bid Capacity Percentage Data will not be available starting 5/1/2017 EIM Bid Capacity Data is available starting 1/1/2018 9/6/ Fall 2018 Release Revision 1 Added CRR Revenue Adjustment Data service Formatted Table 2/6/ Independent Release 2019 Add CRR Revenue Adjustment Details service Page 6 of 175

7 TABLE OF CONTENTS 1 Introduction Purpose Related Documents Document Release tes x x x Retrieve Conformed Dispatch tice Operation Details Conformed Dispatch tice Request Element Table Conformed Dispatch tice Response Element Table Retrieve Contract Usage Operation Details Contract Usage Request Element Table Contract Usage Response Element Table Retrieve Convergence Bid Awards Operation details Convergence Bid Awards Request Element Table Convergence Bid Awards Response Element Table Retrieve CRR Adjustment Constraints Operation Details CRR AdjustmentConstraints Request Element Table CRR AdjustmentConstraints Response Element Table Retrieve CRR Adjustment Flow Impact Operation Details Page 7 of 175

8 7.2 CRR Adjustment FlowImpact Request Element Table CRR AdjustmentFlowImpact Response Element Table Retrieve CRR Adjustment Prices Operation Details CRR AdjustmentPrices Request Element Table CRR AdjustmentPrices Response Element Table Retrieve Default Bid Curves Operation Details Default Bid Curves Request Element Table Default BidCurves Response Element Table Retrieve Default RMR Costs Operation Details Default RMR Costs Request Element Table Default RMR Costs Response Element Table Retrieve Expected Energy Operation Details Expected Energy Request Element Table Expected Energy Response Element Table Retrieve Expected Energy Allocation Details Operation Details ExpectedEnergyAllocationDetails Request Element Table ExpectedEnergyAllocationDetails Response Element Table Retrieve Finally Qualified Load Following Capacity Operation Details Page 8 of 175

9 13.2 Finally Qualified Load Following Capacity Request Element Table Finally Qualified Load Following Capacity Response Element Table Retrieve Flex Ramp Capacity Operation Details Flex Ramp Capacity Request Element Table Flex Ramp Capacity Response Element Table Retrieve ISO Commitment Cost Details Operation Details ISO Commitment Cost Details Request Element Table ISO Commitment Cost Details Response Element Table Retrieve Market Awards Operation Details Market Awards Request Element Table Market Awards Response Element Table Retrieve MPM Results Operation Details MPM Results Request Element Table MPM Results Response Element Table Retrieve RMR Dispatches Operation Details RMR Dispatches Request Element Table RMR Dispatches Response Element Table Retrieve Schedule Prices Operation Details Page 9 of 175

10 19.2 Schedule Prices Request Element Table Schedule Prices Response Element Table Retrieve Start Up Shut Down Instructions Operation Details Start Up Shut Down Instructions Request Element Table Start Up Shut Down Instructions Response Element Table Retrieve Two Day Ahead MSSA Load Forecast Operation Details Two Day MSSA Load Forecast Request Element Table Two Day MSSA Load Forecast Response Element Table Retrieve Unit Commitments Operation Details Unit Commitments Request Element Table Unit Commitments Response Element Table Retrieve n Dispatchable Time Ranges Operation Details n Dispatchable Time Ranges Request Element Table n Dispatchable Time Ranges Response Element Table Retrieve Market Schedules Operation Details Market Schedules Request Element Table Market Schedules Response Element Table Retrieve Market Forecast Operation Details Page 10 of 175

11 25.2 Market Forecast Request Element Table Market Forecast Response Element Table Retrieve EIM Transfer Operation Details EIM Transfer Request Element Table EIM Transfer Response Element Table Retrieve EIM Test Results Operation Details EIM Test Results Request Element Table EIM Test Results Response Element Table Retrieve Load Base Schedules Operation Details Load Base Schedules Request Element Table Load Base Schedules Response Element Table Retrieve EIM Entity Market Base Schedules Operation Details EIM Entity Market Base Schedules Request Element Table EIM Entity Market Base Schedules Response Element Table Retrieve Market Base Schedules Operation Details Market Base Schedules Request Element Table Market Base Schedules Response Element Table Retrieve CMRI Inter-tie Resource Transaction ID Operation Details Page 11 of 175

12 31.2 CMRI Inter-tie Resource Transaction ID Request Element Table CMRI Inter-tie Resource Transaction ID Response Element Table Retrieve EIM Entity CMRI Inter-tie Resource Transaction ID Operation Details EIM Entity CMRI Inter-tie Resource Transaction ID Request Element Table EIM Entity CMRI Inter-tie Resource Transaction ID Response Element Table Retrieve EIM Transfer Limit Operation Details EIM Transfer Limit Request Element Table EIM Transfer Limit Response Element Table Retrieve EIM Entity Transfer Limit Operation Details EIM Entity Transfer Limit Request Element Table EIM Entity Transfer Limit Response Element Table Retrieve EIM Bid Capacity Percentage Operation Details EIM Bid Capacity Percentage Request Element Table EIM Bid Capacity Percentage Response Element Table Retrieve EIR Forecast Operation Details EIR Forecast Request Element Table EIR Forecast Response Element Table Retrieve EIM Interchange Schedule Data Operation Details Page 12 of 175

13 37.2 EIM Interchange Schedule Data Request Element Table EIM Interchange Schedule Data Response Element Table Retrieve Greenhouse Gas Cap Data Operation Details Greenhouse Gas Cap Data Request Element Table Greenhouse Gas Cap Data Response Element Table Retrieve Electricity Price Index Operation Details Electricity Price Index Request Element Table Electricity Price Index Response Element Table Retrieve Resource Level Movement Operation Details Resource Level Movement Request Element Table Resource Level Movement Response Element Table Retrieve Resource Movement Point Operation Details Resource Movement Point Request Element Table Resource Movement Point Response Element Table Retrieve Daily Electricity Price Index Operation Details Daily Electricity Price Index Request Element Table Daily Electricity Price Index Response Element Table Retrieve Actual Limitation Values Operation Details Page 13 of 175

14 43.2 Actual Limitations Values Request Element Table Actual Limitation Values Response Element Table Retrieve External Default Commitment Cost Operation Details External Default Commitment Cost Request Element Table External Default Commitment Cost Response Element Table Retrieve Resource Opportunity Cost Operation Details Resource Opportunity Cost Request Element Table Resource Opportunity Cost Response Element Table Retrieve Gas Burn Resource Data Operation Details Gas Burn Resource Data Request Element Table Gas Burn Resource Data Response Element Table Retrieve Gas Burn Summary Data Operation Details Gas Burn Summary Data Request Element Table Gas Burn Summary Data Response Element Table Retrieve EIM Bid Capacity Percentage v Operation Details EIM Bid Capacity Percentage Request Element Table EIM Bid Capacity Percentage Response Element Table Retrieve Resource Ramp Capacity Operation Details Page 14 of 175

15 49.2 Resource Ramp Capacity Request Element Table Resource Ramp Capacity Response Element Table Retrieve CRR Revenue Adjustment Data Operation Details CRR Revenue Adjustment Data Request Element Table CRR Revenue Adjustment Data Response Element Table Retrieve CRR Revenue Adjustment Details Operation Details CRR Revenue Adjustment Details Request Element Table CRR Revenue Adjustment Details Response Element Table Fault Return Fault Return Element Table XML Element Reference Data Type Facets Element Table Schema (StandardOutput.xsd) Appendix Data Type Page 15 of 175

16 1 Introduction 1.1 Purpose This document describes request and response XSDs related to the Customer Market Results Interface (CMRI) system. 1.2 Related Documents For more information on current or past project initiative releases, please refer to the release planning page at Page 16 of 175

17 2 Document Release tes x This document release version affects the following system data interface specifications: # Service Schema RequestResourceForecast_v1.xsd 1 new retrieveeirforecast ResourceForecast_v1.xsd # Major Minor 1 v x This document release version affects the following system data interface specifications. The following interface specifications are initial versions. The ISO intends to publish any changes to these interface specifications six weeks prior to the start of market simulation. # Service Schema 1 new retrieveresourcerampcapacit y_v1 RequestResourceRampCapacity_v 1.xsd ResourceRampCapacity_v1.xsd # Major Minor 1 v The following interface specifications are currently in planning phase and more details will become available over the next few weeks. # Service Major # Minor 1 Upcoming new service retrieveintervalregulationmileage 1 v Page 17 of 175

18 x This document release version affects the following system data interface specifications. The following interface specifications are initial versions. The ISO intends to publish any changes to these interface specifications six weeks prior to the start of market simulation. # Service Schema 1 new 2 new retrievecrrrevenueadjustme ntdata_v1 retrievecrrrevenueadjustme ntdetails_v1 CRRRevenueAdjustmentData_v1.x sd RequestCRRRevenueAdjustmentD ata_v1.xsd CRRRevenueAdjustmentDetails_v1.xsd RequestCRRRevenueAdjustmentD etails_v1.xsd # Major Minor 1 v v Page 18 of 175

19 3 Retrieve Conformed Dispatch tice 3.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation Message Types Message WSDL XSD Retrieve ConformedDispat chtice Input Output RetrieveConformedDispat chticerequest retrieveconformeddispatc htice_docattachreque st RetrieveConformedDispat chticeresponse retrieveconformed Dispatchtice_v 1.wsdl retrieveconformed Dispatchtice_v 1_DocAttach.wsdl RequestConformedDispat chtice_v1.xsd ConformedDispatchtice _v1.xsd retrieveconformeddispatc htice_docattachrespo nse Fault faultreturntype StandardOutput.xsd 3.2 Conformed Dispatch tice Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload Start Starting DateTime of the time period for which the data is End Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. scheduling Coordinator The unique identifier for a scheduling coordinator (SC). Page 19 of 175

20 resource The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) 3.3 Conformed Dispatch tice Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload ConformedDisptice class Minor Identifier; Date reflecting the release this latest version update was related to. resource (in ConformedDisptice class) Scheduling Coordinator tradedate HR The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) The unique identifier for a scheduling coordinator (SC). The trade day to which the current record pertains (in California Prevailing Time). The hour of the trade day to which the current record pertains (in California Prevailing Time). date integer intervalstarttime Start time of the market interval intervalendtime End time of the market interval VoltageSupport Flag Voltage Support Flag. This field indicates if the unit was dispatched for voltage support. Valid values are Y (for yes) and N (for no). dispatchmw DEC MW value dispatched for local voltage support float UnitSubstitution Page 20 of 175

21 Precedence resource (in SubstitutableUnit class) The precedence for unit substitution. The lower number has a higher precedence. The unique identifier for the substituting resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) integer MW Scheduled MW value for the substituting resource. float DayAheadResult energy (in DayAheadResults class) Sum of energy schedules in the Day-Ahead market. float spin Sum of Ancillary Service Spinning Awards. float nonspin Sum of Ancillary Service n-spinning Awards. float regup Sum of Ancillary Service Regulation Up Awards. float regdown Sum of Ancillary Service Regulation Down Awards. float RMRDispatch (in DayAheadResults class) CCR (in DayAheadResults class) RealTimeResult Dispatched/scheduled value that was either manually or generated by the market run, pursuant to the RMR Contract. Corresponds to the Competitive Constraint Run value for the Day-Ahead market float float RMRDispatchEnergy Total (in RealTimeResults class) Sum (six intervals) of the RMR Dispatch Energy float CCR (in RealTimeResults class) Corresponds to the Competitive Constraint Run value for the Real-Time market float RMRDispatchEnergy intervalnum energy (in RMRDispatchEnergy class) The interval number. An interval represents a specific part of a trade hour to which the current record pertains. A trade hour may comprise of one or more intervals, of equal duration, based on the interval duration. For example, if the interval duration is 60 minutes, the trade hour will comprise of only one interval of 60 minutes. If, on the other hand, the interval duration is 15 minutes, the trade hour will comprise of four intervals of 15 minutes each. The intervals are numbered sequencially starting with the earliest one numbered 1. integer RMR Dispatch Energy per 10-minute intervals. float Page 21 of 175

22 dispatchintervalstartt ime dispatchintervalendti me Start time of the dispatch energy interval End time of the dispatch energy interval Page 22 of 175

23 4 Retrieve Contract Usage 4.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation Message Types Message WSDL XSD retrievecontract Usage Input retrievecontractus agerequest retrievecontractusage_ v2.wsdl RequestContractUsage _v2.xsd Output retrievecontractus age_docattachreq uest retrievecontractus ageresponse retrievecontractusage_ v2_docattach.wsdl ContractUsage_v2.xsd retrievecontractus age_docattachres ponse Fault faultreturntype StandardOutput.xsd 4.2 Contract Usage Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload Start Starting DateTime of the time period for which the data is End Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. Page 23 of 175

24 markettype The identifier for the market type. Only one market type is allowed in the request. Valid values are DAM (for day ahead market), and RTM (for real-time market) scheduling CoordinatorList The unique identifier for a scheduling coordinator (SC). At least one SCID is required. resourcelist The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) 4.3 Contract Usage Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. resource scheduling Coordinator The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) The unique identifier for a scheduling coordinator (SC). markettype The identifier for the market type. Valid values are DAM (for day ahead market), and RTM (for real-time market) tradedate The trade day to which the current record pertains (in California Prevailing Time). date HR The hour of the trade day to which the current record pertains (in California Prevailing Time). integer Page 24 of 175

25 intervalnum The interval number. An interval represents a specific part of a trade hour to which the current record pertains. A trade hour may comprise of one or more intervals. In the case of the CRN report, it would be 1 to 6 intervals per hour; covering a 10-minute interval duration period. integer MW Refers to the self-schedule quantity in MW float contracttype Refers to the contract type of the self-schedule transaction ; represented as: contractreferencenu mber ETC - Existing Transmission Contract TOR - Transmission Ownership Rights Refers to the specific contract identification number issued by the California ISO to Scheduling Coordinators transactions under Existing Contracts or TORs (Transmission Ownership Rights). intervalstarttime Start time of the market interval intervalendtime End time of the market interval Page 25 of 175

26 5 Retrieve Convergence Bid Awards 5.1 Operation details The service has one operation with three message types. All input and output messages are in XML format. Operation retrieveconverg encebidawards Message Types Input Output Message WSDL XSD retrieveconvergenc ebid AwardsRequest retrieveconvergenc ebidawards_docat tachrequest RetrieveConvergen cebid AwardsResponse retrieveconvergenc ebidawards_docat tachresponse retrieveconvergencebid Awards_v2.wsdl retrieveconvergencebid Awards_v2_DocAttach. wsdl RequestConvergenceBi dawards_v2.xsd ConvergenceBidAwards _v2.xsd Fault faultreturntype StandardOutput.xsd 5.2 Convergence Bid Awards Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor version identifier; Date reflecting the release this latest version update was related to. Message Payload Start End scheduling Coordinator Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The list of the unique identifier for a scheduling coordinator (SC). Page 26 of 175

27 Pnode The list of Pde or APde ID associated with the node where convergence bidding occurred virtualbidtype Indicates whether this is a virtual demand or supply bid. Valid values are: VIRTUAL SUPPLY or VIRTUAL DEMAND 5.3 Convergence Bid Awards Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor version identifier; Date reflecting the release this latest version update was related to. Pnode isintertie Scheduling Coordinator flowgate tradedate virtualbidtype HR The Pde or APde ID associated with the node where convergence bidding occurred The flag indicating whether the award is for an intertie or not. Valid Values: indicates that the award is for an intertie indicates that the award is not for an intertie The unique identifier for a scheduling coordinator (SC). Primary Tie Required if the virtual bid Pnode or Apnode is external to CAISO: this is modeled as a flowgate with either the to or from being an external HostControlArea The trade day to which the current record pertains (in California Prevailing Time). Indicates whether this is a virtual demand or supply bid. Valid values are: VIRTUAL SUPPLY or VIRTUAL DEMAND The hour of the trade day to which the current record pertains (in California Prevailing Time). date integer MW This is the cleared convergence bid MW float Page 27 of 175

28 intervalstarttime Start time of the market interval intervalendtime End time of the market interval Page 28 of 175

29 6 Retrieve CRR Adjustment Constraints 6.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation RetrieveCRRAdj ustmentconstrai nts Message Types Input Output Message WSDL XSD retrievecrradjustm entconstraintsreque st retrievecrradjustm entconstraints_doca ttachrequest" retrievecrradjustm entconstraintsrespo nse retrievecrradjustm entconstraints_doca ttachresponse retrievecrradjustme ntconstraints_v1.wsdl retrievecrradjustme ntconstraints_v1_do cattach.wsdl RequestCRRAdjustmentD ata_v1.xsd CRRAdjustmentData_v1.x sd Fault faultreturntype StandardOutput.xsd 6.2 CRR AdjustmentConstraints Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. Start End Scheduling CoordinatorList Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The list of the unique identifier for a scheduling coordinator (SC). Page 29 of 175

30 ConstraintList The list of unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding 6.3 CRR AdjustmentConstraints Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload te: The response CRRAdjustmentData schema is used for all three following services: CRRAdjustmentPrices, CRRAdjustmentConstraints, and CRRAdjustmentFlowImpact. The data elements described below are those relevant in providing the output for the retrievecrradjustmentconstraints service only. tradedate The market trading day on when the CRR settlement rule is applicable on date schedulingcoordinato r Unique identifier of the scheduling coordinator certified by the CAISO to submit convergence bids via a convergence bidding agreement name The unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding node The Full Network Model node identifier associated with the transmission constraint HR HASPPhysical The hour of the trade day to which the current record pertains (in California Prevailing Time). Flag indicating either of the following: integer YES = Denotes that the node s impact to the CRR settlement rule was due to physical bidding activity, that is reduced in the HASP market NO = Denotes that the node s impact to the CRR settlement rule was due to convergence bidding activity Page 30 of 175

31 intervalstarttime Start time of the market interval intervalendtime End time of the market interval Page 31 of 175

32 7 Retrieve CRR Adjustment Flow Impact 7.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation RetrieveCRRAdj ustmentflowimp act Message Types Input Output Message WSDL XSD retrievecrradjustm entflowimpactreque st retrievecrradjustm entflowimpact_doca ttachrequest retrievecrradjustm entflowimpactrespo nse retrievecrradjustm entflowimpact_doca ttachresponse retrievecrradjustme ntflowimpact_v1.wsd l retrievecrradjustme ntflowimpact_v1_do cattach.wsdl RequestCRRAdjustmentD ata_v1.xsd CRRAdjustmentData_v1.x sd Fault faultreturntype StandardOutput.xsd 7.2 CRR Adjustment FlowImpact Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. Start End Scheduling CoordinatorList Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The list of the unique identifier for a scheduling coordinator (SC). Page 32 of 175

33 ConstraintList The list of unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding 7.3 CRR AdjustmentFlowImpact Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload te: The response CRRAdjustmentData schema is used for all three following services: CRRAdjustmentPrices, CRRAdjustmentConstraints, and CRRAdjustmentFlowImpact. The data elements described below are those relevant in providing the output for the retrievecrradjustmentflowimpact service only. tradedate schedulingcoordinato r CBEMGroup name HR MW The market trading day on when the CRR settlement rule is applicable on Unique identifier of the scheduling coordinator certified by the CAISO to submit convergence bids via a convergence bidding agreement The convergence bidding entity group name that coincides with a CRR Holder Name The unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding The hour of the trade day to which the current record pertains (in California Prevailing Time). The total hourly amount of flow (MW) impacted by the CRR settlement rule date integer intervalstarttime Start time of the market interval intervalendtime End time of the market interval float Page 33 of 175

34 8 Retrieve CRR Adjustment Prices 8.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation Retrieve CRRAdjustment Prices Message Types Input Output Message WSDL XSD retrievecrradjustm entpricesrequest retrievecrradjustm entprices_docattach Request retrievecrradjustm entpricesresponse retrievecrradjustm entprices_docattach Response retrieve CRRAdjustmentPrice s_v1.wsdl CRRAdjustmentPrice s_v1_docattach.wsdl RequestCRRAdjustmentD atahour_v1.xsd CRRAdjustmentData_v1.x sd Fault faultreturntype StandardOutput.xsd 8.2 CRR AdjustmentPrices Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload Start End Scheduling CoordinatorList Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The list of the unique identifier for a scheduling coordinator (SC). ConstraintList The list of unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding Page 34 of 175

35 8.3 CRR AdjustmentPrices Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. te: The response CRRAdjustmentData schema is used for all three following services: CRRAdjustmentPrices, CRRAdjustmentConstraints, and CRRAdjustmentFlowImpact. The data elements described below are those relevant in providing the output for the retrievecrradjustmentprices service only. tradedate The market trading day on when the CRR settlement rule is applicable on date schedulingcoordinato r Unique identifier of the Scheduling Coordinator certified by the CAISO who is a CRR Holder entity name The unique identifier of the transmission constraint that impacted the CRR portfolio due to convergence bidding CRR The CRR unique identifier impacted by the CRR settlement rule due to convergence bidding HR The hour of the trade day to which the current record pertains (in California Prevailing Time). integer Price The calculated price which is the difference between the Day- Ahead and Real-Time due to convergence bidding with impact on the CRR portfolio intervalstarttime Start time of the market interval intervalendtime End time of the market interval float Page 35 of 175

36 9 Retrieve Default Bid Curves 9.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation Retrieve DefaultBid Curves Message Types Input Output Message WSDL XSD retrievedefaultbid CurvesRequest retrievedefaultbidcur ves_docattachreque st retrievedefaultbid CurvesResponse retrievedefaultbidcur ves_docattachrespo nse retrievedefaultbidc urves_v1.wsdl retrievedefaultbidc urves_v1_docattac h.wsdl RequestDefaultBid Curves_v1.xsd DefaultBidCurves_v1.x sd Fault faultreturntype StandardOutput.xsd 9.2 Default Bid Curves Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload Start End markettypelist Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The identifier for the market type. Valid values are DAM (for day ahead market), and RTM (for the HASP reports). Page 36 of 175

37 scheduling CoordinatorList The unique identifier for a scheduling coordinator (SC). defaultbidtypelist This element represents the basis on which the default bid price curve is created. Valid values are COST (for cost basis), LMP (for LMP basis), and NEGOTIATED (for negotiated price as the basis). resourcelist TimePeriodList The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) The time period to which the default bid price curve applies. Valid values are ON_PEAK (for on-peak hours), and OFF_PEAK (for off-peak hours). All 24 hours are set to off-peak on holidays as defined by WSCC On regular days- Monday thru Saturday, hour-ending 7 to hour-ending 22 are on-peak; and the rest of the hours including Sunday is off-peak 9.3 Default BidCurves Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. resource The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) resourcetype The type of resource. Valid values are GEN (for a generating resoruce), LOAD (for a load resource) and ITIE (for an intertie resource). Page 37 of 175

38 configuration scheduling Coordinator markettype tradedate timeperiod The unique identifier for a configuration of an MSG (multistage generator) resource. This element will be populated when the transaction applies to an MSG resource; otherwise this element will not be included in the output payload. The unique identifier for a scheduling coordinator (SC). The identifier for the market type. Valid values are DAM (for day ahead market), and RTM (for the HASP reports). The trade day to which the current record pertains (in California Prevailing Time). The time period to which the default bid price curve applies. Valid values are ON_PEAK (for on-peak hours), and OFF_PEAK (for off-peak hours). All 24 hours are set to off-peak on holidays as defined by WSCC On regular days- Monday thru Saturday, hour-ending 7 to hour-ending 22 are on-peak; and the rest of the hours including Sunday is off-peak date defaultbidtype This element represents the basis on which the default bid price curve is created. Valid values are COST (for cost basis), LMP (for LMP basis), and NEGOTIATED (for negotiated price as the basis). starttime The effective start datetime for the default bid curve (in California Prevailing Time). endtime The effective end datetime for the default bid curve (in California Prevailing Time). adderflag A flag to indicate if bid adder value has been applied to the bid. segmentnum The segment number for the bid price curve. integer MW The MW value for the specified segment of the bid price curve. float price segmentbidtype The price ($ per MW) value for the specified segment of the bid price curve. For a LMP bid, this element represents the bid type of the segment. Valid values are COST (for cost basis), LMP (for LMP basis), and NEGOTIATED (for negotiated price as the basis). float intervalstarttime Start time of the market interval intervalendtime End time of the market interval Page 38 of 175

39 10 Retrieve Default RMR Costs 10.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation RetrieveDefaultR MRCosts Message Types Input Output Message WSDL XSD RetrieveDefaultRMR CostsRequest retrievedefaultrmrc osts_docattachrequ est RetrieveDefaultRMR CostsResponse retrievedefaultrmrc osts_docattachresp onse RetrieveDefaultRMR Costs_v1.wsdl retrievedefaultrmrc osts_v1_docattach.w sdl RequestDefaultRMRCosts _v1.xsd DefaultRMRCosts_v1.xsd Fault faultreturntype StandardOutput.xsd 10.2 Default RMR Costs Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload Start End scheduling CoordinatorList Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The unique identifier for a scheduling coordinator (SC). Page 39 of 175

40 resource The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) 10.3 Default RMR Costs Response Element Table Message Header Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Minor Identifier; Date reflecting the release this latest version update was related to. Message Payload resource Scheduling Coordinator tradedate The unique identifier for a resource. (InterTie resources can be either a registered resource id from MF or by a SIBR formed transaction ID) The unique identifier for a scheduling coordinator (SC). The trade day to which the current record pertains (in California Prevailing Time). date intervalstarttime Start time of the market interval intervalendtime End time of the market interval minloadcost Default minimum load cost. float segmentnum The segment number for the startup cost curve. integer minutes Cooling time in minutes for the segment of the startup cost curve. price Price in dollars for for the segment of the startup cost curve. float float Page 40 of 175

41 11 Retrieve Expected Energy 11.1 Operation Details The service has one operation with three message types. All input and output messages are in XML format. Operation RetrieveExpecte denergy Message Types Input Output Message WSDL XSD RetrieveExpectedEn ergyrequest retrieveexpectedene rgy_docattachreque st RetrieveExpectedEn ergyresponse retrieveexpectedene rgy_docattachrespo nse RetrieveExpectedEne rgy _v1.wsdl retrieveexpectedener gy_v1_docattach.ws dl RetrieveExpectedEne rgy _v2.wsdl RequestExpectedEnergy_ v1.xsd RequestExpectedEnergy_ v2.xsd ExpectedEnergy _v1.xsd ExpectedEnergy _v2.xsd Fault faultreturntype retrieveexpectedener gy_v2_docattach.ws StandardOutput.xsd dl 11.2 Expected Energy Request Element Table Message Header (optional) Application level relevant time and date for when this instance of the message was produced. Source Source system which provides data for this service. Message Payload Minor Identifier; Date reflecting the release this latest version update was related to. Start End scheduling CoordinatorList Starting DateTime of the time period for which the data is Ending DateTime of the time period for which the data is Maximum of 31 days can be included in this report. The unique identifier for a scheduling coordinator (SC). Page 41 of 175

Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release

Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release : 3.5.0 February 3, 2016 Revision History Date Description 10/23/2013 2.0 Initial document release related to the Spring

More information

Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services

Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services (Business Rules v 9.x(Fall 2018) or later) Version: 1.4 December 5, 2018 Revision History Date Version By Description 1.4

More information

OMAR Online Replacement

OMAR Online Replacement Doc ID: GNFDMDEHU6BB-46-46 Page 1 of 64 ISO Interface OMAR Online Replacement [ Location of Revision History Date Version Description Author 12/8/2015 1.0 Initial Version CAISO 03/10/2016 1.1 Revised element

More information

FNM Expansion Training Webinar

FNM Expansion Training Webinar FNM Expansion Training Webinar Cynthia Hinman Lead Client Trainer August 11, 2014 The information contained in these materials is provided for general information only and does not constitute legal or

More information

MRI-Settlements. ISO Interface Specification. Date Created: 10/18/2017. Document Version: 2.0. Owner: Lam, Rick. Copyright 2012 California ISO

MRI-Settlements. ISO Interface Specification. Date Created: 10/18/2017. Document Version: 2.0. Owner: Lam, Rick. Copyright 2012 California ISO ISO Interface Specification MRI-Settlements Date Created: 10/18/2017 Deleted: OMAR Online Replacement Doc ID: GNFDMDEHU6BB-46-46 Page 1 of 66 Location of Revision History Date Version Description Author

More information

Interface Specification for OASIS

Interface Specification for OASIS Version: 3.06 Date: 03/28/2011 Author: Arul Jayaraman Technical Lead Interface Specification for OASIS Version: 3.06 04/15/2011 Revision History Date Version Description Author May 30, 2006 July 14, 2006

More information

Release Notes. OASIS Fall 2015 Application Release Version 1.0

Release Notes. OASIS Fall 2015 Application Release Version 1.0 Release Notes OASIS Fall 2015 Application Release 6.8.0 Version 1.0 September 17, 2015 REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 09/17/2015 Initial version Page 2 of 12 Release Identification Application/System

More information

BPM Proposed Revision Requests (PRR): Summary Report Attachment 2

BPM Proposed Revision Requests (PRR): Summary Report Attachment 2 Proposed Revision Requests (): Summary Report Attachment 2 TITLE Reliability Requirements TITLE 215 Details related to the Forbidden Operating Region (FOR) implementation 214 Tracking change for Scarcity

More information

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Version 1 Last Revised: November 21, 2011 ISO Public 1 of 84 Table of Contents 1. Introduction... 5 1.1 Resource Adequacy

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 17. Transmission Ownership Rights (TORs)... 2 17.1 TRTC Instructions... 2 17.1.1 Responsibility to Create TRTC Instructions... 2 17.1.2 TOR Scheduling Coordinator Responsibilities...

More information

SIBR/BSAP SIBR/BSAP has both a UI and API that will reflect changes during the DST Transition from PST to PDT.

SIBR/BSAP SIBR/BSAP has both a UI and API that will reflect changes during the DST Transition from PST to PDT. Daylight Saving Time (DST) Short Day Information The ISO transition from PST (Pacific Standard Time) to PDT (Pacific Daylight Time) on Sunday, March 12 will impact both UIs (user interfaces) and APIs (Automated

More information

Customer Market Results Interface (CMRI) For RC Interface Specification. Version: 1.0.0

Customer Market Results Interface (CMRI) For RC Interface Specification. Version: 1.0.0 Customer Market Results Interface (CMRI) For RC Interface Specification Version: 1.0.0 November 1, 2018 Revision History Date Version Description 11/01/2018 1.0.0 Initial document release Page 2 of 10

More information

Automated Load Forecast System (ALFS) Interface Specification. Fall 2017 Release

Automated Load Forecast System (ALFS) Interface Specification. Fall 2017 Release Automated Load Forecast System (ALFS) Interface Specification Fall 2017 Release Version: 1.1 March 27, 2017 Revision History Date Version Description 03/01/2017 1.0 Initial document release related to

More information

DRS Replacement. ISO Interface Specification. Date Created: 11/9/2015. Document Version: 1.0. Owner: CAISO/ITPD

DRS Replacement. ISO Interface Specification. Date Created: 11/9/2015. Document Version: 1.0. Owner: CAISO/ITPD ISO Interface Specification DRS Replacement Date Created: 11/9/2015 Owner: CAISO/ITPD Doc ID: GNFDMDEHU6BB-46-46 Page 1 of 32 Location of http://www.caiso.com/s/externalbusinessrequirementsspecificationv10demandresponsesystem

More information

SIBR Interface Specification for Bidding Services

SIBR Interface Specification for Bidding Services SIBR Interface Specification for Bidding Services (Business Rules v 8.x(Fall 2014) or later) Version: 11.5 Oct 8, 2014 Revision History Date Version By Description 11/5/2014 11.6 WT 10/8/2014 11.5 WT Minor

More information

Technical Interface Specification For Master File Data Exchange Services v

Technical Interface Specification For Master File Data Exchange Services v Technical Interface Specification For Master File Data Exchange Services v20111001 Version: 2.7 Revision History Date Version Description 05/29/09 1.13 Project First Released Version. 12/15/09 2.1 Project

More information

Report Platform Migration

Report Platform Migration Systems Interface User Group (SIUG) Report Platform Migration Overview and Opportunities for Testing May 3, 2011 Report Platform Migration - Overview The California ISO is planning to release software

More information

SIBR Interface Specification for Bidding Services

SIBR Interface Specification for Bidding Services SIBR Interface Specification for Bidding Services (Business Rules v 8.x(Fall 2015) or later) Version: 12.1 April 23, 2015 Revision History Date Version By Description 4/23/2015 12.1 WT URL name changes

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification EIM Enhancements Winter 2017 Page 1 of 46 Revision History Date Version Description 7/31/2017 1.0 Create Document 8/15/2017 1.1 Include ESDER 1C for 9 BRQs that identified

More information

MRI-Settlements (MRI-S) For RC Interface Specification

MRI-Settlements (MRI-S) For RC Interface Specification Doc ID: GNFDMDEHU6BB-46-46 Page of 5 MRI-Settlements (MRI-S) For RC Interface Specification Date Created: //208 RCSI ISO Interface Specification Date Created: //208 Location of Revision History Date Version

More information

_ Dear Secretary Bose: The attached. Folsom, CA

_ Dear Secretary Bose: The attached. Folsom, CA California Independent System Operator June 29, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

Demand Response Registration System

Demand Response Registration System ISO Interface Demand Response Registration System Owner: CAISO California ISO INTERNAL USE. For use by all authorized California ISO personnel. Do not release or disclose outside the California ISO. Doc

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

Technical User Group Agenda

Technical User Group Agenda Technical User Group Agenda May 2nd, 2017 Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 6085978 10:00 a.m. 11:00 a.m. (Pacific Time) Conference

More information

Technical Interface Specification For Master File Data Exchange Services

Technical Interface Specification For Master File Data Exchange Services Draft Technical Interface Specification For Master File Data Exchange Services Version: 4.1.3 Revision History Date Version Description 05/29/09 1.13 Project First Released Version. 12/15/09 2.1 Project

More information

Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update

Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update Heidi Carder Senior Client Trainer, Training & Readiness February 21, 2018 The information contained in these materials is provided

More information

Technical Interface Specification For Master File Data Exchange Services

Technical Interface Specification For Master File Data Exchange Services Draft Technical Interface Specification For Master File Data Exchange Services Version: 3.3 Revision History Date Version Description 05/29/09 1.13 Project First Released Version. 12/15/09 2.1 Project

More information

Automated Load Forecast System (ALFS) For RC Interface Specification

Automated Load Forecast System (ALFS) For RC Interface Specification Automated Load Forecast System (ALFS) For RC Interface Specification Version: 1.0 October 22, 2018 Revision History Date Version Description 10/23/2018 1.0 Initial document release related to the Load

More information

Technical Interface Specification For Master File Data Exchange Services v

Technical Interface Specification For Master File Data Exchange Services v DRAFT Technical Interface Specification For Master File Data Exchange Services v20121001 Version: 2.12 Revision History Date Version Description 05/29/09 1.13 Project First Released Version. 12/15/09 2.1

More information

Energy Storage and Distributed Energy Resources Phase 2 Implementation

Energy Storage and Distributed Energy Resources Phase 2 Implementation Energy Storage and Distributed Energy Resources Phase 2 Implementation Customer Partnership Group January 29, 2018 1:00 p.m. 2:00 p.m. (Pacific Standard Time) Public Agenda Item Project Schedule Update

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

Resource Adequacy Pre-Market Simulation Training and Settlements Workshop

Resource Adequacy Pre-Market Simulation Training and Settlements Workshop Resource Adequacy Pre-Market Simulation Training and Settlements Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement Commitment

More information

Data Miner 2 Release Notes Release 18.09

Data Miner 2 Release Notes Release 18.09 Data Miner 2 Release Notes Release 18.09 Release Date: September 24, 2018 New Features: 1. New feeds These feeds will be available from September 25, 2018 onwards Enhancements: Real Time Temperature Sets

More information

Powerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017

Powerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017 Powerex EIM Implementation Informational Call Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017 Agenda Time Topic Presenter 9:00 9:05 Introduction Kristina Osborne, ISO 9:05 10:05 Powerex

More information

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way California Independent System Operator October 30, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

SPP Recommendation FERC Electronic Quarterly Report Data Dictionary Version 1.1

SPP Recommendation FERC Electronic Quarterly Report Data Dictionary Version 1.1 SPP Recommendation FERC Electronic Quarterly Report Data Dictionary Version 1.1 March 21, 2017 1 FERC EQR Report Data Dictionary Contents Report Columns... 3 Product Codes Table... 9 Sample Report... Error!

More information

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17 Table of Contents Table of Contents Preface SECTION 1 Introduction 1 Q3 2012 In Review 1 PJM Market Background 2 Conclusions 3 Role of MMU 6 Reporting 7 Monitoring 7 Market Design 8 Recommendations 8 Highlights

More information

Outage Management System Customer Partnership Group. November 2017

Outage Management System Customer Partnership Group. November 2017 Outage Management System Customer Partnership Group November 2017 Customer Partnership Group Scope and Objective Created in response to customer s request to have more involvement in the planning, design

More information

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision

More information

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated

More information

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee Frequently Asked Questions Revenue Sufficiency Guarantee What is Revenue Sufficiency Guarantee (RSG)? Midwest ISO has the responsibility to ensure that adequate capacity is available and committed to meet

More information

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013 Energy Imbalance Technical Workshop BAA Real-Time Congestion Balancing Account August 12, 2013 Overview BAA Real-Time Congestion Balancing Account Real Time Convergence Bid Settlement Slide 2 BAA Real-Time

More information

MOD Transmission Reliability Margin Implementation Document

MOD Transmission Reliability Margin Implementation Document Transmission Margin Implementation Document Transmission Margin Implementation Document For NERC Page 1 of 7 Transmission Margin Implementation Document 1.0 Purpose The California Independent System Operator

More information

We appreciate your feedback

We appreciate your feedback Publishing date: 02/07/2014 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document REMIT ELECTRICITY NOMINATIONS REPORTING

More information

Data Release & Accessibility

Data Release & Accessibility Draft Final Proposal Data Release & Accessibility Phase 1: Transmission Constraints January 6, 2010 Jan-08-2010: To correct for minor edits that were inadvertently omitted, this revised copy was posted.

More information

Master File Interface User Guide. Version 1.8 March 15, 2018

Master File Interface User Guide. Version 1.8 March 15, 2018 Master File Interface User Guide Version 1.8 March 15, 2018 Location of Document http://www.caiso.com/participate/pages/applicationaccess/default.aspx Revision History Date Version Description Author 06/26/2009

More information

Manual Bidding of Balancing- and Transport Power

Manual Bidding of Balancing- and Transport Power CLASSIFICATION C2: Internal Information VERSION PAGE 1 of 9 Manual Bidding of Balancing- and Transport Power PAGE 2 of 9 Amendments to Register: Version number Date Amendment 0.1 18 September 2000 Initial

More information

Business Practice Manual for Managing Full Network Model. Version 910

Business Practice Manual for Managing Full Network Model. Version 910 Business Practice Manual for Managing Full Network Model Version 910 Last Revised: September 7November 16, 2016 Approval History Approval Date: October 1, 2009 Effective Date: October 1, 2009 BPM Owner:

More information

Markets Gateway Roadmap

Markets Gateway Roadmap Markets Gateway Roadmap As of April 17, 2018 www.pjm.com Background Markets Gateway allows users to submit information and obtain data needed to conduct business in the Day-Ahead, Regulation and Synchronized

More information

Wheeling Charge Exemptions Due to ETCs

Wheeling Charge Exemptions Due to ETCs Objective Wheeling Charge Exemptions Due to ETCs Process to notify the ISO of wheeling charge exemptions due to existing transmission contracts. Overview Wheeling charges are assessed to energy exported

More information

Business Practice Manual for Managing Full Network Model. Version 1213

Business Practice Manual for Managing Full Network Model. Version 1213 Business Practice Manual for Managing Full Network Model Version 1213 Last Revised: January 3, 2018January 24, 2018 Approval History Approval Date: October 1, 2009 Effective Date: October 1, 2009 BPM Owner:

More information

ST PASA Report. User Guide- Public

ST PASA Report. User Guide- Public ST PASA Report User Guide- Public 1 April 2006 Document release information Client Document title System Management ST PASA User Guide- Public Revision status 1 Document prepared by: Western Power ABN

More information

Resource Adequacy Pre-Market Simulation Training Workshop

Resource Adequacy Pre-Market Simulation Training Workshop Resource Adequacy Pre-Market Simulation Training Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement October 21, 2015

More information

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2017 Revised: December 15, 2017 Market Participant Guide: SPP 2018 Congestion Hedging Published: December 15, 2017 Revised: December 15, 2017 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Southwest Power Pool Portal Market Participant General User s Guide

Southwest Power Pool Portal Market Participant General User s Guide Southwest Power Pool Portal Market Participant General User s Guide 1. Overview... 4 1.1 User Roles... 4 1.1.1 Market Participant Level Roles... 4 1.1.2. Asset Owner Level Roles... 4 1.1.3. Market Operations

More information

Date of Data Refresh:

Date of Data Refresh: 4/2/18-4/8/18 4/9/18-4/15/18 4/16/18-4/22/18 4/23/18-4/29/18 4/30/18-5/6/18 8/13/18-8/19/18 8/20/18-8/26/18 8/27/18-9/2/18 9/3/18-9/9/18 Date of Data Refresh: 4/6/18 4:23 PM 5/7/18-5/13/18 5/14/18-5/20/18

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting August 22, 2017 Julia Payton BPM Change Management Process BPM_CM@caiso.com Agenda BPM Change Management Meeting, August 22, 2017 Topic Introduction/meeting overview Discussion

More information

Energy Storage and Distributed Energy Resources Phase 2. Customer Partnership Group March 27, p.m. 2 p.m. (Pacific Standard Time)

Energy Storage and Distributed Energy Resources Phase 2. Customer Partnership Group March 27, p.m. 2 p.m. (Pacific Standard Time) Energy Storage and Distributed Energy Resources Phase 2 Customer Partnership Group March 27, 2018 1 p.m. 2 p.m. (Pacific Standard Time) Agenda Item Project Schedule Update New Baseline Requests - Submittal

More information

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01 MW July 26, 2017 - August 1, 2017 This report provides a summary of key market data from the IESO-administered markets. It is intended to provide a quick reference for all market stakeholders. It is composed

More information

OMAR Online Replacement Customer Partnership Group October 20, 2016

OMAR Online Replacement Customer Partnership Group October 20, 2016 OMAR Online Replacement Customer Partnership Group October 20, 2016 Presented by: Nathan Hall, Manager, Customer Service Indu Nambiar, Business Solutions Manager Mike Lucas, Project Manager Customer Partnership

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date February 26, 2013 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009 Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative August 28th, 2013 9:00 a.m. 12:00 p.m. (Pacific Time) Web Conference Information Web Conference Information Web Address (URL):

More information

Published: December 15, 2016 Revised: December 15, 2016

Published: December 15, 2016 Revised: December 15, 2016 Market Participant Guide: SPP 2017 Congestion Hedging Published: December 15, 2016 Revised: December 15, 2016 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Genesys Info Mart. date-time Section

Genesys Info Mart. date-time Section Genesys Info Mart date-time Section 11/27/2017 date-time Section date-time-max-days-ahead date-time-min-days-ahead date-time-start-year date-time-table-name date-time-tz first-day-of-week fiscal-year-start

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date August 23, 2011 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

Small Hydro Regulatory and Permitting Requirements California

Small Hydro Regulatory and Permitting Requirements California Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator

More information

Open Access Transmission Tariff of Southern Companies

Open Access Transmission Tariff of Southern Companies Open Access Transmission Tariff of Southern Companies Procedures for Reserving Transmission Capacity for Future Load Growth, Designating/Undesignating Network Resources, and Arranging for Other Related

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

Residual Auction Revenue Rights Enhancement

Residual Auction Revenue Rights Enhancement Residual Auction Revenue Rights Enhancement Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee December 22, 2016 Solution Package Overview - Package A Proposed

More information

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date May 24, 2011 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

Demand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016

Demand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016 Demand Response User Guide DRRS Enhancement Market Simulation Version 1.0 August 18, 2016 Table of Contents INTRODUCTION... 5 Purpose... 5 Definitions... 6 DEMAND RESPONSE PROVIDER (DRP)... 10 Executing

More information

Member Impacting Project Overview Data Push

Member Impacting Project Overview Data Push Member Impacting Project Overview Data Push Page 1 Table of Contents Table of Contents... 2 Executive Summary... 4 Business Impact... 4 Technical Impact... 5 Technical Implementation... 6 Cutover/Back-out

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder

More information

SLIC Web Service API Guide

SLIC Web Service API Guide SLIC Web Service API Guide Version: 5.0.6 February 19, 2014 Revision History Date Version Description Author 2002 1.0 October 2003 2.0 February 2007 3.0 Initial release of this document Revised to include

More information

LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL. September 2001

LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL. September 2001 LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL September 2001 TABLE OF CONTENTS INTRODUCTION...3 SECTION A: GENERATION SHIFT FACTORS...4 SECTION B: COMMUNICATIONS PROTOCOLS...ERROR! BOOKMARK NOT DEFINED.

More information

Exhibit to Agenda Item #1a

Exhibit to Agenda Item #1a Exhibit to Agenda Item #1a Sandra Kopp Wednesday, Board Finance September & Audit 28, Committee 2011 Meeting and Special SMUD Board of Directors Meeting Budget 2018 Wednesday,, scheduled to begin at 5:00

More information

Market Results Interface- Settlements (MRI-S) Meter Data Submission User Guide

Market Results Interface- Settlements (MRI-S) Meter Data Submission User Guide Market Results Interface- Settlements (MRI-S) Meter Data Submission User Guide Version 1.9 11/28/18 Document Production Doc ID: FGD5EMQPXRTV-204-24121 Page 1 of 48 REVISION HISTORY VERSION NO. (Must match

More information

Uninstructed Deviation Penalty Charge Types 4470, and 4480

Uninstructed Deviation Penalty Charge Types 4470, and 4480 Description Uninstructed Deviation Penalty Charge Types 4470, and 4480 This section of the Dispute Submittal Guide describes the information pertinent to charges for Uninstructed Deviation Penalties, specifically

More information

Market Performance Report December 2015

Market Performance Report December 2015 Market Performance Report December 215 February 1, 216 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance

More information

Market Performance Report January 2016

Market Performance Report January 2016 Market Performance Report January 216 February 29, 216 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance

More information

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015 Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual Version 3.4 Last Updated: February 2015 Copyright 2012-2015 Nexant, Inc. All rights reserved. Nexant, Inc.

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

More information

Forced and Planned Outage Substitution, RAAIM Pre-Calc

Forced and Planned Outage Substitution, RAAIM Pre-Calc Forced and Planned Outage Substitution, RAAIM Pre-Calc RSI 2017 Training January 17, 2018 1:00PM The information contained in these materials is provided for general information only and does not constitute

More information

Load Conformance Limiter Enhancement

Load Conformance Limiter Enhancement TECHNICAL BULLETIN December 28, 2016 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 TECHNICAL BULLETIN Revision History Date Version Description Author December 28, 2016 1.0 Draft Proposal

More information

Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment

Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment Michael Lavillotti Product Business Analyst New York Independent System Operator

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Market Implementation Committee November 2, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage 1B

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee November 17, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage

More information

Mountain West Transmission Group. WECC MIC Update October 17, 2017

Mountain West Transmission Group. WECC MIC Update October 17, 2017 Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain

More information

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code CAP633-15 Version date: January 14 2016 Calendar 2016/2017 for Capacity Allocation Mechanism Network Code EXPLANATORY NOTE/DISCLAIMER The Network Code on Capacity Allocation Mechanisms in Gas Transmission

More information

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010 Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG-71-03 7 December 2010 Council of European Energy Regulators ASBL 28 rue le Titien, 1000 Bruxelles Arrondissement judiciaire de

More information

PISOA Interface Specification. Fall 2017 Release

PISOA Interface Specification. Fall 2017 Release PISOA Interface Specification Fall 2017 Release Version: 1.0 July 21, 2017 Revision History Date Version Description 07/21/2017 1.0 Initial document release related to the PISO Interfaces. RequestVERMeasurements

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

Contingency Modeling Enhancements Prototype Analysis with Production Cases

Contingency Modeling Enhancements Prototype Analysis with Production Cases August 17, 2017 Table of contents 1. Executive summary... 4 2. Purpose... 4 3. Analysis of stressed system scenarios... 5 Methodology... 5 Non-binding scenarios... 6 Binding scenario... 7 Other observations...

More information

Slow Response Local Capacity Resource Assessment CAISO-CPUC Joint Workshop

Slow Response Local Capacity Resource Assessment CAISO-CPUC Joint Workshop Slow Response Local Capacity Resource Assessment CAISO-CPUC Joint Workshop October 4, 2017 Revision as of 10/11/17: Revisions were made on page 62 and page 64 is marked for deletion ISO Public REVISED

More information

Reporting of electricity and gas transportation contracts

Reporting of electricity and gas transportation contracts Reporting of electricity and gas transportation contracts Tomaž Vižintin Market Monitoring Department 9 th Public Workshop on REMIT implementation Ljubljana, 10 December 2014 Outline Reporting of transportation

More information

Memorandum. Created by: EML CAISO LST UPDT: 4/21/ Blue Ravine Road Folsom, California Page 1 (916)

Memorandum. Created by: EML CAISO LST UPDT: 4/21/ Blue Ravine Road Folsom, California Page 1 (916) California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Eric Leuze, Director of Compliance cc: ISO Board of Governors, ISO Officers Date: April 29, 2005 Re: Deferral

More information