1 Transition Plan (TP) Mobil Application for Mobile-Controlled Lighting Team 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey Stall Feasibility Analyst Software Architect Life Cycle Planner Project Manager Requirements Engineer Prototyper Requirements Engineer/Shaper 11/21/14
2 Version History Date Author Version Changes made Rationale 02/08/06 PP 1.0 Original template for use with LeanMBASE v1.5 01/02/09 SK 2.0 Update section 3.0: adding schedule Added expected information in each section 11/21/14 SS 3.0 Update section 1.0: added transition objective and strategy related to our project. Update section 2.0: added hardware, software and site Update section 3.0: added role, responsibilities and schedule of stake holders related to transition plan. Initial draft for use with LeanMBASE v1.5 To comply with Instructional ICM-Sw standard To comply with Draft TRR requirement. To document transition plan, so as to ensure smooth transition. ii
3 Table of Contents TRANSITION PLAN (TP)... I TABLE OF CONTENTS... III TABLE OF TABLES... IV 1. Transition Strategy Transition Objectives Transition Process Strategy Preparing for Transition Hardware Preparation Software Preparation Site Preparation Stakeholder Roles, Responsibilities and Schedule... 8 iii
4 Table of Tables Table 1: Transition Schedule... 8 TP_TRR_F14a_T13_V3.0.doc iv Version Date: 11/21/14
5 1. Transition Strategy The Mobile-Controlled Lighting system will be transitioned to Advanchip, with the final delivery coming during the end of the Development Phase. The client performed a brief product check and provided some feedbacks before the last planned delivery and so that the final changes were made during this last iteration. We will deploy server on cloud to hold our system and provide scripts and document to their staff to maintain after product delivery and administer the server in the future. There is a particular user training and delivery of User Manual in the last iteration for using mobile application. Training Material document and User Manual document are the base documents to be followed through this training phase. The focus of the transition strategy would be making clients future development process as easy as possible. 1.1 Transition Objectives The following are the objectives: Familiarize the client with full functionality of the system and prototype app which uses MQTT protocol for communication. Explain the client the scope the system addresses and validate that all the winconditions discussed with the clients were fully satisfied Guide, and actively deploy the client and server side of the software on Ramnode cloud for future use. Assist the client to figure out the next steps to take to incorporate MQTT in the Android application. Provide codebase and tools to the client so that they can develop further to broaden the project scope in our absence. Transfer credentials and any related material about the hosting service (Ramnode, Papertrail) to the client Package up all documentation, UML diagrams, system specification, and user manual for the system to the client Set up the server environment and install android app on the client device. Set up development environment on client side Successful training of client on how to operate the server. Successful completion of the user training session and receiving feedback about the User Manual. 1.2 Transition Process Strategy The transition process is expected to take around 15 days after the development is done. Since the major job in the transition process is providing client training, our transition 5
6 process strategy will focus on making clients future development process as easy as possible process as easy as possible process as easy as possible as easy as possible The transition process steps are as follows: Final refactoring of developed components Passing all test cases Develop document for Android application source code. (Code comments) Develop user manual for Android application. Develop document for Android prototype application (MQTT protocol for communication) source code(code comments) Develop document for server source code. (Code comments) Develop document for server API Clients feedbacks meeting Issues fixing and features adding, if any Deliver final product and related documents 6
7 2. Preparing for Transition 2.1 Hardware Preparation Android device with Android version 4.1or above 1 or more Server is on Ramnode cloud, so no hardware required. For Switches and Gateway, Advanchip is developing hardware. 2.2 Software Preparation Transfer all codes and documents for Android application and server to Advanchip and help our clients or maintainers to understand it. Set up Papertrail account and handover account details to client so that they can observe server log. Scripts for deleting all server data, start server, stop server. It will help client clear up test data from server. Also instruction on updating server on Ramnode cloud. Android application s APK file. Prototype application with MQTT connection with gateway. 2.3 Site Preparation Install Android application APK file on android device. Set up wireless network on mobile device. Configure gateway to wireless network using application. Provide power supply to gateway and switches Start server by running server script. 7
8 3. Stakeholder Roles, Responsibilities and Schedule Table 1: Transition Schedule Date Role Responsibility Location 11/22/14 Developer Complete development of the unit tested Developer s site application and server 11/23/14 Developer, Client Client review of system and feedback. USC, Client location 11/29/14 Developer Complete refactoring, and integration of Developer s site tested application and server 11/30/14 Developer, Training about application and server USC client setting. 12/1/14 Developer, Deployment and installation of server and Developer s site client android application. 12/5/14 Developer, client Feedback meeting and final interaction, and consultation about future expansion of scope, iphone application development. USC 8
System and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Mobil Application for Mobile-Controlled Lighting Team 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey
More informationOperational Concept Description (OCD)
Operational Concept Description (OCD) Mobile Application for Mobile-Controlled Lighting 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey Stall Feasibility
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) Mobile Application for Mobile-Controlled Lighting Team 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey Stall Feasibility
More informationTransition Plan (TP)
Transition Plan (TP) Healthy Kids Zone Survey App Team 14 Name Jessie Kim Primary Role Contact Email JKim@chc-inc.org Joseph Martinez JMartinez2@chc-inc.org Carson Malcoln MCarson@chc-inc.org Yang Wang
More informationTransition Plan (TP)
Transition Plan (TP) SnApp Voice Communication System Team 05 Divij Durve IIV&V Harsh Mhatre System/Software Architect Khyati Thakur Prototyper Monica Varhale Feasibility Analyst Nikita Gupta Project Manager
More informationTransition Plan (TP)
Transition Plan (TP) Transportation Grant Fund Database Team 14 Team Members Roles Roles Primary Secondary Muruganantham Raju Project Manager Feasibility Analyst Kirill Khistyaev Software Architect Project
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) Mental Math Team 07 Isha Agarwal Prototyper, Life Cycle Planner, Implementer JingXing Cheng Implementer Kajal Taneja Operational Concept Engineer, UML Modeler, Implementer
More informationTransition Plan (TP)
Transition Plan (TP) Cash Doctor 3.0 Team 12 Steven Helferich: Project Manager, Developer Kenneth Anguka: IIV&V Xichao Wang: Operational Concept Engineer, Tester Alisha Parvez: Life Cycle Planner, Developer
More informationTransition Plan (TP)
Transition Plan (TP) United Directed Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility
More informationTransition Plan (TP)
Transition Plan (TP) FlowerSeeker Team 05 Name Eder Figueroa Sophia Wu Doris Lam Hiram Garcia Roles Primary Role: Project Manager/ Implementer. Secondary Role: Tester. Primary Role: Tester/ Trainer Secondary
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) Mental Math Team - 7 Chang Yu Prototyper, Implementer, Requirements Engineer Isha Agarwal Prototyper, Life Cycle Planner, Implementer JingXing Cheng Implementer Kajal
More informationTransition Plan (TP)
Transition Plan (TP) LEAMOS Team # 07 Name Primary Role Secondary Role Monty Shah Project Manager Life Cycle Planner Pragya Singh System Architect Prototyper Shantanu Sirsamkar Requirements Engineer Feasibility
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) Fōkcus Team 08 Name Role Steven Holland Requirement Engineer, Prototyper Arik Oganesian Operation Concept Engineer, Software Architect Marco Alvarez Feasibility
More informationTransition Plan (TP)
Transition Plan (TP) Mission Science Information and Data Management System 3.0 Team 3 Fei Yu: Project Manager, Life Cycle Planner Yinlin Zhou: Prototyper, Operational Concept Engineer Yunpeng Chen: Requirements
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) Discovery Tool Team 3 Josh Bendig - IIV&V Xizhao Deng - Project manager Jingzhou Hong - Requirement Engineer Guancheng Liu - Tester Michael Russo - Prototyper Shenghao
More informationSystem Admin Manual <SNAPVALET> <Team No- 03>
System Admin Manual Name Brian Vanover Brian Bousman Ditong Ding Molly Karcher Patrick Horng Ridhima Manjrekar Role Project Manager, Developer Operational Concept Engineer, Developer
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) PicShare Team 1 Logan Chang Project Manager, Mobile Developer Jiashun Zhou Mobile Developer Yew Hua Chua Backend Developer Haihao Lu Backend Developer Yunwei Yuan
More informationTraining Plan. NICE E-Commerce. Team 7
Training Plan NICE E-Commerce Team 7 Deborah Baker Assistant PM, QFP (Team & Web Req), IIV & V, Team Website Antonis Papantoniou Project Manager (PM), Prototyper, Software Architect, Feasibility Analyst
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop
More informationPrototype Report Version 3.0. Prototype Report. LADOT Scanning. Team 08. Name Primary Role Secondary Role
Prototype Report LADOT Scanning Team 08 Name Primary Role Secondary Role Anirudh Govil Project Manager Life Cycle Planner Jeffrey Colvin Prototyper Systems and Software Architect Aditya Kumar Feasibility
More informationPrototype Report. Tour Conductor. Team 5
Prototype Report Tour Conductor Team 5 Team Members Ajay Kumar G C Manas Yadav Ankush H Prasad Aadithya B K Andrew Han Joseph Mouawad Roles Project Manager, Life Cycle Planner Feasibility Analyst, Prototyper/Builder
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) ShareWeb Team 05 Xuan Wang: Project Manager, Life Cycle Planner LiangHao Gao: Implementation Team member Xi Chen: Implementation Team member, UML Modeler,
More informationSystem and Software Architecture Description
System and Software Architecture Description (SSAD) Mental Math Team - 7 Chang Yu Prototyper, Requirements Engineer Isha Agarwal Prototyper, Life Cycle Planner, Implementer Jingxing Cheng Implementer Kajal
More informationSystem and Software Support Plan (SP)
System and Software Support Plan (SP) Student Scheduling System Team06 Douglass Kinnes: Project Manager, Quality Focal Point, Implementation Team member Alexey Tregubov: System Architect, UML Modeler,
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) LADOT Scanning Team 08 Name Primary Role Secondary Role Anirudh Govil Project Manager Life Cycle Planner Jeffrey Colvin Prototyper Systems and Software
More informationTraining Plan. Tour Conductor. Team-05
Training Plan Tour Conductor Team-05 Name Ankush H Prasad Ajay Kumar G C Aadithya B Andrew Han Joseph Mouawad Manas Yadav Rohit Ravindra Role System Architect, Project Manager, Prototyper/Builder. Project
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Image Processing Platform Team 4 Name First Role Second Role Hao Wu Requirements Engineer Software Architect Junran Liu Operational Concept Engineer
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Swim Meet Sign-Up Team 03 Member Archan Dutta Swasti Sharma Rasleen Sahni Deepanshu Suneja Vibhanshu Sharma Jenny Greer Role Project Manager, Life Cycle
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) GOTRLA Team 15 Deepak Earayil Project Manager & Software/System Architect Ankith Nagarle Prototyper & Operational Concept Engineer Aayush Jain Feasibility Analyst & Project Manager
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee
More informationOperational Concept Description (OCD)
Operational Concept Description (OCD) Image Processing Platform Team 4 Name First Role Second Role Hao Wu Requirements Engineer Software Architect Junran Liu Operational Concept Engineer Software Architect
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Mission Science irobots 12/06/2014 Team 07 Ashwini Ramesha Chen Li Farica Mascarenhas Jiashuo Li Ritika Khurana Siddhesh Rumde Sowmya Sampath Yun Shao
More informationSystem and Software Support Plan (SSSP)
System and Software Support Plan (SSSP) LEMA Integrated Scheduling System Team 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet Kaur
More informationPrototype Report. Frenzy. Team 01
Prototype Report Frenzy Team 01 Arpan Badeka -Prototyper, UML Modeler Ankur Palav-Software Architect, Prototyper Ashwin Hariharan-Software Architect, Prototyper Jheel Somaiya-Project Manager, Lifecycle
More informationSystem and Software Architecture Description (SSAD) City of Los Angeles Personnel Department Mobile Applications
System and Software Architecture Description (SSAD) City of Los Angeles Personnel Department Mobile Applications Team 02 Shreya Kamani Shah: Project Manager, Life Cycle Planner/ Trainer Abhishek Trigunayat:
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) LiveRiot Video Editing System and social networking enhancement Team 04 Yang Li Haoyu Huang Project anager, Life Cycle Planner Feasibility Engineer, System Architect Ye Tian Zichuan
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) Software Quality Analysis as a Service Team 01 Aditya Kathuria Prototyper Aleksandr Chernous Life Cycle Planner Chris Harman Operation Concept Supicha Phadunsilp Feasibility Analyst
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Mission Science irobots 11/26/2014 Team 07 Ashwini Ramesha Chen Li Farica Mascarenhas Jiashuo Li Ritika Khurana Siddhesh Rumde Sowmya Sampath Yun Shao
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Perfecto Coffee Xpress Consistent Perfection Team 5 Chloe Good Yekaterina Glazko Edwards Hays Yucheng Hsieh Atreya Lahiri Jaimin Patel Yun Shen Andrew
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Farmworkers Safety App Team 09 TEAM MEMBER NAME Shobhit Agarwal Akshay Aggarwal Viraj Sahai Vahagen Sinanian Juan Andrade Basir Navab Marko Djuliarso
More informationPrototype Report. Healthy Kids Zone Survey App. Team 14. Name Primary Role Contact Jessie Kim. carson malcoln Representative
Prototype Report Healthy Kids Zone Survey App Team 14 Name Primary Role Contact Email Jessie Kim Client Representative JKim@chc-inc.org carson Client malcoln Representative MCarson@chc-inc.org Joseph Client
More informationOperational Concept Description (OCD)
Operational Concept Description (OCD) Share Web Team 05 Name Xuan Wang Zhangbiaoge Tian Haoliang Gao Xi Chen Chuhan Zheng Yuxuan Li Role Life Cycle Planner & Project Manager Developer & Operation Concept
More informationIteration Plan (IP) Leamos. Team number 7. Name Address Primary Role Secondary Role
Iteration Plan (IP) Leamos Team number 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu IIV&V Off-campus Shaper
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Tipsure.com Team# 09 Member Name Jonathan Tuse Raymond Feng David Brenn-Cogen Aayushi Birla Tej Trivedi Nirupama Vaidyanathan Linkun Li Primary Role
More informationThe Road to Digital Transformation: Increase Agility Building and Managing Cloud Infrastructure. Albert Law Solution Architect Manager
The Road to Digital Transformation: Increase Agility Building and Managing Cloud Infrastructure Albert Law Solution Architect Manager Agenda The Challenges and the trend Bridging the gap Next step 2 FROM
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) SWIM MEET SIGNUP Team 03 Member Name Role Email Archan Dutta Project Manager, Life Cycle Planner archandu@usc.edu Deepanshu Suneja Software Architect, Developer suneja@usc.edu
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) Smart Locks Control Team 05 Team Member: Vaibhav Vishal Diego Brandao Zhe Wang Mohammadreza Barazesh Alejandro Monroy Hao-Yun Yang Katarzyna Ruszowska Project Manager,
More informationAndroid Studio is google's official IDE(Integrated Development Environment) for Android Developers.
Android Studio - Hello World Objectives: In this tutorial you will learn how to create your first mobile app using Android Studio. At the end of this session you will be able to: Create Android Project.
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee
More informationImproving Thai CDC. Team #: 01. Team Members & Roles
Iteration Assessment Report (IAR) Improving Thai CDC Establishing a New Client/Donor/Partner Communications & Project Tracking Tool Team #: 01 Team Members & Roles Name Brandon Foster Charles Muckenthaler
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Construction Meeting Minutes Application Team 6 Pradeep Muruganandam - Prototyper and Quality Focal Point Dennis Evans - System Architect, Project Manager
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee
More informationFeasibility Evidence Description (FED) COSMIC SYSTEM. Team 02. Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer
Feasibility Evidence Description (FED) COSMIC SYSTEM Team 02 Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer Mishaal Aleem Prototyper/ Trainer / Implementer Rachel Inouye Operational Concept Engineer/
More informationMGA Developing Interactive Systems (5 ECTS), spring 2017 (16 weeks)
MGA 672 - Developing Interactive Systems (5 ECTS), spring 2017 (16 weeks) Lecturer: Ilja Šmorgun ilja.smorgun@idmaster.eu, Sónia Sousa sonia.sousa@idmaster.eu Contact Details: All email communication regarding
More informationJob Information Form (1)
Job Information Form (1) Marketing Officer No. of Vacancies: 8 Internship ( Summer) * Responsible for creation, planning, execution and delivery of strategic marketing campaigns (EDM) * Assist in driving
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) We Are Trojans Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility
More informationindex_ qxd 7/18/02 11:48 AM Page 259 Index
index_259-265.qxd 7/18/02 11:48 AM Page 259 Index acceptance testing, 222 activity definition, 249 key concept in RUP, 40 Actor artifact analysis and iterative development, 98 described, 97 136 in the
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) Healthy Kids Zone Survey App Team 14 Name Primary Role Contact Email Andreas Rivera Client ARivera@chc-inc.org Joseph Martinez Client Jmartinez2@chc-inc.org Malcolm Carson Client
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Soccer Data Web Crawler Team 02 First Name Last Name Role Trupti Sardesai Project Manager Wenchen Tu Prototyper Subessware Selvameena Karunamoorthy System/Software
More informationITIL - Lifecycle Service Transition Course
ITIL - Lifecycle Service Transition Course Code: ITSM005CL Certification Exam: ITIL Service Transition Lifecycle Duration: 3 Days Certification Track: N/A Format: Classroom Course Credits: 3 Credits to
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) E-Lock Box Team 05 Weiyi Zhong Prototyper, Tester Woom Kim System Architect, Developer Cecilia Jou II V&V, Tester Azuka Okuleye Feasibility Analyst,
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Fuppy Team No.7 Krupa Patel (Product Manager) Adil Assouab (Requirement Engineer) Yiyuan Chen (Software Architecture) Praveen Chander (Designer/Prototyper)
More informationSTATEMENT OF WORK BETWEEN UNIVERSITY SERVICES PMO and ENVIRONMENTAL SYSTEMS RESEARCH INSTITUTE INC. for the GIS Interactive Campus Web Map Project
STATEMENT OF WORK BETWEEN UNIVERSITY SERVICES PMO and ENVIRONMENTAL SYSTEMS RESEARCH INSTITUTE INC. for the GIS Interactive Campus Web Map Project I. Scope This Statement of Work (SOW) is effective May
More informationFeasibility Evidence Description (FED)
Feasibility Evidence Description (FED) ShareWeb Team 5 Xuan Wang: Project Manager, Life Cycle Planner LiangHao Gao: Implementation Team member Xi Chen: Implementation Team member, UML Modeler, Tester Yuxuan
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Soccer Data Web Crawler Team 02 First Name Last Name Role Trupti Sardesai Project Manager Wenchen Tu Prototyper Subessware Selvameena Karunamoorthy System/Software
More informationUCT Application Development Lifecycle. UCT Business Applications
UCT Business Applications Page i Table of Contents Planning Phase... 1 Analysis Phase... 2 Design Phase... 3 Implementation Phase... 4 Software Development... 4 Product Testing... 5 Product Implementation...
More informationSupporting Information Document (SID)
Supporting Information Document (SID) Team No. 3 Istartonmonday.com Team members Role Kandarp Nyati Project Manager Fei Li Operational Concept Engineer Tanya Gautam Requirement Engineer Bharat Shugani
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman
More informationLife Cycle Plan (LCP)
Life Cycle Plan (LCP) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent Verification & Validation
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) MedFRS Device Diagnostic Software Team 16 Misha Dowd Delnaz Gundevia Anfal Abdul Jaleel Nanda Kishore Kolleje Rao Anupam Kumar Jackie Cheng Project Manager Life Cycle Planner
More information09/07: Project Plan. The Capstone Experience. Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan State University Fall 2016
09/07: Project Plan The Capstone Experience Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan State University Fall 2016 From Students to Professionals Project Plan Functional Specifications
More informationWhite Paper. RingCentral. Professional Services Implementation & Onboarding Methodology
White Paper RingCentral Professional Services Implementation & Onboarding Methodology RingCentral Professional Services Implementation & Onboarding Methodology Any technology transition can be challenging;
More informationIBM IBM WebSphere Lombardi Edition V7.2 BPM Program Management. Download Full Version :
IBM 000-188 IBM WebSphere Lombardi Edition V7.2 BPM Program Management Download Full Version : http://killexams.com/pass4sure/exam-detail/000-188 When documenting an activity in a business process, the
More informationSystem/Software Architect. Description (SSAD)
System and Software Architecture Description (SSAD) BlackProfessionals.net Team 6 Tian Xiang Tan Sadeem Alsudais Jhih-Sheng Cai Aril Alok Jain Pablo Ochoa Jeng-Tsung Tsai Po-Hsuan Yang Project Manager
More informationPrototype Report. LEMA Pilot School Integrated Family Accountability System. Team 4
Prototype Report LEMA Pilot School Integrated Family Accountability System Team 4 Teawon Han: Project Manager Zhen Huang: Feasibility Analyst Ziming Wei: Operational Concept Engineer Xiaoli Ma: Life Cycle
More informationIteration Plan. LEMA Pilot School Integrated Scheduling System. Team No. 12. Name Primary Role Secondary Role
Iteration Plan LEMA Pilot School Integrated Scheduling System Team No. 12 Name Primary Role Secondary Role Neelima Agarwal Life Cycle Planner Project Manager Aakash Shah Prototyper Feasibility Analyst
More informationArchitecting the ArcGIS Platform: Best Practices. Brian R. Embley and Brian J. Baldwin
Architecting the ArcGIS Platform: Best Practices Brian R. Embley and Brian J. Baldwin Patterns & Practices Solution Architects Amplify customer success by offering strategic guidance, communicating best
More informationTest Plan and Cases (TPC)
Test Plan and Cases (TPC) MedFRS Device Diagnostic Software Team 16 Misha Dowd Delnaz Gundevia Anfal Abdul Jaleel Nanda Kishore Kolleje Rao Anupam Kumar Jackie Cheng Project Manager Life Cycle Planner
More informationPrototype Report. LEMA Pilot School Integrated Family Accountability System. Team 4
Prototype Report LEMA Pilot School Integrated Family Accountability System Team 4 Teawon Han: Project Manager Zhen Huang: Feasibility Analyst Ziming Wei: Operational Concept Engineer Xiaoli Ma: Life Cycle
More informationHow Can Testing Teams Play a Key Role in DevOps Adoption?
June 3, 2016 How Can Testing Teams Play a Key Role in DevOps Adoption? Sujay Honnamane QA Director @sujayh Rameshkumar Bar Sr. Automation Architect @rameshbar 2016 Cognizant Session take away DevOps Overview
More informationAlexandre Menezes Cloud Solution Architect
Alexandre Menezes Cloud Solution Architect alexandre.menezes@microsoft.com https://www.linkedin.com/in/alexandremenezes/ You want to adopt cloud technologies for your apps, but Agility Time to market Reduce
More informationCC13c LifeCycle Management. Infrastructure at your Service.
CC13c LifeCycle Management Infrastructure at your Service. About me Infrastructure at your Service. Wisson Delivery Manager Principal Consultant +41 79 819 25 98 gerard.wisson [ at ] dbi-services.com Page
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) LiveRiot Video Editing System and social networking enhancement Team 04 Yang Li Haoyu Huang Ye Tian Zichuan Wang Haishan Ye Kaiqi Zhang Mitra, Alok Project
More informationMicrosoft Core Solutions of Microsoft SharePoint Server 2013
1800 ULEARN (853 276) www.ddls.com.au Microsoft 20331 - Core Solutions of Microsoft SharePoint Server 2013 Length 5 days Price $4290.00 (inc GST) Version B Overview This course will provide you with the
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Transportation Grant Fund Database Team #14 Team Members Kirill Khistyaev Karim Sacre Darren Liu Stephan Rice Zhanna Seitenova Ayman Khalil Roles (Primary)
More informationPrototype Report (PRO) Version 1.2. Prototype Report. Women at Work. Team No: 14. Sr no Name Role 1 Srikant Madhava Project Manager
Prototype Report Women at Work Team No: 14 Sr no Name Role 1 Srikant Madhava Project Manager 2 Sanath Bhandary Operational Concept Engineer 3 Rohit Kudva Feasibility Analyst 4 Varma Maryala Life Cycle
More informationEducation Brochure. Education. Accelerate your path to business discovery. qlik.com
Education Education Brochure Accelerate your path to business discovery Qlik Education Services offers expertly designed coursework, tools, and programs to give your organization the knowledge and skills
More informationPrototype Report (PRO) Version 4.0. Prototype Report. Smart Locks Control. Team 05. Spring 2018 Team Members: Terence Williams William Goishi
Prototype Report (PRO) Version 4.0 Prototype Report Smart Locks Control Team 05 Spring 2018 Team Members: Alex Miller Diego Brandao Terence Williams William Goishi Nicholas Kwong Project Manager Implementer
More informationSystem/Software Architect. Description (SSAD)
System and Software Architecture Description (SSAD) BlackProfessionals.net Team 6 Tian Xiang Tan Sadeem Alsudais Jhih-Sheng Cai Aril Alok Jain Pablo Ochoa Jeng-Tsung Tsai Po-Hsuan Yang Project Manager
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) TOUR CONDUCTOR TEAM - 05 Name Ankush H Prasad Ajay Kumar G C Aadithya B K Andrew Han Joseph Mouawad Manas Yadav Rohith Ravindra Role System Architect,
More informationArchitecting the ArcGIS Platform: Best Practices. Dave Wrazien Ray Bunn
Architecting the ArcGIS Platform: Best Practices Dave Wrazien Ray Bunn Patterns & Practices Solution Architects Amplify customer success by offering strategic guidance, communicating best practices, and
More informationSystem and Software Architecture Description (SSAD) Cash Doctor 3.0 Mobile APP Team 12. Primary Role. Operational Concept Engineer
System and Software Architecture Description (SSAD) Cash Doctor 3.0 Mobile APP Team 12 Name Alisha Parvez Ekasit Jarussinvichai Kenneth Anguka Kshama Krishnan Le Zhuang Shreya Sharma Steven Helferich Xichao
More informationCXA Citrix XenApp 6.5 Administration
Course This is a 5-day class Citrix XenApp 6.5 Administration training course provides the foundation necessary for administrators to effectively centralize and manage applications in the datacenter and
More information20331B: Core Solutions of Microsoft SharePoint Server 2013
20331B: Core Solutions of Microsoft SharePoint Server 2013 Course Details Course Code: Duration: Notes: 20331B 5 days This course syllabus should be used to determine whether the course is appropriate
More informationITIL FOUNDATION NON-TECHNICAL & CERTIFIED TRAINING COURSE SECTOR / IT. Tel: Fax:
SECTOR / IT NON-TECHNICAL & CERTIFIED TRAINING COURSE In this 3 Days exciting and dynamic course, you will get an introduction to the lifecycle of managing IT services to deliver to business expectations.
More informationUse Cases for Argonaut Project -- DRAFT Page
Use Cases for Argonaut Project -- DRAFT Page 1 Use Cases for Argonaut Project DRAFT V0.3 March 03, 2015 Use Cases for Argonaut Project -- DRAFT Page 2 Introduction The Argonaut Project seeks to rapidly
More informationSystem and Software Architecture Description (SSAD)
System and Software Architecture Description (SSAD) Web Media Modernization 2012 Team 7 Anvar Bagiyev (Operational Concept Engineer, Tester) Shawn Han (Software/System Architect, Tester) Barney Hsiao (Prototyper,
More informationSERVICES. Desktop and Smartphone Apps. Databases. Stock Management Portals. Web Design and Development. Telephony Systems
Services Pack 2016 SERVICES Desktop and Smartphone Apps Databases Stock Management Portals Web Design and Development Telephony Systems DESKTOP AND SMARTPHONE APPLICATIONS iphone Objective-C, Unity, Cocos
More informationPrototype Report. Farm Worker Safety Application. Team 09
Prototype Report Farm Worker Safety Application Team 09 S.No. TEAM MEMBERS ROLES 1. Shobhit Agarwal Project Manager Life Cycle Planner System Architect 2. Akshay Aggarwal System Architect Prototype Developer
More information