Iteration Plan (IP) Leamos. Team number 7. Name Address Primary Role Secondary Role

Size: px
Start display at page:

Download "Iteration Plan (IP) Leamos. Team number 7. Name Address Primary Role Secondary Role"

Transcription

1 Iteration Plan (IP) Leamos Team number 7 Name Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu IIV&V Off-campus Shaper Pragya Singh pragyasi@usc.edu System Architect Prototyper Shantanu Sirsamkar sirsamka@usc.edu Requirements Engineer Feasibility Analyst Suchita Doshi suchitad@usc.edu Prototyper Operational Concept Engineer Swapnil Savdekar savdekar@usc.edu Life Cycle Planner System Architect i

2 Version History Date Author Vers ion Changes made 11/21/11 Swapnil 1.0 Original template for Section 1. 12/12/11 Swapnil 1.1 Changes in capabilities plan Rationale Initial draft. Updated for DCR ARB, updated version ii

3 Table of Contents ITERATION PLAN (IP)... I VERSION HISTORY... II TABLE OF CONTENTS... III TABLE OF TABLES... IV TABLE OF FIGURES... V 1. Iteration Overview Capabilities to be Implemented Capabilities to be Tested Capabilities not to be tested CCD Preparation Plans iii

4 Iteration Plan Version 3.1 Table of Tables Table 1: Capabilities to be Implemented (CR)... 6 Table 2 : Capabilities to be Tested... 7 Table 3 : Capabilities not to be tested... Error! Bookmark not defined. iv

5 Iteration Plan Version 3.1 Table of Figures None v

6 1. Iteration Overview In the development phase of the Leamos project, there will be two iterations in the Construction Iteration. This document corresponds to the first iteration. This iteration begins at the end of Rebaselined Development Commitment Review (RDCR), and the milestone is Core Capability Drive-through. At the end of this iteration, we ll have a list of deliverables including executable core capabilities, executable system and Initial Operational Capability Working Set. 1.1 Capabilities to be Implemented In the first iteration, we will implement all the must-have capability requirements listed in the OCD Section OC-1 Simple username and password for the users Table 1: Capabilities to be Implemented No. Description Priority Increment There should be simple username and password for the students so that they can remember the credentials easily. OC-2 Flash to HTML 5 conversion OC-3 Data Migration OC-4 Integrate the current system with third party merchant system OC-5 Availability of username and password immediately after buying courses OC-6 Report generation The old lessons, currently in Flash format should be converted in HTML 5 format which will allow the users to watch the lessons on any HTML 5 supported browser The old database, currently in MS SQL, needs to be migrated in the new Database in MySQL which will help the system admins to maintain only a single database instead of two. The current system should allow the users to buy the course licenses online. This will help the users to get faster access to the courses. The customers buying the licenses should be provided with an immediate automated username and password. The admin should be able to generate reports to track the progress of the students and maintain various other records. 6

7 OC-7 Documentation / Video Tutorials Easy to understand documentation and video tutorials should be provided to the admin which will help them in maintaining the site easily (how to add/ remove courses etc.) without the requirement to hire another set of developers to do the same task. Must Have 2 OC-8 Forgot Password functionality OC-9 Videos in HTML 5 format OC-10 User Management to other organizations OC-11 Sales Website The system should provide the users a forgot password option if they forget their passwords, which will provide them their respective passwords on confirming their identity instead of contacting the admin every time to provide them with their passwords. The system should be able to allow the students to watch lectures online on the Leamos website on HTML 5 supported devices and browsers. Organizations will be able to manage their own students. Could Have 2 Could Have 2 Website for online sale of courses. Must have 1 Level of Service Goals LOS-1: Availability: The system should be up and running at all possible times except for maintenance time or system shut down LOS-2 Security: The system should be able to provide secure transfer of funds when a customer buys license(s) and pays online. This is done by Course Merchant. LOS-2 Ease of use: The system should be easy to use so that it is easier for the students to adapt the system Priority Level Must have Must have Must have 1.2 Capabilities to be Tested All the capabilities listed in Table 1 in Table 2 will be tested in this iteration. Capabilities to be tested are listed as follows. Table 2 : Capabilities to be Tested No. Description Priority Increment 7

8 OC-1 Simple username and password for the users OC-2 Flash to HTML 5 conversion OC-3 Data Migration OC-4 Integrate the current system with third party merchant system OC-5 Availability of username and password immediately after buying courses OC-6 Report generation OC-7 Documentation / Video Tutorials There should be simple username and password for the students so that they can remember the credentials easily. The old lessons, currently in Flash format should be converted in HTML 5 format which will allow the users to watch the lessons on any HTML 5 supported browser The old database, currently in MS SQL, needs to be migrated in the new Database in MySQL which will help the system admins to maintain only a single database instead of two. The current system should allow the users to buy the course licenses online. This will help the users to get faster access to the courses. The customers buying the licenses should be provided with an immediate automated username and password. The admin should be able to generate reports to track the progress of the students and maintain various other records. Easy to understand documentation and video tutorials should be provided to the admin which will help them in maintaining the site easily (how to add/ remove courses etc.) without the requirement to hire another set of developers to do the same task. Must Have 2 OC-8 Forgot Password functionality OC-9 Videos in HTML 5 format OC-10 User Management to other organizations The system should provide the users a forgot password option if they forget their passwords, which will provide them their respective passwords on confirming their identity instead of contacting the admin every time to provide them with their passwords. The system should be able to allow the students to watch lectures online on the Leamos website on HTML 5 supported devices and browsers. Organizations will be able to manage their own students. Could Have 2 Could Have 2 8

9 OC-11 Sales Website Website for online sale of courses. Must have Capabilities not to be tested All capabilities listed above will be tested. 9

10 CCD Preparation Plans The core capability drive through will be part of the next semester. So this will be completed in the next semester. << Identify the clients and other users who will be involved in the Core Capability Drive-through, the usage scenarios that it will support, and the specific CCD preparation plans and milestones. These may include - user context-setting - site preparation dry runs, - feedback forms, and - CCD risk management plans. >> To be defined later in the Development phase. 10

Prototype Report. Leamos. Team Number 7

Prototype Report. Leamos. Team Number 7 Prototype Report Leamos Team Number 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu IIV&V Off-campus Shaper

More information

Prototype Report Template Version 1.1. Prototype Report. Leamos. Team Number 7. Monty Shah Project Manager Life Cycle Planner

Prototype Report Template Version 1.1. Prototype Report. Leamos. Team Number 7. Monty Shah Project Manager Life Cycle Planner Prototype Report Template Version 1.1 Prototype Report Leamos Team Number 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) LEAMOS Team 7 Name Monty Shah Pragya Singh Shantanu Sirsamkar Suchita Doshi Swapnil Savdekar David Wiggins Primary Role Project Manager System Architect Requirements

More information

Prototype Report. Leamos. Team Number 7

Prototype Report. Leamos. Team Number 7 Leamos Team Number 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu IIV&V Off-campus Shaper Pragya Singh pragyasi@usc.edu

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) LEAMOS Team # 07 Name Primary Role Secondary Role Monty Shah Project Manager Life Cycle Planner Pragya Singh System Architect Prototyper Shantanu Sirsamkar Requirements Engineer Feasibility

More information

Acceptance Test Plan and Cases (ATPC)

Acceptance Test Plan and Cases (ATPC) Acceptance Test Plan and Cases (ATPC) Version 1.1 Acceptance Test Plan and Cases (ATPC) Leamos Team 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle

More information

Team 7- Client Interaction Report

Team 7- Client Interaction Report Team 7- Client Interaction Report Project Name: Leamos Client: Anamaria Ruiz, Centro Latino Team Members: Monty Shah Swapnil Savdekar Suchita Doshi Pragya Singh Shantanu Sirsamkar David Wiggins (DEN) Project

More information

Iteration Plan. LEMA Pilot School Integrated Scheduling System. Team No. 12. Name Primary Role Secondary Role

Iteration Plan. LEMA Pilot School Integrated Scheduling System. Team No. 12. Name Primary Role Secondary Role Iteration Plan LEMA Pilot School Integrated Scheduling System Team No. 12 Name Primary Role Secondary Role Neelima Agarwal Life Cycle Planner Project Manager Aakash Shah Prototyper Feasibility Analyst

More information

Life Cycle Plan (LCP)

Life Cycle Plan (LCP) Life Cycle Plan (LCP) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent Verification & Validation

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan (QMP) LEMA Pilot School Integrated Scheduling System. Team number 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet

More information

Iteration Plan. Improving Thai CDC Establishing a New Client/Donor/Partner Communications & Project Tracking Tool

Iteration Plan. Improving Thai CDC Establishing a New Client/Donor/Partner Communications & Project Tracking Tool Iteration Plan Improving Thai CDC Establishing a New Client/Donor/Partner Communications & Project Tracking Tool Team #: 01 Team Members & Roles Name Brandon Foster Ding Li Yi Li Ino Mantaring Vishal Punjabi

More information

Supporting Information Document (SID)

Supporting Information Document (SID) Supporting Information Document (SID) Template Version 6.0 Supporting Information Document (SID) LEMA Pilot School Integrated Scheduling System Team No. 12 Name Primary Role Secondary Role David Wiggins

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Farmworkers Safety App Team 09 TEAM MEMBER NAME Shobhit Agarwal Akshay Aggarwal Viraj Sahai Vahagen Sinanian Juan Andrade Basir Navab Marko Djuliarso

More information

Prototype Report Version 3.0. Prototype Report. LADOT Scanning. Team 08. Name Primary Role Secondary Role

Prototype Report Version 3.0. Prototype Report. LADOT Scanning. Team 08. Name Primary Role Secondary Role Prototype Report LADOT Scanning Team 08 Name Primary Role Secondary Role Anirudh Govil Project Manager Life Cycle Planner Jeffrey Colvin Prototyper Systems and Software Architect Aditya Kumar Feasibility

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan for LEMA Family Accountability System Version 3.3 Quality Management Plan (QMP) PROJECT TITLE LEMA FAMILY ACCOUNTABILITY SYSTEM TEAM NO #04 TEAM MEMBERS & ROLES NAME ROLES Teawon

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) SWIM MEET SIGNUP Team 03 Member Name Role Email Archan Dutta Project Manager, Life Cycle Planner archandu@usc.edu Deepanshu Suneja Software Architect, Developer suneja@usc.edu

More information

Feasibility Evidence Description (FED) COSMIC SYSTEM. Team 02. Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer

Feasibility Evidence Description (FED) COSMIC SYSTEM. Team 02. Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer Feasibility Evidence Description (FED) COSMIC SYSTEM Team 02 Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer Mishaal Aleem Prototyper/ Trainer / Implementer Rachel Inouye Operational Concept Engineer/

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Share Web Team 05 Name Xuan Wang Zhangbiaoge Tian Haoliang Gao Xi Chen Chuhan Zheng Yuxuan Li Role Life Cycle Planner & Project Manager Developer & Operation Concept

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) United Directed Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Transportation Grant Fund Database Team 14 Team Members Roles Roles Primary Secondary Muruganantham Raju Project Manager Feasibility Analyst Kirill Khistyaev Software Architect Project

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Version 1.1 Operational Concept Description (OCD) Scriptonomics Team - 07 Team Member USC Email Id Primary Role Secondary Role Aditya Holikatti holikatt@usc.edu Feasibility

More information

Supporting Information Document (SID)

Supporting Information Document (SID) Supporting Information Document (SID) Team No. 3 Istartonmonday.com Team members Role Kandarp Nyati Project Manager Fei Li Operational Concept Engineer Tanya Gautam Requirement Engineer Bharat Shugani

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Transportation Grant Fund Database Team #14 Team Members Kirill Khistyaev Karim Sacre Darren Liu Stephan Rice Zhanna Seitenova Ayman Khalil Roles (Primary)

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan (QMP) UDM United Direct Marketing Team 09 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang

More information

Prototype Report. Tour Conductor. Team 5

Prototype Report. Tour Conductor. Team 5 Prototype Report Tour Conductor Team 5 Team Members Ajay Kumar G C Manas Yadav Ankush H Prasad Aadithya B K Andrew Han Joseph Mouawad Roles Project Manager, Life Cycle Planner Feasibility Analyst, Prototyper/Builder

More information

Acceptance Test Plan and Cases (ATPC)

Acceptance Test Plan and Cases (ATPC) Acceptance Test Plan and Cases (ATPC) LEMA Pilot School Integrated Scheduling Team Number 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Healthy Kids Zone Survey App Team 14 Name Jessie Kim Primary Role Contact Email JKim@chc-inc.org Joseph Martinez JMartinez2@chc-inc.org Carson Malcoln MCarson@chc-inc.org Yang Wang

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Cash Doctor 3.0 Team 12 Steven Helferich: Project Manager, Developer Kenneth Anguka: IIV&V Xichao Wang: Operational Concept Engineer, Tester Alisha Parvez: Life Cycle Planner, Developer

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent Verification

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan (QMP) UDM United Direct Marketing Team 09 Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner/ Feasibility Analyst Shao-yen Cheng System Architect Yuan-Chang

More information

Improving Thai CDC. Team #: 01. Team Members & Roles

Improving Thai CDC. Team #: 01. Team Members & Roles Iteration Assessment Report (IAR) Improving Thai CDC Establishing a New Client/Donor/Partner Communications & Project Tracking Tool Team #: 01 Team Members & Roles Name Brandon Foster Charles Muckenthaler

More information

Prototype Report. We Are Trojans (WAT) Network. Team #1. Project Manager, Life Cycle Planner Feasibility Analyst, Operational Concept Engineer

Prototype Report. We Are Trojans (WAT) Network. Team #1. Project Manager, Life Cycle Planner Feasibility Analyst, Operational Concept Engineer Prototype Report We Are Trojans (WAT) Network Team #1 Team Members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop Srisopha Roles

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Social Networking Team #7 Team members Gaurav Doon Yixiang Liu Tao Hu Feng Wen Ronghui Zhang Xin Liu Kan Qi Role Project Manager Operational Concept Engineer Requirement

More information

This user guide covers how existing CSUFEDU Qualtrics account users can migrate their account from the CSUFEDU brand to the Fullerton brand.

This user guide covers how existing CSUFEDU Qualtrics account users can migrate their account from the CSUFEDU brand to the Fullerton brand. Quick Reference Guide Converting Your Qualtrics Account from CSUFEDU This user guide covers how existing CSUFEDU Qualtrics account users can migrate their account from the CSUFEDU brand to the Fullerton

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) REAL ESTATE INVESTMENT AND REVIEW TOOL TEAM 02 Venkata Sravanti Malapaka (Project Manager / Software Architect) Yuxuan Chen (Prototyper / Developer/Trainer)

More information

Regression Test Package (RTP)

Regression Test Package (RTP) Regression Test Package (RTP) LEMA Pilot School Integrated Scheduling System Team Number 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) GOTRLA Team 15 Deepak Earayil Project Manager & Software/System Architect Ankith Nagarle Prototyper & Operational Concept Engineer Aayush Jain Feasibility Analyst & Project Manager

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Perfecto Coffee Xpress Consistent Perfection Team 5 Chloe Good Yekaterina Glazko Edwards Hays Yucheng Hsieh Atreya Lahiri Jaimin Patel Yun Shen Andrew

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Healthy Kids Zone Survey App Team 14 Name Primary Role Contact Email Andreas Rivera Client ARivera@chc-inc.org Joseph Martinez Client Jmartinez2@chc-inc.org Malcolm Carson Client

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Student Scheduling System Team #06 Douglass Kinnes: Project Manager, Quality Focal Point, Implementation Team member Alexey Tregubov: System Architect, UML Modeler,

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Image Processing Platform Team 4 Name First Role Second Role Hao Wu Requirements Engineer Software Architect Junran Liu Operational Concept Engineer Software Architect

More information

Prototype Report. Team 02. Member Name Role . Rajat Verma Project Manager, Lifecycle Planner, Dev

Prototype Report. Team 02. Member Name Role  . Rajat Verma Project Manager, Lifecycle Planner, Dev Prototype Report Team 02 Member Name Role Email Rajat Verma Project Manager, Lifecycle Planner, Dev rajatver@usc.edu Preksha Gupta Software Architect, Operational Concept prekshag@usc.edu Engineer Mangalore

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) LiveRiot Video Editing System and social networking enhancement Team 04 Yang Li Haoyu Huang Project anager, Life Cycle Planner Feasibility Engineer, System Architect Ye Tian Zichuan

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) LINGGGO Team 3 Chicheng Ren Software Architect Dahai Li Quality Focal Point Dashun Wen Life Cycle Planner Kraingkrai Bumroungruksa Feasibility Analyst Siming Ye Operational

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) LADOT Scanning Team 08 Name Primary Role Secondary Role Anirudh Govil Project Manager Life Cycle Planner Jeffrey Colvin Prototyper Systems and Software

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Mission Science Information and Data Management System 3.0 Team 3 Fei Yu: Project Manager, Life Cycle Planner Yinlin Zhou: Prototyper, Operational Concept Engineer Yunpeng Chen: Requirements

More information

Acceptance Test Plan and Cases (ATPC)

Acceptance Test Plan and Cases (ATPC) Acceptance Test Plan and Cases (ATPC) LADOT Scanning Team No: 8 Anirudh Govil: Project Manager / Life Cycle Planner Aditya Kumar: Feasibility Analyst / Project Manager Corey Painter: IIV & V / Shaper Jeffrey

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) ShareWeb Team 5 Xuan Wang: Project Manager, Life Cycle Planner LiangHao Gao: Implementation Team member Xi Chen: Implementation Team member, UML Modeler, Tester Yuxuan

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Swim Meet Sign-Up Team 03 Member Archan Dutta Swasti Sharma Rasleen Sahni Deepanshu Suneja Vibhanshu Sharma Jenny Greer Role Project Manager, Life Cycle

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Discovery Tool Team 3 Josh Bendig - IIV&V Xizhao Deng - Project manager Jingzhou Hong - Requirement Engineer Guancheng Liu - Tester Michael Russo - Prototyper Shenghao Tang -

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) United Direct Marketing Team 9 Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Spherical Modeling Tool Team 13 Minsuk Heo, Prototyper Lyle Franklin, Project Manager Mehmet Sezer, Requirements Engineer Oziel De Oliveira Carneiro,

More information

System and Software Support Plan (SP)

System and Software Support Plan (SP) System and Software Support Plan (SP) Student Scheduling System Team06 Douglass Kinnes: Project Manager, Quality Focal Point, Implementation Team member Alexey Tregubov: System Architect, UML Modeler,

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) LEMA Integrated Scheduling System Team 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet Kaur

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) SnApp Voice Communication System Team 05 Divij Durve IIV&V Harsh Mhatre System/Software Architect Khyati Thakur Prototyper Monica Varhale Feasibility Analyst Nikita Gupta Project Manager

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Construction Meeting Minutes App Team 6 Pradeep Muruganandam - Prototyper and Quality Focal Point Dennis Evans - System Architect, Project Manager Pavan Lingambudhi Seshadri Vasan

More information

Prototype Report (PRO) Version 4.0. Prototype Report. Smart Locks Control. Team 05. Spring 2018 Team Members: Terence Williams William Goishi

Prototype Report (PRO) Version 4.0. Prototype Report. Smart Locks Control. Team 05. Spring 2018 Team Members: Terence Williams William Goishi Prototype Report (PRO) Version 4.0 Prototype Report Smart Locks Control Team 05 Spring 2018 Team Members: Alex Miller Diego Brandao Terence Williams William Goishi Nicholas Kwong Project Manager Implementer

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Tipsure.com Team# 09 Member Name Jonathan Tuse Raymond Feng David Brenn-Cogen Aayushi Birla Tej Trivedi Nirupama Vaidyanathan Linkun Li Primary Role

More information

Software Installation Manual

Software Installation Manual Software Installation Manual LEMA Course Scheduling System Team 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet Kaur Developer Developer

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) CRCD Management System Team 11 Muzzammil Imam Project Manager, Implementer Jason Loewy - Implementer Fan Xu Trainer, Tester, Implementer Adarsh Khare Trainer, Tester, Implementer

More information

Bing Shopping program Merchant Migration Guide 1/17/2011

Bing Shopping program Merchant Migration Guide 1/17/2011 Bing Shopping program Merchant Migration Guide 1/17/2011 What is the purpose of this guide? This guide will walk you through migrating your existing merchant center account to the new Bing shopping adcenter

More information

Prototype Report Version 2.0. Prototype Report. Transportation Grant Fund. Team 14. Operational Concept Engineer

Prototype Report Version 2.0. Prototype Report. Transportation Grant Fund. Team 14. Operational Concept Engineer Prototype Report Transportation Grant Fund Team 14 Full Name Muruganantham Raju Kirill Khistyaev Karim Sacre Reza B Far Stephan Rice Zhanna Seitenova Ayman Khalil Primary Role Project Manager Software

More information

Prototype Report Version 1.1. Prototype Report. Transportation Grant Fund. Team 14. Operational Concept Engineer

Prototype Report Version 1.1. Prototype Report. Transportation Grant Fund. Team 14. Operational Concept Engineer Prototype Report Transportation Grant Fund Team 14 Full Name Muruganantham Raju Kirill Khistyaev Karim Sacre Reza B Far Stephan Rice Zhanna Seitenova Ayman Khalil Primary Role Project Manager Software

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng (Gary) Project Manager Integrated Independent

More information

System Admin Manual <SNAPVALET> <Team No- 03>

System Admin Manual <SNAPVALET> <Team No- 03> System Admin Manual Name Brian Vanover Brian Bousman Ditong Ding Molly Karcher Patrick Horng Ridhima Manjrekar Role Project Manager, Developer Operational Concept Engineer, Developer

More information

2017 Accenture. All Rights Reserved. PWM USER GUIDE

2017 Accenture. All Rights Reserved. PWM USER GUIDE PWM USER GUIDE There are three operations that can be performed through PWM. These are: Operations Change Password Forgot Password First Time User Usage When the user remembers their password but still

More information

Training Plan. Tour Conductor. Team-05

Training Plan. Tour Conductor. Team-05 Training Plan Tour Conductor Team-05 Name Ankush H Prasad Ajay Kumar G C Aadithya B Andrew Han Joseph Mouawad Manas Yadav Rohit Ravindra Role System Architect, Project Manager, Prototyper/Builder. Project

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

DCR ARB Presentation. CS577a Fall 2015 Team 2

DCR ARB Presentation. CS577a Fall 2015 Team 2 DCR ARB Presentation CS577a Fall 2015 Team 2 -Sultan Alsarra -Aref Shafaeibejestan -Adil Cem Albayrak -Mohammad Almunea -Charles Reitz -Julapat Julnual -Andrea Brown -Travis Weaver Outline 2 :: Remote

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Team 02 Member Name Role Email Rajat Verma Project Manager, Lifecycle Planner, Dev rajatver@usc.edu Preksha Gupta Software Architect, Operational Concept prekshag@usc.edu Engineer

More information

Prototype Report (PRO) Version 1.2. Prototype Report. Women at Work. Team No: 14. Sr no Name Role 1 Srikant Madhava Project Manager

Prototype Report (PRO) Version 1.2. Prototype Report. Women at Work. Team No: 14. Sr no Name Role 1 Srikant Madhava Project Manager Prototype Report Women at Work Team No: 14 Sr no Name Role 1 Srikant Madhava Project Manager 2 Sanath Bhandary Operational Concept Engineer 3 Rohit Kudva Feasibility Analyst 4 Varma Maryala Life Cycle

More information

Parent Handbook: Campus Portal Account Activation

Parent Handbook: Campus Portal Account Activation Parent Handbook: Campus Portal Account Activation Table of Contents Introduction... 1 FOR PARENTS... 1 Parent receives an email with a link... 2 Campus Security Features... 5 If You Forget Your Password

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Mobil Application for Mobile-Controlled Lighting Team 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Fōkcus Team 08 Name Role Steven Holland Requirement Engineer, Prototyper Arik Oganesian Operation Concept Engineer, Software Architect Marco Alvarez Feasibility

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Construction Meeting Minutes Application Team 6 Pradeep Muruganandam - Prototyper and Quality Focal Point Dennis Evans - System Architect, Project Manager

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) E-Lockbox 05 Team Members Miles Gui Huaiqi Wang Weiyi Zhong Woon Kim Miles Gui Cecilia Jou Roles Project Manager Builder & Feasibility analyst Tester & Operational

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Web Media Modernization 2012 Team 7 Anvar Bagiyev (Operational Concept Engineer, Tester) Shawn Han (Software/System Architect, Tester) Barney Hsiao (Prototyper,

More information

WebStore User Guide. For Lifetouch Yearbook Users

WebStore User Guide. For Lifetouch Yearbook Users WebStore User Guide For Lifetouch Yearbook Users 10812 Telesis Court, Suite 100 - San Diego, CA 92121 (858) 964-3800 Toll free (888) 543-7223 Fax (858) 551-7619 (888) 490-1555 Support http://www.activeeducate.com

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) ShareWeb Team 05 Xuan Wang: Project Manager, Life Cycle Planner LiangHao Gao: Implementation Team member Xi Chen: Implementation Team member, UML Modeler,

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Mission Science irobots 12/06/2014 Team 07 Ashwini Ramesha Chen Li Farica Mascarenhas Jiashuo Li Ritika Khurana Siddhesh Rumde Sowmya Sampath Yun Shao

More information

My Lakeland Student Guide

My Lakeland Student Guide My Lakeland Student Guide My Lakeland is your connection to your class schedule, your grades, your student account and your personal contact information. Known in technical terms as a student self-service

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Social Networking Team #7 Team members Gaurav Doon Yixiang Liu Tu Duong Ronghui Zhang Kan Qi Role Project Manager Developer IV&V Tester Developer 11/23/2013 Version

More information

Installing WordPress CMS

Installing WordPress CMS Installing WordPress CMS Extract the contents of the wordpress zip file to D:/public_html/wordpress folder as shown in diagram 1. D:/public_html/wordpress is a virtual domain controlled by Apache Web server

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Image Processing Platform Team 4 Name First Role Second Role Hao Wu Requirements Engineer Software Architect Junran Liu Operational Concept Engineer

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) Mobile Application for Mobile-Controlled Lighting 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey Stall Feasibility

More information

Welcome to Wilfrid Laurier University!

Welcome to Wilfrid Laurier University! Welcome to Wilfrid Laurier University! As a student, you will use your network account to access your student e-mail (also referred to as the My Laurier e-mail), My Learning Space, campus computers, I:

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Farm Workers Web Application Team 09 TEAM MEMBER NAME Juan Andrade Theerapat Chawannakul Fereshteh Khorzani Basir Navab Vahagen Sinanian David Tasky ROLES Project

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Scriptonomics Team - 07 Team Member USC Email Id Primary Role Secondary Role Aditya Holikatti holikatt@usc.edu Feasibility Engineer Software Developer Alex Miller

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Early Medieval East Asian Timeline Team 9 Daniel Link Ainsley Chong Priyanka Shetty Aarti Kumar Gupta Abdullah Alkahtani Byron Robert Chan System Architect

More information

Getting Started with Outlook Web App (OWA)

Getting Started with Outlook Web App (OWA) Getting Started with Outlook Web App (OWA) Office 365 User Guide When first accessing your new Office 365 account, or if you are having any issues with your regular email client, use the below directions

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Smart Locks Control Team 05 Team Member: Vaibhav Vishal Diego Brandao Zhe Wang Mohammadreza Barazesh Alejandro Monroy Hao-Yun Yang Katarzyna Ruszowska Project Manager,

More information

Step-by-Step Guide to Ansur Executive 3.0 Installation With or without Electronic Signatures

Step-by-Step Guide to Ansur Executive 3.0 Installation With or without Electronic Signatures Step-by-Step Guide to Ansur Executive 3.0 Installation With or without Electronic Signatures Ansur with Electronic Signatures Background: Electronic signature is a new feature that is implemented in Ansur

More information