System and Software Support Plan (SP)

Size: px
Start display at page:

Download "System and Software Support Plan (SP)"

Transcription

1 System and Software Support Plan (SP) Student Scheduling System Team06 Douglass Kinnes: Project Manager, Quality Focal Point, Implementation Team member Alexey Tregubov: System Architect, UML Modeler, Implementation Team member Mihir Daptardar : Operational Concept Engineer, Quality Focal Point, Tester Ihsan Tolga : Life Cycle Planner, Feasibility Analyst, Implementation Team member Simone Lojeck : IV&V, Quality Focal Point, Shaper 04/13/2013

2 Version History Date Author Version Changes made Rationale 04/13/2013 Ihsan Tolga 1.0 Support Plan composed. Environment items and responsibilities are defined. Support strategy defined. Ready for IOC2 and TS. Data taken from records and conducted sessions. SP_IOC2_S13b_T06_V1.0 ii Version Date: 04/13/13

3 Table of Contents SYSTEM AND SOFTWARE SUPPORT PLAN (SSSP)... I VERSION HISTORY... II TABLE OF CONTENTS... III TABLE OF TABLES... IV 1. Support Objectives and Assumptions Support Objectives Support Support Strategy Support Lifetime Release Strategy Release Requirement Determination Release Process Support Environment Hardware Software Facilities Support Responsibilities... 6 SP_IOC2_S13b_T06_V1.0 iii Version Date: 04/13/13

4 Table of Tables Table 1: Release Requirement Determination... 3 Table 2: Description of Software required in Support Plan... 4 Table 3: Stakeholders and their supporting responsibilities... 6 SP_IOC2_S13b_T06_V1.0 iv Version Date: 04/13/13

5 1. Support Objectives and Assumptions 1.1 Support Objectives The main purpose of the System and Software Support Plan is to support the key stakeholders of Student Scheduling System project throughout the transition, operation and the maintenance period. The main objectives of support plan of Student Scheduling System can be listed as follows: To provide maintainers of the Student Scheduling System with sufficient capabilities to handle emerging performance issues of the system. To provide maintainers of the Student Scheduling System with sufficient experience and knowledge to overcome possible malfunctions during the operations phase. Due to the nature of CS577 course and developer team structure; to provide maintainers of Student Scheduling System with enough resources and capabilities to add new features to the system or modifying the existing ones. To define environmental variables and hardware / software arguments of the Student Scheduling System. To provide a supplementary resource for User Manual and Training Plan regarding the transition of the system and initial training concerns. 1.2 Support To keep the Student Scheduling System operating and in service properly; several preconditions must be kept satisfied all the time system runs. These key requirements are given below as assumptions which should be valid. The client side and the school are responsible for web hosting, maintenance and running servers. The client side is the decision maker of system preference between legacy system and Student Scheduling System. Student advisors should be very familiar about course scheduling and study plans in case of system failures. The maintainer team is familiar with the architecture and the use cases of Student Scheduling System. The maintainers are familiar with the course structure and system of the department (Steven s Institute of Technology). They also have enough knowledge about course relations and levels and credit system. SP_IOC2_S13b_T06_V1.0 1 Version Date: 04/13/13

6 The client side will conduct required/demanded upgrades and modifications to the system on their own behalf. The development team cannot be in service after the project delivery due to the CS577b structure and course plan. The documents required are given with final deliverables to the client. The required hardware, software and site preparations are done by the client side due to long physical distance between development team and the client. 2. Support Strategy 2.1 Support Lifetime Until the end of the CS577b Software Engineering Spring 2013 course (05/10/2013); maintenance support and other required technical help will be given by the developer team (Team06) to the client. By this time, user training and dry runs are also held via web-conferences and screen sharing which are also supported by the regular weekly meetings. Apart from these subjects above; User Manual, Training Plan and other resources (including sample data) are provided to the client by developer team with System and Software Support Plan for future uses/ 2.2 Release Strategy The initial full capability version of Student Scheduling System (with respect to the 80% of full capability concern) was provided by Core Capability Drive-through (CCD) session. After CCD, small releases are provided regarding the client concerns and bug fixes until Transition Readiness Review (TRR) with respect to the full customer satisfaction concern of developer team. It is agreed that; in case client has some minor demands/changes about the system (mostly related to user interface, not internal structures), the developer team might provide new releases after TRR until May 10 th 2013, the end of the CS577b course. The new releases during the operation phase of Student Scheduling System will be issued by maintainers designated by the client side. The required info for future system transformation and maintenance are given with the final deliverables package and they are also available on team webpage. SP_IOC2_S13b_T06_V1.0 2 Version Date: 04/13/13

7 2.3 Release Requirement Determination The expected primary drivers of new release content of Student Scheduling System are given in the table below. Table 1: Release Requirement Determination Drivers Responsible Role Small modification mostly related to user interface of the system and Development Team visualizations. Adding new medium level changes (i.e. new arguments for solver Maintainers algorithm) Small user interface changes, new pages / screens Maintainers Service level improvements and performance advancements Maintainers Recently discovered bug fixes / defect removals Maintainers / Development Team (by the end of CS577b) Changes regarding system environment (New host, hardware change, Maintainers database modifications) 2.4 Release Process After the client side designated its capable maintainer staff and their training session, these maintainer team need to define a policy which can orient the release process given below. It is assumed that the software / hardware environment for the system and the hosting are already up and running. Designating people among the maintainers (or outsourcing) for the new release. The identification of needs / requirements for the new release which also includes the tracked bugs if exist. Conducting a brief business case analysis and effort / cost calculation for the new release. Developing the new release. (Includes storing the back-up data and source files, environment variables etc.) Testing the recently developed components and components interoperability. Complete testing of the new release. Preparing the transition site and hardware / software. Transitioning the new release after the current log is saved. Updating the users of the system with the new release and informing. Setting up the database with pre-stored data. Observing the performance of new release, issue resolution if necessary. SP_IOC2_S13b_T06_V1.0 3 Version Date: 04/13/13

8 3. Support Environment For long-term operating Student Scheduling System, the following hardware / software requirements and the facilities should be acquired by the client side / user side. 3.1 Hardware Server Side Hardware Requirements: Processor : Intel Xeon E3xxx Processor or equivalent. Memory : 3GB + 5GB for Database Data Bandwidth : (Relative to the simultaneous numbers of users.) ~1 Mbit/s Domain Name and Dedicated IP address I/O Devices for Maintenance Issues User Side Hardware Requirements: Processor : Intel Centrino/Core/Celeron/PentiumIV; AMD Athlon/Phenom/FX processors or equivalent. Memory : 1GB Internet Connection I/O Devices to operate Web Browsers properly. 3.2 Software Table 2: Description of Software required in Support Plan UNIX Server or Windows Server To run Student Scheduling System on server machine. ; unixhelp.ed.ac.uk Unix is available on Unix web page. Microsoft Server need license. Steven s Institute of Technology already has required servers. Java Runtime Environment Required middle layer to operate Java both on user and server machines docs.oracle.com/javase/7/docs/api Java Version 7 Update 17 is available on It is required to run /java files and for PLAY framework MySQL To maintain and operate a relational database for the system. dev.mysql.com/doc/en MySQL is free and open source database software. Download is available on dev.mysql.com/downloads ; release It works well with Xampp. PLAY Framework for Java/Scala Student Scheduling System is based on this Java framework. It is free and version is available for download on SP_IOC2_S13b_T06_V1.0 4 Version Date: 04/13/13

9 It is required for maintenance of the system. Java Editor (Eclipse) To monitor/modify.java source files and related developer actions. Eclipse is open source, free and available on A strong IDE like Eclipse is required for maintenance concerns. Xampp To access MySQL and Apache Web Server function for maintenance concerns. ; Xampp is free and available on It is highly recommended to access MySQL database and for maintenance issues. Web Browser (Mainstream browsers i.e. Mozilla Firefox, Google Chrome) To access the HTML codes generated by Student Scheduling System. Documentation and manuals are available in related browsers web-page and help tab. Mainstream web browsers are freeware and available in their related pages. Google Chrome or Mozilla Firefox is recommended. 3.3 Facilities Student Scheduling System is a web-based application running on users web browser and Java virtual machine and the hosting should be on a web-server running Java as well. As a result; there is no special facility required to run / operate the system particularly. SP_IOC2_S13b_T06_V1.0 5 Version Date: 04/13/13

10 4. Support Responsibilities Key stakeholder roles for the Student Scheduling System and their related roles / skills are given in the table below. Items for the development team (Team06) cover the period by 05/10/2013 the end of the course and starting of the operation phase of the project lifecycle. Table 3: Stakeholders and their supporting responsibilities Stakeholder Supporting roles # Supporting Skills Development Team (Team06) Releasing new versions by the end of the CS577b course. 5 Implementation skills with Java, MySQL and Providing User Manual and Training web-app. Plan for customer. Training knowledge, Providing System and Software Support Plan for future maintenance. Web design and knowledge about user Providing training to the client and preparing final deliverables with development documents as well. interface software. Client (David Klappholz) Designating maintenance people. Informing students about the new Student Scheduling System and leading the operation/transition before Fall 2013 semester. Receiving feedback from users of the system and planning future releases. 1 Project administration. Project management. Java, web-app. Maintainers (for maintain) Maintaining the Student Scheduling System Resolving emerged defects and malfunctions. Resolving performance issues with the system. Tracking shortfalls about the system during operation phase and required features, 2 Knowledge about Java, PLAY framework, MySQL, web-app. Knowledge about courses and relation between courses in Steven s Institute. Maintainers (for developing future releases) Identifying needs, calculating effort and costs for new releases. Planning for new releases, setting environments and storing data. Implementing new version releases for Student Scheduling System Modifying existing controllers, solver and user interface. 1 Knowledge about Java, PLAY framework, MySQL, web-app. Knowledge about courses and relation between courses Knowledge about HTML and Scala development SP_IOC2_S13b_T06_V1.0 6 Version Date: 04/13/13

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Student Scheduling System Team #06 Douglass Kinnes: Project Manager, Quality Focal Point, Implementation Team member Alexey Tregubov: System Architect, UML Modeler,

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) LEMA Integrated Scheduling System Team 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet Kaur

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) United Directed Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Mental Math Team 07 Isha Agarwal Prototyper, Life Cycle Planner, Implementer JingXing Cheng Implementer Kajal Taneja Operational Concept Engineer, UML Modeler, Implementer

More information

Feasibility Evidence Description (FED) COSMIC SYSTEM. Team 02. Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer

Feasibility Evidence Description (FED) COSMIC SYSTEM. Team 02. Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer Feasibility Evidence Description (FED) COSMIC SYSTEM Team 02 Sam Lehardi Project Manager/ Life Cycle Planner/ Trainer Mishaal Aleem Prototyper/ Trainer / Implementer Rachel Inouye Operational Concept Engineer/

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Discovery Tool Team 3 Josh Bendig - IIV&V Xizhao Deng - Project manager Jingzhou Hong - Requirement Engineer Guancheng Liu - Tester Michael Russo - Prototyper Shenghao

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Fōkcus Team 08 Name Role Steven Holland Requirement Engineer, Prototyper Arik Oganesian Operation Concept Engineer, Software Architect Marco Alvarez Feasibility

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Healthy Kids Zone Survey App Team 14 Name Jessie Kim Primary Role Contact Email JKim@chc-inc.org Joseph Martinez JMartinez2@chc-inc.org Carson Malcoln MCarson@chc-inc.org Yang Wang

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

MGA Developing Interactive Systems (5 ECTS), spring 2017 (16 weeks)

MGA Developing Interactive Systems (5 ECTS), spring 2017 (16 weeks) MGA 672 - Developing Interactive Systems (5 ECTS), spring 2017 (16 weeks) Lecturer: Ilja Šmorgun ilja.smorgun@idmaster.eu, Sónia Sousa sonia.sousa@idmaster.eu Contact Details: All email communication regarding

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan (QMP) UDM United Direct Marketing Team 09 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) LEAMOS Team # 07 Name Primary Role Secondary Role Monty Shah Project Manager Life Cycle Planner Pragya Singh System Architect Prototyper Shantanu Sirsamkar Requirements Engineer Feasibility

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) United Direct Marketing Team 9 Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Cash Doctor 3.0 Team 12 Steven Helferich: Project Manager, Developer Kenneth Anguka: IIV&V Xichao Wang: Operational Concept Engineer, Tester Alisha Parvez: Life Cycle Planner, Developer

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) ShareWeb Team 5 Xuan Wang: Project Manager, Life Cycle Planner LiangHao Gao: Implementation Team member Xi Chen: Implementation Team member, UML Modeler, Tester Yuxuan

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Mission Science Information and Data Management System 3.0 Team 3 Fei Yu: Project Manager, Life Cycle Planner Yinlin Zhou: Prototyper, Operational Concept Engineer Yunpeng Chen: Requirements

More information

Iteration Plan (IP) Leamos. Team number 7. Name Address Primary Role Secondary Role

Iteration Plan (IP) Leamos. Team number 7. Name  Address Primary Role Secondary Role Iteration Plan (IP) Leamos Team number 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle Planner David Wiggins dgwiggin@usc.edu IIV&V Off-campus Shaper

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) PicShare Team 1 Logan Chang Project Manager, Mobile Developer Jiashun Zhou Mobile Developer Yew Hua Chua Backend Developer Haihao Lu Backend Developer Yunwei Yuan

More information

ORACLE SERVICES FOR APPLICATION MIGRATIONS TO ORACLE HARDWARE INFRASTRUCTURES

ORACLE SERVICES FOR APPLICATION MIGRATIONS TO ORACLE HARDWARE INFRASTRUCTURES ORACLE SERVICES FOR APPLICATION MIGRATIONS TO ORACLE HARDWARE INFRASTRUCTURES SERVICE, SUPPORT AND EXPERT GUIDANCE FOR THE MIGRATION AND IMPLEMENTATION OF YOUR ORACLE APPLICATIONS ON ORACLE INFRASTRUCTURE

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Mobil Application for Mobile-Controlled Lighting Team 13 Saumil Kasbekar Sayali Sakhalkar Anuradha Saini Priyank Mishra Sagar Sarda Ashutosh Kale Corey Stall Feasibility Analyst Software

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent Verification

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) SWIM MEET SIGNUP Team 03 Member Name Role Email Archan Dutta Project Manager, Life Cycle Planner archandu@usc.edu Deepanshu Suneja Software Architect, Developer suneja@usc.edu

More information

System and Software Support Plan (SSSP)

System and Software Support Plan (SSSP) System and Software Support Plan (SSSP) Farm Workers Web Application Team 09 TEAM MEMBER NAME Juan Andrade Theerapat Chawannakul Fereshteh Khorzani Basir Navab Vahagen Sinanian David Tasky ROLES Project

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) LINGGGO Team 3 Chicheng Ren Software Architect Dahai Li Quality Focal Point Dashun Wen Life Cycle Planner Kraingkrai Bumroungruksa Feasibility Analyst Siming Ye Operational

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) SnApp Voice Communication System Team 05 Divij Durve IIV&V Harsh Mhatre System/Software Architect Khyati Thakur Prototyper Monica Varhale Feasibility Analyst Nikita Gupta Project Manager

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) E-Lockbox 05 Team Members Miles Gui Huaiqi Wang Weiyi Zhong Woon Kim Miles Gui Cecilia Jou Roles Project Manager Builder & Feasibility analyst Tester & Operational

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Smart Locks Control Team 05 Team Member: Vaibhav Vishal Diego Brandao Zhe Wang Mohammadreza Barazesh Alejandro Monroy Hao-Yun Yang Katarzyna Ruszowska Project Manager,

More information

Life Cycle Plan (LCP)

Life Cycle Plan (LCP) Life Cycle Plan (LCP) The Los Angeles Community Garden Inventory and Locator Team 13 Ardalan Yousefi Cole Cecil Jeff Tonkovich Shi-Xuan Zeng Project Manager Integrated Independent Verification & Validation

More information

Acceptance Test Plan and Cases (ATPC)

Acceptance Test Plan and Cases (ATPC) Acceptance Test Plan and Cases (ATPC) Version 1.1 Acceptance Test Plan and Cases (ATPC) Leamos Team 7 Name Email Address Primary Role Secondary Role Monty Shah montysha@usc.edu Project Manager Life Cycle

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Scriptonomics Team - 07 Team Member USC Email Id Primary Role Secondary Role Aditya Holikatti holikatt@usc.edu Feasibility Engineer Software Developer Alex Miller

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) FlowerSeeker Team 05 Name Eder Figueroa Sophia Wu Doris Lam Hiram Garcia Roles Primary Role: Project Manager/ Implementer. Secondary Role: Tester. Primary Role: Tester/ Trainer Secondary

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Construction Meeting Minutes App Team 6 Pradeep Muruganandam - Prototyper and Quality Focal Point Dennis Evans - System Architect, Project Manager Pavan Lingambudhi Seshadri Vasan

More information

Acceptance Test Plan and Cases (ATPC)

Acceptance Test Plan and Cases (ATPC) Acceptance Test Plan and Cases (ATPC) LEMA Pilot School Integrated Scheduling Team Number 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet

More information

CSE 403 Spring UDub Mail. Gabriel Maganis Sachin Pradhan. April 04, 2006

CSE 403 Spring UDub Mail. Gabriel Maganis Sachin Pradhan. April 04, 2006 CSE 403 Spring 2006 UDub Mail Gabriel Maganis Sachin Pradhan April 04, 2006 Operational Concepts Scenario Paul Wall, a UW student got admitted into the CSE department and gets his @cs.washington.edu e-mail

More information

TRR ARB Presentation. Women at Work Website Redesign

TRR ARB Presentation. Women at Work Website Redesign TRR ARB Presentation Women at Work Website Redesign Operational Concept Overview Sanath Bhandary Srikanth Madhava Operational Concept Overview Old Business Workflow Registration Feedback Check-in Report

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) GOTRLA Team 15 Deepak Earayil Project Manager & Software/System Architect Ankith Nagarle Prototyper & Operational Concept Engineer Aayush Jain Feasibility Analyst & Project Manager

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan (QMP) LEMA Pilot School Integrated Scheduling System. Team number 12 Name Primary Role Secondary Role David Wiggins Project Manager Developer Aakash Shah Prototyper Developer Kushalpreet

More information

EVACUATE PROJECT WEBSITE

EVACUATE PROJECT WEBSITE FP7-313161 A holistic, scenario-independent, situation-awareness and guidance system for sustaining the Active Evacuation Route for large crowds EVACUATE PROJECT WEBSITE Deliverable Identifier: D.12.1

More information

Prototype Report. We Are Trojans (WAT) Network. Team #1. Project Manager, Life Cycle Planner Feasibility Analyst, Operational Concept Engineer

Prototype Report. We Are Trojans (WAT) Network. Team #1. Project Manager, Life Cycle Planner Feasibility Analyst, Operational Concept Engineer Prototype Report We Are Trojans (WAT) Network Team #1 Team Members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Punyawee Pakdiying Saloni Priya Ameer Elkordy Suleyman Erten Kamonphop Srisopha Roles

More information

Synergy Distributed Meeting Scheduler. Project Plan. Revision 2.0. CS 6361 Advance Requirements Engineering Fall 2008

Synergy Distributed Meeting Scheduler. Project Plan. Revision 2.0. CS 6361 Advance Requirements Engineering Fall 2008 Synergy Distributed Meeting Scheduler Project Plan Revision 2.0 CS 6361 Advance Requirements Engineering Fall 2008 Team Members: Name Email Phone Student ID Animesh Roy animesh.roy@student.utdallas.edu

More information

Terms of Reference for Development of Visit Bhutan 2015 Year Web Portal

Terms of Reference for Development of Visit Bhutan 2015 Year Web Portal Terms of Reference for Development of Visit Bhutan 2015 Year Web Portal This document describes the requirements for the development of Visit Bhutan 2015 Year web portal for Tourism Council of Bhutan.

More information

Oracle Virtual Desktop Client for ipad. Release Notes for Release 1.2

Oracle Virtual Desktop Client for ipad. Release Notes for Release 1.2 Oracle Virtual Desktop Client for ipad Release Notes for Release 1.2 E37118-01 January 2013 Oracle Virtual Desktop Client for ipad: Release Notes for Release 1.2 Copyright 2013, Oracle and/or its affiliates.

More information

MyBucks for Faculty and Staff

MyBucks for Faculty and Staff MyBucks for Faculty and Staff MyBucks is the central area where college related information is located. Additionally, MyBucks provides access to the various college systems such as WebAdvisor, Datatel,

More information

Testing your TLS version

Testing your TLS version Testing your TLS version If you are not able to access Progressive Leasing websites, you may need to upgrade your web browser or adjust your settings. In order to test your TLS version to see if it is

More information

Class 1 Introduction to Selenium, Software Test Life Cycle.

Class 1 Introduction to Selenium, Software Test Life Cycle. Class 1 Introduction to Selenium, Software Test Life Cycle. I) Introduction to Selenium 1) What is Selenium? 2) History of the Selenium Project 3) Selenium Components / Selenium s Tool Suite 4) Platforms

More information

Quick Guide to Boardingware: Parent Account

Quick Guide to Boardingware: Parent Account Quick Guide to Boardingware: Parent Account A simple instruction manual to getting started with Boardingware. This guide will cover: 1. Connecting to your child. 2. Approving your child s leave request.

More information

Transition Plan (TP)

Transition Plan (TP) Transition Plan (TP) Transportation Grant Fund Database Team 14 Team Members Roles Roles Primary Secondary Muruganantham Raju Project Manager Feasibility Analyst Kirill Khistyaev Software Architect Project

More information

i-vu Pro v6.0 client, server, operating system, and database requirements

i-vu Pro v6.0 client, server, operating system, and database requirements i-vu Pro v6.0 CARRIER CORPORATION 2015 A member of the United Technologies Corporation family Stock symbol UTX Catalog No. 11-808-418-01 7/29/2015 Verify that you have the most current version of this

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Mental Math Team - 7 Chang Yu Prototyper, Implementer, Requirements Engineer Isha Agarwal Prototyper, Life Cycle Planner, Implementer JingXing Cheng Implementer Kajal

More information

Bug tracking. Second level Third level Fourth level Fifth level. - Software Development Project. Wednesday, March 6, 2013

Bug tracking. Second level Third level Fourth level Fifth level. - Software Development Project. Wednesday, March 6, 2013 Bug tracking Click to edit Master CSE text 2311 styles - Software Development Project Second level Third level Fourth level Fifth level Wednesday, March 6, 2013 1 Prototype submission An email with your

More information

Quality Management Plan (QMP)

Quality Management Plan (QMP) Quality Management Plan for LEMA Family Accountability System Version 3.3 Quality Management Plan (QMP) PROJECT TITLE LEMA FAMILY ACCOUNTABILITY SYSTEM TEAM NO #04 TEAM MEMBERS & ROLES NAME ROLES Teawon

More information

Inline HTML Editor does not load preventing typing in text field

Inline HTML Editor does not load preventing typing in text field Inline HTML Editor does not load preventing typing in text field Date Published: Oct 04,2013 Category: Product:ANGEL; Version:ANGEL_8_0 Article No.: 000034456 Product: ANGEL Issue Description: The Inline

More information

Iteration Plan. LEMA Pilot School Integrated Scheduling System. Team No. 12. Name Primary Role Secondary Role

Iteration Plan. LEMA Pilot School Integrated Scheduling System. Team No. 12. Name Primary Role Secondary Role Iteration Plan LEMA Pilot School Integrated Scheduling System Team No. 12 Name Primary Role Secondary Role Neelima Agarwal Life Cycle Planner Project Manager Aakash Shah Prototyper Feasibility Analyst

More information

ASTRA USER GUIDE. 1. Introducing Astra Schedule. 2. Understanding the Data in Astra Schedule. Notes:

ASTRA USER GUIDE. 1. Introducing Astra Schedule. 2. Understanding the Data in Astra Schedule. Notes: ASTRA USER GUIDE 1. Introducing Astra Schedule Astra Schedule is the application used by Academic Space Scheduling & Utilization to schedule rooms for classes and by academic colleges, schools, and departments

More information

Prototype Report (PRO) Version 4.0. Prototype Report. Smart Locks Control. Team 05. Spring 2018 Team Members: Terence Williams William Goishi

Prototype Report (PRO) Version 4.0. Prototype Report. Smart Locks Control. Team 05. Spring 2018 Team Members: Terence Williams William Goishi Prototype Report (PRO) Version 4.0 Prototype Report Smart Locks Control Team 05 Spring 2018 Team Members: Alex Miller Diego Brandao Terence Williams William Goishi Nicholas Kwong Project Manager Implementer

More information

Nolij Transfer 6 Migration Planning & Preparation. Danielle Whitney Services Product Manager

Nolij Transfer 6 Migration Planning & Preparation. Danielle Whitney Services Product Manager Nolij Transfer 6 Migration Planning & Preparation Danielle Whitney Services Product Manager Introduction Preparation and Planning is key to every successful Nolij Transfer project. In this session we will

More information

o Processor, disk space, and memory o Screen size and resolution o Certain testing accommodations

o Processor, disk space, and memory o Screen size and resolution o Certain testing accommodations Supported System Requirements for TABE Online Testing Effective October February 2019 This document describes the current system requirements for the DRC INSIGHT Online Learning System, including student-testing

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Early Medieval East Asian Timeline Team 9 Daniel Link Ainsley Chong Priyanka Shetty Aarti Kumar Gupta Abdullah Alkahtani Byron Robert Chan System Architect

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

Alkan University College Student Information Management System

Alkan University College Student Information Management System American Journal of Operations Management and Information Systems 2016; 1(1): 1-6 http://www.sciencepublishinggroup.com/j/ajomis doi: 10.11648/j.ajomis.20160101.11 Alkan University College Student Information

More information

Project Plan Claims First Notice of Loss Application

Project Plan Claims First Notice of Loss Application From Students to Professionals Project Plan Claims First Notice of Loss Application The Capstone Experience Team Auto-Owners David Kircos Alex Morton Anthony Tesorero Si Wang Department of Computer Science

More information

HOW TO SOLVE COMMON PROBLEMS WITH LEGACY ORACLE JAVA VERSIONS IN WINDOWS 10

HOW TO SOLVE COMMON PROBLEMS WITH LEGACY ORACLE JAVA VERSIONS IN WINDOWS 10 TECHNOLOGY TOPIC HOW TO SOLVE COMMON PROBLEMS WITH LEGACY ORACLE JAVA VERSIONS IN WINDOWS 10 Legacy applications programmed in Java are having trouble when introduced to a Windows 10 environment. While

More information

i-vu Pro v6.5 client, server, operating system, and database requirements

i-vu Pro v6.5 client, server, operating system, and database requirements i-vu Pro v6.5 CARRIER CORPORATION 2016 A member of the United Technologies Corporation family Stock symbol UTX Catalog No. 11-808-549-01 8/15/2016 Verify that you have the most current version of this

More information

Operational Concept Description (OCD)

Operational Concept Description (OCD) Operational Concept Description (OCD) LEAMOS Team 7 Name Monty Shah Pragya Singh Shantanu Sirsamkar Suchita Doshi Swapnil Savdekar David Wiggins Primary Role Project Manager System Architect Requirements

More information

SYSTEM REQUIREMENTS M.APP ENTERPRISE

SYSTEM REQUIREMENTS M.APP ENTERPRISE SYSTEM REQUIREMENTS M.APP ENTERPRISE Description or Document Category October 06, 2016 Contents M.App Enterprise Server... 3 Hardware requirements... 3 Disk space requirements... 3 Production environment

More information

MAGLOCLEN MOCIC NESPIN RMIN ROCIC WSIN Newtown, PA Springfield, MO Franklin, MA Phoenix, AZ Nashville, TN Sacramento, CA

MAGLOCLEN MOCIC NESPIN RMIN ROCIC WSIN Newtown, PA Springfield, MO Franklin, MA Phoenix, AZ Nashville, TN Sacramento, CA Regional Information Sharing Systems RISS Technology Support Center RISSNET Logon Procedure May 4, 2012 Introduction The purpose of this document is to provide instructions to users of the Regional Information

More information

Release Description. Mission Science irobot. Team 07

Release Description. Mission Science irobot. Team 07 Release Description Mission Science irobot Team 07 Jiashuo Li Chen Li Farica Mascarenhas Hanadi Mardah Sergey Mukhin Yun Shao Project Manager, Life Cycle Planner, Developer Requirements Engineer, Software

More information

What is Advisor Center?

What is Advisor Center? What is Advisor Center? The Advisor Center is a portal within HUB that provides you a modified view of what students see when they log into HUB. It serves as an online one step shop to access a student

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) United Direct Marketing Team 9 Fall Semester Chun-Ling Chen Project manager/ Prototyper Chun-Pei Su Lifecycle Planner Shao-yen Cheng System Architect Yuan-Chang Chang Feasibility

More information

Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications

Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications Team 02 Shreya Kamani - Project Manager Anushree Sridhar - Software Architect Pattra Thongprasert Implementer Abhishek

More information

STAAR TOMS Quick Guide

STAAR TOMS Quick Guide STAAR TOMS Quick Guide 2016 2017 Table of Contents System Requirements... 3 Log in to the System for the First Time... 3 Log In to TOMS... 3 Users... 4 Add an Individual User... 4 Search for a User...

More information

Capable when run in Windows 7 or newer, but not enabled by default. Microsoft IE Desktop versions 9 and 10

Capable when run in Windows 7 or newer, but not enabled by default. Microsoft IE Desktop versions 9 and 10 On Friday February 8, 2019, NorthStar Credit Union's website will no longer support TLS version 1.0 or version 1.1 in order to maintain the highest security standards and promote the safety of member data.

More information

Oracle Learn Cloud. What s New in Release 15B.1

Oracle Learn Cloud. What s New in Release 15B.1 Oracle Learn Cloud What s New in Release 15B.1 August 2015 TABLE OF CONTENTS OVERVIEW... 3 RELEASE FEATURE SUMMARY... 3 BUTTON LABELS CHANGED FOR ADDING ENROLLMENTS... 4 CUSTOMER TICKETS... 4. 2 OVERVIEW

More information

Exam Questions

Exam Questions Exam Questions 70-498 Delivering Continuous Value with Visual Studio 2012 Application Lifecycle Management https://www.2passeasy.com/dumps/70-498/ 1. You are the application architect on your team. You

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) PROJECT TITLE LEMA FAMILY ACCOUNTABILITY SYSTEM TEAM NO #04 TEAM MEMBERS & ROLES NAME ROLES Teawon Han Project Manager Zhen Huang Feasibility Analyst

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Transportation Grant Fund Database Team #14 Team Members Kirill Khistyaev Karim Sacre Darren Liu Stephan Rice Zhanna Seitenova Ayman Khalil Roles (Primary)

More information

WebRTC: Possible? Don McGregor Research Associate MOVES Institute.

WebRTC: Possible? Don McGregor Research Associate MOVES Institute. WebRTC: Possible? Don McGregor Research Associate MOVES Institute mcgredo@nps.edu The World Classic simulation applications: can we do them in the web browser? Pretty much. I think. 2 1990s Start: Classic

More information

Student Instructions SD# /16 Awards Program

Student Instructions SD# /16 Awards Program Student Instructions SD#57 2015/16 Awards Program Go to https://sd57.fluidreview.com *Please note that if you have any issues when using Internet Explorer to navigate this website, change to a different

More information

Qualification Specification for the Knowledge Modules that form part of the BCS Level 4 Software Developer Apprenticeship

Qualification Specification for the Knowledge Modules that form part of the BCS Level 4 Software Developer Apprenticeship Qualification Specification for the Knowledge Modules that form part of the BCS Level 4 Software Developer Apprenticeship BCS Level 4 Diploma in Software Development Methodologies BCS Level 4 Diploma in

More information

PTC Navigate Trial Instructions

PTC Navigate Trial Instructions PTC Navigate Trial Instructions Welcome to the PTC Navigate Trial! Product data is your organization s most valuable asset. Decisions made with this information can greatly impact your business, especially

More information

ISU Alumni Association Online Store May05-39

ISU Alumni Association Online Store May05-39 ISU Alumni Association Online Store May05-39 Client: Faculty Advisor: ISU Alumni Association Dr. Srinivas Aluru, CprE Team Members: Keith Dahlby Andrew Kirpalani Jordan Jump Jon Ruhnke Presentation Outline

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Smart Locks Control Team 05 Team members Alex Miller Diego Brandao Terence Williams William Goishi Nick Kwong Roles Project Manager Implementer Tester IIV&V Quality

More information

FINDAPark Implementation

FINDAPark Implementation La Salle University La Salle University Digital Commons Mathematics and Computer Science Capstones Mathematics and Computer Science, Department of Spring 5-19-2016 FINDAPark Implementation David Laratta

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Tour Conductor Team-05 Name Ankush H Prasad Ajay Kumar G C Aadithya B Andrew Han Joseph Mouawad Manas Yadav Rohit Ravindra Role System Architect, Project Manager,

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Discovery Tool Team 3 Josh Bendig - IIV&V Xizhao Deng - Project manager Jingzhou Hong - Requirement Engineer Guancheng Liu - Tester Michael Russo - Prototyper Shenghao Tang -

More information

Test Plan and Cases (TPC)

Test Plan and Cases (TPC) Test Plan and Cases (TPC) Perfecto Coffee Xpress Consistent Perfection Team 5 Team embers & Roles Chloe Good Yekaterina Glazko Edwards Hays Yucheng Hsieh Atreya Lahiri Jaimin Patel Yun Shen Andrew Tran

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) Real Estate Investment and Review Tool Team - 02 Venkata Sravanti Malapaka Project Manager, Software Architect Yuxuan Chen Prototyper, Developer, Trainer Yonghyun

More information

System Requirements. SuccessMaker 7

System Requirements. SuccessMaker 7 System Requirements SuccessMaker 7 Copyright 2015 Pearson Education, Inc. or one or more of its direct or indirect affiliates. All rights reserved. Pearson and SuccessMaker are registered trademarks, in

More information

The electives catalogue January Multimedia Design and Communication

The electives catalogue January Multimedia Design and Communication The electives catalogue January 2018 Multimedia Design and Communication The electives catalogue, revised January 2018 Content Content 1 1. Elective programme elements... 2 1.1. Completion of the exam...

More information

System and Software Architecture Description (SSAD)

System and Software Architecture Description (SSAD) System and Software Architecture Description (SSAD) Farmworkers Safety App Team 09 TEAM MEMBER NAME Shobhit Agarwal Akshay Aggarwal Viraj Sahai Vahagen Sinanian Juan Andrade Basir Navab Marko Djuliarso

More information

TERMS OF REFERENCE Design and website development UNDG Website

TERMS OF REFERENCE Design and website development UNDG Website TERMS OF REFERENCE Design and website development UNDG Website BACKGROUND The United Nations Development Coordination and Operations Office (UN DOCO) launched a new website in 2015 to ensure accessibility

More information

Acceptance Test. Smart Scheduling. Empire Unlimited. Requested by:

Acceptance Test. Smart Scheduling. Empire Unlimited. Requested by: Smart Scheduling Requested by: Dr. Robert Yoder Computer Science Department Head Siena College Department of Computer Science Prepared by: Meghan Servello Thomas Mottola Jonathan Smith Jason Czajkowski

More information

Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications

Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications Test Plan and Cases (TPC) City of Los Angeles Personnel Department Mobile Applications Team 02 Anushree Sridhar - Software Architect Shreya Kamani - Project Manager Pattra Thongprasert Implementor Abhishek

More information

Operating System Support Plan for Test Delivery System

Operating System Support Plan for Test Delivery System Operating System Support Plan for Test Delivery System Updated for the 2017 2018 This support plan establishes clear guidelines regarding which operating systems AIR will support for the upcoming test

More information

IPER Training Webinars

IPER Training Webinars () Final, July 2010 FirstResponderTraining.gov FirstResponderTraining.gov Table of Contents Table of Contents To Join the Webinar... 1 Audio Requirements... 4 System Requirements... 5 Popup Blocker...

More information

Feasibility Evidence Description (FED)

Feasibility Evidence Description (FED) Feasibility Evidence Description (FED) We Are Trojans (WAT) Network Team 01 Team members Eirik Skogstad Min Li Pittawat Pamornchaisirikij Saloni Priya Suleyman Erten Kamonphop Srisopha Ameer Elkordy Punyawee

More information

ONLINE VOTING SYSTEM

ONLINE VOTING SYSTEM ONLINE VOTING SYSTEM M. Deepa 1,, M.B.Benjula Anbu Malar 2, S.Deepikaa 3, K.Santhi 4 1,2,3,4 School of Information Technology and Engineering, VIT University, Vellore, Tamilnadu, (India) ABSTRACT Online

More information