Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc.

Size: px
Start display at page:

Download "Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc."

Transcription

1 ABSTRACT OF BIDS SAP April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. Estimated Hwy 52S st Ave Hwy 9W Total Chatfield, MN Marshall, MN Decorah, IA Quantity Per Unit TOTAL MOBILIZATION LS 0.2 $175, $35, $60, $12, $80, $16, $148, $29, REMOVE REGULATED WASTE MATERIAL (BRIDGE) LS 0.5 $2, $1, $ $ $ $ $ $ STRUCTURAL CONCRETE (3B52) (P) CU YD 83 $ $70, $ $53, $ $53, $ $54, TYPE F (TL-4) BARRIER CONCRETE (3S52) (P) LF 280 $90.00 $25, $80.00 $22, $80.00 $22, $80.00 $22, REINFORCEMENT BARS (EPOXY COATED) (P) LB $1.50 $70, $1.00 $46, $1.00 $46, $1.00 $46, REINFORCEMENT BARS (STAINLESS-60KSI) LB 340 $2.00 $ $5.00 $1, $5.00 $1, $5.00 $1, STRUCTURE EXCAVATION LS 0.5 $60, $30, $30, $15, $60, $30, $60, $30, BRIDGE SLAB CONCRETE (3YHPC-M) (P) SQ FT 6009 $35.00 $210, $24.00 $144, $24.00 $144, $24.15 $145, ELASTOMERIC BEARING PAD TYPE 1 EACH 12 $ $3, $ $3, $ $3, $ $3, PRESTRESSED CONCRETE BEAMS MN63 (P) LF 827 $ $289, $ $210, $ $210, $ $211, DIAPHRAGMS FOR TYPE MN63 PREST BEAMS (P) LF 113 $ $22, $ $11, $ $11, $ $11, EXPANSION JOINTS, DESIGN E8H LF 80 $ $8, $ $8, $ $8, $ $8, BRIDGE APPROACH PANELS SQ YD 180 $ $45, $ $40, $ $40, $ $40, REMOVE EXISTING BRIDGE LS 0.5 $100, $50, $50, $25, $50, $25, $50, $25, STEEL H-PILING DRIVEN 12" LF 490 $5.00 $2, $1.00 $ $1.00 $ $1.00 $ STEEL H-PILING DELIVERED 12" LF 490 $40.00 $19, $36.00 $17, $36.00 $17, $36.25 $17, STEEL H-TEST PILE 40 FT LONG 12" EACH 2 $10, $20, $7, $15, $7, $15, $7, $15, PILE TIP PROTECTION 12" EACH 16 $ $3, $ $4, $ $4, $ $4, DRAINAGE SYSTEM TYPE (B910) LS 0.5 $8, $4, $4, $2, $4, $2, $4, $2, RANDOM RIPRAP CLASS IV CU YD 870 $80.00 $69, $40.00 $34, $40.00 $34, $40.25 $35, GEOTEXTILE FILTER TYPE VII SQ YD 1180 $4.00 $4, $3.00 $3, $3.00 $3, $3.05 $3, TRAFFIC BARRIER DESIGN SPECIAL LF 100 $75.00 $7, $73.00 $7, $73.00 $7, $73.00 $7, TRAFFIC BARRIER DESIGN B8338 LF 150 $30.00 $4, $20.00 $3, $20.00 $3, $20.15 $3, END TREATMENT-TANGENT TERMINAL EACH 4 $2, $10, $2, $9, $2, $9, $2, $9,860.00

2 TRAFFIC CONTROL LS 0.2 $30, $6, $16, $3, $15, $3, $13, $2, TOTALS: $1,012, $695, $714, $731, ABSTRACT OF BIDS SAP April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC Holland Construction Inc. Estimated Hwy 52S st Ave Hwy 9W Total Chatfield, MN Marshall, MN Decorah, IA Quantity Per Unit TOTAL MOBILIZATION LS 0.2 $175, $35, $60, $12, $80, $16, $140, $28, REMOVE REGULATED WASTE MATERIAL (BRIDGE) LS 0.5 $2, $1, $ $ $ $ $ $ STRUCTURAL CONCRETE (3B52) (P) CU YD 80 $ $68, $ $52, $ $52, $ $52, TYPE F (TL-4) BARRIER CONCRETE (3S52) (P) LF 234 $90.00 $21, $80.00 $18, $80.00 $18, $80.50 $18, REINFORCEMENT BARS (EPOXY COATED) (P) LB $1.50 $60, $1.20 $48, $1.20 $48, $1.25 $50, REINFORCEMENT BARS (STAINLESS-60KSI) LB 340 $2.00 $ $5.00 $1, $5.00 $1, $5.00 $1, STRUCTURE EXCAVATION LS 0.5 $60, $30, $30, $15, $60, $30, $60, $30, BRIDGE SLAB CONCRETE (3YHPC-M) (P) SQ FT 5012 $35.00 $175, $25.00 $125, $25.00 $125, $25.15 $126, ELASTOMERIC BEARING PAD TYPE 1 EACH 12 $ $3, $ $3, $ $3, $ $3, PRESTRESSED CONCRETE BEAMS MN54 (P) LF 689 $ $223, $ $183, $ $183, $ $184, DIAPHRAGMS FOR TYPE MN54 PREST BEAMS (P) LF 75 $ $15, $ $7, $ $7, $ $7, EXPANSION JOINTS, DESIGN E8H LF 80 $ $8, $ $8, $ $8, $ $8, BRIDGE APPROACH PANELS SQ YD 180 $ $45, $ $40, $ $40, $ $40, REMOVE EXISTING BRIDGE LS 0.5 $100, $50, $50, $25, $50, $25, $50, $25, STEEL H-PILING DRIVEN 12" LF 360 $5.00 $1, $1.00 $ $1.00 $ $1.00 $ STEEL H-PILING DELIVERED 12" LF 360 $40.00 $14, $36.00 $12, $36.00 $12, $36.00 $12, STEEL H-TEST PILE 35 FT LONG 12" EACH 2 $10, $20, $7, $15, $7, $15, $7, $15, PILE TIP PROTECTION 12" EACH 14 $ $2, $ $3, $ $3, $ $3, DRAINAGE SYSTEM TYPE (B910) LS 0.5 $8, $4, $4, $2, $4, $2, $4, $2, RANDOM RIPRAP CLASS IV CU YD 850 $80.00 $68, $40.00 $34, $40.00 $34, $40.25 $34, GEOTEXTILE FILTER TYPE VII SQ YD 1110 $4.00 $4, $3.00 $3, $3.00 $3, $3.00 $3,330.00

3 TRAFFIC BARRIER DESIGN SPECIAL LF 100 $75.00 $7, $73.00 $7, $73.00 $7, $73.45 $7, TRAFFIC BARRIER DESIGN B8307 LF 69 $25.00 $1, $30.00 $2, $30.00 $2, $30.00 $2, TRAFFIC BARRIER DESIGN B8338 LF 75 $30.00 $2, $20.00 $1, $20.00 $1, $20.00 $1, ANCHORAGE ASSEMBLY-PLATE BEAM EACH 1 $ $ $ $ $ $ $ $ END TREATMENT-TANGENT TERMINAL EACH 3 $2, $7, $2, $7, $2, $7, $2, $7, TRAFFIC CONTROL LS 0.2 $30, $6, $16, $3, $15, $3, $13, $2, TOTALS: $877, $633, $652, $669, ABSTRACT OF BIDS SAP April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC Holland Construction Inc. Estimated Hwy 52S st Ave Hwy 9W Total Chatfield, MN Marshall, MN Decorah, IA Quantity Per Unit TOTAL MOBILIZATION LS 0.6 $175, $105, $166, $100, $100, $60, $60, $36, MAINT & RESTORATION OF HAUL ROADS LS 1 $2, $2, $5, $5, $1.00 $1.00 $1, $1, CLEARING ACRE 6.4 $4, $25, $2, $16, $7, $44, $4, $27, CLEARING TREE 46 $ $9, $50.00 $2, $ $23, $92.00 $4, GRUBBING ACRE 6.4 $3, $22, $2, $16, $1, $7, $3, $22, GRUBBING TREE 46 $ $6, $50.00 $2, $90.00 $4, $87.00 $4, REMOVE PIPE CULVERTS LF 1240 $12.00 $14, $10.00 $12, $8.00 $9, $8.50 $10, REMOVE FENCE LF 7391 $4.00 $29, $2.00 $14, $1.00 $7, $1.95 $14, REMOVE GUARDRAIL-PLATE BEAM LF 502 $4.00 $2, $3.00 $1, $3.00 $1, $3.00 $1, REMOVE RC CATTLE PASS LF 59 $25.00 $1, $25.00 $1, $25.00 $1, $10.00 $ REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 308 $6.00 $1, $5.00 $1, $3.00 $ $1.00 $ SAWING BIT PAVEMENT (FULL DEPTH) LF 71 $3.00 $ $5.00 $ $4.00 $ $4.00 $ SALVAGE VEHICULAR GATE EACH 7 $1, $7, $ $2, $ $3, $ $1, EXCAVATION-COMMON CU YD $4.00 $324, $3.07 $249, $3.20 $259, $1.05 $85,197.00

4 EXCAVATION-ROCK CU YD $25.00 $894, $9.10 $325, $11.00 $393, $7.25 $259, EXCAVATION-SUBGRADE CU YD $6.00 $71, $4.00 $47, $3.20 $37, $1.05 $12, SELECT GRANULAR EMBANKMENT SUPER SAND (CV) CU YD 1362 $19.00 $25, $27.50 $37, $29.00 $39, $23.00 $31, COMMON EMBANKMENT (CV) CU YD $4.00 $326, $2.00 $163, $0.50 $40, $4.25 $347, DOZER HR 80 $ $10, $ $16, $ $14, $2.25 $ TRACTOR MOUNTED BACKHOE HR 80 $ $8, $ $12, $ $10, $1.45 $ AGGREGATE BASE CLASS 5 TON $18.00 $332, $12.40 $229, $12.35 $228, $13.15 $243, AGGREGATE BASE (CV) FROM STOCKPILE CU YD $15.00 $222, $9.00 $133, $9.20 $136, $4.38 $64, FULL DEPTH RECLAMATION SQ YD $1.50 $70, $2.41 $112, $2.45 $114, $7.85 $366, GRANULAR BACKFILL (MOD) CV CU YD 401 $32.00 $12, $27.45 $11, $26.00 $10, $20.00 $8, AGGREGATE BEDDING (CV) CU YD 1285 $32.00 $41, $27.45 $35, $26.00 $33, $2.25 $2, FINE FILTER AGGREGATE (CV) CU YD 3920 $24.00 $94, $27.85 $109, $27.00 $105, $30.30 $118, " RC PIPE CULVERT LF 166 $53.00 $8, $38.80 $6, $41.00 $6, $58.00 $9, " RC PIPE CULVERT CLASS III LF 108 $65.00 $7, $38.80 $4, $42.00 $4, $84.00 $9, " RC PIPE CULVERT LF 80 $78.00 $6, $58.40 $4, $52.00 $4, $92.99 $7, " RC PIPE CULVERT LF 302 $95.00 $28, $82.65 $24, $63.00 $19, $95.00 $28, " RC PIPE CULVERT CLASS IV LF 96 $ $9, $82.65 $7, $87.00 $8, $ $12, " RC PIPE CULVERT LF 52 $ $7, $88.00 $4, $98.00 $5, $ $5, " RC PIPE CULVERT CLASS III LF 84 $ $11, $ $8, $ $10, $ $10, " RC PIPE CULVERT CLASS IV LF 146 $ $21, $ $19, $ $27, $ $29, " RC PIPE CULVERT LF 184 $ $55, $ $33, $ $41, $ $41, " RC PIPE APRON EACH 4 $1, $4, $ $1, $ $2, $ $2, " RC PIPE APRON EACH 6 $1, $7, $ $4, $1, $6, $ $5, " RC PIPE APRON EACH 2 $1, $3, $ $1, $1, $2, $1, $2, " RC PIPE APRON EACH 4 $1, $7, $1, $4, $1, $5, $1, $4, " RC PIPE APRON EACH 4 $4, $16, $1, $6, $2, $8, $2, $8, " RC SAFETY APRON & GRATE DES 3128 EACH 2 $2, $4, $1, $2, $1, $3, $1, $3, " RC SAFETY APRON & GRATE DES 3128 EACH 2 $3, $6, $1, $3, $1, $3, $1, $3, " RC SAFETY APRON EACH 2 $ $1, $ $1, $ $1, $ $1, " RC SAFETY APRON EACH 2 $1, $2, $ $1, $ $1, $ $1, " PIPE APRON EACH 2 $ $ $ $ $ $ $ $356.00

5 " PIPE APRON EACH 16 $ $2, $ $2, $ $2, $ $3, " SAFETY APRON EACH 6 $ $2, $ $2, $ $2, $ $3, " SAFETY APRON EACH 2 $ $ $ $1, $ $1, $ $1, " PIPE CULVERT LF 28 $35.00 $ $22.00 $ $20.00 $ $29.00 $ " PIPE CULVERT LF 572 $40.00 $22, $26.00 $14, $22.00 $12, $36.00 $20, " PIPE CULVERT LF 48 $45.00 $2, $29.50 $1, $28.00 $1, $43.00 $2, " PRECAST CONCRETE HEADWALL EACH 5 $ $1, $ $1, $ $1, $ $1, " TP PIPE DRAIN LF 590 $12.50 $7, $10.00 $5, $9.50 $5, $6.10 $3, " PERF PE DRAIN PIPE LF 300 $5.00 $1, $10.00 $3, $7.00 $2, $10.15 $3, " PERF PE DRAIN PIPE LF 300 $7.00 $2, $11.00 $3, $8.00 $2, $10.15 $3, " PERF PE DRAIN PIPE LF 200 $10.00 $2, $12.00 $2, $8.00 $1, $10.15 $2, " PERF PE PIPE DRAIN LF 2210 $35.00 $77, $10.00 $22, $9.50 $20, $6.10 $13, RANDOM RIPRAP CLASS IV CU YD 650 $80.00 $52, $40.00 $26, $42.00 $27, $31.00 $20, GEOTEXTILE FILTER TYPE IV SQ YD 631 $4.00 $2, $2.00 $1, $4.00 $2, $1.75 $1, GEOTEXTILE FILTER TYPE VII SQ YD 305 $4.00 $1, $3.00 $ $4.00 $1, $2.40 $ MAILBOX SUPPORT EACH 16 $ $2, $ $2, $ $2, $ $3, TRAFFIC BARRIER DESIGN B8307 LF 150 $25.00 $3, $29.00 $4, $29.00 $4, $29.00 $4, TRAFFIC BARRIER DESIGN B8338 LF 2975 $30.00 $89, $19.50 $58, $19.50 $58, $19.00 $56, GUIDE POST TYPE B EACH 20 $55.00 $1, $65.00 $1, $50.00 $1, $50.00 $1, ANCHORAGE ASSEMBLY-PLATE BEAM EACH 3 $ $1, $ $1, $ $1, $ $1, END TREATMENT-TANGENT TERMINAL EACH 9 $2, $22, $2, $22, $2, $22, $2, $22, TRAFFIC CONTROL LS 0.6 $30, $18, $16, $9, $15, $9, $13, $7, SILT FENCE, TYPE HI LF 400 $4.00 $1, $3.00 $1, $3.00 $1, $3.10 $1, SILT FENCE, TYPE MS LF $2.25 $23, $1.90 $19, $2.00 $20, $1.65 $17, FLOTATION SILT CURTAIN TYPE MOVING WATER LF 647 $50.00 $32, $16.00 $10, $15.00 $9, $18.00 $11, FILTER BERM TYPE 3 LF 2280 $60.00 $136, $20.00 $45, $5.00 $11, $22.42 $51, SEDIMENT CONTROL LOG TYPE COMPOST LF 2400 $3.00 $7, $2.40 $5, $3.00 $7, $3.12 $7, CULVERT END CONTROLS EACH 27 $ $5, $ $5, $ $2, $ $3, FERTILIZER TYPE 1 LB 6200 $0.70 $4, $0.50 $3, $0.50 $3, $0.50 $3, FERTILIZER TYPE 3 LB 8896 $1.00 $8, $0.50 $4, $0.50 $4, $0.50 $4, FILTER TOPSOIL BORROW CU YD 4280 $45.00 $192, $25.00 $107, $41.00 $175, $22.00 $94,160.00

6 SUBSOILING ACRE 1.7 $ $ $ $ $ $ $ $ SOIL BED PREPARATION ACRE 27 $ $4, $85.00 $2, $ $8, $ $8, SOIL TRACKING ACRE 2.3 $ $1, $1, $2, $ $ $ $2, SEEDING ACRE 62 $ $14, $75.00 $4, $ $12, $ $9, SEED MIXTURE LB 3100 $2.00 $6, $0.88 $2, $1.00 $3, $0.75 $2, SEED MIXTURE LB 942 $5.00 $4, $3.54 $3, $4.00 $3, $3.50 $3, SEED MIXTURE LB 253 $4.00 $1, $2.70 $ $3.00 $ $2.80 $ SEED MIXTURE LB 468 $17.00 $7, $14.52 $6, $16.00 $7, $16.20 $7, MULCH MATERIAL TYPE 1 TON 62 $ $12, $ $12, $ $8, $ $9, MULCH MATERIAL TYPE 3 TON 42.2 $ $19, $ $12, $ $11, $ $11, TEMPORARY POLY COVERING SQ YD 772 $2.00 $1, $2.00 $1, $0.50 $ $5.45 $4, DISK ANCHORING ACRE 52.1 $ $5, $65.00 $3, $ $5, $95.00 $4, EROSION CONTROL BLANKETS CAT 6 SQ YD 5665 $3.00 $16, $2.60 $14, $3.00 $16, $2.85 $16, EROSION CONTROL BLANKETS CAT 3N SQ YD $2.00 $61, $1.49 $46, $1.25 $38, $1.20 $37, EROSION CONTROL BLANKETS CAT 4N SQ YD $2.50 $26, $1.95 $20, $1.50 $16, $1.65 $17, WEED SPRAYING ACRE 15.6 $35.00 $ $ $2, $ $1, $ $1, WEED SPRAY MIXTURE GALLON 10 $25.00 $ $ $1, $ $1, $ $1, RAPID STABILIZATION METHOD 3 M GAL 12 $ $5, $ $3, $ $6, $ $5, SEEDING SPECIAL ACRE 0.5 $5, $2, $ $ $4, $2, $3, $1, TOTALS: $3,798, $2,337, $2,316, $2,371, *Awarded to low bidder 5/10/16 Total Combined Bids: $5,688, $3,667, $3,683, $3,772,643.25

7 Minnowa Construction CJ Moyna & Sons Inc. PO Box Hwy 13 Harmony, MN Elkader, IA $280, $56, $230, $46, $1, $ $ $ $ $58, $ $53, $75.00 $21, $80.00 $22, $1.00 $46, $1.00 $46, $6.00 $2, $5.00 $1, $50, $25, $60, $30, $28.00 $168, $24.00 $144, $ $3, $ $3, $ $219, $ $210, $ $22, $ $11, $30.00 $2, $ $8, $ $36, $ $40, $75, $37, $50, $25, $3.00 $1, $1.00 $ $40.00 $19, $36.00 $17, $5, $10, $7, $15, $ $2, $ $4, $10, $5, $4, $2, $30.00 $26, $40.00 $34, $3.00 $3, $3.00 $3, $73.00 $7, $30.00 $3, $20.00 $3, $25.00 $3, $2, $9, $3, $12,000.00

8 $13, $2, $34, $6, $788, $747, Minnowa Construction CJ Moyna & Sons Inc. PO Box Hwy 13 Harmony, MN Elkader, IA $280, $56, $230, $46, $1, $ $ $ $ $56, $ $52, $75.00 $17, $80.00 $18, $1.00 $40, $1.20 $48, $6.00 $2, $5.00 $1, $50, $25, $60, $30, $28.00 $140, $25.00 $125, $ $3, $ $3, $ $182, $ $183, $ $15, $ $7, $30.00 $2, $ $8, $ $36, $ $40, $75, $37, $50, $25, $3.00 $1, $1.00 $ $50.00 $18, $36.00 $12, $5, $10, $7, $15, $ $1, $ $3, $10, $5, $4, $2, $30.00 $25, $40.00 $34, $3.00 $3, $3.00 $3,330.00

9 $73.00 $7, $30.00 $3, $30.00 $2, $35.00 $2, $20.00 $1, $35.00 $2, $ $ $3, $3, $2, $7, $2, $7, $13, $2, $34, $6, $700, $685, Minnowa Construction CJ Moyna & Sons Inc. PO Box Hwy 13 Harmony, MN Elkader, IA $280, $168, $230, $138, $1.00 $1.00 $0.01 $0.01 $5, $32, $1, $11, $ $18, $30.00 $1, $5, $32, $1, $11, $ $18, $30.00 $1, $10.00 $12, $15.00 $18, $1.50 $11, $2.00 $14, $3.00 $1, $8.00 $4, $50.00 $2, $50.00 $2, $5.00 $1, $15.00 $4, $5.00 $ $8.00 $ $ $2, $ $5, $3.20 $259, $3.90 $316,446.00

10 $12.00 $429, $13.50 $483, $3.20 $37, $6.00 $71, $28.00 $38, $29.30 $39, $0.50 $40, $2.50 $204, $ $12, $ $14, $ $8, $ $17, $12.35 $228, $10.70 $197, $9.20 $136, $20.60 $305, $2.45 $114, $7.30 $341, $20.00 $8, $25.00 $10, $24.00 $30, $28.00 $35, $26.00 $101, $30.00 $117, $46.00 $7, $65.00 $10, $46.00 $4, $66.00 $7, $59.00 $4, $80.00 $6, $82.00 $24, $95.00 $28, $82.00 $7, $ $9, $82.00 $4, $ $5, $ $9, $ $11, $ $18, $ $27, $ $34, $ $38, $ $2, $ $1, $1, $6, $ $3, $1, $2, $ $1, $1, $4, $ $3, $2, $8, $1, $7, $1, $3, $1, $2, $2, $5, $1, $3, $ $1, $ $1, $1, $2, $ $1, $ $ $ $370.00

11 $ $2, $ $4, $ $3, $ $2, $ $1, $ $1, $25.00 $ $40.00 $1, $30.00 $17, $38.00 $21, $40.00 $1, $45.00 $2, $ $ $ $1, $12.00 $7, $35.00 $20, $7.00 $2, $20.00 $6, $10.00 $3, $20.00 $6, $10.00 $2, $22.00 $4, $12.00 $26, $12.00 $26, $40.00 $26, $44.80 $29, $3.00 $1, $3.90 $2, $4.00 $1, $4.20 $1, $ $3, $ $4, $29.00 $4, $40.00 $6, $19.50 $58, $20.00 $59, $30.00 $ $ $2, $ $1, $3, $9, $2, $22, $2, $22, $13, $7, $34, $20, $3.10 $1, $5.00 $2, $1.90 $19, $1.90 $19, $10.00 $6, $20.00 $12, $15.00 $34, $28.00 $63, $3.10 $7, $2.80 $6, $ $2, $ $5, $0.50 $3, $0.60 $3, $0.50 $4, $0.50 $4, $21.00 $89, $40.00 $171,200.00

12 $ $1, $ $1, $ $8, $90.00 $2, $ $1, $ $1, $75.00 $4, $90.00 $5, $0.88 $2, $1.00 $3, $3.54 $3, $3.20 $3, $2.70 $ $5.00 $1, $14.52 $6, $30.00 $14, $ $12, $ $7, $ $12, $ $18, $2.00 $1, $3.50 $2, $95.00 $4, $50.00 $2, $2.85 $16, $2.50 $14, $1.19 $36, $1.30 $40, $1.63 $17, $1.50 $16, $ $1, $30.00 $ $ $1, $ $1, $ $3, $ $6, $3, $1, $3, $1, $2,403, $3,230, $3,892, $4,663,437.11

Solicitation Information

Solicitation Information Solicitation Information Kansas Turnpike Authority Solicitation Number 7048 Deadline 10/11/2016 02:00 PM CDT Advertised 09/08/2016 01:46 PM CDT Revised 10/11/2016 12:14 PM CDT Description Construction

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: 481-013-5357 Description: 1.00 mi of road reconstruction Location: Projects(s): Buchanan St - 136th Ave to 128th Ave 481-013-5357 Rank Bidder Total

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE

More information

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL CITY OF BRECKSVILLE BID TABULATION CARRIAGE HILL DRIVE PUMP STATION ABANDONMENT AND SANITARY IMPROVEMENTS PROJECT NO. 3810-224 BID OPENING: SEPTEMBER 19, 2014 10:00 a.m. Present were: Becki Burlingham,

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-109 Description Page 201.0403 REMOVE AND DISPOSE SIDEWALKS 1 201.0407 REMOVE AND DISPOSE PAVEMENT

More information

Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA

Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA BAIN CONSTRUCTION CMD ENDEAVORS, INC. DAN WILLIAMS JORDAN FOSTER CONSTRUCTION Key

More information

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material ITEM SPEC CMS DESCRIPTION QUANTITY Labor Labor Labor 1 201 ODOT CLEARING AND GRUBBBING 1 $13,000.00 $0.00 $13,000.00 $13,000.00 $6,800.00 $10,200.00 $17,000.00 $17,000.00 $75,000.00 $0.00 $75,000.00 $75,000.00

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

DESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log

DESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log 4.5-q FIBER ROLL Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log DESCRIPTION Fiber rolls are sediment control devices made from fibrous organic material, such as rice or coconut

More information

U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate

U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate TIGER FY17 Grant Application October 2017 Appendix B Cost Estimate B-1 FY17 TIGER U.S. Trade Connection at Eagle Project Preliminary

More information

Town North Sanitary Sewer Renewal PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru

Town North Sanitary Sewer Renewal PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru Bids Opened: Ju uly 19 Arlington, TX Fort Worth, TX Kennedale, TX Kennedale, TX Item

More information

BID ISSUE DATE: JUNE 2016

BID ISSUE DATE: JUNE 2016 July 11, 2016 To All Plan Holders: ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR CHATHAM COUNTY SOLID WASTE AND RECYCLING RECYCLING STATION BID ISSUE DATE: JUNE 2016 The following revisions, additions and

More information

INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items:

INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: Earthwork --items such as borrow excavation, and subsoil excavation Concrete -- the various

More information

Granite Shoals, TX San Antonio, TX 78251

Granite Shoals, TX San Antonio, TX 78251 Water Bid Items 1 226.00 LF (103) Remove Concrete Curb $2.00 $452.00 $1.05 $237.30 $5.00 $1,130.00 $5.00 $1,130.00 2 672.00 SF (103) Remove Sidewalks and Driveways $3.00 $2,016.00 $1.75 $1,176.00 $5.00

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017 SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3 SAWS Job No. 17-4528 SAWS Solicitation No. CO-00139 September 27, 2017 To Bidder of Record: This addendum, applicable to work referenced above, is an

More information

Denver, CO February 5 8. Landscape Math. Mike Fedison Pickens Technical College Horticulture Instructor

Denver, CO February 5 8. Landscape Math. Mike Fedison Pickens Technical College Horticulture Instructor Denver, CO February 5 8 Landscape Math Mike Fedison Pickens Technical College Horticulture Instructor Landscape Math Preparation for The CLT Certification Tests The use of scales: Architect Scale General

More information

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN 55051 320-679-6300 Dear Property Owner: Kanabec County Culvert Policy implemented August 1, 1975

More information

Convert cubic yard to square feet

Convert cubic yard to square feet P ford residence southampton, ny Convert cubic yard to square feet Cubic Feet to Cubic Yards (ft³ to yd³) conversion calculator for Volume conversions with additional tables and formulas. The Square Feet

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

FENCING, GEOTEXTILES & BARRICADE TAPES

FENCING, GEOTEXTILES & BARRICADE TAPES FENCING, GEOTEXTILES & BARRICADE TAPES manufacturing since 1979 Quest Brands Inc. is a 100% family owned Canadian company. Our head office / main warehouse is located in Brampton, Ontario and our extrusion

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 5 PROVINCIAL-ORIENTED

More information

Chapter V Earth Work & Quantities. Tewodros N.

Chapter V Earth Work & Quantities. Tewodros N. Chapter V Earth Work & Quantities Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Is the phase during a highways construction when the right of way is converted from its natural condition

More information

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly By : Y.A. Agboatwala & Fatima.Y. Agboatwala 1802, Jamuna Amrut, 219, Patel Estate, S.V.Road, Jogeshwari(W), Mumbai - 400102

More information

NEXT Beam Bridge & Innovative Materials. Darren Conboy, PE & David Massenzio, PE

NEXT Beam Bridge & Innovative Materials. Darren Conboy, PE & David Massenzio, PE NEXT Beam Bridge & Innovative Materials Darren Conboy, PE & David Massenzio, PE Presentation topics Overview of existing & new bridges MATERIAL / DESIGN ELEMENT HUDSON BRIDGE PROJECT USE 10,000 psi Mix

More information

Summary Listing of Ohio LTAP elearning Courses

Summary Listing of Ohio LTAP elearning Courses Summary Listing of Ohio LTAP elearning Courses In recent years, the Ohio Local Technical Assistance Program (LTAP) Center has added many online courses also called elearning, or Web-based training (WBT)

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

AASHTOWare Bridge Rating and Design Training. CVT1 Two-Cell RC Box Culvert Example (BrR/BrD 6.4)

AASHTOWare Bridge Rating and Design Training. CVT1 Two-Cell RC Box Culvert Example (BrR/BrD 6.4) AASHTOWare Bridge Rating and Design Training CVT1 Two-Cell RC Box Culvert Example (BrR/BrD 6.4) Topics Covered Enter culvert description Perform AASHTO Culvert LRFR analysis and review results Culvert

More information

SpecLink-E Catalog Listing As Of: June, 2015

SpecLink-E Catalog Listing As Of: June, 2015 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS Catalog Updated 00 0101 - BSD Project Title Page This document is intentionally blank. Add the specifics needed for the project. ASCLME# Feb 2009 00

More information

Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow.

Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Kully Reference Book

Kully Reference Book Kully Reference Book Serving the Greater Mid-West since 1946 Angles Channels Beams Rounds Sheets Squares Flats Rebar Wire Mesh Black & Galvanized Pipe Anchor Bolts Plastic, Copper, Black, Galvanized Pipe

More information

Poly Slide, 40" Sheet 1 of 3

Poly Slide, 40 Sheet 1 of 3 14125200 5 1 / 4 "/133 13 1 / 2 " 343 5 1 / 4 "/133 6'/1829 Minimum Use Zone PLAN VIEW/ FOOTING LAYOUT 26" 660 40" 24" 610 Right Side Frame 72 5 / 8 " 1845 See Dim. "A" 5 1 / 2 "/ 140 Left Side Frame Typical

More information

CONTRACT ITEM NO. PROJECT TOTALS. Plan. As Const Inlet Type C (15 Foot) 5,586 5,103 70, , ,861

CONTRACT ITEM NO. PROJECT TOTALS. Plan. As Const Inlet Type C (15 Foot) 5,586 5,103 70, , ,861 6 6 6 6 6 6 6 6 6 6 66 66 66 66 66 66 66 66 66 66 68 68 69 69 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 67 68 68 6 6 6 6 65 66 67 67 6 7 7 7 7 7 7 nlet Type C ( oot) nlet Type C (5

More information

PE Exam Review - Surveying Demonstration Problem Solutions

PE Exam Review - Surveying Demonstration Problem Solutions PE Exam Review - Surveying Demonstration Problem Solutions I. Demonstration Problem Solutions... 1. Circular Curves Part A.... Circular Curves Part B... 9 3. Vertical Curves Part A... 18 4. Vertical Curves

More information

DRY EXCAVATION USING A TIE BACK WALL

DRY EXCAVATION USING A TIE BACK WALL 3 This example involves the dry construction of an excavation. The excavation is supported by concrete diaphragm walls. The walls are tied back by prestressed ground anchors. Silt Sand 10 m 2 m 20 m 10

More information

Chapman Fence Company, Inc. (OC) UNIT PRICE

Chapman Fence Company, Inc. (OC) UNIT PRICE BID TABULATION Page 1 of 6 SECTION A - GALVANIZED CHAIN LINK FENCE 1 3 tall complete fence installation 10 lf $9.00 $90.00 $9.25 $92.50 $11.15 $111.50 2 4 tall complete fence installation 260 lf $10.72

More information

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

Section 7.I: Estimates Backup. 7.I Estimates Back-Up Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State

More information

WELCOME & ANNOUNCEMENTS. 1. HOLIDAY PARTY DECEMBER 7th 1. Save the DATE!!!! TRULUCKS 2. IMPACT AWARDS

WELCOME & ANNOUNCEMENTS. 1. HOLIDAY PARTY DECEMBER 7th 1. Save the DATE!!!! TRULUCKS 2. IMPACT AWARDS WELCOME & ANNOUNCEMENTS 1. HOLIDAY PARTY DECEMBER 7th 1. Save the DATE!!!! TRULUCKS 2. IMPACT AWARDS 2. A4LE Calendar 1. Sign up on line 3. SRC April 1-4 NOLA 1. Sign up on line TEXO CEFPI NTX Joint Committee

More information

Design of diaphragm and sheet pile walls. D-Sheet Piling. User Manual

Design of diaphragm and sheet pile walls. D-Sheet Piling. User Manual Design of diaphragm and sheet pile walls D-Sheet Piling User Manual D-SHEET PILING Design of diaphragm and sheet pile walls User Manual Version: 16.1 Revision: 00 19 February 2016 D-SHEET PILING, User

More information

City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS S-1 Removed Feb/10 S-2 Precast Manhole 1050mm Dia. July/10 S-3 Precast Concrete Deep Manhole Jan/11 S-4

More information

GET IN, GET OUT AND GET THE JOB DONE ON TIME!

GET IN, GET OUT AND GET THE JOB DONE ON TIME! GET IN, GET OUT AND GET THE JOB DONE ON TIME! a guide to products, systems and services This access road near Mobile, Alabama, was a contractor s nightmare. The unpaved road, built with fabrics, rapidly

More information

Tempofor. Mobile fences

Tempofor. Mobile fences Tempofor Mobile fences Betafence Quality Betafence strives relentlessly for optimum quality, without losing sight of users own particular requirements. Quality is of prime importance: it begins at the

More information

BS up.v.c SOIL, WASTE, VENT PIPES AND FITTINGS

BS up.v.c SOIL, WASTE, VENT PIPES AND FITTINGS Soil Waste & Vent Pipes Sweep Bend Sweep Bend with Inspection Opening 91¼ Soil Waste & Vent pipes for solvent weld connection to all fittings. Wall Length Mean Outside Thickness L in per M. Dia. D (mm)

More information

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1 = 20'-0 ADD-002 ISSUED FOR: MB/GSB PW/R RESIDENCE O/R /R W/R W/R /R /R /R /R /R NMSD Site Improvements Phase Scale: " = 0'-0" 06.0.05 MB/GSB BO ISSUED FOR: 4-000 REF: C-306 W/R W/R W/RW/R W/R W/R W/R W/R FO ADD-00 SKC-049 W/R W FO T R NMSD Site

More information

32 sewer jetting & vacuum combination truck, including disposal of debris

32 sewer jetting & vacuum combination truck, including disposal of debris BMC CORP. 32 sewer jetting & vacuum combination truck, including disposal of debris $ 194.00 $ 194.00 $ 194.00 8 1.25 1.25 VAC-CON 2012 TWO UNITS 33 closed circuit television inspection equipment, necessary

More information

Strip Till. Ultimate in Strip Till Versatility & Performance. The. Toll Free:

Strip Till. Ultimate in Strip Till Versatility & Performance. The. Toll Free: Strip Till The Ultimate in Strip Till Versatility & Performance Toll Free: 1-800-537-7370 www.remlingermfg.com The Original Remlinger Precision Strip Till (PST) row unit was farmer inspired and tested.

More information

USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS

USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS Quiroga, Ford, Kranc, Kraus, Taylor 1 USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS Paper 08-2942 Transportation Research Board 87 th Annual Meeting (January 13-17, 2008) Cesar Quiroga, Ph.D.,

More information

Former DuPont Barksdale Works Project Update

Former DuPont Barksdale Works Project Update Former DuPont Barksdale Works Project Update September 10, 2003 Presented by: DuPont Corporate Remediation Group Presenters and Topics Brad Nave - DuPont Corporate Remediation Group Tonight s Topics Update

More information

SVKM S NMIMS Mukesh Patel School of Technology Management & Engineering BTI 1

SVKM S NMIMS Mukesh Patel School of Technology Management & Engineering BTI 1 Mukesh Patel School of Technology Management & Engineering BTI 1 Structure of B. Tech Integrated - Civil Engineering Annexure 1 Semester I Communication Skills Mathematics I Physics-I Chemistry-I Basics

More information

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA REVISED AMENDMENT NO.3/ CONTRACT NO. Y16-182 TERM CONTRACT FOR COUNTY WIDE ROOF MAINTENANCE AND REPAIR ADVANCED ROOFING, INC. 200 Northstar

More information

NOTE ON PERFORMANCE TESTING

NOTE ON PERFORMANCE TESTING NOTE ON PERFORMANCE TESTING Performance Profile Sheet(s) are included in a format that can be easily photocopied for each trainee. This examination is designed to measure competency in the tasks taught

More information

FB-MULTIPIER vs ADINA VALIDATION MODELING

FB-MULTIPIER vs ADINA VALIDATION MODELING FB-MULTIPIER vs ADINA VALIDATION MODELING 1. INTRODUCTION 1.1 Purpose of FB-MultiPier Validation testing Performing validation of structural analysis software delineates the capabilities and limitations

More information

Knight Piésold. Knight Piésold

Knight Piésold. Knight Piésold Mount Polley Project Tailings Facility Summary February 26, 2007 Knight Piesold ref #: 101-01/18 1 Overview of Presentation General Information Project Background On-going Operations and Monitoring Test

More information

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,

More information

BID TABULATION SHEET. Garden State Highway Products, Inc 1740 E. Oak Road Vineland, NJ X X X 4831 X X Y Y N

BID TABULATION SHEET. Garden State Highway Products, Inc 1740 E. Oak Road Vineland, NJ X X X 4831 X X Y Y N Title: Traffic Control Signs, Supports, Hardware & Safety Devices Opening Date: Tuesday, August, 05 :0pm Contract #: CC-0099-5 Total Bids Received: Signed Proposal Stock Disclose Non- Collusion BID TABULATION

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 7 MUNICIPAL-ORIENTED

More information

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form (NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* Soils & Aggregate Lab Technician* Drilled Shaft Inspector* PG Asphalt Binder Laboratory

More information

COMMISSION POLICY POLICY #9.16

COMMISSION POLICY POLICY #9.16 COMMISSION POLICY POLICY #9.16 SUBJECT: Public Right-of-Way Encroachments and Regulations for Mailboxes and Newspaper Delivery Boxes DATE ADOPTED PAGE (BCC MINUTES) February 19, 2008 Page 26 OBSOLETE VERSIONS

More information

Quick Reference Guide Storm Water Database Initial Setup

Quick Reference Guide Storm Water Database Initial Setup Quick Reference Guide Storm Water Database Initial Setup This article is intended to guide the user in creating a project and entering the information into the storm water database. The database is to

More information

CertainTeed. Access Covers and Gratings. SELECTA Curb Units

CertainTeed. Access Covers and Gratings. SELECTA Curb Units CertainTeed Access Covers and Gratings SELECTA Curb Units Advanced Design SELECTA curb units have been developed to complement the technically advanced range of municipal castings now available to the

More information

Mailbox Installation and Damage Replacement Policy

Mailbox Installation and Damage Replacement Policy Mailbox Installation and Damage Replacement Policy Mailboxes represent obstructions within road right-of-way and hazards to the traveling public and the Lawrence County Engineer encourages mailbox installations

More information

GTS. midas GTS Advanced Webinar. Date: June 5, 2012 Topic: General Use of midas GTS (Part II) Presenter: Vipul Kumar

GTS. midas GTS Advanced Webinar. Date: June 5, 2012 Topic: General Use of midas GTS (Part II) Presenter: Vipul Kumar midas GTS Advanced Webinar Date: June 5, 2012 Topic: General Use of midas GTS (Part II) Presenter: Vipul Kumar Bridging Your Innovations to Realities GTS MIDAS Information Technology Co., Ltd. [1/30] Contents:

More information

Maintaining Military Missions: Coordinated Approach to Sea Level Rise Infrastructure Impacts

Maintaining Military Missions: Coordinated Approach to Sea Level Rise Infrastructure Impacts Maintaining Military Missions: Coordinated Approach to Sea Level Rise Infrastructure Impacts Keil Schmid, Geoscience Consultants, LLC Ginnie Kozak, Lowcountry Council of Govt Larry Lewis, BMI Environmental

More information

SLS LSC LSM. Bulletin No. 425B

SLS LSC LSM. Bulletin No. 425B SLS LSC LSM Bulletin No. 425B Mobile, Self-Contained Design Completely self-contained NTEP legal-for-trade mobile animal weighing Includes weight indicator, ticket printer, and battery (battery not included

More information

ADDENDUM NO. 02 INVITATION NUMBER:

ADDENDUM NO. 02 INVITATION NUMBER: ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT

More information

Access Field Entrance Other Constructed Yes (Type)

Access Field Entrance Other Constructed Yes (Type) APPLICATION FOR RESIDENTIAL OR FIELD ACCESS PERMIT SCOTT COUNTY PUBLIC WORKS DIVISION HIGHWAY DEPARTMENT 600 Country Trail East Jordan, MN 55352-9339 Phone 952-496-8487 Fax 952-496-8365 Permit No. Permit

More information

AASHTOWare BrM Deterioration and LCCA April 26, 2017 Mesa, Arizona

AASHTOWare BrM Deterioration and LCCA April 26, 2017 Mesa, Arizona AASHTOWare BrM 5.2.3 and LCCA April 26, 2017 Mesa, Arizona BrM Help Desk AASHTOWareBridge.com BrM@Bentley.com JIRA tickets: bridgeware.atlassian.net Josh Johnson, PE TAM Lead Engineer Joshua.Johnson@Bentley.com

More information

Call to Order! 1

Call to Order! 1 Carbon Steel Stainless Steel ANGLES BEAMS CHANNELS Bar Angles...... Structural Angles.............., Junior Beams... Standard....... Wide Flange 7,,9, Standard...... MC Shapes- (Car, Ship and Junior)......,

More information

HG-1 FLUSHING SYSTEM WITH BUILT-IN (NODE) or BLUETOOTH PROGRAMMING CONSTRUCTION

HG-1 FLUSHING SYSTEM WITH BUILT-IN (NODE) or BLUETOOTH PROGRAMMING CONSTRUCTION Automatic Water Distribution Flushing Equipment Controller Preferences (Select One) Built-In Node Bluetooth (KR-BL) 1. GENERAL DESCRIPTION 1.1 The equipment furnished under this Section shall be automatic

More information

DATE: 07/07/17 WAUKEGAN PARK DISTRICT PAGE 1 PO'S DATED FROM 06/01/2017 TO 06/30/2017

DATE: 07/07/17 WAUKEGAN PARK DISTRICT PAGE 1 PO'S DATED FROM 06/01/2017 TO 06/30/2017 DATE: 07/07/17 WAUKEGAN PARK DISTRICT PAGE 1 20180063 06/05/17 23060 Emeric Facility Services 01 MAY CUSTODIAL CLEANING-FH C 02-46-72-521-1230 1.00000 5,470.2700 5,470.27 PO TOTAL: 5,470.27 20180066 06/09/17

More information

Texas Department of Transportation BOOK 2 TECHNICAL PROVISIONS

Texas Department of Transportation BOOK 2 TECHNICAL PROVISIONS Texas Department of Transportation BOOK 2 TECHNICAL PROVISIONS FOR LOOP 375 - BORDER HIGHWAY WEST EXTENSION PROJECT Design-Build Project ATTACHMENT 19-2 PERFORMANCE AND MEASUREMENT TABLE BASELINE August

More information

CONTRACTORS STEEL COMPANY STOCK BOOK AND REFERENCE GUIDE INDEX

CONTRACTORS STEEL COMPANY STOCK BOOK AND REFERENCE GUIDE INDEX CONTRACTORS STEEL COMPANY STOCK BOOK AND REFERENCE GUIDE INDEX CARBON STEEL BARS Hot Rolled Rounds...3 Squares...4 Strip...4, 5 Flats...5, 6, 7, 8 COLD FINISHED Rounds - 1018...9, 10 Rounds - 1045...10

More information

Project Description: Automated Compilation of Semantically Rich BIM Models of Bridges Information Delivery Manual

Project Description: Automated Compilation of Semantically Rich BIM Models of Bridges Information Delivery Manual BIM Guideline Detailed Exchange Requirements Project SeeBridge for the Project Phase Inspection & Data Collection Date: 23.03.2017 Creator: Burcu Esen Barutcu Project : Automated Compilation of Semantically

More information

AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015

AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015 AASHTOWare BrR - SIMPLE SPAN PRESTRESSED I BEAM EXAMPLE - BR 76015 M N D O T B R I D G E S T A T E A I D Page 1 PS1 - Simple Span Prestressed I Beam Example (BrR 6.7.1) 1. From the Bridge Explorer create

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox v. 9.1 WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox

More information

TALREN v5. The latest design tool for checking the stability of geotechnical structures with or without reinforcements

TALREN v5. The latest design tool for checking the stability of geotechnical structures with or without reinforcements FICHE TALREN 5 GB:FICHE TALREN 5 GB 31/07/13 16:06 Page1 TALREN v5 STABILITY OF SLOPES AND ANCHORED WALLS The latest design tool for checking the stability of geotechnical structures with or without reinforcements

More information

BID RESULTS BID OPENING DATE: OCTOBER 15, 2015 NAME OF BIDDER CHERRY VALLEY TRACTOR SALES ROORK'S FARM SUPPLY, INC.

BID RESULTS BID OPENING DATE: OCTOBER 15, 2015 NAME OF BIDDER CHERRY VALLEY TRACTOR SALES ROORK'S FARM SUPPLY, INC. CK09MERCER2015-14B REBID VEHICLES AND EQUIPMENT FOR THE MERCER COUNTY PARK COMMISSION AND THE MERCER COUNTY COOPERATIVE CONTRACT PURCHASING SYSTEM BID OPENING DATE: OCTOBER 15, 2015 REBID AS NO BIDS WERE

More information

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan Introduction Controlling and maintaining fluid flow within the HDD bore during all installation stages is critical to the success of an HDD

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Sheet Pile Wall

GEO-SLOPE International Ltd, Calgary, Alberta, Canada  Sheet Pile Wall 1 Introduction Sheet Pile Wall Deep excavation on a level group usually results in a very low factor of safety, unless it is properly reinforced. The purpose of this example is to illustrate how the stability

More information

Advanced Webinar. Date: December 8, 2011 Topic: General Use of midas GTS (Part I) Presenter: Abid Ali, Geotechnical Engineer

Advanced Webinar. Date: December 8, 2011 Topic: General Use of midas GTS (Part I) Presenter: Abid Ali, Geotechnical Engineer midas GTS Advanced Webinar Date: December 8, 2011 Topic: General Use of midas GTS (Part I) Presenter: Abid Ali, Geotechnical Engineer Bridging Your Innovations to Realities Contents: 1. Introduction 2.

More information

Skills Practice Skills Practice for Lesson 2.1

Skills Practice Skills Practice for Lesson 2.1 Skills Practice Skills Practice for Lesson.1 Name Date Backyard Barbecue Introduction to Volume and Surface Area Vocabulary Write the term from the box that best completes each statement. surface area

More information

Invitation for Bids Amendment #1

Invitation for Bids Amendment #1 Invitation for Bids Amendment #1 DESCRIPTION: CLEARING RETENTION POND Solicitation: Issued: Procurement Officer: Phone: E-Mail Address: Mailing Address: USING GOVERNMENTAL UNIT: SPARTANBURG COMMUNITY COLLEGE

More information

FWD Data Analysis. version Office of Materials Pavement Engineering Section Pavement Design Unit 1400 Gervais Ave Maplewood, MN

FWD Data Analysis. version Office of Materials Pavement Engineering Section Pavement Design Unit 1400 Gervais Ave Maplewood, MN FWD Data Analysis version 2.2.5 Office of Materials Pavement Engineering Section Pavement Design Unit 1400 Gervais Ave Maplewood, MN 55109-2044 FWD Data Analysis First of all, this program is a work in

More information

System Components for Precast Concrete Tekla Structures 12.0 Basic Training September 19, 2006

System Components for Precast Concrete Tekla Structures 12.0 Basic Training September 19, 2006 System Components for Precast Concrete Tekla Structures 12.0 Basic Training September 19, 2006 Copyright 2006 Tekla Corporation Copyright 2006 Tekla Corporation SYSTEM COMPONENTS FOR PRECAST CONCRETE ii

More information

D.1 Radon Model Emanation Analysis

D.1 Radon Model Emanation Analysis D.1 Radon Model Emanation Analysis This appendix presents the radon emanation analyses performed in support of the EE/CA for the Ross-Adams Mine Site. The radon emanation analyses were used to determine

More information

WATER USE. LAND USE AC.IN. TOTAl ACREAGE SUMMARY: (ACRES) PER AC. AC.IN.

WATER USE. LAND USE AC.IN. TOTAl ACREAGE SUMMARY: (ACRES) PER AC. AC.IN. TABLE 1. Acreage Summary, Otero County, BUDGET AREA... DELL CITY AREA, OTERO COUNTY FARM SIZE 640 ACRES IRRIGATION TYPE PIVOT/FLOOD NUMBER OF CROPS.. 5 WATER USE LAND USE AC.IN. TOTAl ACREAGE SUMMARY:

More information

SELF-type SB. The polyester concrete drainage channel for use around the house. -SELF is available as follows: SA15 SB125 SC250 SD400 SE600 SF900

SELF-type SB. The polyester concrete drainage channel for use around the house. -SELF is available as follows: SA15 SB125 SC250 SD400 SE600 SF900 -type SB SA15 SB125 SC250 SD400 SE600 SF900 The polyester concrete drainage channel for use around the house The polyester concrete channels from the -SELF range are the ideal solution for surface water

More information

BLÜCHER Compact. The flexible drains for easy solutions in housing and commercial applications

BLÜCHER Compact. The flexible drains for easy solutions in housing and commercial applications BLÜCHER Compact The flexible drains for easy solutions in housing and commercial applications K E E P I N G U P T H E F L O W S T A I N L E S S S T E E L D R A I N A G E S Y S T E M S BLÜCHER Compact

More information

Caltrans Connect Opt-In

Caltrans Connect Opt-In Caltrans Connect Opt-In Caltrans Connect: Connect Overview: Connect is a feature that lets you manage which projects you're interested in, lets you manage which projects you've opted in on, which projects

More information

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM Date of Meeting: May 2, 2017 # I-2 SUBJECT: Quarterly Metrorail Construction Status Report ELECTION DISTRICTS: Ashburn/Broad Run STAFF CONTACTS: Alan

More information

Table of Contents: Pressure Vessel Codes & Registrations: Manufacturing Capabilities: Engineering Capabilities: Paint Specifications:

Table of Contents: Pressure Vessel Codes & Registrations: Manufacturing Capabilities: Engineering Capabilities: Paint Specifications: Pressure Vessel Codes & Registrations: The items listed in this catalog have been designed and constructed in accordance with the ASME Section VIII Division I Code latest edition and are registered with

More information

Slope stability analysis

Slope stability analysis Engineering manual No. 8 Updated: 04/2018 Slope stability analysis Program: Slope stability File: Demo_manual_08.gst This engineering manual shows how to verify the slope stability for a critical circular

More information

Three- Span Continuous Horizontally Curved. Composite Steel TUB Girder Bridge

Three- Span Continuous Horizontally Curved. Composite Steel TUB Girder Bridge Three- Span Continuous Horizontally Curved Composite Steel TUB Girder Bridge WIZARD, ANALYSIS AND DESIGN TUB Girder Curved Contents Bridge Information Material and Section Properties Wizard Modelling Tweaks

More information

Testconsult. Testconsult capabilities. Contact us. Structural health monitoring, specialist testing services and equipment

Testconsult. Testconsult capabilities. Contact us. Structural health monitoring, specialist testing services and equipment Testconsult Specialist testing services Testconsult capabilities Contact us Structural health monitoring, specialist testing services and equipment T: +44 (0)1925 286880 E: sales@testconsult.co.uk W: www.testconsult.co.uk

More information

834-P Sprayer Control User Guide (Y1.04) R0

834-P Sprayer Control User Guide (Y1.04) R0 Control TECHNOLOGIES 834-P Sprayer 834-P Sprayer Control User Guide (Y1.04) 98-70028-R0 ALARM 834-P SPRAYER CONTROL speed pressure Man Auto inch gal/ @40psi p/300ft p/rot 1 2 3 4 5 adjust value 834-P Sprayer

More information

Top View. Side View Perspective View Front View

Top View. Side View Perspective View Front View 3-D Model Images of Five High Fiber Roll Reinforced Lift Top View Side View Perspective View Front View 20" DIAMETER FIBER ROLLS INSTALLED AT.5: SLOPE APPROX. TOP FOUR FIBER ROLLS TO BE LOW-DENSITY (#7)

More information

North US 290 US 183. MLK Blvd. FM 969. ASERO Steel Sales. Ben White TX 71 IH-35 US 183

North US 290 US 183. MLK Blvd. FM 969. ASERO Steel Sales. Ben White TX 71 IH-35 US 183 North US 290 US 8 MLK Blvd. FM 969 ASERO Steel Sales Ben White TX IH- US 8 Hot Rolled Strip Commercial Quality A - 0 Size in Per 20 Ft. /8 x /2.2 4.26 /4.9 6.8.42 8.0 /4. 0.62 /2.68 2.6 2.80.00 2 /2.06

More information

Soil-Structure Interaction for Piled-Raft Foundation

Soil-Structure Interaction for Piled-Raft Foundation MIDAS Geotechnical Know-how Sharing Series Session 1. Soil-Structure Interaction for Piled-Raft Foundation JaeSeok Yang Principal Geotechnical Engineer, MIDAS IT Integrated Solver Optimized for the next

More information