Introduction to Next NGA West
|
|
- Edward Anthony
- 6 years ago
- Views:
Transcription
1 Introduction to Next NGA West Society of American Military Engineers Scott Field Post February 18 th, 2015 Approved for Public Release NGA Case Nos , ,
2 Overview Purpose: To provide an introduction to the Next NGA West Facilities Program Discussion: Background & Current Conditions Completed Studies & Analysis Program Details: Scope and Timeline Four Sites Way Ahead Key Takeaways Approved for Public Release NGA Case Nos , ,
3 NGA s U.S. Facilities Enhance Mission Performance Springfield, VA St. Louis, MO Arnold, MO Approved for Public Release NGA Case #
4 This domestic imagery was collected IAW a valid Proper Use Memorandum approved by NGA, and is not directed at U.S. persons. Next NGA West NGA key initiative to enhance mission capabilities, resiliency, and operational efficiencies by replacing STL 2 nd Street facilities at a to-be-determined location in the St. Louis metropolitan area Is necessary to provide a safe and reliable workplace for ~3,000 intelligence professionals Designed to meet NGA s long-term requirements and vision for GEOINT while aligning its people, processes, and technology Program is aligned with the ODNI IC Facility Management Strategy (FMS) Background: Currently, NGA 2 nd Street has approx. 3,000 intelligence officers working in high risk and functionally obsolete facilities Major concerns include: 1. Anti-Terrorism / Force Protection (AT/FP) 2. Facilities do not meet current seismic standards 3. Industrial accident potential 4. Facilities have exceeded their life-expectancy and are on a run-to-failure trajectory; incur high maintenance costs w/ inefficient space configurations Active Rail Line Anheuser Busch Lyon Park Replacement facility is needed to provide safe/secure work environment and will operate more efficiently; will achieve maximum output and flexibility necessary to meet NGA mission Approved for Public Release NGA Case # Mississippi River Sigma Chemical Plant 4
5 Studies & Analysis Studies evaluated: existing facility conditions, economics, security, seismic, and qualitative factors Facility Condition Assessment (2010) Design Basis Threat Analysis (2010) Economic Analysis (2011) Qualitative Analysis (2012) Decision Analysis (2012) Additional studies: Seismic Study, Lease Analysis, Blast Analysis, Balanced Survivability Assessment Replacement facilities are the best long-term solution: Resolves all workforce and mission vulnerabilities (note: due to the site configuration not all vulnerabilities could be properly mitigated with a renovation) Maximizes mission gains from integration, collaboration, and technologies Enabling the Future State Vision: provides an environment that supports anticipatory intelligence and provides a decision advantage Approved for Public Release NGA Case #
6 UNCLASSIFIED NGA s Adaptive Future Approved for Public Release NGA Case #
7 NGA s Future State Vision Approved for Public Release NGA Case #
8 Initiated in 2012 Search Process Contacted communities, regional development agencies, realtors, and other stakeholders 186 sites identified Applied minimal requirement filters to the sites 22 sites remained viable Further graded sites under specific criteria 6 sites warranted further discussion Eliminated sites due to master planning and external factors 4 sites will be studied in the Environmental Impact Statement (EIS) Approved for Public Release NGA Case #
9 Lambert International Airport B Spirit of St Louis Airport C Interstate 70 2 nd Street St. Louis Downtown Airport A Scott AFB Mid-America Airport D Interstate 64 B Fenton A Mehlville B North City C St. Clair County D 64 Arnold Interstate 44 Approved for Public Release NGA Case #
10 Fenton Site UNCLASSIFIED 1050 Dodge Dr Fenton, Missouri Former Chrysler Plant 280 acres Approved for Public Release NGA Case # UNCLASSIFIED Source: NAIP2012
11 Mehlville Site UNCLASSIFIED Tesson Ferry Rd St. Louis, Missouri Current Office Park 101 acres Approved for Public Release NGA Case # UNCLASSIFIED Sour
12 North St. Louis City Site UNCLASSIFIED Intersection of Cass and Jefferson Avenues Includes former Pruitt-Igoe site 136 acres Approved for Public Release NGA Case # UNCLASSIFIED Source: NAIP2012
13 St. Clair County Site UNCLASSIFIED Located near O Fallon, Illinois Adjacent to Scott Air Force Base near I acres Approved for Public Release NGA Case # UNCLASSIFIED Source: NAIP2012
14 Environmental Impacts The EIS will follow National Environmental Policy Act (NEPA) requirements Study environmental impacts, including, but not limited to: Endangered Species Air Quality Water Quality Cultural Resources Traffic & Transportation Noise Health & Safety Socioeconomics Approved for Public Release NGA Case #
15 Environmental Studies Environmental Baseline Survey (EBS) Phase I Threatened and Endangered Species Habitat Assessment Cultural Resource Phase I surveys Clean Air Act Conformity Analysis Traffic Modeling Wetland/ Floodplain Assessment Economic Impact Modeling Approved for Public Release NGA Case #
16 Consultations National Historic Preservation Act Section 106 Consultation Illinois and Missouri State Historic Preservation Offices Tribal Coordination Endangered Species Act Section 7 Consultation U.S. Fish and Wildlife Service Approved for Public Release NGA Case #
17 Deployment Design & Construction Programming Planning PMO as of 5 Feb 2015 Next NGA West Timeline (Phased MILCON Funding) FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 Establish PMO Staff for Planning, Communications, and Concept Design Staffed to Complete Design & prepare for Program Execution * Communications (External, Leadership, Workforce) Staffed to Execute Program PMO Phase Out Decision Analysis EA Determined Build New QDS SLS OSD MLAWR CCR NEPA Analysis OSD MLAWAR #2 Develop PMP and IMS Master Planning, Security, and Transportation Studies ROD Final Site Location Purchase Land IPBS Wedge FY16-20 IPBS FY17-21 IPBS Budget Submissions Submit P&D MILCON Docs Submit Construction MILCON Documents Congressional Approval IT Key Points: FY15: Planning: Environmental, Security, Transportation, Customer Reqts FY16: Begin Design FY17: Land Acquisition FY18: Begin Construction FY22: Deploy, Transition to Operations, FOC FY23: Decommission 2nd St. Planning Advertise / Award Project 100% Design Phase 1 (FY18) MILCON Construction Funding Preconstruction Services Power & Roads VCC/RIF/PG Site Construction Design / Engineering / Procurement Fit-Out (FF&E) Phase 2 (FY19 MILCON Construction Funding) MIAB and CUP Construction Installation, Test & Checkout FOC BOD Decommission 2 nd St Planning Approved for Public Release NGA Case # Legend Completed Planned Critical Highly Critical Deployments 17
18 Next NGA West Program Details Description: Design and construct NGA Campus West at a to be determined location in the St. Louis metropolitan area; capable of being master-planned for future expansion Scope: New facilities will include a purpose-built ~800,000 GSF main office building, central utility plant (CUP), visitor control center (VCC), remote inspection facility (RIF) and structured parking Sized for the existing 2 nd Street workforce (~3,000 people) with allowance for future growth Energy efficient, flexible for mission and technology changes in the future Fully-compliant with all regulations, standards, and codes (e.g., EPA, DNI, OSD, OSHA, AT/FP) Excludes: Data Center (Arnold remains) Proposed Timeline: FY 15: Planning: National Environmental Policy Act (NEPA); Customer Concept of Requirements (CCR) FY 16: Concept Design FY 17: Land acquisition FY 22: Deploy, Transition to Operations, FOC, Decommission 2nd Street Approved for Public Release NGA Case #
19 Key Takeaways Next NGA West is necessary to provide a safe and reliable workplace for ~3,000 employees NEPA is well underway and expected to conclude in the Spring of It will identify environmental impacts associated with each site. It has and will continue to generate high public, political, and employee interest NGA will select the final site location (CY2016) and coordinate with Director of National Intelligence and Office of the Secretary of Defense to obtain approval to purchase land NGA will obtain FY16 MILCON authorization and appropriations to proceed with a conceptual design NGA has and will continue to take a deliberate, transparent, and measured approach to this process and will work to keep all parties informed Approved for Public Release NGA Case #
20 facebook.com/natlgeointagency Approved for Public Release NGA Case Nos , ,
APPENDIX C SOURCES & REFERENCES CITED
APPENDIX C SOURCES & REFERENCES CITED Sources & References Cited Chapter 1 City of Minneapolis. 2007. Access Minneapolis Ten Year Transportation Action Plan. Connetics Transportation Group. 2012. Transit
More informationCouncil of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013
Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility
More informationStem Beach Solar 1041 Application
Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project
More informationApproval of Medical Center New Entrance Agreement
Finance & Administration Committee Action Item III-A February 14, 2013 Approval of Medical Center New Entrance Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationContents. 1. Routing and Siting Process Routing and Siting Process Highlights Timeline Constraints Map
Ranchtown Substation Project Open House Displays 08/16/2012 Contents 1. Routing and Siting Process Routing and Siting Process Highlights Timeline Constraints Map 2. Scope, Purpose and Need Existing Helotes
More informationDowntown Boise Multimodal Center
Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department
More informationDHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs
DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure
More informationPUBLIC WORKS ORGANIZATIONAL CHART
PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470
More informationCITY OF WINSTON-SALEM, NORTH CAROLINA Public Safety Needs Assessment Study Phase One EXECUTIVE SUMMARY
EXECUTIVE SUMMARY I. Documentation and Current Conditions Establishment Process II. Existing Public Safety Facilities Analysis III. Space Allocation, Co-Location and Potential Site Location Analysis IV.
More informationThe State of Missouri
NASCIO 2013 Recognition Awards Nomination The State of Missouri Hazardous Substance Site Locator Project Initiation and Completion Dates: 04/29/13 to 12/01/13 Category: Digital Government: Government to
More informationVTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association
VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for
More informationTRIAEM LLC Corporate Capabilities Briefing
TRIAEM LLC Corporate Capabilities Briefing 3/4/ 1 CORPORATE OVERVIEW CORPORATE VALUES MISSION STATEMENT SERVICES WORKFORCE EXPERIENCE CORPORATE CONTACTS 3/4/ 2 CORPORATE OVERVIEW TRIAEM is certified through
More informationKCTCS Facilities Support Services and Capital Projects
KCTCS Facilities Support Services and Capital Projects Responsible for the management of KCTCS facilities, equipment, and property, the mission of KCTCS Facilities Support Services and Capital Projects
More informationMunicipal Service Park 3 December Consolidation of City services to one centralized complex
Municipal Service Park 3 December 2010 Consolidation of City services to one centralized complex Overview: Operational Challenges and Opportunities South East Connector impacts Opportunities: The South
More informationCHAPTER 6 REFERENCES
Chapter 6 References CHAPTER 6 REFERENCES Chapter 1, Purpose and Need 40 CFR 1500.1, Purpose. 42 USC 4321 et seq. National Environmental Policy Act of 1969, as amended. Colton, G. Woolworth. 1862. Map
More informationEXECUTIVE ORDER Chemical Facility Safety and Security: Providing ProtecFon Reduces Risk
EXECUTIVE ORDER 13650 Chemical Facility Safety and Security: Providing ProtecFon Reduces Risk THE DAILY www.region6gazette.com - Since 2014 Executive Order (EO) 13650 signed August 1, 2013 - Result of
More informationSchematic Design Overview Project Review Stakeholder Engagement Project Delivery Method Upcoming Milestones
Schematic Design Overview Project Review Stakeholder Engagement Project Delivery Method Upcoming Milestones Public Safety & Security Secure parking and access for Police, Sheriff, Judge Secure & segregated
More informationThe Blue Line Extension
The Blue Line Extension NORTH CAROLINA JOINT TRANSPORTATION OVERSIGHT COMMITTEE Presented by Carolyn Flowers CATS Chief Executive Officer Raleigh, NC February 10, 2012 Overview Charlotte Area Transit System
More information# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:
BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design
More informationEnvironmental Impact Questionnaire
Community Development Department 11 English Street Petaluma, CA 94952 Phone: 707-778-4301 Email: cdd@ci.petaluma.ca.us Web: www.cityofpetaluma.net/cdd Building Geographic Information Systems Housing Neighborhood
More informationCybersecurity Presidential Policy Directive Frequently Asked Questions. kpmg.com
Cybersecurity Presidential Policy Directive Frequently Asked Questions kpmg.com Introduction On February 12, 2013, the White House released the official version of the Presidential Policy Directive regarding
More informationFeasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008
Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 INTRODUCTION The City of Moorhead (City), along with the Fargo-Moorhead Metropolitan Council of Governments (FM
More informationATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n
RFP P5413 Contract No. 200703566 Work Order No. -07 ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: DMJM Harris/JJG Joint
More informationGateway Transportation Collaboration Forum. 21/01/2015 Gateway Transportation Collaboration Forum 1
Gateway Transportation Collaboration Forum 21/01/2015 Gateway Transportation Collaboration Forum 1 21/01/2015 Gateway Transportation Collaboration Forum 2 BACKGROUND AND CONTEXT 2006 Asia-Pacific Gateway
More informationNovember 23, Ms. Amy Blair U.S. Army Corps of Engineers Kansas City District, Room E. 12th Street Kansas City, MO 64016
November 23, 2015 Ms. Amy Blair U.S. Army Corps of Engineers Kansas City District, Room 529 601 E. 12th Street Kansas City, MO 64016 Re: Next NGA West (NGW) Draft EIS Comments Resolutions of Support Dear
More informationThe Office of Infrastructure Protection
The Office of Infrastructure Protection National Protection and Programs Directorate Department of Homeland Security Organisation for the Prohibition of Chemical Weapons September 13, 2011 Overall Landscape
More informationNovember 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING
November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING Project Background Description of the Project Alternatives Analysis Process Project Progress Activity Stations Comments Adjourn 2 VIA spent 2 years
More informationALBEMARLE COUNTY SERVICE AUTHORITY
ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: Strategic Plan Process STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: September 20, 2018 ACTION:
More informationNorth Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009
North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor
More informationApplying Mitigation. to Build Resilient Communities
Applying Mitigation to Build Resilient Communities The Hazards Around Us Think about the natural hazard that... poses the greatest risk to where you live or work OR has had the greatest impact on you personally
More informationHarbourside Commercial Park Inc. Crown Corporation Province of Nova Scotia Business Plan
Harbourside Commercial Park Inc. Crown Corporation Province of Nova Scotia Business Plan 2010 2011 1 Message from the Minister and the President Harbourside Commercial Park Inc. (HCPI) began operations
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2016 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2017 Introduction The
More informationAPPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:
APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: New 240 kv Montana Alberta Tie Ltd. (MATL) Substation 120S and Reconfigure 240kV Transmission Line 923L AltaLink Management Ltd. 2611 3 rd
More informationContext Sensitive Case Study: Grand Avenue Bridge
Context Sensitive Case Study: Grand Avenue Bridge MODERATOR: Craig Gaskill, TSH Engineering Joe Elsen, Colorado Department of Transportation - DOT Perspective / Client Brian Pettet, Pitkin County - Pitkin
More informationOrganizational Structure of the Toronto Environment Office
STAFF REPORT INFORMATION ONLY Organizational Structure of the Toronto Environment Office Date: April 20, 2007 To: From: Wards: Reference Number: Parks and Environment Committee Richard Butts, Deputy City
More informationSTATE STREET CORRIDOR
CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals
More informationS-03-SegB: South Federal Way to Fife LRT
Project Number S-03-SegB Subarea South King/Pierce Primary Mode Light Rail Facility Type Corridor Length 4.0 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE
More informationConstruct Chiller Plant, Phase I
Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2015 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2016 Introduction The
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT A A-1: BACKGROUND AND CONTRACTOR QUALIFICATIONS A-2: SCOPE OF WORK
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT A A-1: BACKGROUND AND CONTRACTOR QUALIFICATIONS A-2: SCOPE OF WORK GOODS AND SERVICES CONTRACTS Page 1 of 5 RFP 16-PR-DEM-33 Comprehensive All-Hazards
More informationPresentation to Local/State/Federal Agency Mtg November 10, 2015
Presentation to Local/State/Federal Agency Mtg November 10, 2015 Summary Proposed 114 mile 500 kv transmission project that will connect with Delaney Substation near Palo Verde Nuclear Generating Station,
More informationCASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC
CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION Alan Stuart, Managing Director National Science Foundation s New Headquarters in Alexandria, Virginia 1. Introduction to the National
More informationWashington Headquarters Services Defense Facilities Directorate
Washington Headquarters Services Defense Facilities Directorate Meeting Executive Order 13514 Federal Leadership in Environmental, Energy, and Economic Performance Crystall Merlino, LEED AP Engineering
More informationSRS Overview. Dave Hepner. Looking toward the future of the Savannah River Site
SRS Overview Looking toward the future of the Savannah River Site Dave Hepner Department of Energy-Savannah River Director, Acquisition Operations Division Savannah River Site March 19, 2012 SRS: We know
More informationSupplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21
Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest
More informationTOWN OF ARNPRIOR STRATEGIC PLAN AT A GLANCE ( )
VISION 2019 1. Robust sustainable growth We have solid economic development and growth management strategies resulting in expanded commercial, retail activity and industrial base. Our Values LONG TERM
More informationMeeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.
TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,
More informationStockton Aviation Research & Technology Park
Stockton Aviation Research & Technology Park Overview Joseph M. Sheairs, Sr. Executive Director Introduction Industry, Academia, and Government collaboration dedicated to the advancement of aviation sciences,
More informationCorridor Management Committee. January 12, 2017
Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major
More informationA Data Model for Distributed Data Management. Matt Erker, Phil Lidov
A Data Model for Distributed Data Management Matt Erker, Phil Lidov Problem Statement Transportation planning, from statewide long range planning through environmental assessment of individual improvements,
More informationScoping Information Report
Scoping Information Report February 2019 To request accommodations for persons with disabilities or information in alternative formats, call 1-800-201-4900/TTY Relay: 711 or email accessibility@soundtransit.org.
More informationMarch 21, 2016 MEMORANDUM FOR THE HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES. Building National Capabilities for Long-Term Drought Resilience
This document is scheduled to be published in the Federal Register on 03/25/2016 and available online at http://federalregister.gov/a/2016-06901, and on FDsys.gov March 21, 2016 MEMORANDUM FOR THE HEADS
More informationDallas Streetcar Central Link Locally Preferred Alternative Selection
Dallas Streetcar Central Link Locally Preferred Alternative Selection Mobility Solutions, Infrastructure & Sustainability Committee August 28, 2017 Tanya Brooks, Assistant Director Mobility and Street
More informationWestern Illinois University Quad Cities Facilities. Consolidated Fiscal-Year 2012 Annual Report and Fiscal-Year 2013 Planning Document
Mission statement: Western Illinois University Quad Cities Facilities Consolidated Fiscal-Year 2012 Annual Report and Fiscal-Year 2013 Planning Document Submitted by: William Brewer University Architect
More informationDirector of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.
PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal
More informationSTRATEGIC PLAN. USF Emergency Management
2016-2020 STRATEGIC PLAN USF Emergency Management This page intentionally left blank. Organization Overview The Department of Emergency Management (EM) is a USF System-wide function based out of the Tampa
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting July 9, 2014 Executive Director Approval
More informationSTRENGTHENING THE CYBERSECURITY OF FEDERAL NETWORKS AND CRITICAL INFRASTRUCTURE
STRENGTHENING THE CYBERSECURITY OF FEDERAL NETWORKS AND CRITICAL INFRASTRUCTURE By the authority vested in me as President by the Constitution and the laws of the United States of America, it is hereby
More informationAppendix 2. Capital Funding Source Summary Table of Contents
Capital Source Summary Table of Contents 2016 Corporate Services APP 2-3 Mayor and Council APP 2-5 Office of the Chief Administrative Officer APP 2-5 Office of the Chief Operating Officer APP 2-5 Planning
More informationSystem-wide Security Assessment for MetroLink
System-wide Security Assessment for MetroLink June 21, 2018 Presented by: PROJECT OVERVIEW Perform a comprehensive security assessment of the St. Louis MetroLink System, resulting in recommendations to
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT
CITY OF VANCOUVER Supports Item No. 2 P&E Committee Agenda September 20, 2007 ADMINISTRATIVE REPORT Report Date: August 31, 2007 Author: Gordon Foy Phone No.: 604.873.7306 RTS No.: 06810 VanRIMS No.: Meeting
More informationInapplicability to Non-Federal Sales and Use
Security Industry Association 8405 Colesville Road, Suite 500 Silver Spring, MD, 20190 301-804-4705 www.securityindustry.org Submitted by email: osd.dfars@mail.mil October 19, 2018 Re: Section 889 of the
More informationInfrastructure PA Stephen Lecce
PA Stephen Lecce Ministry of Stephen Lecce, Parliamentary Assistant Meeting: Topics: Topics: PA Stephen Lecce, MPP Monday, August 20, 2018 9:15 am 9:45 am Shaw Centre, Room 107, Level 1 National Centre
More informationOffice of Acquisition Program Management (OAPM)
Office of Acquisition Program Management (OAPM) Ron Gallihugh Assistant Administrator Airport Consultants Council July 18, 2017 Acquisition Reform Historically, Transportation Security Administration (TSA)
More informationICAS Workshop 3rd October 2005 Single European Sky Implementation Plan - SESAME
ICAS Workshop 3rd October 2005 Single European Sky Implementation Plan - SESAME Jan Van Doorn EUROCONTROL Experimental Centre, France Director European 1 Organisation for the Safety of Air Navigation Demand
More informationProposed FY 06 Project Development Program and FY 05 Project Development Program Update
Washington Metropolitan Area Transit Authority Proposed FY 06 Project Development Program and FY 05 Project Development Program Update Presented to the Board of Directors: P D E C Planning & Development
More informationMN 2050 Infrastructure Neglect in Minnesota
MN 2050 Infrastructure Neglect in Minnesota January 12, 2011 Dave Hutton, SRF - MPWA Tom Eggum, TKDA - ASCE Patti Craddock, Craddock Consulting Engineers - CSWEA Craddock Consulting Engineers Why a MN2050?
More informationSTATE OF THE ATLANTA BELTLINE 22 Miles to A Better Atlanta May 25, 2016
STATE OF THE ATLANTA BELTLINE 22 Miles to A Better Atlanta May 25, 2016 STATE OF THE ATLANTA BELTLINE 22 Miles to A Better Atlanta MICHAEL PARIS President & CEO Council for Quality Growth STATE OF THE
More informationJoint Task Force District-Wide 40J Technology Program Monthly Status Update
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Joint Task Force District-Wide 40J Technology Program Monthly Status Update Build-LACCD IT PMO 01/31/2017 40J Technology Agenda 40J Technology
More informationISOO CUI Overview for ACSAC
ISOO CUI Overview for ACSAC Briefing Outline ISOO Overview Overview of the CUI Program CUI and IT Implementation CUI and NIST Standards and Guidelines NIST SP 800-171 CUI Approach for the Contractor Environment
More informationDepartment of Defense Fiscal Year (FY) 2014 IT President's Budget Request Defense Advanced Research Projects Agency Overview
Mission Area Business System Breakout Appropriation BMA 0.027 Total 35.003 Defense Business Systems 0.027 All Other Resources 34.976 EIEMA 34.976 FY 2014 ($M) FY 2014 ($M) 35.003 FY 2014 ($M) FY13 to FY14
More informationWRI BUILDING EFFICIENCY INITIATIVE BUILDING EFFICIENCY INITIATIVE, WRI ROSS CENTER FOR SUSTAINABLE CITIES
WRI BUILDING EFFICIENCY INITIATIVE BUILDING EFFICIENCY INITIATIVE, WRI ROSS CENTER FOR SUSTAINABLE CITIES WRI ROSS CENTER FOR SUSTAINABLE CITIES 2 Supporting partners to create local solutions by adapting,
More informationMOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension
MOTION NO. M2018-30 Task Order 2 with the City of Des Moines for the Federal Way Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 03/08/2018 Final Action Ahmad Fazel, DECM
More informationMaximizing the University s Physical Assets (Part I): Facility Condition Assessment
Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013 Agenda Program background Broadening our data
More informationBremner Transformer Station and Cable Tunnel PROGRESS OF THE CLASS ENVIRONMENTAL ASSESSMENT STUDY
May 19, 2011 Community Meeting Metro Toronto Convention Centre North Building, Room 203B May 19 th, 2011, 4:30 p.m. to 7:30 p.m. Please sign in and complete a comment sheet Project team members are available
More information2/12/2018 FBI HEADQUARTERS
FBI HEADQUARTERS OVERVIEW GSA and FBI are presenting a revised plan for the FBI Headquarters Consolidation project which remains a critical project and high priority. In response to the Senate Committee
More information* Person responsible for this Memorandum Michael
DCN: 8216 DEFENSE BASE CLOSURE AND REALIGNMENT COMMISSSION 2521 CLARK STREET ARLINGTON, VIRGINIA 22202 (703) 699-2950 MEMORAUNDUM OF MEETING DATE: 18 August 2005 TIME: 0 8 3 0 MEETING [XI or PHONE CALL
More informationGirard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013
Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities
More informationImplementation Plan FY
Implementation Plan FY 2013 2015 January 18, 2012 Financial Integrity - Address the District's Structural Deficit - Financially support the District's reinvention of its family of services - Promote funding
More informationPublic-Private Partnerships: Investing in our Infrastructure
Marvin Markus Managing Director Goldman Sachs marvin.markus@gs.com Hudson Yards Project Area The HY Idea Takes Shape Master Plan: Caemmerer West Side Yard released by the MTA (1988) Plan proposed a mixed-use
More informationWritten Statement of. Timothy J. Scott Chief Security Officer The Dow Chemical Company
Written Statement of Timothy J. Scott Chief Security Officer The Dow Chemical Company Representing The Dow Chemical Company and the American Chemistry Council To the United States Senate Committee on Homeland
More informationWest of Hudson Regional Transit Access Study
West of Hudson Regional Transit Access Study Open House Presentation June 1, 2009 1 Agenda 1. Progress to Date 2. Level 1 Screening Analysis 3. Level 2 Screening Criteria 4. Next Steps 5. Questions and
More informationExecutive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc.
Goodyear Intelligent Transportation Systems Strategic Plan Executive Summary Prepared for: City of Goodyear Prepared by: 191376000 Copyright 2008, Kimley-Horn and Associates, Inc. I. INTRODUCTION The City
More informationcybersecurity in Europe Rossella Mattioli Secure Infrastructures and Services
Enhancing infrastructure cybersecurity in Europe Rossella Mattioli Secure Infrastructures and Services European Union Agency for Network and Information Security Securing Europe s Information society 2
More informationConnecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1
Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1 Presentation Overview What is BTOP? Making BTOP work for our state What
More informationGirard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013
Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities
More informationGeorgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline
Georgia Institute of Technology Advanced Computing Technology Building Draft Program Vision Program Outline Issued April 2, 2001 I N T R O D U C T I O N Scope This document is a summary of the Vision Session
More informationThe U.S. Manufacturing Extension Partnership - MEP
The U.S. Manufacturing Extension Partnership - MEP Roger D. Kilmer Director, MEP National Institute of Standards and Technology (NIST) U.S. Department of Commerce roger.kilmer@nist.gov 301-975-5020 http://www.nist.gov/mep/
More informationStrategic Investment Prioritization for Management of Risk of Land Development Adjacent to Critical Private Infrastructure Networks
Strategic Investment Prioritization for Management of Risk of Land Adjacent to Critical Private Infrastructure Networks Shital Thekdi and James H. Lambert 2011 Winter Global Conference on Business and
More informationA Growing Hub in the Heart of the Bakken
A Growing Hub in the Heart of the Bakken Presented to the Interim Energy Development and Transmission Committee March 8, 2018 Key Points 1 2 3 CITY GROWTH 2006-2017 DEBT SERVICE GROWTH 2008-2018 CONTINUED
More informationLIVABLE CENTERS INITIATIVE THE ATLANTA EXPERIENCE. Amy Goodwin Alabama Planning Association Conference May 2, 2013
LIVABLE CENTERS INITIATIVE THE ATLANTA EXPERIENCE Amy Goodwin Alabama Planning Association Conference May 2, 2013 Atlanta Regional Commission ARC is a multi-disciplinary regional planning agency with wide-ranging
More informationUAE National Space Policy Agenda Item 11; LSC April By: Space Policy and Regulations Directory
UAE National Space Policy Agenda Item 11; LSC 2017 06 April 2017 By: Space Policy and Regulations Directory 1 Federal Decree Law No.1 of 2014 establishes the UAE Space Agency UAE Space Agency Objectives
More informationNext Steps. Investing in the Future of. MASTER DEVELOPER PROCUREMENT OVERVIEW October 2016 July Chicago Union Station Chicago Union Station
Investing in the Future of Chicago Union Station Chicago Union Station MASTER DEVELOPER PROCUREMENT OVERVIEW October 2016 July 2015 Next Steps 1 Chicago Union Station Operations 4 th busiest station in
More informationTRANSIT CENTER DISTRICT PLAN
TRANSIT CENTER DISTRICT PLAN Informational Presentation Planning Commission 04.19.2012 San Francisco Planning Department In partnership with: San Francisco Redevelopment Agency Transbay Joint Powers Authority
More informationLanier Environmental Consultants
Lanier Environmental Consultants Providing environmental and planning services to protect the Air Force Mission and the Environment P.O. Box 241562 Montgomery, Alabama 36124 1562 334 430 1130 jlanier@lecllc.com
More informationEstablishing the Vision
BIM & Beyond: USCG Case Studies from Mission to Management Establishing the Vision June 23, 2007 Dana K. Deke Smith, AIA Executive Director, buildingsmart Alliance Setting the Vision $3 Trillion industry
More informationCritical Infrastructure Assessment
Critical Infrastructure Assessment Everyday the products and services that support our standard of living flow, almost seamlessly, to and from our homes, communities, and government. Making this possible
More informationStewarding NOAA s Data: How NCEI Allocates Stewardship Resources
Stewarding NOAA s Data: How NCEI Allocates Stewardship Resources Eric Kihn, Ph.D. Director, NCEI Center for Coasts, Oceans and Geophysics (CCOG) Krisa M. Arzayus, Ph.D. Deputy Director (Acting), NCEI Center
More informationHow UAE is Driving Smart Sustainable Cities: key Achievements and Future Considerations
How UAE is Driving Smart Sustainable Cities: key Achievements and Future Considerations By Dr. Saeed Al Dhaheri @DDSaeed Chairman, We are the leading Smart Solutions Integrator. With our far sight and
More informationBill Jackson Asst. Statewide Utility Engineer, Office of Construction MDOT SHA
Jeff Ensor TDD Chief of Staff Director of Project Development & Delivery MDOT MTA Purple Line Judy Freedman Breckon Director of Property Acquisition MDOT MTA Purple Line Brian Horn Purple Line Real Estate
More information