1 Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013

2 Agenda Program background Broadening our data and tools Balancing facility needs with funding challenges A new approach Questions and discussion 2

3 Policy Questions for the Board What percent of University resources should be allocated to facilities? What is an appropriate [minimum] condition standard for individual buildings, or portfolios of buildings (age, type, programs served, etc)? What is the best approach to stop adding to the backlog (e.g. maintenance endowments for new buildings)? 3

4 Background: Systemwide Facilities Million Gross Square Feet Research and Outreach Centers & Field Stations 4

5 Campus Age Profile 25 Addition of new buildings has minimal impact GSF in Millions M 26% 6.2M 30% 2.9M 14% 6.5M 30% 6.1M 28% 6.5M 30% 6.6M 29% 6.4M 28% 6.8M 30% Age in Years Over to to 25 Under M 30% 2.7M 12% 2.9M 13%

6 Outstanding Organization University Goal Outstanding Organization; Be responsible stewards of resources, focused on service, driven by performance, and known as the best among peers. University Strategy Be responsible stewards of resources Key Indicator Facilities Condition Measure Facilities Condition Needs Index (FCNI) 6

7 Facilities Condition Assessment (FCA) Vision: The enterprise source of the most accurate and up-to-date condition information for campus facilities and infrastructure used to ensure effective operations and guide renewal investments. Operationally: An independent, inspection based review of building conditions Report prioritizes needs for facilities renewal over next ten years Database provides a tool for accessing and utilizing data Information used to measure long term facilities condition against established metrics and peers 7

8 Facility Planning Drivers Programmatic Needs Facility Conditions Space -Correct Type -Optimal Quantity -Appropriate Condition 8

9 What is Assessed Roofing Foundations Windows Walls Doors Structure Interiors Walls, Doors Ceilings Elevators Stairs Interior Finishes Classrooms Equipment Ductwork Piping Controls Component List Equipment Power Distribution Interior Lighting Exterior Lighting Security Building Exterior Building Interior HVAC Electrical Equipment Fixtures & Hardware Domestic Water Drain, Waste, Vents Storm Drains Equipment Alarm Systems Sprinkler Systems Stand Pipes Walkways Plazas (select) Lighting Int l Building Code State Code MN Accessibility Code Universal Accessibility Plumbing Fire / Life Safety Site Code / Accessibility 9

10 Broadening Assessments Percent (%) of Campus Assessed Pre Twin Cities 91% 94% Duluth 60% 72% Morris 96% 96% Crookston 52% 83% 1 ROCs 0% 53% 2 Total 82% 90% 1 Represents ~90% of ROCs FCA Eligible facilities (those with mechanical, electrical, plumbing systems). 2 Includes formally inspected space and new/remodeled space <5 years old. Also includes SF for parking ramp decks. 10

11 Facilities Condition Assessment updated 2013 (System-wide) Campus Total GSF 1 Estimated Replacement Value Projected 10-Year Needs 10 Year Needs/Replacement Value = (FCNI) Twin Cities 22,405,496 $7,077,426,098 $2,443,793, Duluth 3,264,295 $677,093,369 $196,133, Morris 965,276 $257,875,932 $95,122, Crookston 665,410 $103,457,191 $33,286, Grand Totals 27,442,878 $8,115,852,590 $2,768,336, Excludes 1.9 Million GSF for Rochester Campus, Field Stations, and Research and Outreach Centers. Does not include parking ramp decks. 11

12 12

13 13

14 Actual Investment vs. Target $300 Accumulated deferral to lower target since 2002: $306 Million $ in Millions $250 $200 $150 $100 Upper Target Lower Target Decreasing Backlog Sustaining Backlog Increasing Backlog $50 $

15 HEAPR Appropriation History (System-wide) $ Millions Request Appropriation Emergency Appropriation 15

16 Capital Need Exceeds Available Funding (System-wide) Required Capital to Maintain current FCNI Ratio: $160 Million per year Actual Funding (annual average during last 5 years): $110 Million per year R & R $11,655,600 11% Auxiliary Funds $13,359,200 12% Facility Renewal $25,194,400 23% Utilities Infrastructure $9,509,800 9% Value of Razed Facilities $12,004,600 11% HEAPR $37,600,000 34% Average Annual Renewal Investment: FY 09-13: $110M 16

17 Investment in Existing Space vs. New Space (Twin Cities State Supported Space) New Construction 47% Renewal 53% Capital Investments FY02-FY12 17

18 Renewal Backlog vs. Peers (Twin Cities State Supported Space) 18

19 Renewal Spending vs. Peers (Twin Cities State Supported Space) $9.00 Peers $9.00 U of M $8.00 $7.00 $8.00 $7.00 $1/gsf less than peers $6.00 $6.00 $5.00 $5.00 $4.00 $4.00 $3.00 $3.00 $2.00 $2.00 $1.00 $1.00 $0.00 $0.00 Peer Avg. (FY02-FY12) U of MN Avg. (FY02-FY12) Peer Avg. (FY06-FY12) U of MN Avg. (FY06-FY12) 19

20 Facility Condition Strategies Utilize existing space Renovate existing space Maximize energy conservation and implement district utility strategies Target individual system improvements Demolish or decommission targeted buildings Build new facilities Renovated 11 Vital Buildings 1,192,501 GSF Retired $200M+ of renewal work Razed 23 Obsolete Buildings 533,352 GSF Avoided $31M renewal; $1.25M annual O&M Twin Cities State Supported Space 20

21 Draft Investment Model Criteria Range Criteria Condition (FCNI) Renovation Cost ($ per GSF) Operations & Maint. Costs Energy Demand (kbtu) Space Efficiency Historical Value (NHRP Status) Code and Accessibility Deficiencies Master Plan Fit Program Flexibility of Functionality Space High / Poor Critical (>1.00) >$200 >110% >110% Worst None 0-Serious Identified for Disposal Poor Poor Poor ( ) $125-$199 1-Major Disposal advances plan Mid Fair ( ) $75-$124 95% to 110% 95% to 110% Steward 2-Moderate Not Addressed Reasonable Reasonable Good ( ) $25-$74 3-Minor Preservation advances Plan Low / Good Excellent ( ) <$25 <95% <95% Best Listed or Eligible 4-Not Significant Identified for preservation Excellent Excellent Weight TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 21

22 Target FCNI Draft Building Portfolios Title Description Default Buildings Range TBD Keep Up Little to no deferred maintenance or need for space/system renewal or modernization. Maintain all components and replace at end of useful life. Our best buildings, typically new, FCNI generally < Range TBD Catch Up and Keep Up Maintenance has been deferred, but space/systems not yet in need of renewal. Retire deferred maintenance on a system-by-system basis. Functional buildings; FCNI generally between Range TBD Keep & Renew Significant maintenance has been deferred; space/systems need extensive renewal to serve programs. Maintain bldg components to extent possible, retire deferred maintenance when feasible, and invest in renewal when economically justifiable. Compromised buildings; FCNI generally > 0.41 NA Defer and Do Not Reinvest Not suitable for significant investment. Ability to serve program is compromised in long run, yet suitable for near term. On disposal cycle with undetermined date. Greatly compromised or non-strategic support buildings NA Secure and Protect Significant maint. Has been deferred, and space/systems need significant renewal. No longer capable of supporting program, yet carries significance worth protecting against the time renewal and modernization become possible. Eddy Hall NA Dispose or Replace Qualitative considerations outweigh practicality of further investment. Prepare to remove (and potentially replace) asset within 5 years, or at minimum identify funds to begin the process. Highly compromised buildings generally at or near end of life; FCNI ~

23 Summary Facility needs present a significant challenge Funding support is critical to maintain a safe, functional campus and uphold competitive position amongst peers Optimal utilization of existing space is paramount to the success of our mission Updating assessments and pursuing a strategic multi-year investment approach ensures inclusiveness and balance 23

24 Policy Questions for the Board What percent of University resources should be allocated to facilities? What is an appropriate [minimum] condition standard for individual buildings, or portfolios of buildings (age, type, programs served, etc)? What is the best approach to stop adding to the backlog (e.g. maintenance endowments for new buildings)? 24

25 Questions 25

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded

More information

Redmond Facilities Strategic Management Plan Overview

Redmond Facilities Strategic Management Plan Overview Redmond Facilities Strategic Management Plan Overview Project Purpose + Provide guidance on how to best operate, maintain, and upgrade facilities now and in the future + Optimize maintenance staffing and

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Facility Condition Assessments

Facility Condition Assessments Facility Condition Assessments City Council Work Session: July 1, 2014 Department of Public Works Introduction Andrew Clough, Director, Public Works Phil Harrington, Deputy Director, Public Works Lorin

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Five-Year Capital Plan Request FY through FY

Five-Year Capital Plan Request FY through FY Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance Seniors bonded $690,706 Health and Safety bonded Facilities Preservation

More information

2012 Bond Planning. Facility Management CPAC Overview Presentation. Denver Public Schools. March 2012

2012 Bond Planning. Facility Management CPAC Overview Presentation. Denver Public Schools. March 2012 2012 Bond Planning Facility Management CPAC Overview Presentation Denver Public Schools March 2012 Facility Management Table of Contents I. DPS Facility Management Mission II. DPS Existing Facility Overview

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Construct Chiller Plant, Phase I

Construct Chiller Plant, Phase I Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:

More information

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Business Opportunities with VISN 23 Capital Assets Management Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Overview VISN 23 Capital Assets Manager Veterans Health Administration,

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 Project Tasks Programming Interviews Fairbank Community Center Feasibility Study Recreation, Senior Center,

More information

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

City Reso-A Requests FY 2018 (City Council and Borough Presidents) Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation

More information

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 CNM Master Plan Line # Master Plan Project Title Description Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 Projected spending for FY18 Potential Funding Source

More information

John Strybos, PE OCTOBER 11, 2016

John Strybos, PE OCTOBER 11, 2016 ALAMO COLLEGES FACILITIES ANNUAL John Strybos, PE Kyle LeBlanc, PE, CFM, LEED GA OCTOBER 11, 2016 ALAMO COLLEGES Mission Statement: To provide reliable, cost-effective, and excellent facilities operations

More information

Getting Started with Stormwater Asset Management

Getting Started with Stormwater Asset Management Getting Started with Stormwater Asset Management Fall Conference Broken Arrow, OK September 17, 2018 Trey Shanks CFM, IAM, PACP ts@freese.com Asset management roadmap STEP 4 Risk Based Analysis STEP 3

More information

FACILITIES CAPITAL. FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000

FACILITIES CAPITAL. FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000 FACILITIES CAPITAL FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000 STRATEGIC GOAL: ENHANCED MANAGEMENT EXCELLENCE Federal Resource Summary by Performance Objective

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

Capital Planning & Financing

Capital Planning & Financing Capital Planning & Financing Lifelines Council Brian Strong, Director of Capital Planning City and County of San Francisco November 17, 2011 Capital Planning Discussion San Francisco Capital Plan Overview

More information

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance FY 2018 19 Janette Pell Department Director Administration and Finance Capital Projects Facilities and Real Estate Management Fleet Operations Information and Communications Technology Purchasing, Surplus

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT K.5 CITY COUNCIL AGENDA REPORT TYPE OF ITEM: Info/Consent AGENDA ITEM NO.: 5 DATE: December 6, 2016 TO: City Council THROUGH: Greg Nyhoff City Manager FROM: SUBJECT: Darwin Base Fire Chief Additional Appropriation

More information

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA Prospectus Number: PCA-0154-S F15 FY2015 Project Summary The General Services Administration () proposes a repair and alteration project to upgrade several building systems and reconfigure existing space

More information

2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY

2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY 2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY Prepared for Governor Rick Snyder The 21st Century Infrastructure Commission's research is composed of two major works: a full report and

More information

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI Presented by: Scott Mason 1 Agenda Traditional energy efficiency Next generation

More information

IT Town Hall Meeting. IT Town Hall - October 6,

IT Town Hall Meeting. IT Town Hall - October 6, IT Town Hall Meeting Scott F. Midkiff Vice President for Information Technology and CIO Professor of Electrical and Computer Engineering Virginia Tech midkiff@vt.edu IT Town Hall - October 6, 2014 1 Agenda

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

TRANSIT CENTER DISTRICT PLAN

TRANSIT CENTER DISTRICT PLAN TRANSIT CENTER DISTRICT PLAN Informational Presentation Planning Commission 04.19.2012 San Francisco Planning Department In partnership with: San Francisco Redevelopment Agency Transbay Joint Powers Authority

More information

FACILITY SERVICES UILDINBUILDG

FACILITY SERVICES UILDINBUILDG FACILITY SERVICES UILDINBUILDG PROGRAM MAP Facilities, Real Estate & Environment and Energy Facilities Management Real Estate Environment & Energy Custodial Care Appraise Property Research & Policy Development

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Replacement of Unit Ventilation System

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD National Music Museum

More information

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Facilities Report 2011-12 2 nd Quarter KCCD Facilities Planning & Construction February 1, 2012 Overview Facility Report

More information

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115 GOVERNMENT FACILITIES FY 2017 FY 2016 CIP Pages C-72 through C-115 June 16, 2016 Facilities Capital Projects Facilities Design & Construction Capital Program Mission To encompass both significant modernization

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M 1 Landscape 1,335 acres, 64 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

Service Plan for Infrastructure Engineering

Service Plan for Infrastructure Engineering Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...

More information

Draft Water Master Plan Capital Improvement Program

Draft Water Master Plan Capital Improvement Program Draft Water Master Plan Capital Improvement Program December 17, 2014 Tualatin Valley Water District Water Master Plan Today s meeting: Water Master Planning and CIP overview Origin of the Draft Level

More information

US DOE Asset Revitalization Initiative in Oak Ridge, Tennessee

US DOE Asset Revitalization Initiative in Oak Ridge, Tennessee Oak Ridge Reindustrialization US DOE Asset Revitalization Initiative in Oak Ridge, Tennessee J. T. Howell Assistant Manager for Nuclear Fuel Supply, US DOE - Oak Ridge February 27, 2012 WM 2012 RI_02_12_0001

More information

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014 154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, 16-20 June 2014 Provisional Agenda Item 5.7 CE154/26 28 April 2014 Original: English MASTER CAPITAL INVESTMENT PLAN Periodic Report on the

More information

KCTCS Facilities Support Services and Capital Projects

KCTCS Facilities Support Services and Capital Projects KCTCS Facilities Support Services and Capital Projects Responsible for the management of KCTCS facilities, equipment, and property, the mission of KCTCS Facilities Support Services and Capital Projects

More information

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work Ft Worth Data Center Power Metering for Real Time PUE Calculation Scope of Work Prepared for the General Services Administration By Lawrence Berkeley National Laboratory Rod Mahdavi December 13, 2010 Executive

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term

More information

GSA Deep Energy Retrofit Program

GSA Deep Energy Retrofit Program Public Private Partnerships GSA Deep Energy Retrofit Program Kinga Porst Hydras U.S. General Services Administration August 15, 2017 Tampa Convention Center Tampa, Florida GSA Portfolio 376 million square

More information

SHARED SERVICES - INFORMATION TECHNOLOGY

SHARED SERVICES - INFORMATION TECHNOLOGY Updated: February, 00 EB-00-0 Exhibit D Page of SHARED SERVICES - INFORMATION TECHNOLOGY.0 INTRODUCTION 0 Information Technology ( IT ) refers to computer systems (hardware, software and applications)

More information

POWER INFRASTRUCTURE PLAN 2016

POWER INFRASTRUCTURE PLAN 2016 POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people

More information

Infrastructure and Asset Management. and Asset Management

Infrastructure and Asset Management. and Asset Management Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 1 W elcome to Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 2 1 About Emad Elbeltagi Structure and delivery Assessment Course

More information

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs.

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. CHILLED WATER SUB-ELEMENT GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. OBJECTIVE 1.1: To ensure that there

More information

Office for Capital Facilities Guidance Document

Office for Capital Facilities Guidance Document Guidance Document September 17, 2018 Telecommunications Site Manager Agreement A reference guide to assist in the use of the NYS Police Crown Castle Telecommunications Agreement Contents Overview Benefits

More information

Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012

Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012 Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012 FY12 Budget from 2011 Revenues Heat & Power Income -24,247-578 -3.23-0.09 2.9% Water Income -3,376-93 -0.45-0.01 3.3% McCorkle Surcharge

More information

Site Level Deficiencies

Site Level Deficiencies Level Deficiencies Walkways do not have shelter from rain. School lacks marquee or marquee in poor condition. Computer room lacks independent AC. School site lacks appropriate lighting. Specialties Other

More information

Why and How to Benchmark Building Energy Use in Office Buildings

Why and How to Benchmark Building Energy Use in Office Buildings Why and How to Benchmark Building Energy Use in Office Buildings Presented by Felix Flechas, P.E. Environmental Compliance and Sustainability Engineering, LLC March 2015 Making the case for energy efficiency

More information

2017 IESALC FALL TECHNOLOGY MEETING

2017 IESALC FALL TECHNOLOGY MEETING 2017 IESALC FALL TECHNOLOGY MEETING CONDUCTING AIRFIELD LIGHTING ASSESSMENTS TO IDENTIFY FUTURE CAPITAL IMPROVEMENT PROJECTS HYATT REGENCY DALLAS OCTOBER 22 26 2017 PRESENTED BY MARK A. MORLEY, P.E., RCDD

More information

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure

More information

Earthquake Safety and Emergency Response Bond Program 2010 & 2014

Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Quarterly Status Report Presented to the Citizens General Obligation Bond Oversight Committee as of December 2016 Overview of ESER 2010

More information

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure GROW YOUR BRAND AND MAKE AN IMPRESSION Unique 2-storey office building with Highway 401 exposure Grand entrance and great room with high ceilings Low gross up factor - 4.3%, large floor plates 2 internal

More information

CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION

CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION Ron Beeler Ava Hill Steve Renew Director, Facilities Services Kimon Onuma Principal Patrick Daniels Senior Project

More information

Next Steps. Investing in the Future of. MASTER DEVELOPER PROCUREMENT OVERVIEW October 2016 July Chicago Union Station Chicago Union Station

Next Steps. Investing in the Future of. MASTER DEVELOPER PROCUREMENT OVERVIEW October 2016 July Chicago Union Station Chicago Union Station Investing in the Future of Chicago Union Station Chicago Union Station MASTER DEVELOPER PROCUREMENT OVERVIEW October 2016 July 2015 Next Steps 1 Chicago Union Station Operations 4 th busiest station in

More information

DRAFT. Cascaded Plan Waypoint 1 1 July June Facilities Division of Infrastructure

DRAFT. Cascaded Plan Waypoint 1 1 July June Facilities Division of Infrastructure Cascaded Plan Waypoint 1 1 July 2016 30 June 2019 Facilities Division of Infrastructure DRAFT Long term focus supporting the University Strategic Plan: The work of Facilities supports the university s

More information

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

PUBLIC WORKS FY

PUBLIC WORKS FY PUBLIC WORKS FY 2014-15 PUBLIC WORKS MISSION Maintain and enhance the livability and sustainability of Lane County s natural and built environments by providing safe and cost effective public infrastructure

More information

Power Infrastructure Plan

Power Infrastructure Plan Power Infrastructure Plan 2015 Introduction Background LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4

More information

Ridges Advisory Committee. December 15th, 2017

Ridges Advisory Committee. December 15th, 2017 Ridges Advisory Committee December 15th, 2017 1 Ridges Advisory Committee December 2017 Meeting Ridges Advisory Committee Members & Roles Near-term vs long-term planning Request for Recommendation/Feedback

More information

Please contact us if you have any questions about this document, or about our organization. Our Mission

Please contact us if you have any questions about this document, or about our organization. Our Mission About FM July 2015 2 July, 2015 Greetings, I am pleased to present the first edition of our About Facilities Management document. We ve kept this tool short and simple; with clear explanations of our organization,

More information

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014 Treatment Facility Asset Management and Risk Based Assessment NE Texas WEAT Biennial Conference May 7, 2014 Asset Management What is? A set of processes to minimize infrastructure life cycle costs at an

More information

Ashland Center, 25 N. Third Street, Suite 100 Geneva, IL Medical/Office/Retail Suite For Lease. 12,686 SF available

Ashland Center, 25 N. Third Street, Suite 100 Geneva, IL Medical/Office/Retail Suite For Lease. 12,686 SF available 12,686 SF available, 25 N. Third Street, Suite 100 Geneva, IL 60134 www.ashlandcenter.com 630.444.0444 630.444.0444 kevin@odcre.com meredith@odcre.com 40W222 LaFox Rd, Suite N2, St. Charles, IL 60175 www.odcre.com

More information

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017 Summary 11/9/217 Jefferson PF Site is located in a Priority Funding Area Y/N Y Y Y Y Y Y Y Buildable Area Size & Quality 1 2.% Existing Site Features Roadways/Traffic 1 2.% Vehicular Access & Sight Distance

More information

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21 Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest

More information

High Performance Computing (HPC) Data Center Proposal

High Performance Computing (HPC) Data Center Proposal High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015 Quick Facts!! Located on 1 st floor in Building

More information

Exhibit to Agenda Item #1a

Exhibit to Agenda Item #1a Exhibit to Agenda Item #1a Sandra Kopp Wednesday, Board Finance September & Audit 28, Committee 2011 Meeting and Special SMUD Board of Directors Meeting Budget 2018 Wednesday,, scheduled to begin at 5:00

More information

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25 UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY2015-16 ---> FY204-25 *Lifecycles were estimated using industry standards. Some items may not need attention

More information

Heavy Industrial / Corporate Office Campus

Heavy Industrial / Corporate Office Campus Heavy Industrial / Corporate Office Campus -Priced at: $80 Sq.Ft. -131,040 square feet (+/-) -8.8 Acres (+/-) -18 Megawatt Electrical Service -500,000 Gallons per-day Water Service 1270 SE Monmouth Cutoff

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

Resilience Planning in San Francisco

Resilience Planning in San Francisco Resilience Planning in San Francisco 2 Developed policies and infrastructure to mitigate and recover from disasters Expanded definition of resilience: Responding to disasters Systemic crises like economic

More information

EXECUTIVE SUMMARY CAPITAL IMPROVEMENT PROGRAM

EXECUTIVE SUMMARY CAPITAL IMPROVEMENT PROGRAM EXECUTIVE SUMMARY Cook County s Capital Improvement Program (CIP) sets forth the plan for the design, construction and renovation of buildings and building systems, making them safe, functional, efficient,

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Academic Building II bonded New Ventilation

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN T AF CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN DR DECEMBER 9, 2016 CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OWNERSHIP TABLE OF CONTENTS SECTION 1- INTRODUCTION

More information

Dallas Streetcar Central Link Locally Preferred Alternative Selection

Dallas Streetcar Central Link Locally Preferred Alternative Selection Dallas Streetcar Central Link Locally Preferred Alternative Selection Mobility Solutions, Infrastructure & Sustainability Committee August 28, 2017 Tanya Brooks, Assistant Director Mobility and Street

More information

FY 12/13 Recommended Public Works Budget $4,472,871

FY 12/13 Recommended Public Works Budget $4,472,871 PUBLIC WORKS FY 12/13 Recommended Public Works Budget $4,472,871 Facilities Development 20% RSWA Contribution 8% General Services 72% FY 10/11 FY 11/12 FY 11/12 FY 12/13 FY 12/13 $ % DEPARTMENT ACTUAL

More information

Portable Building Utilization Report

Portable Building Utilization Report 1 Portable Building Utilization Report Presented by Joel E. Falcon Jr. Executive Director Maintenance Services Date Created: 09.20.11 2 Agenda 1. A Historical Perspective 2. Dallas ISD Policy Regarding

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline Georgia Institute of Technology Advanced Computing Technology Building Draft Program Vision Program Outline Issued April 2, 2001 I N T R O D U C T I O N Scope This document is a summary of the Vision Session

More information

2018 Capital Budget Presentation

2018 Capital Budget Presentation 2018 Capital Budget Presentation 2018 General Capital Budget Expenditures Asset Type 2018 Capital Projects Police 1,431,200 Fire 1,200,000 Finance 37,000 Transportation 8,231,900 Drainage 7,356,000 Parks

More information

City of Dunedin, FL Department of Finance Government Services Center Five Year Cost Comparison 8/4/2010

City of Dunedin, FL Department of Finance Government Services Center Five Year Cost Comparison 8/4/2010 Government Services Center Five Year Cost Comparison Option #1 Option #2 Net Cost Comparison Debt Service Operating Cost Revenue Net Cost/(Revenue) Debt Service Operating Cost Revenue Net Cost/(Revenue)

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: AUMA RESOLUTION BROADBAND INTERNET Recommendation(s) That the AUMA Broadband Resolution 2016, provided as Attachment 1 to the May 24, 2016 report entitled AUMA Resolution

More information

TOWN OF ARNPRIOR STRATEGIC PLAN AT A GLANCE ( )

TOWN OF ARNPRIOR STRATEGIC PLAN AT A GLANCE ( ) VISION 2019 1. Robust sustainable growth We have solid economic development and growth management strategies resulting in expanded commercial, retail activity and industrial base. Our Values LONG TERM

More information

Planning & Priorities Update. April 27, 2011

Planning & Priorities Update. April 27, 2011 Planning & Priorities Update April 27, 2011 Campus Physical Plant 550 acres 9.4M GSF growing to 14.2M+ GSF by early 2013 130+ Facilities By Fall 2013 targeted 8556 students living on campus (owned and

More information

Labs21 Sub-Metering Guidelines for Laboratory Facilities

Labs21 Sub-Metering Guidelines for Laboratory Facilities DRAFT OUTLINE 6-17-10 Note: This draft outline is only a strawman to facilitate discussion. It is expected that it will be revised based on stakeholder review and input. Please provide comments using track

More information

LADWP POWER INFRASTRUCTURE PLAN

LADWP POWER INFRASTRUCTURE PLAN LADWP 2017-18 POWER INFRASTRUCTURE PLAN Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

The City of St. Petersburg (City) initiated

The City of St. Petersburg (City) initiated FWRJ Remote Facility Condition Inspections and Subsequent Integration into the City of St. Petersburg s Asset Management Program Laura Baumberger, Robert Labrie, and Rebecca Overacre The City of St. Petersburg

More information

Implementation Plan FY

Implementation Plan FY Implementation Plan FY 2013 2015 January 18, 2012 Financial Integrity - Address the District's Structural Deficit - Financially support the District's reinvention of its family of services - Promote funding

More information

LaGuardia Community College

LaGuardia Community College Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) Center 3 Infrastructure Upgrade

More information

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D May 5-6, 2016 Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered

More information

RESILIENT UTILITY COALITION OF SOUTH FLORIDA

RESILIENT UTILITY COALITION OF SOUTH FLORIDA RESILIENT UTILITY COALITION OF SOUTH FLORIDA RUC MISSION The Resilient Utility Coalition seeks to advance utility infrastructure resiliency efforts in South Florida and provide essential value to its members

More information

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 River Bend 6 River Bend 11 RIVER BEND CENTER OVERVIEW 7 8 6 1 2 12 highly flexible buildings situated on 40 sprawling acres in the Springdale section

More information

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT Jack Strollo, Broker 500 S. Florida Avenue, Suite 420 Lakeland, Florida 33801 O. 863.683.3425 x103 C. 863.640.8238 jstrollo@resbroadway.com FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

More information

Create a sustainable, high-performance university campus.

Create a sustainable, high-performance university campus. Create a sustainable, high-performance university campus. Discover how to maximize efficiency, safety, and productivity with an integrated university infrastructure. Make the most of your energy SM Today

More information

CLAS Department Head Meeting Master Plan and STEM Planning Discussion

CLAS Department Head Meeting Master Plan and STEM Planning Discussion CLAS Department Head Meeting Master Plan and STEM Planning Discussion Planning, Architectural & Engineering Services December 2, 2014 Overview STEM Facilities Space Needs Assessment Conceptual Timeline

More information