Kopeopeo Canal Remediation Project Community Liaison Group Meeting. 24 April 2018
|
|
- Jocelin Garrison
- 5 years ago
- Views:
Transcription
1 Kopeopeo Canal Remediation Project Community Liaison Group Meeting 24 April
2 Meeting agenda topics Welcome & introduction John Pullar Approval of minutes from previous meeting Communications update Abby Tozer Project update Brendon Love/Ken Tarboton Independent Monitor Matt James Cultural Monitor Eula Toko Health, Safety and Monitoring Des McCleary Other business Light lunch 2
3 Communications Website Project page updates Pedestrian accessway open CLG site tour 3
4 Project page Register to follow the project You ll get alerts when updates are published You can unfollow at any time 4
5 Kopeopeo Orini Public Access Path 5
6 6 CLG Site Tour
7 Project update Overview Progress made over previous period Dredging (progress, monitoring, validation) CS3 Enabling works CS3 Works Public access Activities planned for upcoming period 7
8 8 Overview of progress (5 March 20 April) Main dredging completed to Paroa Road First section complete and validated Second lift over bridge completed CS3 enabling works mostly complete CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to Paroa Road Alternative pedestrian access to Whakatāne river stopbank constructed
9 Dredging progress 1850m FCS West Containment Site 1 CS1 Lift over SH30 Bridge 4 270m Validated to date S4. 670m S1. 270m 660m 1180m Lift over bridge 1 S2. 390m Lift over bridge 2 Lift over Paroa Rd Bridge 3 Dredged to date S3. 520m 9
10 Geobags filled Bags 2-7 full & closed Bags 9-10 actively being filled Bag 8 Unrolled ready to fill Bag 1 initial bag partially full 10
11 Barge lift over second bridge 11
12 12 Sand bug operations
13 13 Weed removal
14 Wood pellet processing 14
15 CS3 preliminary works 15
16 CS3 works 16
17 Activities planned for upcoming period Progress dredging in Section 4 CS3 construction based on final design Processing of eels Ongoing weed removal ahead of large objects Sand-bug dredging under bridges and Kope/Orini pump intake channel 17
18 Independent Monitor monthly report available on website See the Reports and Key documents page 18
19 Independent Monitor update Powerpole incident investigation ongoing CLG site visit Excavator removing weed ahead of dredging Complaints received Dredging and dust Eel removal report reviewed MP8 turbidity monitor installed Bone finds at CS3 FCS-East fixed Sand bug dredging 19
20 20 ACM & Wood Waste at CS3
21 Canal Sediment Validation The canal sediment Total PCDD/F WHO-TEQ Upperbound results ranged between 23 and 45 pg/g, which is below the remedial target of 60 pg/g. 21
22 Dioxin Air & Groundwater Monitoring Air Groundwater Geobags Tested Awaiting results for review Six groundwater samples (including two duplicates ) were collected from the four monitoring wells located at CS1. Total PCDD/F I-TEQ Upperbound results of between 6.67 and 9.53 pg/l were recorded in the water samples. All were below the adopted Tier 1 trigger level criteria outlined in the Environmental Tested Awaiting Monitoring results for and review Validation Plan (EMVP) of 13.5 pg/l and the consented limit of 30 pg/g. Tested Awaiting results for review Over-sized bulk bags Tested Awaiting results for review 22
23 Cultural Monitor update Recent finds determined by Archaeologist to be modern, not archaeological artefacts Modified protocol 23
24 24 Health, Safety & Environment Safety incident regarding overhead powerlines investigated CS3 Site closed to public Asbestos find at CS3 and sampling Disposal of material from trial site
25 Dust Monitoring CS3 No dust exceedances in period Example false alarm 3:47am 27 March At Kope/Orini Pump station Mobile dust monitor at CS3 25
26 Traffic Management CS3 traffic management Road closures associated with each crane lift 26
27 Other Business Next meeting: Tuesday 29th May 2018 Tech Talk at next meeting Monitoring system by Karam de Lacey of Control Tech 27
Chapter 21 Environmental management
Chapter 21 Environmental management November 2013 Table of contents 21. Environmental management... 21-1 21.1 Purpose of this chapter... 21-1 21.2 Environmental management process... 21-1 21.2.1 Overview...
More informationOctober 2001 (June 2002 revision) Greenpoint Tittabawassee River Dioxin Study Area Phase I Sampling Study Report
October 2001 (June 2002 revision) Greenpoint Tittabawassee River Dioxin Study Area Phase I Sampling Study Report Summary Soil samples collected as part of a wetland mitigation project identified elevated
More informationMetro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps. Park Board Committee Meeting Monday, January 15, 2018
Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps Park Board Committee Meeting Monday, January 15, 2018 Purpose To provide an update on Metro Vancouver s Stanley Park Water
More informationNorth Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009
North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor
More informationTraffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM
Traffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM TODAY What is Traffic Management Enhancements Phase 3? Traffic Information Center (TIC) Network Design Downtown Multimodal
More informationOrganizational Structure of the Toronto Environment Office
STAFF REPORT INFORMATION ONLY Organizational Structure of the Toronto Environment Office Date: April 20, 2007 To: From: Wards: Reference Number: Parks and Environment Committee Richard Butts, Deputy City
More informationWelcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project
Welcome Metro North Transmission Project Vancouver Community Information Open House March 9, 207 Thank you for attending this Community Information Open House about the Metro North Transmission Project.
More informationDid you know you have a choice? What do you need to do? nienetworks.co.uk Connecting multiple supplies
multiple supplies Did you know you have a choice? From 28 March 2018 you can select NIE Networks to undertake all of the works associated with your connection or an Independent Connections Provider (ICP)
More informationIAEA Action Plan on Nuclear Safety
Action Plan on Nuclear Safety Presented to IEEE Nuclear Power Engineering Committee San Antonio, TX 2011 January 25 Gary Johnson International Atomic Energy Agency g.johnson@iaea.org International Atomic
More informationCity of East Bethel City Council Agenda Special Meeting - 5:30 PM Date: July 10, 2013
City of East Bethel City Council Agenda Special Meeting - 5:30 PM Date: July 10, 2013 Item 5:30 PM 1.0 Call to Order 5:31 PM 2.0 Adopt Agenda 5:32 PM 3.0 Castle Towers/Whispering Aspen 2013 Forcemain Project
More informationIntegration Guide AXIS Camera Station and Citilog SmartTraffic-AID application
HOW TO Integration Guide AXIS Camera Station and Citilog SmartTraffic-AID application Created: April 20, 2017 Last updated: April 26, 2017 Rev: 1.0 1 Please note that AXIS does not take any responsibility
More informationThe challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software
EMS Optimization Software Often immediate energy savings can be achieved with proper set points, sequencing, scheduling and fault detection of the Building Automation System (BAS). The challenge is that
More informationA G E N D A. 1. Greetings and Introductions Review Agenda
RUSSIAN RIVER WATERSHED ASSOCIATION TECHNICAL WORKING GROUP MEETING February 12, 2019, 10:30 AM 12:30 PM Windsor Town Council Chambers 9291 Old Redwood Highway, Windsor, CA 95492 A G E N D A 1. Greetings
More informationWest of Hudson Regional Transit Access Study
West of Hudson Regional Transit Access Study Open House Presentation June 1, 2009 1 Agenda 1. Progress to Date 2. Level 1 Screening Analysis 3. Level 2 Screening Criteria 4. Next Steps 5. Questions and
More informationRoad Condition Reporting System
Road Condition Reporting System Highway User Administration Highway User Administration Login to Highway User Administration The RCRS is a Web-based system. To login to the RCRS Highway User Administration
More informationUSERS CONFERENCE Copyright 2016 OSIsoft, LLC
HRSD - Bringing Time and Space Together for Operational Awareness in Waste Water Presented by Kimberly Peterson, Data Analysis Manager, HRSD Clay Wise, Chief of IT Operations & Support, HRSD Agenda Outline
More informationWorkplace Safety and Health
INSPECTIONS* 214-215 215-2 2-217 2,25 Q1 1,714 Q1 1,728 Q1 2,348 Q2 1,418 Q2 1,534 Q2 1,888 Q3 1,231 Q3 1,9 Q3 1,617 Q4 1,454 Q4 Q4 6% 5% Percentage of Inspections Resulting in Orders 8,58 Total 5,817
More informationREQUEST FOR ACTION PROCESS
REQUEST FOR ACTION PROCESS This section provides instruction in the following four areas: 1. Job Class and Security User Group in FSFN 2. Creating a Case Note without an RFA in an Open or Closed Case Search
More informationGeorgia Tech Outreach Trainer s Manual
Georgia Tech Outreach Trainer s Manual Revised October 31, 2017 1 P a g e 2 P a g e TABLE OF CONTENTS TABLE OF CONTENTS... 3 INTRODUCTION... 4 HOW TO BEGIN... 5 HOW TO REGISTER... 8 SUBMIT AN ADVANCED
More informationContractor Environmental Management Procedure
PURPOSE To define the minimum environmental management requirements of any contractor working in any capacity on university grounds, plant or equipment. 1 SCOPE This procedure applies to all works performed
More informationSR 2108-A12 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements. August 31, 2016
SR 2108-A12 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements August 31, 2016 Agenda Welcome Ralph Horgan, CMU Overview of Projects Dan Cessna, PENNDOT Forbes Corridor Overview
More informationRead & Download (PDF Kindle) Practice Problems For The Civil Engineering PE Exam: A Companion To The Civil Engineering Reference Manual, 13th Ed
Read & Download (PDF Kindle) Practice Problems For The Civil Engineering PE Exam: A Companion To The Civil Engineering Reference Manual, 13th Ed Practice Problems for the Civil Engineering PE Exam contains
More informationDallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office
Trinity Parkway Alternative 3C Dallas City Council August 2, 2017 Jody Puckett, Assistant City Manager (I) City Manager s Office Presentation Overview Provide background on Trinity Parkway Alternative
More informationPROJECT TIMELINE. Next steps. Plan. Start of Service
PROJECT TIMELINE 2018 2019 2020 2021 2022 2023 WE ARE HERE Plan Develop Build Develop design options for termini, station locations, and transit operations Conduct environmental research Assess funding
More informationQuanta Resources Corporation Superfund Site, Operable Unit 1 (OU1) Edgewater, New Jersey Progress Report July 2015
CH2M BOS 18 Tremont Street Suite 700 Boston, MA 02108-2307 O +1 617.523.2002 F +1 617.723.9036 www.ch2m.com August 7, 2015 Mr. Richard Ho, RPM/OSC U.S. Environmental Protection Agency Region 2 Emergency
More informationUncertainty Analysis: Parameter Estimation. Jackie P. Hallberg Coastal and Hydraulics Laboratory Engineer Research and Development Center
Uncertainty Analysis: Parameter Estimation Jackie P. Hallberg Coastal and Hydraulics Laboratory Engineer Research and Development Center Outline ADH Optimization Techniques Parameter space Observation
More informationA Data Model for Distributed Data Management. Matt Erker, Phil Lidov
A Data Model for Distributed Data Management Matt Erker, Phil Lidov Problem Statement Transportation planning, from statewide long range planning through environmental assessment of individual improvements,
More informationAccess Control and CIP 10/20/2011
Access Control and CIP 10/20/2011 Agenda Access Control Requirements Impact on Entities Risk Discussion Response Discussion Future pursuit 2 RELIABILITY ACCOUNTABILITY Let s Talk CIP 3 RELIABILITY ACCOUNTABILITY
More information3000 CONTROLLER TRAINING MANUAL. April 26, 2012 Software Version
3000 CONTROLLER TRAINING MANUAL April 26, 2012 Software Version 1.59.03 Contents 3000 CONTROLLER USER GUIDE Quick Reference: Using the 3000... 3 Menu Summary Tree... 6 Main Menu: Programming your Fryer...
More informationGet set, go! Getting to know your go! stick USB modem. The package of your ACN go! stick contains the following items:
Quick Start Guide Get set, go! Welcome to ACN Mobile Broadband. This guide details the simple steps to install your go! stick USB modem and connect to the Internet - you ll be up and running in no time!
More informationW3C Web of Things Interest Group
W3C Web of Things Interest Group Joerg Heuer Unrestricted Page 1 Welcome to Sapporo March 15 Start of WoT IG April 15 1 st F2F Munich July 15 2 nd F2F Sunnyvale (Prague) October 15 3 rd F2F Sapporo Version
More informationManaged Security Services - Endpoint Managed Security on Cloud
Services Description Managed Security Services - Endpoint Managed Security on Cloud The services described herein are governed by the terms and conditions of the agreement specified in the Order Document
More informationSmart Labs O&M Training Program
Smart Labs O&M Training Program Session 1 - Advanced Understanding of Laboratory Airflow Controls Session 2 - Testing and Maintenance of Airflow Control Systems Administered by: ECT, Inc. Training Center
More informationSmart City Solution & Case Study. LG Uplus
Smart City Solution & Case Study LG Uplus LG Group & LGU+ LG Group Overview LG Group Founded in 1947, LG Group now has 3 main business domains Portfolio Revenue (USD) 9.6 B 10.2 B 11.0 B 2015 2016 2017
More informationDEP Construction Contracts
DEP Construction Contracts BID OPENING RESULTS - Three apparent low bidders. Next bid opening October 25, 2018 Thursday, October 11, 2018 OSM 11(2812)101.1 1. ~ J & J Snyder, Inc. $154,023.60 2. ~ Morgan
More informationAnalysis of part B GMO deliberate release field trials management in Member States and prevention of accidental entry into the marketplace
Analysis of part B GMO deliberate release field trials management in Member States and prevention of accidental entry into the marketplace A study for EC DG Environment under research tender ENV.B.3/ETU/2007/0008
More informationEVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE
EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA
More informationAgreement to use herbicides in or near water
Agreement to use herbicides in or near water Please read through this form and the guidance notes that came with it. Please write clearly in the answer spaces. The Food and Environment Protection Act 1985
More informationDATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]
DATE: April 8, 2013 REPORT NO. CD2013-040 TO: FROM: Chair and Members Committee of the Whole Community Services Gregory Dworak, General Manager Community Services 1.0 TYPE OF REPORT CONSENT ITEM [ ] ITEM
More information2015 General Rate Case
Application No.: Exhibit No.: Witnesses: SCE-1 J. P. Shotwell (U -E) 01 General Rate Case Testimony Regarding Accessibility Issues Developed Jointly By SCE and Center for Accessible Technology Before the
More informationNC SWANA Managers Training Center
NC SWANA Managers Training Center Hotel Ballast Wilmington 301 N. Water Street Wilmington, NC 28401 (910) 763-5900 June 11-14, 2018 In cooperation with National SWANA; NC-SWANA is holding it s Annual Chapter
More informationInfrastructure and Asset Management. and Asset Management
Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 1 W elcome to Infrastructure and Asset Management 18/09/2015 Emad Elbeltagi 2 1 About Emad Elbeltagi Structure and delivery Assessment Course
More information2nd High Elevation Pressure Loss. Low Pressure Incident at Bryant Street Pumping Station
2nd High Elevation Pressure Loss Low Pressure Incident at Bryant Street Pumping Station Background DC Water buys water from Washington Aqueduct From pump stations, water is distributed to different elevations
More informationMeeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.
TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,
More informationSTEP 1 STEP 2 STEP 3 STEP 4. Factory Installation & Service Training. Factory Installation & Service Training at the Colville, WA Factory
Factory Installation & Service Training at the Colville, WA Factory In, visit the Colville, WA factory location to take your Hearth & Home Technologies Factory Hands-On Installation & Service Training.
More informationWater Distribution Level 1 January 8 12, 2018
Water Distribution Level 1 Operator Training and Certi ication Exam January 8 12, 2018 Hosted by: Lac Courte Oreilles Public Works Lac Courte Oreilles Ojibwa Community College Hayward, Wisconsin Includes:
More informationIncludes: FREE Training for Tribal Personnel Opportunity for FREE Professional Certification FREE Wastewater Collection Level 1 Certification Exams
Wastewater Collection - Level 1 Tribal Operator Training and Certification Exam April 3-5, 2018 Hosted by: Quechan Indian Tribe, Publics Works Department Includes: FREE Training for Tribal Personnel Opportunity
More informationBRINGING AUTOMATED RWIS INFO TO THE MOTORIST
BRINGING AUTOMATED RWIS INFO TO THE MOTORIST National Rural ITS & ITS Arizona Annual Meeting Rural ITS Weather Applications Oct 23, 2018 F. Todd Foster, P.E. VP of ITS Engineering Ver-Mac, Inc. Do MORE
More informationSRP SMART ENERGY SAVER STUDY
SRP SMART ENERGY SAVER STUDY Setup Guide January 2018 WELCOME!... 2 SRP SMART ENERGY SAVER STUDY OVERVIEW... 2 STEPS TO COMPLETE... 2 1. EQUIPMENT INSTALLATION OVERVIEW... 3 THERMOSTAT... 3 LOAD CONTROLLER
More informationRECORD OF PRE-APPLICATION MEETING FOR THE PROPOSED SANRAL PROJECT TO WIDEN THE N3 (AND PORTION OF N2) BETWEEN DURBAN AND PIETERMARITZBURG
RECORD OF PRE-APPLICATION MEETING FOR THE PROPOSED SANRAL PROJECT TO WIDEN THE N3 (AND PORTION OF N2) BETWEEN DURBAN AND PIETERMARITZBURG Date: 25 th July 2016 Location: Department of Environmental Affairs,Environmental
More informationMSVE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES
MSVE LT19 KNOCKNAGAEL TOMATIN 275KV REINFORCEMENT OVERHEAD LINE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES CLIENT Management System Plan LT19-CTMP-A3 CTMP Appendix 3 - Site Access Points & Traffic
More informationIntroduction to the FAMU NAA website
Introduction to the FAMU NAA website Stephen D. Roberson, Ph.D. Chair, Technology Committee Florida A&M University National Alumni Association May 24, 2018 12:30 pm - 2:00 pm I m just not good at this
More informationClassification: UNCLASSIFIED Caveats: NONE. Ms. Kelly,
From: "Dot Kelly" Subject: FW: Follow up on outstanding items. Hope to discuss with you today. Thanks. (UNCLASSIFIED) Date: June 6, 2011 8:32:43 AM EDT To: "'Steve Hinchman'"
More informationA Regional Water Utility and the Private Sector Defining a Partnership for Infrastructure Delivery
A Regional Water Utility and the Private Sector Defining a Partnership for Infrastructure Delivery Carmel Krogh Director Shoalhaven Water Shoalhaven City Council Shoalhaven City Council Structure Asset
More informationPractice Guidelines from Other Canadian Jurisdictions. The Association of Professional Engineers and Geoscientists of Alberta (
Jan, 2017 Practice Guidelines from Other Canadian Jurisdictions Jurisdiction Guideline Name Main Discipline Revision Date Comments The Association of Professional and of Alberta (www.apega.ca) Authenticating
More informationBig Data for Smart Cities Connected Vehicles in the Wireless World
Big Data for Smart Cities Connected Vehicles in the Wireless World Dr Nigel Jefferies WWRF Chairman Huawei Technologies 3rd March 2016 Will IoT trigger next industrial revolution? Size of the IoT opportunity
More informationMetal Theft Focus Group
Metal Theft Focus Group 28 th February 2013 2011. UK Power Networks. All rights reserved Safety and Housekeeping No planned fire alarms Emergency exits Fire assembly points Toilets Mobile phones Disclosure
More informationManatee County Board of County Commissioners Wingate East Wingate Creek Southeast Tract
Manatee County Board of County Commissioners Wingate East Wingate Creek Southeast Tract July 26, 2018 1 Introductions NAME Hugh McGuire Michelle Tickles BUSINESS INFORMATION Partner McGuire & McGuire,
More informationAddendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15, 2016 Open House Response to Comments
Final Design Township of Lower Makefield, Bucks County, Pennsylvania Township of Ewing, Mercer County, New Jersey Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15,
More informationContractor Alliancing Sean Mooney Programme Manager
1 Contractor Alliancing Sean Mooney Programme Manager Today s Agenda Introduction Background Contractor Alliancing The Process Alliance Electricity Alliance North (EAN) Optimise Water (LLP) JV Benefits
More informationREQUEST FOR PROPOSALS RFP 2016/5 IMPROVING SOLID WASTE MANAGEMENT AND INCOME CREATION IN HOST COMMUNITIES- REHABILITATION OF ALAKEDIR LANDFILL
United Nations Development Programme برنامج األمم المتحدة اإلنمائي REQUEST FOR PROPOSALS RFP 2016/5 IMPROVING SOLID WASTE MANAGEMENT AND INCOME CREATION IN HOST COMMUNITIES- REHABILITATION OF ALAKEDIR
More informationCollector for ArcGIS: What s New. Chris LeSueur & James Tedrick
Collector for ArcGIS: What s New Chris LeSueur & James Tedrick Outline Product overview Workflows Preparing data for Collector for ArcGIS What s new in Collector for ArcGIS v18.1.0 (Aurora) Advanced topics
More informationCITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES
CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic
More informationRecording and Reporting of High Voltage and Low Voltage Switching
1 SCOPE This document details the procedures to be adopted prior to, during, and on completion of Switching operations, and details the manner in which HV and LV Switching shall be recorded in order to
More informationSWLRT Community Advisory Committee Meeting. June 27, 2013
SWLRT Community Advisory Committee Meeting June 27, 2013 Today s Topics Welcome and Introductions Hennepin County Works Update: TSAAP Open House Summary Mind-Mixer Demonstration Focus Group Outreach Technical
More informationInspector for Stormwater Management. Department of Environmental Quality Office of Training Services
Inspector for Stormwater Management Department of Environmental Quality Office of Training Services Agenda Day 1 8:30 10:00 Mod. 1 Intro to VSMP 10:00 10:15 Break 10:15 11:00 Mod. 2 Basic Stormwater Principles
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located
More informationRe: FortisBC Inc. Customer Complaint Melody Farmer Boswell Power Surge and Incident Report
LETTER NO. L 59 10 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604)
More informationOBSERVEIT CLOUDTHREAT GUIDE
OBSERVEIT CLOUDTHREAT GUIDE Contents 1 About This Document... 2 1.1 Intended Audience... 2 1.2 Related ObserveIT Software and Documentation... 2 1.3 Support... 2 2 Product Overview... 3 3 Installing the
More informationA SMART PORT CITY IN THE INTERNET OF EVERYTHING (IOE) ERA VERNON THAVER, CTO, CISCO SYSTEMS SOUTH AFRICA
A SMART PORT CITY IN THE INTERNET OF EVERYTHING (IOE) ERA VERNON THAVER, CTO, CISCO SYSTEMS SOUTH AFRICA Who is Cisco? Convergence of Mobile, Social, Cloud, and Data Is Driving Digital Disruption Digital
More informationJOINING FORCES TO ACHIEVE STATEWIDE N DEx INTEGRATION
JOINING FORCES TO ACHIEVE STATEWIDE N DEx INTEGRATION PRESENTED BY: Leon Frederick, CIO, Iowa Department of Public Safety Liz Pearson, URL Integration PRESENTATION OVERVIEW What is N-DEx? What is Iowa
More informationOperation and Maintenance of Switching System. For internal circulation of BSNL only
E3-E4 E4 CFA Operation and Maintenance of Switching System WELCOME This is a presentation for the E3-E4 CFA Technical Module for the Topic: Operation and Maintenance of Switching System. Eligibility: Those
More informationCollaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions
STAFF REPORT ACTION REQUIRED Collaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions Date: March 21, 2011 To: From: Wards: Reference Number: Public Works and
More informationPERFORMANCE STANDARDS AND ENFORCEMENT
PERFORMANCE STANDARDS AND ENFORCEMENT Criteria for Certification & De-certification Certification: Certification is for a period of two years, subject to both random checks and investigation of noncompliance
More informationABC Project Database
ABC Project Database April 29, 2016 Jawad Gull, PhD Bridge Designer HDR Inc. Email: jawad.gull@hdrinc.com Phone: 305-728-7458 1 ABC Project Database ABC-UTC completed research project Principal Investigator:
More informationImproving Resiliency w/better Data
Improving Resiliency w/better Data Safety Message 1/26/2017 Workshop - 3DM 2 Opening Remarks John Shaner Chair Multi-State Fleet Response Working Group Erin Robinson Executive Director Earth Science Information
More informationCOMPLIANCE MONITORING REPORT
COMPLIANCE MONITORING REPORT IFC Investment in Togo LCT Project #29197 Complaint 01 Monitoring of IFC s Response to: CAO Investigation of IFC s Investment in Togo LCT March 28, 2018 Office of the Compliance
More informationFormer DuPont Barksdale Works Project Update
Former DuPont Barksdale Works Project Update September 10, 2003 Presented by: DuPont Corporate Remediation Group Presenters and Topics Brad Nave - DuPont Corporate Remediation Group Tonight s Topics Update
More informationRB has been with HSE within a different sector but has recently joined the ALU.
Asbestos Liaison Group Technical Working Group Minutes ALGTWG/MIN/17/2017 Meeting Number 17 Date 19 th January 2017 Asbestos Liaison Group Technical Working Group (ALGTWG) Minutes of the meeting of the
More informationSILENCING THE NOISE: NEW TECHNOLOGY TO OBTAIN TIME- INTEGRATED AVERAGE GROUNDWATER CONCENTRATION OVER MONTHS
SILENCING THE NOISE: NEW TECHNOLOGY TO OBTAIN TIME- INTEGRATED AVERAGE GROUNDWATER CONCENTRATION OVER MONTHS GC 3 Thomas McHugh, Charles Newell, Lisa Molofsky, Julia Small, Kaitlin Moran GSI ENVIRONMENTAL
More informationA Perspective on V2X in the United States
A Perspective on V2X in the United States John B. Kenney, Ph.D Director and Principal Researcher Toyota InfoTechnology Center, USA jkenney@us.toyota-itc.com November 14, 2017 SIP-adus Workshop on Connected
More informationDeactivation & Decommissioning and Facility Engineering (DD/FE) Working Group
Deactivation & Decommissioning and Facility Engineering (DD/FE) Working Group Waste Management 2008 Symposia Panel: US DOE - Energy Facility Contractors Group's Knowledge Portal (EFCOG) Review February
More informationCompliance Enforcement Initiative
Compliance Enforcement Initiative Filing and Status Update November 2, 2011 Rebecca Michael Status of the Filings NERC filed several components of the Compliance Enforcement Initiative on September 30,
More informationSolid Waste Association of North America (SWANA)
Manitoba Operator Certification Solid Waste Association of North America (SWANA) SWANA NLC Solid Waste Association of North America Non-profit organization Over 8,000 members 45 Chapters in US, Canada,
More informationBest Practices for Campus Security. January 26, 2017
Best Practices for Campus Security January 26, 2017 Welcome to Safe University (Safe U ) Protecting People, Property, and Tradition: The Safe University (Safe U SM ) Program By G. Michael Verden, Owner
More informationFISH HOEK BUSINESS IMPROVEMENT DISTRICT NPC MANAGEMENT & OPERATIONS
FISH HOEK BUSINESS IMPROVEMENT DISTRICT NPC 2017/18 IMPLEMENTATION PLAN 1 st July 2017 to 30 th June 2018 FISH HOEK BUSINESS IMPROVEMENT DISTRICT NPC MANAGEMENT & OPERATIONS APPENDIX A 1. Annual General
More informationMinutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS
Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS Item No. 4 Water Supervisory Control and Data Acquisition (SCADA) Upgrade Financial Status Report No. 1 for the Period from November
More informationLocal Emergency Planning Committee (LEPC)
Local Emergency Planning Committee (LEPC) Tuesday, February 20, 2018 2:00pm to 4:00pm Council District 2 Introduction and LEPC Business Meeting Agenda Welcome and Introductions Gary Freeman, LEPC Vice-Chairperson
More informationSW 8th Avenue Corridor & Financing
Avenue Corridor & Financing Avenue Corridor Projects Ave Extension West Ave Extension East Ave @ 91st St Ave Connector 20 Ave @ 61st St 20 Ave Bridge Ave @ Parker Rd Signal Ave Extension West Typical Section
More informationVTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association
VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for
More informationPart I: Introduction to Wireless Sensor Networks. Xenofon Fafoutis
Part I: Introduction to Wireless Sensor Networks Xenofon Fafoutis Sensors 2 DTU Informatics, Technical University of Denmark Wireless Sensor Networks Sink Sensor Sensed Area 3 DTU Informatics,
More informationGREEN POINT CITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN
GREEN POINT CITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN 1st July 2019 to 30 June 2020 1. ADMINISTRATIVE ACTION STEPS RESPONSIBLE DURATION IN MONTHS ACTION 1. Appointment of staff CEO / CID Board / Chairman
More informationBest Practices. Makegoods. Introduction Occasionally there will be times where your site is unable to air all spots. How makegoods work
Makegoods Best Practices Makegoods Introduction Occasionally there will be times where your site is unable to air all spots as ordered. In broadcast, this can occasionally result in the need to make good
More informationBLUE RIBBON Facilities
BLUE RIBBON 2015 Facilities FACILITY PRIORITIES Police Administration Addition $4,484,864 Relocation of Fire Station 3 $4,829,683 (Does not include land purchase) City Hall Basement/Conference/Training/Emergency
More informationStandard CIP 007 3a Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3a 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for
More information2018 Priorities. Staff Lead Legend: 2 P age DCAO GMDS CAO GMEPW. Mayor and Council
Priorities Table of Contents Executive Summary Page 3 Economic Development Page 4 Infrastructure Page 5 Safety and Security Page 6 Service Delivery Page 7 Social and Environmental Page 8 Operational Plan
More informationVirginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations
Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations Initial Panel Charge August 2009 To review existing policies and
More informationModule 3. Overview of TOGAF 9.1 Architecture Development Method (ADM)
Module 3 Overview of TOGAF 9.1 Architecture Development Method (ADM) TOGAF 9.1 Structure The Architecture Development Method (ADM) Needs of the business shape non-architectural aspects of business operation
More informationCedar Rapids ITS Deployment Project
Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders
More information