3 Minutes of the Special Meeting on URTDSM / SCADA / Communication held on Introduction A Special Meeting on URTDSM / SCADA / Communication was held on at SR-II, PGCIL, Bengaluru. The list of participants is enclosed at Annexure-I. In the 141 st OCC meeting held on , it was noted that there were frequent outage of ICCP links and the ICCP data was not stable. APTRANSCO and TSTRANSCO had expressed concern on the operational and commercial implications due to this. There were other SCADA/Communication issues along-with URTDSM Project Phase-I was nearing completion and it was agreed to take stock of the situation in a special meeting. The agenda was taken up for deliberation. 2. URTDSM 2.1 Status of URTDSM project as on Region Approved Installed Integrated SR-I SS SR-I PMU SR-II SS SR-II PMU Total PMU SR SR-I - 9 PMU Chittor (5) and Srikakulam (4) installation works under progress. SR-I - 5 PMU -Srisailam (4) and Kurnool (1) data validation is not completed. SR-I - 1 PMU -Simhadri (1) - SRLDC requested SR-1 to co-ordinate with NTPC Simhadri to complete the pending installation works. SR-II -2 PMU -Kaiga (2) installation works under progress. SR-II -5 PMU -Arasur (2) and Kalpakkam (3) data validation is not completed. 2.2 Supply and installation of APS- Auxiliary power supply system as part of URTDSM project SRLDC vide letter dated (Annexure-II) had requested to SR-II to expedite the supply Auxiliary Power Supply System. SR-II had intimated that the Auxiliary Power Supply System is under manufacturing and is expected to reach site by 20 th April 2018 and commissioning will be completed by 15 th May 2018 AP and TS also expressed concern regarding delay in supply of Auxiliary power supply system. SR-I confirmed that the APS System is expected to reach site in April 2018 and commissioning was expected by May MOM of URTDSM SCADA - COMMUNICATION Page 1

4 2.3 Status of SAT and SAVT of URTDSM project in SR SRLDC - SAT completed and SAVT is yet to commence. KSEBL - SAT and SAVT completed. KPTCL - SAT and SAVT completed. TNEB - SAT completed and SAVT is yet to commence TSTRANSCO - SAT completed and SAVT has commenced from 1 st March 2018 APTRANSCO - Commissioning works under progress expected to be completed by 31 st March Powergrid Analytical Application installed as part of URTDSM SRLDC vide letter dated (Annexure-III) had informed Smart Grid PGCIL the need to improve the performance of installed Analytical Application to make it useful for real time grid operations SRLDC requested the forum to consider a procedure on the lines of SAT for verifying the working of the Analytical Applications. It was noted that proper feedback could be given for improvement of the Analytical Application Software. All the control centers were requested to use the software and report the deficiencies. PGCIL agreed to make a Web group of all the Control Centers, LD&C, IIT Mumbai, SR-I/SR-II etc for exchanging the information/usage and for deficiencies / rectification etc. It was noted that Chief Engineer, NPC vide letter dated (Annexure-IV) had sought certain information on the Analytics and implementation of PMUs from CTU. 3. SCADA and Communication Issues 3.1 ICCP links failure / not stable APTRANSCO vide letter dated (Annexure-V) had expressed concern on the ICCP data not being received for long durations due to apparent failure of PGCIL communication network and redundancy failure at various Network/Server equipment at SRLDC. Concern was expressed on maintaining the overdrawal /under drawal without the ICCP data and the huge commercial implications. Besides that many 765 kv Powergrid s SS SCADA data is not good and affecting the state CGS drawals. In view of the above, the following was suggested: To discuss SCADA/Communication issues of Powergrid SR1 & SR2, states and also SRLDC s redundancy readiness of ICCP servers/routers. To discuss the issue that the Payments may be linked to availability and healthiness of Powergrid s communication network. SRLDC s ICCP equipment and percentage availability of ICCP data to the State. TSTRANSCO vide letter dated (Annexure-VI) had expressed concern on the ICCP data not being stable for most of the period during the month. On 7 th & 8 th MOM of URTDSM SCADA - COMMUNICATION Page 2

5 February 2018, ICCP data failed due to expiry of SSL certificates of secure ICCP. Again on , the ICCP data failed from 22:00 hrs and it was restored only at 08:30 hrs of The economical load dispatch operation solely lies on ICCP data in real time including safety and security of the grid. It was pointed out that the loss of real time data for long time periods affects the CGS drawal severely and attracts penalties. To avoid such problems in future there was a necessity to discuss these situations in detail and make a resolution. SRLDC observation on ICCP failure are given below: Secure ICCP certificates expired throughout SCADA systems maintained by M/s GE (T & D) in India. ICCP data exchange unaffected for Karnataka & TN SLDCs (connected on non secure ICCP) SRLDC SCADA team tried to resolve issue with known methods Upon non restoration of ICCP data exchange to/from affected SLDCs, issue was reported to GE Noida and ticket open for problem resolution by SRLDC. ICCP data exchange restored in morning hours starting with AP, Kerala, Telangana & Puducherry. Data restored in non secure mode. ICCP certificates were restored by GE on 15 th Feb SRLDC suggested that affected SLDCs need to raise issue with M/s GE (T&D) directly for timely resolution and coordinate for early resolution. Further all were requested to analyse the problem before arriving at any conclusion. SRLDC observation on 23 rd Feb 2018 (22:30 hrs onwards) ICCP failure is given below: ICCP communication with AP & TS went down. Multiple fibre cuts in CTU system were reported. PGCIL was alerted in real time. Links were restored in morning hours (around 08:30 Hrs), followed by ICCP restoration. Subsequently following was taken up jointly by SRLDC & APSLDC/TSSLDC : AP & TS SCADA team informed SRLDC that in certain situations (ICCP server 2 being main at SRLDC, and ICCP server 1 being main at AP/TS end), ICCP data is not reporting even when the ICCP links are up. AP & TS SCADA teams claimed problem due to misconfiguration at SRLDC servers/routers/firewalls. FPRs raised by SRLDC for resolution of TS & AP ICCP issues. Issue resolved for both AP & TS ICCP by attending erroneous entries in AP firewall & TS routers. Subsequently following was taken up jointly by SRLDC & APSLDC/TSSLDC for ICCP Resolution : AP ICCP Resolution steps: AP internal firewall mis-configuration rectified. AP ICCP application error rectified. MOM of URTDSM SCADA - COMMUNICATION Page 3

6 AP SISCO security outdated certificate configured with new certificates. TS ICCP Resolution steps: Encapsulation PPP enable in TS WR1 router for serial link interface. Deleted all the static routing from both TS WR routers and TS ICCP servers which was enforced for SRLDC ICCP LAN. APTRANSCO expressed concern on frequent ICCP failures recently. This failure was likely due to communication link and other issues. Due to high CGS schedule, ICCP data is very important for state. Due to failure of ICCP, AP SLDC control room is not aware of its OD/UD. After secure license updation one of ICCP server it was not able to communicate on ICCP protocol. SCADA personnel should be available in shifts to solve any issue related to SCADA. APTRANSCO requested to waive off penalty for UD/OD, which happened due to ICCP failure. It was pointed out that many communication channel has been configured for ICCP data communication between AP SLDC and SRLDC. M/s Tejas Engineers have configured 6 No of communication channel with same ID, which creates problem in troubleshooting after link outage. Many changes have been done in communication network by Powergrid (M/s Tejas), without information of AP Telecom. Expiry date of all licenses to be taken from M/s GE. APTRANSCO requested to check the healthiness of server and link redundancy for ICCP data transfer. Recently complete redundancy test was done for server, Router, link and found to be OK. TSTRANSCO expressed similar concern as stated by APTRANSCO. ICCP failure outage duration on was longer, which causes penalty for states due to OD/UD. KPTCL informed that ICCP with SRLDC failed on On prima facie analysis it was analyzed that patch updation was the issue. Subsequently on further analysis it was found that number of points being handled in ICCP database was huge and it had created problem. Matter was resolved on priority basis with the help of OEM, M/s ABB Engineers. During above outage real time scada data available on web server provided by SRLDC helped KPTCL in grid operation. TANTRANSCO requested to waive off penalty for UD/OD, which happened due to ICCP failure. APTRANSCO / TSTRANSCO stressed on 24 hrs shift at SRLDC /SR-I / SR-II for SCADA and communication issues in similar lines to the SLDCs. SRLDC pointed out that 24 hrs support was being extended from office and through remote login. It was confirmed that there were some mis-configuration at AP int-firewall. It was rectified by M/s GE team upon ticket raised for rectification. It was confirmed that there were some mis-configuration at TS ICCP router. The same was attended by M/s GE Engineers on FPR raised by SRLDC. It was noted that ICCP failure on was due to power supply interruption of equipment at Hoody substation of KPTCL. SRLDC stated that data is extremely important for reliable and secure grid operation and all the concerned entities needed to resolve the issue at their end and also coordinate with other entities. MOM of URTDSM SCADA - COMMUNICATION Page 4

7 SRLDC suggested AP & TS to actively raise all SCADA/communication related complain to GE/CTU/STU and not leaving the matter only to SRLDC for resolution. SR-I & SR-II pointed out that all ICCP link failures may not be due to communication. ICCP problem occurred on was not due to fibre cut in Munirabad/Raichur area. After discussion the following was agreed: Expiry date of all licenses would be furnished by M/s GE to the respective Control Centers. It was noted that respective Control Center would ensure that M/s GE take pro-active action to renew the licenses before the expiry. As pointed out by KPTCL that there should not be any license renewal issues during the project cycle of the project and it needed to be ensured by Control Centers (through M/s GE). License for external firewall is going to expire in three months. M/s GE has to update the certificates in ext firewall of AP. M/s GE to take necessary action. M/s GE site engineer at respective Control Centers to escalate the matter to BO- Noida, if they are unable the resolve the issue at their level. Further, inter-action between M/s GE site engineers at SLDCs and M/s GE site engineers at SRLDC needs to be strengthened. Changeover to ICCP data communication through Backup SRLDC could be explored during such conditions which would reduce data outage duration. All the ICCP links (Main/Back up CC of SLDCs to Main/Back up CC of SRLDC) to be checked daily to ensure healthiness. All SLDCs to carry out HA test once in every month to a check SCADA/Communication system healthiness. All states to actively raise all SCADA/communication related complain to M/s GE/CTU (M/s Tejas) /STU and not leaving the matter only to SRLDC for resolution. It was noted there was no provision for DSM waiver during ICCP failure as per extant Regulations. Updated communication network diagram to be submitted by SR-I and SR-II to all SLDCs & SRLDC. Further any changes done in the communication network needed to be informed to all. 3.2 Frequent data outage (Central Sector & State Sector) SRLDC presented the detail of data outage from to (Annexure-VII). It was pointed out that most of the outage was due to communication failure. SRLDC requested Powergrid to provide all fibre cut/equipment outage information in real time. TSTRANSCO expressed concern that due to frequent failure of Powergrid station (Nizamabad, Warangal etc.), TS drawl gets affected and real time CGS drawl becomes erratic. SR-I & SR-II stated that all data outages may not be due to communication issues. MOM of URTDSM SCADA - COMMUNICATION Page 5

8 SR-I & SR-II stated that DCPC healthiness also needed to be checked. For this SRLDC replied that all DCPC patches etc. has been done and at present one of DCPC at Narendra is having the problem, which is being looked by M/s GE for faster resolution After deliberations the following was agreed: PGCIL to share their observations for communication failure on the instances of data outage beyond 8 hrs (refer annexure) put up by SRLDC. PGCIL to share all fibre cut/equipment outage information in real time. It was suggested to take all measure to minimize down time of data 3.3 KKNPP analog data not reporting It was noted that presently Analog data issue has been resolved after Analog Card (as supplied by PGCIL SR2) replacement and is under observation. The forum opined that if the problem persists, it would be prudent for KKNPP to procure a new RTU. 3.4 Data outage after commissioning In earlier meeting it was agreed to cross check with site daily values for newly commissioned elements for a period of two week duration from commissioning. 3.5 Data discrepancy The latest data discrepancy list compiled by SRLDC was presented in the forum (Annexure-VIII). The forum opined to delete the points which are not feasible to be telemetered. SRLDC agreed to look into the issue. 3.5 RTU/SAS Maintenance/Upgradation All states/powergrid/cgs to explore option of replacement of old RTUs and AMC for SAS, as getting spare is difficult for old RTU. The issue has already been discussed earlier and AMC need to be provided for all RTU/SAS gateways by CTU/STU. A life/functional assessment report and action plan by PGCIL/ISGS on old RTUs would be prepared and submitted to SRLDC/SRPC. 3.6 Backup Control Centre Backup SCADA functionality testing frequency needs to be done once in 6 months to ensure high availability of data/preparedness to operate from Back up CC in event of any contingency. Compliance report may be furnished to SRLDC. Periodical testing was being carried out by SRLDC and KSEBL. TN stated that communication network is being strengthened to Backup CC. Once same is completed, TN will do the testing. APTRANSCO informed that communication link has to be established from AP CC at Vijaywada to Back Up CC of SRLDC at Delhi. Powergrid & AP confirmed to establish the same by MOM of URTDSM SCADA - COMMUNICATION Page 6

9 PGCIL would be floating new combined Open Tender for Backup SLDCs for AP (Tirupati), TS (Warangal) along-with few other states. After discussions, it was noted that backup control centre establishment for AP & TS need to be expedited. 3.7 ICCP with NTAMC PGCIL confirmed that as pointed out in 32 nd TCC/33 rd SRPC meeting, due to cyber security concerns data would not be extended to SRLDC from NTAMC ICCP. It was noted that functional requirement of the requisite data by SRLDC would remain, which needed to be ensured by PGCIL. SRLDC would furnish the list of telemetry points that have to be extended to PGCIL within 10 days, and within 1 month PGCIL would come out with a detailed plan to be completed within 6 months (October 2018) 3.8 Modification in EMS package TSTRANSCO Earlier TSTRANSCO informed that they had received estimate of Rs 47 lakhs and the contract was being firmed up. TSTRANSCO requested PGCIL to assist in finalizing the EMS contract through M/s GE. SR-I stated that TSTRANSCO to interact directly with M/s GE without PGCIL involvement. SRPC requested that PGCIL to render assistance to TSTRANSCO if possible. 3.9 Status review of compliance of approved protocol of handling scada & communication issues ( communication meeting) In the earlier meeting, it had been noted that RTU not reporting/data failure would be communicated to the concerned entity/user with a copy to PGCIL. User would take lead role in getting the issue resolved. User/SRLDC would ensure necessary verification at their ends as explained in the training. Parallely, PGCIL would look into communication issues. User/SRLDC would appraise PGCIL about the verification at their end for PGCIL to sort out the communication issues. Official ID for SCADA issues to be created for each entity/user involved for easier communication and proper delivery of information. SRLDC pointed out that there were instances of delay in attending the faults wrt the time schedule and requested all the constituents to attend to the faults within the agreed time schedules. It was noted that if the issue is not getting resolved within 8 hrs (3 hrs for ICCP) the following action would be taken: Shri A P Gangadharan, GM(AM), SR-II and Shri S Ravi, GM(AM), SR-I would be informed for necessary follow up. The issue would be escalated with M/s G E (both by SLDCs and SRLDC) and with M/s Tejas (by SR-I & SR-II). MOM of URTDSM SCADA - COMMUNICATION Page 7

10 In case the issue was as not resolved within 24 hrs physical involvement of OEM (M/s GE and M/s Tejas) would be ensured through effective coordination by user / PGCIL/ SRLDC. Sustained efforts/involvement of all the concerned entities to be ensured till the issue is resolved In case of hardware replacement / major rectification it would be completed by 72 hrs Sparing of Fibre in Central Sector Project TANTRANSCO again requested for sparing of fibre in Central Sector Project. It was noted that the issue was already deliberated in the 30 th TCC/31 st SRPC meetings held on 24/ wherein, the following was noted: PGCIL had informed that in most of the FO, there were no spare fibres available. Six fibres are available for grid management purposes. The balance 18 fibres in the state or central sector are left to the entities on how to utilize. As for Central sector, 18 fibres are being leased out to M/s Powertel as per CERC formula which covered issues like sparing of fibres, cost sharing (50% being shared by M/s Powertel), ROW compensation (Rs.3000/km) etc. For grid operation purpose, bandwidth on 6 fibres could be given to the states. M/s Powertel may not take all the 18 fibres in some of the lines but those fibres are being leased out anywhere. Keeping in view of the non availability of spare fibres in most of FO links and the approved MoU with M/s Powertel the scheme of allocation the fibres was dropped. SR-II stated that request for sparing of fibre in new FO links could be communicated for consideration VC issues TSTRANSCO pointed out that Video Conference issue at TSSLDC. There was disturbance in Video Conference at TS end when connected to SRLDC. SRLDC confirmed as per AMC Engineer no issue was observed at SRLDC end and software upgradation is pending at TS end. After deliberations, TSSLDC and SRLDC were requested to coordinate and sort out the issue Talcher RTU It was noted that earlier proposed meeting was not held due to overlapping holidays. It was noted that a meeting with NTPC Talcher, SR2 ULDC and SRLDC for the same in is proposed 3 rd /4 th week of March SR-II was kindly requested to address the communication issue between Talcher-II & HVDC. NTPC as a User needed to be proactive in this. 4. SE (O), SRPC thanked all for the interactive deliberations and requested the Entities for concerted/sustained action to close the issues highlighted in the Meeting. MOM of URTDSM SCADA - COMMUNICATION Page 8

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE 1 The Short Term Open Access (STOA) in Inter State Transmission System (ISTS) was commenced in the year 2004 through a

More information

FORUM LOAD DESPATCHERS (FOLD)

FORUM LOAD DESPATCHERS (FOLD) CHARTER OF FORUM OF LOAD DESPATCHERS (FOLD) FOLD Secretariat NLDC,B-9 Qutab Institutional Area, New Delhi http://www.forumofld.in http://www.forumofloaddespatchers.in Table of Contents 1. Background...3

More information

Modernization of Multi Location Live SCADA system A case Study

Modernization of Multi Location Live SCADA system A case Study Modernization of Multi Location Live SCADA system A case Study P. K. Agarwal General Manager Debasis De Adl General Manager Harish Kumar Rathour Chief Manager POWER SYSTEM OPERATION CORPORATION LIMITED,

More information

Service Level Agreement

Service Level Agreement General This document is a (SLA) setting out the indicative levels of services to be provided to you by Luminet. This document must be read in conjunction with our standard Terms and Conditions of Service

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Luminet - Service Level Agreement

Luminet - Service Level Agreement Service Level Agreement General This document is a Service Level Agreement (SLA) setting out the levels of services to be provided to you by Luminet. This document must be read in conjunction with our

More information

Conference on Telecom Needs in Power Sector. Session Focus on Transmission

Conference on Telecom Needs in Power Sector. Session Focus on Transmission Conference on Telecom Needs in Power Sector Session Focus on Transmission 30-05-2012 POWERGRID- Business Segments Generation Linked (carries 51% of Nation s electric power) Grid Strengthening Inter-Regional

More information

Service Level Agreement

Service Level Agreement Service Level Agreement General This document is a Service Level Agreement (SLA) setting out the levels of services to be provided to you by Luminet. This document must be read in conjunction with our

More information

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO

More information

Indian Power Grid Developments

Indian Power Grid Developments Indian Power Grid Developments Rathin Basu Country President, Alstom Grid, March 25 th 2015 Evolution of Voltage level of Indian Grid kv Anticipated the evolution & Timely Investment in Indian Facilities

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting

North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting Time of meeting : 10:00 Hrs. Date of meeting : 08 th January, 2016 (Friday) Venue : Hotel Nandan, Guwahati. A. C O N F

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

Annexure 1 SERVICE LEVEL AGREEMENT. This Agreement is effective from the Service Commencement Date as defined in Clause 1.1 (i) of the Agreement

Annexure 1 SERVICE LEVEL AGREEMENT. This Agreement is effective from the Service Commencement Date as defined in Clause 1.1 (i) of the Agreement Annexure 1 SERVICE LEVEL AGREEMENT This Agreement is effective from the Service Commencement Date as defined in Clause 1.1 (i) of the Agreement This Agreement provides the right under certain circumstances

More information

POWER SYSTEM DATA COMMUNICATION STANDARD

POWER SYSTEM DATA COMMUNICATION STANDARD POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center 2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center Ed Batalla Director of Grid Control Systems Florida Power & Light Company Sept. 24, 2014 Florida Power

More information

QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA

QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA Rev SLAQPC06052016SJ Please Note: This may not be the newest version of this document;

More information

A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT

A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT 1.0 INTRODUCTION: BPCL Mumbai Refinery, Mahul intends to implement the new process I/O s related to a new Dry Gas Seal System to the existing C300_2 controller in

More information

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

Council, 8 February 2017 Information Technology Report Executive summary and recommendations Council, 8 February 2017 Information Technology Report Executive summary and recommendations Introduction This report provides the Council with an update into the work of the Information Technology Directorate

More information

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

Framework of QoS Monitoring and Implementation in India. I. General guide to concepts of QoS: the contribution made by the components as shown below:

Framework of QoS Monitoring and Implementation in India. I. General guide to concepts of QoS: the contribution made by the components as shown below: Framework of QoS Monitoring and Implementation in India I. General guide to concepts of QoS: (a) End to end QoS: The end to end QoS depends on the contribution made by the components as shown below: (b)

More information

SyndicateBank: CO: DIT: Bangalore Details of Contracts concluded during the Month of February 2018

SyndicateBank: CO: DIT: Bangalore Details of Contracts concluded during the Month of February 2018 Details of Contracts concluded during the Month of February 201 1 SI. No. 1 Supply, Installation, Commissioning and Maintenance of Solution for Packet Capture at Data Centre: Mumbai (DC) and Disaster Recovery

More information

University Information Systems. Administrative Computing Services. Contingency Plan. Overview

University Information Systems. Administrative Computing Services. Contingency Plan. Overview University Information Systems Administrative Computing Services Contingency Plan Overview Last updated 01/11/2005 University Information Systems Administrative Computing Services Contingency Plan Overview

More information

Error Handling Strategy

Error Handling Strategy Error Handling Strategy Author: DCC Operational Policy Draft Version 1 Date: 1 st May 2014 Page 1 of 13 Contents 1. Document History 3 1.1 Document Location 3 1.2 Review Dates 3 1.3 Revision History 3

More information

A s c e r t i a S u p p o r t S e r v i c e s G u i d e

A s c e r t i a S u p p o r t S e r v i c e s G u i d e A s c e r t i a S u p p o r t S e r v i c e s G u i d e A S C E R T I A LTD J A N U A R Y 2 0 1 7 D O C U M E N T V E R S I O N - 5.1 Copyright Ascertia Ltd, 2017 Commercial-in-Confidence 1 Ascertia Support

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) without SITE AUDIT SERVICES EXHIBIT

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) without SITE AUDIT SERVICES EXHIBIT ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) without SITE AUDIT SERVICES EXHIBIT This exhibit incorporates by reference the terms of your order for Oracle Standard System Installation

More information

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) with SITE AUDIT SERVICES EXHIBIT

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) with SITE AUDIT SERVICES EXHIBIT ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) with SITE AUDIT SERVICES EXHIBIT This exhibit incorporates by reference the terms of your order for Oracle Standard System Installation

More information

Sub : ADDENDUM/CORRIGENDUM for Request for Proposal for Providing Managed Networking Solutions using SDWAN Technology for ESIC Offices across India

Sub : ADDENDUM/CORRIGENDUM for Request for Proposal for Providing Managed Networking Solutions using SDWAN Technology for ESIC Offices across India EMPLOYEES STATE INSURANCE CORPORATION ESIC Hqrs. Extension office, Express Building, BSZ Marg, Ground Floor, New Delhi-02 VOIP No. 10011008/10011048 PH: 011-23701356, email: ac_icthq@esic.nic.in F. No.

More information

Marine Institute Job Description

Marine Institute Job Description Marine Institute Job Description Position Contract Service Group Location Temporary Systems Administrator Team Leader Temporary Specified Purpose contract for a duration of up to 3 years Ocean Science

More information

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION (OSSI) BASIC SERVICE EXHIBIT

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION (OSSI) BASIC SERVICE EXHIBIT ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION (OSSI) BASIC SERVICE EXHIBIT This exhibit incorporates by reference the terms of the order for Oracle Standard System Installation ( OSSI )

More information

BT One Cloud Cisco UK Schedule to the General Terms

BT One Cloud Cisco UK Schedule to the General Terms BT One Cloud Cisco UK Schedule to the General Terms Contents A note on you... 2 1 Service Summary... 2 2 Standard Service Components... 2 3 Service Options... 2 4 Service Management Boundary... 3 5 Associated

More information

Grid Monitoring Tool- A Case Study of ERLDC, Kolkata U.K.Verma, S.Banerjee, M.K.Thakur, S.K.Sahay, A.B. Sengupta Eastern Regional Load Despatch Centre, POSOCO, Kolkata Abstract To improve the response

More information

IT facility Management service and comprehensive AMC requirements

IT facility Management service and comprehensive AMC requirements IT facility Management service and comprehensive AMC requirements IGIDR is an advance research institute established by Reserve Bank of India. It spread across 15 Acers of land and entire campus is inter-connected

More information

ICCP Customer Forum. Inter Control Centre Communication Protocol. Friday 30 th September 2011

ICCP Customer Forum. Inter Control Centre Communication Protocol. Friday 30 th September 2011 ICCP Customer Forum Inter Control Centre Communication Protocol Friday 30 th September 2011 Main Forum Objectives The business driver for ICCP Build a common understanding of ICCP Obtain input from a wide

More information

SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017

SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017 SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017 SCHEDULE DOCUMENT 1.2 N4PROTECT DDOS This schedule contains additional terms and conditions, service description & Service Levels

More information

Standdards of Service

Standdards of Service Standards of Service for the Provision and Maintenance of; THUS Demon Business 2000, Business 8000, Business 2+, Business 2 + Pro, Demon Business Lite, Demon Business Lite +, Demon Business Unlimited,

More information

Managed Security Services - Endpoint Managed Security on Cloud

Managed Security Services - Endpoint Managed Security on Cloud Services Description Managed Security Services - Endpoint Managed Security on Cloud The services described herein are governed by the terms and conditions of the agreement specified in the Order Document

More information

How smart can the grid really be?

How smart can the grid really be? How smart can the grid really be? by Dale Pudney, HVT Power Systems and Luo Wei, NR Electric With the improvement of electronic communications and computing technology, it becomes possible to integrate

More information

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION MANAGEMENT SOFTWARE Maharashtra State Load Dispatch Centre (Maharashtra State Electricity Transmission Co. Ltd.) Developed & Prepared by India s Largest

More information

Corrigendum to CRFQ NO : Pre Bid Meeting : Supply & Installation of 3250 Laptops with 3 Years Comprehensive Warranty

Corrigendum to CRFQ NO : Pre Bid Meeting : Supply & Installation of 3250 Laptops with 3 Years Comprehensive Warranty S. No. 1 Clause/Page no. Clause as per RFP Query/Clarification/modification required BPCL's Response 2(1)/page 12 Corrigendum to CRFQ NO.1000305385: Pre Bid Meeting : 24.05.2018 - Supply & Installation

More information

SOFTWARE TECHNOLOGY PARKS OF INDIA MUMBAI (DIT, Ministry of Communications & Information Technology-Govt of India)

SOFTWARE TECHNOLOGY PARKS OF INDIA MUMBAI (DIT, Ministry of Communications & Information Technology-Govt of India) SOFTWARE TECHNOLOGY PARKS OF INDIA MUMBAI (DIT, Ministry of Communications & Information Technology-Govt of India) 6 th Floor, 7 th Tower, International Infotech Park, Vashi Rly. Station Complex, Vashi,

More information

TRANSLATIONAL HEALTH SCIENCE AND TECHNOLOGY INSTITUTE

TRANSLATIONAL HEALTH SCIENCE AND TECHNOLOGY INSTITUTE TRANSLATIONAL HEALTH SCIENCE AND TECHNOLOGY INSTITUTE T E N D E R D O C U M E N T FOR Providing of 4 Mbps Bandwidth (1:1) Connectivity through Leased Line required At 496 - Udyog Vihar Phase-III,Gurgaon,Haryana

More information

CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION

CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION 1. INTRODUCTION This document contains information on the Corporate Global Roaming service. If you require more detailed technical information, please contact

More information

Strategy Consulting Digital Technology Operations. Transmission Distribution SCADA Separation 2017 EMMOS Conference

Strategy Consulting Digital Technology Operations. Transmission Distribution SCADA Separation 2017 EMMOS Conference Strategy Consulting Digital Technology Operations Transmission Distribution SCADA Separation 2017 EMMOS Conference SCADA for Electric Utility Operations The SCADA platform is at the heart of Electric Utility

More information

EMS-LECTURE 2: WORKING OF EMS

EMS-LECTURE 2: WORKING OF EMS EMS-LECTURE 2: WORKING OF EMS Introduction: Energy Management systems consists of several applications programs which are used by the operator in a control centre for effective decision making in the operation

More information

WAN/MPLS SLA Fault Reporting

WAN/MPLS SLA Fault Reporting WAN/MPLS SLA Fault Reporting How to report a fault to us Call: 0 550 - Option, Option 5 Email: fixedlinefaults@onecom.co.uk We ll need the below information to log your fault: Company name and your name

More information

RfP No. APSFL/CCTVPMA/231/2016, Dated:

RfP No. APSFL/CCTVPMA/231/2016, Dated: S.No 1 2 3 RfP No. APSFL/CCTVPMA/231/2016, Dated: 30.05.2018 RfP for Selection of Project Monitoring Agency (PMA) for implementation of cloud based IP CCTV Surveillance System in AP Corrigendum 2 Dated:

More information

SERVICE DESCRIPTION MANAGED BACKUP & RECOVERY

SERVICE DESCRIPTION MANAGED BACKUP & RECOVERY Contents Service Overview.... 3 Key Features... 3 Implementation... 4 Validation... 4 Implementation Process.... 4 Internal Kick-Off... 4 Customer Kick-Off... 5 Provisioning & Testing.... 5 Billing....

More information

Marine Institute Job Description

Marine Institute Job Description Marine Institute Job Description Position Contract Service Group Location Temporary Scientific and Technical Officer (STO) - IT Systems Administrator Temporary specified purpose contract for a duration

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Cloud Service SLA Declaration

Cloud Service SLA Declaration Cloud Service SLA Declaration Basic level of support for Cloud services (SLA 1) Table of Content: 1. Definitions 2. General terms 3. Level of service warranty service functioning 4. Provider`s liability

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, WA, USA PaiFest In Honor of Prof. M. A. Pai Urbana-Champaign, IL October 15, 2015 The Past (before 1960s) Hard

More information

Network Code on Operational Security. User s Group System Operations 06/11/2013

Network Code on Operational Security. User s Group System Operations 06/11/2013 Network Code on Operational Security User s Group System Operations 06/11/2013 Agenda Objectives of Network Codes Operations codes vs. Connection codes System Operation NC and NC OS State of play of NC

More information

Service Level Agreement (SLA)

Service Level Agreement (SLA) Service Level Agreement (SLA) of PlusServer GmbH, Hohenzollernring 72, 50672 Cologne, Germany hereinafter referred to as the Provider. Version: 04.09.2015 V1.1 PlusServer GmbH Contacts Registered office

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder

More information

Blue Star Limited. Published by. Blue Star Limited, Kasturi Buildings, Mohan T Advani Chowk, Jamshedji Tata Road, Mumbai

Blue Star Limited. Published by. Blue Star Limited, Kasturi Buildings, Mohan T Advani Chowk, Jamshedji Tata Road, Mumbai Blue Star Limited This document is a property of Blue Star Limited and is created for internal circulation by Blue Star Limited to its Dealers/ Franchisees/ Service Associates/ Designated Employees and

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR RFP No. MTS/01/ /CCOM

GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR RFP No. MTS/01/ /CCOM GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR- 440 001 RFP No. MTS/01/2015-16/CCOM CORRIGENDUM No. 1 13 October 2015 Page 1 of 7 Contents Corrigendum Item

More information

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer ECE 421 Session 28 November 29, 2018 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Information Technology Procedure IT 3.4 IT Configuration Management

Information Technology Procedure IT 3.4 IT Configuration Management Information Technology Procedure IT Configuration Management Contents Purpose and Scope... 1 Responsibilities... 1 Procedure... 1 Identify and Record Configuration... 2 Document Planned Changes... 3 Evaluating

More information

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry

More information

IT Services.

IT Services. IT Services Executive Summary August 2018 KPI & Summary (1024) (4481) Incidents 86% Volumes Requests 87% (3) (52) P1 Inc. 80% 1223 (23%) 861 (16%) 516 (9%) 2784 (52%) P2 Inc. 78% Telephone Email In Person

More information

Metering System and Communication Requirements

Metering System and Communication Requirements Metering System and Communication Requirements Andrew Levitt Sr. Market Strategist MIC Special Session on DER June 20, 2017 Definitions Metering system: includes all components from the meter location

More information

Ethernet DIA SLA Fault Reporting

Ethernet DIA SLA Fault Reporting Ethernet DIA SLA Fault Reporting How to report a fault to us Call: 0 550 - Option, Option Email: fixedlinefaults@onecom.co.uk We ll need the below information to log your fault: Company name and your name

More information

TERMS OF REFERENCE FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR WEBSITE AND DOMAIN HOSTING SERVICES

TERMS OF REFERENCE FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR WEBSITE AND DOMAIN HOSTING SERVICES TERMS OF REFERENCE FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR WEBSITE AND DOMAIN HOSTING SERVICES 09 April 2018 1. Assignment: The National Lotteries Board requires the appointment of a service provider

More information

Distributed Generation Requirements Update

Distributed Generation Requirements Update Distributed Generation Requirements Update Toronto Hydro has updated its real time monitoring and control requirements for Distributed Generation facilities. The latest version of the Distributed Generation

More information

IntelliGrid. Don Von Dollen IntelliGrid Program Manager (650)

IntelliGrid. Don Von Dollen IntelliGrid Program Manager  (650) IntelliGrid Don Von Dollen IntelliGrid Program Manager dvondoll@epri.com www.epri-intelligrid.com (650) 855-2679 Background EPRI s IntelliGrid Program Mission: To accelerate the transformation of the power

More information

Web-Hosting: Service Level Agreement

Web-Hosting: Service Level Agreement Web-Hosting: Service Level Agreement Aims of the Service The Web Hosting service provides an internal environment for hosting static websites or small-scale web applications. The service aims to provide

More information

COMMUNICATION LINKS FOR SIGNALLING

COMMUNICATION LINKS FOR SIGNALLING Engineering Standard - Design Signalling & Operational Control Systems COMMUNICATION LINKS FOR SIGNALLING Version: 2 Issued: April 2016 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST

More information

Overview of DSASP; Telemetry/Communication Alternatives

Overview of DSASP; Telemetry/Communication Alternatives Overview of DSASP; Telemetry/Communication Alternatives The New York Independent System Operator Price Responsive Load Working Group May 12, 2010 Agenda Overview of DSASP Market Rules Current Communications/Telemetry

More information

primary Control Center, for the exchange of Real-time data with its Balancing

primary Control Center, for the exchange of Real-time data with its Balancing A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed

More information

CESC Limited Power Distribution for the Future August BCC & I - Power Distribution for the Future

CESC Limited Power Distribution for the Future August BCC & I - Power Distribution for the Future CESC Limited Power Distribution for the Future August 2016 www.cesc.co.in debasis.gupta@rp-sg.in 1 1 Power Distribution for the Future In the coming years, Utilities would need to: Expand the network to

More information

HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore

HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore 560032 Associates - Administration /Hindi /Corporate Planning / Systems / Company Secretariat HMT Limited, a Government

More information

Smart WiFi. Rapid Deployment: Rapid deployment with self-provisioning, self-optimizing hardware

Smart WiFi. Rapid Deployment: Rapid deployment with self-provisioning, self-optimizing hardware Smart WiFi Introduction Ooredoo s Smart WiFi solution is a bundled offering of fixed business broadband and smart wifi access points. The service provides fully proactive operational support and includes

More information

v February 2016

v February 2016 Service Description HPE Application Performance Management on Software-as-a- Service v2.1 20 February 2016 This Service Description describes the components and services included in HPE Application Performance

More information

Lifecycle Performance Care Services. Bulletin 43D02A00-04EN

Lifecycle Performance Care Services. Bulletin 43D02A00-04EN Performance Care Services Bulletin 43D02A00-04EN As your trusted partner, Yokogawa is always with you to address your concerns whether recognized or hidden. Performance Care Services offer a complete service

More information

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: ) 1. Member, Secretary, NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) 4. Director (Technical), Punjab State Transmission Corperation Ltd. (PSTCL) Head

More information

Sub: Invitation of sealed quotations for Procurement of UPS systems for MDI Gurgaon

Sub: Invitation of sealed quotations for Procurement of UPS systems for MDI Gurgaon Ref. No. : MDI/PROCUREMENT OF UPS SYSTEMS/2016 Date: July 6, 2016 Kind Attn: Dear Sir, Sub: Invitation of sealed quotations for Procurement of UPS systems for MDI Gurgaon Sealed Quotations are invited

More information

: Course CDFOM : Certified Data Centre Facilities Operations Manager

: Course CDFOM : Certified Data Centre Facilities Operations Manager Module Title Duration : Course CDFOM : Certified Data Centre Facilities Operations Manager : 3 days Course Description Managing the facilities of today s hi-end and hi-availability data centres is an extremely

More information

Operator Frequently Asked Questions

Operator Frequently Asked Questions Water & Wastewater Facility Operators Certification Program Operator Frequently Asked Questions Exam: 1. How often / when are exam sessions held? 2. How can I register to write the exam? 3. What if my

More information

Objective of the Postgraduate Online Approval Procedure: Description of the Postgraduate Online Approval Procedure:

Objective of the Postgraduate Online Approval Procedure: Description of the Postgraduate Online Approval Procedure: Institution Name: Originating Department: Contact Name: The University of Warwick IT Services Membership & Staff Application Mgmt Service David Hall (David.Hall@Warwick.ac.uk) Service Owner Objective of

More information

Visit us at https://www.globalqualityvillage.com. Please use the Mouse or Arrow Keys to browse the slides at your own pace.

Visit us at https://www.globalqualityvillage.com. Please use the Mouse or Arrow Keys to browse the slides at your own pace. Visit us at https://www.globalqualityvillage.com Please use the Mouse or Arrow Keys to browse the slides at your own pace. We are glad to present our revolutionary software... Sirwill FBM Tools - Management

More information

Procurer User Manual

Procurer User Manual MTR Corporation Limited Procurer User Manual of Secure Electronic Tendering System Version : 1.6 Date : 18-Dec-2013 Status : Final Document ID : Prepared By Global e-business Services Limited I. Overview...

More information

DRAFT Risks and Mitigations for Losing EMS Functions

DRAFT Risks and Mitigations for Losing EMS Functions DRAFT Risks and Mitigations for Losing EMS Functions 1.0 Executive Summary Energy Management System (EMS) is a system of computer-aided tools used by System Operators to monitor, control, and optimize

More information

The IDN Variant TLD Program: Updated Program Plan 23 August 2012

The IDN Variant TLD Program: Updated Program Plan 23 August 2012 The IDN Variant TLD Program: Updated Program Plan 23 August 2012 Table of Contents Project Background... 2 The IDN Variant TLD Program... 2 Revised Program Plan, Projects and Timeline:... 3 Communication

More information

Web Dashboard. User Manual. October Revision

Web Dashboard. User Manual. October Revision Web Dashboard User Manual October Revision This is the official user manual on using justsamit web dashboard to perform reporting and administrative tasks. This manual describes each section of reporting

More information

INTELLIGENT ELECTRONIC DEVICE DATA EXTRACTION AT HYDRO ONE. Sheng Hsu Senior Protection & Control Engineer Hydro One

INTELLIGENT ELECTRONIC DEVICE DATA EXTRACTION AT HYDRO ONE. Sheng Hsu Senior Protection & Control Engineer Hydro One INTELLIGENT ELECTRONIC DEVICE DATA EXTRACTION AT HYDRO ONE Sheng Hsu Senior Protection & Control Engineer Hydro One sheng.hsu@hydroone.com Adam Gauci Field Applications Engineer Cooper Power Systems adam.gauci@cybectec.com

More information

Bihar School Examination Board

Bihar School Examination Board Bihar School Examination Board Sinha Library Road, Patna-800017 CORRIGENDUM TO e-tender Notice No- PR 55/2018 With reference to tender notice No:- PR-55/2018 issued in various newspapers on 13 th March

More information

Title. Critical Infrastructure Protection Getting Low with a Touch of Medium. CanWEA Operations and Maintenance Summit 2018.

Title. Critical Infrastructure Protection Getting Low with a Touch of Medium. CanWEA Operations and Maintenance Summit 2018. Critical Infrastructure Protection Getting Low with a Touch of Medium Title CanWEA Operations and Maintenance Summit 2018 January 30, 2018 George E. Brown Compliance Manager Acciona Wind Energy Canada

More information

CORRIGENDUM / AMENDMENT-1 TO REQUEST FOR PROPOSAL FOR REPLACEMENT OF OLD INTEL SERVERS

CORRIGENDUM / AMENDMENT-1 TO REQUEST FOR PROPOSAL FOR REPLACEMENT OF OLD INTEL SERVERS CORRIGENDUM / AMENDMENT-1 Dated: 25 Sep 2017 With reference to the query received from vendors (bidders), following are the amendments to the RFP Reference No. IT-07/2017-18 dated 08/09/2017 RFP DOCUMENT

More information