SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

Size: px
Start display at page:

Download "SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING"

Transcription

1 SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated requested to discuss the following additional points in the Agenda of 496 th OCCM being held on For implementation of automatic switching OFF 400 KV bus reactors in the PGCIL S/S in Gujarat network wherever in service based on voltage level (405 KV) KV ICTs Tap changing as per system requirement at all the Power Grid owned S/S in Gujarat system to maintain downstream voltage. 3. In/Out status indication in SCADA of the A/R switch of all the interstate lines is to be integrated in SCADA for monitoring purpose. 4. URTDSM project it is observed that under this project, PMU S are being installed on 400 KV system only. GETCO S requirement PMU on 220 KV system for analysis of incident in 220 KV system. Matter shall be taken up with implementing Nodal agency. SA-2. : MAPPING OF FEEDERS WIRED UNDER AUFLS IN SCADA-ITEM FROM NPC. Background: In the 4 th, 5 th & 6 th NPC meetings, the feeders/lines mapping of the Feeders / Lines covered under AUFLS, on SCADA systems of SLDC's/RLDC's was discussed, wherein NPC have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's / RLDC's, so as to ascertain that the desired results are ensured during the events, frequency falling below the AUFLS frequency settings. In the 6 th NPC meeting it was informed that SR has already achieved mapping of 84% of loads/ feeders on the SCADA system & online feedback of tripping of these feeders during frequency falling below the AUFLS settings, is available at SRLDC. In NR the exercise/process of mapping such feeders into the SCADA system has started. In the 6 th

2 NPC meeting it was therefore desired that all the loads/feeders wired under the AUFLS is monitored in Western Region also and the progress be submitted to NPC. A list of feeders/loads implemented under AUFLS in WR was compiled at WRPC in 2014 and same was uploaded on website of WRPC under news section and PCM Minutes section. Constituents / States were requested to initiate the process of mapping these feeders in the SCADA System & the data should be made available to WRLDC. States were requested to update the list of feeders under AUFLS and intimate the feeders which have already been mapped in their SCADA System and are being monitored on line by them. Also constraints, if any, faced in mapping AUFLS feeders in their SCADA System may be intimated. In 493 rd OCC meeting it was decided that list of feeders connected with AUFLS, available with WRPC/WRLDC be sent to all SLDC s by WRPC. SLDCs shall update the same and send the updated list of AUFLS feeders to WRPC/WRLDC. Based on the updated list of AUFLS feeders the States shall intimate the feeders that are already telemetered and the feeders that can be telemetered and made available on WRLDC SCADA. Further SLDCs shall identify such substation where SCADA communication is available and AUFLS feeders emanates from these sub stations and take up mapping of these feeders for monitoring through SCADA in first phase by providing necessary hardware. All other AUFLS feeders emanating from substations where SCADA communication is not available shall be taken up for monitoring on SCADA system thereafter in second phase. The update on above shall be compiled by SLDCs and submitted to WRPC/WRLDC at the earliest. Subsequently WRPC sent the list of feeders connected with AUFLS, available with WRPC/WRLDC on The matter was further discussed during 494 th OCC meeting & SLDCs agreed to update. The updated list from SLDC s was not received. Hence SLDCs were again requested to expedite the same. 495 th OCC: Member Secretary (I/c), WRPC informed that in OCC held in Dec 20 at Dahanu TPS, following was decided:

3 If there is a SCADA coverage at sub stations where AUFLS feeders are connected, tripping bit can be telemetered to SLDC/RLDC. Where existing SCADA telemetry is not there then, utilities may plan for providing the necessary hardware and map the feeders for SCADA telemetry. Thereafter he queried the progress on same. CE,SLDC,MSETCL informed that SCADA coverage in Maharashtra network is only upto 220 kv ring. 132 kv and below network is not under SCADA coverage. Majority of loads are in 11 kv side for AUFLS. Hence unless there is a complete coverage of 132 kv/66 kv/33 kv networks, this availability of AUFLS data on SCADA network is not possible. However, very few loads are at 220 kv substation (on lower kv like 33 kv/11 kv) and SCADA, if exists, at such 220 kv substation can be mapped to control room. Gujarat, MP, Chhattisgarh SLDC representatives endorsed the news of CE,SLDC,MSETCL. Therefore OCC recommended the following: (1). Data of feeder wise AUFLS mapping is available and sent to WRPC. Changes are periodically modified. As such NPC requirement is fulfilled. (2). Fibre optic connectivity for all stations upto 132 kv level for states is being prepared at national level for which states have sent the data for DPR. Once that project is implemented, AUFLS real time feeder wise positions can be captured in SCADA. SA-3.: INSPECTION OF AUFLS Member Secretary (I/c), WRPC stated that as decided in the 31 st WRPC meeting held on , at item no 11, the aspect of testing/inspections of the AUFLS was discussed and no compliance from Discoms/SLDCs have been received. He requested that SLDCs shall collect the data of self certification by Discoms/STUs and inspection carried out by intra-circles of Discoms/STUs and submit to WRPC immediately (within days). Also as decided in 478 th OCC meeting, the STUs were required to self certify the healthiness of the

4 UFRs under their jurisdiction and submit the same to WRPC. He requested SLDCs to coordinate for the same and submit the data to WRPC. SA-4. WEB PORTAL ON WEATHER INFORMATION FOR POWER SECTOR As per the MoU signed between Earth System Science Organisation-India Metrological Dept. (ESSO-IMD), Ministry of Earth Sciences and Power System Operation Corporation Ltd.(POSOCO), Weather Website of Western Region has been made operational w.e.f The Link is The objective of MoU was to use the weather information provided by ESSO-IMD by Power System Operators across India for better management of Indian Power System and for the purpose of analysis. The data available is useful for both real time load management (radar imagery) as well day ahead and term ahead load/generation planning (through meteograms). The Sub-committee may like to note the same. Sl No 1 2 SA-5. MULTIPLE TRANSMISSION LINE TRIPPING ON BAD WEATHER CONDITION ON GM, WRLDC informed vide dated on due to severe weather condition multiple lines tripping has occurred near Bina area as given below:-. Outage Revival Element Name Type Voltage Ti Reason / Owner Level Date Time Date m Remarks e due to 18 CLD 800 kv protection Champa-Kurukshetra Pole-I Line HVDC PGCIL in DMR 14 Jabalpur(PS)-Bina(PG)-I Line 765 kv PGCIL R-E fault

5 7 3 Bina(PG)-Gwailor(PG)-III Line 765 kv PGCIL :1 5 Y-E fault 4 Bina(PG)-Indore(PG)-S/C Line 765 kv PGCIL R-E fault 5 Y-B Ph to Jabalpur(PS)-Bina(PG)-III Line 765 kv Sterlite * * Ph fault 6 Bina(PG)-Gwailor(PG)-II Line 765 kv PGCIL Y-E fault 7 Jabalpur(PS)- Bhopal(BDTCL)-S/C Line 765 kv Sterlite : B-E fault 8 Seoni(PG)-Wardha(PG)-I Line 765 kv PGCIL :5 4 B-E fault 9 22 Bhopal(BDTCL)- Indore(PG)-S/C Line 765 kv Sterlite R-B FAULT 10 Aurangabad-Wardha-II Line 765 kv PGCIL : :3 0 R-E fault 11 Bina(PG)-Gwailor(PG)-III Line 765 kv PGCIL * * R-B fault ITARSI-INDORE(MP)-II Line 400 kv PGCIL :1 5 B-E fault 13 BINA(PGCIL)-SUJALPUR-I Line 400 kv PGCIL R-B Ph to Ph fault 14 BINA(MP)-JP BINA(BPSCL) S/C Line 400 kv JAYPEE :5 2 B-E fault BINA(PGCIL)-SUJALPUR- II Line 400 kv PGCIL :5 R-B Ph to Ph fault

6 BHILAI(KHEDAMARA)- KORADI S/C Line 400 kv PGCIL B-E fault RAIPUR-DURG-II Line 400 kv PGCIL : R-E fault RAIPUR-DURG-I Line 400 kv PGCIL B-E fault 20 BHILAI(KHEDAMARA)- RAITA-II Line 400 kv CSPTCL : R-E fault Sujalpur(PG)- RAPP(NPCIL)-I Line 400 kv Sterlite : Y-E fault 21 KATNI-BIRSINGPUR-I Line 400 kv MPPTCL B-E fault 22 JPNIGRI-SATNA-I-I Line 400 kv JAYPEE Y-E fault 23 JPNIGRI-SATNA-II-II Line 400 kv JAYPEE B-E fault Bina(PG)-Shivpuri-S/C Line 220 kv MPPTCL R-E fault All lines except 765kV Jabalpur-Bina-3 and 765kV Bina-Gwalior-III were restored immediately. It was reported by M/s Sterlite that towers have collapsed/partially damaged at 5 locations and is yet to assess the damage in totality and tentative restoration plan of this line is to yet be received from Sterlite. PGCIL intimated that tower collapsed in one location and 765kV Bina-Gwalior-3 will be restored within a week and tentatively expected by

7 PGCIL and Sterlite are requested to submit the plan and expedite the restoration of the lines. Though there has not been any load generation loss reported, considering the severity of tripping, the incidents may be deliberated and members may give their opinion for taking precautionary steps to ensure future preparedness for such natural calamities. *****************

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects Proposed transmission system in WR for various generation projects in Jharkhand, Orissa, West Bengal, Chhattisgarh, M.P. and Maharashtra and other NTPC projects System studies have been carried out to

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on Minutes of the Special Meeting on URTDSM / SCADA / Communication held on 13.03.2018 1. Introduction A Special Meeting on URTDSM / SCADA / Communication was held on 13.03.2018 at SR-II, PGCIL, Bengaluru.

More information

Indian Power Grid Developments

Indian Power Grid Developments Indian Power Grid Developments Rathin Basu Country President, Alstom Grid, March 25 th 2015 Evolution of Voltage level of Indian Grid kv Anticipated the evolution & Timely Investment in Indian Facilities

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

Outage Management System Pilot Roll-out: Division User Manual

Outage Management System Pilot Roll-out: Division User Manual Outage Management System Pilot Roll-out: Division User Manual February 2017 Table of Contents 1. Outage Management System... 2 1.1. Overall Objective... 2 1.2. Outage Categories... 2 1.3. Division User

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title s Reference Number PCP 07 - (RIC Standard: EP 99 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

FORUM LOAD DESPATCHERS (FOLD)

FORUM LOAD DESPATCHERS (FOLD) CHARTER OF FORUM OF LOAD DESPATCHERS (FOLD) FOLD Secretariat NLDC,B-9 Qutab Institutional Area, New Delhi http://www.forumofld.in http://www.forumofloaddespatchers.in Table of Contents 1. Background...3

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: ) 1. Member, Secretary, NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) 4. Director (Technical), Punjab State Transmission Corperation Ltd. (PSTCL) Head

More information

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY S&C Remote Supervisory V ista Outdoor Distribution (15.5 kv through 38 kv) Electric utility customers are increasingly concerned about the frequency and duration of outages they are experiencing, and are

More information

~m"ifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut"11 ~iif>"f ~ ~~. ~ltt9l~i~~'1! ~ W "ip".~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~:

~mifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut11 ~iif>f ~ ~~. ~ltt9l~i~~'1! ~ W ip.~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~: ~m"ifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut"11 ~iif>"f ~ ~~. ~ltt9l~i~~'1! ~ W 110066 "ip".~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~: 09.08.2010 1 ~(~~), 8 ~~~~,~~~), ~ ~ III~qI~UI, ; ~ t!jqx qll~yi~~i-1 3frffI

More information

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg New Delhi, Dated, io" October, 2014 To 1. Chief Secretary(Power), Government of Arunachal Pradesh, Itanagar. 2.

More information

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP)

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number POP 07 - (RIC Standard: EP 99 00 00 04 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

Modernisation of Transmission System In MSETCL

Modernisation of Transmission System In MSETCL Modernisation of Transmission System In MSETCL Jaolikar S.A., Rajurkar S.S.,, and. Kulkarni A.R. 3 Jaolikar S.A.Superintending Engineer Testing and Communication Circle Vashi, MSETCL Rajurkar S.S. Deputy

More information

Advanced Ultra Power Transmission Consultancy

Advanced Ultra Power Transmission Consultancy 2100 Advanced Ultra Power Transmission Consultancy AUPTC the Complete Solutions to Power Infrastructure, Electrical, Electronics, Automation, HVAC Advanced Ultra Power Transmission Consultancy About AUPTC

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Conference on Telecom Needs in Power Sector. Session Focus on Transmission

Conference on Telecom Needs in Power Sector. Session Focus on Transmission Conference on Telecom Needs in Power Sector Session Focus on Transmission 30-05-2012 POWERGRID- Business Segments Generation Linked (carries 51% of Nation s electric power) Grid Strengthening Inter-Regional

More information

Power System Control And Smart Grid

Power System Control And Smart Grid Power System Control And Smart Grid The Technology Journey so far... 2005-07 2007-09 2009-11 2011-12 OMS Implementation ISO 27001- Security certification Basic DMS Application,SPM JGC DMS System & Distribution

More information

Grid Monitoring Tool- A Case Study of ERLDC, Kolkata U.K.Verma, S.Banerjee, M.K.Thakur, S.K.Sahay, A.B. Sengupta Eastern Regional Load Despatch Centre, POSOCO, Kolkata Abstract To improve the response

More information

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011 Power Grid Corporation of India Limited Analysts Presentation February 9, 2011 1 Listed Company with public holding of 30.58% and balance by Government of India Central Transmission Utility of the country

More information

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation Digital Substation A Substation Why Should We Make It Digital? Adopt new business models Time to operation Quality assurance Business agility Avoid outages Investment security Ensuring grid availability

More information

Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations

Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations Michael. Duff City of College Station Payal Gupta, Dharmendra Prajapati, and Alex Langseth

More information

North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting

North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting North Eastern Regional Power Committee Agenda For 2nd NETeST Sub-Committee Meeting Time of meeting : 10:00 Hrs. Date of meeting : 08 th January, 2016 (Friday) Venue : Hotel Nandan, Guwahati. A. C O N F

More information

AUTOMATION OF POWER DISTRIBUTION USING SCADA

AUTOMATION OF POWER DISTRIBUTION USING SCADA 1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from

More information

Design of Coal Mine Power Supply Monitoring System

Design of Coal Mine Power Supply Monitoring System 2nd International Conference on Electronics, Network and Computer Engineering (ICENCE 2016) Design of Coal Mine Power Supply Monitoring System Lei Shi 1, Guo Jin 2 and Jun Xu 3 1 2 Department of electronic

More information

Training programme. Hands-On Protection Relay School

Training programme. Hands-On Protection Relay School Training programme on Hands-On Protection Relay School March 16-20, 2015 Power Systems Division Central Power Research Institute (Govt. of India Society, Ministry of Power) Prof. Sir. C.V.Raman Road, P.B.No.8066,

More information

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook) ABOUT THE COMPANY A Navaratna Central Public Sector Enterprise, incorporated in 1989 The Central Transmission Utility of India Consistently Rated Excellent By GoI Created synchronously connected Country-wide

More information

Lecture 6 Substation Automation Systems

Lecture 6 Substation Automation Systems Lecture 6 Substation Automation Systems 1 Course map 2 Contents of the Lecture Part 1 Substation Automation Components & Architectures Substation Automation Functions Communication within the Substation

More information

Lecture 5 Substation Automation Systems. Course map

Lecture 5 Substation Automation Systems. Course map Lecture 5 Substation Automation Systems 1 Course map 2 1 Contents of the Lecture Part 1 Substation Automation Components Substation Automation Functions Communication within the Substation (Intro) Part

More information

PG&E Transmission Interconnection Handbook

PG&E Transmission Interconnection Handbook Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New

More information

POWER TRANSMISSION IN INDIA 2018

POWER TRANSMISSION IN INDIA 2018 Now Available POWER TRANSMISSION IN INDIA 2018 Segment Trends and Developments; Outlook and Projections Report (PDF) Data-set (Excel) India Infrastructure Research Power Transmission in India 2018 Table

More information

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide REVISION HISTORY VERSION NO. (Must match header) DATE REVISED BY DESCRIPTION 1.0 6/6/2016 EDAS Created Document 1.1 6/29/2016 EDAS Updates to include all Meter Work and instruction 1.2 8/29/2016 EDAS Included

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

Automation in Large Urban Power Distribution System. Dr. K Rajamani CENTRAL TECHNICAL SERVICES, RELIANCE ENERGY LIMITED, MUMBAI

Automation in Large Urban Power Distribution System. Dr. K Rajamani CENTRAL TECHNICAL SERVICES, RELIANCE ENERGY LIMITED, MUMBAI Automation in Large Urban Power Distribution System Dr. K Rajamani CENTRAL TECHNICAL SERVICES, RELIANCE ENERGY LIMITED, MUMBAI Need for Automation and Current trends Automation Systems and Functionality

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

Message Box ( Arial, Font size 18 Bold)

Message Box ( Arial, Font size 18 Bold) ed Operational Presentation Excellence through Title ( Arial, Automation Font size 28 ) Date, Venue, etc..( Arial, Font size 18 ) Jacob Joseph 02 nd Nov 2012 CII conference, New Delhi Outline Tata Power

More information

IMPLEMENTATION OF A WIDE-AREA MONITORING SCHEME FOR THE INDIAN POWER SYSTEM

IMPLEMENTATION OF A WIDE-AREA MONITORING SCHEME FOR THE INDIAN POWER SYSTEM IMPLEMENTATION OF A WIDE-AREA MONITORING SCHEME FOR THE INDIAN POWER SYSTEM Peter Harding, GE Grid Solutions UK, peter.harding@ge.com Ritesh Bharat, GE Grid Solution India, ritesh.bharat@ge.com A.Gillies,

More information

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. 1 Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. of Federal Republic of Germany. Registered as a non-profit

More information

CONCLUSIONS OF THE WESTERN BALKANS DIGITAL SUMMIT APRIL, SKOPJE

CONCLUSIONS OF THE WESTERN BALKANS DIGITAL SUMMIT APRIL, SKOPJE CONCLUSIONS OF THE WESTERN BALKANS DIGITAL SUMMIT 2018 18-19 APRIL, SKOPJE CONCLUSIONS OF THE WESTERN BALKANS DIGITAL SUMMIT 2018 At the Trieste Western Balkans Summit, we stressed the importance of the

More information

QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester

QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.18 Data acquisition systems on offshore platform Filename ONL-TTB-03103 T18_Data acquisition

More information

STCP Amendment Proposal Form

STCP Amendment Proposal Form STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory

More information

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control ENERGY CONTROL CENTERS To generated, Transmission and Distribution system, Number of customers and Total investment. Installed capacity in India exceeds 206 GW with annual energy generated energy exceeding

More information

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a

More information

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel Utility Bulletin: TD-1013B-002 Publication Date: 07/03/2012 Rev: 0 Direct Transfer Trip (DTT) Telecommunication Options Summary Interconnection partners (customers) are requesting additional options for

More information

Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE)

Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE) Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE) Synchrophasors at PSE&G PJM SynchroPhasor Project ~Circa 2008 DOE PJM AEP AP BGE ComEd DOM DUQ

More information

""""FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI["

FGJTCFWPKPUVKVWVGQHVGEJPQNQI[ UNIT 1: INTRODUCTION 1.) Overview of power system operation: The electrical energy is the most convenient form of energy in comparison to all the other forms of energy. However the biggest drawback of

More information

SECTION SPECIAL SYSTEMS. Website and Construction Cameras

SECTION SPECIAL SYSTEMS. Website and Construction Cameras PART 1 GENERAL SECTION 01121 SPECIAL SYSTEMS 1.01 WORK INCLUDED A. Project Construction Site Cameras and Video Streaming Servers B. Project Web site C. Network & Infrastructure D. Internet Connectivity

More information

List of members of TCC

List of members of TCC MAILING LIST FOR AGENDA OF 18TH WRPC List of members of WRPC List of members of TCC 1 Chairman, CSPTCL & Chairman, WRPC 1 Managing Director, CSPTCL & Chairman, TCC 2 Member (GO&D), CEA, New Delhi 2 Chief

More information

How smart can the grid really be?

How smart can the grid really be? How smart can the grid really be? by Dale Pudney, HVT Power Systems and Luo Wei, NR Electric With the improvement of electronic communications and computing technology, it becomes possible to integrate

More information

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 INTRODUCTION... 4 1.1 Contact persons... 5 1.2 Guidelines the statistics... 5 1.3 Voltage levels in the

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

B Incremental implementation of a utility-wide protection information system

B Incremental implementation of a utility-wide protection information system 21, rue d'artois, F-75008 Paris http://www.cigre.org B5-104 Session 2004 CIGRÉ Incremental implementation of a utility-wide protection information system Nikolaus Lahner* ABB Switzerland, Sandor Csontos

More information

Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY

Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY December 2015 (Version 3) 1 Contents 1. Introduction... 5 2. Criteria for approval of a Certification Body... 5 3. Selection of audit team members

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

A summary on the deliberations on each application is as under:

A summary on the deliberations on each application is as under: Annexure-OA Minutes of 15 th Meeting of Western Region constituents regarding Connectivity/Open Access Applications held on 21 st October, 2011 at NRPC, New Delhi List of participants is enclosed at Annexure-OA-1.

More information

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power

More information

2. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafi Marg New Delhi FAX No

2. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafi Marg New Delhi FAX No 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 400 093 5. Chief Engineer(SP

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

ENGINEERING SOLUTIONS INDIA PVT. LTD.

ENGINEERING SOLUTIONS INDIA PVT. LTD. Company Profile Company Overview P I N N A C L E ENGINEERING SOLUTIONS INDIA PVT. LTD. is founded in beginning of the first decade of 2000. The company is founded by Mr. Praphullachandra Ohol who has 20

More information

BSES Smart Grid Road Map

BSES Smart Grid Road Map BSES Smart Grid Road Map Rajesh Bansal, Head (Network Operations), BSES Delhi BSES Delhi Discoms A Synopsis NDPL BRPL BYPL Reliance Infrastructure Ltd. acquired 51% stake in July 2002 in two Discoms MES

More information

GENERAL INFORMATION. The time it takes to find the fault The time it takes to repair the fault.

GENERAL INFORMATION. The time it takes to find the fault The time it takes to repair the fault. GENERAL INFORMATION Improve customer satisfaction Customer satisfaction is often difficult to measure. One of the key figures used to indicate the performance of a distribution network is SAIDI. SAIDI

More information

1. Project Description

1. Project Description Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal

More information

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist 14 th September, 2015, New Delhi NHP Project Background Achievements of HP-I & HP-II:- establishment of hydro-meteorological equipment in the States

More information

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation

More information

Preparing for the unexpected: Transmission Planning in ERCOT

Preparing for the unexpected: Transmission Planning in ERCOT Preparing for the unexpected: Transmission Planning in ERCOT 2014 Transform TX January 29, 2014 Hala N. Ballouz, PE Electric Power Engineers, Inc. In business since 1968 Consulting to electric utilities

More information

Reliance Infrastructure Limited

Reliance Infrastructure Limited Reliance Infrastructure Limited Reg. : H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections / suggestions on Reliance Infrastructure

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

Southern Company Smart Grid

Southern Company Smart Grid Southern Company Smart Grid Smart Grid Investment Grant Update July 25, 2011 Southern Company Southern Company is one of the nations largest generators of electricity Has 4.4 million retail customers across

More information

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter 1 Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter Nee, Staffan Norrga, Remus Teodorescu ISBN-10: 1118851560

More information

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE 1 The Short Term Open Access (STOA) in Inter State Transmission System (ISTS) was commenced in the year 2004 through a

More information

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB Memorandum of Understanding for Joint Working by Ministry of Health and Sanitation, Ministry of Information and Communication on the Government of Sierra Leone ehealth Coordination Hub Dated 3 rd of November

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

IDS SAS. Station Automation System for Complex Applications

IDS SAS. Station Automation System for Complex Applications IDS SAS Station Automation System for Complex Applications IDS SAS The IDS SAS automation system for switchgear significantly reduces costs and efforts for the installation of secondary equipment and enables

More information

Achieving Smarter Grid Operation With On-Line DSA Technology

Achieving Smarter Grid Operation With On-Line DSA Technology Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of

More information

State Estimation at All India Level

State Estimation at All India Level State Estimation at All India Level Akhil Singhal Harish Kumar Rathour P.K. Agarwal KVS Baba S.K. Soonee Deputy Manager Chief Manager General Manager Executive Director Chief Executive Officer POWER SYSTEM

More information

CENTRAL MARKS DEPARTMENT III. Our Ref: CMD III/16: IS (Part 3)

CENTRAL MARKS DEPARTMENT III. Our Ref: CMD III/16: IS (Part 3) CENTRAL MARKS DEPARTMENT III Our Ref: CMD III/16: IS 16333 (Part 3) 04-08-2017 Subject: Revised Guidelines for Implementation of IS 16333 (Part 3): 2016 - Mobile Phone Handsets-Part 3 - Indian Language

More information

IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7

IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7 IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7 LINETROLL 110Eµ 8 LINETROLL 111K 9 LINETROLL L400D 10

More information

NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS

NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS John DULLER Ahsan HALIM Gordon PATON UK Power Networks UK UK Power Networks UK General Electric - UK john.duller@ukpowernetworks.co.uk

More information

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities Critical Asset Identification Methodology William E. McEvoy Northeast Utilities Disclaimer This NPCC TFIST workshop provides a forum for the presentation and discussion of member experience in the implementation

More information

Denmarks Cable Policy

Denmarks Cable Policy Denmarks Cable Policy Landsnet Annual meeting 2014 March 20th 2014 Jens Møller Birkebæk Director, International Affairs 1 About Energinet.dk 3 Interconnector capacity 3 Agenda Danish Cable Policy 1. Political

More information

Disturbance Monitoring and

Disturbance Monitoring and PRC-002-2 R1 Notification Disturbance Monitoring and Reporting Requirements Compliance Spring Workshop May 10, 2017 Objectives This presentation will discuss: Requirement R1 Part 1.2 notifications Definition

More information

Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY

Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY Original Issue: September 2007 Prepared by: Lee Chan & Rob Rogerson This Revision: 0 October 2007 Date For Next Review:

More information

Distributed Generation Requirements Update

Distributed Generation Requirements Update Distributed Generation Requirements Update Toronto Hydro has updated its real time monitoring and control requirements for Distributed Generation facilities. The latest version of the Distributed Generation

More information

GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR RFP No. MTS/01/ /CCOM

GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR RFP No. MTS/01/ /CCOM GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES INDIRA BHAWAN, CIVIL LINES, NAGPUR- 440 001 RFP No. MTS/01/2015-16/CCOM CORRIGENDUM No. 1 13 October 2015 Page 1 of 7 Contents Corrigendum Item

More information

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION MANAGEMENT SOFTWARE Maharashtra State Load Dispatch Centre (Maharashtra State Electricity Transmission Co. Ltd.) Developed & Prepared by India s Largest

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

GUIDELINES FOR THE CLASSIFICATION OF GRID DISTURBANCES ABOVE 100 kv

GUIDELINES FOR THE CLASSIFICATION OF GRID DISTURBANCES ABOVE 100 kv GUIDELINES FOR THE CLASSIFICATION OF GRID DISTURBANCES ABOVE 100 kv 13.04.2017 1 INTRODUCTION... 4 2 PURPOSE OF THE GUIDELINES... 4 3 SCOPE AND LIMITATIONS OF THE STATISTICS... 5 4 DEFINITIONS... 6 4.1

More information

HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore

HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore 560032 Associates - Administration /Hindi /Corporate Planning / Systems / Company Secretariat HMT Limited, a Government

More information

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are

More information

Version Changes

Version Changes Version 8.7.15 Changes Copyright Notice Copyright @1985-2018 Milsoft Utility Solutions, Inc. All rights reserved. Version 8.7.15 July 25, 2018 Trademarks Milsoft TM, WindMil TM, WindMilMap TM, and DisSPatch

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System Real Time Digital Simulator Testing of an On Line Integrated Stability Control System R.P. Wierckx, M. Kawasaki, N. Saito, K. Anzai, S.C. Verma Abstract The paper describes the testing of an on line integrated

More information