Manzanita Pubic Works. 10/16/2018 Special Meeting
|
|
- Hortense Short
- 5 years ago
- Views:
Transcription
1 Manzanita Pubic Works 10/16/2018 Special Meeting
2 Agenda Items CO2 Project Update Water Meter System Update Highway 101 Project Manzanita and 3 rd Project
3 CO2 Project Current Status
4
5
6 CO2 Project Current Status No caustic has been used since unit has been on ph goal is Current ph is Flows are not meeting engineered requirements pump curve Wrong check valves were installed.
7 CO2 Project Current Status Check Valves Current check Valves are not NSF approved. Current check valves are causing the flow reduction of 16.3 feet of head, compared to the NSF check valve at 1.6 feet of head loss. So 7 psi more resistant. Contactor felt that because the valves are not called out on the prints they are not responsible for the wrong ones installed. The check valves are on the prints as a picture and requirements listed in spec s. HBH has decided to pay the fees to close the project and avoid legal action.
8 CO2 Project Current Status HBH will review and approve the required check valves (size, quantity, etc.). pay the pipe supplier direct (not to exceed $2,000) in a timely manner. If the material needed exceeds $2,000 Stettler will pay for the balance directly. Stettler will order the valves and needed materials once approval of the new check valves are received. will schedule the work with the City and HBH once the materials have arrived and our crew is available. will make every effort to provide a crew in a timely manner knowing that this work activity is important to complete and part of this agreement. will provide the labor to remove the original valves and install the new approved check valves and fittings to correct the check valve issue. City of Manzanita will work with Stettler for any shut-downs and control items. will release and provide full and complete payment including all retainage. Once the check valve work has been completed and accepted, to close out this project.
9 CO2 Project City items to complete Install blower speed control. This will require a small VFD install and PLC programming. Fence around blower and piping. Improve security around blower, pipes and valves. Help dampen blower noise.
10 Water Meter System
11
12 Water Meter System Current system 1746 meters in the system 917 Badger Touch reads 100 Hersey Touch reads 162 Radio s (Mueller & Badger refits) 567 Manuel meters (Various manufactures) Most installed in 70 s and 80 s
13 Water Meter System Current system Reading of the system is done every 3 months Reading takes two workers five days to read system. Current reading equipment for reading. Golf Cart 2 handhelds Radio system 2 meter probes
14 So why the change? Badger is replacing their read center with Beacon. Badger is changing their business model on billing. City required to buy Beacon software. City has to pay per meter read. File transfers between handheld and software are cumbersome and data can easy be lost.
15 Where Intelligence Meets Infrastructure City of Manzanita, OR AMI Ready Mobile Solutions January 16th, 2018
16 PACIFIC NORTHWEST DISTRIBUTOR Tigard Salem Eugene Bend
17 Solid State Register (SSR) No friction for high accuracy 10-digit display and 9- digit electronic transmission for more granular data Programmable tampers
18 Mobile Reading
19 Equipment used for radio reads Fully functional long range technology Stores 500 days worth of readings
20 Instant Data Logging Alerts Provide Visual notification of system events Including leaks Backflows Zero usages Ability to stop and address field issues immediately Ability to reduce your carbon footprint due to not requiring additional costly field investigations
21 Water Meter System Current Issue 162 Radio s (Mueller & Badger refits) Mueller handheld is not compatible with our current Touchread(TR) system. There was confusion on what type of TR system we were using between Mueller and Consolidated. TR probe and the Muller Handheld are not compatible. City currently has 240 Mueller meters and 100 Mueller radios in stock
22 Options Keep current system there is difficulty in reading two different systems Find another meter system there are more expenses in finding a new provider Replace all touch reads with radios there is a larger upfront expense
23 Water Meter System The original replacement plan was: Replace 917 radios over the next 5 years ($66,618) Replace 567 manual meters over the next 2 years ($109,287) Cost total $175,906 The replacement plan would be: Replace radios this year. Replace manual meters over the next 2 years. Cost total $146,266 (saves $29,680 with discount)
24 Water Meter System Implementation (Fix the issue) Retro fit 817 TR meters (Badger) 817 Radios ($50,278) Replace 100 TR Hersey meters (High Failure rate) 100 meters ($14,385) Consolidated Supply Company will carry at no interest the cost of $64,663 until July 2019 Another 350 meters will be purchased at the discount price in the 19/20 budget. ($50,347)
25 Water Meter System Implementation CURRENT SYSTEM 2 crew member, 5 days to read system (80 hrs) Equipment needed to read now. ($23,000) Handheld (5,500) Computer ($500) Radio receiver ($7,000) TR Meter probe (6,500) Golf Cart ($4,000) truck RADIO SYSTEM 1 crew member 2 hours to read system. Equipment needed to read now. ($7,500) Computer ($500) Radio receiver ($7,000) truck
26 HIGHWAY 101 Water project
27 101 Water Project Current Status Due to Hwy 101 corner project, water main failed. Nor contractor or ODOT has responsibility to repair or replace as water main was in conflict with depth requirements of ODOT. Water main is a loop line for the system and is a critical water main.
28 101 Water Project Engineering Engineering costs are $39,000 Construction costs will established in the design by the engineer.
29
30 101 Water Project Construction Water main will be constructed of 8 HDPE as 8 is called at proper size in the Master water plan. Water main is set to be bored in middle of the highway from the water plant to the first home south of the plant. Hydrants will placed at both ends of the new line.
31 101 Water Project Time Line Project should go to bid in January/February Project will start March/April Complete in May/June
32 Manzanita Ave Project 3 rd St N. from Laneda to Manzanita and Manzanita from 3 rd to 4th
33 Manzanita Ave Project Current Status Asbestos concrete(ac) water mains. No Storm system Storm Gutters that cause local are flooding and road damage. Failed road surface
34 Manzanita Ave Project Current Status Water From gutter feeds and over flows pond Water overflows pond and runs down 4 th St to Laneda causing damage to road edge.
35 Manzanita Ave Project Current Status Gravel was flush jest before the first rains of fall. Last winter we seen this dug out around 18 inches
36 Manzanita Ave Project Engineering Design work is under way with Kyle from OTAK. Project is in early design. City staff are starting talks with other utilities in the area on the project.
37 Manzanita Ave Project Construction Project will consist of new water mains and service lines. C900 PVC Mains. (not HDPE) 950 feet +/- Pex Service lines to new meters and boxes. (19+/-) Some service meters may require to be moved and hooked up by a plumber on the homeowner side. Project will consist of new storm drain system with concrete gutters.
38
39
40
41 101 Water Project Time Line Project finalize Design Mid November Project bid in December Project will start January Complete in June
Former DuPont Barksdale Works Project Update
Former DuPont Barksdale Works Project Update September 10, 2003 Presented by: DuPont Corporate Remediation Group Presenters and Topics Brad Nave - DuPont Corporate Remediation Group Tonight s Topics Update
More informationM E M O R A N D U M. Summary
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Helgeson, Brown, Mital, Simpson and Carlson Rod Price, Chief Engineering & Operations Officer Rene González, Customer Solutions
More informationWater Company Lay Application
WCL FORM 2018/3494 Water Company Lay Application SECTION A CONTACT DETAILS Preferred method of contact: Post Email DEVELOPER DETAILS Company name: For the attention of: Property name / number: Street:
More informationCustomer Information Packet
Customer Information Packet Important: This Booklet Contains Your Account Settings and How-To Guides Please Store in a Safe Place for future reference! Page 1 of 7 Jenco Wireless, LLC Service Agreement
More informationBALTIMORE UTILITY ASSET MANAGEMENT DIVISION
BALTIMORE UTILITY ASSET MANAGEMENT DIVISION Baltimore City s Asset Management Program Sustainable Best Management Practices in Transportation Workshop July 16, 2013 Rudy S. Chow, P.E. Bureau Head Alfred
More informationODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL
CITY OF BRECKSVILLE BID TABULATION CARRIAGE HILL DRIVE PUMP STATION ABANDONMENT AND SANITARY IMPROVEMENTS PROJECT NO. 3810-224 BID OPENING: SEPTEMBER 19, 2014 10:00 a.m. Present were: Becki Burlingham,
More informationLinus L. Smith, GIS Supervisor, Engineering Public Works Department, City of Winfield, Kansas
Challenges in Developing a City GIS Wastewater Geo Database System Linus L. Smith, GIS Supervisor, Engineering Public Works Department, City of Winfield, Kansas OVERVIEW The City of Winfield Kansas recognized
More informationECA EDUCATIONAL SERVICES 1960 W. WEST MAPLE WALLED LAKE, MICHIGAN PH: / FAX:
ECA EDUCATIONAL SERVICES 1960 W. WEST MAPLE WALLED LAKE, MICHIGAN 48390 PH: 248-669-7170 / FAX: 248-669-7515 To: Joyce Mundy Centennial School District Fr: Lisa Marrone Date: February 24, 2012 RE: Agreement
More informationTABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016
TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING
More informationCONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA
CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011
More informationCONTRACT DOCUMENTS. for the CIGAR LAKE: RECLAIMED WATER DISTRIBUTION PUMP STATION (ITB - U ) PREPARED BY
Addendum No. 2 December 19, 2006 CONTRACT DOCUMENTS for the CIGAR LAKE: RECLAIMED WATER STRIBUTION PUMP STATION (ITB - U - 07-04) PREPARED BY CPH ENGINEERS, INC. P.O. BOX 2808 SANFORD, FL 32772-2808 PHONE:
More informationNOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841
The Contractor shall notify the Inspection Division at the LVVWD (702-258-3227) 48 hours prior to the requested removal time to allow the District to take the final meter reading. After the final reading
More informationAdvances in Telemetry. Finding out what is really going on in your system
Advances in Telemetry { Finding out what is really going on in your system Dr. David Mundie President of High Tide Technologies Involved in telemetry design for over 30 years Space, Air and Ground Telemetry
More informationMount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010
Mount Pleasant Waterworks Cross-Connection Control Program Guidelines October 2010 1 PREFACE The purpose of this policy is to protect the public water supply from the possibility of contamination. The
More informationMeter Reading Technology. AMR vs AMI
Meter Reading Technology Current Itron Automatic Meter Reading (AMR) technology was installed in 2007. 200W system no longer in production and supported Limited reads per day No customer portal for monitoring
More informationWhat are Non-Catalog Orders?
What are Non-Catalog Orders? Non-Catalog Orders are intended to address purchasing needs that fall outside of typical requests within a punch-out site, catalog or form. Prior to beginning a Purchase Request,
More information2017 MEDIA KIT. (713) (800)
2017 MEDIA KIT Well Servicing, the Association of Energy Service Companies official publication, is working hard to educate and inform its 10,000 readers. Published bimonthly, the editorial content reflects
More informationSection 3.0 Financial Requirements
Section 3.0 Financial Requirements Section 3.0 Financial Requirements 3.1 Impact Fees 3.1.1 What are Impact Fees 3.1.2 How are Impact Fees Calculated 3.1.3 Assignment of Impact Fees 3.2 Summary of Required
More informationHenderson Mill Road 48 Water Line Issue. Thursday, July 23, 2015 Monday, July 27, 2015
Henderson Mill Road 48 Water Line Issue Thursday, July 23, 2015 Monday, July 27, 2015 Situation A grass cutting crew working in the area hit a fire hydrant on Henderson Mill Road The fire hydrant was directly
More informationWATER USE. LAND USE AC.IN. TOTAl ACREAGE SUMMARY: (ACRES) PER AC. AC.IN.
TABLE 1. Acreage Summary, Otero County, BUDGET AREA... DELL CITY AREA, OTERO COUNTY FARM SIZE 640 ACRES IRRIGATION TYPE PIVOT/FLOOD NUMBER OF CROPS.. 5 WATER USE LAND USE AC.IN. TOTAl ACREAGE SUMMARY:
More informationUser Guide. PartnerPortal Support at your Fingertips
User Guide PartnerPortal Support at your Fingertips Table of Contents How to Access the PartnerPortal pg. 3 PartnerPortal User Settings pg. 4 Placing an Order pg. 5-6 Wish List pg. 7 Pricing pg. 8 Submitting
More informationBreaking. Ground. New State of the Utilities Report
Breaking New Ground 2015 State of the Utilities Report Breaking New Ground for the Future This year marked 75 years of service for Huntsville Utilities. It also marked a year of planning and preparing
More informationThe Board grants site licenses for utilities that do not interfere with the park function.
Date: August 26, 2008 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Rogers Telecommunications Proposal - Hillcrest Park RECOMMENDATION A. THAT the Board enters
More informationGranite Shoals, TX San Antonio, TX 78251
Water Bid Items 1 226.00 LF (103) Remove Concrete Curb $2.00 $452.00 $1.05 $237.30 $5.00 $1,130.00 $5.00 $1,130.00 2 672.00 SF (103) Remove Sidewalks and Driveways $3.00 $2,016.00 $1.75 $1,176.00 $5.00
More informationDesign & Management of District Metered Areas
United Water Westchester Design & Management of District Metered Areas 2015 NYSAWWA Conference Nick Curcio 1 System Overview 7.0 MGD Average Day Demand 16.8 MGD Peak Hourly Demand 12,000 # Service Connections
More informationPart 1 SCADA Technology Update
Part 1 SCADA Technology Update 2015 Joint Annual Meeting West Virginia AWWA West Virginia WEA Mark Place John P. Place, Inc. mplace@johnplaceinc.com Brief Historical Overview of SCADA Landmarks (Supervisory
More informationE-rate Program Applicant Training Fiber Options
E-rate Program Applicant Training Fiber Options September November 2016 Agenda 1. Identifying Eligible Fiber Services and Charges 2. Requesting Proposals for Fiber Options 3. Selecting the Most Cost-Effective
More informationLou Di Gironimo, General Manager Toronto Water, City of Toronto Toronto, Ontario, Canada
Lou Di Gironimo, General Manager Toronto Water, City of Toronto Toronto, Ontario, Canada Toronto Water Overview Serves 3.1 million residents and businesses Over $26 billion in infrastructure Infrastructure
More informationBusiness Advantages of Using Electronic Engineering Data
Business Advantages of Using Electronic Engineering Data Dan Streett, PE & LS NYS Department of Transportation December 5, 2006 AGC/DOT Technical Conference Types of Electronic Engineering Data Created
More informationCity of East Bethel City Council Agenda Special Meeting - 5:30 PM Date: July 10, 2013
City of East Bethel City Council Agenda Special Meeting - 5:30 PM Date: July 10, 2013 Item 5:30 PM 1.0 Call to Order 5:31 PM 2.0 Adopt Agenda 5:32 PM 3.0 Castle Towers/Whispering Aspen 2013 Forcemain Project
More informationEligible Fiber Options for the E-rate Program
Eligible Fiber Options for the E-rate Program 2017 E-rate Training 2017 Universal Service Administrative Co. 1 2017 Universal Service Administrative Co. AGENDA Identifying E-rate eligible fiber services
More informationCereal Hudson. Tariffs. Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs. Requested Revenue Increases
1 Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs P Power. Possibilities Cereal Hudson A FORTIS COMPANY July 28, 2017 Via Electronic Filing By Hand Honorable Kathleen Burgess,
More informationCHAPTER 35: PRACTICE ANALYSIS
CHAPTER 35: PRACTICE ANALYSIS The AVImark Practice Analysis feature provides you with the option of viewing and printing reports and graphs to help better manage your business. Each graph and report will
More informationSimplifying Control of your Water Treatment Plant Wireless SCADA System Case Study
Simplifying Control of your Water Treatment Plant Wireless SCADA System Case Study Michael Buzicky, P.E. Kevin Stock. Sangamon Valley Public Water District Mahomet, Illinois 1 GOALS OF THE SCADA SYSTEM
More informationRESELLER & SYSTEM INSTALLER APPLICATION
PLEASE FAX OR EMAIL THIS FORM TO ORDERS@DATAVIDEO.COM 7048 Elmer Ave, Whittier, CA 90602 USA Voice: 562-696-2324 Fax: 562-698-6930 RESELLER & SYSTEM INSTALLER APPLICATION DESCRIPTION OF YOUR BUSINESS What
More informationINVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)
INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) BID SUBMITTAL DATE, TIME, & LOCATION: EMAIL QUESTIONS TO: December 8, 2017 @ 2:00 PM Mount Pleasant Waterworks Operations Center 1619
More informationPennsylvania Capability Enhancement Program
Pennsylvania Capability Enhancement Program 2017 SRBC Workshop Williamsport, PA September 20, 2017 Community Water Systems Community Water Systems < 10,000 (1962 systems) Community Water Systems Community
More informationUser Guide. PartnerPortal Support at your Fingertips
User Guide PartnerPortal Support at your Fingertips Table of Contents How to Access the PartnerPortal pg. 3 PartnerPortal User Settings pg. 4 Placing an Order pg. 5-6 Configured Products pg. 7-9 Wish List
More informationAbsent: Kevin W., Chris
SilverHawk HOA Board Meeting Monday May 4 th, 2015 7:00 PM - Clubhouse Attendance: Kevin M., Ryan, Nick, Jesse, Mandy, Lisa Absent: Kevin W., Chris Old Business: What did we decide to do about the improvement
More informationWater Distribution System Wireless Monitoring Solutions
Water Distribution System Wireless Monitoring Solutions Pump Station Aquifer Level Tank Level Reservoir Level Rainfall Mag Meter Flow Hydrant Pressure Water Meter Flow Water Quality Water Hammer Pressure
More informationAPPLICATION FOR DARK FIBRE OPTIC SERVICE
Suite 101, 310 Ward Street, Nelson, BC V1L 5S4 Phone: (250) 352-5511 Fax: (250) 352-2131 Website: http://www.nelson.ca/ APPLICATION FOR DARK FIBRE OPTIC SERVICE FOR OFFICE USE: APPLICATION # DATE OF APPLICATION:
More informationLess Energy and Darker Skies Through Street Lights
Less Energy and Darker Skies Through Street Lights April 13, 2017 Background City Staff are investigating options to buy back existing street lights owned by PGE and convert all existing high pressure
More informationPrime Contractor DBE Solicitation Effort Help Guide
Bureau of Clean Water Prime Contractor DBE Solicitation Effort Help Guide The DBE solicitation process does not require you to hire a certain number of DBE firms and does not have goals. The purpose of
More informationINTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items:
INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: Earthwork --items such as borrow excavation, and subsoil excavation Concrete -- the various
More information8505 Baycenter Road Jacksonville, FL
Your Company Name Here 8505 Baycenter Road Jacksonville, FL OFFERING SUMMARY Newmark Grubb Knight Frank is pleased to offer 8505 Baycenter to the market for purchase or master lease. This Robert C. Broward
More informationA RESOLUTION. WHEREAS, On January 20, 2017, the inauguration of the 47th President of the United States of
RESOLUTION 2016-130 APPROVING AN AGREEMENT WITH WASHINGTON METROPOLITAN TRANSIT AUTHORITY TO PROVIDE UP TO TEN POLICE OFFICERS IN SUPPORT OF SECURITY MEASURES FOR THE 2017 PRESIDENTIAL INAUGURATION; AND
More informationStandard mobile phone a mobile device that can make and receive telephone calls, pictures, video, and text messages.
Overview Fiscal Accountability Rule 10.9 Utilizing Mobile Devices to Conduct City Business establishes the mobile device rule for the City and County of Denver. This policy provides mobile device guidelines
More informationBarksdale Alternative Water Supply Project Proposal
Barksdale Alternative Water Supply Project Proposal Washburn Common Council Approves Water Supply Agreement At their January 26, 2004 meeting, the Washburn Common Council approved a 30-plus year agreement
More informationSmall Business Storm Preparedness & Resiliency
Small Business Storm Preparedness & Resiliency Deborah Mills, CFM Dewberry Consultants, LLC Agenda Introduction to small business preparedness and resiliency Beverly MA, Brooklyn, New Orleans case studies
More informationGCMS CARDHOLDER - COST ALLOCATION
Go to https://www.globalmanagement.citidirect.com/sdng/login/login.do and enter your User ID and Password. After (6) invalid attempts, GCMS users will be locked out of the system; you will receive an email
More informationPVC SOLVENT WELD DRAIN WASTE & VENT
PVC-17R PAGE 1 november 007 COUPLING (Hub x Hub) 0 110 11 11 11 1171 1 1/ 0 7 00 00 0 10.9.79 1.0.. 1. REDUCER BUSHING (Spigot x Hub) Style 17 x TRAP ADAPTER (Spigot x Slip Joint ) 1 19.71 REDUCER COUPLING
More informationALBEMARLE COUNTY SERVICE AUTHORITY
ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: FY 2017 CIP Authorizations STAFF CONTACT(S)/PREPARER: Peter C. Gorham, P.E., Director of Engineering AGENDA DATE: March 16,
More informationAnnual Training plan 2018
Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018
More informationEvaluation of Jackson and Saylor Sanitary Sewer Lift Station During July 23-24, 2010 Storm Event. Presented by:
City of Elmhurst Evaluation of Jackson and Saylor Sanitary Sewer Lift Station During July 23-24, 2010 Storm Event Christopher B. Burke Engineering, Ltd. Presented by: Christopher B. Burke, PhD, PE, D.WRE,
More informationPROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year
VREDEKLOOF COMMUNITY IMPROVEMENT DISTRICT 5 YEAR IMPLEMENTATION PLAN 1st July 2018 to 30th June 2019 PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS 1. Successful day-to-day management and operations
More informationGo SOLAR Online Permitting System A Guide for Applicants November 2012
Go SOLAR Online Permitting System A Guide for Applicants November 2012 www.broward.org/gogreen/gosolar Disclaimer This guide was prepared as an account of work sponsored by the United States Department
More informationTHE NEXUS OF LEAK DETECTION & ASSET MANAGEMENT
THE NEXUS OF LEAK DETECTION & ASSET MANAGEMENT AN INNOVATIVE AND EFFICIENT APPROACH IN SAN MARCOS, TX & SAN JUAN, PR Wayne Pratt WPratt@wachsws.com (847) 946-5907 Agenda Leak Detection Key Drivers Methodology
More informationTraverse City Asset Management Plan
Utilities and Public Services Larry LaCross, GISP, Asset Management/GIS Analyst Traverse City Department of Public Services Introduction About Traverse City (TC) TC Assets Department of Public Services
More informationWelcome to Shopfront. Your distributor will supply your user name, password, and the website address for your login page.
User Guide Table of Contents Login... 3 Choose a Location... 4 Home Page... 5 Header Bar... 6 My Catalog... 6 Menu Bar... 7 My Profile... 8 Contact Us... 9 Change Location... 10 Shopping Lists... 11 Quick
More informationDistributor Thoughts on Smart Grid
Distributor Thoughts on Smart Grid Sylvia Smith Budget & Rates Manager Tony Richman Meter Services Manager-Smart Grid 1 Agenda Introduction Smart Grid Program Strategy & Technical Aspects Financial Considerations
More information2018 MEDIA KIT WELLSERVICING MAGAZINE
WELLSERVICING MAGAZINE 121 East Magnolia Street Suite 103 Friendswood, TX 77546 (713) 781-0758 (800) 692-0771 kristin@hinckeconsulting.com www.aesc.net 2018 MEDIA KIT CONTENT CIRCULATION ANALYSIS 6632
More informationICT Guidelines. Steyn City Parkland Residence. Introduction
Steyn City Parkland Residence ICT Guidelines Introduction This guideline document has been developed to assist all Steyn City stakeholders from the builder, developer, architect and home owner to effectively
More informationEurope Bayonet Nut Connector(BNC) Interface Industry 2016 Market Research Report
Published on Market Research Reports Inc. (https://www.marketresearchreports.com) Home > Europe Bayonet Nut Connector(BNC) Interface Industry 2016 Market Research Report Europe Bayonet Nut Connector(BNC)
More informationMEMORANDUM. Board Members Alaska Industrial Development and Export Authority
MEMORANDUM To: From: Board Members Alaska Industrial Development and Export Authority John Springsteen CEO/Executive Director Date: January 9, 2019 Subject: Information Technology Capital Request Resolution
More informationQG Interdepartmental Service Request
QG Interdepartmental Service Request HokieMart will deliver PO Interdepartmental Service Request (ISR) The Interdepartmental Service Request (ISR) form is used to process orders to all university suppliers
More informationSupplier Relationship Management. Vendor user manual. Creation of Advance Shipment Notification (ASN)
Supplier Relationship Management Vendor user manual Creation of Advance Shipment Notification (ASN) Ways to access Internet Explorer 3. Click on Internet Explorer 2. Click on All programs 1. Go to the
More informationMETER REPLACEMENT PROGRAM PNWS-AWWA 2015 SECTION CONFERENCE APRIL 29, 2015
METER REPLACEMENT PROGRAM PNWS-AWWA 2015 SECTION CONFERENCE APRIL 29, 2015 560 MILLING GALLONS PER YEAR $130,000 PER YEAR 2.6% OF RATES 5/3/2015 2 WHAT WE HAVE DONE TO DATE 6 5 Innovate Registers on SRII
More information2 Geek Tech Support Services 2GTSS Products
CCTV / Security Camera Buying Guide Shopping for Security camera or CCTV system can be confusing sometimes especially with so many different kind of systems, trying find the right installer and making
More informationMetro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps. Park Board Committee Meeting Monday, January 15, 2018
Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps Park Board Committee Meeting Monday, January 15, 2018 Purpose To provide an update on Metro Vancouver s Stanley Park Water
More informationy o u r u s e r g u i d e
your user guide www.thermofisher.com.au 2 key benefits Easy to do business Support at hand Partners in process See your prices and stock availability in real-time with information available 24/7 Search
More informationGL300 START GUIDE. To activate your account and device:
GL300 START GUIDE Before using our products or installing a device, carefully read our legal terms which you can find at http://us.americaloc.com/legal_info.html. To activate your account and device: 1.
More informationGENENRAL SERVICES ADMINISTRATION (GSA) AUTHORIZED FEDERAL SUPPLY SCHEDULE CATALOG PRICE LIST
GENENRAL SERVICES ADMINISTRATION (GSA) AUTHORIZED FEDERAL SUPPLY SCHEDULE CATALOG PRICE LIST Schedule Title: FSS84 - Total Solution for Law Enforcement, Security, Facilities Management, Fire, Rescue, Clothing,
More informationCITY of NOVI CITY COUNCIL
CITY of NOVI CITY COUNCIL Agenda Item D May 22,2017 SUBJECT: Approval to award SCADA implementation services to ICS Integration Services LLC for work related to the completion of the City's SCADA system,
More informationIn the section from valve site No 13 to the place of the end of works Lithuanian-Polish border (~37 km)
The components of the price for procurement construction works for the part of gas interconnection Poland-Lithuania in the territory of the Republic of Lithuania are as follows: 1. 1.1. 1.1.1. Construction
More informationALL THE IMPORTANT BITS
STAFF MOBILE Cap Plan AND FRIENDS OF TELSTRA CAP PLAN ALL THE IMPORTANT BITS C125 DEC11 01 ACCEPTANCE It is important that you read these terms and conditions, our Mobile Services Things you need to know
More informationBeth Picardi Unitil Service Corp
Beth Picardi Unitil Service Corp Unitil Service Corporation Headquarters in Hampton, NH 3 Non-contiguous distribution operations Massachusetts, New Hampshire MA: both Gas & Electric 2 NH Operations: Electric
More informationA Non-Revenue Water Tale of Five Cities
A Non-Revenue Tale of Five Cities Tory Wagoner, PE/PLS Cavanaugh & Associates, P.A. tory.wagoner@cavanaughsolutions.com 4/25/2017 AWWA M36 Methodology State of the Art Auditing & Loss Control M36 1 st
More informationRegistration for the LANDSCAPE INDUSTRY CERTIFIED TECHNICIAN (LICT) TRAINING PROGRAM. Classes start on June 1, 2016 at Urban Garden Center, Pearl City
Landscape Industry Council of Hawaii P.O. Box 88416 Honolulu, HI 96815 Registration for the LANDSCAPE INDUSTRY CERTIFIED TECHNICIAN (LICT) Classes start on June 1, 2016 at Urban Garden Center, Pearl City
More informationEvaluator Pro: Irrigation
Evaluator Pro: Irrigation User s Manual Version 11.21.16 Appendix: 1. Background / History / Creation of Evaluator Pro: Irrigation 2. Creating New Account a. Registration process b. Administrator vs. User
More informationScalable Protocol Design. Supporting Millions of Simultaneously-connected Devices
Scalable Protocol Design Supporting Millions of Simultaneously-connected Devices OpenDOF Project Background 2 Open-source project, royalty-free Founded by Panasonic in 2015 A complete IoT framework over
More informationVista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA
Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA BAIN CONSTRUCTION CMD ENDEAVORS, INC. DAN WILLIAMS JORDAN FOSTER CONSTRUCTION Key
More informationFreedom of Information Act 2000 reference number RFI
P. Norris By email to: xxxxxxxxxxxxxxxxxxxxxx@xxxxxxxxxxxxxx.xxm 02 November 2011 Dear P. Norris Freedom of Information Act 2000 reference number RFI20111218 Thank you for your request under the Freedom
More informationCity Council Agenda Memo
City Council Agenda Memo City Council TO: David A. Vela, Interim City Manager Meeting Date: March 26, 2015 FROM: SUBJECT: Tommy O Brien, Director of Water Utilities Award of Bid to Cardinal Contractors
More informationKnight Piésold. Knight Piésold
Mount Polley Project Tailings Facility Summary February 26, 2007 Knight Piesold ref #: 101-01/18 1 Overview of Presentation General Information Project Background On-going Operations and Monitoring Test
More informationOpportunity Corridor-Section 3 Stakeholders Meeting. The Kokosing DBT
Opportunity Corridor-Section 3 Stakeholders Meeting The Kokosing Design-Build Team Leads Kokosing Construction Lead Contractor Michael Baker International Lead Designer Brownstone Grey Diversity, Inclusion
More informationSC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703
SC2000 INSTRUCTION MANUAL MOTOR PROTECTION ELECTRONICS, INC. 2464 Vulcan Road Apopka, Florida 32703 Phone: (407) 299-3825 Fax: (407) 294-9435 Operating Program Revision: 10 Revision Date: 1-9-12 STATION
More informationFY2016 FCC Form 470 and Competitive Bidding
and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 29 Form 470
More informationUtah Pilot Training Program AWWA M36 Water Audits & Loss Control. Introductory Webcast July 19, :00a MT
Utah Pilot Training Program AWWA M36 Audits & Loss Control Introductory Webcast July 19, 2016 9:00a MT 1 Today s Webcast Program overview & orientation objectives, activities & schedule AWWA Balance terms
More informationAn energy metering system that gives flexibility, security and control. Century House, Roman Road, Blackburn, BB1 2LD
An energy metering system that gives flexibility, security and control 1 Contents 1. Before you get started...4 What s inside the box?...4 What is vpro2? Why do you have it? How does it work?...4 Liberty
More informationDESIGN & ENGINEERING DATA
DESIGN & ENGINEERING DATA Flow Friction loss through PVC pipe is normally obtained by using the Hazen-Williams equation shown below for water: f = 83 x ( 0 ) 2 x Q 2 Where: C di 4.8655 f = friction head
More informationIIABC Convention & Tradeshow
Convention Edition 2018 39 th Annual IIABC Convention & Tradeshow Nov. 27-30th, 2018 Vancouver Island Conference Centre Nanaimo, BC Agenda TUESDAY 7:30am WEDNESDAY THURSDAY 8:00am Registration Opens 8:00am
More informationEquipment Installment Plans for enterprise customers
AT&T Premier Equipment Installment Plans for enterprise customers Premier enhancements Release Notes December 2015 Presenting Equipment Installment Plans, a new way to purchase and own devices An Equipment
More informationCLOUD ECONOMICS: HOW TO QUANTIFY THE BENEFITS OF MOVING TO THE CLOUD
CLOUD ECONOMICS: HOW TO QUANTIFY THE BENEFITS OF MOVING TO THE CLOUD Matt Johnson, Solutions Architect, Amazon Web Services 30 October 2017 2017, Amazon Web Services, Inc. or its Affiliates. All rights
More informationMunicipal Broadband Project. City Council Meeting February 4, 2016
Municipal Broadband Project City Council Meeting February 4, 2016 Broadband Timeline 12 Months February March 2015 Feasibility Study April May 2015 Business Plan Development June August 2015 Renegotiation
More informationWATER TELEMETRY SYSTEM
WATER TELEMETRY SYSTEM v1.04 1 SkyΜeter Hydro edition (SM-HL) The SkyMeter is installed in the water supply and offer the following capabilities: Latest technology Highly accurate metering R160 Feature
More informationDEPENDABLE BY DESIGN EASE OF USE PERFORMANCE SERVICEABILITY DURABILITY
FOR VENDED LAUNDRY DEPENDABLE BY DESIGN The Maytag Multi-Load Washer is built to provide the performance and durability your business needs. PERFORMANCE Experience optimal wash performance with a consistent
More informationThe Rogers QNW HP Series is a state-of-the-art, high pressure compressor for service applications requiring high pressure.
The Rogers QNW HP Series is a state-of-the-art, high pressure compressor for service applications requiring high pressure. www.rogers-machinery.com Inside the QNW HP Series When your production requirements
More information1. How and where can I find the terms and conditions of my contract?
1 Post Pay My Contract 1. How and where can I find the terms and conditions of my contract? At the time of signing up; When you sign up to a Bill Pay contract with id, we provide you with your contract
More informationRequest for Quotation RFQ SUBJECT: FT-IR SYSTEM
Request for Quotation SUBJECT: FT-IR SYSTEM DATE OF ISSUE: January 31, 2018 TO RESPOND BY: RESPOND TO: February 26, 2018 @ 1400 Hours (2:00 PM Pacific Time) Sandra Shelke Contract & Supply Chain Management
More informationFY2017 FCC Form 470 and Competitive Bidding
and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 30 Form 470
More information