CONTRACT DOCUMENTS. for the CIGAR LAKE: RECLAIMED WATER DISTRIBUTION PUMP STATION (ITB - U ) PREPARED BY

Size: px
Start display at page:

Download "CONTRACT DOCUMENTS. for the CIGAR LAKE: RECLAIMED WATER DISTRIBUTION PUMP STATION (ITB - U ) PREPARED BY"

Transcription

1 Addendum No. 2 December 19, 2006 CONTRACT DOCUMENTS for the CIGAR LAKE: RECLAIMED WATER STRIBUTION PUMP STATION (ITB - U ) PREPARED BY CPH ENGINEERS, INC. P.O. BOX 2808 SANFORD, FL PHONE: (407) FAX: (407) CPH PROJECT No. P To: Prospective Bidders and Other Concerned Parties This Addendum No. 2 to the Contract Drawings, Specifications, and Contract Documents for the Cigar Lake: Reclaimed Water Distribution Pump Station (ITB - U ) is hereby declared a part of the Original Contract Documents (as defined in the Project Manual dated November 2006), and in case of conflict, the following Addendum No. 2 shall govern. Bidders shall acknowledge on the Bid Form that their work is in conformance with Addendum No. 2. This Addendum consists of six (6) pages and ten (10) attached PDF files. CHANGES TO THE PROJECT MANUAL 2. Section Instructions to Bidders a. Delete Article 1.23(F), in its entirety, from this specification section. 1

2 2. Section Bid Form a. Delete this Section in its entirety and replace with the attached Section 00300, Bid Form which is in a PDF format. 3. Section Agreement Form a. Replace all of the text in Article 1.03(A), in its entirety, with the following: The Contractor will commence the work required by the Project Manual/Contract Documents within ten (10) calendar days after the date of the Notice to Proceed and shall substantially complete the work within two hundred ten (210) consecutive calendar days, or, 2007, and finally complete the work within two hundred forty (240) consecutive calendar days, or, 2007, unless the period for completion is extended otherwise by the Contract Documents. b. Replace the second sentence of Article 1.03(B)(2) with the following: Accordingly, instead of requiring such proof, the Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), the Contractor shall pay the Owner the sum of One Thousand Five Hundred Dollars ($1,500) for each calendar day that expires after the time stipulated in Article 1.03(A)(1) above for project substantial completion for the various portions of the Project until the Work is substantially complete. c. Replace the first sentence of Article 1.03(B)(3) with the following: After Substantial Completion, if the Contractor shall neglect, refuse or fail to complete the remaining Work within the time specified in Article 1.03(A)(1) for final completion and readiness for final payment or any proper extension thereof granted by the Owner, the Contractor shall pay the Owner One Thousand Two Hundred Fifty Dollars ($1,250) for each calendar day that expires after the time specified in Article 1.03(A)(1) for completion and readiness for final payment. d. Replace the text in Article 1.05(C)(1-3), in its entirety, with the following: 1. Ninety percent (90%) of the value of Work completed, with a ten percent (10%) retainage until the Project Work is fifty percent (50%) complete, at which time the retainage will be reduced to five percent (5%). The point at which Project Work is fifty percent (50%) complete shall be defined by the Engineer. 2. Ninety percent (90%), with the balance being retainage of the value of materials and equipment not incorporated in the Work, but delivered, suitably stored and accompanied by documentation satisfactory to the Owner as provided in the General Conditions and amended by the Supplementary Conditions. When the Project work is fifty percent (50%) complete, the retainage will be reduced to five percent (5%). The point at which Project Work is fifty percent (50%) complete shall be defined by the Engineer. 2

3 3. Upon Substantial Completion, the Owner may, at his option, increase total payments to the Contractor to ninety seven and one-half percent (97.5%) of the Contract Price, with the balance being retainage, less such amounts as the Engineer shall determine, or the Owner may withhold, in accordance with the General Conditions and amended by the Supplementary Conditions. e. Replace the text in Article 1.06(A)(2), in its entirety, with the following: 2. The Contractor has visited the site and become familiar with and is satisfied as to the general, local and site conditions, including surface and groundwater conditions, that may affect cost, progress, performance or furnishing of the Work. f. Replace the text in Article 1.07(A)(9), in its entirety, with the following: The Contractor s Bid Proposal (pages to , inclusive). 4. Section Measurement and Payment a. Replace the text in Article 1.02(L)(1)(a-b), in its entirety, with the following: a. Certificate of Registry # for tax-free transactions under Chapter 32, Internal Revenue Codes. b. Florida Sales & Use Tax Exemption Certificate Number C. b. Replace page , in its entirety, with the attached page (PDF). 5. Section Special Project Procedures a. Replace page , in its entirety, with the attached page (PDF). 6. Section Site Preparation a. Replace page , in its entirety, with the attached page (PDF). 7. Section Remote Telemetry Unit (RTU) a. Replace the text in Article 1.01(A-B), in its entirety, with the following: A. This Specification Section covers work associated with engineering, furnishing, installing, testing, calibrating, documenting and placing in operation two Remote Telemetry Units (RTU) at the following City of Palm Coast facilities: 3

4 1. Cigar Lake - Reclaimed Water Distribution Pump Station. 2. Cigar Lake - Lake Water Supply Valve Station. B. The RTU at the Reclaimed Water Distribution Pump Station shall interface with the Programmable Logic Controller (PLC) in the pump station s Pump Control Panel via a serial data link using Modbus RTU protocol. b. Insert the following Item into the list, in Article 2.02(A): 3. Override the Pressure Sustaining Valve at the Lake inlet and force it to close or open in regulating mode. c. Replace the text in Article 2.02(B)(2), in its entirety, with the following: B. Add the sites to the polling PLC s polling sequence. When the operator selects the manual mode of operation for either site, automatically modify the polling sequence such that the sites are polled at least once every five (5) seconds. d. Table ) Rename Table to read as follows: Table : Reclaimed Water Distribution Pump Station RTU Data Exchange 2) Delete the first two entries from Table which read Pond Inlet Flow and Pond Level. e. Insert the following subarticle into Article 3.05, Data Exchange : B. Table , below, lists the inputs and outputs for the Lake Water Supply Valve Station RTU. f. Insert Table , shown below, in the specification section following Table : TABLE LAKE WATER SUPPLY VALVE STATION RTU Description Type Lake Float High Level PRPS Valve Fully Open PRPS Valve Fully Closed PRPS Valve Open Command PRPS Valve Close Command DO DO 4

5 TABLE LAKE WATER SUPPLY VALVE STATION RTU Description Type System Pressure Lake Water Inlet Flow Rate Lake Water Level RTU Enclosure Open RTU on UPS Low UPS Battery AI AI AI CHANGES TO THE CONTRACT DRAWINGS 1. Replace the following Contract Drawings in their entirety with the attached Contract Drawings which are attached as PDF files (6 total): Drawing No. Contract Drawing Title E-02 Electrical Site Plan E-03 Single Line Diagram E-04 Reclaimed Water Pond Supply Power Plan and Single Line Diagram E-05 Reclaimed Water Distribution Pump Station Power Plan View E-06 Reclaimed Water Distribution Pump Station Lightning Protection Plan E-07 Lighting Fixture Details & Panel Schedule 2. Clarification: The survey information present on the Contract Drawings was provided to the Owner and Engineer by Palm Coast Holdings, Inc. They contracted with Singhofen & Associates who hired Tomoka Engineering to generate topography for Cigar Lake. The Owner and Engineer do not assume responsibility for the accuracy or completeness of this information. GENERAL QUESTIONS 1. Question No. 1: What type of roof is being supplied by the prefabricated, factory-built pump station manufacturer? 5

6 Response: The prefabricated, factory-built pump station manufacturer shall account for, in his Bid Price, the cost of providing a prefabricated aluminum roofing system over the entire reclaimed water distribution pump station building (pump/electrical room, air-burst (purging) room and chemical feed room). The roof shall have metal trusses, be able to withstand a 140 mph wind loading (tropical events), soffit, facia, downspouts, gutters, splash pads, etc. and all of the metal components of the roofing system shall be a finished color that is to be selected by the Owner and Engineer during the shop drawing review process. 2. Question No. 2: Are skylights or hatches preferable in the roof of the prefabricated, factorybuilt pump station? Response: The City of Palm Coast Utility Department would prefer weathertight, hatches with removable tops for ease of pump removal during maintenance periods. Skylights, although preferable due to the ability to let light into the building are also very notorious with respect to potential leaks. The prefabricated, factory-built pump station manufacturer shall integrate the installation and design of the roof mounted pump removal hatches for installation onto the exterior roof and through the interior roof (provided by the prefabricated, factory-built pump station manufacturer) for access to the vertical turbine pumps within the building. 3. Question No. 3: Is the RTU to be located within the Reclaimed Water Distribution Pump Station Building? Response: The Bidder is referred to attached Contract Drawing E-05 (PDF). The RTU and antenna have been moved and as the note indicates will be field located at the Preconstruction Conference. The final location will most likely end up on the interior western portion of the pump station site. 4. Question No. 4: Will the Contractor have to obtain a Tree Removal Permit. Response: The Contractor will be required to obtain a Tree Removal Permit from the City of Palm Coast and provide for the removal and disposal of all trees within the limits of the Reclaimed Water Distribution Pump Station and Lake Water Supply Valve Station limits that are to be cleared and grubbed. The limits of the clearing shall be a minimum of fifteen (15) feet beyond the fence line associated with the Reclaimed Water Distribution Pump Station and Lake Water Supply Valve Station and ten (10) foot on either side of the centerline of the associated project pipelines. Benjamin M. Fries, Vice-President End of Addendum No. 2 6

ADDENDUM NO. 3. Date: February 20, 2018 for Wireless Access Points Installation South Orange County Community College District BID No.

ADDENDUM NO. 3. Date: February 20, 2018 for Wireless Access Points Installation South Orange County Community College District BID No. ADDENDUM NO. 3 Date: February 20, 2018 for Wireless Access Points Installation South Orange County Community College District BID No. 359D South Orange County Community College District General-All project

More information

The Interlocal Purchasing System (TIPS Cooperative) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Mr. David Ma

The Interlocal Purchasing System (TIPS Cooperative) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Mr. David Ma The Interlocal Purchasing System (TIPS Cooperative) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Mr. David Mabe General Address Region VIII Education Address Manager

More information

A-SERIES/Owner-Contractor Documents

A-SERIES/Owner-Contractor Documents AIA Contract Document Price List for 2013 To place orders please contact AIA/Portland Chapter offices: Phone: (503) 223-8757 Email: amyd@aiaportland.org for questions *We cannot email/fax documents. AIA

More information

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,

More information

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA REVISED AMENDMENT NO.3/ CONTRACT NO. Y16-182 TERM CONTRACT FOR COUNTY WIDE ROOF MAINTENANCE AND REPAIR ADVANCED ROOFING, INC. 200 Northstar

More information

ADDENDUM NO. 02 INVITATION NUMBER:

ADDENDUM NO. 02 INVITATION NUMBER: ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group August 7, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Server Hardware and VMware vsphere Enterprise

More information

IDBI Bank Limited Corrigendum to the RFP For Procurement of Treasury PCs RFP ref. no: IDBI/PCELL/RFP/ /017 dated : 30-Oct-2015

IDBI Bank Limited Corrigendum to the RFP For Procurement of Treasury PCs RFP ref. no: IDBI/PCELL/RFP/ /017 dated : 30-Oct-2015 RFP Page Section / Clause/Para 1 6 Document Control Sheet 2 6 Document Control Sheet Existing clause Schedule for Receipt of Bids: Date 23/11/2015 Time 16:00 hours Schedule for Opening of Technical Bids

More information

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) BID SUBMITTAL DATE, TIME, & LOCATION: EMAIL QUESTIONS TO: December 8, 2017 @ 2:00 PM Mount Pleasant Waterworks Operations Center 1619

More information

AIA Documents-on-Demand Frequently Asked Questions Updated July 2011

AIA Documents-on-Demand Frequently Asked Questions Updated July 2011 AIA Documents-on-Demand Frequently Asked Questions Updated July 2011 General Documents-on-Demand Questions - 1. What is AIA Documents-on-Demand? AIA Documents-on-Demand is a web-based service that allows

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group September 20, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Software Microsoft Server 2008 plus SQL

More information

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL 7703 NW Barry Road Kansas City, MO 64153 2019 SUMMER HVAC Park Hill South High School Detailed Proposal Information is Available on District Website http://www.parkhill.k12.mo.us

More information

Enq. No. IIITMK/ 0612 /18 Date: 12/03/2018 Due on: 26/03/2018 4pm

Enq. No. IIITMK/ 0612 /18 Date: 12/03/2018 Due on: 26/03/2018 4pm Enq. No. IIITMK/ 0612 /18 Date: 12/03/2018 Due on: 26/03/2018 4pm On behalf of INDIAN INSTITUTE OF INFORMATION TECHNOLOGY & MANAGEMENT KERALA (IIITMK), the Registrar invites offers for the supply of following

More information

City Council Agenda Memo

City Council Agenda Memo City Council Agenda Memo City Council TO: David A. Vela, Interim City Manager Meeting Date: March 26, 2015 FROM: SUBJECT: Tommy O Brien, Director of Water Utilities Award of Bid to Cardinal Contractors

More information

Sybase Database Details. Data Device Usage. Transaction Log Segment Usage

Sybase Database Details. Data Device Usage. Transaction Log Segment Usage Information Technology Division. Kolkata LIMITED TENDER ENQUIRY NO.: BL/2015-2016/SOFTWARE/05 DATE: 12/08/2015 DUE ON: 21/08/2015 LIMITED TENDER FOR CONVERSION OF VB APPLICATION FROM SYBASE ASE XV TO MS

More information

QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS

QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS GENERAL INFORMATION Quest Construction Data Network (QuestCDN) is the official public advertisement site to obtain Bidding Documents for all Minnesota

More information

Vendor Inquiry and Reports Munis Version 11.2

Vendor Inquiry and Reports Munis Version 11.2 Objective This document gives you step by step instructions for using the Vendor Inquiry/Reports program to query the vendor master table for information regarding a specific vendor(s) and how to produce

More information

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.:

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.: Bids and Awards Committee on Goods REQUEST FOR QUOTATION (RFQ) Procurement of IT Supplies (GAA) RFQ No: 116 1. The Surigao del Sur State University (SDSSU) - Main Campus, through the GOP-GAA intends to

More information

Purchasing Department Finance Group INVITATION TO BID. PROJECT # 3299 Document length seven (7) pages DEADLINE 2:00 PM May 2, 2013

Purchasing Department Finance Group INVITATION TO BID. PROJECT # 3299 Document length seven (7) pages DEADLINE 2:00 PM May 2, 2013 Purchasing Department Finance Group April 18, 2013 INVITATION TO BID The City of Norwalk is soliciting bids for the City s Information Technology Department for Data Center Core Switch Equipment for the

More information

Building Tune-Up Program Application

Building Tune-Up Program Application Thank you for applying for Vectren s Building Tune-Up Program ( Program )! The Program provides a study focused on optimizing the energy performance of a facility by identifying no-and low-cost energy-saving

More information

Oracle Linux and Oracle VM Support Policies ~ Statement of Changes Effective Date: 20-April-2018

Oracle Linux and Oracle VM Support Policies ~ Statement of Changes Effective Date: 20-April-2018 Oracle Linux and Oracle VM Support Policies ~ Statement of Changes Effective Date: 20-April-2018 This section describes the changes made to the Oracle Linux and Oracle VM Support Policies dated January

More information

Indefinite Delivery, Indefinite Quantity (IDIQ)

Indefinite Delivery, Indefinite Quantity (IDIQ) CONTRACT ADMINISTRATION MANUAL Minnesota Department of Transportation Chapter 7 Section 7.1 Indefinite Delivery, Indefinite Quantity (IDIQ) General Disclaimer: This manual section not currently approved

More information

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.:

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.: Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.: 086-214-2744 E-mail: sdssu_bac@yahoo.com Bids and Awards Committee on Goods REQUEST FOR QUOTATION

More information

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.:

Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.: Republic of the Philippines SURIGAO DEL SUR STATE UNIVERSITY Rosario, Tandag, Surigao del Sur Tel. no.: 086-214-2744 E-mail: sdssu_bac@yahoo.com Bids and Awards Committee on Goods REQUEST FOR QUOTATION

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 6 APPR:LWB:DBP:07-31-13 FHWA:APPR:09-23-13 a. Description. This work consists of one or more

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group December 4, 2012 INVITATION TO BID The City of Norwalk is soliciting bids for the Norwalk Public Schools, Information Technology Department for Desktop Computers & Computer

More information

2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: Table 1-4: Number of GWA/SCADA Upgraded Facilities

2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: Table 1-4: Number of GWA/SCADA Upgraded Facilities 2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: GWA has a few facilities upgraded with supervisory control and data acquisition systems and are presently operating as

More information

WEBSITE DESIGN CONTRACT RECITALS AGREEMENT

WEBSITE DESIGN CONTRACT RECITALS AGREEMENT WEBSITE DESIGN CONTRACT We are delighted that you have selected Wards Enterprise Web Design, Inc. for your website design needs! We look forward to working with you on this exciting project. In order to

More information

Q1: Were you looking for any Software Assurance with any of the Microsoft Windows or SQL?

Q1: Were you looking for any Software Assurance with any of the Microsoft Windows or SQL? February 12, 2016 To: All Prospective Bidders Re: 3 Legal Notice No. GD 16-01 Servers & Server Software Following are questions received and RTA s responses: Q1: Were you looking for any Software Assurance

More information

Legislative Decree. Legislative Decree. President of the Government of Islamic Republic of Afghanistan,

Legislative Decree. Legislative Decree. President of the Government of Islamic Republic of Afghanistan, Legislative Decree Ref: 60 Date: 26/ 5/1394 Legislative Decree President of the Government of Islamic Republic of Afghanistan, with regards to Approving Telecommunication Service Charge Law Article One:

More information

REQUEST FOR QUOTE (RFQ):

REQUEST FOR QUOTE (RFQ): TO: FROM: PRINTERS Chad Thompson Procurement Manager Town of Longmeadow 735 Longmeadow Street, Suite 101 Longmeadow, MA 01106 Phone: 413-565-4136 Fax: 413-565-4372 cthompson@longmeadow.org DATE: November

More information

RULES AND REGULATIONS OF THE BUICK CLUB OF AMERICA

RULES AND REGULATIONS OF THE BUICK CLUB OF AMERICA CHAPTERS Chapter officers shall be: Chapter Director, Assistant Director, Secretary, Treasurer, and any other officers that may be deemed necessary by the Chapter. All Chapter officers should be well acquainted

More information

Fiscal Year Pay and Classification Plan for Non-Union Employees

Fiscal Year Pay and Classification Plan for Non-Union Employees City Hall 0 I West Palmetto Park Road, Boca Raton, Florida -0- Phone: (1) -00 (For Hearing Impaired) TDD: (1) -0 September 1, 01 TO: FROM: RE: Mayor & City Council Leif J. Ahnell, C.P.A.. C.G.F. City Manager

More information

SECTION SURGE PROTECTIVE DEVICES

SECTION SURGE PROTECTIVE DEVICES SECTION 16289 PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

ADDENDUM NO. 1. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri Point to Point Fiber Connection

ADDENDUM NO. 1. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri Point to Point Fiber Connection Issue Date: December 9, 2016 ADDENDUM NO. 1 Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri 64108 Project #16-7029-25 This Addendum is hereby made a part of

More information

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) Walla Walla Regional Airport Bid Project No. Security Camera System Proposals are due to the Port of Walla Walla by Thursday, March 2, 2017 at 4:00 PM. Results of the proposals

More information

Invitation for Bids Amendment #1

Invitation for Bids Amendment #1 Invitation for Bids Amendment #1 DESCRIPTION: CLEARING RETENTION POND Solicitation: Issued: Procurement Officer: Phone: E-Mail Address: Mailing Address: USING GOVERNMENTAL UNIT: SPARTANBURG COMMUNITY COLLEGE

More information

Office for Capital Facilities Guidance Document

Office for Capital Facilities Guidance Document Guidance Document September 17, 2018 Telecommunications Site Manager Agreement A reference guide to assist in the use of the NYS Police Crown Castle Telecommunications Agreement Contents Overview Benefits

More information

Request for Quotation Amendment #: 1

Request for Quotation Amendment #: 1 Request for Quotation Amendment #: 1 Solicitation Number Printed Issued Procurement Officer Phone E-Mail Address 080515-962-36505-08/14/15 08/11/15 08/11/15 Robert E. Tyner, C.P.M. 843-574-6279 Robert.tyner@tridenttech.edu

More information

DEE JASPAR & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS 2730 UNICORN ROAD, BLDG A BAKERSFIELD, CA PHONE (661) FAX (661)

DEE JASPAR & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS 2730 UNICORN ROAD, BLDG A BAKERSFIELD, CA PHONE (661) FAX (661) DEE JASPAR & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS 2730 UNICORN ROAD, BLDG A BAKERSFIELD, CA 93308 PHONE (661) 393-4796 FAX (661) 393-4799 ARVIN COMMUNITY SERVICES DISTRICT NOTICE TO PLANHOLDERS

More information

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703 SC2000 INSTRUCTION MANUAL MOTOR PROTECTION ELECTRONICS, INC. 2464 Vulcan Road Apopka, Florida 32703 Phone: (407) 299-3825 Fax: (407) 294-9435 Operating Program Revision: 10 Revision Date: 1-9-12 STATION

More information

Completing Your W-9 Online

Completing Your W-9 Online Completing Your W-9 Online 1 Introduction Welcome to your user guide for completing your W-9 online. As a plan participant, you will be aware of the need to provide us with a valid W-9 form to ensure that

More information

APPENDIX 4 to LGIP INTERCONNECTION FACILITIES STUDY AGREEMENT

APPENDIX 4 to LGIP INTERCONNECTION FACILITIES STUDY AGREEMENT APPENDIX 4 to LGIP INTERCONNECTION FACILITIES STUDY AGREEMENT THIS AGREEMENT is made and entered into this day of, 20 by and between [Customer Name (Project Name, QXXXX)], a [Type of company] organized

More information

Answers to questions asked prior to the deadline of 5pm, November 14, 2018;

Answers to questions asked prior to the deadline of 5pm, November 14, 2018; Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 November

More information

Code of Conduct. Certified Backflow Tester

Code of Conduct. Certified Backflow Tester Certified Backflow Tester Sarasota County Public Utilities (SCPU) has the primary responsibility of protecting the public water distribution system. The utility must take all reasonable precautions to

More information

APPLICATION FOR DARK FIBRE OPTIC SERVICE

APPLICATION FOR DARK FIBRE OPTIC SERVICE Suite 101, 310 Ward Street, Nelson, BC V1L 5S4 Phone: (250) 352-5511 Fax: (250) 352-2131 Website: http://www.nelson.ca/ APPLICATION FOR DARK FIBRE OPTIC SERVICE FOR OFFICE USE: APPLICATION # DATE OF APPLICATION:

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group October 7, 2011 INVITATION TO BID The City of Norwalk is soliciting bids for the Norwalk Public Schools, Information Technology Department for Data Center Core Switching

More information

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment Installation Service Statement of Work Start-up Service for Cooling Start-up - 1 - Service for Cooling Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0

More information

Manzanita Pubic Works. 10/16/2018 Special Meeting

Manzanita Pubic Works. 10/16/2018 Special Meeting Manzanita Pubic Works 10/16/2018 Special Meeting Agenda Items CO2 Project Update Water Meter System Update Highway 101 Project Manzanita and 3 rd Project CO2 Project Current Status CO2 Project Current

More information

Electric Sample Form No Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities

Electric Sample Form No Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32135-E Cancelling Revised Cal. P.U.C. Sheet No. 27053-E Electric Sample Form No. 79-1048 Agreement for Unmetered

More information

CLIENT DIY 1099-MISC KIT

CLIENT DIY 1099-MISC KIT CLIENT DIY 1099-MISC KIT 2014 Table of Contents DIY (Do It Yourself) 1099-MISC Kit: What Is This?... 3 Overview... 3 Reporting Payments to Corporations... 4 Reporting Payments for Property... 4 How to

More information

LICENSE, SUPPORT AND MAINTENANCE AGREEMENT

LICENSE, SUPPORT AND MAINTENANCE AGREEMENT LICENSE, SUPPORT AND MAINTENANCE AGREEMENT Notes These notes are intended to help prospective purchasers complete the attached Agreement. 1. Enter your organization s details on Page 2, between the (2)

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.bid.ci.norwalk.ct.us. Adobe Acrobat reader is required to view this document.

More information

UTILITY NOTIFICATION CENTER OF COLORADO CONVERSION TO TIER ONE MEMBERSHIP REGISTRATION

UTILITY NOTIFICATION CENTER OF COLORADO CONVERSION TO TIER ONE MEMBERSHIP REGISTRATION UTILITY NOTIFICATION CENTER OF COLORADO CONVERSION TO TIER ONE MEMBERSHIP REGISTRATION Name of Applicant/Company: Company Address: Company Representative: Title: Fax: E-Mail: Type of Facility/Utility (

More information

THE TOWN OF NORTHEASTERN MANITOULIN AND THE ISLANDS

THE TOWN OF NORTHEASTERN MANITOULIN AND THE ISLANDS THE TOWN OF NORTHEASTERN MANITOULIN AND THE ISLANDS Request for Quotations () For Submissions must be received on or before: 12:00 p.m. March 20 th, 2015 Attn: Mrs. Kristin Luoma, EDO 14 Water Street East

More information

TERMS OF ENGAGEMENT TO PROVIDE ACCESSIBILITY CONSULTING SERVICES BY A CERTIFIED ACCESS SPECIALIST (CASp)

TERMS OF ENGAGEMENT TO PROVIDE ACCESSIBILITY CONSULTING SERVICES BY A CERTIFIED ACCESS SPECIALIST (CASp) TERMS OF ENGAGEMENT TO PROVIDE ACCESSIBILITY CONSULTING SERVICES BY A CERTIFIED ACCESS SPECIALIST (CASp) DATE OF ENGAGEMENT AGREEMENT: BETWEEN: (OWNER) AND CASp: I.LAWRENCE KALTMAN, AIA, CASp (CASp) FOR

More information

Model Legislation As approved by the NCSL Executive Committee Task Force on State & Local Taxation of Communications and Electronic Commerce

Model Legislation As approved by the NCSL Executive Committee Task Force on State & Local Taxation of Communications and Electronic Commerce Model Legislation As approved by the NCSL Executive Committee Task Force on State & Local Taxation of Communications and Electronic Commerce An act imposing a uniform, statewide E charge 1 on the retail

More information

Section I. GENERAL PROVISIONS

Section I. GENERAL PROVISIONS LAW OF THE RUSSIAN FEDERATION NO. 5151-1 OF JUNE 10, 1993 ON CERTIFICATION OF PRODUCTS AND SERVICES (with the Additions and Amendments of December 27, 1995, March 2, July 31, 1998) Federal Law No. 154-FZ

More information

COMMERCIAL FURNACES CERTIFICATION PROGRAM

COMMERCIAL FURNACES CERTIFICATION PROGRAM COMMERCIAL FURNACES CERTIFICATION PROGRAM AHRI OM CFRN JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by: PREFACE The following manual outlines

More information

Subject: Quotation for Setup/Up Gradation of Data Center in Karachi

Subject: Quotation for Setup/Up Gradation of Data Center in Karachi REQUEST FOR QUOTATION (RFQ) FACSIMILE/EMAIL Company/Individual Name: Business address: Telephone Fax Email Subject: Quotation for Setup/Up Gradation of Data Center in Karachi Dear Sir/Madam, On behalf

More information

CUMBRE VISTA HOMEOWNERS ASSOCIATION, INC. RECORDS INSPECTION AND COMMUNICATIONS POLICY AND PROCEDURE. 1-Pl) ~ \ 1

CUMBRE VISTA HOMEOWNERS ASSOCIATION, INC. RECORDS INSPECTION AND  COMMUNICATIONS POLICY AND PROCEDURE. 1-Pl) ~ \ 1 CUMBRE VISTA HOMEOWNERS ASSOCIATION, INC. RECORDS INSPECTION AND EMAIL COMMUNICATIONS POLICY AND PROCEDURE Effective Date: ~ \ 1 1-Pl) Pursuant to Article XIII of the Association's Bylaws, "records and

More information

City of St. Louis. Treasurer's Office

City of St. Louis. Treasurer's Office City of St. Louis Treasurer's Office Request for Proposals Parking and Revenue Control System Proposals due no later than 3:00 p.m., September 4, 2015 1 1) Opening Statement The City of St. Louis Treasurer

More information

Online Statements Disclosure

Online Statements Disclosure Online Statements Disclosure Rev. 04/30/13 DEFINITIONS "We", "Our", "Us" or "The Bank" mean Central Pacific Bank. "You" and "your" mean the account owner(s) authorized by the Bank to receive account statements

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 TRAFFIC SIGNAL INSTALLATIONS MIDDLE TURNPIKE EAST AT SUMMIT STREET MIDDLE TURNPIKE EAST AT

More information

THE CORPORATION OF THE CITY OF STRATFORD

THE CORPORATION OF THE CITY OF STRATFORD THE CORPORATION OF THE CITY OF STRATFORD Tender Number: T16 17 Replacement of Entrance Phone Systems, Addition of CCTV Camera Systems and Wireless Fidelity/Wireless Internet (WIFI) Systems Throughout the

More information

QNB Bank-ONLINE AGREEMENT

QNB Bank-ONLINE AGREEMENT This is an Agreement between you and QNB Bank ("QNB"). It explains the rules of your electronic access to your accounts through QNB Online. By using QNB-Online, you accept all the terms and conditions

More information

Underfloor Controllers

Underfloor Controllers Price Underfloor Controllers work with the entire line of Price Diffusers and Terminal Units. The whole system can be easily integrated with plug-and-play connections and BACnet communication. With a full

More information

Addendum No. 2 Reference: ITB Procurement of Medical Equipment for the Intensive Care Unit at Alia Hospital Hebron

Addendum No. 2 Reference: ITB Procurement of Medical Equipment for the Intensive Care Unit at Alia Hospital Hebron Addendum No. 2 Reference: ITB-2017-91 ITB: Procurement of Medical Equipment for the Intensive Care Unit at Alia Hospital Hebron Issue Date: 12 April 2017 Original Deadline for submission of bids/offers:

More information

APPLICATION FOR PRODUCT CERTIFICATION

APPLICATION FOR PRODUCT CERTIFICATION Head Office DIRECTORATE FOR STANDARDS, METROLOGY AND QUALITY QUALITY ASSURANCE AND TESTING CENTER 3 49 Pasteur, District 1, Ho Chi Minh city, Vietnam Tel: 84-28-3829 4274 Fax: 84-28-3829 3012 Certification

More information

Vendor Maint/Reports Menu Vendor Inquiry/Reports MUNIS Version 7

Vendor Maint/Reports Menu Vendor Inquiry/Reports MUNIS Version 7 Module: Topic: Accounts Payable Vendor Maint/Reports Menu Vendor Inquiry/Reports MUNIS Version 7 Objective This document gives you step by step instructions for using the Vendor Inquiry/Reports program

More information

Advertisement for Bids Warning Siren Systems. Advertisement to Bidders. Watertown Fire Rescue

Advertisement for Bids Warning Siren Systems. Advertisement to Bidders. Watertown Fire Rescue Advertisement for Bids Warning Siren Systems Advertisement to Bidders Watertown Fire Rescue Sealed bids will be received by the City of Watertown at the Finance Office in City Hall, 23 Second Street NE,

More information

AMENDMENT NO. 1 TO REGISTRY-REGISTRAR AGREEMENT

AMENDMENT NO. 1 TO REGISTRY-REGISTRAR AGREEMENT AMENDMENT NO. 1 TO REGISTRY-REGISTRAR AGREEMENT This Amendment No. 1 to the Registry-Registrar Agreement (this Amendment ) is made as of this 2 day of November, 2004, by and between VeriSign, Inc. ( VERISIGN

More information

VERIZON SELECT SERVICES INC. Page 1. SECTION 13 - EXHIBIT M - Network-Based IP VPN SERVICE

VERIZON SELECT SERVICES INC. Page 1. SECTION 13 - EXHIBIT M - Network-Based IP VPN SERVICE VERIZON SELECT SERVICES INC. Page 1 Quote Number or CBS/CNE Tracking Number: 1) Description of Service. Internet Protocol-Virtual Private Network (IP VPN) Service (Service) is a packet-based advanced data

More information

ADDENDUM NO. 1 DATE ISSUED: JANUARY 15, 2016

ADDENDUM NO. 1 DATE ISSUED: JANUARY 15, 2016 CONTRACT DOCUMENTS, SPECIFICATIONS AND CONTRACT DRAWINGS FOR CITY OF KENNER STATEWIDE FLOOD CONTROL PROGRAM STATE PROJECT NO. H.010107 DRAINAGE IMPROVEMENTS PROJECT UNIVERSITY CITY SUBDIVISION AREA PHASE

More information

Go SOLAR Online Permitting System A Guide for Applicants November 2012

Go SOLAR Online Permitting System A Guide for Applicants November 2012 Go SOLAR Online Permitting System A Guide for Applicants November 2012 www.broward.org/gogreen/gosolar Disclaimer This guide was prepared as an account of work sponsored by the United States Department

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016 Item 5, Report No. 24, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 REVIEW OF RESIDENTIAL AIR CONDITIONER (AC) REGULATIONS

More information

17. Microwave Collocation 17.1 General

17. Microwave Collocation 17.1 General Original Page 1 17.1 General 17.1.1 General A. Unless otherwise specified herein, general regulations contained in Sections 1 through 4 and Sections 14 and 15 apply in addition to the regulations contained

More information

Request for Proposal # For. Services

Request for Proposal # For. Services Request for Proposal # 2010-02 For Utility Bill Printing & Mailing Services City of Dunnellon 20750 River Drive Dunnellon, FL 34431 Phone: (352) 465-8500 Fax: (352) 465-8505 Contact: Lisa Algiere Email:

More information

RULES OF THE TENNESSEE ALCOHOLIC BEVERAGE COMMISSION CHAPTER RULES FOR PROFESSIONAL ALCOHOL SERVER TRAINING TABLE OF CONTENTS

RULES OF THE TENNESSEE ALCOHOLIC BEVERAGE COMMISSION CHAPTER RULES FOR PROFESSIONAL ALCOHOL SERVER TRAINING TABLE OF CONTENTS RULES OF THE TENNESSEE ALCOHOLIC BEVERAGE COMMISSION CHAPTER 0100-08 RULES FOR PROFESSIONAL ALCOHOL SERVER TRAINING TABLE OF CONTENTS 0100-08-.01 Purpose 0100-08-.05 Miscellaneous Provisions 0100-08-.02

More information

OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018

OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018 To Respondent of Record: OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R-18-001-JAM ADDENDUM NO. 1 February 28, 2018 This addendum, applicable to project referenced above, is an amendment

More information

DURO-LAST ROOFING, INC.

DURO-LAST ROOFING, INC. DURO-LAST ROOFING, INC. Duro-Last: Defining Rooftop Sustainability In the commercial roofing industry, reflectivity has been the dominant discussion point for several years, and the Duro-Last Cool Zone

More information

SAMPLE SPECIFICATIONS CONTINUOUS EMISSION MONITORING DATA ACQUSITION SYSTEM

SAMPLE SPECIFICATIONS CONTINUOUS EMISSION MONITORING DATA ACQUSITION SYSTEM SAMPLE SPECIFICATIONS CONTINUOUS EMISSION MONITORING DATA ACQUSITION SYSTEM TABLE OF CONTENTS Part Description 1 General Requirements 2 Process/Application Description 3 DAS Specifications 4 Services PART

More information

Regulations Respecting Examinations and Certificates of Engineers and Firemen

Regulations Respecting Examinations and Certificates of Engineers and Firemen EXAMINATION AND CERTIFICATES 1 Regulations Respecting Examinations and Certificates of Engineers and Firemen Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulations

More information

Voya s Distributions with EASE

Voya s Distributions with EASE Voya s Distributions with EASE User Guide for Third Party Administrators Version 3.10 November 2016 Table of Contents Introduction. 3 When is Paperwork Required. 3 Security Roles... 3 How does It Work

More information

DHSMV ITN FRVIS Equipment Refresh Addendum No. 5

DHSMV ITN FRVIS Equipment Refresh Addendum No. 5 DHSMV ITN 001-19 FRVIS Equipment Refresh Addendum No. 5 SEPTEMBER 19, FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY

More information

Appendix B. TechKnowsion PLC and SCADA Programming Proposal

Appendix B. TechKnowsion PLC and SCADA Programming Proposal Appendix B TechKnowsion PLC and SCADA Programming Proposal THIS PAGE LEFT INTENTIONALLY BLANK TechKnowsion, Inc. 3305 Vincent Road Pleasant Hill, CA 94523 925.939.8324 Voice 925.280.8324 Fax www.techknowsion.com

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 5 APPR:JVG:DBP:06-29-17 FHWA:APPR:08-02-17 a. Description. This work consists of one or more

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Agenda Item No. AGENDA ITEM BRIEFING

Agenda Item No. AGENDA ITEM BRIEFING AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval to Amend the FY 2016-FY 2020 Texas A&M University

More information

Installation. 9mm. Rear view showing cable header pins

Installation. 9mm. Rear view showing cable header pins Installation Remove the cap that s covering the locking mechanism, this is located on the bottom of the VoiceNav. With the cap removed you now have access to the locking mechanism that secures your VoiceNav

More information

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford GRC COMPLEX South Fir Street - Medford Naumes, Inc. P.O. Box 996 2 Barnett Road Medford, OR 97501 Phone 541.772.6268 Fax 541.772.2135 NO AGENCY, REPRESENTATION OR COMMISSION This Property Profile is being

More information

Andrea Sappleton, Assistant Director of Purchasing

Andrea Sappleton, Assistant Director of Purchasing BID ADDENDUM NO. 1 COVER SHEET TO: FROM: Prospective Bidders Andrea Sappleton, Assistant Director of Purchasing DATE: July 6, 2015 RE: RCNJ Bid No. 15-007A Magazine Printing Services The attached Addendum

More information

INVITATION FOR QUOTATION. TEQIP-II/2015/KL1G17/Shopping/152

INVITATION FOR QUOTATION. TEQIP-II/2015/KL1G17/Shopping/152 INVITATION FOR QUOTATION TEQIP-II/2015/KL1G17/Shopping/152 07-Jan-2015 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for

More information

Greyhawk Ridge HOA Architectural Control Committee Procedures: Request For Project Approval (RFPA)

Greyhawk Ridge HOA Architectural Control Committee Procedures: Request For Project Approval (RFPA) Overview: The formal Resident Request For Project Approval (RFPA) process provides a vehicle for communications between Residents and the ACC to work together for ensuring proposed projects comply with

More information

FIGURE 1. Five Logical Levels of a SCADA System

FIGURE 1. Five Logical Levels of a SCADA System SCADA AND TELEMETRY IN NATURAL GAS OPERATIONS Russel W. Treat EnerSys Corporation Introduction SCADA systems provide are combinations of field devices, communications infrastructure and software integrated

More information

CONTRACT DOCUMENTS AND SPECIFICATIONS SCADA IMPROVEMENTS PROJECT 2014 THE CITY OF ROCKDALE MILAM COUNTY, TEXAS

CONTRACT DOCUMENTS AND SPECIFICATIONS SCADA IMPROVEMENTS PROJECT 2014 THE CITY OF ROCKDALE MILAM COUNTY, TEXAS CONTRACT DOCUMENTS AND SPECIFICATIONS FOR SCADA IMPROVEMENTS PROJECT 2014 TO SERVE THE THE CITY OF ROCKDALE MILAM COUNTY, TEXAS FEBRUARY 2014 The City of Rockdale will use the Best Value Method to award

More information

TECHNICAL SPECIAL PROVISION FOR. ITS Automatic Vehicle Identification System (AVI): Financial Project ID:

TECHNICAL SPECIAL PROVISION FOR. ITS Automatic Vehicle Identification System (AVI): Financial Project ID: TECHNICAL SPECIAL PROVISION FOR ITS Automatic Vehicle Identification System (AVI): Financial Project ID: 435443-2-52-01 ORANGE COUNTY & SEMINOLE COUNTY The official record of this Technical Special Provision

More information

MSEDCL e-tendering Contractor Registration Guide

MSEDCL e-tendering Contractor Registration Guide MSEDCL e-tendering Contractor Registration Guide Table Of Contents Getting Started...4 Getting Started...4 Contractor Registration...5 Adding Company Details...5 Adding Company Contact Details...8 Registration

More information