1 TECHNICAL AND GENERAL BID REQUIREMENTS The following specifications are similar to those used by several utilities in procuring photovoltaic systems. These specifications help insure the bidders turn in all relevant documents and are aware of expectations should they be awarded the contract. Each section is split into two parts a Should Include and a Could Include. Although any portion of these specifications may be deleted or altered, those in the Should section are considered most critical to obtaining the best systems and information. Those in the Could section are additional features to the agreement an organization may want to consider. The words in the italics that are underlined are parts of the agreement that should be changed to best suit your organization s needs. Comments in brackets describe a particular option. The term contractor refers to those submitting a proposal. The term Purchasing Organization refers to the group issuing the RFP. 1. GENERAL INFORMATION 1.1 These specifications cover the procurement of equipment, hardware, documentation, labor and supervision required for the installation of a maximum of five (5) nominal 4 kw p grid-connected PV systems as part of the Purchasing Organization Photovoltaic (PV) project. There will be no energy storage devices (e.g. batteries) used in these systems. 1.2 Bids must list all the equipment necessary to complete system installations. In addition, documentation on the design, configuration, installation, operation and maintenance of the complete system must be included. 1.3 All systems should be designed for outdoor installation in the City area. Central Florida is subject to long-term high humidity and temperature conditions. Annual ambient temperatures can range from 30 F to 100 F. Supplied equipment must be rated and warranted to withstand and operate under these conditions. 1.4 Each PV system will be installed at site. The Contractor shall provide mounting (e.g. free standing, roof-mounting, etc.) the array in a manner that is acceptable with the Purchasing Organization. This structure shall mounting specifics (e.g. have a 30-degree fixed tilt plane, be mounted parallel to roof, etc.) to be oriented either to the South or the West, as local conditions dictate. 1.5 A total of five (5) identical 4 kw p systems are to be quoted. Purchasing Organization estimates these units will be installed within eighteen (18) months of award of the contract. 1.6 System complexity adds to the labor and material costs of installing a system. Purchasing Organization will consider this factor in evaluating bids. 1.7 Each PV system will be connected to Purchasing Organization's utility electric grid through a grid-interactive power conditioner (inverter). The design and specification of the PV modules, power conditioners, utility interconnections, PV system electrical design, and PV array mechanical design are described in the following sections. 1.8 Contractors should be aware of all the documentation and procedural issues required prior to submitting bid. These are listed below. 1.9 The successful Contractor shall have a Florida Solar Contractor's License and will have taken the course, "Installing Grid-Connected Photovoltaic Systems," conducted by the Florida Solar Energy Center. SR-1

2 1.10 Purchasing Organization will incorporate required manufacturer s and vendor's drawings into its as-built drawings for its own records and those of the owners of the site. Therefore, all drawings submitted for bid evaluation shall be provided within three (3) weeks after the award All drawings will be submitted within three (3) weeks in an electronic format that may be imported into AutoCAD drafting software. Proper credit of the source of these drawings will be noted on Purchasing Organization's drawings Supplier may include any value-added services in their quotations, as long as they are not bound to the mandatory portions of this specification The Contractor will provide an option for an Extended Service Contract, thereby extending labor, technical assistance and routine maintenance. Routine maintenance is defined as the act of making sure the PV system operates properly. This includes changing blown fuses, diodes, or other minor equipment. This does not extend the warranties of factory-warrantied components such as the modules or inverters, but includes any labor required to change out these or other components that fail during the Extended Service Contract The Contractor will conduct a routine site visit every six (6) months to make sure the system is operating properly. During this visit, the Contractor will conduct tests similar to those made during the original system acceptance test. This includes measurements of short-circuit current and open-circuit voltage. This also includes the instantaneous measurement of DC and AC current and voltage while the system is in operation. Irradiance and module temperature should be taken during all testing procedures. Forms for these tests will be provided by Purchasing Organization It is desirable that the system be so designed that, should Purchasing Organization choose to do so, a 2 kw p array could be constructed and operated using the same PCS and Balance-of-System (BOS) components and half of the modules. 2. PV MODULE AND ARRAY SPECIFICATIONS 2.1 Size of the array is/is not a consideration. The PV modules should be framed flat-plate crystalline/amorphous silicon modules. Thin- film modules will/will not be considered for this project. 2.2 The PV array should be sized to achieve a nominal 4 kw p DC STC output for the entire system under peak sun conditions (1000 W/m 2 ). In general, AC output should be around 70% of the DC kwp rating. 2.3 The PV modules shall meet or exceed the requirements of Underwriter Laboratories (UL) Standard 1703 Standard for Safety for Flat-Plate Photovoltaic Modules and either IEEE Standard IEEE Recommended Practice for Qualification of Photovoltaic (PV) Modules and Panels or IEC 1215 Crystalline Silicon Terrestrial Photovoltaic (PV) Modules- Design Qualification and Type Approval. 2.4 Each PV module shall include bypass diodes installed in the module junction box. 2.5 Each PV module shall be warrantied by the manufacturer for at least 90% of its rated power for 10 years and 80% of its rated power for 20 years from the date of system acceptance. {Though these numbers may be changed, most Manufacturers offer this warranty for crystalline silicon modules which is currently the most commonly used type} SR-2

3 2.6 Modules shall be made in the U.S.A. 2.7 The PV modules' electrical characteristics including current-voltage (I -V) curves and temperature coefficients of module power, voltage, and current shall be characterized by a research laboratory such as the Florida Solar Energy Center, the National Renewable Energy Laboratory, Sandia National Laboratories, or Arizona State University. 3. OTHER COMPONENT SPECIFICATIONS 3.1 The PCS for each system must use a single/multiple inverter(s), designed specifically for utility grid interconnection of photovoltaic arrays and be capable of automatic, continuous, and stable operation over the range of voltages, currents, and power levels for the size and type of array used. 3.2 Each PCS shall be compliant with IEEE Std (Recommended Practice for Utility Interface of Photovoltaic Systems) and have UL1741 (Standard for Static Inverters and Charge Controllers for Use in Photovoltaic Power Systems). The PCS shall also comply with IEEE Std. 519 (Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems) and the latest applicable ANSI and FCC standards and addenda dated prior to the award of the purchase order for this procurement. 3.3 The PCS must have an automatic visual indicator showing whether the system is on-line or not. 3.4 The PCS must have at least a two-year repair or replacement warranty from the manufacturer covering parts and labor. 3.5 The PCS, AC and DC disconnects, and any other required electronics shall be installed near the array, where they may be exposed to weather and possible vandalism. The contractor will provide a suitable pad-mountable, lockable enclosure for housing these components. This enclosure shall provide any venting and weather sealing required by the electronics enclosed. All electrical enclosures shall be rated as NEMA 3R or better and have superior strength and corrosion resistance properties. 3.6 Batteries will be used for base loading/peak-load shaving/back-up power. {Specify either the number of Wh of power you wish to have or the kind of load you wish to have supplied}. Battery selection is/is not constrained by battery size or type. {If either are constraints, specify} 3.7 The aforementioned enclosure (section 3.5) (or an additional enclosure) is to have adequate additional space to house a Campbell Scientific CR 10 datalogger, power supply and terminal board. The space/enclosure should be 16 inches by 20 inches, and 8 inches deep. Contractor/Others will supply the datalogger and its associated hardware. SR-3

4 4. PV SYSTEM ELECTRICAL DESIGN 4.1 The electrical design and installation instructions for the PV systems shall conform to the 1999 National Electric Code (NFP A 70). Article 690 of the NEC applies specifically to photovoltaic system safety, protection, control and interface with other sources. Other articles of the NEC also apply. The PV system electrical design shall also comply with the IEEE Std (Guide for Terrestrial Photovoltaic Power System Safety). 4.2 All electrical components, including overcurrent protection, disconnect, surge suppression devices, conduit, wiring and terminals must have UL or equivalent listing and have appropriate voltage, current and temperature ratings for the application. Special attention should be given to appropriate ratings for components used in DC circuits. 4.3 All wiring shall be listed for a minimum operation of 600 volts and temperature rating of 90 C in wet locations. All current carrying conductors may/must be enclosed in conduit, including module interconnections. 4.4 Ampacity calculations must take into account appropriate de-ratings as required. All conductors in the system are subject to a 125% NEC de-rate, and all DC source circuit conductors and overcurrent devices must include an additional 125% de-rate for solar radiation enhancement. Appropriate temperature de-ratings for conductors used in module junction boxes must be considered for peak module operating temperatures, as well as de-ratings for instances where more than three current-carrying conductors are enclosed in a conduit. 4.5 Voltage drop in array DC source circuits should be limited to no more than five percent (5%), including losses in conductors and through all fuses blocking diodes and termination points. 4.6 All overcurrent devices shall have trip ratings no greater than the de-rated ampacity of the conductors that it protects. 4.7 All series connected strings of modules (also known as panels, or source circuits) must include a series fuse as required by UL and NEC to prevent to wiring or other system components. Parallel connections of modules in individual source circuits are not permitted. Parallel-connected cells within individual modules are allowable as long as the module listing allows for the series fuse required for this configuration. 4.8 All series connected strings of modules (source circuits) may/must also include a blocking diode to prevent reverse currents. These diodes should have low voltage drop to meet the requirements above, and have a voltage and current ratings (at temperature) at least twice the open-circuit voltage and short-circuit ratings of the source circuits. 4.9 As some of these systems may be installed on the rooftops of dwellings, array ground-fault protection devices should be included as part of the PCS packages as required by the NEC. These devices must be capable of detecting array ground faults, shunting the fault current to ground, and disabling the array until the fault has been cleared All terminations must use listed box terminal or compression type connections. Twist on wire splices, crimped, soldered or taped connections are not permitted for the required field installed wiring. Proper torque specifications should be provided for all of the required field connections All module frames, panel/array support structures, metal enclosures, panel boards and the PCS cabinet should be provided with connections for bonding to a common grounding conductor and terminating at the ground rod at the utility service entrance point. In addition, provisions for grounding the neutral of the PCS output shall be provided. The DC negative circuit may be common to the AC neutral in the PCS design and under no circumstances should multiple connections to ground be specified for current carrying conductors in the system Since distribution panels and location conditions vary, Purchasing Organization s Utility will provide the utility service connection for each system, and Purchasing Organization will provide watt-hour meter to record the array power and energy performance and disconnect device if one is not included with the PCS. A licensed electrician must make the final connection. SR-4

5 4.13 Loss of Line: The PCS shall not operate without the line voltage present. The PCS shall sense a "loss of line" (utility) condition and shall automatically disconnect from the line. In the event of multiple PCSs and/or balanced load on a common line, the PCS shall contain circuits (such as Sandia Voltage Shift and Sandia Frequency Shift) that will cause the PCS voltage or frequency to drift downwards under loss of line conditions and cause it to cease energizing the grid within two seconds after loss of line. The PCS restart shall occur automatically after restoration of line voltage and frequency for at least five minutes The PCS shall be capable of completely automatic operation, including "wake-up," "sleep" mode and shutdown after loss of utility power. In the automatic mode, the PCS shall monitor the available PV array power and voltage, and when a predetermined amount of power threshold of 200 watts maximum is available and the array voltage is within the normal starting voltage, the wake-up sequence shall be initiated. The PCS shall monitor the AC line voltage and frequency and, when the AC voltage is within the normal operating range (106 to 127 V for nominal 120 V or 212 to 254 for nominal 240 V) and the frequency is between 59.5 and 60.5 Hz, the synchronization process shall be initiated prior to establishing line-tie. The shutdown sequence to place the PCS in "sleep" mode shall not be initiated above 200 watts of array power. The DC power source and/or the AC circuit may remain connected in the "sleep" mode to provide monitoring and instrumentation power during nighttime operation. {The reason this is a Could Include as opposed to a Should Include is that most inverters that fit the other criteria above will also contain these features} 5. PV ARRAY MECHANICAL DESIGN 5.1 The Contractor shall provide the mechanical hardware for mounting the photovoltaic arrays. The Contractor shall provide all other hardware required for assembling the photovoltaic modules and panels and structurally attaching them to the base support structure/roof. 5.2 The PV array, including modules, hardware and attachments shall be designed to withstand wind loads of 125 mph or more and comply with all existing local and national codes. 5.3 Array mounting hardware supplied by the bidder should be compatible with the site considerations and environment. Special attention should be paid to minimizing the risk from exposed fasteners, sharp edges, and potential damage to the modules or support structure. Corrosion resistance and durability of the mechanical hardware should be emphasized the use of stainless steel fasteners and an aluminum support structure is preferred. The use of ferrous metals, wood or plastic components are strongly discouraged. Galvanic corrosion should be avoided. 5.4 As these are high profile, publicly visible installations, the aesthetics of the overall installation is extremely important to Purchasing Organization. To create a uniform appearance of the array, spacing between individual modules and panels should be kept to a minimum. As much as possible, all mechanical hardware, conduit, junction boxes and other equipment should be concealed beneath and/or behind the array. 5.5 The array layout should be consistent with the ordering (and labeling) of source circuits in the array combiner boxes. Ease of access for array troubleshooting and maintenance is desired by allowing access to the back of the array for module junction box servicing, and removal/replacement of individual source circuits (panels) and modules if necessary. SR-5

6 5.6 In roof-mounted systems, it is desired that the array is mounted on stand-offs three (3) to five (5) inches off the roof, to allow array ventilation. This prevents excessive temperatures that decrease output and increase module degradation. 5.7 As there may be occasion to install some of these systems on different rooftops/elsewhere, the array mechanical hardware shall be designed to attach to other type of rooftop/other structure. 5.8 The Contractor shall provide an additional freestanding base structure for other locations equipped with a rigid frame, capable of receiving this same hardware. 6. INFORMATION TO BE SUPPLIED WITH BID 6.1 For the purposes of Purchasing Organization's design, conformance to specifications, system features, and bid comparison, the contractor shall supply the FSEC PV Bid Review Checklist/other checklist. These sheets shall not be retyped or revised, and must include the minimum information specified. These documents will be used to insure compliance with the technical and general specifications, and will be used in the design review process. These must include (at a minimum) the following information for the bid to be considered responsive: The bid shall include the total bid price The bid shall include the required lead-time in delivery of equipment The bid shall include the required documentation package A price list for all replacement components, including individual modules and the PCS central unit shall be included. These prices are to remain in effect for one year after the date of acceptance Overview of major system components and principles of operation Complete parts lists, including all electrical components, mechanical hardware and other equipment required for installing the systems (must include description and make for all the equipment provided, model/part number and source are also required for the PV modules and the inverter) Diagram indicating proposed layout of entire system, including PV array, and location of BOS hardware and PCS with respect to the array Electrical schematics and diagrams showing all major components and devices, including conductor types and sizes, connections of individual modules and array source circuits, terminations at junction boxes, connection to surge suppression devices and the PCS, and the PCS interface with the utility grid Mechanical drawings showing details of module/array mechanical support Warranty information on individual components as required in this bid document Proof of solar or electrical contractors license, with license number, type of license and expiration date Proof of successful completion of FSEC authorization exam All equipment manufacturer's specifications and operations manuals, including those for PV modules, PCS, overcurrent devices, disconnects and optional equipment. 6.2 Designs will be reviewed as part of the bid review process. The drawings and other technical information will be checked for completeness and accuracy. Bidders with insufficient design information may be requested for SR-6

7 additional supporting material or have their bid dismissed outright. A list of criteria that will be checked can be found in the appendix Complete assembly and installation instructions for mounting array, junction boxes and enclosures, routing conduit, wiring arrays, and terminating conductors at array, combiner boxes and PCS Procedure for commissioning, operating, disconnecting, servicing and maintaining complete system and individual components. 7. INFORMATION TO BE PROVIDED BY CONTRACT AWARDEE BEFORE PROJECT COMPLETION 7.1 The Contractor is responsible for providing two complete copies of all installation, operations and maintenance manuals. {Also any other materials listed above that the Purchasing Organization does not feel obligated to receive during the bid process but may require at a later date} 7.2 The Contractor will provide design, materials, installation, and permitting price information. The materials information will be broken down into four categories: modules, PCS, batteries, and other. These costs should be the costs to Purchasing Organization, and not wholesale or distributor costs, and should be similar or identical to those on the parts list mentioned above (Section 6.1.4). In the case of packaged PV systems (e.g. Siemens Earthsafe, AstroPower SunLINE, BP Solar PV Plus, etc.), the materials cost breakdown may not be possible, so the replacement cost of each component should be listed, along with the cost of any miscellaneous materials (e.g. wire, junction boxes, etc.). This information may/will not be shared with utilities/research organizations. 7.3 As-built diagrams indicating overall layout of entire system, including PV array, and location of BOS hardware and PCS with respect to the array. 7.4 A site survey of the intended array location should be completed before the installation begins. This will help the Contractor determine appropriate equipment locations and give all parties a better idea of the expected performance of the PV system. It is preferable to use the site survey form included in the appendix. 7.5 The Florida Solar Energy Center/equivalent testing organization must test the PV modules used in this project before the system is to be installed. The following modules have been tested so far: AstroPower AP 120, BP 585F, BP Solarex MSX64, Siemens SP75, and the Siemens SR100. If any other modules are used, four of them must be brought to the Florida Solar Energy Center/equivalent testing organization to receive a module rating. 7.6 A copy of the interconnection agreement between the owner and the utility must be provided, preferably the one provided in the appendix of this document. If the system is owned by the utility, no documentation is required. 7.7 An acceptance test must be performed on the system once the installation is complete. This includes measuring the short circuit currents and open-circuit voltages on all source circuits while measuring irradiance and module temperature. This also includes measuring the instantaneous DC input and AC output of the system to determine its efficiency. The acceptance test form included in the appendix of this document should be completed in its entirety. If the acceptance test is performed by FSEC, no acceptance test is required from the contractor. 7.8 A copy of the permit obtained from the appropriate legal authority for system installation. 7.9 A copy of the minimum two-year system warranty including parts and labor Array structural design information sealed by a professional engineer is desired/required. SR-7

8 7.11 An end-user agreement between FSEC/other monitoring body and the property owner of the PV system installation site. This allows FSEC/other monitoring body to inspect and monitor the system over the course of its operation. A copy of the end-user agreement is located in the appendix of this document A copy of the FSEC PV Rebate Requirement Checklist /Other shall be completed by the Contractor and turned in to the Purchasing Organization and FSEC/Other to signify completion of each task at the end of the project. Purchasing Organization may withhold payment to Contractor until all forms required for rebate are completed and received. A copy of the FSEC PV Rebate Requirement Checklist /Other may be found in the appendix. 8. PROJECT SCHEDULE The Owner requires completion of this project by Date, based on the following schedule of the award: Pre Bid Meeting: Date Bids Due: Date Conformed Contract Issued By: Date Construction Completed and New Facilities Put In Service By: Date 9. BONDS The Contractor will be required to provide a Performance and Payment Bond in the full amount of this contract. 10. LIQUIDATED DAMAGES The Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified, plus any extensions thereof allowed in accordance with the General Conditions. The parties also recognize the delays, expenses, and difficulties involved in providing the actual loss suffered by Owner if the Work is not completed on time. Instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) in achieving the milestone dates stipulated, Contractor shall pay the Owner the stipulated amount of $ U.S. for each day that expires after the time specified. {If date of completion is of importance, a liquidated damages clause will help insure the system is completed on schedule} SR-8

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:

More information

Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010

Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010 Ontario Electrical Safety Code - Bulletins 50-1-0 Bulletin 50-1-0 Installation of Solar Photovoltaic Systems Section 50; Rules: 84-020, 84-024, 84-030; Tables 11 and 19 Issued July 2010 Scope (1) Introduction

More information

Stalking the Elusive and Somewhat Strange PV System

Stalking the Elusive and Somewhat Strange PV System A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles PERSPECTIVES ON PV Stalking the Elusive and Somewhat Strange PV System Photo 1. Framed PV modules

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13

More information

Installation Guide for America Solar Wholesale Photovoltaic Modules

Installation Guide for America Solar Wholesale Photovoltaic Modules Installation Guide for America Solar Wholesale Photovoltaic Modules Mono Module Poly Module 1 ASW Photovoltaic Module Installation Guide Installation guide for American Solar Wholesale Photovoltaic modules

More information

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) SECTION 26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) PART 1 -GENERAL 1.1 SYSTEM DESCRIPTION A. Definitions: The Variable Speed AC Motor Drive (hereafter referred to as "VFD") shall be designed to

More information

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum) Section 16306 50/60-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER Index PART 1 GENERAL PART 2 PRODUCTS 1.1 References 2.1 Frequency Converters 1.2 Factory Tests 2.2 Conduit and Fittings 1.3 Submittals 2.3

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN This Inspection Checklist for Rooftop Photovoltaic (PV) Systems is based on the Model Inspection Checklist

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 6 APPR:LWB:DBP:07-31-13 FHWA:APPR:09-23-13 a. Description. This work consists of one or more

More information

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1993 Specifications CSJ s 0924-06-221,etc. & 0924-06-223 SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1. Description. This specification describes the minimum acceptable requirements for a weatherproof

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 6 APPR:MDW:JVG:06-08-18

More information

SECTION (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Individually Mounted Switches and Circuit Breakers Used for the following: a. Service

More information

More Questions from Inspectors Numerous PV Systems Pose Issues

More Questions from Inspectors Numerous PV Systems Pose Issues Perspectives on PV More Questions from Inspectors Numerous PV Systems Pose Issues by John Wiles 76 IAEI NEWS March. April 2012 www.iaei.org Photovoltaic (PV) systems prices continue to drop and inspectors

More information

Bulletin Installation of solar photovoltaic systems Rules , , , , and

Bulletin Installation of solar photovoltaic systems Rules , , , , and Bulletin 64-5-0 Installation of solar photovoltaic systems Rules 64-060, 64-200, 64-214, 84-020, 84-024 and 84-030 Scope (1) Introduction (2) Disconnecting means (a) Disconnecting means for solar photovoltaic

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APsystems YC500-A Photovoltaic Grid-connected Inverter Version 4.1 8/15 APsystems 600 Ericksen Ave. NE Ste 200 Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com WEB:

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

PV Module Installation Instructions

PV Module Installation Instructions Name 1601A Page 1 / 8 Name 1601A Page 2 / 8 1 Introduction Thanks for purchasing PV modules of HT SOLAR ENERGY JOINT STOCK COMPANY This manual refers to PV modules manufactured and sold by HT Turkey. This

More information

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

DIVISION 16 SECTION Surge Protective Device Submittal (SPD) DIVISION 16 SECTION 16289 Surge Protective Device Submittal (SPD) PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary

More information

SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System

SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System 2004 Specifications CSJ 2374-01-153, etc. SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System 1. Description. Furnish and install the microwave vehicle detection (MVD) system as shown in the

More information

PV Rapid Shutdown device

PV Rapid Shutdown device PV Rapid Shutdown device Installation and Operation Manual Solis-RSD-1G(1:1) Solis-RSD-1G(2:2) Manufacturer: Ginlong (Ningbo) Technologies Co.,Ltd., Ningbo, Zhejiang, P.R.China US Office: 565 Metro Pl.

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1.1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Surge Protective Devices Installation, Operation and Maintenance Manual. LoadTrack LTL

Surge Protective Devices Installation, Operation and Maintenance Manual. LoadTrack LTL LoadTrack LTL Surge Protective Devices Installation, Operation and Maintenance Manual P.O. Box 3760 Winter Park, FL 32790 USA TEL: 800-647-1911 www.tpssurge.com LOADTRACK LTL INSTALLATION, OPERATION AND

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:02-02-12 a. Description. This work consists of furnishing, installing, integrating, and testing

More information

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM> SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

SOLARLOK Micro Junction Box Assembly. Terminal Potting Window. Diode (Inside) Locking Latch (2 Places) Figure 1

SOLARLOK Micro Junction Box Assembly. Terminal Potting Window. Diode (Inside) Locking Latch (2 Places) Figure 1 SOLARLOK* Micro Junction Box Assemblies Application Specification 114-13304 07 JUN 11 NOTE i All numerical values are in metric units [with U.S. customary units in brackets]. Dimensions are in millimeters.

More information

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4 Safety information 1 General 2 SINAMICS SINAMICS G120P Mechanical installation 3 Electrical installation 4 Technical specifications 5 Operating Instructions Control version V4.6 11/2013 A5E32845290B AA

More information

SECTION SWITCHBOARDS

SECTION SWITCHBOARDS SECTION 26 24 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Switchboards 2. Commercial Metering Switchboards 3. Non-Utility Power Meters (Microprocessor-Based Metering Equipment) PART 2 - PRODUCTS

More information

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2 Supersedes 6/2015 Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2 XXCFXXX10-DIN Contents Description Page 1.0 Setup...2 1.1 Before Installation...2 1.2 Installation...3 For AC Applications...3

More information

CenterPoint Energy P O Box 1700 Houston, TX

CenterPoint Energy P O Box 1700 Houston, TX CenterPoint Energy P O Box 1700 Houston, TX 77251-1700 IF YOU ARE APPLYING FOR DISTRIBUTED GENERATION, PLEASE FOLLOW THE INSTRUCTIONS IN THE PARAGRAPHS BELOW. YOU WILL NEED TO COMPLETE AND SIGN AND THEN

More information

Returnable Schedules

Returnable Schedules Returnable Schedules Engineering, and Construction of a fixed tilt Solar Photovoltaic Power Facility (Phase I) at the CSIR Campus in Pretoria on building 3, 10, 22, 23 and 33 Date of issue 17 th October

More information

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Part 1 General 1.01 Summary A. These specifications describe

More information

Rapid Shutdown Requirements for NEC 2017

Rapid Shutdown Requirements for NEC 2017 2017 AEESOLAR DEALER CONF. Rapid Shutdown Requirements for NEC 2017 Presented by: Bill Brooks, CMP 4 2017 NEC Statistics for Article 690 Whole article was reduced from 11,000 words to about 8,000 words.

More information

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW The Customer Generator applicant ("Applicant") hereby makes application to the T &

More information

Surge Protective Devices. STV100K Series. Instruction Manual

Surge Protective Devices. STV100K Series. Instruction Manual Surge Protective Devices STV100K Series Instruction Manual Contents 1.0 Installation... 4 1.1 Environment... 4 1.2 Mounting... 4 1.3 Proper Connection of SPDs... 4 1.4 Mechanical Dimensions... 5 1.5 Voltage

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

Surge Protective Devices. STV100K Series. Instruction Manual

Surge Protective Devices. STV100K Series. Instruction Manual Surge Protective Devices STV100K Series Instruction Manual Contents 1.0 Installation... 4 1.1 Environment... 4 1.2 Mounting... 4 1.3 Proper Connection of SPDs... 4 1.4 Mechanical Dimensions... 5 1.5 Voltage

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Meter Enclosure and Equipment Standards

Meter Enclosure and Equipment Standards Meter Enclosure and Equipment Standards (a) (b) General Requirements: CITY OF OCALA UTILITY SERVICES METER ENCLOSURE AND EQUIPMENT STANDARDS: (1) To avoid the costs associated with having to replace unacceptable

More information

CITY OF BOISE SPECIFICATIONS FOR LIGHT EMITTING DIODE (LED) STREET LIGHTING Effective 1 Feb, 2018

CITY OF BOISE SPECIFICATIONS FOR LIGHT EMITTING DIODE (LED) STREET LIGHTING Effective 1 Feb, 2018 CITY OF BOISE SPECIFICATIONS FOR LIGHT EMITTING DIODE (LED) STREET LIGHTING Effective 1 Feb, 2018 1. LIGHT EMITTING DIODE (LED) LUMINAIRES FOR ROADWAY TYPE 3 ILLUMINATION A. Testing and Compliance I Manufacturer

More information

Specifications, Installation, and Operating Instructions

Specifications, Installation, and Operating Instructions Specifications, Installation, and Operating Instructions Model: Power Vantage AC Panel Protector CAUTION: The installation of a surge protection device () must be done by qualified electrical personnel.

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 26 24 11 This section specifies the furnishing, installation, and connection of the distribution switchboards. 1.2 RELATED WORK: A. Section 13 05 41, SEISMIC RESTRAINT

More information

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 2004 Specifications CSJ 0025-02-194, 0017-10-261, 0017-10-268 & 0017-10-271 SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 1. Description. Retrofit existing

More information

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 2004 Specifications CSJ 0016-06-046, etc. SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 1. Description. Furnish and install Wireless Ethernet Radio (WER) (Backhaul) Link in the 5.8

More information

SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem 2004 Specifications CSJ s 0508-07-027, 0177-06-064, 0271-04-067, 0389-13-049 SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem 1. Description. Furnish and install Fiber Optic RS-232 Data Modem (FO-MODEM)

More information

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 2004 Specifications CSJ 0924-06-258 SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem

More information

SPECIAL SPECIFICATION 1826 Field Ethernet Switch

SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1. Description. Furnish, install, and make fully operational a Field Ethernet Switch at designated locations as shown

More information

SECTION ( ) LIGHTING CONTROL PANELBOARD

SECTION ( ) LIGHTING CONTROL PANELBOARD (26 24 16.02) LIGHTING CONTROL PANELBOARD PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install Lighting Control Panelboards as specified and as shown on the contract drawings. B. The Lighting

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 5 APPR:JVG:DBP:06-29-17 FHWA:APPR:08-02-17 a. Description. This work consists of one or more

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

Enphase S-Series Microinverter and Engage Cable Safety

Enphase S-Series Microinverter and Engage Cable Safety SAFETY Enphase S-Series Microinverter and Engage Cable Safety Important Safety Information (S280-60-LL and S230-60-LL) This document contains important instructions to use during installation of the Enphase

More information

CRM Control Panel and Weather Detection System CRM3 for DC actuators (part # 40821J) CRM4 for AC actuators (part # 40822K)

CRM Control Panel and Weather Detection System CRM3 for DC actuators (part # 40821J) CRM4 for AC actuators (part # 40822K) CRM Control Panel and Weather Detection System CRM3 for DC actuators (part # 40821J) CRM4 for AC actuators (part # 40822K) CRM Applications CRM includes a control relay box and a power supply; additional

More information

WN U-60 Original Sheet No. 152

WN U-60 Original Sheet No. 152 WN U-60 Original Sheet No. 152 Table of Contents INTERCONNECTION WITH ELECTRIC GENERATORS 1) Introduction Sheet 152-A 2) Attachments Sheet 152-A 3) Definitions Sheet 152-B 4) Applicability Sheet 152-H

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA SURGE PROTECTION DESIGN. Parallel Versus Series Protection. Surge protectors within the scope of this UFC should normally be of the parallel

More information

M250 (M LL) Safety

M250 (M LL) Safety M250 SAFETY M250 (M250-60-2LL) Safety Important Safety Information This document contains important instructions to use during installation of the Enphase M250 Microinverter. To reduce the risk of electrical

More information

PowerFlex 400 AC Drive Guide Specification

PowerFlex 400 AC Drive Guide Specification PowerFlex 400 AC Drive Guide Specification Adjustable Frequency Drives with Bypass 3.0 50HP @ 208V AC 3.0 350HP @ 480V AC PART 1 GENERAL 1.01 Quality Assurance A. The manufacturer shall have minimum 5

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APsystems YC500i Photovoltaic Grid-connected Inverter Version 1.0 7/16 APsystems 600 Ericksen Ave. NE Ste 200 Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com WEB:

More information

Installation and Operations Manual Micro-Inverter M S

Installation and Operations Manual Micro-Inverter M S Installation and Operations Manual Micro-Inverter M175-24-240-S Release 1.3 Page 1 Copyright Enphase Energy Inc. 2008 Release 1.3 Contact Information Enphase Energy Inc. 201 1 St Street, Suite 111 Petaluma,

More information

FSEC Procedure for Testing Stand-Alone Photovoltaic Systems

FSEC Procedure for Testing Stand-Alone Photovoltaic Systems FSEC Procedure for Testing Stand-Alone Photovoltaic Systems Authors FSEC PVDG Division Publication Number FSEC-GP-69-01 Copyright Copyright Florida Solar Energy Center/University of Central Florida 1679

More information

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D.

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D. Electrical Integration of PV Systems Ridha Hamidi, Ph.D. 1 Many articles in the NEC are applicable to the electrical integration of a PV system, particularly Article 690. 2 The NEC defines the various

More information

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011 Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 INTERCONNECTION APPLICATION FOR ALL BUT UL1741 CERTIFIED INVERTER BASED SYSTEMS LESS THAN 10 KW In addition to the information provided below, a complete

More information

Title Power Supply Units for Signalling Equipment - DC (Regulated & Filtered) Units. Reference Number SPS 30 - (RIC Standard: SC SP)

Title Power Supply Units for Signalling Equipment - DC (Regulated & Filtered) Units. Reference Number SPS 30 - (RIC Standard: SC SP) Discipline Engineering Standard - NSW Category Signalling Title Power Supply Units for Signalling Equipment - DC (Regulated & Filtered) Units Reference Number SPS 30 - (RIC Standard: SC 09 10 07 00 SP)

More information

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE IMPORTANT! Please read all the information on this sheet. SAVE THESE INSTRUCTIONS! NOTICE BEFORE USING READ INSTRUCTIONS COMPLETELY. TO BE INSTALLED BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH NATIONAL

More information

AIR COOLED MODULAR RECTIFIER

AIR COOLED MODULAR RECTIFIER CONTROLLED POWER COMPANY SPECIFICATIONS AIR COOLED MODULAR RECTIFIER Spc1800a1 5JAN1999 SPECIFICATION S-1800-A MODULAR (REMOVABLE AND NON-REMOVABLE MODULES) AIR COOLED RECTIFIER Standard output power range:

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Transportation Management Console

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Transportation Management Console 1993 Specifications CSJ 0598-01-057 1.0 Description SPECIAL SPECIFICATION ITEM 6398 Transportation Management Console This Item shall govern for the furnishing and installation of Transportation Management

More information

M215 (M215-60) Safety

M215 (M215-60) Safety M215 QUICK INSTALL GUIDE M215 (M215-60) Safety Important Safety Information This document contains important instructions to use during installation and maintenance of the Enphase M215 Microinverter. To

More information

Ferraz Shawmut TPMOV Principles and Operation

Ferraz Shawmut TPMOV Principles and Operation TPMOV Origin Due to recent changes in the Underwriters Laboratories Standard for Safety for Surge Protective Devices UL 1449 additional requirements have been instituted to maintain listings of Surge Protective

More information

E2EY. A Proximity Sensor for Aluminum, Brass and Other Non-ferrous Metals. Iron Is Not Detected. Aluminum-detecting Proximity Sensor

E2EY. A Proximity Sensor for Aluminum, Brass and Other Non-ferrous Metals. Iron Is Not Detected. Aluminum-detecting Proximity Sensor Aluminum-detecting Proximity Sensor EEY CSM_EEY_DS_E_5_1 A Proximity Sensor for Aluminum, Brass and Other Non-ferrous Metals. Iron Is Not Detected. Non-ferrous metals, such as aluminum and brass, are detected.

More information

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

Elastimold Molded Vacuum Recloser - MVR

Elastimold Molded Vacuum Recloser - MVR Subject: Elastimold Recloser Technical Specification Date: 4/24/12 File: MVR-RS-0412 Page: 1 of 6 1.0 SCOPE Elastimold Molded Vacuum Recloser - MVR 1.1 This specification covers electrical and mechanical

More information

Module Shading Guide. Field Shading Guide and Avoiding Device Damage

Module Shading Guide. Field Shading Guide and Avoiding Device Damage Module Shading Guide The purpose of this document is to provide an understanding of the shading impact on First Solar Series 3 and Series 4 PV modules (hereafter referred to as FS Series PV Modules ) as

More information

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) TECHNICAL SPECIAL PROVISION FOR SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) FINANCIAL PROJECT NO.: 428213-2-52-02 MARION COUNTY The official record of this Technical Special Provision is the

More information

SPECIAL SPECIFICATION 1606 ISDN Compressed Video Equipment

SPECIAL SPECIFICATION 1606 ISDN Compressed Video Equipment 1993 Specifications CSJ 0043-09-104, etc. SPECIAL SPECIFICATION 1606 ISDN Compressed Video Equipment 1. Description. This Item shall govern for the furnishing and installation of Integrated Services Digital

More information

OPERATING AND SERVICE MANUAL. Universal Interface Device 47

OPERATING AND SERVICE MANUAL. Universal Interface Device 47 OPERATING AND SERVICE MANUAL Universal Interface Device 47 MAGNA-POWER ELECTRONICS, INC. 39 ROYAL ROAD, FLEMINGTON, NJ 08822 May 24, 2012 SAFETY NOTICE Universal Interface Device 47 (UID46) connects

More information

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs) Models beginning with 2M, 2L or 2X Series 2000 Multiple Meter Units (MMUs) Product Description Technical Specifications Installation Instructions February 28 th, 2013 List of Figures...2 List of Tables...2

More information

CMSA-100 Manual. Cinema Media Server Automation

CMSA-100 Manual. Cinema Media Server Automation CMSA-100 Manual Cinema Media Server Automation 181 Bonetti Drive San Luis Obispo, CA 93401-7397 USA Phone: +1 805 549 0161 Fax: +1 805 549 0163 www.uslinc.com Table of Contents 1. Safety Notice... 3 2.

More information

SPECIAL SPECIFICATION 8371 Field Terminal Server

SPECIAL SPECIFICATION 8371 Field Terminal Server 2004 Specifications CSJ 0914-00-280 SPECIAL SPECIFICATION 8371 Field Terminal Server 1. Description. Furnish, install, and make fully operational a Field Terminal Server at designated locations as shown

More information

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15 System Design Guide APsystems YC1000-3 Photovoltaic 3-Phase Grid-connected Microinverter Version 1.1 3/15 APsystems 600 Ericksen Ave NE. Ste 200; Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com

More information

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1993 Specifications CSJ s 0924-06-221, etc. & 0924-06-223 SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1. Description. This Item shall govern for the furnishing and

More information

As a minimum, the scope of work shall include: 1.12 GPA will install the new drive control equipment per contractor supplied elementary drawings.

As a minimum, the scope of work shall include: 1.12 GPA will install the new drive control equipment per contractor supplied elementary drawings. Requisition # 10093128- Page 6 of 15 1.0 GENERAL REQUIREMENTS: 1.1 Scope Of Work: 1.11 Work includes, but is not limited to, providing all materials and technical direction required to replace the existing

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR ACCESSIBLE PEDESTRIAN SIGNAL SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR ACCESSIBLE PEDESTRIAN SIGNAL SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR ACCESSIBLE PEDESTRIAN SIGNAL SYSTEM SIG:EMS 1 of 6 APPR:LWB:DBP:07-17-14 FHWA:APPR:07-30-14 a. Description. This work consists of either furnishing

More information

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1. Description. Furnish, install, and make fully operational a Computer Room Voice-over- Internet Protocol

More information

FS Series PV Modules Reverse Current Overload

FS Series PV Modules Reverse Current Overload FS Series PV Modules Reverse Current Overload Purpose The purpose of this document is: to describe the system conditions that can cause reverse current overload (RCOL) and the behavior of FS modules in

More information

HT2000 Transverter Installation & Operation Manual

HT2000 Transverter Installation & Operation Manual HT2000 Transverter Installation & Operation Manual 1 A message from the team at Heart Transverter S.A. Thanks for your recent purchase of the HT2000 Power inverter in combination with the HTREM Remote

More information

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1 Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 2460-KIT Screw Terminal Connector Kit Description The Model 2460-KIT Screw Terminal Connector Kit

More information

Operation of Photovoltaic Equipment Certification Program

Operation of Photovoltaic Equipment Certification Program D R A F T FSEC STANDARD Operation of Photovoltaic Equipment Certification Program FSEC Standard 201-10 January 2010 FSEC Standard 201-04 - 0 - Table of Contents 1.0 [Reserved] 2.0 [Reserved] 3.0 [Reserved]

More information

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION SECTION 16709 TRANSIENT VOLTAGE SURGE SUPPRESSION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Transient Voltage Surge Suppression (TVSS) devices, also known as Surge Protective Devices (SPDs), for

More information

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC. 1.1 SCOPE. This section covers the furnishing and installation of Video Surveillance Systems (VSS), including Video Management System (VMS) software, Cameras, and all associated equipment, devices, and

More information

Specification Voltage Limiting Device

Specification Voltage Limiting Device Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,

More information

MAINTENANCE MANUAL. EDACS REDUNDANT POWER SUPPLY SYSTEM 350A1441P1 and P2 POWER MODULE CHASSIS 350A1441P3, P4, AND P5 POWER MODULES TABLE OF CONTENTS

MAINTENANCE MANUAL. EDACS REDUNDANT POWER SUPPLY SYSTEM 350A1441P1 and P2 POWER MODULE CHASSIS 350A1441P3, P4, AND P5 POWER MODULES TABLE OF CONTENTS MAINTENANCE MANUAL EDACS REDUNDANT POWER SUPPLY SYSTEM 350A1441P1 and P2 POWER MODULE CHASSIS 350A1441P3, P4, AND P5 POWER MODULES TABLE OF CONTENTS SPECIFICATIONS*... 2 INTRODUCTION... 3 DESCRIPTION...

More information

INVITATION TO BID. (This is not an order.)

INVITATION TO BID. (This is not an order.) Page 1 of 5 SCHEDULE OF EVENTS Event Description 1 / 1 Frequency Locator Receiver 4.00000 / Event Date The unit shall be a frequency locator receiver. The unit shall be of heavy-duty construction and capable

More information

Recommended Practices for Installation For EC Directive 2004/108/EC Relating to EMC Supplement to Installation and Operating Manual

Recommended Practices for Installation For EC Directive 2004/108/EC Relating to EMC Supplement to Installation and Operating Manual Recommended Practices for Installation For EC Directive 2004/108/EC Relating to EMC Supplement to Installation and Operating Manual 6/09 MN1383 Any trademarks used in this manual are the property of their

More information

School District City of Hamtramck Request for Proposal Copiers

School District City of Hamtramck Request for Proposal Copiers Request for Proposal Copiers Submission of Bid Bids shall be submitted in accordance with Instructions to Bidders. Sealed bids clearly labeled 2011 Copier Bid will be received by Hamtramck Public Schools

More information

BSPD Surge Protective Devices

BSPD Surge Protective Devices BUSSMANN Supersedes December 2016 SERIES BSPD Surge Protective Devices High capacity Type 1 and Type 2 SPDs for overvoltage protection on Contents Description Page Introduction 2 Applications 2 Features

More information

dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Safety information 1 General 2

dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Safety information 1 General 2 dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Operating Instructions Safety information 1 General 2 Mechanical installation 3 Electrical

More information