1 USU Small Satellite Conference 2008 SSC08-III-8 Plug and Play Small Satellite Solutions with Large Satellite Implications Lee Thienel Guy Robinson Dale Stottlemyer Rus Burgess Libration Systems Management, Inc Albuquerque, NM Scott Clough Vantage Systems Inc Lanham, MD
2 Agenda Introduction Modular Satellites TacSat II Plug N Play Sat Applicability to Midsize to Large Satellites Conclusions
3 Introduction Modular satellites are coming of age with projects such as AFRL s Plug and Play Satellite (PnPSat) PnPSat is using standardized interfaces, interface plates, and self realization to minimize development time and assembly, integration and test (AI&T) schedules.
4 The history of modular satellites In the 1970 s NASA developed the Multimission Modular Spacecraft (MMS) to be serviced using the space shuttle. The first MMS was Solar Max which launched in Today AFRL is building PnP Sat
5 Multimission Modular Spacecraft (MMS) Bus consists of 3 modules mounted to the Module Support Structure (MSS) Control & Data Handling Attitude Control System Power System Propulsion module added from underneath as needed Payload mounts to the CTA
6 MMS Projects and MMS Module Use Adapted from: Falkenhayn, E, Jr. Multimission Modular Spacecraft (MMS), AIAA , AIAA Space Programs and Technologies Conference 1988, Houston, TX.
7 The end of the MMS era As advances came in the 1980 s and 1990 s MMS technology became outdated For example the NSSC-I was no longer competitive Flexibility was not built into the design Standardization was on the module level not the component level
8 Responsive Space Connection to Plug and Play Satellite Development TacSat II AI&T 11 payloads/instruments Month AI&T program was the goal AI&T was 18 months and 2 days Small I&T Teams Working multiple aspects concurrently QA and CM built into the team not added on Use of a FlatSat for pre-integration check out Reduced integration times by 15 to 25%
9 Responsive Space Connection to Plug and Play Satellite Development TacSat II AI&T (continued) Integration flexibility minimized the impact of late deliveries Individual delays did not create greater delays Average payload or instrument was 5 ½ months late, impact on program was limited to 2 ½ months A 50% reduction in the top four AI&T activities would bring in the AI&T at under 12 months Mechanical, Interface Testing, System Level Testing, and Troubleshooting & Repair The use of standard interfaces should allow this to be achieved
10 Percentage of Time for Integration by Activity Type
11 Plug and Play Satellite Based on Self realizing components and modules Works similar to your computer Standardizing bus component and instrument interfaces allows: Established mechanical interface predetermined hole pattern Simplified harness design all interface connectors are the same P/N and pin out Harness fabrication with fewer errors becomes standard builds Safer integration Every identical connector is identically wired Shorter Assembly, Integration, and Test (AI&T) cycle
12 MID-SIZE AND LARGE SATELLITE APPLICABILITY Hubble Space Telescope: Used standard interfaces for the 4 axial instruments Used MMS heritage C&DH components for SI C&DH
13 Large Satellites Benefit from simplified harnesses Probably necessary to separate out the power lines from the interface connectors (contact size) Result is a data connector and a power connecter for each component AI&T benefits from accelerated schedule and reduced cost Safer integration Every identical interface connector interchangable Faster time to launch Reduced interface errors well defined and heritage
14 Conclusions The technologies being introduced in the Plug and Play Satellite have far reaching applications across the industry Components become interchangeable Reduces harness size The ability to reduce integration time represents a significant savings Shorter project development cycles will result in reduced per mission budgets allowing a fixed budget to cover more projects By standardizing interfaces and protocols innovation is possible and new higher capacity components can be used as they become available
Predictive Engineering: FEA Consulting Femap and NX Nastran PSD Analysis of Advanced R&D Satellite
Revolutionary satellite solution features modular design SpaceWorks provides unique and advanced satellite solutions. One of the company s current projects involves the development of the next-generation
More informationRapid Assembly of Spacecraft Structures for Responsive Space
Rapid Assembly of Spacecraft Structures for Responsive Space Honeybee Robotics Spacecraft Mechanisms Corporation Speaker: Ron Hayes, Chief Engineer Sadick, S. et al. Honeybee Robotics Client Focus Teamwork
More informationNew Space, small and pocket spacecraft
New Space, small and pocket spacecraft Chris Brunskill 01 July 2016 What is New Space? Nano and microsatellites provide easy access to space, trading reduced costs for greater risks Cost reduction The
More informationExample of Technology Development Program
Example of Technology Development Program SSTDM 2014 IISC, Bangalore, India April 1, 2014 Dr. Marco Villa CANEUS Small Satellites Director Tyvak VP Space Vehicle Systems Ground rules Power and Volume are
More informationPlug and Play Satellite Evolution
Plug and Play Satellite Evolution AIAA/USU Conference On Small Satellites August, 2009 SSC09-VI-4 Don Fronterhouse PnP Innovations, Inc SPA Genealogical Tree Adaptive Avionics Experiment Responsive Space
More informationAppliqué Sensor Interface Module: An Enabling Technology For Space PnP Systems
Appliqué Sensor Interface Module: An Enabling Technology For Space PnP Systems 15 Aug 2007 Lt Jeffrey Scott Project Lead, Compact Avionics Space Electronics Branch, Space Vehicles Directorate, Air Force
More informationBlue Canyon Technologies XB1 Enabling a New Realm of CubeSat Science. George Stafford BCT Range St, Suite 200 Boulder, CO 80301
Blue Canyon Technologies XB1 Enabling a New Realm of CubeSat Science George Stafford BCT 720.458.0703 1600 Range St, Suite 200 Boulder, CO 80301 About BCT Blue Canyon Technologies is a small business founded
More informationUKube-1: A Multi-Payload Technology Demonstration Platform. Ritchie Logan, Steve Greenland, Clyde Space Ltd
UKube-1: A Multi-Payload Technology Demonstration Platform Ritchie Logan, Steve Greenland, Clyde Space Ltd Outline 1. Timeline and functional overview 2. Payload Details & Management 3. Enabling Rapid
More informationPaper SSC03-XI-6. Autonomous Telemetry Collection for Single-Processor Small Satellites
Paper SSC03-XI-6 Autonomous Telemetry Collection for Single-Processor Small Satellites Dave Speer Northrop Grumman Electronic Systems Space Technology & Services 4276 Forbes Blvd. Lanham, MD 20706 On site
More informationTotal and Spectral solar Irradiance Sensor (TSIS-1) Project Overview
November 12, 2015 TSIS-1 Project Overview 1 Total and Spectral solar Irradiance Sensor (TSIS-1) Project Overview 2015 Sun-Climate Symposium Project Manager: Candace Carlisle Deputy Project Manager / Resources:
More informationTelemetry Processing and Display Ground System
The MPCS Multimission Telemetry Processing and Display Ground System Its Use in the Mars Science Laboratory Mission and Beyond Josh Choi, Lloyd Deforrest, Marti DeMore Jet Propulsion Laboratory California
More informationInterfaces Module Exploration Systems Engineering, version 1.0
nterfaces Module Exploration Systems Engineering, version 1.0 Exploration Systems Engineering: nterfaces Module Module Purpose: nterfaces Define interfaces, how they are described and why it is important
More informationSpace Robotics. Lecture #23 November 15, 2016 Robotic systems Docking and berthing interfaces Attachment mechanisms MARYLAND U N I V E R S I T Y O F
Lecture #23 November 15, 2016 Robotic systems Docking and berthing interfaces Attachment mechanisms 1 2016 David L. Akin - All rights reserved http://spacecraft.ssl.umd.edu Shuttle Remote Manipulator System
More informationHDD Virtual Reality Training Simulator. Controls Troubleshooting Guide V003
HDD Virtual Reality Training Simulator Controls Troubleshooting Guide V003 Table of Contents HDD VR Training Simulator Controls Troubleshooting Guide 1. Introduction... 3 2. Parts Description... 3 3. Wiring
More informationModular Platform Architecture for Small Satellites
Modular Platform Architecture for Small Satellites Quinn Young Space Dynamics Laboratory Utah State University Research Foundation 1695 North Research Park Way, North Logan, UT 84341; (435) 797-4120 quinn.young@sdl.usu.edu
More informationLockheed Martin Corporation. All Rights Reserved. 1
eileen.b.liu@lmco.com 1 LOCKHEED MARTIN HERITAGE 40 + years of planetary heritage Diverse mission requirements Incremental hardware evolution Strong operations focus Multiple NASA interfaces 2 LOCKHEED
More informationTAS RTU PRODUCTS. ADCSS 2015 Noordwijk. Thales Alenia Space 23/10/2015. Ref.: DOC-TAS-EN-001
TAS RTU PRODUCTS ADCSS 2015 Noordwijk 83230356-DOC-TAS-EN-001 TAS PRODUCTS & DEVELOPMENT 83230356-DOC-TAS-EN-001 TAS-BELGIUM HIGH POWER AVIONICS Development programme underway under ARTES R&D Modular PLDIU
More informationSpace Plug-and-Play Architecture Standard
BSR/AIAA S-133-5-201X Space Plug-and-Play Architecture Standard 28V Power Service DRAFT August 2011 Sponsored by American Institute of Aeronautics and Astronautics Approved XX Month 200X Abstract The SPA
More informationDevelopment of Formation Flight and Docking Algorithms Using the SPHERES Testbed
Development of Formation Flight and Docking Algorithms Using the Testbed Prof. David W. Miller MIT Allen Chen, Alvar Saenz-Otero, Mark Hilstad, David W. Miller Introduction : Synchronized Position Hold
More informationSolving problems and providing solutions since 1975.
Solving problems and providing solutions since 1975. A-Tech Corporation, d.b.a. Applied Technology Associates (ATA), is a privately held small business founded in 1975 and headquartered in Albuquerque,
More informationDRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter. June 23, Goddard Space Flight Center Greenbelt, Maryland
DRAFT Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter Cosmic Ray Telescope for the Effects of Radiation (CRaTER) to Spacecraft Electrical Interface Control Document (ICD) June 23, 2005 Goddard
More informationCisco Unified Computing System Delivering on Cisco's Unified Computing Vision
Cisco Unified Computing System Delivering on Cisco's Unified Computing Vision At-A-Glance Unified Computing Realized Today, IT organizations assemble their data center environments from individual components.
More informationThe Geostationary Operational Satellite R Series (GOES-R) SpaceWire Implementation
The Geostationary Operational Satellite R Series (GOES-R) SpaceWire Implementation Session: SpaceWire Missions and Applications William H. Anderson NASA Goddard Space Flight Center/MEI Technologies E-mail:
More informationDelta T Dew Heater for CDK
Delta T Dew Heater for CDK Delta T Dew Heater for CDK12.5 (125902) Your CDK 12.5 Delta T Dew Heater includes the following: QTY 1 Delta T control box w/ mounting bracket attached 1 2.5Amp AC adapter 2
More informationORS Mission Service Interface
ORS Mission Service Interface Prototyping a Compatible C2 Framework GSAW 2010 March 1 Rico Espindola, Terry Gold, Patricia Klein, Ben Lui, George Moretti 1 Purpose Describe Command and Control activities
More informationSSC14-V-9 UNCLASSIFIED UNCLASSIFIED LLNL-PRES
Government-owned CubeSat Next Generation Bus Reference Architecture Vincent Riot, Darrell Carter, Todd Decker, Lance Simms (LLNL) Jim Newman, Lara Magallanes, Jim Horning, David Rigmaiden (NPS) Meagan
More informationStart Relay Circuit - Test
Start Relay Circuit - Test System Operation Description: Use this procedure to troubleshoot any suspect problems with the circuit for the start relay. This procedure covers the following diagnostic codes:
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Accessory Application Publications No. MP3 ATTACHMENT KIT 2006 RIDGELINE AII 28615 Issue Date FEB 2005 PARTS LIST Attachment Kit: P/N 08B06-SJC-100 MP3 Player Kit (sold separately):
More informationN E W! SAI Panel Feed -Thro u g h S A I - M 1 2 / M 2 3 SA I- A New Wir ing Concep t. c o n c e p t s. c o s t s.
Data shee t SAI Panel Feed -Thro u g h S A I - M 1 2 / M 2 3 SA I- A New Wir ing Concep t SA I NPN-PNP N E W! Weidmuller is bringing innovative SAI integrator wiring solutions to help make your installation
More informationCoin Acceptors, Inc. Installation Instructions for the 4.3 Touch Screen Display
Coin Acceptors, Inc. Installation Instructions for the 4.3 Touch Screen Display Kit # 410930 and 410930-1 DN3800 and DN5800 Publication 928412 1 Hand Drill Utility Knife Step Ladder 5/8 Drill Bit Tools
More informationInstallation Instructions Models CC-5 / CC-2
Installation Instructions Models CC-5 / CC-2 System Cardcage CC-5 (500-633037 / S24235-B123-A1) System Cardcage CC-2 (500-633440 / S24235-B122-A1) INTRODUCTION The SIEMENS Model CC-5 Cardcage (see Figure
More informationYour Company Logo Here. Flying High-Performance FPGAs on Satellites: Two Case Studies
Your Company Logo Here Flying High-Performance FPGAs on Satellites: Two Case Studies Introduction Often when considering flying a FPGA or other high-performance device the first thoughts might be how will
More informationOverview of Proximity Operations Missions Relevant to NanoSats
Overview of Proximity Operations Missions Relevant to NanoSats Scott MacGillivray, President Tyvak Nano-Satellite Systems LLC (714) 392-9095 scott@tyvak.com 18 April 2012 This document does not contain
More informationGOES-R SpaceWire Implementation
GOES-R SpaceWire Implementation William Anderson GSFC/MEI Technologies Inc. William.H.Anderson@nasa.gov International SpaceWire Conference 2007 Dundee, Scotland, UK September 17, 2007 1 GOES-R SpaceWire
More informationPerformance Characterization of a Space Plug-and-Play Avionics Appliqué Sensor Interface Module
Infotech@Aerospace 2011 29-31 March 2011, St. Louis, Missouri AIAA 2011-1502 Performance Characterization of a Space Plug-and-Play Avionics Appliqué Sensor Interface Module William L. Walker 1 Applied
More informationCurrent Joint Polar Satellite System (JPSS) Common Ground System (CGS) Technical Performance Measures (TPMs)
Current Joint Polar Satellite System (JPSS) Common Ground System (CGS) Technical Performance Measures (TPMs) Shawn Miller Milt Panas Kerry Grant Mike Jamilkowski 13 January 2015 Copyright 2016 Raytheon
More informationHydraulics with IO-Link: Reduced effort, high value
Hydraulics with IO-Link: Reduced effort, high value Standardized wiring and electronic name plate support commissioning and increase availability Open standard for bi-directional point-to-point connections
More informationPlug-and-Play Satellite (PnPSat)
Plug-and-Play Satellite (PnPSat) Session: Missions and Applications Long Paper Don Fronterhouse 1 Scientific Simulation, Inc. 2951 Marina Bay Dr. #130-306, League City, TX 77573 Jim Lyke 2 Air Force Research
More informationOverhauling the Astrium Satellite Business
Overhauling the Astrium Satellite Business Antoine Bouvier Global Investor Forum Munich 28 th /29 th April 2003 1 Astrium key figures Satellite revenues in 2002 : 1 201 M 91% Europe, 5% North America,
More informationSustain.Ability Honeywell Users Group EMEA. Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time
Sustain.Ability. 2012 Honeywell Users Group EMEA Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time Customer Needs Challenges: - Project becoming increasingly complex
More informationOperationally Responsive Space Office
Operationally Responsive Space Office Operationally Responsive Space: Transforming the Space Enterprise 13 th ISU Annual International Symposiium 19 February 2009 by Dr. Peter Wegner, ORSO Director 21
More informationInSight Single Implement
Note: Indented items indicate parts Included in an assembly listed above Part name/description Part Number Quantity DirectCommand 4100544 1 Cable Install Kit 2000901-1 1 Module Mounting Plate Kit 2001358
More informationImproving Prototype Validation with NI Multisim and LabVIEW. Bhavesh Mistry, Product Manager National Instruments
Improving Prototype Validation with NI Multisim and LabVIEW Bhavesh Mistry, Product Manager National Instruments bhavesh.mistry@ni.com 1 Modern Design Having to Do More Time to market continues to shrink
More informationLX Navigation d.o.o LX Mini Map short form LX Mini Map. Short form catalogue
LX Mini Map LX Mini Map Short form catalogue LX Mini map is Windows CE 5.0 running device which is supported by sunshine readable color display with backlight and touch panel. Aluminum housing makes the
More informationNext-Generation Distributed Satellite Bus Information Systems
What s Coming on Spacecraft: Next-Generation Distributed Satellite Bus Information Systems L. H. Miller, M. M. Gorlick, D. L. Wangerin, C. A. Landauer The Aerospace Corporation 29 February 2012 The Aerospace
More informationHitachi Adaptable Modular Storage and Hitachi Workgroup Modular Storage
O V E R V I E W Hitachi Adaptable Modular Storage and Hitachi Workgroup Modular Storage Modular Hitachi Storage Delivers Enterprise-level Benefits Hitachi Adaptable Modular Storage and Hitachi Workgroup
More informationDARPA Phoenix Payload Orbital Delivery (POD) System: Progress towards Small Satellite Access to GEO
DARPA Phoenix Payload Orbital Delivery (POD) System: Progress towards Small Satellite Access to GEO Erin Fowler DARPA SETA Coauthors: LtCol Larry Gunn, Dr. Jeremy Palmer DARPA Program Managers Joanne Leung,
More informationD-Series High Reliability Circular Connectors
D-Series High Reliability Circular Connectors Technology Company, Inc. integramate D-Series Circular Connectors QA Technology integramate D-Series Connectors are high quality, plastic circular connectors
More informationPower Distribution Unit (PDU) Specification - Level V Specification
Document # Date effective LAT-SS-06988-02 10/05/2005 Author(s) Supersedes Patrick Young Rev 01 Subsystem/Office Electronics & DAQ Subsystem Document Title Power Distribution Unit (PDU) Specification -
More informationInnovation for system integration
Innovation for system integration PERFORMANCE MADE SMARTER PR backplane A user-friendly and reliable mounting solution between the DCS/PLC/SIS system and isolators/i.s. interfaces TEMPERATURE I.S. INTERFACES
More informationSEER-H Space Guidance
SEER-H Space Guidance Revision 2.0 April 25, 2016 Table of Contents 1. Introduction 2. Mapping SEER to NASA WBS 2.1. NASA Work Breakdown Structure 3. Starting a New Project 4. Project Structure in SEER
More information> OLEODL Workshop > Christopher Schmidt OSIRIS Update and Outlook. Christopher Schmidt Institute of Communications and Navigation
DLR.de Chart 1 OSIRIS Update and Outlook Christopher Schmidt Institute of Communications and Navigation DLR.de Chart 2 OSIRIS Design Roadmap OSIRISv1: Open-Loop Body Pointing 200 Mbit/s OSIRISv2: Closed-Loop
More information09. DIN CONNECTORS
. 41 612 CONNECTORS Connectors that comply with 41 612 have been in use for years for both board-to-board applications and cable-to-board applications. Their robustness and universality are legendary.
More informationA SPA-1 Enabled Plug-and-Play CubeLab for ISS Payloads
A SPA-1 Enabled Plug-and-Play CubeLab for ISS Payloads Zachary Jacobs *, Samir Rawashdeh, James E. Lumpp Jr. University of Kentucky, Lexington, KY 40506 This paper describes the design and development
More informationVIPAC Array Family. of DC-DC Converters Up to 750 Watts. Description & Installation Guide. Product Description
2 VIPAC Array Family of DC-DC Converters Up to 70 Watts Description & Installation Guide Product Description The VIPAC Array is a highly flexible system of DC input, power building-blocks that can be configured
More information1 COMMAND AND DATA HANDLING (C&DH)
1 COMMAND AND DATA HANDLING (C&DH) 1.1 Requirements and Design Drivers 1.1.1 Functional The command and data handling shall provide the capability to: Transfer information in digital or discrete representation
More informationSEER-H Space Guidance
SEER-H Space Guidance Revision 2.2 June 8, 2016 Table of Contents 1. Introduction 2. Mapping SEER to NASA WBS 2.1. NASA Work Breakdown Structure 3. Starting a New Project 4. Project Structure in SEER 4.1.
More informationMission Enabling Compact Avionics Systems
Mission Enabling Compact Avionics Systems Next Generation Cubesat Bus Design Brian Tubb Cubesat Limitations Rundown Previous Bus Design Results Problems Outline Paradigm Shift with Lightsail CP7 New Requirements
More informationREMOVE COVERS. 1. Remove three screws from the Side Panel (L). 2. Slide the Side Panel (L) backward, and raise it to remove from the printer.
REMOVE COVERS 1. Remove three screws from the Side Panel (L). 2. Slide the Side Panel (L) backward, and raise it to remove from the printer. 3. Fully open the Top Cover. 4. Release the tab on the right
More informationDEEP: Dallas EEProm Equipment Profile for Rapid Integration and Automatic System Modeling
SSC07-IX-1 DEEP: Dallas EEProm Equipment Profile for Rapid Integration and Automatic System Modeling Forrest Rogers-Marcovitz Aerospace Systems Laboratory, Washington University in Saint Louis Phelps Williams
More informationInstallation Instructions
Second Kit for the GrandSTAR Jukebox Kit #26694913 Purpose: These instructions outline the procedures to install a second 1000W into the GrandSTAR jukebox with the AV controller (shown) or the 4 Channel
More informationDirectCommand Installation DirectCommand Complete Wiring Harness
Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number With Switch Box Quantity by Model With Boom Switch Cable Display Cable Kit 4100814 1 1 Power Control
More informationSpacecraft Communications Payload (SCP) for Swampworks
Spacecraft Communications Payload (SCP) for Swampworks Joseph A. Hauser Praxis, Inc. 2550 Huntington Avenue Suite 300 Alexandria, VA 22303 phone: (703) 682-2059 fax: (703) 837-8500 email: hauserj@pxi.com
More informationINTELLIGENT PROGRAMMABLE DRIVES BECOME A CONTROL FOR THE ENTIRE MACHINE
INTELLIGENT PROGRAMMABLE DRIVES BECOME A CONTROL FOR THE ENTIRE MACHINE Josef Hammer, Siemens Energy & Automation Norcross, GA Abstract - Mechatronic solutions and modular machine concepts become more
More informationSystem F6: Progress to Date Small Satellite Conference 2012 Monday August 13, 2012 Session I: The Horizon
System F6: Progress to Date Small Satellite Conference 2012 Monday August 13, 2012 Session I: The Horizon LtCol (Sel) John Losinski, DARPA/TTO Dr. Owen Brown, Kinsey Technical Services, Inc. Dr. Elwin
More informationMission Enabling Compact Avionics Systems
Mission Enabling Compact Avionics Systems Next Generation Cubesat Bus Design Brian Tubb Ø Cubesat Limitations Rundown Ø Previous Bus Design Ø Results Problems Outline Ø Paradigm Shift with Lightsail CP7
More informationBUILDING NETWORK SOLUTIONS GUIDE
BUILDING NETWORK SOLUTIONS GUIDE designed to be better. INTEGRATED SOLUTIONS BUILDING NETWORK CHALLENGES Constantly evolving technologies are driving connectivity expectations and moving interactions to
More informationOn-Board Data Systems
On-Board Data Systems Ph. Armbruster TEC-ED Email: philippe.armbruster@esa.int Slide : 1 Avionics for multi-mission platforms, hard Facts Avionics take an important share of the platform cost Many building
More informationPCB Terminals and Connectors. Capabilities Brochure. Phone: Fax: Web: -
PCB Terminals and Connectors Capabilities Brochure Connectivity Solutions are a Matter of... Application Knowledge With over 60 years in the industry, Weidmuller offers unmatched depth in thousands of
More informationLeading in the compute era. Delivering the right compute, for the right workload, at the right economics every time.
Leading in the compute era Delivering the right compute, for the right workload, at the right economics every time. The company that brought HP introduces ProLiant you the you first 25 years to the of
More informationOn Design for Reliability
On Design for Reliability of Electronics in Nanosatellite Olga Mamoutova (presenter) Andrey Antonov Peter the Great St. Petersburg State Polytechnic University, Russia Dpt. of Computer Systems & Software
More information11 th Annual CubeSat Developers Workshop
11 th Annual CubeSat Developers Workshop NearSpace Launch, Inc. Satellite Globalstar Products: Technology, Service, and Education TSAT Communication First Results EyeStar: A Paradigm Shift 25 // 04 //
More informationSGEO: Overview and Product Offering. Marco R. Fuchs. Marco R. R. Fuchs. DLR-ESA Workshop on ARTES 11. Marco R. Fuchs OHB Technology AG
DLR-ESA Workshop on ARTES 11 SGEO: Overview and Product Offering Marco R. R. Fuchs June June29, 29, 2006 2006 Tegernsee, Tegernsee, Germany Germany Marco R. Fuchs Marco R. Fuchs OHB Technology AG OHB Technology
More informationWireless Open-Source Open Controlled Command and Control System WOCCS Design Project. User Manual
MSD - 2011 Rochester Institute of Technology Wireless Open-Source Open Controlled Command and Control System WOCCS Design Project User Manual Revision 1 P11204 Systems Level User Manual WOCCS User Manual
More informationIntroducing ubo 1. Build your ubo 5. Parts List Build Guide - 7-8
Welcome To SPACE Introducing ubo 1 Build your ubo 5 Parts List Build Guide - 7-8 Introducing The ubo kit is a satellite you can build yourself. This guide will give you all the information you need to
More informationSPACECRAFT MECHANISMS SPACECRAFT MECHANISMS
SPACECRAFT MECHANISMS SPACECRAFT MECHANISMS OVERVIEW MANUFACTURING CAPABILITIES Moog produces mechanisms for spacecraft Class 100 certified laminar flow work stations motion control with design and flight
More informationKinetix 6000 Axis Module and Shunt Module
Installation Instructions Kinetix 6000 and Shunt Module Catalog Numbers 2094-AMxx, 2094-BMxx 2094-AMxx-S, 2094-BMxx-S 2094-BSP2 Topic Page About This Publication 1 Important User Information 2 Before You
More informationGSAW2001 Breakout Session 2 Outbrief. Standards and interoperability: space missions in the Internet era
GSAW2001 Breakout Session 2 Outbrief Standards and interoperability: space missions in the Internet era Adrian J. Hooke Jet Propulsion Laboratory California Institute of Technology 23 February 2001 Standardization
More informationSpaceFibre Flight Software Workshop 2015
SpaceFibre Flight Software Workshop 2015 Steve Parkes, University of Dundee Albert Ferrer Florit, Alberto Gonzalez Villafranca, STAR-Dundee Ltd. David McLaren, Chris McClements, University of Dundee Contents
More informationALL STAR Payload Interface Control Document Outline ALL STAR-SYS.402.3
1 ALL STAR Payload Interface Control Document Outline ALL STAR-SYS.402.3 Revision Date Authored By Description 0 7/9/10 Jessica Brown Initial Release 1 1/4/11 Jessica Brown Riley Pack Additional Details
More informationA Universal Interface for Modular Spacecraft. Lennon Rodgers
SSC05-I-3 A Universal Interface for Modular Spacecraft Lennon rodgers@mit.edu Nicholas Hoff, Elizabeth Jordan, Michael Heiman, David W. Miller nhoff@mit.edu, ejordan@mit.edu, michaelh@mit.edu, millerd@mit.edu
More informationIntel: Driving the Future of IT Technologies. Kevin C. Kahn Senior Fellow, Intel Labs Intel Corporation
Research @ Intel: Driving the Future of IT Technologies Kevin C. Kahn Senior Fellow, Intel Labs Intel Corporation kp Intel Labs Mission To fuel Intel s growth, we deliver breakthrough technologies that
More informationWhat s next for satellite systems. Dr. Bruce Chesley, Boeing Network & Space Systems 27 October 2016
What s next for satellite systems Dr. Bruce Chesley, Boeing Network & Space Systems 27 October 2016 Commercial & Civil Satellites 2600 years in Orbit and Coun3ng Syncom (1963) 1 analog TV channel ViaSat-2
More informationChapter 3: Computer Assembly
Chapter 3: Computer Assembly IT Essentials v6.0 ITE v6.0 1 Chapter 3 - Sections & Objectives 3.1 Assemble the Computer Build a Computer. 3.2 Boot the Computer Explain how to verify BIOS and UEFI settings.
More informationEnabling technologies for downstream services. Steve Greenland Clyde Space Ltd
Enabling technologies for downstream services Steve Greenland Clyde Space Ltd Clyde Space view: needs of downstream developers 1. Standardised, modular, and reusable building blocks for satellite development
More informationSpaceWire: Key principles brought out from 40 year history
SpaceWire: Key principles brought out from 40 year history SSC06-III-4 Paul Walker, Barry Cook 4Links Limited Bletchley Park, Milton Keynes, England MK3 6ZP; +44 1908 642001 paul, barry,@4links.co.uk ABSTRACT:
More informationScope adapters and probes. Surface mount QFP Logic Analyzer adapters
Logic Analyzer Adapters Logic Analyzer and scope adapters are designed to give access to each signal pin on a high-density IC. Some variations are specifically adapted to connect to a specific logic analyzer
More informationModular Jack Slimline Product Presentation
Product Presentation Basics Portfolio Agenda Value Proposition Product Overview Product Specifications Features & Benefits Markets & Applications Collaterals Product Presentation- 2 Value Proposition Amphenol
More informationNEW S Laser Scanner S 3000 Leading the way in stationary and mobile safeguarding of danger areas. IEC compliant. Product information
NEW S 3000 Product information Laser Scanner S 3000 Leading the way in stationary and mobile safeguarding of danger areas IEC 61508 compliant Economy and User Benefits Setting the standards throughout
More informationATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES
Hard Drive Removal IMPORTANT NOTE: If you are replacing a PATA hard drive with a SATA hard drive, please see PATA to SATA Hard Drive Conversion. Hard Drive Identification: To determine whether your hard
More informationP7000 Stepper Drives. P7000 Introduction
P7 Introduction P7 Stepper Drives Danaher Motion introduces the P7 Series Stepper Drives. Previously unheard of stepper features allow the P7 to provide true servo-like performance at a fraction of the
More informationData Structures and Algorithms of Intelligent Web-based System for Modular Design
INSTITUTE OF INFORMATION AND COMMUNICATION TECHNOLOGIES BULGARIAN ACADEMY OF SCIENCE Data Structures and Algorithms of Intelligent Web-based System for Modular Design Ivan Mustakerov, Daniela Borissova
More informationCabling Best Practices Using Fast Channel TM Switch Connect. Marc Dunham, Methode - Data Solutions
Cabling Best Practices Using Fast Channel TM Switch Connect Marc Dunham, Methode - Data Solutions ABSTRACT With the continued growth of port count density in data center hardware, end users are presented
More informationDistribution Devices - Outlets, Jacks, & Plates
35564W Modular Tel Jack 4con Eaton Wiring Devices Catalog Number 35564W Manufacturer Eaton Wiring Devices Description Telephone Jack, Modular Jack; White; Thermoplastic; 4 Wire RJ11/RJ14; Category 3; Surface
More informationGarage Door Control Button. What s inside: Quickstart Guide Model No. WGO x Garage Door Control Button
Add-On Device Quickstart Guide 1 Garage Door Control Button Quickstart Guide Model No. WGO2001 What s inside: 1x Garage Door Control Button 1x Power Adapter 2x U-fork Wires Mounting Accessories and Double-sided
More informationAg Leader Technology. DirectCommand Installation RoGator Model Years
Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Direct Command Kit 4100550 1 Dual Lock 2000052-9 1 Dual Lock 2000053-9 1 Hardware Kit
More information3.3 Integrate Reconfigurable Mass Interconnect Solutions. Evaluating Platforms for Performance and Reusability
3.3 Integrate Reconfigurable Mass Interconnect Solutions Evaluating Platforms for Performance and Reusability 157 What is a MASS INTERCONNECT? Creates Order From Chaos 158 Mass Interconnect Standardize
More informationATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES
Hard Drive Removal IMPORTANT NOTE: If you are replacing a PATA hard drive with a SATA hard drive, please see PATA to SATA Hard Drive Conversion. Hard Drive Identification: To determine whether your hard
More informationAttaining PMBus Adoption in Spaceborne Power Systems
Attaining PMBus Adoption in Spaceborne Power Systems APEC 2018 PMBus Industry Session Presented by: Tim Meade Staff Applications Engineer Sr. Pr. Cobham Semiconductor Solutions March 8, 2018 0 Agenda Introduction
More informationAssuring Certainty through Effective Regression Testing. Vishvesh Arumugam
Assuring Certainty through Effective Regression Testing Vishvesh Arumugam Agenda Introduction The Problem Magnitude Management Regression Test Efficiency Solution and Approach Test Suite Maintenance Determining