Memorandum. This memorandum requires Committee action.
|
|
- Gyles Atkins
- 5 years ago
- Views:
Transcription
1 California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure Development Date: June 7, 2006 Re: Approval of City of Riverside 230kV Transmission Interconnection Project This memorandum requires Committee action. EXECUTIVE SUMMARY This memorandum is a request for the ISO Operations Committee to recommend the Board s approval of the City of Riverside 230 kv Transmission Interconnection Project described as Option 1 in this memorandum. This project, which is needed as soon as possible to reliably serve load growth in the City of Riverside, includes a loop in the Mira Loma-Vista #1 230 kv transmission line and construction of a new 230/66 kv Substation. The estimated cost of the project is $ 52.5 million in 2008 dollars - $ 48.2 million for ISO controlled facilities and $ 4.3 million for non-iso controlled facilities. MOVED, that the Operations Committee recommends that the Board of Governors grant its approval of: the City of Riverside Transmission Project (Option 1 as described in this Memorandum dated June 7, 2006) as a necessary and cost effective addition to the ISO Controlled Grid and Directs Southern California Edison (SCE) to complete the construction of the City of Riverside Transmission Project as soon as possible and preferably no later than Q2, 2008; and support of SCE recovery of reasonably incurred costs associated with the permitting and construction of the City of Riverside Transmission Project (Option 1 as described in this Memorandum dated June 7, 2006) in relevant FERC and CPUC rate cases. ISSUE STATEMENT An interconnection study request was made by the Riverside Public Utilities (RPU) for the City of Riverside after Southern California Edison (SCE) had indicated that the existing 230/66 kv point of interconnection between SCE and Riverside at SCE s Vista Substation will not be adequate to serve Riverside s increased load in the future. The 2005 actual peak load 151 Blue Ravine Road Folsom, California (916)
2 was 552 MW. The projected 2006 peak load of 583 MW (1-in-10 year forecast) will exceed the combined capacity of the two A transformer banks (557 MVA) used to provide service to the City of Riverside. 1 SCE has determined that there are physical size limitations that restrict the expansion of the existing Vista 230 kv switch-rack. Expansion of the 230 kv bus by installation of another 230 kv bus across from the substation connected by 230 kv underground (UG) cables is also not possible due to an existing UG pipeline. Further expansion of the Vista Substation is not viable and it is not desirable to continue with a single point of service for the City of Riverside. A second point of service is required for the City of Riverside. OPTIONS TO SOLVE PROBLEM OR DEAL WITH THE ISSUE Three options were investigated to provide a second point of service to the City of Riverside. Option 1: Loop the existing Mira Loma-Vista #1 230 kv line by building 8.25 miles of new 230 kv double circuit transmission line from the existing Mira Loma-Vista #1 T/L ROW to into a new 230 kv SCE interconnection facility with RPU s new Jurupa Substation in Riverside. Option 2: Build a 230 kv SCE interconnection facility located at Riverside s new Jurupa Substation with two new 230 kv lines from the Mira Loma and Vista substations to the new Jurupa Substation. Option 3: Build a new SCE 230 kv interconnection facility adjacent to the existing Mira Loma Vista 230 kv rightof-way with new 8.25 miles of double circuit 230 kv transmission to a new Riverside 230/66 kv Jurupa Substation. SCE studies concluded that Options 2 was impractical 2 and Option 3 cost higher than Option 1. Option 1 would have no adverse system impacts and no system upgrades are necessary other than those facilities necessary to loop the Mira Loma-Vista #1 230 kv transmission line and the SCE constructed 230 kv substation. The recommended Option 1 is shown in the attached Figure 1. Also shown are the ISO and non-iso controlled facilities. RPU proposes to serve about half of its retail load radially from Vista Substation and the other half from the new Jurupa 230/66 kv substation 283 MW of the year 2008 load will be transferred from six existing 66/12 kv substations currently being supplied from the 230/66 kv Vista Substation. The new 230/66 kv Jurupa Substation is planned to serve up to 560 MW of existing and future load. RPU may not parallel the facilities served by the Jurupa Substation with any other electrical facilities served by SCE or others without receiving review and authorization. POSITIONS OF THE PARTIES Both RPU and SCE support the project and have formally requested ISO Board approval. SCE plans to finance, construct, own and maintain the new transmission facilities of the project upon Board approval and receipt of other necessary regulatory approvals. SCE intends that the $ 48.2 million cost of the ISO-controlled facilities constructed and 1 The capability of the existing supply from Vista may be exceeded this summer. To overcome this Riverside has two internal generating plants, with a combined nominal rating of 140 MW. This generation will be used to maintain the Vista transformer loading within acceptable limits, until the Jurupa Project can be constructed. 2 Option 2 is not feasible due to physical limitation at the Vista 230 kv bus.! Page 2
3 owned by SCE will be recovered through the ISO transmission access charge. SCE would recover the $ 4.3 million for non-caiso facilities from the City of Riverside (RPU) through their Wholesale Distribution Access Tariff (WDAT). Both SCE and City of Riverside (RPU) are Participating Transmission Owners pursuant to the ISO Tariff. RPU and SCE have entered into an Interim Agreement in order to expedite certain pre-construction activities while an Interconnection Agreement is developed that contains terms for RPU to interconnect to the SCE electrical system and for SCE to construct, own, operate and maintain the 230 kv lines and 230 kv substation developed pursuant to SCE s TO tariff. RPU will construct, own, operate and maintain the 66 kv switchyard facilities with 2-230/66 kv, 280 MVA transformers. MANAGEMENT RECOMMENDATION Based on the assessments performed, ISO Management recommends approval of the City of Riverside Transmission Interconnection Project. The City of Riverside may not parallel the facilities served by the Jurupa Substation with any other electrical facilities served by SCE or others without receiving review and authorization. MOVED, that the Operations Committee recommends that the Board of Governors grant its approval of: the City of Riverside Transmission Project (Option 1 as described in this Memorandum dated June 7, 2006) as a necessary and cost effective addition to the ISO Controlled Grid and directs Southern California Edison Company (SCE) to complete the construction of the City of Riverside Transmission Project as soon as possible and preferably no later than Q2, 2008; and support of SCE recovery of reasonably incurred costs associated with the permitting and construction of the City of Riverside Transmission Project (Option 1 as described in this Memorandum dated June 7, 2006) in relevant FERC and CPUC rate cases.! Page 3
4 Figure 1 Recommended Option 1 for City of Riverside 230 kv Transmission Interconnection Project To Mira Loma Substation Existing Mira Loma Vista Line #1 230 kv T/L To Vista Substation New 8.25 miles of 230 kv double-circuit transmission line 230 kv Highlight indicates Non-ISO Controlled Facilities New Jurupa Substation SCE Riverside WW WW kv, 280 MVA Transformer To City of Riverside! Page 4
5 ! Page 5 Figure 2 Proposed for City of Riverside 230 kv Transmission Interconnection Project
From: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO
ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) )
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E For a Permit to Construct Electrical Facilities With Voltages
More informationInterconnection and Transmission
Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationITC HOLDINGS, CORP. Edison Electric Institute 9
ITC HOLDINGS, CORP. Company Background: ITC Holdings, Corp. is in the business of investing in electricity transmission infrastructure as a means to improve electric reliability, connect renewable energy
More information2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning
Application No.: Exhibit No.: Witnesses: A.1-0- SCE-0, Vol. 0 R E. Takayesu A (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume R System Planning Before the nd Errata Public Utilities
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (APRIL 2017) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER07-1034-002 REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More information2015 General Rate Case
Application No.: Exhibit No.: Witnesses: A.1--00 SCE-0, Vol. 0 R. Woods E. Takayesu (U -E) 01 General Rate Case ERRATA Transmission and Distribution (T&D) Volume System Planning Capital Projects Before
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (JANUARY 2017) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationDominion Supplemental Projects
Dominion Supplemental Projects Transmission Expansion Advisory Committee October 11, 2018 Needs Need Number: DOM-2018-0017 Meeting Date: 10/11/2018 Process Stage: NEED Supplemental Project Driver: Customer
More informationDelaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation
Steve Rutty Director, Grid Assets Lou Fonte Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation Lead Engineer, Grid Assets September 3, 2014 Transmission Planning
More informationFebruary 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
California Independent System Operator Corporation February 18, 2015 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationJanuary 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (JANUARY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationIntroduction to the NYISO
Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the
More informationSmall Generator Interconnection System Impact Study Report. Completed For Q0047
Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection
More informationWritten Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator
Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities
More informationJuly 1, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION
Donald A. Fellows, Jr. Manager of Revenue and Tariffs July 1, 1999 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction of Facilities
More informationProject Presentation April, 2017
Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern
More informationFeasibility Study on Load Flow and Short Circuit Project
Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November
More informationPacifiCorp Transmission Technical Workshop
PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt
More informationWestern Spirit Clean Line Project. Non Tariff Interconnection Facilities Study
Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean
More informationERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018
ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 Purpose The purpose of this Practice Guide is provide a reference to be used
More informationWORKPAPERS TO PREPARED DIRECT TESTIMONY OF DAVID BUCZKOWSKI ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES
Application of SOUTHERN CALIFORNIA GAS ) COMPANY for authority to update its gas ) requirement and base rates ) effective January 1, 2019 (U 904-G) ) Application No. 17-10- Exhibit No.: (SCG-11-CWP) WORKPAPERS
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: January 30, 2019 Re: Decision on
More informationGenerator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281
Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking Regarding Policies, Procedures and Rules for the California Solar Initiative, the Self-Generation Incentive
More informationAppendix 1 Interconnection Request INTERCONNECTION REQUEST
Appendix 1 Interconnection Request INTERCONNECTION REQUEST NO HARD COPY REQUIRED FOR INTERCONNECTION REQUESTS SUBMITTED ELECTRONICALLY VIA RIMS 5 Provide one hard copy of this completed form pursuant to
More informationSystem Impact Study for Power Supply 400 MW Import on the EAL BCHA Path
System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path Report No: NPP2000-21 September 13, 2001 Network Performance Planning Department T&D Engineering Executive Summary BC Hydro Power
More informationSMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM
SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM 1. Instructions By completing this request form, an Interconnection Customer may request a preapplication report from the NYISO regarding the
More informationInterconnection Re-MAT September 11, 2013
Interconnection Re-MAT September 11, 2013 2013 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Distribution System Interconnection Processes Rule 21 - Governed by CPUC Wholesale
More informationFebruary 25, Subject: Southern California Edison 2015 Annual Progress Report
February 25, 2015 Mr. Tracy Rolstad, Chair WECC Technical Studies Subcommittee Avista Corp. 1411 East Mission Avenue Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff Salt Lake City, UT 84103-1114
More informationQuarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan
Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability
More informationPublic Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM
Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationGenerator Interconnection Process. Wholesale Transmission Overview
1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent
More informationJuly 26, Dear Mr. Millar:
July 26, 2012 Mr. Neil Millar Executive Director Infrastructure Development California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Dear Mr. Millar: As you are aware, Clean
More informationTransWest Express Transmission Project Interregional Transmission Project Submittal
TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March
More informationDistributed Generation Interconnection in Illinois
Distributed Generation Interconnection in Illinois David Rearden January 31, 2014 1a In the beginning Electricity system was vertically integrated: the utility generated the electricity, transmitted to
More informationHistory of NERC August 2013
History of NERC August 2013 Timeline Date 1962 1963 November 9, 1965 1967 1967 1968 June 1, 1968 July 13 14, 1977 1979 Description The electricity industry creates an informal, voluntary organization of
More informationBusiness Update. Al Fohrer Chief Executive Officer Southern California Edison Company. Merrill Lynch Power & Gas Conference September 2006
Business Update Al Fohrer Chief Executive Officer Southern California Edison Company Merrill Lynch Power & Gas Conference September 2006 Forward-Looking Statement This presentation contains forward-looking
More informationWarrenton Wheeler Gainesville 230kV Reliability Project
Warrenton Wheeler Gainesville 230kV Reliability Project February 28, 2013 Key Messages Dominion Virginia Power and Northern Virginia Electric Cooperative (NOVEC) have been working together to address three
More informationHistory of NERC December 2012
History of NERC December 2012 Timeline Date 1962-1963 November 9, 1965 1967 1967-1968 June 1, 1968 July 13-14, 1977 1979 1980 Description Industry creates an informal, voluntary organization of operating
More informationScreening Procedures for Access to ISO Register of Transmission Facilities and Entitlements
Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements In accordance with the Federal Energy Regulatory Commission (FERC) order issued on January 24, 2003 (as modified
More informationATTACHMENT I: Generator Interconnection Procedures (GIP)
ATTACHMENT I: Generator Interconnection Procedures (GIP) Section 1. Application 1.1 Applicability 1.1.1 The objective of this GIP is to implement the requirements for Generating Facility interconnections
More informationSouthern California Edison. Leading the Way in Electricity TM
Southern California Edison Leading the Way in Electricity TM Smart Metering Essentials at SCE End-Use Energy Reductions through Monitoring, Feedback, and Behavior Modification Precourt Institute for Energy
More informationRevised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )
Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original
More informationTransWest Express and Gateway South
TransWest Express and Gateway South Co-developed by four leading entities: Arizona Public Service PacifiCorp National Grid Wyoming Infrastructure Authority Regional Stakeholder Meeting January 23, 2008
More informationThe NYISO shall assign a Queue Position based upon the date and time of receipt of the
30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection
More informationAgreements & Queue Management
Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems
More informationJoint Transmission Planning Base Case Preparation Process
California Independent System Operator & Southern California Edison Joint Transmission Planning Base Case Preparation Process NERC Reliability Standard MOD-032-1 Version 1.2 August 31, 2017 INTENTIONALLY
More informationFunding California Investor Owned Utilities Smart Grid Technologies & Deployments
Funding California Investor Owned Utilities Smart Grid Technologies & Deployments Wendy al-mukdad, PE Utilities Engineer Grid Planning & Reliability Section, Energy Division California Public Utilities
More informationRFP Attachment 13. January 2010
PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION HORUS Central Valley Solar 1, LLC ) HORUS Central Valley Solar 2, LLC ) ) v. ) Docket No. EL16-104-000 ) California Independent
More informationGeneration, Transmission, and End User Facilities
Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3
More informationUnofficial Comment Form
Generator Requirements at the Transmission Interface (Project 2010-07) Please DO NOT use this form to submit comments. Please use the electronic comment form to submit comments on the first formal posting
More informationONCOR INFRASTRUCTURE DEVELOPMENT
ONCOR INFRASTRUCTURE DEVELOPMENT Ellen Buck Presentation to Leadership North Texas March 27, 2015 ONCOR: 100 YEARS AND COUNTING Largest Texas regulated utility More than 3,000 employees 10 million living
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process
More informationSilicon Valley Power:
Critical Facilities Roundtable Silicon Valley Power: Santa Clara s Hometown Advantage John Roukema Assistant Director Silicon Valley Power June 2, 2006 1 SVP: Santa Clara s Hometown Advantage High value
More informationWELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER
WELCOME Draft Energy Storage Roadmap Draft Matrix Stakeholder Call November 3, 2014 San Francisco SAFER, SMARTER, GREENER Alignment of Proposed Actions to Storage Configuration and Use Cases Robert Anderson,
More informationDemand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.
Power delivery Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Forward-thinking power grid design This evolution has
More informationSmall Hydro Regulatory and Permitting Requirements California
Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator
More informationTransmission Register PTO Admin User Manual. Version 1.0
Transmission Register PTO Admin User Manual Version 1.0 Table of Contents 1. INTRODUCTION... 3 1.1. Purpose...3 1.2. Scope...3 1.3. Definitions...3 2. COMPONENTS HOMEPAGE... 6 2.1. Find Components...6
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More information2012 General Rate Case
Application No.: Exhibit No.: SCE-0, Vol. 0 Part 0 & 0, Ch. I-II Witnesses: P. Arons K. Varnell (U -E) 01 General Rate Case Transmission And Distribution Business Unit (TDBU) Volume Part - Transmission
More informationSupporting Strategic Customers Needs
Session: Partnering with Utilities for Energy Resiliency Supporting Strategic Customers Needs Daniel Tunnicliff Southern California Edison August 9, 2016 Rhode Island Convention Center Providence, Rhode
More informationNERC Overview and Compliance Update
NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance
More informationMocuba The First Utility Scale PV Project in Mozambique
Scatec Solar ASA Mocuba The First Utility Scale PV Project in Mozambique October 26th, 2017 Scatec Solar - Integrated Independent Power Producer Scatec Solar develops, builds, owns & operates solar plants
More informationOrder No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process
Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint
More informationPlanning for the Future
Gas/Electric Partnership Conference Planning for the Future February 1, 2018 Entergy Texas, Inc. Entergy Texas, Inc. Staci Meyer Manager, Resource Planning Jeff Dicharry Manager, Transmission Planning
More informationThe Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.
d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is
More informationDraft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission
The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E for a Permit to Construct Electrical Facilities With Voltages
More informationUpdate on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection
GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY Update on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection by: Adnan Al-Mohaisen, GM, GCCIA S. Sud, V.P., SNC-Lavalin Power
More informationSDG&E s Accomplishments and Future Plans
SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego
More informationSOUTH TEXAS ELECTRIC COOPERATIVE, INC.
SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection
More informationRELIABILITY OF THE BULK POWER SYSTEM
RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Context In the Beginning-2003
More informationStatus and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014
Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 2014 Electric Power Research Institute, Inc. All rights reserved. Meet the Challenge An Integrated Grid 2 Interconnected
More informationSOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY COMPLIANCE PROCEDURES IMPLEMENTING FERC ORDER 717C STANDARDS OF CONDUCT Version 1.2 Updated June 14, 2017 Purpose: To provide Southern California Edison s (SCE) overall
More informationCompetitive Solicitation Process Enhancements. Status Update / Issue Paper
Competitive Solicitation Process Enhancements Status Update / Issue Paper October 7, 2014 Table of Contents 1 Introduction... 3 2 Stakeholder process... 4 3 Background on the competitive solicitation process...
More informationData Center Site Assessment and Tiered Designation Program. Northport Industrial Park North Mankato, MN Executive Site Summary
Data Center Site Assessment and Tiered Designation Program Northport Industrial Park North Mankato, MN Executive Site Summary Northport Industrial Park North Mankato, MN Econdev.greatriverenergy.com Summary
More informationINTERCONNECTION FACILITIES STUDY REPORT
INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December
More informationSmart Distribution Technology
Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications
More informationLarge Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities
Large Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities Effective Date: May 12, 2014 Revision History Date May 1, 2013 May 12, 2014 Description Initial document Revision
More informationQ44 Generation Interconnection
A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,
More informationStakeholder Comments Template
Stakeholder Comments Template Submitted by Company Date Submitted Ben Kaun, bkaun@epri.com, 650-855-2208 EPRI 9/24/14 Please use this template to provide your comments on the presentation and discussion
More informationSMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2
SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:
More informationB-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax:
B-- Janet L. Fraser Director, Regulatory Affairs Phone: 0-- Fax: 0-- E-mail: janet.fraser@bctc.com October 00 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission 00 Howe Street,
More informationState Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission
State Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission October 21, 2010 Dave Johnston Beth Krogel Roads Indiana Utility Regulatory Commission (IURC)
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationGeneration Interconnection Impact Study Report. For. Interconnection Customer Q0022
Generation Interconnection Impact Study Report For Interconnection Customer Q0022 Prepared by: PacifiCorp Date: 10/29/2003 Generation Interconnection System Impact Study Report Interconnection Customer
More informationValley-Ivyglen and Alberhill Transmission Line Projects
Valley-Ivyglen and Alberhill Transmission Line Projects Final Environmental Impact Report City Council Meeting May 23, 2017 Valley-Ivyglen Project Construction of a new, single-circuit 115-kV subtransmission
More informationENMAX Power Corporation
Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L September 15, 2017 Alberta Utilities Commission Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L Proceeding 22769 Application
More information