1 The AstroPower Headquarters Newark, Delaware Steven A. Neimeister The Pennsyvania State University Architectural Engineering Senior Thesis Presentation 13 April 2004
2 Presentation Outline Lighting Design
3 Presentation Outline Omitted from Presentation: Lighting Design Lunch Room Open Office Area Front Entranceway Electrical Design
4
5 AstroPower is one of the world s fastest-growing solar electric power companies involved in many innovative new solar projects. Their headquarters in Newark, Delaware, was constructed to creatively demonstrate AstroPower s commitment to bringing the benefits of clean renewable energy to the environment.
6 Newark, Delaware is located in the North East region of the United States. Surrounded by major cities such as Wilmington, Philadelphia, Baltimore, Washington D.C., and New York, along with the fact that it lies close to the Chesapeake Bay, the location is optimum for easy accessibility by all clients or customers that would like to visit the Headquarters.
7 Project Team Architect Bernardon, Haber, Halloway Architects PC Owner/Developer McConnell Development, Inc. Structural Engineer O Donnell, Naccarato, & MacIntosh Mechanical/Electrical Engineer Bruce E. Brooks & Associates Fire Protection Bear Industries, Inc. Interior Designer Bernardon, Haber, Halloway Architects PC General Contractor Commonwealth Constructive Company
8
9 -Building used to manufacture, sell, and represent the solar panels. -Situated to face the southeast, a Green Design guideline. -Exterior covered in the blue/green solar panels that are manufactured inside. -Interior has an abundance of daylight.
10 Project Design Goals -To keep the idea of solar panels constant throughout the interior of the building -To incorporate the color blue to mimic the sky, or natural elements -Have a new lighting design that works with the building s daylighting influence -To provide an energy efficient design -To maintain the same goals in all spaces of redesign
11 Project Design Criteria -To satisfy the minimum illuminance levels recommended by the IESNA. -To maintain lighting power densities at or lower than the required ASHRAE/IESNA Standard values. -To consider glare, illuminance distribution, and color appearance.
12
13
14 Existing Conditions
15 Design Goals -To accentuate the architectural cove above the table. -To provide an even wallwash over solar panels hung on the interior walls, with a blue tint. -To create a visually interesting space. Design Criteria -To have an evenly lit table surface for writing and reading. -Illuminance values of 30 fc horizontal, 5 fc vertical. -Power allowance of 1.5 watts/ft². -To allow for flexibility of lighting control system.
16 -Cove Lighting -Fluorescent downlights over table surface -Wallwashers around room perimeter
17 Luminaire Layout
18 System Controls A control system will be implemented for three different user controlled settings: -General Meeting environment -Audio/Visual Presentation environment -Midday Meeting environment (for use with high daylight)
19
20
21 Photoshop rendering of blue tinted wallwashers (solar panels not shown)
22 Power Analysis Spreadsheet to be imported
23
24 Second Level First Level
25 Existing Conditions
26 Existing Conditions
27 Design Goals -To take advantage of the architectural pieces, such as the balconies and skylight. -To provide an even wallwash over solar panels hung from the interior walls, with a blue tint. -To create a visually interesting space. Design Criteria -To have an adequately lit area for walking. -Illuminance values of 5 fc horizontal. -Power allowance of 1.7 watts/ft² (0.7 w/ft² for corridor, 1.0 w/ft² for decorative and accent lighting). -To allow for flexibility of lighting control system.
28 -Uplighting the skylight, drawing attention to it at night -Wallwashers around room perimeter -Blue L.E.D.s around the balcony edges
29 Luminaire Layout To be imported with pictures of luminaires
30 System Controls A control system will be implemented for three different user controlled settings: -Morning/Afternoon Environment (for use with high daylight) -Presentation environment for nighttime functions -Unoccupied/Night light
31 RENDERING PAGE
32 RENDERING PAGE
33 RENDERING PAGE
34 Power Analysis Spreadsheet to be imported
35 Telecommunications Design
36 Design Goals With rapidly changing technology, an up-to-date telecommunications network infrastructure is needed for a company to keep up with their competitors. Four new telecommunications closets will be added to the AstroPower Headquarters. Each will be equipped with a data rack and risers to link to the new main Data Center, located on the second floor. Using Category 6 plenum-rated cable, a new network will be developed for the AstroPower Office.
37 First Floor Plan First Floor Plan
38 Second Floor Plan Second Floor Plan
39 Typical Telecommunications Closet Typical closet plan, layout, and rack elevation
40 System Riser Diagram System Riser Diagram
41 Main Data Center The Main Data Center will consist of a row of 48 deep cabinets with multiple servers. The room will also feature a UPS to backup the entire system in the even of power failure. Construction of the room will be completed by multiple vendors in compliance with the Owners for their individual wants and needs.
42
43 Summary To be composed after analysis is complete.
44 Recommendations for Improvement To be composed after analysis is complete.
45
46 Lighting Design All of the lighting redesign goals have been achieved: -To keep the idea of solar panels constant throughout the interior of the building -To incorporate the color blue to mimic the sky -To have a new lighting design that works with the building s daylighting influence -To provide an energy efficient design -To maintain the same goals in all spaces of redesign An up-to-date telecommunications network infrastructure has been designed and is ready to be implemented into the building s current design.
47 (A summary for this section will be added as soon as the analysis has been completed).
48 Special Thanks -Bernardon, Haber, Halloway Architects PC -The Architectural Engineering Faculty at the Pennsylvania State University -AstroPower North America and everyone who took the time to be here today! Thanks!
49 Questions?
Newark, Delaware Architectural Engineering Senior Thesis Portfolio
Telecommunications System Design The represents the advancement of solar design in our world today. The building itself is an example of this. A Headquarters this dedicated to moving into the future should
More informationJoshua Kreutzberger Lighting/Electrical Thesis Proposal December 15, 2006 Dr. Mistrick. Dorrance H. Hamilton Building Philadelphia, PA
Joshua Kreutzberger Thesis Proposal December 15, 2006 EXECUTIVE SUMMARY The depth and breadth proposals provide the foundation for the analysis of the in the spring semester. Four topics will be investigated
More informationRun a Smart Workplace Introducing the Digital Building. Digital Building Solutions
Digital Building Solutions Run a Smart Workplace Introducing the Digital Building Maximize efficiency and productivity Enhance infrastructure flexibility & network security Reduce installation and operating
More informationArchitecture Engineering Training courses : Course BIM Architecture Diploma Revit Architecture 3D Max Vasari Navis Works Photoshop For Architects
Architecture Engineering Training courses : Course BIM Architecture Diploma Revit Architecture 3D Max Vasari Navis Works Photoshop For Architects BIM ARCHITECTURAL DIPLOMA ( Design and visualization ):
More informationDaylighting. Openings. Daylighting Luminaires = Openings. Openings. Levente Filetóth Light sources.
Daylighting Openings Levente Filetóth filetoth@egt.bme.hu Dpt. of Building Energetics and Services K.231. www.egt.bme.hu/filetoth Daylighting Luminaires = Openings Light sources direct sunlight diffused
More informationThe Riser as a Contract Document. Peter Sharp, RCDD
The Riser as a Contract Document Peter Sharp, RCDD IBI Group 1 1 Who am I? Presenter Credentials Electrical Engineer Specialties in communications, electronics and computer sciences, In practice for 40
More informationDevelopment Of A Fast Simulation-aided-design Method For Office Building In Early Design Stage Ziwei Li 1, Borong Lin 1,*, and Hongzhong Chen 1 1 Scho
Development Of A Fast Simulation-aided-design Method For Office Building In Early Design Stage Ziwei Li 1, Borong Lin 1,*, and Hongzhong Chen 1 1 School of Architecture, Tsinghua University, Beijing, China
More informationFinal Report. Abstract
Submitted to...california Institute for Energy Efficiency, Southern California Edison Date...April 30, 2002 Project Title...Improving Lighting and Daylighting Decision Making to Facilitate the Design of
More informationPeter Sharp RCDD IBI Group
Peter Sharp RCDD IBI Group Who am I? Presenter Credentials Electrical Engineering Consultant Specialties in communications, electronics and computer sciences, In practice for more than 40 years Member
More informationENERGY SCHEMING 1.0. G.Z. Brown, Tomoko Sekiguchi. Department of Architecture, University of Oregon Eugene, Oregon USA
ENERGY SCHEMING 1.0 G.Z. Brown, Tomoko Sekiguchi Department of Architecture, University of Oregon Eugene, Oregon 97403 USA ABSTRACT This paper describes software for the Apple Macintosh microcomputer that
More informationAV Using Autodesk 3ds Max Design, Autodesk Revit, and iray to Render Compelling Photographic Scenes
AV4672 - Using Autodesk 3ds Max Design, Autodesk Revit, and iray to Render Compelling Photographic Scenes Steven Schain Autodesk Certified Instructor AV4672 This virtual class introduces designers to the
More informationSmart Solutions Intelligent, Integrated Infrastructure for the Data Center
Solutions For Business-Critical Continuity Smart Solutions Intelligent, Integrated Infrastructure for the Data Center DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com Deploy
More informationDaylighting. Note: Daylight is typically defined as diffuse light and is very different from sunlight (direct solar radiation).
systems can significantly reduce both lighting consumption and cooling-energy consumption by reducing the electric-lighting heat gain in the building. However, daylighting can also cause increased heating-energy
More informationLEHIGH VALLEY TRADE CENTER AVAILABLE FOR LEASE 123,140 SF. Building A. Building B CLASS A NEW CONSTRUCTION BETHLEHEM, PA
1,245,198 SF 2 BUILDINGS CLASS A NEW CONSTRUCTION Building A Bldg. A - 4863 Hanoverville Road Bldg. B - 4779 Hanoverville Road Building B AVAILABLE FOR LEASE 123,140 SF Excellent proximity to parcel &
More informationCorbin Building. Schematic Lighting Design. 192 Broadway New York, NY. Matthew Trethaway Lighting/ Electrical Advisor: Dr.
Corbin Building 192 Broadway New York, NY Schematic Lighting Design Matthew Trethaway Lighting/ Electrical Advisor: Dr. Houser 1 Corbin Building 192 Broadway, New York, NY World Trade Center Corbin Building
More information1.1 OVERVIEW OF THIS BOOK
1 Introduction 1.1 OVERVIEW OF THIS BOOK Today s datacom (data and communications) facility managers and operators understand the importance of protecting their business critical data and information technology
More informationPRESCRIPTIVE APPROACH. 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method
PRESCRIPTIVE APPROACH 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method THE COMPLIANCE PROCESS There are two major steps to Title 24 compliance: 1. Meet all
More informationThe Westside s Next Creative Address
JEFFERSON Culver City Project Overview Location 1 Jefferson Boulevard Culver City, California Project Size 132,387 RSF Floor Sizes North Building: South Building: 1st 23,827 1st 20,306 2nd 23,827 2nd 20,300
More informationCOMMERCIAL OFFICE SOLUTION GUIDE
COMMERCIAL OFFICE SOLUTION GUIDE COMMERCIAL OFFICE SOLUTIONS YOUR CHALLENGES You are relied upon to ensure maximum productivity in your office environment by providing reliable network and A/V infrastructure
More informationPRESCRIPTIVE APPROACH. 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method
PRESCRIPTIVE APPROACH 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method THE COMPLIANCE PROCESS There are two major steps to Title 24 compliance: 1. Meet all
More informationVisual Warehouse Project Tutorial
Visual 2012 Warehouse Project Tutorial Import a DWG file into Visual 1. From the File tab, select New->Interior Project 2. From the File tab select Import 3. Select the Interior Warehouse.DWG file 4. Select
More informationLighting Design and Analysis in Revit
PRODUCT REVIEW By: Dan Stine Lighting Design and Analysis in Revit As the Building Information Modeling () movement continues to evolve or mature it is only natural that we now have more advanced features
More information[IPD/BIM LIGHTING TECH I]
2010 Jason Brognano KGB Maser Lighting/Electrical Option Advisor: Michael Lucas Building Stimulus Christopher Russell BIMception AE Senior Thesis 2010/2011 BIM/IPD Team #3 October 4, 2010 Table of Contents
More informationWiredScore Report. Tanfield. 1 Tanfield, Edinburgh, EH3 5DA. Audit Reported Points. Building Connectivity 37 / 45. Building Infrastructure 28 / 41
WiredScore Report Tanfield 1 Tanfield Edinburgh, EH3 5DA Building Location Building Profile Address: 1 Tanfield, Edinburgh, EH3 5DA Rentable Sqft(k): 191 Section Audit Reported Points Building Connectivity
More informationAT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)
AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT) Site Preparation Guide 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T
More informationEngineering and Design Services Mechanical HVAC Plumbing Electrical Chemical/Process Structural Instrumentation
Commissioning Profile + Services About Us Established in 1965, DEDC is a privately owned, full-service multidisciplined engineering and design firm. We offer in-house expertise in mechanical HVAC, electrical,
More informationYour One Source for Federal Solutions
Your One Source for Federal Solutions GSA Contract Vehicles Dedicated Federal and Technical Teams Local Presence, International Network About WESCO The WESCO Federal Advantage Government Team Commitment
More informationSiemon and Moorings Park Prove That Technology Never Retires
I T I n f r a s t r u c t u r e S o l u t i o n s Share Siemon and Moorings Park Prove That Technology Never Retires If your idea of retirement revolves around front porches and rocking chairs, the folks
More informationInterior. Exterior. Daylight
Interior Exterior Daylight Page 2 ElumTools is a fully-integrated lighting calculation Add-in for Autodesk Revit authored by Lighting Analysts, Inc. The growth of BIM (Building Information Modeling) software
More informationLighting Database User Guide <Virtual Environment> 5.9
Lighting Database User Guide 5.9 Page 1 of 54 Contents 1. Lighting Database Overview...6 1.1. Access to the Lighting Database... 6 1.1.1. Select Light Fitting Command... 6 1.1.2.
More informationComputer Network Design Guide Existing Systems 1 / 6
COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should
More informationInstaPATCH Cu Cabling Solutions for Data Centers
SYSTIMAX Solutions InstaPATCH Cu Cabling Solutions for Data Centers Design Guidelines August 2008 www.commscope.com Contents Overview 1 InstaPATCH Cu Solution Specification 2 Harness Assembly Design 3
More informationFlucsLDB: Lighting Database
FlucsLDB: Lighting Database User Guide IES Virtual Environment Copyright 2014 Integrated Environmental Solutions Limited. All rights reserved. No part of the manual is to be copied or reproduced in any
More informationKR Series. LED Specification Grade Downlight
KR Series LED Specification Grade Downlight KR Series LED Specification Downlight / Benefits KR Series LED Specification Downlight / Benefits KR Series LED Specification Downlight Never Specify a Fluorescent
More informationOrganizational Readiness. Discharge/Checkout. Waiting/Registration Exam/Consulting. Operational issues. Construction Occupancy Access
Consider informational kiosks within lobby/check-in space to highlight wellness initiatives, informational guides on building, and access to other clinic programs x x x x x x x Consider using integrated
More informationLACCD IT Design Standards
LACCD IT Design Standards March 1 2009 This document establishes a uniform standard for the design of IT Structured Cabling for LACCD. It ensures a secure, consistent, robust system with physical and low-voltage
More informationBIM by AGC. Glass Add-On for GRAPHISOFT ARCHICAD 18
BIM by AGC Glass Add-On for GRAPHISOFT ARCHICAD 18 Contents: 1. Description 2. Catalogue components 3. Add-On installation for Mac users 4. Add-On installation for Windows users 5. Log in and registration
More informationPOWER AND THERMAL MANAGEMENT SOLUTIONS
POWER AND THERMAL MANAGEMENT SOLUTIONS Power has long been a critical public utility we depend on in our homes and daily lives. Companies are under pressure to provide the necessary hardware and software
More informationCarina Grega Food Network Space Final Thesis Report Electrical Overview. Electrical Overview. Existing System Overview
Electrical Overview Existing System Overview Chelsea Market is served by Consolidated Edison, the electric utility for most of New York City. The Food Network space is supplied by two separate radial systems
More informationAdvanced Tips for Better Translation Autodesk Revit 2010 IES
Advanced Tips for Better Translation Autodesk Revit 2010 IES IES Worldwide Support Series A. Chan and M. Farrell What is a gbxml? When you click on Set Model Properties, even though you are doing it within
More informationLinear LED Portfolio. Architectural Lighting Innovations
Linear LED Portfolio Architectural Lighting Innovations Linear LED Portfolio Architectural Lighting Innovations Shallow Plenum Systems Recessed Systems Page 20 Page 68 Click New Beam 3 SurroundLite New
More informationAutodesk Revit Architecture 2011 Getting Started Video Tutorials
Autodesk Revit Architecture 2011 Getting Started Video Tutorials Instructor Handout Created by: Marvi Basha, Klaus Hyden und Philipp Müller Autodesk Student Experts TU Graz September 2010 Introduction:
More informationThe University of Texas at Austin July 30, 2014 SECTION COMMUNICATIONS TERMINATION BLOCKS AND PATCH PANELS
SECTION 27 11 19 COMMUNICATIONS TERMINATION BLOCKS AND PATCH PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section specifies the products and installation of communications termination blocks and patch panels
More informationSurroundLite. Architectural Lighting Innovations. Winter 2018
TM SurroundLite Architectural Lighting Innovations Winter 2018 SurroundLiteTM Architectural Lighting Innovations Creative Systems Every luminaire in this collection uses SurroundLite technology. Please
More informationAugust 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner
August 10, 2010 Sacramento County Planning and Community Development 827-7th Street Sacramento, CA 95814 Attn: RE: Tricia Stevens, Principal Planner Conditional Use Permit Application Material / Justification
More informationFinding a Better Way to Work with
V e c t o r W o r k s C A S E s t u d y Finding a Better Way to Work with VectorWorks Adobe PDF Support London-based Media Synthesis Ltd. finds a better way of working. With the built-in Adobe PDF support
More informationARCHITECTURAL GUIDELINES FOR INSTRUCTIONAL TECHNOLOGY
ARCHITECTURAL GUIDELINES FOR INSTRUCTIONAL TECHNOLOGY Introduction A classroom is measured by its effectiveness in facilitating the exchange of information. The following general guidelines have been developed
More informationWAREHOUSE / DISTRIBUTION EXPERIENCE
WAREHOUSE / DISTRIBUTION EXPERIENCE BERRY WHOLESALE DRUGS Walter Knestrick Contractor, Inc. The warehouse space includes a partial mezzanine with administrative offices and staff support areas. The mezzanine
More informationAdd style to any space with minimal effort. Downlighting
Downlighting SlimSurface LED Add style to any space with minimal effort Low profile, easy-to-install round and square surface mount downlights will bring a sophisticated look to your ceiling. SlimSurface
More informationData Cabling / Low Voltage Technology Specifications
P19-02- Forsyth County Schools Data Cabling / Low Voltage Technology Specifications 1. General requirements 1.1 On premise connectivity All building closets (IDF) aside from the main closet (MDF) shall
More informationPEARL MANHATTAN, NY
FEATURES :: Power 40 MWs of high tension service :: Inter-connectivity 3 milliseconds to New York City s major exchanges :: Security New York Police Department is immediately adjacent; secured vehicular
More informationKEEPING YOU OUT IN FRONT
URBACON DATA CENTRE SOLUTIONS KEEPING YOU OUT IN FRONT A next generation data centre in the core of downtown Toronto DOWNTOWN DATA CENTRE 281 FRONT STREET TORONTO, ON 1 2 X URBACON BUILDING GROUP 70 Lake
More informationCreating a New Plan File
1 Tutorial NAME Creating a New Plan File 2 The first step in creating your own design is to open and name a new plan file. 1. From the MENU BAR, select File, New Plan. 2. From the MENU BAR, select File,
More informationAT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)
AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT) Site Preparation Guide This guide is designed to assist local on-site contacts to understand what you will need to
More informationLighting Power Density (LPD) Public User s Manual. August 2005
Lighting Power Density (LPD) Public User s Manual August 2005 Table of Contents 1 LPD APPLICATIONS... 1-4 1.1 BACKGROUND... 1-4 1.2 HOW LPD VALUES ARE CALCULATED... 1-5 2 PUBLIC MODULE... 2-7 2.1 WHOLE
More informationAT&T Switched Ethernet Service SM
Site Preparation Guide AT&T Switched Ethernet Service SM December 2016 2016 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo, Mobilizing Your World and DIRECTV are registered trademarks
More informationTwo-Stage Power Distribution: An Essential Strategy to Future Proof the Data Center
Two-Stage Power Distribution: An Essential Strategy to Future Proof the Data Center Adapting to Change Concern over the pace of technology change is increasing among data center managers. This was reflected
More informationCommercial Design Using Autodesk Revit Architecture 2013
Commercial Design Using Autodesk Revit Architecture 2013 Includes video instruction Daniel John Stine CSI, CDT Multimedia DVD SDC P U B L I C AT I O N S Schroff Development Corporation Better Textbooks.
More informationUsing Autodesk Ecotect Analysis and Building Information Modeling
Autodesk Ecotect Analysis 2010 Using Autodesk Ecotect Analysis and Building Information Modeling This document helps you to get the most from Autodesk Ecotect Analysis software and building information
More informationEnergy Engineering: Tools and Trends
Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and
More informationCase Study Leicester City Council
Data Centre Solutions...energy efficient by design Case Study Leicester City Council Leicester City Council Deploys New Sub 1.1 PUE3 Data Centre Infrastructure. Designed & Installed by Workspace Technology
More informationData Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. TelecityGroup Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se
More informationData and Voice Line Installation Procedure. Revision History
Data and Voice Line Installation Procedure OBJECTIVE SCOPE Data and Voice Line Installation Procedure Information Services Technical Revision History Date Detail of Change Change Made By 1/14/11 Revision
More informationWho Turned the Lights Out? Lighting Analysis with Autodesk Revit MEP 2012 and Autodesk 3ds Max Design 2012
Who Turned the Lights Out? Lighting Analysis with Autodesk Revit MEP 2012 and Autodesk 3ds Max Design 2012 Eric Bogenschutz BSA LifeStructures MP5719 In this class, we will discuss multiple different lighting
More informationConflicts in Data Center Fiber Structured Cabling Standards
Conflicts in Data Center Fiber Structured Cabling Standards By Dave Fredricks, CABLExpress Data Center Infrastructure Architect Various telecommunications and data center (DC)-specific standards are commonly
More informationBy Helmut Kientz, R.A. Hixson Design & Illustration
By Helmut Kientz, R.A. Hixson Design & Illustration The process of selecting glazing for storefronts, office buildings, and other façades with large amounts of glass can be daunting. Glazing is chosen
More informationHV601/HV602 for General Construction
HV601/HV602 for General Construction CONTROL YOU CAN RELY ON Accurate Versatile Fast Easy to Use Precision Leveling and Aligning Maximum Versatility The Spectra Precision Laser HV601 and HV602 from Trimble
More informationWhite Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017
White Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017 As operators have demanded increasing levels of power density
More informationSALAMANDER. Automated Infrastructure Management
SALAMANDER Automated Infrastructure Management INNOVATION STARTS HERE Facemate is a market leader, providing customers with Data Center Solutions, Networking and Datacenter cabinets, DC Management Software,
More informationArchitectural & Design Catalog
Architectural & Design Catalog Welcome To Millwork Concepts The design of a new home is both an exciting and expensive endeavor. From the architect to the installer, the quality of the service creates
More informationHARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017
HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION Presentation to ANC 3E April 13, 2017 1 PURPOSE AND NEED We are committed to providing reliable electric service to our customers. As part of this commitment,
More informationProceedings of BS2013: 13th Conference of International Building Performance Simulation Association, Chambéry, France, August 26-28
Proceedings of BS213: - 1126 - Proceedings of BS213: Figure 1: - 1127 - Proceedings of BS213: - 1128 - Proceedings of BS213: Table 1 Table 2 Figure 2: - 1129 - Proceedings of BS213: Relative Error 2 1.5
More informationLumenfacade Inground, Asymmetric Wallwash. lumenfacade inground
Lumenfacade Inground, Asymmetric Wallwash lumenfacade inground Lumenfacade Inground, Direct View Minimalist design No exposed screws Continous lines of light End-to-end installation Breaking New Ground
More informationBBVA Interior Design
BBVA Interior Design BBVA Bancomer Operations Center General work area BBVA Mexico City Headquarters General work area BBVA Madrid Headquarters Trading floor BBVA Centro Tecnológico Command center The
More informationLED LIGHTING SELECTIONS
LED LIGHTING SELECTIONS 2 TABLE OF CONTENTS 4 8 12 14 20 28 Slimstick Under Cabinet 3K Under Cabinet SKY WAFER LED DIVERSE COVE LEGEND ADA Compliant Title 24 Wet Location Damp Location Dimmable Energy
More informationCCNA Discovery 4.0 Designing and Supporting Computer Networks
CCNA Discovery 4.0 Designing and Supporting Computer Networks Characterizing Existing Network Chapter 3 1 Objectives 2 Creating a Network Diagram Typically, the first step in installing a new network is
More information10'R 8'/INLET 10'R 1'-8" 10'RR 2'-7 1/2" 10'R 2'-1 1/2" 10'R 2' 10'RR 6' 10'RR 4'-5" DIMENSIONS ARE IN INCHES BUMPHREY ENGINEERING DRAWING NUMBER:
10'R 8'/LIGHT 10'RR 2'-7 1/2" 10'R 7'-10 1/4"/INLET 10'R 3' TYPE-2 DIVING 10'R 8'/INLET 10'R 1'-8" 10'RR 2'-7 1/2" REVISION HISTORY REV. DESCRIPTION DATE ECO BY 10'R 8'/INLET 10'R 5' 16 MIRROR NUMBER:
More informationTABLE OF CONTENTS LEGEND. 1K Under Cabinet. 3K Under Cabinet. Slimstick Under Cabinet WAFER LED SKY LED WRAP LED DIVERSE LED COVE LED.
LED TASK LIGHTING 2 TABLE OF CONTENTS 4 6 10 14 20 22 24 30 1K Under Cabinet 3K Under Cabinet Slimstick Under Cabinet WAFER LED SKY LED WRAP LED DIVERSE LED COVE LED LEGEND ADA Compliant Title 24 Wet Location
More informationversion: 3/16/2009 A Design Sequence for Diffuse Daylighting Tiffany Otis Christoph Reinhart Harvard Graduate School of Design
A Design Sequence for Diffuse Daylighting DAYLIGHTING RULES OF THUMB Tiffany Otis Christoph Reinhart Harvard Graduate School of Design WHAT IS IT? - This document presents a sequence of simple equations
More informationOffice of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO
Cabling Standards Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO 1. Purpose CABLING STANDARDS This technical note
More informationDaylight and Sunlight Study 47 Gainsford Road, London E17 6QB
Daylight and Sunlight Study 47 Gainsford Road, London E17 6QB 4 May 2016 Right of Light Consulting Burley House 15-17 High Street Rayleigh Essex SS6 7EW Tel: 0800 197 4836 DAYLIGHT AND SUNLIGHT STUDY 47
More informationData Center NJ1. Piscataway, NJ
Data Center NJ1 Piscataway, NJ powerful/ efficient /reliable solutions > Data Center NJ1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale data centers.
More informationEditing Specs. stilio.com
Specs Highlights: Specific editing guidelines Detailed list of editing workflow Input requirements Output specifics Turn-around time per product Photography Standard and Drone photos- 12 hour turnaround
More informationLighting/Daylighting Software Current State of the Art Report
Lighting/Daylighting Software Current State of the Art Report A Report for GPIC Task 2.2 by Richard G. Mistrick, PhD, PE, FIES Associate Professor of Architectural Engineering RMistrick@psu.edu, 814-863-2086
More informationWeb Design Graphic Design Motion Graphics
Web Design Graphic Design Motion Graphics Freelance Art Director Contents About... Page 1 Web Design... Page 2-9 Graphic Design... Page 10 Ad... Page 10-13 Print... Page 14-17 Identity... Page 18-23 Illustration...
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationSmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up. Solutions For Business-Critical Continuity
SmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up Solutions For Business-Critical Continuity Deploy a Fully Configured Data Center in Just Weeks Efficiency. Capacity. Availability.
More informationIBDN 110 Cross-Connect System
IBDN 110 Cross-Connect System Connecting & Wiring Blocks Cross-Connect Kits Wall Mount Frame Kits Patch Cords Labels & Management Accessories For For A Complete End-to-End 110 Solution what s coming next.
More informationPROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES
PROCESS & DATA CENTER COOLING How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES CONGRATULATIONS 2 BOLD PREDICTION 3 Where We Are TODAY Computer Technology NOW advances more
More informationData Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center
Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationHuangcun IDC of China Unicom Beijing: China's First Warehouse Micro-modular IDC
Huangcun IDC of China Unicom Beijing: China's First Warehouse Micro-modular IDC China Unicom Beijing (hereinafter referred to as Beijing Unicom below) has reconstructed its two unused warehouses in Huangcun,
More informationEHS Steering Team Meting, 2008
EHS Steering Team Meting t, 2008 Duke Energy Fast Facts Duke Energy Corporation is an energy company headquartered in Charlotte, N.C. Its Regulated Utilities business unit serves 7.3 million retail electric
More informationA Simulation-Based Expert System for Daylighting Design
A Simulation-Based Expert System for Daylighting Design Jaime M. Lee 1, Marilyne Andersen 2 Abstract In this paper, we propose an expert system for daylighting in architecture which is used to guide a
More informationChecklist for building an edge data center
Checklist for building an edge data center Building an edge data center to provide a cloud computing environment within a service provider central office can be a complex endeavor. It requires lots of
More information2016 EXPANDED. LED Program...see what's new inside!
2016 EXPANDED LED Program...see what's new inside! CALENDAR Saving Environmentally Conscious Long NEW LED s! Making the switch to LED lamps provides significant energy savings by using less energy to produce
More informationControl of an Adaptive Light Shelf Using Multi-Objective Optimization
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Control of an Adaptive Light Shelf Using Multi-Objective Optimization Benny Raphael a a Civil Engineering
More informationdavincifireplace.com 1
davincifireplace.com 1 avinci Custom Fireplaces The most innovative and unique fireplaces ever made DaVinci is a fusion of fire and iconic, contemporary design The epitome of the perfect decorative, non-heating
More informationHISTORIC & FLEXIBLE POST INDUSTRIAL HEADQUARTERS
Presented by : HISTORIC & FLEXIBLE POST INDUSTRIAL HEADQUARTERS Central Location \ Surrounded by Wicker Park, Bucktown, Lincoln Park, Old Town, River North, and River West. Unbeatable access to young,
More informationGuideline to Daylight Simulations in LightStanza with MicroShade. Simulation of MicroShade in LightStanza. About MicroShade.
Guideline to Daylight Simulations in LightStanza with MicroShade This is a guideline to daylight simulations with MircoShade in LightStanza. LightStanza is an advanced web-based simulation software for
More information