North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

Size: px
Start display at page:

Download "North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009"

Transcription

1 North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10,

2 Welcome & Introductions 2

3 3

4 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor Draft Environmental Impact Statement (DEIS) Open House Portion Presentation Portion Comments Portion 4

5 Why the Public Hearing? To Present the Results of the North Metro Corridor Draft Environmental Impact Statement (DEIS) Highlights in Presentation Details in Open House To Solicit Your Comments on the DEIS What are your comments and why? 5

6 Your Comments to the DEIS by Jan 15, 2010 Tonight: verbal during comment period verbal to the court reporter written using comments form or computers written drop off previously written comments Online at select North Metro Corridor By at By mail Dave Beckhouse, FTA c/o North Metro Project th Street, #900 Denver, CO

7 Rules for Verbal Comments During Comment Period Please sign up at the welcome area 3 minute limit State your name, address, and organization (if applicable) Cannot give your 3 minutes to others Please focus your comment on the alignment, stations, vehicle technology, impacts and mitigation All comments will be addressed in the FEIS We are not responding to comments tonight 7

8 Agenda Welcome & Introductions Why this EIS? Purpose and Need Alternatives Considered Recommendations & Project Benefits Environmental Summary Public & Agency Outreach Summary Schedule & Next Steps Receive Verbal Comments from Public Continue Open House 8

9 EIS Process Overview 9

10 Why Do an EIS? Required for a Major Federal Action (the proposed project) Discloses the Estimated Impacts and Proposed Mitigation for the Project Supports the Decision Making Process Serves as a Forum for Public Input 10

11 EIS Study Area 11

12 Purpose & Need Purpose...to implement high capacity, fixed guideway transit within the North Metro Corridor (Study Area) between Denver Union Station and 162 nd Avenue area in Thornton. Needs to improve mobility to enhance regional connectivity to serve traditional and new transit users to support community and regional plans 12

13 Alternatives Considered 13

14 Range of Alternatives Considered No Action Transportation Systems Management (TSM) Light Rail Transit (LRT) Diesel Multiple Unit (DMU) Electric Multiple Unit (EMU) Other Alternatives 14

15 Build Alignment Alternatives Considered 15

16 Alternatives Evaluation 16

17 Recommendations 17

18 DEIS Build Alternative 18

19 Build Alternative - Southern Section Alignment Options in DEIS A-3, B-2, B-3, B-4 19

20 EMU is Preferred Vehicle Technology More cost-effective than DMU Fewer environmental impacts General public preference Fewer noise impacts and less noise wall construction than DMU 20

21 Build Alternative Proposed Operations Plan Weekday Base Service 30 min headway each direction DUS to 162 nd Ave / SH hours per weekday Weekday Peak Period Service Additional service each direction DUS to 162 nd Ave/SH 7 6 peak hours 3 morning / 3 afternoon 21

22 Recommended Stations Denver Coliseum or Stock Show Commerce City 72 nd Avenue 88 th Avenue w/o Welby Road Relocation 104 th Avenue only option 112 th Avenue parking west of York option 124 th Avenue RTD option 144 th Avenue west side 162 nd Avenue/SH 7 east side 22

23 Capital Cost $1,066 million YOE DUS to 162 nd Ave/SH 7 EMU vehicle technology 8 New Stations Right of Way 23

24 Project Benefits Mobility Ridership 14,300 in 2030 Faster travel time than auto: DUS to SH 7 in 2030 (27 min vs. 62 min); improved reliability Increase in overall transit use & connectivity Reduced VMT and VHT Economic & Land Use Jobs for construction Improved access to jobs, especially for transit dependants Land use support and TOD opportunities 24

25 Environmental Summary 25

26 Key Environmental Topics Transportation System Social & Environmental Justice Property Acquisition & Economics Cultural Noise Visual Parks & Open Space Trails Other 26

27 Transportation System Traffic Impacts 120 th Ave Crossings Mitigation: Protection Upgrades & Grade Separation at 104 th and 120 th Stations Mitigation: Intersection re-configuration, signalization, turn lanes CDOT I-70 East Project Conflicts Mitigation: Coordinate with CDOT Freight Railroad Access Mitigation: North-temporal separation; South-may need agreement with Railroads 27

28 Social Impacts Barrier Effect New Alignments Increased Train Use Mitigation: Identified pedestrian & bike crossings to maintain connections including social trails Environmental Justice Property acquisition impacts Investigations: Surveys will be conducted in the FEIS 28

29 Property Acquisition and Economic Impacts Right of Way Acquisition Acres Approximately 80 Parcels Affected Acquisitions with Relocations 0-3 Residential Commercial/Industrial Loss of Opportunity to Extract Minerals Mitigation: Coordinate with Current Property Owners and Comply with Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 Note Will try to further minimize impacts as more detailed design advances. 29

30 Cultural Resources Impacted Paleontological Resources 1 impact from alignment Archaeological Resources: Adverse Effect Quimby RR Stop Eastlake RR Stop Historic Built Environment Adverse Effect 124 th Avenue Farmstead Mitigation: MOA with SHPO, FTA and RTD 30

31 Noise Noise Impacts - EMU (2030) 1,172-1,275 total impacted sites severe Post-Mitigation Impacts from Quiet Zones and Noise Walls: 143 total impacted sites 4 severe Mitigation: Quiet Zones (local jurisdictions) Noise Walls Investigating Additional Measures 31

32 Visual Visual Impacts Noise Walls (37,200+ linear feet; 8 feet high) Fencing length of corridor Overhead Catenary length of corridor Aerial structures Mitigation: Consult local jurisdictions on design 32

33 Parks and Open Space Globeville Landing Park Impacted by alignment 15 trees removed 3 frisbee golf holes Yucca Way Property Impacted by station parking Grandview Ponds Open Space and Prairie Dog Habitat Impacted by relocating pond at 104 th Avenue Station Mitigation: Coordinate with Jurisdictions Globeville Landing Park Yucca Way Property 33

34 Trails Trails Direct Impact: Fernald Trail Signal Ditch Trail Rocky Top Middle School Connector Trail Fernald Trail Mitigation: Coordinate with Jurisdictions and Schools Realign or Grade Separate Signal Ditch Trail Rocky Top MS Trail 34

35 Other Wetlands acres acres Other Water features Mitigation: As specified in 404 Permit with USACE Health, Safety & Security Potential industrial incidents Hazardous materials impacts Mitigation: Additional investigations 35

36 Outreach Summary Project Notices 100,000 + Major Public Meetings 20+ Other Meetings/Presentations 90+ Public Comments Received 1,400 Other Public Outreach Efforts newsletters/e-news including bilingual web site Agency Coordination 36

37 Schedule & Next Steps 37

38 DEIS Build Alternative 38

39 Schedule/Next Steps Public Hearings 9 & 10 December 2009 End DEIS Comment Period 15 Jan 2010 Address DEIS Comments Address Other Outstanding Issues Refine Engineering of Project Elements Refine Impact Calculations & Mitigation Measures Agency Coordination Ongoing Intergovernmental Agreements (IGA) FEIS Spring 2010 ROD Summer 2010 Quiet Zones work with Jurisdictions on Applications DESIGN BUILD RFQ Winter 2010 DESIGN BUILD RFP Early 2011 OPEN

40 Rules for Verbal Comments During Comment Period Please sign up at the welcome area 3 minute limit State your name, address, and organization (if applicable) Cannot give your 3 minutes to others Please focus your comment on the alignment, stations, vehicle technology, impacts and mitigation All comments will be addressed in the FEIS We are not responding to comments tonight 40

41 Comments? 41

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

S-03-SegB: South Federal Way to Fife LRT

S-03-SegB: South Federal Way to Fife LRT Project Number S-03-SegB Subarea South King/Pierce Primary Mode Light Rail Facility Type Corridor Length 4.0 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE

More information

SWLRT Community Advisory Committee Meeting. June 27, 2013

SWLRT Community Advisory Committee Meeting. June 27, 2013 SWLRT Community Advisory Committee Meeting June 27, 2013 Today s Topics Welcome and Introductions Hennepin County Works Update: TSAAP Open House Summary Mind-Mixer Demonstration Focus Group Outreach Technical

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2016 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2017 Introduction The

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2015 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2016 Introduction The

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

West of Hudson Regional Transit Access Study

West of Hudson Regional Transit Access Study West of Hudson Regional Transit Access Study Open House Presentation June 1, 2009 1 Agenda 1. Progress to Date 2. Level 1 Screening Analysis 3. Level 2 Screening Criteria 4. Next Steps 5. Questions and

More information

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 Varuna A. Singh August 17, 2018 NHHIP OVERVIEW Project divided into three segments: Segment 1: I-45: from Beltway 8 to I-610 (9 mi) 45 Segment

More information

Business Advisory Committee. October 1, 2013

Business Advisory Committee. October 1, 2013 Business Advisory Committee October 1, 2013 1 Today s Topics Hennepin County Community Works Update Project Development Update Ridership Next Steps Success Measures Update Member and Committee Reports/Public

More information

Corridor Management Committee. December 17, 2014

Corridor Management Committee. December 17, 2014 Corridor Management Committee December 17, 2014 1 Today s Topics Technical Issues/Issue Resolution Process Environmental Consultant Contract Update Advisory Committees Community Advisory Committee Business

More information

The Blue Line Extension

The Blue Line Extension The Blue Line Extension NORTH CAROLINA JOINT TRANSPORTATION OVERSIGHT COMMITTEE Presented by Carolyn Flowers CATS Chief Executive Officer Raleigh, NC February 10, 2012 Overview Charlotte Area Transit System

More information

CLAYTON COUNTY TRANSIT INITIATIVE. Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017

CLAYTON COUNTY TRANSIT INITIATIVE. Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017 CLAYTON COUNTY TRANSIT INITIATIVE Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017 AGENDA Welcome! Introduction of Speakers Webinar Housekeeping Project Overview & Status

More information

System Expansion Implementation Plan. Board Meeting, April 2017

System Expansion Implementation Plan. Board Meeting, April 2017 System Expansion Implementation Plan Board Meeting, April 2017 2016: A record-breaking year Opened 3 new light rail stations. Completed tunneling for 3 more. Broke ground on our longest extension to date.

More information

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego Maximizing Asset ROI for Self & Clients in a Public Sector Setting July 16 th San Diego State of Washington Population: 7.53 M Area: 71,303 Sq. Miles Population density: 107 population/mi² Puget Sound

More information

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018 MARTA BOARD OF DIRECTORS OCTOBER 4, 2018 TODAY S AGENDA o Key driver of the program o Recommended plan o Project summaries o Next steps 2 KEY DRIVER: PUBLIC INPUT o Atlanta City Design o Atlanta s Transportation

More information

Corridor Management Committee. January 12, 2017

Corridor Management Committee. January 12, 2017 Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major

More information

Provo-Orem Bus Rapid Transit

Provo-Orem Bus Rapid Transit Provo-Orem Bus Rapid Transit and Timpanogos Maintenance Facility Expansion Procurements Informational Meeting August 18, 2014 Agenda Topic Presenter Time Introduction of key project personnel Project history

More information

Corridor Management Committee. January 14, 2016

Corridor Management Committee. January 14, 2016 Corridor Management Committee January 14, 2016 1 Today s Topics 2 Regional METRO System Overview 2016 Project Overview: Key Activities and Milestones Municipal Consent Schedule Design Resolution Schedule

More information

Downtown to NAIT LRT Concept Plan Attachment 4 Public Involvement Summary

Downtown to NAIT LRT Concept Plan Attachment 4 Public Involvement Summary north, lrt, light, transit, rail, track, line, closure, close, road, interuption, partial, lane, construction, bulletin, NAIT, line, motorist, pedestrian, map, metro, line,downtown to NAIT LRT Concept

More information

PROJECT TIMELINE. Next steps. Plan. Start of Service

PROJECT TIMELINE. Next steps. Plan. Start of Service PROJECT TIMELINE 2018 2019 2020 2021 2022 2023 WE ARE HERE Plan Develop Build Develop design options for termini, station locations, and transit operations Conduct environmental research Assess funding

More information

Community Advisory Committee. June 5, 2017

Community Advisory Committee. June 5, 2017 Community Advisory Committee June 5, 2017 1 Today s Topics Call to Order/Introductions Approval of Minutes Project Overview Traffic Signal Coordination 60% Plans Update Advanced Construction: Bassett Creek

More information

Denver s Future. City Club of Denver

Denver s Future. City Club of Denver Denver s Future City Club of Denver Post-Recession Challenges Building Trades hit hard Aging population Neglected/unfunded infrastructure Constrained federal and state budgets Affordable housing (construction

More information

ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n

ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n RFP P5413 Contract No. 200703566 Work Order No. -07 ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: DMJM Harris/JJG Joint

More information

Downtown Boise Multimodal Center

Downtown Boise Multimodal Center Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department

More information

Metrobus 30s Line Enhancements

Metrobus 30s Line Enhancements Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

vision42

vision42 vision42 www.vision42.org vision4 auto-free light rail 2 boulevard for 42nd Street Roxanne Warren, AIA, Chair George Haikalis, ASCE, Co-Chair Institute for Rational Urban Mobility,Inc. www.vision42.org

More information

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Municipal Service Park 3 December Consolidation of City services to one centralized complex Municipal Service Park 3 December 2010 Consolidation of City services to one centralized complex Overview: Operational Challenges and Opportunities South East Connector impacts Opportunities: The South

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

MOTION NO. M Agreement with the Microsoft Corporation and the City of Redmond for the Overlake Transit Center within the East Link Extension

MOTION NO. M Agreement with the Microsoft Corporation and the City of Redmond for the Overlake Transit Center within the East Link Extension MOTION NO. M2014-79 Agreement with the Microsoft Corporation and the City of Redmond for the Overlake Transit Center within the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital

More information

DART s Program of Inter-Related Projects. Joint DART and Transportation and Trinity River Project Committee 10 November 2014

DART s Program of Inter-Related Projects. Joint DART and Transportation and Trinity River Project Committee 10 November 2014 DART s Program of Inter-Related Projects Joint DART and Transportation and Trinity River Project Committee 10 November 2014 Outline Dallas CBD Second Alignment (D2) What s Changed Since 2006 Core Capacity

More information

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 INTRODUCTION The City of Moorhead (City), along with the Fargo-Moorhead Metropolitan Council of Governments (FM

More information

Community Update. June 21, 2011

Community Update. June 21, 2011 Community Update June 21, 2011 Presented at Beth Sholom Synagogue Presented by: Honourable Kathleen Wynne, Minister of Transportation Councillor Karen Stintz, Chair, Toronto Transit Commission Eglinton-Scarborough

More information

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014 I-20 EAST TEXAS CORRIDOR STUDY TxDOT Planning Conference, Corpus Christi June 4 th, 2014 Table of Contents 1 Introduction 3-5 2 I-20 East Texas Corridor Advisory Committee 6-10 3 Study Schedule 11-12 4

More information

High Speed Rail Update

High Speed Rail Update Update Mobility Solutions, Infrastructure and Sustainability Committee October 8, 2018 Brady Redwine Vice President Texas Central Molly Carroll Executive Director Project City of Dallas 1 Presentation

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

Approval of Medical Center New Entrance Agreement

Approval of Medical Center New Entrance Agreement Finance & Administration Committee Action Item III-A February 14, 2013 Approval of Medical Center New Entrance Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

Facebook West Campus. Planning Commission Meeting February 25, 2013

Facebook West Campus. Planning Commission Meeting February 25, 2013 Facebook West Campus Planning Commission Meeting February 25, 2013 Meeting Purpose Review and make a recommendation to the City Council on the following items (Attachment C): Statement of Overriding Considerations

More information

Moving Forward with Transit Oriented Communities

Moving Forward with Transit Oriented Communities Moving Forward with Transit Oriented Communities Planning & Development Committee October 7, 2014 Packet Pg. 33 History of TOD at RTD Mid 1990s - Local jurisdictions start planning for TOD 2000 RTD hires

More information

North Denver Cornerstone Collaborative

North Denver Cornerstone Collaborative North Denver Cornerstone Collaborative World-class cities begin with great planning Initiative Overview The North Denver Cornerstone Collaborate (NDCC) is part of a larger comprehensive envisioning effort

More information

Community Update. June 8, 2011

Community Update. June 8, 2011 Community Update June 8, 2011 Presented to: Scarborough Community Presented by: Honourable Kathleen Wynne, Minister of Transportation Councillor Karen Stintz, Chair, Toronto Transit Commission Eglinton-Scarborough

More information

STUDY REPORT #1 ADDENDUM

STUDY REPORT #1 ADDENDUM STUDY REPORT #1 ADDENDUM 1.0 PURPOSE OF ADDENDUM This document is an addendum to Study Report #1: Sub-System Planning Alternatives. The purpose of this addendum is to bridge the gap between the initial

More information

Electrification - Infrastructure Construction activities in Segment 2:

Electrification - Infrastructure Construction activities in Segment 2: Peninsula Corridor Electrification Project (PCEP) Q1 Quarterly Update #12 July 1 September 30, 2017 JPB Board Meeting November 2, 2017 Agenda Item # 8a Electrification - Infrastructure Construction activities

More information

// Atlanta BeltLine Quarterly Briefing

// Atlanta BeltLine Quarterly Briefing // Atlanta BeltLine Quarterly Briefing Second Quarter // May 15, 2014 5/20/2014 Atlanta BeltLine // 2014 Page 1 // Agenda Welcome Atlanta BeltLine, Inc. Update Parks, Trails, Transit Art on the Atlanta

More information

Reston Town Center North Development. Community Update

Reston Town Center North Development. Community Update Reston Town Center North Development Community Update May 31, 2017 1 Presentation Agenda Project Overview Site and Current Property Ownerships Development Plan/Grid of Streets Proposed Ownership Comprehensive

More information

Bill Jackson Asst. Statewide Utility Engineer, Office of Construction MDOT SHA

Bill Jackson Asst. Statewide Utility Engineer, Office of Construction MDOT SHA Jeff Ensor TDD Chief of Staff Director of Project Development & Delivery MDOT MTA Purple Line Judy Freedman Breckon Director of Property Acquisition MDOT MTA Purple Line Brian Horn Purple Line Real Estate

More information

APPENDIX C SOURCES & REFERENCES CITED

APPENDIX C SOURCES & REFERENCES CITED APPENDIX C SOURCES & REFERENCES CITED Sources & References Cited Chapter 1 City of Minneapolis. 2007. Access Minneapolis Ten Year Transportation Action Plan. Connetics Transportation Group. 2012. Transit

More information

Station Location Feasibility Study

Station Location Feasibility Study Station Location Feasibility Study Gateway Cities Gateway Cities Service Council Meeting May 11, 2017 Gateway Cities Service Council Meeting May 11, 2017 1 Meeting Purpose Introduce and present the Metrolink

More information

Los Angeles Metro Upcoming Tunneling Opportunities

Los Angeles Metro Upcoming Tunneling Opportunities Los Angeles Metro Upcoming Tunneling Opportunities Westside Subway Extension Regional Connector Crenshaw/LAX Transit Corridor Los Angeles County Metropolitan Transportation Authority 1 Westside Subway

More information

VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group

VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group June 16, 2016 Agenda Follow-up Items, Project Updates and Work Plan Construction Methodology Joint Development Construction

More information

Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps. Park Board Committee Meeting Monday, January 15, 2018

Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps. Park Board Committee Meeting Monday, January 15, 2018 Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps Park Board Committee Meeting Monday, January 15, 2018 Purpose To provide an update on Metro Vancouver s Stanley Park Water

More information

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE SITE COMPARISON CHART CITY Bellevue County Kirkland Kirkland Redmond ADDRESS 555 116th Ave. Lane 118th Ave. 14955 90th St. ACREAGE 5.6 10.7 7.5 5.5 7.2 to 11.6 ACRES ZONING COMMERCIAL LIGHT INDUSTRIAL

More information

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY Chapter 15: Safety and Security A. INTRODUCTION This chapter discusses safety and security as they relate to the Proposed Project and summarizes how potential safety and security issues are identified

More information

Corridor Management Committee Meeting. June 4, 2014

Corridor Management Committee Meeting. June 4, 2014 Corridor Management Committee Meeting June 4, 2014 1 Today s Topics Welcome Approval of Minutes Municipal Consent Process Update Public Hearing Schedule City/County Comment Categories Public Outreach Activities

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

F O R S A L E 2 Acre Outparcel Four Lane Exposure Gateway Corridor to Downtown 0 Kathleen Road, Lakeland, Florida 33801

F O R S A L E 2 Acre Outparcel Four Lane Exposure Gateway Corridor to Downtown 0 Kathleen Road, Lakeland, Florida 33801 0 Kathleen Road, Lakeland, Florida 33801 Property: This is a 2 acre out parcel. Site is level and serviced by a master water retention system. Adjacent to the south is the newly built Storeright Self Storage

More information

INDUSTRIAL LAND FOR SALE

INDUSTRIAL LAND FOR SALE INDUSTRIAL LAND FOR SALE INDUSTRIAL LAND & DEVELOPMENT OPPORTUNITIES 150 ACRE INDUSTRIAL BUSINESS PARK LOTS RANGING FROM 5 150 ACRES Property Features Nexus at DIA provides a compelling opportunity for

More information

1.0 PURPOSE AND NEED

1.0 PURPOSE AND NEED 1.0 PURPOSE AND NEED This chapter documents the need for transit improvements in the Northwest Corridor and the purposes that the proposed project is intended to serve. An overview of the study corridor

More information

Agenda Overview. Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close

Agenda Overview. Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close Agenda Overview Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close 2 1. Welcome and Meeting Overview 1. Process Update 3

More information

Click to edit Master title style Click to edit Master title style

Click to edit Master title style Click to edit Master title style Southwest Chief & Front Range Passenger Rail Commission Overview for Transportation Legislative Review Committee November 2, 2017 Presented by: Sal Pace Jacob Riger, AICP November 2, 2017 FIRST WE WERE

More information

Community Update. May 31, 2011

Community Update. May 31, 2011 Community Update May 31, 2011 Presented to: Leaside Community Presented by: Honourable Kathleen Wynne, Minister of Transportation Councillor Karen Stintz, Chair, Toronto Transit Commission Eglinton-Scarborough

More information

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM FROM: Joel Rae, Director of Public Safety (ext. 113) THROUGH: Deb Hinsvark, Interim City Manager (ext. 228) DATE: December 18, 2012 RE: Police and Fire

More information

A Data Model for Distributed Data Management. Matt Erker, Phil Lidov

A Data Model for Distributed Data Management. Matt Erker, Phil Lidov A Data Model for Distributed Data Management Matt Erker, Phil Lidov Problem Statement Transportation planning, from statewide long range planning through environmental assessment of individual improvements,

More information

Engaging Maryland toward CAV advancements Christine Nizer, Administrator

Engaging Maryland toward CAV advancements Christine Nizer, Administrator Engaging Maryland toward CAV advancements Christine Nizer, Administrator Maryland Department of Transportation Motor Vehicle Administration Maryland CAV activities Overall goal: Maryland is open for business

More information

Los Angeles County One Gateway Plaza 2i3.g Tel Metropolitan Transportation Authority Los Angeles, CA metro.net

Los Angeles County One Gateway Plaza 2i3.g Tel Metropolitan Transportation Authority Los Angeles, CA metro.net Metro Los Angeles County One Gateway Plaza 2i3.g22.2000 Tel Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.net PLANNING AND PROGRAMMING COMMITTEE JULY 14,2010 SUBJECT: BUENA VISTA

More information

Bus Circulator Feasibility Study Scope of Work March 12, 2018

Bus Circulator Feasibility Study Scope of Work March 12, 2018 The City of Hyattsville Comprehensive Transportation and Infrastructure Study Bus Circulator Feasibility Study Scope of Work March 12, 2018 Project Approach At the request of the City of Hyattsville, Toole

More information

Section 4: Citizen s Guide to SDEIS

Section 4: Citizen s Guide to SDEIS Section 4: Citizen s Guide to SDEIS Improving mobility Record Page 40 Easing congestion Strengthening our communities Central Corridor Light Rail Transit Citizens Guide to the Supplemental Draft State

More information

4 Transportation Systems

4 Transportation Systems 4 Transportation Systems This chapter presents the existing transportation facilities and services in the study area and the anticipated environmental impacts of the two project alternatives presented

More information

Transportation & Mobility

Transportation & Mobility Transportation & Mobility October 11, 2017 October 11, 2017 Community Dialogue Series Session 3: Transportation & Mobility YOU ARE NOT STUCK IN TRAFFIC. YOU ARE TRAFFIC. October 11, 2017 Community Dialogue

More information

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS DOÑA ANA COUNTY COMMUNITY PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Building Planning GIS 845 North Motel Boulevard Las Cruces, New Mexico 88007 (575) 647-7350 Fax: (575) 525-6131 Toll Free: 1 (877)

More information

Evolution of TOC. Joint Development Program TOD Land Use/Planning Grants Transit Supportive Toolkit Union Station Redevelopment

Evolution of TOC. Joint Development Program TOD Land Use/Planning Grants Transit Supportive Toolkit Union Station Redevelopment Transit Oriented Communities October 12, 2018 Evolution of TOC Joint Development Program TOD Land Use/Planning Grants Transit Supportive Toolkit Union Station Redevelopment First/Last Mile Strategy Systemwide

More information

TRANSIT CENTER DISTRICT PLAN

TRANSIT CENTER DISTRICT PLAN TRANSIT CENTER DISTRICT PLAN Informational Presentation Planning Commission 04.19.2012 San Francisco Planning Department In partnership with: San Francisco Redevelopment Agency Transbay Joint Powers Authority

More information

Scoping Information Report

Scoping Information Report Scoping Information Report February 2019 To request accommodations for persons with disabilities or information in alternative formats, call 1-800-201-4900/TTY Relay: 711 or email accessibility@soundtransit.org.

More information

New York Building Congress May 24, Uday Durg, P.E. Senior Vice President & Chief Engineer MTA Capital

New York Building Congress May 24, Uday Durg, P.E. Senior Vice President & Chief Engineer MTA Capital New York Building Congress May 24, 2016 Uday Durg, P.E. Senior Vice President & Chief Engineer MTA Capital Construc@on Agenda 1. East Side Access 2. Second Avenue Subway 3. Penn Access 4. Security Projects

More information

Welcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project

Welcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project Welcome Metro North Transmission Project Vancouver Community Information Open House March 9, 207 Thank you for attending this Community Information Open House about the Metro North Transmission Project.

More information

Stem Beach Solar 1041 Application

Stem Beach Solar 1041 Application Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project

More information

Stakeholder Engagement Summary Report

Stakeholder Engagement Summary Report Stakeholder Engagement Summary Report South Shore Corridor Project 1. INTRODUCTION 1.1 Project Overview Port Metro Vancouver s South Shore Trade Area is of critical importance to Canadian trade. One of

More information

US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016

US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016 1 US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016 Today s Presentation Outline 2 US 101 Widening Strategy 4 Phases Status of Phase IV: South Coast 101 HOV Project (Tony Harris) Phase

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Lake View ris Nichols Dillon North M yrtle Beach ullins 410 Latt Marion 319

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Lake View ris Nichols Dillon North M yrtle Beach ullins 410 Latt Marion 319 9 Loris 9 Nichols Dillon 41 tu 57 917 410 Latta 905 tu 38 Marion 319 Conway 41 North Myrtle Beach Cemetery (SCDOC) Landfills (SCDHEC) NPS/SPL Superfund Sites (SCDHEC) Schools (SCDOC) FIGURE 211 ALTERNATIVE

More information

Multimodal TOD Principles for Denver Union Station Rail~Volution November 7, 2006

Multimodal TOD Principles for Denver Union Station Rail~Volution November 7, 2006 Multimodal TOD Principles for Denver Union Station Rail~Volution November 7, 2006 TOD Principles for Denver Union Station 1. Use Partnerships 2. Understand the history of the place 3. Strong community

More information

Unified Development Code. Public Workshop No. 3 November 7, 2017

Unified Development Code. Public Workshop No. 3 November 7, 2017 Unified Development Code Public Workshop No. 3 November 7, 2017 Purpose of the Project 2 The overall goal of the project is to bring together the County s Land Development Regulations (Chapter 74 of the

More information

Regional Transit System (RTS) BRT Feasibility Study Project Kick-Off. Project Management Team Meeting May 22, 2008

Regional Transit System (RTS) BRT Feasibility Study Project Kick-Off. Project Management Team Meeting May 22, 2008 Regional Transit System (RTS) BRT Feasibility Study Project Kick-Off Project Management Team Meeting May 22, 2008 Agenda Welcome and Introductions National Bus Rapid Transit Institute (NBRTI) Overview

More information

GATEWAY PROGRAM OVERVIEW AND UPDATE

GATEWAY PROGRAM OVERVIEW AND UPDATE January 12, 2017 GATEWAY PROGRAM OVERVIEW AND UPDATE John D. Porcari, Interim Executive Director Gateway Program Development Corporation 1 GATEWAY PROGRAM DEVELOPMENT CORPORATION» Incorporated in the state

More information

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Customer Services, Operations, and Safety Committee Board Information Item III-B September 24, 2009 Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Washington Metropolitan Area

More information

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time. TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,

More information

Dallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office

Dallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office Trinity Parkway Alternative 3C Dallas City Council August 2, 2017 Jody Puckett, Assistant City Manager (I) City Manager s Office Presentation Overview Provide background on Trinity Parkway Alternative

More information

NCTCOG MTP Policy Bundle Application for TXDOT

NCTCOG MTP Policy Bundle Application for TXDOT MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.

More information

Environmental Impact Questionnaire

Environmental Impact Questionnaire Community Development Department 11 English Street Petaluma, CA 94952 Phone: 707-778-4301 Email: cdd@ci.petaluma.ca.us Web: www.cityofpetaluma.net/cdd Building Geographic Information Systems Housing Neighborhood

More information

BEVRLYRLY STAFF REPORT. Meeting Date: August 4, 2015 Item Number: To: From:

BEVRLYRLY STAFF REPORT. Meeting Date: August 4, 2015 Item Number: To: From: BEVRLYRLY STAFF REPORT Meeting Date: August 4, 215 Item Number: To: From: Honorable Mayor & City Council Mark Cuneo, City Engineer Aaron Kunz, Deputy Director of Transportation Subject: Update on Metro

More information

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING Project Background Description of the Project Alternatives Analysis Process Project Progress Activity Stations Comments Adjourn 2 VIA spent 2 years

More information

Master Plan for the Port of New York and New Jersey: A Road Map for the Next 30 Years

Master Plan for the Port of New York and New Jersey: A Road Map for the Next 30 Years Master Plan for the Port of New York and New Jersey: A Road Map for the Next 30 Years **Hatch: Please provide images used on GID presentation title page. Also please provide replace image of 1 WTC with

More information

Bellevue s Traffic Adaptive Signals

Bellevue s Traffic Adaptive Signals What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April

More information

Joint Business and Community Advisory Committee Meeting. April 15, 2015

Joint Business and Community Advisory Committee Meeting. April 15, 2015 Joint Business and Community Advisory Committee Meeting April 15, 2015 1 Today s Topics Welcome & Introductions BAC & CAC Introductions Project Overview and Staff Introductions Role, Responsibilities and

More information

Making Mobility Better, Together JANUARY 31, 2013 AUSTIN CITY COUNCIL PROJECT CONNECT REGIONAL TRANSIT UPDATE

Making Mobility Better, Together JANUARY 31, 2013 AUSTIN CITY COUNCIL PROJECT CONNECT REGIONAL TRANSIT UPDATE Making Mobility Better, Together JANUARY 31, 2013 AUSTIN CITY COUNCIL PROJECT CONNECT REGIONAL TRANSIT UPDATE Achieving Compact & Connected Engaging in a regional transit discussion Pursuing a compact

More information

Record of Public Comment on Central Corridor SDEIS

Record of Public Comment on Central Corridor SDEIS Executive Summary Page 1 Executive Summary Project Background The Ramsey County Regional Rail Authority (RCRRA) initiated the Central Corridor scoping process in 2001 and conducted the Alternatives Analysis

More information