Visualization Software for Wide-Area Situational Awareness. Power Affiliates Program. May 20, 2011

Size: px
Start display at page:

Download "Visualization Software for Wide-Area Situational Awareness. Power Affiliates Program. May 20, 2011"

Transcription

1 Visualization Software for Wide-rea Situational wareness Power ffiliates Program May 20, South First Street Champaign, Illinois (217) Mark Laufenberg, Ph.D.

2 History of PowerWorld 1994: Simulator Version 1.0 was created by Professor Thomas Overbye at the University of Illinois. Original motivation was for teaching power system operation to nontechnical audiences. Emphasis on visualization PowerWorld Corporation continues to maintain close ties with the University 1996: PowerWorld Corporation was formed to further develop and commercialize the tool. Simulator evolved into a powerful and robust power system analysis and visualization environment. 2000: PowerWorld Retriever developed for real-time visualization 2006: PowerWorld Simulator surpasses 500 customer installations worldwide 2

3 PowerWorld Overview Simulator Load flow analysis and power system visualization State-of-the-art user interface Retriever Real-time visualization for the control room and remote access Easy for customer to configure and customize OPS-X: NERC-approved operator training exercises 3

4 PowerWorld Visualization One-line diagrams Wide-area geographic views Local and sub-topology views Bus View and Substation View nimated power flows Dynamically-sized pie charts for line and interface loading Color contouring for any numeric quantity such as voltage, angle, LMP, line loading, etc. Dynamic formatting, alarming, and emphasis GIS Support 4

5 One-line Diagrams Basic tool in power system visualization 80 MW 30 Mvar 200 MW 110 MW 40 Mvar Case Hourly Cost $/hr 50 MW 40 MW 20 Mvar 150 MW Top rea Cost 8596 $/hr 130 MW 40 Mvar 200 MW Left rea Cost Right rea Cost 0 Mvar 4187 $/hr 3994 $/hr 200 MW 168 MW 200 MW 0 Mvar 5

6 Voltage Contours 100 to 200 kv per unit voltage contour 6

7 Bus View One-line utomatically created diagram which shows the connections at a single bus 7

8 Map Board-Style Substation Diagram 3 SNDIEGO San Luis Rey kv Load: 80 MW 155 MW mps mps 7 SNDIEGO Miguel kv mps 1154 MW 7 SNDIEGO Imperial Valley kv Gen: 460 MW mps 410 MW SNDIEGO Old Town kv Load: 59 MW 2 mps mps 222 MW 4 SNDIEGO Mission Peaker kv Load: 142 MW mps 150 MW 7 SNDIEGO South Bay kv Gen: 533 MW 8

9 di agram created by E. Wegman Substation Topology MW Mv ar KV 0.41 Deg 0 MW 0 Mv ar 8 MW 14 Mv ar PN KEYSTONE MW Mv ar KV 0.40 Deg 853 MW 143 Mv ar MW Mv ar 8170 MV 8171 PL (3) JUNIT kV MW Mv ar MW Mv ar MW Mv ar 8178 MV MV 849 MW 141 Mv ar MW Mv ar MV 0.37 MW Mv ar KV Deg KV 0.37 MW 2.99 MW 3.10 Mv ar Mv ar KV MW Deg Mv ar MW Mv ar MV KV MV Deg Deg 2.99 MW 0.67 Mv ar KV Deg MW 0 Mv ar 0.37 MW Mv ar MV KV Deg KV 4.49 MW Mv ar 0 MW 0 Mv ar KV Deg Deg KV Deg PN (10) SHELOCT kV MV 4.49 MW 0.32 Mv ar 2.24 MW 0.67 Mv ar KV Deg 8 MW 14 Mv ar KV Deg MV MW Mv ar PN (10) CONEMUG kV MW 0.07 Mv ar MV 2.66 MW Mv ar PS (15) SBEND kV MW 8.74 Mv ar MV MV MW Mv ar MW Mv ar 0.37 MW 0.93 Mv ar MV 2.24 MW Mv ar 1 KV Deg MW Mv ar PS (15) CBOT kV 9

10 reas and Tie-Line Interfaces CP PENELEC NI NIPS TE CEI OE DLCO PJM500 CILCO EP IP IPL METED DPL CWLP CIPS HE CIN P PEPCO OVEC IMP SIPC VP EMO SIGE BREC EKPC EEI LGE KU DOE DUKE CPLE TV CPLW 10

11 Dynamically-Sized Pie Charts 11

12 rea Diagram with Load Contour 12

13 Contouring with 3D Columns: Reactive Reserves 13

14 Line Flows: Without Emphasis Filter 14

15 Line Flows: Emphasis Filter on High Voltage System 15

16 GIS Support 16

17 Phase Measurement Units: Text, Contour, and Gauges 17

18 Visualization and nalysis for Operations Historically, operational data has been trapped inside legacy Energy Management Systems (EMS) EMS software is very expensive, difficult to use, and difficult to modify PowerWorld Retriever has been used in real time operations as a visualization and analysis tool that augments and replaces some EMS functionality Much lower cost Much easier to use and implement Much easer and cheaper to modify and improve new analysis tool Integrated Topology Processing breaks down the historical wall between operational data and the rest of the enterprise ITP allows engineers and operators to do use fast, easy to use tools to improve situational awareness and increase grid efficiency and reliability 18

19 Retriever in TV Control Room 19

20 Implementation at ISO-NE Courtesy: ISO New England Inc. Prototype wallboard (9X3 array, 20 LCD monitors) Hired a professional /V company to help optimizing the content of wallboard displays and develop a style guide Daily interaction with control room operators when building displays Testing was actually done by control room operators ll employee move to new building on pril 24, 2006 Parallel control room operation between May 1 and 5 Final control room move on May 5, 2006 and Wallboard (9X3 array, 80 DLP video wall) go live! Operators love it! 2009 PowerWorld Corporation 20

21 Courtesy: ISO New England Inc. Wallboard: 9*3 array, 12 feet tall, 48 feet wide 2009 PowerWorld Corporation 21

22 Courtesy: ISO New England Inc. Wallboard: 9*3 array, 12 feet tall, 48 feet wide 2009 PowerWorld Corporation 22

23 Wide rea Monitor Courtesy: ISO New England Inc PowerWorld Corporation 23

24 ISO NE Internal Interface Bubble Courtesy: ISO New England Inc PowerWorld Corporation 24

25 PJM and NY Internal Interface Courtesy: ISO New England Inc PowerWorld Corporation 25

26 Voltage Contour Courtesy: ISO New England Inc PowerWorld Corporation 26

27 Substation One-Line Diagram Courtesy: ISO New England Inc PowerWorld Corporation 27

28 Mvar Reserve Gauge Courtesy: ISO New England Inc PowerWorld Corporation 28

29 PowerWorld EMS Integration Courtesy: ISO New England Inc. PW Simulator PW Retriever

30 SFNR V2 Project nnounced 31 March, 2011 Winning Team: SmartCloud, PowerWorld, Instep Goal: Situational wareness for FERC, NERC and the Regions 30

31 SFNR Implementation SmartCloud will set up a new NERCnet/ICCP node in Boston at a highly secure data center Users will log into SFNR site Customized version of PowerWorld will be installed, along with cases, diagrams, and links to data Real-time data will be updated at a user specified interval 31

32 Retriever Implementation Models: Full topology models, exact copies of EMS model, filtered for SFNR use (230 kv and above) liases/tags: Linked via file used by RCs during EMS model set up Diagrams: Built by PowerWorld automatically and edited manually 32

33 RC Concerns Data is being shared already among Reliability Coordinators (12 of them) However, not historically shared in a meaningful way with NERC and FERC lso concerns with marketers, traders, and other industry participants 33

Multi User Operations Training Simulator. Trainers Workshop Reception

Multi User Operations Training Simulator. Trainers Workshop Reception : Multi User Operations Training Simulator Trainers Workshop Reception July 26, 2012 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 Scott R. Dahman, P.E. scott@powerworld.com http://www.powerworld.com

More information

Oscillation Monitoring System

Oscillation Monitoring System Oscillation Monitoring System Mani V. Venkatasubramanian Washington State University, Pullman, WA mani@eecs.wsu.edu Project Objectives Oscillation Monitoring System for WECC and Entergy Monitoring hundreds

More information

Using PMU Data to Increase Situational Awareness

Using PMU Data to Increase Situational Awareness Using PMU Data to Increase Situational Awareness Tom Overbye Fox Family Professor of Electrical and Computer Engineering University of Illinois at Urbana-Champaign December 2010 PSERC Webinar PSERC Project

More information

2016 Fall ITO Stakeholder Meeting. Topics in Operations

2016 Fall ITO Stakeholder Meeting. Topics in Operations 2016 Fall ITO Stakeholder Meeting Topics in Operations 11/17/2016 TOP-003-3 Requirement R1. Each Transmission Operator shall maintain a documented specification for the data necessary for it to perform

More information

Grid Modernization at SDG&E

Grid Modernization at SDG&E Grid Modernization at SDG&E Ali Yari Director, Electric Grid Operations 2017 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E Service Territory Subsidiary of Sempra

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

Introduction to PowerWorld Simulator: Interface and Common Tools

Introduction to PowerWorld Simulator: Interface and Common Tools Introduction to PowerWorld Simulator: Interface and Common Tools I1: The PowerWorld Simulator Case Editor 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

Visualization of. Power Systems and Components (S-18)

Visualization of. Power Systems and Components (S-18) Visualization of Power Systems and Components (S-18) Tom Overbye Sakis Meliopoulos Doug Wiegmann Esa Rantanen Tele-Seminar, January 24, 2006 2006 Tom Overbye. All rights reserved. Project Overview Project

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

PowerWorld s Experience Using Real-Time Power System Models

PowerWorld s Experience Using Real-Time Power System Models PowerWorld s Experience Using Real-Time Power System Models Presented by: James Weber, Ph.D. Director of Software Development February 28, 2018 2001 South First Street Champaign, Illinois 61820 (217) 384-6330

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

Terry Williams Tennessee Valley Authority

Terry Williams Tennessee Valley Authority Knox - Douglas 161 (FLO) E Knox - Dumplin Valley 161 exceedance Presentation 1 Use of Proxy Flowgate for Exceedance to: Knox - Douglas 161kV (FLO) E Knox - Dumplin Valley 161kV line 9/29/2015 Terry Williams

More information

Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes

Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes Matt Davis matt@powerworld.com 217 384 6330 Ext. 20 2001 South First Street Champaign, Illinois

More information

Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool

Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool Ed Kovler Jacqulynn Hugee November 2017 What is DIMA? 2 Aware of your surroundings?

More information

Real-Time Data Retrieval and New Visualization Techniques for the Energy Industry

Real-Time Data Retrieval and New Visualization Techniques for the Energy Industry Real-Time Data Retrieval and New Visualization Techniques for the Energy Industry Raymond P. Klump Lewis University and PowerWorld Corporation Urbana, IL 61801 USA ray@powerworld.com Abstract Effective

More information

Cyber and Physical Security: An Integrated Approach Tim Rigg Managing Director, Enterprise Protective Services

Cyber and Physical Security: An Integrated Approach Tim Rigg Managing Director, Enterprise Protective Services A Cultural Petri Dish Cyber and Physical Security: An Integrated Approach Tim Rigg Managing Director, Enterprise Protective Services 2012 NERC Grid Security Conference San Diego, CA October 16-18, 2012

More information

2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012

2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012 2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Agenda Introduction 2012 Grid Assessment

More information

Visualization of Power System Data

Visualization of Power System Data Visualization of Power System Data Thomas J. Overbye overbye@ece.uiuc.edu University of Illinois at Urbana-Champaign Urbana, IL 61801 USA Jamie D. Weber weber@powerworld.com PowerWorld Corporation Urbana,

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

MISO. Smart Grid Investment Grant Update. Kevin Frankeny NASPI Workgroup Meeting October 17-18, 2012

MISO. Smart Grid Investment Grant Update. Kevin Frankeny NASPI Workgroup Meeting October 17-18, 2012 MISO Smart Grid Investment Grant Update Kevin Frankeny kfrankeny@misoenergy.org NASPI Workgroup Meeting October 17-18, 2012 ARRA Disclaimer "This report was prepared as an account of work sponsored by

More information

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Michehl R. Gent President and CEO N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 The Honorable Patrick H. Wood III,

More information

Procedure For NPCC Bulk Electric System Asset Database

Procedure For NPCC Bulk Electric System Asset Database Procedure For NPCC Bulk Electric System Asset Database Compliance Procedure 09 (CP-09) Revision 2 Table of Contents 1. Introduction and Purpose... 3 2. Responsibilities... 3 3. Overview... 3 4. Asset Database...

More information

Addressing Challenges Through Interconnection Wide

Addressing Challenges Through Interconnection Wide Addressing Challenges Through Interconnection Wide Transmission Analysis High Plains Regional Transmission Summit November 3, 2009 David A. Whiteley, Whiteley BPS Planning Ventures LLC 2 Challenge and

More information

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power

More information

Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities

Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities G. Kumar Venayagamoorthy, PhD, FIET, FSAIEE Duke Energy Distinguished Professor & Director & Founder

More information

OPF Automation Examples

OPF Automation Examples OPF Automation Examples 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com OPF Automation Examples Standardize settings with Auxiliary

More information

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 Purpose The purpose of this Practice Guide is provide a reference to be used

More information

A guide on PowerWorld Simulator ver. 12.0

A guide on PowerWorld Simulator ver. 12.0 A guide on PowerWorld Simulator ver. 12.0 This tutorial has been developed to aid the undergraduate and graduate students at the University of Cyprus to learn the basic features of PowerWorld. It is not

More information

PowerWorld Simulator 17 What s New in Simulator. Mark Laufenberg

PowerWorld Simulator 17 What s New in Simulator. Mark Laufenberg PowerWorld Simulator 17 What s New in Simulator Mark Laufenberg lauf@powerworld.com 217 384 6330 ext. 10 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

Seams Management at the RTO level

Seams Management at the RTO level Seams Management at the RTO level IEEE Winter Meeting January 29, 2002 New York, NY Mike Gahagan V. P., CIO and Chief Strategic Officer The Midwest Independent Transmission System Operator, Inc. A Brief

More information

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,

More information

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities Critical Asset Identification Methodology William E. McEvoy Northeast Utilities Disclaimer This NPCC TFIST workshop provides a forum for the presentation and discussion of member experience in the implementation

More information

Wide Area Measurements & Control Systems

Wide Area Measurements & Control Systems The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Wide Area Measurements & Control Systems NERC Security Coordinators and Interregional Security Network Nodes

More information

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Industry: Transmission/Distribution/Smarts Presented by Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Agenda About the NYISO A New State-of-the-Art

More information

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"

More information

University of California, Santa Cruz Baskin Engineering School Electrical Engineering Department

University of California, Santa Cruz Baskin Engineering School Electrical Engineering Department Lab-2 Intro, rev2.0, page 1 University of California, Santa Cruz Baskin Engineering School Electrical Engineering Department Laboratory 2 Tutorial Addendum Introduction to POWERWORLD Simulator EE175L Power

More information

Load Flow Analysis. I Objectives

Load Flow Analysis. I Objectives EE342 Electrical Power Lab Experiment PS3 Load Flow Analysis I Objectives To demonstrate load flow concepts. To study system performance under different operating conditions. To experience the real feel

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

Building a Topology Estimator for Large Inter-regional Networks

Building a Topology Estimator for Large Inter-regional Networks Building a Topology Estimator for Large Inter-regional Networks ETREP02.pdf Robin Podmore *, Margaret Goodrich**, David Becker***, Peter Hirsch***, Stephen Lee ***, Marck Robinson**** robin@incsys.com,

More information

Metering System and Communication Requirements

Metering System and Communication Requirements Metering System and Communication Requirements Andrew Levitt Sr. Market Strategist MIC Special Session on DER June 20, 2017 Definitions Metering system: includes all components from the meter location

More information

Board of Directors Meeting. April 27, 2017

Board of Directors Meeting. April 27, 2017 Board of Directors Meeting April 27, 2017 2016 Annual Report April 27, 2017 Project Team 2016 Annual Report Lead Kari Lynch Communications & Marketing Specialist Independent Auditors Subject Matter Experts

More information

POWER WORLD LAB MANUAL

POWER WORLD LAB MANUAL POWER WORLD LAB MANUAL Power world is a great powerful tool for solving power flows. Solving a power system is a little different from circuit analysis. Instead of being given voltages at certain nodes

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document NERC Cyber Security Standards Drafting Team for Order 706 December 2010 This document provides

More information

Peter J. Buerling Director, Records & Information Compliance. ReliabilityFirst Workshop April 15, 2016

Peter J. Buerling Director, Records & Information Compliance. ReliabilityFirst Workshop April 15, 2016 Peter J. Buerling Director, Records & Information Compliance April 15, 2016 Opening Comments Presentation Topic Disclaimer Presentation Support Introductions Mark Koziel Consultant, CIP Compliance Don

More information

System Studies for American Transmission Co. s Benson Lake SVC Project

System Studies for American Transmission Co. s Benson Lake SVC Project Helping to keep the lights on, businesses running and communities strong System Studies for American Transmission Co. s Benson Lake SVC Project Adam Manty, Transmission Planning Engineer, ATC Outline Introduction

More information

Copyright 2013 OSIsoft, LLC. 1

Copyright 2013 OSIsoft, LLC. 1 1 Industry Benefits and Trends of "PI" for Utilities Presented by Ann Moore, OSIsoft, LLC PI System for Transmission 3 California ISO On the front Lines of the Power Grid - New York Times, October 2011

More information

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1 DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...

More information

Draft CIP Standards Version 5

Draft CIP Standards Version 5 Draft CIP Standards Version 5 Technical Webinar Part 1 Project 2008-06 Cyber Security Order 706 Standards Drafting Team November 15, 2011 Agenda Opening Remarks John Lim, Consolidated Edison, Chair V5

More information

Dynamic State Estimation Based Protection: Laboratory Validation

Dynamic State Estimation Based Protection: Laboratory Validation Dynamic State Estimation Based Protection: Laboratory Validation Paul Myrda - EPRI & A.P. Meliopoulos and G. J. Cokkinides - Georgia Tech October 21, 2014, Houston, TX Contents Background and Motivation

More information

April Oracle Spatial User Conference

April Oracle Spatial User Conference April 29, 2010 Hyatt Regency Phoenix Phoenix, Arizona USA Parag Parikh Dan Kuklov CURRENT Group Kerry D. McBee Xcel Energy Unified Real-Time Network Topology Management Using Xcel Energy SmartGridCity

More information

Electric Transmission and Distribution Future R&D Needs

Electric Transmission and Distribution Future R&D Needs Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization The Center for Advanced Power Systems Florida State University, Tallahassee, Florida February 1,

More information

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber Modeling of RAS and Relays in Power Flow Contingency Analysis Jamie Weber weber@powerworld.com 217 384 6330 ext. 13 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center 2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center Ed Batalla Director of Grid Control Systems Florida Power & Light Company Sept. 24, 2014 Florida Power

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic October 27, 2010 2010 RTEP Baseline Analysis Update Potential loss of load exceeding 300 MW for the loss of the Smithburg Englishtown 230 kv and Raritan River Deep

More information

Optimal Power System Management with SIGUARD

Optimal Power System Management with SIGUARD Optimal Power System Management with SIGUARD Unrestricted www.siemens.com/siguard SIGUARD Suite Increase of Observability, Controllability, Security and Operator Awareness SIGUARD PDP Phasor Data Processing

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1,

EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1, EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1, 2008 www.morganlewis.com Overview Reliability Standards Enforcement Framework Critical Infrastructure Protection (CIP)

More information

Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC

Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC Brazil CIGRE B5 PDC Workshop Considerations and Requirements of PDCs for WAMPAC Systems Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC Rio de Janeiro, Brazil April 6, 2010 Presentation Outline Global

More information

PJM Interconnection Smart Grid Investment Grant Update

PJM Interconnection Smart Grid Investment Grant Update PJM Interconnection Smart Grid Investment Grant Update Bill Walker walkew@pjm.com NASPI Work Group Meeting October 22-24, 2013 Acknowledgment: "This material is based upon work supported by the Department

More information

The Automation of Converting SCADA EMS Displays to PI WebParts

The Automation of Converting SCADA EMS Displays to PI WebParts The Automation of Converting SCADA EMS Displays to PI WebParts Presented by Linda Stevens, Pepco Holdings, Inc Li Luo, Pepco Holdings, Inc Pepco Holdings, Inc Pepco Holdings, Inc. (PHI) is a holding company

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

The Future of Real-Time Energy Management Systems For Transmission System Operations

The Future of Real-Time Energy Management Systems For Transmission System Operations San Francisco Chapter The Institute of Electrical and Electronic Engineers Power Engineering Society The Future of Real-Time Energy Management Systems For Transmission System Operations John Sell, EleQuant,

More information

GridEx IV Initial Lessons Learned and Resilience Initiatives

GridEx IV Initial Lessons Learned and Resilience Initiatives GridEx IV Initial Lessons Learned and Resilience Initiatives LeRoy T. Bunyon, MBA, CBCP Sr. Lead Analyst, Business Continuity 2017 GridEx IV GridEx is a NERC-sponsored, North American grid resilience exercise

More information

California lndependent System Operator Corporation Compliance Filing Docket No. ER

California lndependent System Operator Corporation Compliance Filing Docket No. ER The Woshington Harbour 3000 K Street, N.W., Suite 300 Washington, D.C. 20007-51 16 Phone 202.424.7500 Fox 202.424.7647 January 3l.2005 The Honorable Magalie R. Salas Secretary Federal Energy Regulatory

More information

A Simulation Tool for Analysis of Alternative Paradigms for the New Electricity Business

A Simulation Tool for Analysis of Alternative Paradigms for the New Electricity Business A Simulation Tool for Analysis of Alternative Paradigms for the New Electricity Business Thomas J. Overbye Peter W. Sauer George Gross Mark J. Laufenberg Jamie D. Weber overbye@uiuc.edu p-sauer@uiuc.edu

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator T14: Large-Scale Simulation Examples 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10, Sacramento Municipal Utility District SMUD May 10, 2010 1 SMUD Facts and Figures 900 Sq. Miles Service Area 585,500 Customers 1.4 million Area Population 10 Bulk Substations 473 Miles of Transmission Lines

More information

Situational Intelligence in Control Centers

Situational Intelligence in Control Centers Situational Intelligence in Control Centers G. Kumar Venayagamoorthy, PhD, FIET, FSAIEE Duke Energy Distinguished Professor & Director of the Real-Time Power and Intelligent Systems Laboratory Holcombe

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

Road Map to Grid Modernization

Road Map to Grid Modernization Road Map to Grid Modernization APIC, University of Alberta May 5 th, 2016 Presenter: Chris Chapelsky, MSc., P.Eng. Operations 1 Engineer About EPCOR Water & Power Transmission & Distribution in Edmonton

More information

RTDMS CAISO TRAINING SESSION

RTDMS CAISO TRAINING SESSION Consortium for Electric Reliability Technology Solutions Real-Time Dynamics Monitoring System (RTDMS ) RTDMS CAISO TRAINING SESSION January 31, 2006 Manu Parashar & Jim Dyer Electric Power Group (EPG)

More information

DRAFT Risks and Mitigations for Losing EMS Functions

DRAFT Risks and Mitigations for Losing EMS Functions DRAFT Risks and Mitigations for Losing EMS Functions 1.0 Executive Summary Energy Management System (EMS) is a system of computer-aided tools used by System Operators to monitor, control, and optimize

More information

Recent Issues in Electric Grid Physical Security

Recent Issues in Electric Grid Physical Security Recent Issues in Electric Grid Physical Security Paul W. Parfomak, Ph.D. Congressional Research Service pparfomak@crs.loc.gov Carnegie Mellon University Electricity Industry Center October 8, 2014 What

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

ABB Information & Energy Management systems support Mexico s growing demand for electric power

ABB Information & Energy Management systems support Mexico s growing demand for electric power BB Information & Energy Management systems support Mexico s growing demand for electric power llen R. Skopp, Srinivas Varadan BB etwork Management, a unit of BB utomation, was selected by Mexico s national

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com Multiple Contingencies In most

More information

Tutorials. Tutorial: Creating a New Case Page 1 of 13

Tutorials. Tutorial: Creating a New Case Page 1 of 13 Tutorial: Creating a New Case Page 1 of 13 This procedure describes how to create a simple power system model using PowerWorld Simulator. This procedure was developed for use with version 13 and later

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

PowerWorld Simulator Data Checks

PowerWorld Simulator Data Checks PowerWorld Simulator Data Checks Jamie Weber, Ph.D. Director of Software Development 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

N-1-1 Reactive Upgrades

N-1-1 Reactive Upgrades N-1-1 Reactive Upgrades Previous Analysis Discussed at November 2011 TEAC Voltage collapse for multiple 500 kv N-1-1 contingency pairs A number of reactive upgrade locations evaluated to determine a optimal

More information

NASPI Reliability Coordinator Data Quality Survey Summary. Alison Silverstein NASPI Project Manager March 21, 2016

NASPI Reliability Coordinator Data Quality Survey Summary. Alison Silverstein NASPI Project Manager March 21, 2016 NASPI Reliability Coordinator Data Quality Survey Summary Alison Silverstein NASPI Project Manager March 21, 2016 Overview Improving data quality is essential to assure that synchrophasor technology can

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Benefits, offering and references

Benefits, offering and references DOC ID: 9AKK107045A9180 DISTRIBUTION SOLUTIONS Digital medium-voltage switchgear Benefits, offering and references Contents Digital switchgear for medium-voltage applications Digital switchgear definition

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

An Interactive, Extensible Environment for Power System Simulation on the PMU Time Frame with a Cyber Security Application

An Interactive, Extensible Environment for Power System Simulation on the PMU Time Frame with a Cyber Security Application An Interactive, Extensible Environment for Power System Simulation on the PMU Time Frame with a Cyber Security Application Thomas J Overbye, Zeyu Mao, Komal S. Shetye Dept. of Electrical and Computer Engineering

More information

A Statistical Method for Synthetic Power Grid Generation based on the U.S. Western Interconnection

A Statistical Method for Synthetic Power Grid Generation based on the U.S. Western Interconnection A Statistical Method for Synthetic Power Grid Generation based on the U.S. Western Interconnection Saleh Soltan, Gil Zussman Columbia University New York, NY Failures in Power Grids One of the most essential

More information

10 BEST PRACTICES TO STREAMLINE NETWORK MONITORING. By: Vinod Mohan

10 BEST PRACTICES TO STREAMLINE NETWORK MONITORING. By: Vinod Mohan 10 BEST PRACTICES TO STREAMLINE NETWORK MONITORING By: Vinod Mohan 10 Best Practices to Streamline Network Monitoring Introduction As a network admin, you are tasked with keeping your organization s network

More information

2017 RTEP Assumptions for Western Sub-Region

2017 RTEP Assumptions for Western Sub-Region CLICK TO EDIT MASTER TITLE STYLE Click to edit Master text styles 2017 RTEP Assumptions for Western Sub-Region CLICK 2017 RTEP TO EDIT Assumptions MASTER TITLE STYLE Click Duquesne to edit uses Master

More information

Québec Interconnection Approach to BES

Québec Interconnection Approach to BES Québec Interconnection Approach to BES Placer une photo ici s il y a lieu NPCC Governmental/Regulatory Affairs Advisory Group Sylvain Clermont November 27, 2012 Introduction: HQT Our mission HQT operates

More information

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

IJESRT. Scientific Journal Impact Factor: (ISRA), Impact Factor: [192] [Revency, 3(12): December, 2014] ISSN:

IJESRT. Scientific Journal Impact Factor: (ISRA), Impact Factor: [192] [Revency, 3(12): December, 2014] ISSN: IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY Applications of SCADA in Wind Power Plant- An Overview Revency.J*, Dhanarega A.J, Booma.J, Priyanka.K *The Student/ EEE, PSNA

More information

Northeast Coordinated System Plan and Other Interregional Activities

Northeast Coordinated System Plan and Other Interregional Activities Northeast Coordinated System Plan and Other Interregional Activities IPSAC10 November 6, 2009 Michael I. Henderson and John Buechler Background on Interregional Planning Order 890 requires regional coordination

More information

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices Ed Batalla Director of Technology Florida Power & Light Company September 19, 2013 Florida

More information

Achieving Smarter Grid Operation With On-Line DSA Technology

Achieving Smarter Grid Operation With On-Line DSA Technology Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of

More information

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa System Engineering, IT/OT Integration and the Smart Grid Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa South African grid: large and complex Line (kv) Length (km) 765 1,859 533

More information

Commission Testing Methods for Protection Systems

Commission Testing Methods for Protection Systems Commission Testing Methods for Protection Systems Tom Ernst GE Grid Solutions Ken Sletten Minnesota Power Abstract Commission testing should be designed to assure that the protection system is set and

More information

The debut of Relion 2.2 The new IEDs generation A suitable portfolio for your digital substation

The debut of Relion 2.2 The new IEDs generation A suitable portfolio for your digital substation RELAY DAY 2017 The debut of Relion 2.2 The new IEDs generation A suitable portfolio for your digital substation Miguel Lara Mendoza Sales Manager Factory worldwide Caribbean & Central America Suriname,

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, Washington, USA University of Seville Seville, Spain June 17, 2016 THE INTERCONNECTED GRID Economics Transfer electric