1 WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

2 Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term capital facilities master planning process in order to provide a superior educational environment for our students. During this participative process, facility and site improvement priorities at all five campus locations are identified for expansion and development. These initiatives augment the strategic initiatives and mission of the District. Dr. Curtis L. Ivery, Chancellor

3 TABLE OF CONTENTS Facilities Master Plan: Need and Recommendations Administrative Structure and Resource Management Academic and Career Programs Distance Learning Campus Updates Instructional Support Renovation and Remodeling Technology Infrastructure Improvements

4 Pathways to the Future Program Giving Students More Pathways to the Future is a transformational effort initiated in November 2001, following the passage of the millage, focusing on providing students with new and improved programs, facilities and services throughout the District. Pathways program utilizes an effective dual administrative structure to design, implement and diligently monitor growth initiatives to meet the rapidly growing demand for WCCCD and respond dynamically to the ever changing needs of the communities served.

5 Facilities Improvement Needs Dictated By Dramatic Growth Headcount Spring 2001 Fall 2001 Spring 2002 Fall 2002 Spring 2003 Fall 2003 Spring 2004 Fall 2004 Spring 2005 Credit and non-credit courses Semester

6 Facility And Campus Master Plan Recommendations 1) New Northwest Campus Facility 2) Internet and Computer Success Initiative 3) Multi-purpose Building on the Downriver Campus 4) Upgrading of Existing Campus Facilities and Campuses 5) Establishment of the Technology Careers of the Future 6)Initiative under the leadership of the District Career Commission 7) Investment in Learning and Information technologies 8) Investment in Laboratory and Classroom upgrading

7 ADMINISTRATIVE STRUCTURE

8 ADMINISTRATIVE STRUCTURE The dual administrative structure consists of administrative staff managing ongoing college operations and temporary parttime staff and consultants designs strategic institutional change initiatives. Administrative Teams On-going District Administration Staffing: Primarily Full-Time Administrators Cross-Campus Councils Pathways to the Future (Strategic Initiatives) Staffing: Primarily Temporary Contract Employees

9 ADMINISTRATIVE STRUCTURE OBJECTIVES To expeditiously launch the transformational initiative of the Pathways program while optimizing human resources. To serve as a catalyst for creating a new administrative structure that will ensure broad involvement, dialogue, and decision-making processes from all constituencies regarding strategic matters. To ensure faculty and staff involvement through cross-campus and other related councils.

10 Resource Monitoring & Management Expenditure Audit: In accordance with our high standards of accountability the District has engaged an external auditor to review Pathways expenditures. The process includes an expense analysis, book keeping and account classification propriety checks. Monthly monitoring: Pathways expenditure reports are generated from the system, systematically categorized and given to a committee for review. Quarterly Monitoring: Open or Inactive purchase orders are reviewed by Accounts Payable for any payments generated or cancellations and expenditure report is updated.

11 ACADEMIC AND CAREER PROGRAMS

12 Academic & Career Programs Investment Areas WCCCD has more than 80 degree and certificate programs Automotive Computer Aided Design Criminal Justice Dental Distance Learning Electrical/Electronics Technology Emergency Medical Technology Fire Technology Program Heavy Equipment Maintenance Heating, Ventilation & Air Conditioning Humanities Life Science Machine Tool Technology Nursing Surgical Technology

13 Automotive Technology Computer Aided Design & Electrical/Electronics Technology Furniture Software Robotic Technology Hoists Alignment rack Tools & equipment

14 Heavy Equipment Maintenance Tire Repair Unit Truck Tire Balancer Truck Tire Changer Tools HVAC Heating, Ventilation, and Air Conditioning Boilers Roof-top air units Furnaces Coolers Freezers Refrigerators

15 Life Science Machine Tool Technology Adams Models Analytical Balances Autoclaves Ice makers Lab Supplies Microscopes Various human organ models Skeletons Steam Scrubbers Human Torsos Computerized Machining Mill and Lathe

16 Anesthesia Machine Operating Tables Surgical Instruments Vital Signs Monitors Various Supplies Surgical Technology

17 DISTANCE LEARNING

18 Distance Learning Initiatives Online orientation (2003) State of the art equipment upgrades in Interactive Television classrooms ( ) 2004) Smart Classroom Installations ( ) 2005) Recruiting and training faculty ( ) 2005) Distance Learning Support Center Western Campus (2005) Internet 2 Capability (2005)

19 Distance Learning Major Pathways Expenditure Areas ITV Classrooms Smart Classrooms Upgrades to Infrastructure

20 NEW CONSTRUCTION

21 Downriver Campus Education & Performing Arts Center Projected Construction Start Date: May 2005 Projected Completion Date: July 2006 Projected Cost: $12 $14 million Upper Level Interior Lower Level Interior Exterior Rendering

22 Downriver Emergency Training Complex Construction Began: August 2004 Projected Completion Date: August 2005 Projected Cost: $6 million Rendering

23 New Northwest Campus Projected Construction Start Date: February 2006 Projected Completion Date: August 2007 Projected Cost: $40 50 million Exterior Rendering Health Sciences Building Rendering

24 Western Campus Educational Multipurpose Center Projected Construction Start Date: June 2005 Projected Completion Date: September 2006 Projected Cost: $12 - $14 million Exterior Rendering Interior Rendering

25 INSTRUCTIONAL SUPPORT

26 Instructional Support Student Photo ID LCD Projectors Copiers Computers Computer lab furniture: District wide Classroom furniture and whiteboards

27 Instructional Support LRC Upgrades Bookshelves Furniture Security Detection System

28 Instructional Support Registration Stations Downtown and Northwest Campuses Student Services One Stop Shop Downtown Campus Student Response Center

29 Renovations & Remodeling

30 Renovations & Remodeling CAD, Electronics, HVAC, and MCSE Labs Eastern Campus Before, work in progress and after

31 Renovations & Remodeling Smart Classrooms, Downriver Campus Before, work in progress and after

32 Renovations & Remodeling Science Labs Before, work in progress and after

33 Work in progress and after Renovations & Remodeling Bookstore, Eastern Campus

34 Renovations & Remodeling Community Room, Downriver Campus Before and after

35 Renovations & Remodeling Community Room, Downtown Campus Before, work in progress and after

36 Renovations & Remodeling Community Room, Eastern Campus Work in progress and after (rendering)

37 Deferred Maintenance

38 Deferred Maintenance Projects Roof Replacement at four District facilities Carpet Replacement at three District facilities Power wash building exteriors Replacement of (2) A/C chillers - Eastern Upgrading of all District elevators to A.D.A. compliance Repair retaining wall - Upgrade entrance walkway with lighting District-wide Rebuild, repair and clean-out storm drains - Western Parking lot replacement and patching Replacement of condensate tank for A/C Chiller - Downriver Cooling coil replacement on HVAC units - Downtown Downtown

39 Deferred Maintenance Projects (Cont d) Cooling Tower Replacement at the Northwest Campus Upgrading of energy management system Replacement of fan motors for HVAC systems District-wide A/C chiller pump and motor impeller replacement at three campuses Air Compressor replacement for Voc-Tech lab - Downriver Exterior caulking and sealing Downtown Painting of interior classrooms and offices District-wide Replacement of heating system and pump motors District-wide Repair and upgrade environmental controls Districtwide Repair and replacement of interior lighting fixtures Districtwide

40 Deferred Maintenance Projects (Cont d) Re-route power lines in main office floor Western Replacement of ceiling tile and ceiling track District-wide Replacement of float assembly and cleaning of heating system Downriver Replacement of domestic hot water heating tank Western Replace second floor atrium tile Western Replacement of condensation pumps Northwest Replacement of skylight glass in LRC Downtown Replacement of condensation pipes on heating system - Downriver Repair and/or replace hallway quarry tile - Downtown

41 Deferred Maintenance Projects Powerwash Downriver and Downtown Campuses Building Tuckpointing Downtown Campus

42 Deferred Maintenance Projects Parking Lot and Lighting Replacement - Downriver Roof Replacement District Office, Downriver, Downtown, Eastern and Western Campuses

43 Network and Technology Infrastructure Improvements

44 Network and Technology Infrastructure Improvements Upgrade of Network Cabling District-wide Server used for System Integration New Telecommunications System

45 SCT Banner (Integrated Software System) Staging of Banner Project Office (January 2004) Hardware Installation (February 2004) Software Installation (February 2004) Initial Training and Technical Sessions (began March 2004)

46 WAYNE COUNTY COMMUNITY COLLEGE DISTRICT.FORGING AHEAD

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Replacement of Unit Ventilation System

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

City Reso-A Requests FY 2018 (City Council and Borough Presidents) Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation

More information

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Facilities Report 2011-12 2 nd Quarter KCCD Facilities Planning & Construction February 1, 2012 Overview Facility Report

More information

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred. Location Beeville-Primary; All Campuses Hours 40 hours/week minimum Salary $40,000-$50,000 annual, based on KSAs Job Classification Exempt Security Sensitive Y e s Division Physical Plant Department Physical

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

Five-Year Capital Plan Request FY through FY

Five-Year Capital Plan Request FY through FY Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance Seniors bonded $690,706 Health and Safety bonded Facilities Preservation

More information

Risk Mitigation Strategies 2017 Tier 1 Risk Profile Interim Report UNCW Institutional Risk Management

Risk Mitigation Strategies 2017 Tier 1 Risk Profile Interim Report UNCW Institutional Risk Management Risk Mitigation Strategies 2017 Tier 1 Risk Profile Interim Report UNCW Institutional Risk Management Presented to the Audit, Risk and Compliance Committee of the UNCW Board of Trustees January 18, 2018

More information

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014 154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, 16-20 June 2014 Provisional Agenda Item 5.7 CE154/26 28 April 2014 Original: English MASTER CAPITAL INVESTMENT PLAN Periodic Report on the

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

PROGRESS REPORT of TECHNOLOGY PLAN 2016 INITIATIVES AS OF FEBRUARY 28, 2013

PROGRESS REPORT of TECHNOLOGY PLAN 2016 INITIATIVES AS OF FEBRUARY 28, 2013 PROGRESS REPORT of TECHNOLOGY PLAN 2016 INITIATIVES AS OF FEBRUARY 28, 2013 The Tier 1 Initiatives were tied to Strategic Plan 2013 and the Program Review & Planning process. They offered desirable benefits

More information

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance FY 2018 19 Janette Pell Department Director Administration and Finance Capital Projects Facilities and Real Estate Management Fleet Operations Information and Communications Technology Purchasing, Surplus

More information

H. COUNCILL TRENHOLM STATE COMMUNITY COLLEGE TECHNOLOGY PLAN ACADEMIC YEAR

H. COUNCILL TRENHOLM STATE COMMUNITY COLLEGE TECHNOLOGY PLAN ACADEMIC YEAR H. COUNCILL TRENHOLM STATE COMMUNITY COLLEGE TECHNOLOGY PLAN 2016-2017 ACADEMIC YEAR AUGUST 26, 2016 WHAT WE BELIEVE: Students need to be able to use a wide variety of technological tools to enhance their

More information

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO Hurricane Florence Response and Recovery October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO Event Impact Campus Grounds Approximately 400 downed trees Light poles Power lines Page

More information

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 CNM Master Plan Line # Master Plan Project Title Description Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 Projected spending for FY18 Potential Funding Source

More information

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire

More information

ELS Language Centers/Tacoma at Bates Technical College - Opening September 17,

ELS Language Centers/Tacoma at Bates Technical College   - Opening September 17, ELS Language Centers/Tacoma at Bates Technical College www.els.edu/tacoma - Opening September 17, 2012 - Copyright 2012 ELS Educational Services, Inc. a Berlitz company ELS/Tacoma The ELS facility, with

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,

More information

Owensboro Community and Technical College Degrees, Diplomas, and Certificates

Owensboro Community and Technical College Degrees, Diplomas, and Certificates Owensboro Community and Technical College Degrees, Diplomas, and Certificates Classification of Instructional SOC Code Associate in Arts Degree Associate in Arts 24.0101 No Match Associate in Science Degree

More information

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels 10.0 UTILITIES ELEMENT The purpose of this element is to ensure coordinated provision of utility services required to meet the future needs of the University, consistent with current efforts to address

More information

Critical Facility Operations

Critical Facility Operations Data Center Life Cycle Services Statement Of Work Critical Facility Operations Critical Facility Operations Data Center Operations Table of Contents 1.0 Executive Summary 2.0 Core Competencies 3.0 Scope

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

Gold: points Platinum: 80+ points. Certified: points Silver: points

Gold: points Platinum: 80+ points. Certified: points Silver: points What is LEED? LEED, or Leadership in Energy & Environmental Design, is redefining the way we think about the places where we live, work and learn. As an internationally recognized mark of excellence, LEED

More information

BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER

BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER Contact: Joe Verkennes, Director of Marketing, (734) 384-4207 January 24, 2011 FOR IMMEDIATE RELEASE BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER MONROE, Mich. At its

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1

Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1 Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1 Presentation Overview What is BTOP? Making BTOP work for our state What

More information

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013 Agenda Program background Broadening our data

More information

STRATEGIC PLAN

STRATEGIC PLAN STRATEGIC PLAN 2013-2018 In an era of growing demand for IT services, it is imperative that strong guiding principles are followed that will allow for the fulfillment of the Division of Information Technology

More information

Agenda Item No. AGENDA ITEM BRIEFING

Agenda Item No. AGENDA ITEM BRIEFING AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval to Amend the FY 2016-FY 2020 Texas A&M University

More information

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 . Lessons Learned - SMUD s East Campus Operations Center Jim Parks 7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 Powering forward. Together.

More information

50 Years of Facility Operations or Rebuilding from the inside out

50 Years of Facility Operations or Rebuilding from the inside out 50 Years of Facility Operations or Rebuilding from the inside out National Optical Astronomy Observatory (NOAO) NORTH Kitt Peak National Observatory and Tucson Headquarters Facility Presented by John Dunlop

More information

Centre Lionel E. Lalonde Centre (Emergency & Protective Services Centre)

Centre Lionel E. Lalonde Centre (Emergency & Protective Services Centre) (Emergency & Protective Services Centre) Priorities Committee Meeting Wednesday, March 21 st 2007 Presented By: Tim P. Beadman Acting General Manager of Emergency Services - and - Richard Dixon Facilities

More information

PimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona ACTION ITEM

PimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona ACTION ITEM PimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona 85709-1010 ACTION ITEM Meeting Date: 5/13/15 Item Number: 3.2 (4) Item Title Capital Budget Plan for Fiscal Years

More information

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system Fair City Plaza Task: Diagnose problems, recommend improvements for small municipal district cooling system The Fair City Plaza district cooling system provides chilled water to five buildings in a downtown

More information

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010 JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS 5 Credit Hours Prepared by William Kaune November 30, 2010 Revised by William Kaune April 25, 2012 Mary Beth Ottinger, Ph.D., Division

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

Why WeWork. WeWork Ginza 6- Tokyo

Why WeWork. WeWork Ginza 6- Tokyo Why WeWork Make real estate flexible Access great buildings Increase capital efficiency Get up and running fast Attract and retain top talent Grow globally at your own pace WeWork Ginza 6- Tokyo WHAT IS

More information

LaGuardia Community College

LaGuardia Community College Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) Center 3 Infrastructure Upgrade

More information

Library Board of Directors / Board of County Commissioners 21 May 2015

Library Board of Directors / Board of County Commissioners 21 May 2015 Library Board of Directors / Board of County Commissioners 21 May 2015 1 2 Acknowledgements Group 4 Architecture, Research, and Planning Carson Block Consulting Joan Frye Williams Collins Noteis and Associates

More information

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility. High Tech Cleanroom Laboratory & Production Facility www.technologyincubationcenter.com Jay Chmieleski 612 275 3775 mobile Dan Friedner FOR SALE OR LEASE Technology Incubation Center VADNAIS HEIGHTS, MINNESOTA

More information

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services Report to the Board TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent Steve Dickinson, Assistant Superintendent Administrative Services 2016-2017 Routine Restricted Maintenance

More information

Buildings & Grounds Committee September 30, 2016 Update on Capital Improvement Projects

Buildings & Grounds Committee September 30, 2016 Update on Capital Improvement Projects Administrative and Fiscal Services 336-506-4410 FAX 336-578-3964 1247 Jimmie Kerr Road P.O. Box 8000 Graham, NC 27253-8000 www.alamancecc.edu Buildings & Grounds Committee September 30, 2016 Update on

More information

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Project: Concord Hospital Infrastructure Upgrades Facility Size: 600,000+

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE

Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Key Factors of Resilient Electrical

More information

Riverside Public Utilities Long Range Space Plan. Board of Public Utilities 12/07/12

Riverside Public Utilities Long Range Space Plan. Board of Public Utilities 12/07/12 Riverside Public Utilities Long Range Space Plan Board of Public Utilities 12/07/12 Long Term Goals Centralize staff location(s) for 650 positions Increase security for critical 24/7 operations Optimize

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

EXECUTIVE SUMMARY CAPITAL IMPROVEMENT PROGRAM

EXECUTIVE SUMMARY CAPITAL IMPROVEMENT PROGRAM EXECUTIVE SUMMARY Cook County s Capital Improvement Program (CIP) sets forth the plan for the design, construction and renovation of buildings and building systems, making them safe, functional, efficient,

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

Vocational Training Programs

Vocational Training Programs CNC Machinist Course code: 51-4012 Program Title: CNC Machinist Credits: 49.5 600 Clock Hours 24 Weeks Prerequisites: Basic Mathematics Course Description: This course will introduce the student into blueprinting,

More information

Capital Projects Report. Citizens Oversight Committee

Capital Projects Report. Citizens Oversight Committee Capital Projects Report Citizens Oversight Committee Intentionally Left Blank TABLE OF CONTENTS Projects in Feasibility, Planning, Programming, and Design CAMPUS SITE PLANS Cypress Campus... 2 Fullerton

More information

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO 6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions

More information

Organizational Readiness. Discharge/Checkout. Waiting/Registration Exam/Consulting. Operational issues. Construction Occupancy Access

Organizational Readiness. Discharge/Checkout. Waiting/Registration Exam/Consulting. Operational issues. Construction Occupancy Access Consider informational kiosks within lobby/check-in space to highlight wellness initiatives, informational guides on building, and access to other clinic programs x x x x x x x Consider using integrated

More information

Havel. Havel. Expert Facilities Solutions for High Performance Environments. Expert Facilities Solutions for High Performance Environments

Havel. Havel. Expert Facilities Solutions for High Performance Environments. Expert Facilities Solutions for High Performance Environments Serving the Communities Where We Live, Work, and Play. Taking KidSafety to the Streets As part of EMCOR s Taking KidSafety to the Streets Program, is proud to serve the community through its work with

More information

Track 11, Session 4 -- Campus Utility Distribution Systems

Track 11, Session 4 -- Campus Utility Distribution Systems Track 11, Session 4 -- Campus Utility Distribution Systems ESCO Contract Vehicle approaches to implement VA requirements at VISN 21 Steven T. Smith, Senior Director, Engineering Federal Energy Systems

More information

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540)

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540) COMPANY RESUME MEIengineering, inc. mechanical electrical industrial consultants 1780 South Main Street, Harrisonburg, VA 22801 (540) 432-6272 www.meiengineeringinc.com 2018 About our Firm Founded in 1989,

More information

Georgia World Congress Center Authority

Georgia World Congress Center Authority Georgia World Congress Center Authority BOARD OF GOVERNORS MEETING August 28, 2018 Authority Financial Facility ACTION ITEM Approval of Minutes July 31, 2018 JULY FINANCIAL UPDATE Janet Arsenault Sr. Director

More information

PROJECT PROGRESS REPORT Information Technology Equipment. Chabot- Las Positas CCD October 27, Equipment Categories of Hardware and Software:

PROJECT PROGRESS REPORT Information Technology Equipment. Chabot- Las Positas CCD October 27, Equipment Categories of Hardware and Software: PROJECT PROGRESS REPORT Information Technology Equipment Chabot- Las Positas CCD October 27, 2010 Equipment Categories of Hardware and Software: Desktop & laptops Network switches & routers Network monitoring

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

UNC Campus Security Initiatives Update. Business Affairs Committee May 9, 2017

UNC Campus Security Initiatives Update. Business Affairs Committee May 9, 2017 UNC Campus Security Initiatives Update Business Affairs Committee May 9, 2017 UNC Campus Security Initiative In August 2013, President Ross asked for a review of current security practices, an assessment

More information

City Hall Space Selection 15 Market Square. November 27, 2017

City Hall Space Selection 15 Market Square. November 27, 2017 City Hall Space Selection 15 Market Square November 27, 2017 Future City Hall Space Recommendation Recommendation Committee of the Whole recommends that Common Council approve the Offer to Amending Existing

More information

CARRIER edesign SUITE NEWS

CARRIER edesign SUITE NEWS Welcome Welcome to the premier issue of EXchange, offering timely, informative and interesting news on the Carrier edesign Suite of Software. Delivered quarterly, each issue will provide a wealth of information

More information

Report to: General Committee Date Report Authored: January 18, 2012

Report to: General Committee Date Report Authored: January 18, 2012 SUBJECT: Energy Services Agreement with Markham District Energy Inc. PREPARED BY: Henry Tse, P. Eng., Senior Project Manager, extension 2208 RECOMMENDATION: 1) THAT the report titled Energy Services Agreement

More information

INFORMATION SECURITY- DISASTER RECOVERY

INFORMATION SECURITY- DISASTER RECOVERY Information Technology Services Administrative Regulation ITS-AR-1505 INFORMATION SECURITY- DISASTER RECOVERY 1.0 Purpose and Scope The objective of this Administrative Regulation is to outline the strategy

More information

Construct Chiller Plant, Phase I

Construct Chiller Plant, Phase I Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Academic Building II bonded New Ventilation

More information

Annual Report for the Utility Savings Initiative

Annual Report for the Utility Savings Initiative Report to the North Carolina General Assembly Annual Report for the Utility Savings Initiative July 1, 2016 June 30, 2017 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY http://portal.ncdenr.org Page

More information

FY 2016 Capital Budget Draft April 10, 2015

FY 2016 Capital Budget Draft April 10, 2015 Basic Revenue State Charter School Capital Outlay 5,470,110 5,470,110 5,470,110 CO & DS 1,212,173 1,212,173 1,212,173 PECO Bonds Maintenance 5,875,752 5,875,752 5,875,752 State Total 12,558,035 12,558,035

More information

For personal use only

For personal use only Legend Corporation AGM Presentation CEO Brad Dowe CFO Hamish McEwin Important Notice This presentation contains forward looking statements which may be subject to significant uncertainty outside of Legend

More information

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform Case Study - Global Switch Sydney East About Global Switch Global Switch is a leading owner, operator and developer

More information

Let s face it addressing the growing list of deferred

Let s face it addressing the growing list of deferred by L. Scott Turley Let s face it addressing the growing list of deferred maintenance projects is one of the most difficult challenges we have as campus facilities managers. Within Utility Operations, the

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION CAPITAL OUTLAY FUND PROPOSED 2017-2018 2016-2017 ACCOUNT BUDGET BUDGET COMMENTS CODE DESCRIPTION REVENUE 4.4110.000.000 County Appropriation - Initial 2,827,745 882,525 4.4110.000.000 County Appropriation

More information

Site Level Deficiencies

Site Level Deficiencies Level Deficiencies Walkways do not have shelter from rain. School lacks marquee or marquee in poor condition. Computer room lacks independent AC. School site lacks appropriate lighting. Specialties Other

More information

National Service Center

National Service Center UNITED TECHNOLOGIES CARRIER CORPORATION National Service Center MAXIMIZING PERFORMANCE AND LONGEVITY OF INDUSTRIAL CHILLERS Protection, Performance and Peace of Mind Because industrial chillers serve large

More information

UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017

UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017 What the Government Needs from the Utility UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017 Tampa Convention Center Tampa, Florida Agenda Resiliency

More information

1515 IVAC WAY CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN ROOMS ±112,000 SF

1515 IVAC WAY CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN ROOMS ±112,000 SF CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN S ±112,000 SF CLEAN MANUFACTURING SPACE FOR SALE PROPERTY OVERVIEW Foundry Commercial is pleased to offer 1515 IVAC Way in Creedmoor,

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION

ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION Cathy Bates Senior Consultant, Vantage Technology Consulting Group January 30, 2018 Campus Orientation Initiative and Project Orientation Project

More information

Plumbing All plumbing 25 years B_Plumb25

Plumbing All plumbing 25 years B_Plumb25 Assigned Asset Buildings and Building Components Building Structures Reinforced Concrete Buildings 40 years B_Bldg40 Building Structures Outdoor stadiums 40 years B_Bldg40 Building Structures Multilevel

More information

IDEA Campus Energy UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure

IDEA Campus Energy UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure IDEA Campus Energy 2018 UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure University of Maryland Presenters Mary-Ann Ibeziako, Director, Facilities Management Engineering & Energy Don

More information

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services

More information

Property Maintenance & Operations Manual Training

Property Maintenance & Operations Manual Training Property Maintenance & Operations Manual Training Introduction to Property Operations Management and Building Security October 16, 2007 Property Maintenance & Operations Manual Training April 12, 2007

More information

City of Toronto Accessibility Design Guidelines 2015

City of Toronto Accessibility Design Guidelines 2015 RE: DI3.2 City of Toronto Accessibility Design Guidelines 2015 Update to Disability Issues Committee Presented By: Facilities Management Division June 2 nd, 2015 Presenters: Sunil Sharma, General Manager,

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

Strategic Action Plan. for Web Accessibility at Brown University

Strategic Action Plan. for Web Accessibility at Brown University Strategic Action Plan for Web Accessibility at Brown University May 15, 2018 INTRODUCTION Diversity and inclusion are central to Brown University s mission, and the University is committed to sustaining

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

ONE PARTNERS PLACE TWO PARTNERS PLACE THREE PARTNERS PLACE FOUR PARTNERS PLACE FIVE PARTNERS PLACE

ONE PARTNERS PLACE TWO PARTNERS PLACE THREE PARTNERS PLACE FOUR PARTNERS PLACE FIVE PARTNERS PLACE 1N ONE PARTNERS PLACE TWO PARTNERS PLACE THREE PARTNERS PLACE FOUR PARTNERS PLACE FIVE PARTNERS PLACE RADAR INNOVATIONS LABORATORY STEPHENSON LIFE SCIENCES CENTER STEPHENSON RESEARCH AND TECHNOLOGY CENTER

More information

University of Pittsburgh

University of Pittsburgh University of Pittsburgh Office of the Controller General Accounting Department SUBJECT: PRISM SUBCODE GUIDELINES The PRISM General Ledger Subcode Listing provides the four-digit codes used to record financial

More information

2018 Capital Improvement Budget Library Department

2018 Capital Improvement Budget Library Department 2018 Capital Improvement Budget Library Department (in thousands) Projects s State Federal Other Total Chugiak-Eagle River Library Facility Improvements 90 - - - 90 Loussac Library Planning and Video Surveillance

More information

Effective energy management services for all your needs

Effective energy management services for all your needs Effective energy management services for all your needs Discover our complete services offer Make the most of your energy sm Energy Challenge Supply Costs Sustainability Pressures Demand Efficiency When

More information