Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Size: px
Start display at page:

Download "Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013"

Transcription

1 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013

2 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P. Donegan, Inc. Financial Advisors Baer and Associates Cost Estimating C&S Companies Mechanical, Electrical, Plumbing, Life Safety, Security and Telecom Engineering

3 Agenda 1. Capital Project - Review Scope of Campus Wide Work a) Sewer b) Technology c) Direct Digital Controls (DDC) 2. Capital Project - Review Scope of Work for Facilities a) Ellis Elementary Facility b) MS/HS c) Transportation Facility 3. Capital Project - Schedule a) Emerging Phasing of Building and Site Work 4. Financial Overview

4 Campus Wide Work New Sanitary Sewer System 1. Town System Timeline: Bid fall of 2013 Begin construction spring of 2014 Greenville CSD Tie-in summer of 2015 (earliest)

5 Campus Wide Work New Sanitary Sewer System

6 Campus Wide Work New Technology Infrastructure Provide new fiber backbone, data closet upgrades, wireless connectivity and projection capability at Ellis Elementary and the MS/HS.

7 Campus Wide Work Direct Digital Controls (DDC) for HVAC Campus Wide Existing system is outdated. Install new system to control new and existing HVAC systems including control valves and damper operators.

8 Ellis Elementary School Facility Replace Roof at Main West Classroom Wing and Cafe

9 Ellis Elementary School Facility Main Entry Space Configuration for Security

10 Ellis Elementary School Facility Provide new access control hardware for interior doors

11 Ellis Elementary School Facility Re-point Masonry

12 Ellis Elementary School Facility Replace kindergarten water closet and sink fixtures. One room to be ADA compliant.

13 Ellis Elementary School Facility Provide new Hot Water Boiler to support Kitchen and Lavatory hot water demands outside of the heating season. (Review solar and thermal possibilities.)

14 Ellis Elementary School Facility Replace Ceiling and Lighting at Gym/Auditorium & Multipurpose Room

15 MS/HS Facility Provide EPDM membrane roofs at all areas where roofs are older than 2002 (approximately 68,000 SF). Work includes roof drain replacement.

16 MS/HS Facility Reconfigure Main Entry Space for Security

17 MS/HS Facility Replace approximately 110 single paned non insulated windows at HS wing with doubled paned insulated windows, screens and shades. Coordinate with unit ventilators and test caulk for PCB s.

18 MS/HS Facility Replace interior doors as required and ALL hardware for ADA accessibility and access control. Replace approximately 800 hall lockers at the HS.

19 MS/HS Facility Provide approximately 30 Unit Ventilators in the HS wing and relief air vents (involves relief air path replace louvered doors with solid doors.)

20 Transportation Facility Provide Storage Addition, Enclosed Wash Bay, Entry Vestibule and Covered Walk. Include roof gutter and snow guard replacement and unit heaters for storage addition. New Underground Fuel Station to replace existing. Storage shall accommodate magic salt.

21 Transportation Facility

22 Emerging Schedule

23

24

25

26

27

28

29

30 Questions and Answers

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D May 5-6, 2016 Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered

More information

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX 453.1 Scope: Public educational facilities X X X 453.2 Public schools and Florida colleges general requirements X X X 453.2.1 Owner X X X 453.2.2 Exemption from local requirements X X X 453.3 Code enforcement

More information

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages University of Maryland UB USPS Maintenance Facility Remaining Bid Packages Procurement Office: University of Maryland, Baltimore Owner: University of Baltimore Design-Build Contractor: The Whiting-Turner

More information

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 Project Tasks Programming Interviews Fairbank Community Center Feasibility Study Recreation, Senior Center,

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina 29847 For Sale or Lease ±421,200 s.f. of Class A industrial space Expandable footprint: up to +1MM s.f. Minimum divisibility:

More information

Site Level Deficiencies

Site Level Deficiencies Level Deficiencies Walkways do not have shelter from rain. School lacks marquee or marquee in poor condition. Computer room lacks independent AC. School site lacks appropriate lighting. Specialties Other

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services

More information

Utility System Infrastructure

Utility System Infrastructure Utility System Infrastructure THE COLLEGE OF 2015 Campus Master Plan WILLIAM & MARY SUPPORTING DOCUMENTATION TABLE OF CONTENTS 3 4 4 4 4 5 Electrical Utility Infrastructure Emergency Power Generators

More information

Ehresman Associates, Inc. architects engineers

Ehresman Associates, Inc. architects engineers Architects 803 West Big Beaver, Suite 350 Troy, MI 48084 Wright & Hunter Technology Advisors 818 West 11 Mile Road Royal Oak, MI 48067 Peter Basso Associates Inc Mechanical/Electrical Engineers 5145 Livernois,

More information

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115 GOVERNMENT FACILITIES FY 2017 FY 2016 CIP Pages C-72 through C-115 June 16, 2016 Facilities Capital Projects Facilities Design & Construction Capital Program Mission To encompass both significant modernization

More information

DEFERRED MAINTENANCE PLAN (DMP) FY

DEFERRED MAINTENANCE PLAN (DMP) FY DEFERRED MAINTENANCE PLAN (DMP) FY 2013-2014 Project Category SCHOOL PROJECT/TRADE BID # SHOP BLDG./ ROOM ESTIMATE/ACTUAL COST CFD % Prioritize Asbestos HAZMAT abatement HAZMAT Boiler room BPE Classroom

More information

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

City Reso-A Requests FY 2018 (City Council and Borough Presidents) Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation

More information

Orange County Public Schools

Orange County Public Schools 100 % Design/Construction Update Community Meeting May 23, 2016 Meeting Agenda May 23, 2016 Introductions Welcome School Board Member Kathleen Kat Butler Gordon Project Update Facilities Meeting Organizer

More information

CHAPTER 5. Special Cases

CHAPTER 5. Special Cases CHAPTER 5 Special Cases OVERHANGS To be treated as an overhang, slotted and louvered shading devices must have the slats arranged so that no direct solar radiation penetrates the overhang at any time during

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

Orange County Public Schools

Orange County Public Schools Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1 Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect:

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

HAYSVILLE USD 261 Preliminary Project Timeline

HAYSVILLE USD 261 Preliminary Project Timeline HAYSVILLE USD 261 Preliminary Project Timeline 2015 2016 2017 2018 Package J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D June 9th Election 1 Campus High School ##

More information

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013 Agenda Program background Broadening our data

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term

More information

SUB-CONTRACTOR PRE-QUALIFICATION FORM

SUB-CONTRACTOR PRE-QUALIFICATION FORM CONTACT INFORMATION Company Contact Person: Title: Street Address: Suite No.: EXPERIENCE City: Zip: 1. Please check the CSI Codes applicable to your business: 02 00 00 Existing Conditions 02 20 00 Assessment

More information

Emergency Cooling Centres

Emergency Cooling Centres 53 Emergency Cooling Centres To: Financial Budget and Enrolment Committee Date: 09 May 2018 Report No.: 05-18-3388 Strategic Directions Make every school an effective school Recommendation It is recommended

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

Catalog Addendum 3 December 2017

Catalog Addendum 3 December 2017 2017 2018 Catalog Addendum 3 December 2017 The College of the Desert Catalog Addendum represents course and program revisions made since the last publication of the Catalog. Included in this Addendum are

More information

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO 6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions

More information

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014

154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, June 2014 154th SESSION OF THE EXECUTIVE COMMITTEE Washington, D.C., USA, 16-20 June 2014 Provisional Agenda Item 5.7 CE154/26 28 April 2014 Original: English MASTER CAPITAL INVESTMENT PLAN Periodic Report on the

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS May 1, 2016 Reviewers should - Be aware that these checklists are not allinclusive but only provide important review items. Reviewers should - Use Checklists

More information

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Project: Concord Hospital Infrastructure Upgrades Facility Size: 600,000+

More information

Company information PROTEC Facility Solutions PROTEC GmbH » Established: *» General Manager: Ralf Wogawa

Company information PROTEC Facility Solutions PROTEC GmbH » Established: *» General Manager: Ralf Wogawa Company information PROTEC Facility Solutions PROTEC GmbH» Established: 02.2008*» General Manager: Ralf Wogawa» Main Office: Heidelberg» Locations: Baumholder Kaiserslautern Stuttgart Wiesbaden» Employees:

More information

LOUISIANA FLOOD RELIEF INVENTORY. (800)

LOUISIANA FLOOD RELIEF INVENTORY. (800) LOUISIANA FLOOD RELIEF INVENTORY SERIAL # DESCRIPTION RESTROOM 5235A/B 24x68 Doublewide 2 ADA 5237A/B 24x68 Doublewide 2 ADA 5337A/B 24x68 Doublewide 2 ADA 5338A/B 24x68 Doublewide 2 ADA 5339A/B 24x68

More information

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire

More information

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services Report to the Board TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent Steve Dickinson, Assistant Superintendent Administrative Services 2016-2017 Routine Restricted Maintenance

More information

Five-Year Capital Plan Request FY through FY

Five-Year Capital Plan Request FY through FY Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance Seniors bonded $690,706 Health and Safety bonded Facilities Preservation

More information

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview Contents 1. Document Purpose... 2 2. Facility Overview... 2 2.1 Technical Space... 2 2.2 Load Density... 2 2.3 Resilience... 2 2.4 Engineering Plant Maintenance & Service Restoration... 3 3. Engineering

More information

2018 Capital Budget Presentation

2018 Capital Budget Presentation 2018 Capital Budget Presentation 2018 General Capital Budget Expenditures Asset Type 2018 Capital Projects Police 1,431,200 Fire 1,200,000 Finance 37,000 Transportation 8,231,900 Drainage 7,356,000 Parks

More information

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs.

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. CHILLED WATER SUB-ELEMENT GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. OBJECTIVE 1.1: To ensure that there

More information

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Business Opportunities with VISN 23 Capital Assets Management Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Overview VISN 23 Capital Assets Manager Veterans Health Administration,

More information

ADDENDUM #1 RFP # , Districtwide Network Refresh Design

ADDENDUM #1 RFP # , Districtwide Network Refresh Design ADDENDUM #1 RFP #1718-03, Districtwide Network Refresh Design This Addendum forms a part of the Contract Documents and modifies the original Contract Documents. Acknowledge receipt of this Addendum in

More information

OWNER PROPERTY DISCLOSURE

OWNER PROPERTY DISCLOSURE OWNER PROPERTY DISCLOSURE GENERAL INFORMATION Rental Property Address Owner s Name (First, MI, Last) Nickname Home # Business # Extension Email address Mobile # Pager # Address City State Zip code Name

More information

3D EDUCATORS. Page # 1

3D EDUCATORS. Page # 1 3D EDUCATORS Invest in People the Only Asset that Appreciates Certified Plumber Training Program LIVE ONLINE INSTRUCTOR LED ONE TO ONE FACILITY AVAILABLE BUILDING NATIONS A Professional Development Institute

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

G R E E N PLUMBING D E S I G N Candidate Bulletin

G R E E N PLUMBING D E S I G N Candidate Bulletin GREEN PLUMBING DESIGN Candidate Bulletin PROGRAM OVERVIEW The Green Plumbing Design (GPD) certificate program, sponsored by the American Society of Plumbing Engineers and the International Association

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY19 Capital Project Request Presentation To The Board of Selectmen, Finance & Fiscal Advisory Committee s Duxbury Senior Center January 8, 2018 Prepared and Maintained

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M 1 Landscape 1,335 acres, 64 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES

INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES University of California, Riverside Computing and Communications April XX, 2001 R1V6 TABLE OF CONTENTS Introduction and Background...3 Outside

More information

Mountain Lakes Infrastructure Projects and Investments. January 2017

Mountain Lakes Infrastructure Projects and Investments. January 2017 Mountain Lakes Infrastructure Projects and Investments January 2017 Presentation & Discussion of: Birchwood & Island Beach Renovations Sunset Lake Dam Restoration/Rehabilitation Project Borough Hall Administrative

More information

Johnson City ITS Project Pre-Bid Meeting Minutes State Pin #

Johnson City ITS Project Pre-Bid Meeting Minutes State Pin # Speakers: 1. Anthony Todd City of Johnson City 2. Mark Washing Gresham Smith and Partners 3. Ed Turbyfill Gresham Smith and Partners Company name needs to be noted on sign-in sheet Anthony Todd Contractual

More information

50 Years of Facility Operations or Rebuilding from the inside out

50 Years of Facility Operations or Rebuilding from the inside out 50 Years of Facility Operations or Rebuilding from the inside out National Optical Astronomy Observatory (NOAO) NORTH Kitt Peak National Observatory and Tucson Headquarters Facility Presented by John Dunlop

More information

RCMP Capital Improvements

RCMP Capital Improvements Prepared by: D. R. Duckworth, Corporate Services and Community Safety Director Improvements_BUS_1.docx Executive Summary This business case seeks approval for additional funding of $1,000,000 for capital

More information

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure GROW YOUR BRAND AND MAKE AN IMPRESSION Unique 2-storey office building with Highway 401 exposure Grand entrance and great room with high ceilings Low gross up factor - 4.3%, large floor plates 2 internal

More information

Building Energy Management Training Systems

Building Energy Management Training Systems Building Energy Management Training Systems 3466-00 LabVolt Series Datasheet Festo Didactic en 120 V - 60 Hz 03/2019 Table of Contents General Description 2 Courseware 2 Topic Coverage 2 List of Available

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA WAREHOUSE SPACE 198,788 SF ON 95 ACRES As the exclusive listing agent, The Stubblebine Company is pleased to present Route Commerce Park for lease. With robust

More information

Membership Resolution Definitions of Key School-Facilities Data Elements

Membership Resolution Definitions of Key School-Facilities Data Elements Membership Resolution 2015-01 Definitions of Key School-Facilities Data Elements The National Council on School Facilities is the nonprofit association representing the 58 U.S. states, territories, and

More information

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 River Bend 6 River Bend 11 RIVER BEND CENTER OVERVIEW 7 8 6 1 2 12 highly flexible buildings situated on 40 sprawling acres in the Springdale section

More information

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance FY 2018 19 Janette Pell Department Director Administration and Finance Capital Projects Facilities and Real Estate Management Fleet Operations Information and Communications Technology Purchasing, Surplus

More information

ADDENDA 1/LAST IN RESPONSE TO QUESTIONS

ADDENDA 1/LAST IN RESPONSE TO QUESTIONS ADDENDA 1/LAST IN RESPONSE TO QUESTIONS REGARDING REQUEST FOR PROPOSALS HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) PERVENTATIVE MAINTENANCE AND REPAIR SERVICES Issue Date: December 6, 2018 SCHEDULE

More information

New Certification & Training Structure

New Certification & Training Structure New Certification & Training Structure For Building Safety Codes Officers Effective: October 3, 2016 New Certification and Training Structure for Building Safety Codes Officers The Safety Codes Council

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FO R LEA SE 100 SIMPLEX DRIVE WESTMINSTER, MA 19,91 SF WORLD-CLASS 6 CLEAR DISTRIBUTION BUILDING Salient details include: Prominent Route visibility Institutional quality asset ensconced on a 95 acre pristine

More information

North Marion School District Bond Projects

North Marion School District Bond Projects North Marion School District Bond Projects School Board Work Session: 6.4.2018 listen.design.deliver Primary School Update: Safety & security: modify Admin area to create a secure entry vestibule Staff

More information

Building Control GAMMA instabus

Building Control GAMMA instabus The worldwide standard for home and building control Building Control GAMMA instabus siemens.com/gamma The comprehensive GAMMA instabus product portfolio comprises intelligent devices and is your key to

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

2012 Bond Planning. Facility Management CPAC Overview Presentation. Denver Public Schools. March 2012

2012 Bond Planning. Facility Management CPAC Overview Presentation. Denver Public Schools. March 2012 2012 Bond Planning Facility Management CPAC Overview Presentation Denver Public Schools March 2012 Facility Management Table of Contents I. DPS Facility Management Mission II. DPS Existing Facility Overview

More information

INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS. January 18, 2013

INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS. January 18, 2013 INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS January 18, 2013 Scope of Work Building Scope 1) Year the facility was built. 2) Hurricane rating. 3) Flood Plain. 4) Future capacity. 5) Square

More information

Buildings & Grounds Committee September 30, 2016 Update on Capital Improvement Projects

Buildings & Grounds Committee September 30, 2016 Update on Capital Improvement Projects Administrative and Fiscal Services 336-506-4410 FAX 336-578-3964 1247 Jimmie Kerr Road P.O. Box 8000 Graham, NC 27253-8000 www.alamancecc.edu Buildings & Grounds Committee September 30, 2016 Update on

More information

DRAWING INDEX UNIVERSITY OF NEW MEXICO VR - CLASSROOM UNIVERSITY OF NM CAMPUS MILTON HALL, ROOM 155

DRAWING INDEX UNIVERSITY OF NEW MEXICO VR - CLASSROOM UNIVERSITY OF NM CAMPUS MILTON HALL, ROOM 155 3 4 5 OWNER: DRAWING INDEX UNIVERSITY OF NEW MEXICO COVER G-SHEETS CONTACT: NIVIA FRANCO G00 COVER SHEET CONSULTANTS: CIVIL ENGINEERING ARCHITECTURAL A D0 FIRST FLOOR DIMENSIONED PLAN & WALL PARTITION

More information

QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS

QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS GENERAL INFORMATION Quest Construction Data Network (QuestCDN) is the official public advertisement site to obtain Bidding Documents for all Minnesota

More information

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 . Lessons Learned - SMUD s East Campus Operations Center Jim Parks 7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 Powering forward. Together.

More information

LACCD IT Design Standards

LACCD IT Design Standards LACCD IT Design Standards March 1 2009 This document establishes a uniform standard for the design of IT Structured Cabling for LACCD. It ensures a secure, consistent, robust system with physical and low-voltage

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

Chabot-Las Positas Community College District. Information Technology Master Plan. ITS Detailed Specifications

Chabot-Las Positas Community College District. Information Technology Master Plan. ITS Detailed Specifications Information Technology Master Plan Chabot-Las Positas Community College District Information Technology Master Plan ITS Detailed Specifications Updated 2012 For CLPCCD ITS Limited Distribution Only Updated

More information

VEHICLE REQUESTS PER FISCAL YEAR

VEHICLE REQUESTS PER FISCAL YEAR 2012-13 Vehicle Description Department Budgeted VEHICLE REQUESTS PER FISCAL YEAR 2013-14 2014-15 2015-16 2016-17 2017-18 Field Vehicle Community Dev.-Planning 17,500 IP Field Vehicle Community Dev.- Inspections

More information

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded

More information

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25 UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY2015-16 ---> FY204-25 *Lifecycles were estimated using industry standards. Some items may not need attention

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016 STATE DATA CENTER DRAFT PROPOSAL 1 PROJECT TEAM 2 SERA Architects, Inc George Hager Patrick Sullivan PAE Engineers Dave Williams Doug Nachtrieb Michael Yee JMB Consulting Group Jon Bayles MEETING GOALS

More information

Introducing the Heat Wheel to the Data Center

Introducing the Heat Wheel to the Data Center Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure Specialist KyotoCooling International Critical Facilities Round Table 1 A New Free Cooling Technique

More information

Multiple Dwellings $.25/sq ft Building of Non-Residential Occupancy (New Building) $.30/sq ft

Multiple Dwellings $.25/sq ft Building of Non-Residential Occupancy (New Building) $.30/sq ft Fee Schedule for Building and Zoning Compliance Permits Extract from Executive Law, Article 18 and Section 383: "...each municipality...is expressly authorized and empowered to make, amend and repeal rules

More information

2017 Capital Improvement Budget Police Department

2017 Capital Improvement Budget Police Department 2017 Capital Improvement Budget Police Department (in thousands) Projects Bonds State Federal Other Total APD Headquarters Campus Perimeter Security Project 500 - - - 500 APD Investigation Interview Room

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Academic Building II bonded New Ventilation

More information

2009 Capital Projects Fund Assumptions November 3, 2008

2009 Capital Projects Fund Assumptions November 3, 2008 2009 Capital Projects Fund Assumptions November 3, 2008 Revenue Assumptions: Assumes that our maximum levy will stay the same in spite of a 20% decrease in AV Maximum rate of 0.3410 (maintains same levy

More information

2014 Bond Technology Infrastructure Status Report. March 10, 2016

2014 Bond Technology Infrastructure Status Report. March 10, 2016 Status Report March 10, 2016 Agenda and Status Items Network Hubs High Schools Middle Schools Elementary Schools Alternate Schools Service Centers District Level Expenditure Report Two Categories of Funding

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA 203,000 SF WORLD-CLASS 18 CLEAR MANUFACTURING/DISTRIBUTION SPACE The Stubblebine Company is pleased to offer 100 Simplex Drive, Westminster, MA, a World-Class

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

TASK II MASTER PLAN REPORT

TASK II MASTER PLAN REPORT TASK II MASTER PLAN REPORT FOR ST. CHARLES COUNTY EMERGENCY COMMUNICATIONS CENTER SUBMITTED BY FINAL SUBMITTAL 08 August 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 PROGRAM REQUIREMENTS... 3 GOALS...

More information

Agreement with National Grid USA

Agreement with National Grid USA Agreement with National Grid USA Acquisition of service contract business from National Grid Energy Services LLC Signing of 10 Year Marketing Agreement with National Grid USA 14 April 2010 Transaction

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC :: Module Title Duration : Course CTDC : Certified TIA-942 Design Consultant : 3 days Course Description Data centres are at the core of many organisations. Downtime of the data centre could lead to major

More information

FY 2016 Capital Budget Draft April 10, 2015

FY 2016 Capital Budget Draft April 10, 2015 Basic Revenue State Charter School Capital Outlay 5,470,110 5,470,110 5,470,110 CO & DS 1,212,173 1,212,173 1,212,173 PECO Bonds Maintenance 5,875,752 5,875,752 5,875,752 State Total 12,558,035 12,558,035

More information

Doing More with Less: Maintaining, Operating, and Improving your BMS. Bernard Keister, V PE Senior Engineer Guttmann & Blaevoet Consulting Engineers

Doing More with Less: Maintaining, Operating, and Improving your BMS. Bernard Keister, V PE Senior Engineer Guttmann & Blaevoet Consulting Engineers Doing More with Less: Maintaining, Operating, and Improving your BMS Bernard Keister, V PE Senior Engineer Guttmann & Blaevoet Consulting Engineers AIA Quality Assurance Learning Objectives 1. Develop

More information