1 Dallas Horseshoe ATM Design Mike Holt, PE, PTOE Senior ITS/Traffic Engineering Manager

2 Project Background $798 million Design-Build project south of Downtown Dallas Reconstruction of I-30/I-35E interchange and approaches across Trinity River Construction of new signature bridge over I-30 Started construction summer 2013; scheduled completion fall 2017

3 Project Team Texas DOT is owner Pegasus Link Constructors is D-B Joint Venture (Fluor Enterprises and Balfour Beatty Infrastructure) Parsons Brinckerhoff is lead design firm

4 Existing Conditions 460,000 ADT through interchange I-30/35E canyon depressed freeway section with 8 mainline lanes and auxiliary lanes Extensive existing signage Multiple lane closures and ramp detours

5 Existing Aerial Overview

6 Existing Conditions Photos

7 ATM Overview ATM proposed for value added project feature

8 ATM Overview Initial proposal included: Overhead lane control signals (LCS) Dynamic message signs Travel time signs Contractor negotiated DMS and TTS out of project scope PB proceeded with LCS design

9 Lane Control Signals 8 locations include: New overhead gantries (4) Existing bridge attachments (3) Existing overhead sign bridge attachment (1)

10 Lane Control Signals Skyline SlimLine LED Variable Message Signs 5 x 5 full color matrix 64 x 064 pixel layout 336S cabinet 2070 ATC controller Envoy DMS Central Control Software

11 Design Challenges Power Communications Structural attachments Sign visibility

12 Power 120/240 VAC 50 amp service to cabinet 20 amp service to each LCS Alpha Micro Secure 100 UPS

13 Power Challenges Need meter and disconnect for some cabinets Use existing ITS service for some cabinets Service points were not always close to LCS Prepared voltage drop calculations for service conductor sizing

14 Communications Wireless communications to temp. project TMC Sierra Wireless AirLink LS300 Gateway AntennaPlus Hockey Puck antenna Cat 5e cabling from cabinet to LCS

15 Communications Challenges Existing fiber network not accessible Cellular comm. to temporary TMC Cat 5e cabling limitations (<300 )

16 Communications Schematic

17 Structural Attachments Gantry Existing bridge Existing OH sign bridge Submitted customized structural details

18 Structural Details

19 Structural Details

20 Structural Details

21 Sign Visibility Reviewed available guidance documents for LCS visibility requirements: MUTCD Section 2L.03 Legibility and Visibility of Changeable Message Signs Offers guidance that CMS on roadways with speed limits of 55 mph or higher that messages should be legible from a minimum distance of 600 feet for nighttime conditions and 800 feet for normal daylight conditions.

22 Sign Visibility MUTCD Section 4D.12 Visibility, Aiming and Shielding of Signal Faces Offers guidance that traffic signal faces should be continuously visible to approaching traffic, from a point at least the minimum sight distance provided in Table 4D-2 85th-Percentile Speed Minimum Sight Distance 20 mph 175 feet 25 mph 215 feet 30 mph 270 feet 35 mph 325 feet 40 mph 390 feet 45 mph 460 feet 50 mph 540 feet 55 mph 625 feet

23 Sign Visibility MUTCD Section 4M.03 Design of Lane-Use Control Signals States the color of lane-use control signal installations shall be clearly visible for 2,300 feet at all times, unless otherwise physically obstructed

24 Sign Visibility Analysis Section 2L.03 applies to CMS (messages vs. LCS) Section 4D.12 addresses traffic signals (single color) Section 4M.03 most commonly applied to reversiblelane control and toll plaza lanes (more complex) Section 4D.12 (625 ) appears most appropriate for LCS visibility

25 LCS Deployment Recommendations LCS #1 (I-30 EB) proposed gantry LCS #2 (I-30 EB) proposed gantry LCS #3 (I-30 WB) existing bridge LCS #4 (I-30 WB) existing bridge LCS #5 (I-35E NB) proposed gantry LCS #6 (I-35E NB) existing bridge LCS #7 (I-35E SB) existing OH sign structure LCS #8 (I-35E SB) proposed gantry

26 Gantry Plan

27 Bridge Mount Plan

28 OSB Mount Plan

29 LCS Deployment

30 LCS Deployment

31 LCS Deployment

32 LCS Deployment

33 LCS Mounting

34 Current Progress

35 Current Progress

PART 2. SIGNS Chapter 2L. Changeable Message Signs

PART 2. SIGNS Chapter 2L. Changeable Message Signs PART 2. SIGNS Chapter 2L. Changeable Message Signs TABLE OF CONTENTS Chapter 2L. CHANGEABLE MESSAGE SIGNS Page Section 2L. Description of Changeable Message Signs.................................... 2L-

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

TMC of the Future. Matt Lee Associate Vice President

TMC of the Future. Matt Lee Associate Vice President TMC of the Future Matt Lee Associate Vice President Overview Traffic Operations Centers Transportation Management Centers TMCs are transforming to be more proactive in addressing recurring as well as non-recurring

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

SPECIAL PROVISION Scope of Work

SPECIAL PROVISION Scope of Work 2004 Specifications CSJ 0914-00-301 & 0914-00-314 SPECIAL PROVISION 004---018 Scope of Work For this project, Item 004, Scope of Work, of the Standard Specifications, is hereby amended with respect to

More information

Cornerstone of downtown; Gateway to the state

Cornerstone of downtown; Gateway to the state Paving the information highway Building public trust through reliable communications Brian Manthey Communications Officer Marquette Interchange Team Wisconsin Department of Transportation September 12,

More information

1995 Metric CSJ 's & SPECIAL PROVISION ITEM 4. Scope of Work

1995 Metric CSJ 's & SPECIAL PROVISION ITEM 4. Scope of Work 1995 Metric CSJ 's 0015-13-235 & 3136-01-098 SPECIAL PROVISION TO ITEM 4 Scope of Work For this project, Item 4, "Scope of Work", of the Standard Specifications, is hereby amended with respect to the clauses

More information

Intelligent Transportation Systems (ITS)

Intelligent Transportation Systems (ITS) Intelligent Transportation Systems (ITS) Systems Engineering (SE) Requirement Intelligent Transportation Systems (ITS) means electronics, communications, or information processing used singly or in combination

More information

Dynamic Message Signs. Qualifications, Technology, Capabilities & Specifications

Dynamic Message Signs. Qualifications, Technology, Capabilities & Specifications Dynamic Message Signs Qualifications, Technology, Capabilities & Specifications Listening to You DMS Topics Functionality Reliability Legibility Specifications System Integration Support Services Financial

More information

Dallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office

Dallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office Trinity Parkway Alternative 3C Dallas City Council August 2, 2017 Jody Puckett, Assistant City Manager (I) City Manager s Office Presentation Overview Provide background on Trinity Parkway Alternative

More information

THE APPLICATIONS OF ADVANCED TECHNOLOGIES TO AUTOMATE TRAVEL TIMES Port Aransas Ferry Operations Project

THE APPLICATIONS OF ADVANCED TECHNOLOGIES TO AUTOMATE TRAVEL TIMES Port Aransas Ferry Operations Project THE APPLICATIONS OF ADVANCED TECHNOLOGIES TO AUTOMATE TRAVEL TIMES Port Aransas Ferry Operations Project America B. Garza, P.E. Corpus Christi District October 15, 2014 Presentation Agenda 1 Introduction

More information

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan Managing DC Work Zones: DDOT s Citywide Transportation Management Plan ARTBA National Work Zone Management Conference September 20, 2016 1 Outline Citywide Transportation Management Plan (TMP) Citywide

More information

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE Town of Putnam Valley, Putnam County February 7, 2018 1 2 MEETING AGENDA Introductions (5 minutes)

More information

Northern Virginia Transportation Authority

Northern Virginia Transportation Authority IV Northern Virginia Transportation Authority March 23, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation 66 Outside the Beltway Project Scope Multimodal improvements to

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

Away from Isolation: Caltrans Arterial Management

Away from Isolation: Caltrans Arterial Management Away from Isolation: Caltrans Arterial Management David Man CALTRANS TRAFFIC OPERATIONS NOV 19, 2015 1 Agenda Introduction Basic Facts Past Present Future 2070s and Cabinets 2 Basic Facts 5,000 State traffic

More information

Opportunities To Succeed

Opportunities To Succeed Harris County ITS Deployments Presented by Wayne Gisler Manager Harris County Traffic & Operations Section Ron Johnson Quality Control Coordinator Harris County Traffic & Operations Section Our Goal To

More information

OR 217,I-5 Experience Portland, OR

OR 217,I-5 Experience Portland, OR OR 217,I-5 Experience Portland, OR By: Abby Caringula Parsons Brinckerhoff July 8th, 2011 Presentation Outline Background VISUM Network Adjustment Model Origin-Destination(O-D) Demand Development ANM Export

More information

SAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District

SAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District SAFETY ON THE IH 35 EXPANSION PROJECTS Andy Petter, P.E. - Waco District Presentation IH 35 Expansion through the Waco District Safety Requirements on the Projects IH 35 Safety Summit Meetings Crash Data

More information

Smarter Work Zones Webinar Series

Smarter Work Zones Webinar Series Smarter Work Zones Webinar Series Webinar #14: Leveraging Traffic Management Center Resources for Work Zone Management Todd Peterson, Gerald (Jerry) Ullman, Eric Rasband, and Brian Kary June 16, 2016 1:00-2:30pm

More information

San Antonio TransGuide: TOC Update ITS Texas 2009

San Antonio TransGuide: TOC Update ITS Texas 2009 San Antonio TransGuide: TOC Update ITS Texas 2009 Brian G. Fariello, P.E. Traffic Management Engineer TxDOT- San Antonio bfariel@dot.state.tx.us (210) 731-5247 San Antonio TransGuide Partner Agencies Current

More information

RTMS Solutions. Detection solutions to fit your city s needs.

RTMS Solutions. Detection solutions to fit your city s needs. RTMS Solutions Detection solutions to fit your city s needs. Keeping your daily commute free of congestion - and maintenance. Behind the scenes in cities all over the world, RTMS radar detection solutions

More information

Dynamic Message Sign Message Design and Display Manual

Dynamic Message Sign Message Design and Display Manual Product 0-4023-P1 October 2004 Dynamic Message Sign Message Design and Display Manual Project performed in Cooperation with the Texas Department of Transportation and the Federal Highway Administration

More information

Understanding the Potential for Video Analytics to Support Traffic Management Functions

Understanding the Potential for Video Analytics to Support Traffic Management Functions Understanding the Potential for Video Analytics to Support Traffic Management Functions Project Summary Slides November 2014 ENTERPRISE Program Program Goals Facilitate rapid progress in the development

More information

Safety Chain Control System. Keith Koeppen, P.E. Caltrans, District

Safety Chain Control System. Keith Koeppen, P.E. Caltrans, District Safety Chain Control System Keith Koeppen, P.E. Caltrans, District 2 2015 1 Overview Background Chain Control Operations Operational need for change Design Initial Design Final Design Controlling Electronics

More information

Opening the New Woodrow Wilson Memorial Bridge: Planning & Implementing a Major Traffic Switch

Opening the New Woodrow Wilson Memorial Bridge: Planning & Implementing a Major Traffic Switch Opening the New Memorial : Planning & Implementing a Major Traffic Switch Scott C. Crumley, P.E., P.T.O.E. Manager March 26, 2009 1 Agenda Background The Major Milestone: Opening the New to Traffic Challenges

More information

Hartford Area Incident Management. Using ITS To Improve Safety on the Greater Hartford Area Expressways

Hartford Area Incident Management. Using ITS To Improve Safety on the Greater Hartford Area Expressways Hartford Area Incident Management Using ITS To Improve Safety on the Greater Hartford Area Expressways Presenters: Joe Balskus, P.E., PTOE, Senior Project Manager, Fuss & O Neill Hartford Area IMS Project

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:02-02-12 a. Description. This work consists of furnishing, installing, integrating, and testing

More information

Special Provision No. 683S27 June 2017

Special Provision No. 683S27 June 2017 GATEWAY ROUTERS - Item No. Special Provision No. 683S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of Gateway Routers with integrated digital subscriber line

More information

BEST PRACTICES IN JOINT USE. Erik Nelson March 21, 2018 RMEL Distribution Overhead and Underground Operations and Maintenance Conference

BEST PRACTICES IN JOINT USE. Erik Nelson March 21, 2018 RMEL Distribution Overhead and Underground Operations and Maintenance Conference BEST PRACTICES IN JOINT USE Erik Nelson March 21, 2018 RMEL Distribution Overhead and Underground Operations and Maintenance Conference Agenda Introduction to Mobilitie Data Demand Why Right-of-Way? Small

More information

Deployment of ITS Projects in Pasadena A Local Agency Perspective

Deployment of ITS Projects in Pasadena A Local Agency Perspective Deployment of ITS Projects in Pasadena A Local Agency Perspective ITS California Annual Meeting October 2, 2013 Norman Baculinao, PE Pasadena and the Region Source: Census Transportation Planning Package,

More information

An Analysis of TDM Impacts on a Corridor Segment Research Findings

An Analysis of TDM Impacts on a Corridor Segment Research Findings An Analysis of TDM Impacts on a Corridor Segment Research Findings Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM

More information

UDOT Freeway and Traffic Signal Performance Metrics

UDOT Freeway and Traffic Signal Performance Metrics UDOT Freeway and Traffic Signal Performance Metrics September 26, 2016 Grant Farnsworth, PE, PTOE UDOT Traffic Mobility Engineer Kelly Burns Eric Rasband Utah Demographics Speed Report Benefit of Past

More information

Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones

Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones Presentation to the Texas Transportation Commission August 27, 2014 Presenters Mike Cantrell Commissioner, Dallas

More information

TXDOT ITS STRATEGIC PLAN DEVELOPMENT

TXDOT ITS STRATEGIC PLAN DEVELOPMENT TXDOT ITS STRATEGIC PLAN DEVELOPMENT Agency Follow-up: Sherman-Denison Stakeholders June 26, 2013 9:00 a.m. TxDOT, 3904 US 75, Sherman, Texas Project Objectives Assist TxDOT in developing a statewide ITS

More information

Treating Potential Back- of-queue Safety. Developed By:

Treating Potential Back- of-queue Safety. Developed By: Treating Potential Back- of-queue Safety Hazards Developed By: 1 Module Objectives Discuss the hazards associated with queuing caused by work zones Describe steps to quantify work zone impacts, determine

More information

Evaluation of Caltrans Automated Warning System Caltrans District 10 Stockton, California. Status Report Winter 2002

Evaluation of Caltrans Automated Warning System Caltrans District 10 Stockton, California. Status Report Winter 2002 Evaluation of Caltrans Automated Warning System Caltrans District 10 Stockton, California Status Report Winter 2002 Loragen Corporation _ Advanced Transportation Research Characteristics of Fog-related

More information

Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry

Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry July 26, 2016 ENTERPRISE Webinar: Data Collection and Uses at International Border

More information

2014 REPORT. Distracted Driving. on I-95 in Northern Virginia

2014 REPORT. Distracted Driving. on I-95 in Northern Virginia 2014 REPORT Distracted Driving on I-95 in Northern Virginia Distracted Driving on Interstate 95 The National Safety Council estimates that as of May 6, 2014 there have already been 354,913+ crashes this

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 Varuna A. Singh August 17, 2018 NHHIP OVERVIEW Project divided into three segments: Segment 1: I-45: from Beltway 8 to I-610 (9 mi) 45 Segment

More information

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 2004 Specifications CSJ 0025-02-194, 0017-10-261, 0017-10-268 & 0017-10-271 SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 1. Description. Retrofit existing

More information

Intelligent Transportation Systems (ITS) for Critical Infrastructure Protection

Intelligent Transportation Systems (ITS) for Critical Infrastructure Protection Intelligent Transportation Systems (ITS) for Critical Infrastructure Protection Presented at the Transportation Research Board January 2002 Annual Meeting Washington DC, USA HAMED BENOUAR Executive Director

More information

Columbus Regional Signal System

Columbus Regional Signal System Columbus Regional Signal System Identifying need for system upgrade Existing proprietary systems that had surpassed their design life Limited signal coordination and traffic monitoring ability Older character

More information

Arterial data quality and traffic estimation

Arterial data quality and traffic estimation Arterial data quality and traffic estimation Qijian Gan Postdoctoral Researcher PATH University of California, Berkeley qgan@berkeley.edu 10th SF Bay Area ITE Annual Workshop May 2nd, 2018 Outline Introduction

More information

ITS Canada Annual Conference and General Meeting. May 2013

ITS Canada Annual Conference and General Meeting. May 2013 Evaluation of Travel Time Data Collection Technologies: An Innovative Approach for a Large- Scale Network ITS Canada Annual Conference and General Meeting May 2013 Study Steps Obtain the traffic data from

More information

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a

More information

Indoor. Heritage Preservation CAD versus Cloud. inside. Applanix and CSIRO. Grows with LiDAR. Vol. 2 Issue 4 ABOVE & BEYOND. ipad & Tablet Ready!

Indoor. Heritage Preservation CAD versus Cloud. inside. Applanix and CSIRO. Grows with LiDAR. Vol. 2 Issue 4 ABOVE & BEYOND. ipad & Tablet Ready! inside Indoor Mapping Applanix and CSIRO SMALL BUSINESS Grows with LiDAR Heritage Preservation CAD versus Cloud Vol. 2 Issue 4 ABOVE & BEYOND ipad & Tablet Ready! RE-MODELING THE MIXMASTER From Mobile

More information

ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer

ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer ANDREW J. HORGAN, PE, PTOE ITS/Traffic Engineer Professional Background Education M.S.C.E, Civil Engineering- Transportation, Villanova University, Villanova, PA, 2012 B.S.C.E., Civil Engineering, Villanova

More information

Portable Work Zone Data Collection. Blaine Van Dyke ODOT ITS Designer

Portable Work Zone Data Collection. Blaine Van Dyke ODOT ITS Designer Portable Work Zone Data Collection Blaine Van Dyke ODOT ITS Designer Year 1 Construction Zone Travel Time project. Provide work zone information to public. Test OSU Bluetooth travel time sensors in new

More information

Using GPS Based Origin-Destination Data to Improve Traffic Studies. Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017

Using GPS Based Origin-Destination Data to Improve Traffic Studies. Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017 Using GPS Based Origin-Destination Data to Improve Traffic Studies Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017 Overview Benefits of using O-D data for traffic analysis, particularly for operational

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

6.9 Intelligent Transportation Systems

6.9 Intelligent Transportation Systems 6.9 Intelligent Transportation Systems This chapter describes Intelligent Transportation Systems (). The chapter also describes the process that defines how agencies and systems are interconnected through

More information

Tolling Innovations and State Interoperability. Agenda

Tolling Innovations and State Interoperability. Agenda Tolling Innovations and State Interoperability 2006 Summer TexITE Meeting Technical Program Fred Philipson, Assistant Director June 23, 2006 Agenda The PPP Question Operations More Electronic Toll Collection

More information

Mike Mollenhauer. Director of the Center for Technology

Mike Mollenhauer. Director of the Center for Technology Mike Mollenhauer Director of the Center for Technology Dr. Michael Mollenhauer is the Implementation at the Virginia Tech Transportation Institute. He leads a team of researchers and software engineers

More information

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 INTRODUCTION The City of Moorhead (City), along with the Fargo-Moorhead Metropolitan Council of Governments (FM

More information

9i Full Matrix Display Radar Driver Feedback Sign

9i Full Matrix Display Radar Driver Feedback Sign 9i Full Matrix Display Radar Driver Feedback Sign Chassis Size Weight LED (Light Emitting Diode) LED 1/2 Cone Angle Sign Mounting 9" high numbers 3" high two lines SLOW DOWN text, 9" high smile or sad

More information

Transportation Data for Chicago Traffic Management Center. Abraham Emmanuel Deputy Commissioner, CDOT

Transportation Data for Chicago Traffic Management Center. Abraham Emmanuel Deputy Commissioner, CDOT Transportation Data for Chicago Traffic Management Center Abraham Emmanuel Deputy Commissioner, CDOT Chicago Traffic Management Center (TMC) Proposed in the early 2000s with a core building and Advanced

More information

Bluetooth Travel Time Technology Evaluation Using the BlueTOAD TM

Bluetooth Travel Time Technology Evaluation Using the BlueTOAD TM Bluetooth Travel Time Technology Evaluation Using the BlueTOAD TM E01271 PennDOT District 6-0 ITS & Support Open End Contract Work Order #1 Submitted To: Pennsylvania Department of Transportation Engineering

More information

Lane Closure System Construction

Lane Closure System Construction Lane Closure System Construction A short course on closure entry - http://transportal.cee.wisc.edu/closures/ For a complete guide to the LCS, please follow the link below. http://transportal.cee.wisc.edu/closures/docs/lcs%20manual_20160615.pdf

More information

Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry

Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry Analysis of Bluetooth and Wi-Fi Technology to Measure Wait Times of Personal Vehicles at Arizona-Mexico Ports of Entry ITE 2016 Western District Annual Meeting July 2016 Presented by: Yung Koprowski, PE,

More information

HEADLIGHT PROGRAM IMPLEMENTATION

HEADLIGHT PROGRAM IMPLEMENTATION HEADLIGHT PROGRAM IMPLEMENTATION TxDOT Dallas US 75/PGBT Improvements Million Weldemariam, P.E. Jacobs Engineering Group Inc. AGENDA TOPICS 1 US 75 at President George Bush Turnpike Improvements Project

More information

Generic Procurement Specification for a Video Detection Solution for Roadway Applications

Generic Procurement Specification for a Video Detection Solution for Roadway Applications Generic Procurement Specification for a Video Detection Solution for Roadway Applications 1 of 10 Video Detection System This specification sets forth the minimum requirements for a video detection system

More information

TECHNICAL BULLETIN Ministry of Transportation

TECHNICAL BULLETIN Ministry of Transportation TECHNICAL BULLETIN Ministry of Transportation ENGINEERING BRANCH TRAFFIC, ELECTRICAL, HWY SAFETY AND GEOMETRIC STANDARDS. SECTION BULLETIN NUMBER: TE-2005-04 Subject: Web Camera Design, Installation, and

More information

APPLICATION OF ADVANCED ANALYSIS TOOLS FOR FREEWAY PERFORMANCE MEASUREMENT

APPLICATION OF ADVANCED ANALYSIS TOOLS FOR FREEWAY PERFORMANCE MEASUREMENT APPLICATION OF ADVANCED ANALYSIS TOOLS FOR FREEWAY PERFORMANCE MEASUREMENT Pantelis Kopelias Attikes Diadromes S.A., 41.9 Km of Attiki Odos, GR 19002 Peania, Athens, Greece Email:pkopelia@attikesdiadromes.gr

More information

Planning Partners Meeting

Planning Partners Meeting January 10, 2011 Planning Partners Meeting All Rights Reserved, 2010 Find us at: Agenda Introductions & Project Update Project Outreach Update Buildout Socioeconomic Data (SED) Initial Buildout Modeling

More information

RoDARS Form User Guide. City of Toronto Road Disruption Activity Reporting System

RoDARS Form User Guide. City of Toronto Road Disruption Activity Reporting System RoDARS Form User Guide City of Toronto Road Disruption Activity Reporting System Contents 1. Background... 1 2. Applicant Information...2 3. City Contacts... 3 4. Brief Explanation of Project... 4 5. Roadway

More information

Smart Gym Relay Panels Enables control of electrically operated gym equipment

Smart Gym Relay Panels Enables control of electrically operated gym equipment Smart Gym Panels Enables control of electrically operated gym equipment Specifications Control of Basketball Backstops, Height Adjusters, Gymnasium Divider Curtains, Overhead Volleyball Systems, Mat Lifters,

More information

Office of Roadway Engineering. Traffic Engineering Manual (TEM) Revision Log

Office of Roadway Engineering. Traffic Engineering Manual (TEM) Revision Log Office of Roadway Engineering Traffic Engineering Manual (TEM) Revision Log January 18, 2019 Revision (of the October 2002 Edition) The following is a detailed list of the changes made in the Preface Materials

More information

Sight Distance on Vertical Curves

Sight Distance on Vertical Curves Iowa Department of Transportation Office of Design Sight Distance on Vertical Curves 6D-5 Design Manual Chapter 6 Geometric Design Originally Issued: 01-04-0 Stopping sight distance is an important factor

More information

SPECIAL PROVISION PROJECT # F-I80-1(61)24 PIN # SECTION 01554M TRAFFIC CONTROL. D. Portable Variable Speed Limit (PVSL) System and Equipment.

SPECIAL PROVISION PROJECT # F-I80-1(61)24 PIN # SECTION 01554M TRAFFIC CONTROL. D. Portable Variable Speed Limit (PVSL) System and Equipment. SPECIAL PROVISION December 20, 2017 Add Article 1.1, Paragraph D: PROJECT # F-I80-1(61)24 PIN # 15284 SECTION 01554M TRAFFIC CONTROL D. Portable Variable Speed Limit (PVSL) System and Equipment. Add the

More information

JCE 4600 Fundamentals of Traffic Engineering. Horizontal and Vertical Curves

JCE 4600 Fundamentals of Traffic Engineering. Horizontal and Vertical Curves JCE 4600 Fundamentals of Traffic Engineering Horizontal and Vertical Curves Agenda Horizontal Curves Vertical Curves Passing Sight Distance 1 Roadway Design Motivations Vehicle performance Acceleration

More information

Vehicle Safety Communications Project Final Overview

Vehicle Safety Communications Project Final Overview CAMP IVI Light Vehicle Enabling Research Program Vehicle Safety Communications Project Final Overview Vehicle Safety Communications (VSC) Project 2.5 year program started in May 2002 VSC Consortium Members:

More information

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS Memorandum DATE February 22, 2019 CITY OF DALLAS TO Honorable Mayor and Members of the City Council SUBJECT February 27, 2019 City Council Agenda Item #19 On Wednesday, February 27, 2019 you will be presented

More information

Connected Corridors Face-to-Face Meeting. Tuesday, Dec 6th, :30 3:30 pm Caltrans D7 HQ

Connected Corridors Face-to-Face Meeting. Tuesday, Dec 6th, :30 3:30 pm Caltrans D7 HQ Connected Corridors Face-to-Face Meeting Tuesday, Dec 6th, 2016 1:30 3:30 pm Caltrans D7 HQ Dec 6th, 2016 Agenda 2 Introductions Schedule Update Outreach High Level Design and Implementation Software Hardware

More information

City Spotlight- City of Santa Clarita ITS Efforts. Andrew Yi, P.E., P.T.O.E City Traffic Engineer

City Spotlight- City of Santa Clarita ITS Efforts. Andrew Yi, P.E., P.T.O.E City Traffic Engineer City Spotlight- City of Santa Clarita ITS Efforts Andrew Yi, P.E., P.T.O.E City Traffic Engineer About Santa Clarita Santa Clarita Downtown LA Located 30 miles northwest of Downtown LA Geographically isolated

More information

Xcel Energy Telemetry Requirements for Distributed Energy Resource Interconnections: Revision 3.1

Xcel Energy Telemetry Requirements for Distributed Energy Resource Interconnections: Revision 3.1 Xcel Energy Telemetry Requirements for Distributed Energy Resource Interconnections: Revision 3.1 Version 3.1: September 22, 2017. Please note that this Revision 3.1 may be subject to subsequent revisions.

More information

Connected Vehicle Safety Pilot Overview and Infrastructure Readiness

Connected Vehicle Safety Pilot Overview and Infrastructure Readiness Connected Vehicle Safety Pilot Overview and Infrastructure Readiness Scott Shogan, PE, PTOE Infrastructure Team Lead Engineer March 28, 2013 Agenda Safety Pilot Program overview V2V and V2I communications

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 6 APPR:LWB:DBP:07-31-13 FHWA:APPR:09-23-13 a. Description. This work consists of one or more

More information

Product Specification SpeedAlert 18 Radar Message Sign

Product Specification SpeedAlert 18 Radar Message Sign SpeedAlert Radar Message Sign SpeedAlert 18 (SA18): 18 x 28 full matrix (SpeedAlert 24 (SA24) 24 x 60 full matrix also available See separate SpeedAlert 24 Spec Sheet) Size and Weight without battery 30

More information

Context Sensitive Case Study: Grand Avenue Bridge

Context Sensitive Case Study: Grand Avenue Bridge Context Sensitive Case Study: Grand Avenue Bridge MODERATOR: Craig Gaskill, TSH Engineering Joe Elsen, Colorado Department of Transportation - DOT Perspective / Client Brian Pettet, Pitkin County - Pitkin

More information

South Mountain Freeway Interchange Selection

South Mountain Freeway Interchange Selection slide 1 South Mountain Freeway Interchange Selection Public Private Partnership (P3) Today s Agenda Project Overview Interchange Selection Pavement Selection Lawsuit Update Design and Construction Q&A

More information

Central Based Transit Signal Priority Deployment NYC s TSP System for Select Bus Service (SBS)

Central Based Transit Signal Priority Deployment NYC s TSP System for Select Bus Service (SBS) Central Based Transit Signal Priority Deployment NYC s TSP System for Select Bus Service (SBS) TSP Deployment Without the Expensive Infrastructure Bob Rausch, P.E. Vice President TransCore, ITS Outline

More information

Bellevue s Traffic Adaptive Signals

Bellevue s Traffic Adaptive Signals What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April

More information

Quick Installation Guide

Quick Installation Guide 4.9-5.8GHz MIMO Bridge Point to Point Kit Package Contents: Two Netkrom AIRNET Outdoor Bridge Units Two Mounting brackets (include: 2 Wall/ Pole mounting system and 4 screw nuts) Two PoE Injectors Two

More information

APPENDIX E TRANSPORTATION

APPENDIX E TRANSPORTATION APPENDIX E TRANSPORTATION 2011 PATRON SURVEYS VISSIM MODEL CALIBRATION AND VALIDATION Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax:

More information

2

2 1 2 3 4 PennDOT has 11 engineering districts that provide engineering, maintenance, construction, traffic and related services for the state transportation system. PennDOT s Central Office provides administrative,

More information

Wisconsin Department of Transportation. Lane Closure System User Manual

Wisconsin Department of Transportation. Lane Closure System User Manual Wisconsin Department of Transportation Lane Closure System User Manual Revised March 2009 Table of Contents Overview Section 1 Creating an Account / Logging In. 1. LCS Home and Requesting an Account 2.

More information

A Pennsylvania Plan for Safe Work Zones PRESENTED BY: LARRY BANKERT, ASSOCIATE V.P., TOLL SERVICES MICHAEL BAKER INTERNATIONAL

A Pennsylvania Plan for Safe Work Zones PRESENTED BY: LARRY BANKERT, ASSOCIATE V.P., TOLL SERVICES MICHAEL BAKER INTERNATIONAL A Pennsylvania Plan for Safe Work Zones PRESENTED BY: LARRY BANKERT, ASSOCIATE V.P., TOLL SERVICES MICHAEL BAKER INTERNATIONAL Introduction A Pennsylvania Plan for Safe Work Zones presents a framework

More information

SHIELD RADAR SPEED DISPLAY

SHIELD RADAR SPEED DISPLAY PRODUCT SPECIFICATIONS: SHIELD RADAR SPEED DISPLAY Shield Speed Display 3 units to cover any application Shield 12 or 12B: 12 x 6 digits, 112 LED/digit Shield 15 or 15B: 15 x 8 digits, 140 LED/digit SpeedAlert

More information

MAJOR PROJECTS STRATEGY

MAJOR PROJECTS STRATEGY MAJOR PROJECTS STRATEGY Texas Transportation Commission October 25, 2017 Outline and Goals Current TexasClearLanes initiatives to mitigate congestion for non-tolled projects Review Unified Transportation

More information

SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment

SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment 2004 Specifications SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment 1. Description. Furnish and install Lane Control Signal (LCS) equipment. 2. Material. Provide new, corrosion resistant materials

More information

Bulletin Installation of solar photovoltaic systems Rules , , , , and

Bulletin Installation of solar photovoltaic systems Rules , , , , and Bulletin 64-5-0 Installation of solar photovoltaic systems Rules 64-060, 64-200, 64-214, 84-020, 84-024 and 84-030 Scope (1) Introduction (2) Disconnecting means (a) Disconnecting means for solar photovoltaic

More information

ITE 2015 Fall Conference, Tucson, Arizona API RI. ATC Application Programming Interface Reference Implementation Demonstration and Training Workshop

ITE 2015 Fall Conference, Tucson, Arizona API RI. ATC Application Programming Interface Reference Implementation Demonstration and Training Workshop ITE 2015 Fall Conference, Tucson, Arizona API RI ATC Application Programming Interface Reference Implementation Demonstration and Training Workshop APIRI Demonstration and Training Workshop Advanced Transportation

More information

Dave Ness. Civil Engineer II City of Dubuque Cell

Dave Ness. Civil Engineer II City of Dubuque Cell Dave Ness Civil Engineer II City of Dubuque Dness@CityofDubuque.org Cell - 563-599-3107 Battery Backup Systems (BBS) Early versions kept the light in RED flash vs. going dark. When LED s Introduced, BBS

More information

Evolution in the Use of Adaptive Signal Control for Smaller Scale Applications

Evolution in the Use of Adaptive Signal Control for Smaller Scale Applications October 23, 2018 Evolution in the Use of Adaptive Signal Control for Smaller Scale Applications Presented by Paul R. Bell, PE VHB Joseph R. Herr, PE, PTOE VHB Presentation Agenda Adaptive System Control

More information

Nevco Message Center Installation Manual Retain this manual in your permanent file. 08/27/ Rev. C

Nevco Message Center Installation Manual Retain this manual in your permanent file. 08/27/ Rev. C Nevco Message Center Installation Manual Retain this manual in your permanent file. 08/27/2014 135-0144 Rev. C Table of Contents INSTALLATION INSTRUCTIONS... 1 UNPACKING THE EQUIPMENT... 1 MESSAGE CENTER

More information

Quick Installation Guide

Quick Installation Guide Quick Installation Guide AIRNET 54 Mb CPE Bridge Point to Point Kit Series Package Contents: 2 Netkrom CPE units Two Mounting bracket include: 2 stainless steel U-Bolt, 2 mounting brackets, 2 pipe Brackets

More information

Quick Installation Guide

Quick Installation Guide LPH1004A Hardened Ethernet PoE Switch, (4) 10/100/1000 Mbps, (1) GE SFP Quick Installation Guide LPH1000 Series Switches operate in harsh environments. Two power inputs connect simultaneously to live DC

More information

2017 Fall Certification Conference

2017 Fall Certification Conference Dedicated to providing quality certification programs for the safe installation, operation and maintenance of public safety systems; delivering value for members by providing the latest information and

More information