Managing Costs via Automated Control Systems. Dave Franczak President Engineered Energy Systems
|
|
- Clare Anderson
- 5 years ago
- Views:
Transcription
1 Managing Costs via Automated Control Systems Dave Franczak President Engineered Energy Systems
2 Good News / Bad News "The good news is that America's energy problems can be solved," (Energy Secretary Spencer) Abraham said. "The bad news is that the situation in California is not isolated. It is not temporary. And it will not fix itself." Source: Energy Chief Says U.S. Is Facing Worst Shortages Since '70s, Richard Simon, LA Times, 3/21/01
3 How can automated control systems help? Better information Help you identify energy cost centers Load profile Better bargaining position Enable flexibility in operations Impacts supply AND demand side management!!!
4 Let s look at an example of a successfully AUTOMATED control system!
5 2,000,000 ft 2 R&D Facility Jersey - 60 s building 6000 ton chilled water plant - five electric drive centrifugals Manually operated - obsolete monitoring system Simultaneous heating & cooling High potential for savings
6 Let the results speak... Automation solved or uncovered many operational problems Comfort level of occupants dramatically increased Energy savings in excess of $300K annually Foundation for the future
7 Where are you today?
8 Some questions to ponder? Where is my control system? Do I know the true cost savings my system provides? Am I locked into one control system vendor? Have I benchmarked my system? Do I need to re-commission my system? Is my system a glorified time clock or smart system?
9 System works Energy cost savings? Labor savings? Reliability? Too overloaded to worry about it! In the dark?
10 Graphics show that the readings are correct. Confident System has been working fine for years. Must be saving me some energy If it ain t broken...
11 Happy System has not caused any problems. Downtime and repairs have been minimal Operators like the graphics Always sign off on the maintenance contract
12 Turn your automated control system into an information system!
13 Breakdown of Costs Lighting Cooling Heating Internal loads
14 You can tackle the issues once you have identified the potential for $$$ savings.
15 To find the potential cost savings... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
16 Benchmark Your Facility Walk around and look Interview operators / maintenance 2:00 a.m. on Sunday Occupancy, running equipment, operations Know cost/ft 2
17 BOMA Benchmarks Table 1 Facility Type Operating Expense Comparisons Total Operating Costs Facility Type ($/RSF) Back-Office Operations and Administrative $6.41 Computer Operations/Data Services $7.07 Headquarters $6.63 Mixed Function (No predominant use) $5.21 Production/Process Facility $9.25 Research and Development $6.43 Table 2 Industry Function Operating Expense Comparisons Total Operating Costs ($/RSF) Industry Function Financial/Insurance $6.90 Hi-Tech $5.94 Utility $7.49 Health $5.78 Manufacturing $5.84 Wholesale/Retail $6.13 Source: BOMA 2000 Experience Exchange Report Corporate Facility Highlights
18 $2.00 $1.80 Expense Trends Source: BOMA 2000 Experience Exchange Report U.S. Office Market Highlights $1.60 $1.40 $/RSF $1.20 $1.00 $0.80 Cleaning Repair/Maintenance Utilities Roads/Grounds Security Administrative $0.60 $0.40 $0.20 $
19 Highest Expenses - Downtown Washington, DC Minneapolis, MN Chicago, IL Boston, MA New York, NY $8.00 $9.00 $10.00 $11.00 $12.00 $13.00 $14.00 $15.00 $16.00 $/RSF Source: BOMA 2000 Experience Exchange Report U.S. Office Market Highlights
20 Highest Expenses - Suburban Morristown, NJ Los Angeles, CA Minneapolis, MN New York, NY Honolulu, HI $8.00 $8.20 $8.40 $8.60 $8.80 $9.00 $9.20 $9.40 $9.60 $9.80 $/RSF Source: BOMA 2000 Experience Exchange Report U.S. Office Market Highlights
21 What does this mean? Utilities and Maintenance are the largest cost drivers (about 1/2 of operating expenses in office bldgs). Computer room - add 10% on average to $/sf Where is your facility? Does your control system provide you with real data? Use the control system to flatten your load profile.
22 Onto Step 2... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
23 Control System Costs Self sufficiency MTBF Labor costs impacted by system sophistication Life cycle vs. first cost Service contracts
24 Life Cycle vs. First Cost 50% 35% 12% 3% Concept Non-Recurring Costs Design & Build Install & Commission Operation & Support
25 50% 35% 12% 3% Incremental spending Concept Do the math... Non-Recurring Costs Design & Build Install & Commission Savings opportunitie s Operation & Support
26 Planning for the future... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Re-commission the control system Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
27 Technical Considerations Age and flexibility Capability to be tied into the meter? Level of customization for optimization Open protocol Communication platforms Controlling systems vs. equipment Level of operator intervention Internet / Intranet
28 How do I find out? Control system vendors Engineering firms Internal resources Independent control system integrator Team solution
29 Decision Time Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
30 Why get rid of it? COST OF KEEPING OUTWEIGHS THE BENEFIT DECREASED FLEXIBILITY SERVICE CONTRACT PRISON VENDOR INDEPENDENCE TECHNICAL DINOSAUR System must have the ability to tell you actual $ per BTU and verify with bills!!
31 If you jettison... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Re-commission the control system Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
32 Most important step... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
33 Re-commissioning SHOULD ALWAYS BE DONE FOR NEW CONSTRUCTION MAY BE MORE IMPORTANT THAN NEW CONSTRUCTION BENEFITS TO RETROFIT PROJECT Increased efficiency Reduced operating costs Reduced maintenance costs
34 Re-commissioning IDENTIFY PROBLEMS INCREASE OPERATING EFFICIENCIES IDENTIFY, QUANTIFY & RESOLVE COMPLAINTS IDENTIFY WHERE NEW SYSTEMS ARE APPLICABLE RE-TRAIN PERSONNEL DOCUMENT
35 Mechanical Systems Dampers stuck Valves not controlling properly Air and water pressure Chiller / boiler efficiencies Strainers, filters, tube fowling, etc. Operator inserts fixes without energy considerations!
36 Mechanical Band Aids QUICK FIXES THAT BECOME PERMANENT High Condenser Pressure = Extra pump AHU Coil frozen = Seal off the outside air SEPARATING FACT FROM FICTION Computer Center requires 44 Degree Chilled 120 GPM The tail wags the dog
37 Electrical Systems PC / Occupancy Shifts Classify loads Essential Ability to be shed Sub-metering cost allocation benchmark changes Lighting survey Projects may have been done without looking at the BIG PICTURE!
38 Control System Calibration of sensors Calibration of controlled devices Verification through to the graphics Control system is only as good as its data. Get back into AUTO
39 Sensors Can make data unbelievable Bad data = bad automation Proper range Calibrated when??? Blow down pressure lines Evaluate quality requirements Knowledge is the key!!!
40 Controlled Devices Dampers allowing OA to enter AHU Valves leaking / shutoff Analog signal calibration Re-examine setpoints Rethink control strategies Retune PID loops Mechanical efficiencies
41 Control System Data Verify data to front end graphics Recheck all loops with proper test equipment Bad data = bad automation Operator ambivalence Migration to HAND Lose / Lose to all To automate, data must be correct!!!
42 Getting bang for your buck... Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
43 Where can AUTOMATED control systems help you save $$$? Lighting Heating Cooling Demand based ventilation Demand Cost Energy Purchase Options End product People
44 Lighting Controls Look around Interior and exterior Occupancy sensors and photosensors are a good start Networked programmable breakers - next step scheduling load shedding ASHRAE 90.1 creates total building wattage limitations.
45 Control the Heat Integrated system - room to boiler Common situations Unnecessary simultaneous heating and cooling Cooling towers System running fixed No night setback
46 Stop the Waste Recapture waste heat AUTOMATIC resetting of setpoints outside air space conditions night setback Systems need to operate in harmony to maximize savings!
47 Cooling Controls Integrated system - room to chiller Common situations Unnecessary simultaneous heating and cooling Chillers running during the winter System running fixed Shock loads No night setback
48 Take Advantage of Nature & Time Free cooling w/ plate and frame HX Ice storage build ice bank off peak emergency cooling Multiple source choices Don t leave it up to the operators to make the decision!
49 Demand Based Ventilation What is it? CFM of OA / person Measure CO 2 vs. VOC gases ASHRAE Location of building is important.
50 Control Considerations Adjust OA CFM based on CO 2 Safety factor to setpoint Impact heating / cooling requirements Save $$$ Example: classrooms
51 Demand Cost Load profile When does your peak KW come into play? Automatic load shedding Real time pricing Alternative sources of energy Strategic Utility Management
52 Energy Purchase Options Automated control system MUST provide info Flatten the load profile Autoswitching to self generation Allow users to shop Provide flexibility with multiple sources
53 End Product Cost Quantitative $/widget Become part of product supply chain Departmental budgeting Boiler room to board room integration Good information = good decision
54 People Component Automation creates manpower savings Use people in other capacities Pushbutton on screen saves the wrong kind of energy. Efficient operation must be net result In house support with open system Growth of staff
55 Re-evaluate Step 1 - Benchmark your facility Step 2 - Identify cost of your control system Step 3 - Technical considerations Step 4 - Jettison or Keep Step 5 - Commission / Re-commission Step 6 - Figure out where $$$ can be saved and go to task Step 7 - Re-evaluate and back to step 6
56 Re-evaluation This is why you commissioning the control system! Did the change work? Meter your results for verification Work on simple fixes first Evaluate and re-evaluate
57 Just to summarize...
58 Find out where you are... In the dark Confident Happy Combination Evaluate technical and financial costs/benefits of the system!
59 Step 1 - Benchmarking HOW DOES YOUR BUILDING COMPARE WITH SIMILAR USE BUILDINGS IN YOUR GEOGRAPHIC AREA $/sq.ft. BTUs/sq.ft. Automated control systems can help you get back into line!!!
60 Step 2 - Control System Cost First Cost vs. Life Cycle Cost Service Contract Prison Cost of repairs Downtime costs Who is in control? Vendor independence is the way to go!!!
61 Step 3 - Technical Considerations Automated vs. Optimized Flexibility Implement customized control strategies Be careful of the open buzzword! Tied to the meter for real time automated decisions Know building / plant information anywhere, anytime, through any media!
62 Step 4 - Keep or Jettison Take into account both the tangible and intangible benefits / costs when making the decision.
63 Get the correct data Step 5 - Commission / Recommission Ensure system works from graphics to end device Third party solution Report and document No Sacred Cows! You MUST do this or the other steps become moot!
64 Steps 6 & 7 Take Action Everything up to speed Determine where you can save $$$ Prioritize, determine payback, and act!!! Those who get past here will be rewarded in the deregulated market!
65 How will you be rewarded with an AUTOMATED system? Quantitatively track demand - better energy contract Energy cost centers Help utilities on supply side More flexible operations Easily incorporate new engineering solutions Run the facility on the edge Power quality Reduced energy use = environmentally friendly
66 Good Team is the Key! In the new market, efficiency goes to the bottom line and is better for the environment!!! Much to evaluate Owner Operator Engineer Commissioning Agent System Integrator individual systems big picture
Saving Energy and Reducing Costs Through Better Use of Building Automation Systems
Session: Low/No Cost Solutions Through BAS Saving Energy and Reducing Costs Through Better Use of Building Automation Systems Mark M. Duszynski Johnson Controls Federal Systems August 9, 2016 Rhode Island
More informationCenterPoint Energy Retro-Commissioning Program Application
CenterPoint Energy Retro-Commissioning Program Application CenterPoint Energy Retro-Commissioning Program is offered to Commercial and Industrial customers in our service territory to enhance their facility
More informationRetro-Commissioning Report
10 Retro-Commissioning Report Retro-Commissioning Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism
More informationEngineered Energy Solutions An Overview. Controls, Automation and Energy Conservation
Engineered Energy Solutions An Overview Controls, Automation and Energy Conservation Engineered Energy Solutions Independent Control System Integration and Engineering Firm specializing in the energy efficient
More informationDriving Proactive Facility Operations with Automated HVAC Diagnostics
Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics
More informationwhere we are, where we could be, how we can get there. 12/14/2011
Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo
More informationDeveloping an Action Plan: Building Energy Metering and Beyond
Developing an Action Plan: Building Energy Metering and Beyond Angela Lewis, PE, PhD, LEED AP, FMP Project Manager Facility Engineering Associates (FEA) MANAGING CEUs AND CFM MAINTENANCE POINTS You are
More informationJames Donahue Control Consultants, Inc.
James Donahue Control Consultants, Inc. Founded 1989 NE s premier distributor of Building Automation products Customer Base: Controls Contractors and Systems Integrators In-House Engineering Department
More informationHow Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy
How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy Critical facility management drivers are impacting all industries Sustainability Big Data/Cloud Open Building Systems
More informationCommercial Retro-Commissioning Program Manual for 2016 SECTION 1
Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Introduction The Commercial Retro-Commissioning Program (RCx) is designed to achieve demand and energy savings in commercial facilities.
More informationBAS Chillers 8/15/2016. Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August 10, 2016
Session 7: Building Automation and Operation Tools Outline Analytics Tools to Supplement BAS Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August
More informationGreen IT Project: The Business Case
Green IT Project: The Business Case Indumathi Lnu University at Albany DATE We will discuss Identifying green IT projects Funding green IT projects Building the business case Case study: University at
More informationDesigning Ultra-Efficient Building Cooling Systems
Designing Ultra-Efficient Building Cooling Systems Design to Apply Effective Optimization Technologies To Chiller Plants and Air Systems ASHRAE Triangle Chapter Raleigh, NC November 16, 2016 Tom Hartman,
More informationBuilding Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II
Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II Lesson 4: Sections Review of last class (0:20) Section 1: AHU: Discharge air temperature control (0:45) Break (0:10) Section 2: AHU: Heating
More informationFair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system
Fair City Plaza Task: Diagnose problems, recommend improvements for small municipal district cooling system The Fair City Plaza district cooling system provides chilled water to five buildings in a downtown
More informationModernizing Control Systems for Campuses
Modernizing Control Systems for Campuses APPA 2018 Presented by: James Comte, Commissioning and Controls Manager University of California, San Francisco In November 2013, President Janet Napolitano announced
More informationEnergy Action Plan 2015
Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015
More informationFuture of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power
Future of Cooling High Density Equipment Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Agenda Issues facing the Data Center Managing the explosive
More informationE e n rgy g y St S ud u y y Pr P og o r g ams December 2011
Energy Study Programs December 2011 1 Agenda Energy Study Programs Overview Recommissioning Engineering Studies Data Center Studies Custom Rebates What makes a good energy study? 2 Energy Study Program
More informationCarrier Hong Kong Limited. Carrier Comfort Network. - optimizes the performance of HVAC Systems & is the premier solution for Building Control
Carrier Hong Kong Limited Carrier Comfort Network - optimizes the performance of HVAC Systems & is the premier solution for Building Control Carrier Comfort Network Fire Systems Lifts & Elevators Plumping
More informationYour Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant
Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,
More informationNew Wisconsin Energy Code: What it Means for Me?
2018 Wisconsin Energy Efficiency Expo Hosted by the Wisconsin Association of Energy Engineers New Wisconsin Energy Code: What it Means for Me? May 17, 2018 Shana Scheiber, PE, LEED AP ID+C, WELL AP Building
More informationCommitted to Energy Efficiency
RESOLUTE Resolute Helps PNC Arena Reduce Energy Consumption and Costs While Improving Fan Comfort Lacking the visibility, real-time data and analytics needed to optimize facility performance and reduce
More informationT66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management
T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell
More informationCritical Facilities Existing Building Commissioning (EBCx)
Critical Facilities Existing Building Commissioning (EBCx) Tony DiLeonardo LEED AP, CxA President Wick Fisher White Tracey Jumper CCP President Jump Start Building Commissioning, LLC AIA Quality Assurance
More informationChiller Replacement and System Strategy. Colin Berry Account Manager
Chiller Replacement and System Strategy Colin Berry Account Manager Current Situation 4 Existing RTAA chillers All units 23 years old Limited service history One unit MUST be replaced immediately One unit
More informationBUILDING AUTOMATION YORKLAND
YORKLAND Distributor / Systems Solutions Provider with over 35 years of controls experience Represent major control manufactures Uniquely positioned to offer integrated control systems from various control
More informationPresentation. Guaranteed Energy Savings Performance Project
Presentation Guaranteed Energy Savings Performance Project Greg Spiro, PE, CEM, LEED-AP Georgia Institute of Technology Senior Mechanical Engineer Facilities Design & Construction 470-351-9867151 6th Street
More informationThe challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software
EMS Optimization Software Often immediate energy savings can be achieved with proper set points, sequencing, scheduling and fault detection of the Building Automation System (BAS). The challenge is that
More informationAchieving Operational Excellence
Achieving Operational Excellence Energy Efficient Operations in a Shrinking Budget Environment 2010 Energy/Facilities Connections Conference Innovative Approaches for a New Decade DID YOU KNOW? Nine out
More informationComEd Retro-Commissioning and Monitoring-Based Commissioning
ComEd Retro-Commissioning and Monitoring-Based Commissioning Rick Tonielli Sr. Program Manager C O N F I D E N T I A L Territory profile ComEd is an electric delivery company providing service to 3.8 million
More informationthat may have a direct effect on your bottom line. The question
VOLUME THREE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Cost of Owning a Chiller What is your bottom line?....... 1 What
More informationenergy solutions MEASUREMENT &VERIFICATION& ELLEN FRANCONI, ROCKY MOUNTAIN INSTITUTE,
7 G energy solutions MEASUREMENT &VERIFICATION& ELLEN FRANCONI, ROCKY MOUNTAIN INSTITUTE, PHD, LEED AP, BEMP TRACY PHILLIPS, 7 TH GENERATION ENERGY SOLUTIONS, CEM, LEED AP Rocky Mountain ASHRAE Conference
More informationHVAC Energy Management System
HVAC Energy Management System Spotlight coordinates the complex tasks required by a building s heating, cooling, fresh air, humidification and lighting systems resulting in increased efficiencies. OVERVIEW
More informationContinuous Commissioning at Sandia National Laboratories
Session: Why On going Commissioning Can Lead to Better Performing Buildings Continuous Commissioning at Sandia National Laboratories Jack Mizner Sandia National Laboratories August 10, 2016 Sandia National
More information7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
More informationChiller Plant Optimization: A Case Study
Presentation of Chiller Plant Optimization: A Case Study Presented by Michael S. Conway The site Large pharmaceutical client 5 MW cogen 88,000 PPH of boiler capability 8,200 tons of chiller capability
More informationDaikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers
Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers Explore financial impacts that can save your budget Commissioning cash-on-cash returns of 91% for existing buildings
More informationLos Anseles W Department of 5* Water & Power
Los Anseles W Department of 5* Water & Power 3D RESOLUTION NO. BOARD LETTER APPROVAL DAVID H. WRIGHT MARCIE L. EDWARDS Chief Operating Officer General Manager DATE: May 26, 2016 SUBJECT: Lease Agreement
More informationTulane University. Reducing energy waste. Smart is...
Tulane University Reducing energy waste Smart is... Lowering energy expenses and increasing sustainability with intelligent buildings. In the wake of a major natural disaster, Tulane University made a
More informationIntegrated and Intelligent Buildings: An Imperative to People, the Planet and the Bottom Line Kelly A. Romano, President, Intelligent Building
Integrated and Intelligent Buildings: An Imperative to People, the Planet and the Bottom Line Kelly A. Romano, President, Intelligent Building Technologies, United Technologies Building & Industrial Systems
More informationLeveraging Building Automation Systems to support ongoing commissioning
Leveraging Building Automation Systems to support ongoing commissioning Building Automation Systems Introduction Show me the money Critical components Building Automation System Architectures Protocols
More informationENERGY EFFICIENCY FINANCE
ENERGY EFFICIENCY FINANCE Energy Efficiency Indicator Survey and PACE 1 Copyright 2011 Johnson Controls, Inc. JOHNSON CONTROLS 140,000 Employees Multi-industry Founded 1885 Building Efficiency Creating
More informationPROCESS COOLING STUDY WORKSHEET
PROCESS COOLING STUDY WORKSHEET January, 0 December, 0 DIRECTIONS: Please save a copy of this form to your computer by selecting FILE/SAVE AS before entering text and numbers. Then fll in your information
More informationDigital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is located
More informationData Center Optimized Controls
Data Center Optimized Controls Controls Agenda 30 min. Emerson Control Products icom (Dynamic Thermal Optimization) 20 min. Station Rotation Station 1: Controller Challenge Station 2: Wireless Demo 5 min.
More informationWhy Should We Care? Building Intelligent Solutions 2
Why Should We Care? Building Intelligent Solutions 2 Responsible environmental leadership Building Intelligent Solutions 3 Responsible environmental leadership Setting targets for reducing energy consumption
More informationHIGH EFFICIENCY Central Chiller
Blending Conveying Drying Process Cooling Heat Transfer Size Reduction HIGH EFFICIENCY Central Chiller Energy Efficient Modular & Expandable Virtually Eliminate Downtime Available in 20-60 ton single units,
More informationAPC InRow Cooler Prototype Initial Report - Test Setup Verification. H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011
APC InRow Cooler Prototype Initial Report - Test Setup Verification H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011 1 Introduction Contents Technology Description/Attributes Installation
More informationPrediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques
Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques Joel Urban Director of Quality Assurance Brady Services, Inc. Leah Lehman IoT Program Director
More informationFactsheet. Power Generation Service Energy efficiency in power generation and water
Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy
More informationCommunicating Submeter Data Via BACnet
BACnet Today and the Smart Grid This article was published in ASHRAE Journal, vember 2013. Copyright 2013 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically
More informationInterested in conducting your own webinar?
Interested in conducting your own webinar? Email webinars@bnpmedia.com July 17, 2012 TCO in the Data Center Audio Abstract Presenter Info Slides Handouts Group Chat Q & A Live Twitter Feed Help Survey
More information1.0 Executive Summary. 2.0 Available Features & Benefits
Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions
More informationA New Paradigm for Retrocommissioning: Moving Building Science to Green Collar Trades
A New Paradigm for Retrocommissioning: Moving Building Science to Green Collar Trades Presented by: Keith Forsman,PE Pacific Gas & Electric Company August 17, 2010 .From Building Science to Green Collar
More informationDEDICATED HEAT RECOVERY UNIT (DHRC)
DEDICATED HEAT RECOVERY UNIT (DHRC) AHRI CERTIFICATION Air-Conditioning, Heating, and Refrigeration Institute Multistack is AHRI Certified and continues to certify products as they are developed AHRI Certification
More information18 th National Award for Excellence in Energy Management. July 27, 2017
18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months
More informationThe Future. Today. YZ MAGNETIC BEARING CENTRIFUGAL CHILLER
The Future. Today. YZ MAGNETIC BEARING CENTRIFUGAL CHILLER YZ MAGNETIC BEARING CENTRIFUGAL CHILLER YORK YZ Magnetic Bearing Centrifugal Chiller The YORK YZ Magnetic Bearing Centrifugal Chiller is a revolutionary
More informationComprehensive Energy Management & Utility Master Plan
Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach
More informationTrane Cold Generator TM. Scroll Chillers. Comfort and Process Cooling Solutions
Trane Cold Generator TM Scroll Chillers Comfort and Process Cooling Solutions Advanced Cooling Solutions The Trane Cold Generator family of scroll chillers is a broad line of comfort and process cooling
More informationPrecision Controls of Indianapolis
Precision Controls of Indianapolis For nearly 30 years, Precision Controls of Indianapolis has excelled at process controls, HVAC controls, HVAC and mechanical services, and instrument calibration. An
More informationInternational 6SigmaDC User Conference CFD Modeling for Lab Energy Savings DCSTG Lab Temperature Setpoint Increase
International 6SigmaDC User Conference CFD Modeling for Lab Energy Savings DCSTG Lab Temperature Setpoint Increase Chris Noland cnoland@cisco.com Vipha Kanakakorn vkanakak@cisco.com 3/4/2010 Goal & Limitations
More information2017 NEHES Fall Conference Technical Breakout Session: Deep Chiller Plant Optimization
2017 NEHES Fall Conference Technical Breakout Session: Deep Chiller Plant Optimization Presented by: Steve Keppler, Senior Director Critical Systems Design Build Practice CLEAResult Deep Optimization Standard
More informationMSYS 4480 AC Systems Winter 2015
MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and
More informationBuilding Management Systems (BMS) Back to Basics. Presented By: Andrew Smith Leader Building Technologies A.G. Coombs Advisory
Building Management Systems (BMS) Back to Basics Presented By: Andrew Smith Leader Building Technologies A.G. Coombs Advisory Back to Basics. 1) What is a Building Management System (BMS)? 2) Typical Components
More informationMetering and Energy Retrofits for the GSA
Metering and Energy Retrofits for the GSA 2012 Rocky Mountain Chapter ASHRAE Technical Conference Leadership in HVAC&R April 20 th, 2012 Juan Moreno and Christian Marsh-Frydenlund 1 1 Agenda Project Overview
More informationDrives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)
Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to
More informationWhat is building analytics and why should we care? Daniel Hansen Salt Lake Community College March 23, 2016
What is building analytics and why should we care? Daniel Hansen Salt Lake Community College March 23, 2016 Daniel Hansen 14 years in Facilities 3 years in PM and HVAC Maintenance (UVU) 4 years in HVAC
More informationSilicon Valley Power Data Center Program Rebate Application
Contact Information Tax Status (check one) Sole Proprietor Contact Name Phone Corporation Partnership Company Email address Government Not-For-Profit Customer/Facility Information Company Name SVP Account
More informationORGANIZATIONAL ROLES THE TEAM BLDG CONTROLS ADACENT PROJECTS ARC FLASH BLDG OCCUPANTS ENGINEERING HIGH VOLTAGE LOW VOLTAGE UTILITIES DISTRIBUTION PM &
UTILITY METERING AT PURDUE ENTERPRISE ENERGY MANAGEMENT SYSTEM Jason Kutch, P.E. Malcolm Drane, P.E. AGENDA Organizational roles Comprehensive Energy Master Plan (CEMP) goals Metering program Enterprise
More informationExisting Building Energy Saving
Existing Building Energy Saving Ir Cary Chan Executive Director, HK Green Building Council Aviation industry 1981 1971 1969 1930s 1903 2 3 4 5 6 7 A big gap to fill Convincing responses to your boss! Deliver!
More informationData Center Energy Savings By the numbers
Data Center Energy Savings By the numbers Chris Kurkjian, PE HP Critical Facility Services provided by EYP Mission Critical Facilities 2008 Hewlett-Packard Development Company, L.P. The information contained
More informationUtility System Infrastructure
Utility System Infrastructure THE COLLEGE OF 2015 Campus Master Plan WILLIAM & MARY SUPPORTING DOCUMENTATION TABLE OF CONTENTS 3 4 4 4 4 5 Electrical Utility Infrastructure Emergency Power Generators
More informationCLICK TO EDIT MASTER TITLE STYLE. AdvanTEC Solutions CHILLER PLANT HEALTH MANAGER
CLICK TO EDIT MASTER TITLE STYLE AdvanTEC Solutions CHILLER PLANT HEALTH MANAGER GREEN CHILLER PLANT Energy Efficiency Superior system performance Less energy consumption versus similar size building Operation
More informationEfficiency of Data Center cooling
Efficiency of Data Center cooling Comparison of data room layouts and cooling systems Bohumil Cimbal Product manager for Cooling Systems in CONTEG Company Objective Basic questions between investor and
More informationCASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO
6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions
More informationCHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM
CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New
More informationMiG2 CONTROLLERS. 2 & 4 Stage General Purpose Controllers, with Air-conditioning Facilities
MiG2 CONTROLLERS 2 & 4 Stage General Purpose Controllers, with Air-conditioning Facilities The MiG2 controllers incorporate: 2 Inputs (Configurable as Resistive, 0 10V, 0 20mA or 4 20mA) 2 or 4 Relay Outputs
More informationWashington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401
FOR LEASE > OFFICE SPACE Washington Square 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FPO 111 Washington Square > Office Space HENNEPIN AVE PARKING RAMP > Built in 1987, 111 Washington is part of a three
More informationAffinity. Dedicated HVAC/R Drive for Building Automation. 1.1kW to 132kW (1.5hp to 200hp) 200V / 400V / 575V / 690V IP20 (NEMA 1) and IP54 (NEMA 12)
Affinity Dedicated HVAC/R Drive for Building Automation 1.1kW to 132kW (1.5hp to 200hp) 200V / 400V / 575V / 690V IP20 (NEMA 1) and IP54 (NEMA 12) Affinity A dedicated HVAC/R drive Affinity is Control
More informationFinal Thesis Presentation
Final Thesis Presentation Spring 2011 Advisor: Dr. Treado Building Overview Existing Conditions System Evaluation Building Overview Existing Conditions System Evaluation Building Overview Existing Conditions
More informationCommercial Controls. Advanced control for saving time and money
L Connection NetWork Commercial Controls Advanced control for saving time and money The efficient way to control hvac and building operations L Connection Network at a glance: Controls a wide range of
More informationCleanroom Energy Benchmarking In High-Tech and Biotech Industries
ACEEE 2001 Paper #66 Cleanroom Energy Benchmarking In High-Tech and Biotech Industries William Tschudi; Lawrence Berkeley National Laboratory Kathleen Benschine, Stephen Fok; Pacific Gas and Electric Company
More informationHVAC System Energy Savings Opportunities
HVAC System Energy Savings Opportunities Speaker Info M. Lant DuBose Energy Services ConEdison Solutions dubosem@conedsolutions.com (813)285-6340 Wholly owned subsidiary of ConEdison since 2007 Entered
More informationData Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1
Energy for What s Ahead SM Energy Management Solutions Data Centers Powerful Solutions That Put You in Control Ready to take a byte out of your data center energy use and become more cost-effcient? Data
More informationEnergy efficiency at scale:
Energy efficiency at scale: Virtual energy assessment technologies are uniquely powerful for saving energy in building portfolios Large portfolios of commercial buildings can benefit greatly from new virtual
More informationSetting New Standards for Ultra High Performance HVAC
Setting New Standards for Ultra High Performance HVAC WHITE PAPER What if your commercial HVAC system could operate as efficiently in 10 years as it did on the day it was commissioned? What if you could
More informationOptimizing Laboratory Controls through Fault Detection and Diagnostics Software. Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM
Optimizing Laboratory Controls through Fault Detection and Diagnostics Software Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM Overview What are EIS & FDD Tools? Data Connection Methods
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities
UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the
More informationCECIP 18 GWH3. 16KMTCO 2 e 4 ABOUT CECIP CALTECH ENERGY CONSERVATION INVESTMENT PROGRAM ANNUAL REPORT 2014 ABOUT CALTECH INVESTED TO DATE
CECIP CALTECH ENERGY CONSERVATION INVESTMENT PROGRAM ANNUAL REPORT 2014 ABOUT CECIP Caltech s green revolving fund, CECIP, combines finance, engineering and operations to implement energy conservation
More informationEnergy Solutions for Buildings
Energy Solutions for Buildings Making energy safe, reliable, efficient, productive and green Make the most of your energy SM 1 Solutions to enable and sustain energy savings Technology is crucial to make
More informationDUKE UNIVERSITY DESIGN & CONSTRUCTION STANDARDS
1 25 95 00 Integrated Automation Control Sequences for HVAC GENERAL The HVAC operational sequences in this guideline are commonly used by Duke University. They are being provided as a preferred design
More informationCommunicative controller for VAV systems
FCR015 Communicative controller for VAV systems Summary FCR015 is a communicative controller for heating and cooling panels and a VAV (variable air volume) damper. It measures temperature and CO 2 concentration
More informationO&M Roadie or Rockstar?
Session: O&M Strategies: A Rock to Rockstar O&M Roadie or Rockstar? Greg Palko Ameresco August 10, 2016 Rhode Island Convention Center Providence, Rhode Island What s the context? Roles and Activities
More informationBeverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center
Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire
More informationSMART VENTILATION MANAGEMENT: CHANGING THE WAY WE THINK ABOUT VENTILATION
SMART VENTILATION MANAGEMENT: CHANGING THE WAY WE THINK ABOUT VENTILATION VENTILATION: THE KEY TO HEALTHY & EFFICIENT BUILDINGS At Ventacity Systems we believe that ventilation deserves more attention
More informationOptimizing the Existing Building Cx Process:
Optimizing the Existing Building Cx Process: Integrating EBCx into ESPCs Lia Webster, P.E. Senior Engineer Portland Energy Conservation, Inc. AIA Quality Assurance Learning Objectives 1. Identify ways
More informationNEW WEB BROWSER-BASED APPLIANCE ADDS TO DATA CENTER SECURITY
CASE STUDY Standby Generation for Data Centers NEW WEB BROWSER-BASED APPLIANCE ADDS TO DATA CENTER SECURITY Taking the Next Step to Protect Critical Data If you live or work there, you understand that
More informationENERGY AND BUILDING AUTOMATION A WHITE PAPER ON ITS POTENTIAL FOR THE CITY OF FLINT AND GENESEE COUNTY. AltEnergy Inc.
ENERGY AND BUILDING AUTOMATION A WHITE PAPER ON ITS POTENTIAL FOR THE CITY OF FLINT AND GENESEE COUNTY AltEnergy Inc. 2009 Advanced Solutions Group, LLC All Rights Reserved Page 1 of 15 BUILDING AUTOMATION
More informationCGWN/CCUN indoor liquid chillers The compact AquaStream² solution
CGWN/CCUN indoor liquid chillers The compact AquaStream² solution Plug and Play for unparalleled Certified performance Eurovent certification provides capacity and efficiency compliance, thus confirming
More information