Green IT Project: The Business Case

Size: px
Start display at page:

Download "Green IT Project: The Business Case"

Transcription

1 Green IT Project: The Business Case Indumathi Lnu University at Albany DATE

2 We will discuss Identifying green IT projects Funding green IT projects Building the business case Case study: University at Albany s storage consolidation project

3 Green IT Projects IT equipment and facilities related projects that reduce energy usage and costs % Energy Usage Focus on the big ticket items Don t ignore the low hanging stuff

4 Partial List of Green Projects: Servers Servers Follow the standards- 80Plus, Standard Performance Evaluation Corp. (SPEC) s performance-per-watt benchmark, LBNL+EPA specifications, Energy Star labeled servers Not all these standards are in place yet ENERGY STAR servers 30% more energy efficient than standard servers

5 Partial List of Green Projects: Servers Server and Storage: Consolidation and Virtualization Eliminate physical servers Increase utilization of servers and remove idle/dead and underutilized servers Savings: About $1200/server/year Thin Client: Shift all processing to servers for maximum server utilization Only user interface, some heavily used applications and networked operating system on the client Savings: $10 to 25/device + lower cost of terminal device

6 Partial List of Green Projects: Servers Enable Power Management: Not many reliable tools; AMD has good power management capability Advanced Configuration and Power Interface developed by HP, Intel and Microsoft may cause problems on Linux servers Potential for 20% reduction in energy usage

7 Partial List of Green Projects: Power Supply High Efficiency Power Supply: Consider power supply efficiency vs. server load profile when selecting power supply Right-size power supplies Power supply must deliver 80% efficiency across a range of low load levels Consider power supplies that are Gold certified by 80Plus.org Certified power supplies are at least 33% more energy efficient than standard power supplies Install Power Distribution Units as close to the rack as possible to limit conductor run

8 Partial List of Green Projects: HVAC Efficient HVAC System: Life Cycle Cost analysis on new data center or upgrades Modular chillers or chillers with VSD compressors with high part load efficiencies Chilled and condenser water reset strategies Low pressure drop diffusers and filters Increase supply air temperature as feasible to provide adequate cooling Variable Frequency Drives for AHU, cooling tower and other HVAC fans and chilled and hot water pumps Premium efficiency fan and pump motors

9 Partial List of Green Projects: HVAC Water or Airside Economizer: Integrate economizer with mechanical cooling Air economizer vs. filtration issues: Could use indirect but requires space Water side economizer required a water-cooled system Design economizer for medium temperature air and install controls to avoid unnecessary humidity loads Economizers can reduce cooling usage by 20% in NY climate

10 Partial List of Green Projects: HVAC Mechanical Airflow Management: Eliminate mixing and re-circulating hot equipment exhaust air: Hot aisle/cold aisle isolation, rigid enclosures, blanking unused racks, racks with good internal airflow Maximize return air temperature by supplying air directly to the loads Provide adequately sized return and supply ducts/ plenums CFD software for efficient airflow and cooling design

11 Partial List of Green Projects: Lighting Efficient Lighting and Controls: High performance T8 or T5 fixtures, maybe even LED Occupancy based lighting controls Reduce lighting load as well as load on air-conditioning Ensure heat load from lighting is effectively removed Savings: 30-50% of lighting loads

12 Partial List of Green Projects: Other Energy Management System: Consider real-time energy and demand monitoring for various data center systems including IT loads, cooling system, HVAC fans and pumps, and power supplies Provide trending capabilities that allow analysis of data for decision-making Provide controls for temperature and humidity, fully integrated economizer cycle, and part load operation of cooling and fan systems Retro- and Re-Commissioning: Develop schedules and process for re-commissioning including schedules for recalibrating control sensors

13 Identifying Green IT Projects Two Approaches One: Conduct a preliminary audit and develop master plan Flex tech services from NYSERDA or NGRID Two: Upgrade to energy efficient measures when purchasing/replacing equipment Typical IT refresh cycle: 5 years? Only look at incremental costs Easier to develop business case Drawback: may not be comprehensive but could be if guided by master plan/audit

14 Funding Green IT Projects Internal sources Capital funds Operating funds (utility budget) ITS and/or Facilities Department External grants NYSERDA NGRID Private sponsors: manufacturers, vendors, etc. Federal grants

15 Business Case: TCO Total cost of ownership: Half is capital expenses; other half is operating expenses Annual energy savings: utility cost savings Operation and maintenance savings Reliability Service contracts Staff proficiency and productivity gain System performance improvement and end user satisfaction Physical space savings Current and future capital cost avoidance

16 Business Case: Getting Started Define problem Define technical and performance goals for the project Research solutions Prepare a comparative matrix using the goals document Provide metrics for each solution : PUE, Watts/usable terabytes, annual cost savings, % energy reduction, etc. Highlight advantages of proposed solution

17 Business Case : The Metrics Gather data Initial cost of proposed project and alternatives: equipment, labor, internal staff time Avoided capital cost (current and future) : life expectancy of existing equipment vs. proposed Metered energy data Current and proposed staff time (hours and $$) : may not result in cost savings but increased efficiency Current and proposed service contract $$ Current and proposed space requirement Other quantitative data Other qualitative data Available grants and incentives

18 Business Case : The Analysis Analysis Vendor: beware of exaggerated savings ITS staff: may need assistance from other departments such as facilities, energy office Consultant: could be partially funded by grants/incentives Use simple payback for simpler projects Use cash flow analysis or life cycle cost analysis for more complex projects Include all recurring annual cost savings Clearly state assumptions Prepare an executive summary as well as detailed report Present to senior management and/or grant sources

19 Case Study: UA Storage Consolidation Problem Identification Distributed approach to data storage (16) fiber attached storage systems 60% of systems >4 years old : nearing end of useful life Limited growth capacity Underutilized Inability to achieve site redundancy High overhead costs: different interfaces each with periodic updates and maintenance, staff proficiency Storage not adequate to meet needs of server virtualization

20 UA Storage Consolidation: Opportunity Need to add storage capacity to meet campus needs Traditional approach Add two more storage devices to existing (16) Keep existing problems and add to it Lowest first cost No staff re-training

21 UA Storage Consolidation: Opportunity Virtualize existing storage systems using appliance-based abstraction layer Examples include the IBM SVC and the NetApp V3140 Allowed for data replication via SAN fabric Thirteen of the sixteen existing storage systems were not integrated in the SAN: migration a project in itself Old storage systems would still remain Still need to purchase (2) new storage systems Total (18) storage systems plus redundant storage virtualization appliances = twenty-two systems Management, maintenance costs, power, cooling and rack space issues would only be exacerbated

22 UA Storage Consolidation: Opportunity Storage Consolidation : Preferred Solution NetApp FAS3160 storage solution: met our technical and performance goals Unified storage architecture Consolidate (12) storage systems in the primary data center into one new system and (4) storage systems currently in the alternate data center into an identical new system De-commission (16) storage systems Higher first cost Staff need to be re-trained

23 Storage Consolidation: Benefits Consolidation of # of systems Replaced many relatively low density disk drives with higher density disk drives Same usable disk space with less disk drives Allow staff to develop proficiency in one system Occupy less space : we have a cubicle for a data center Future Growth Accommodation Accommodate disk space requirements served by (16) systems : 80% of usable disk space Can accommodate 1-2 years of future storage growth needs

24 Storage Consolidation: Benefits Site Redundancy Positions UAlbany to continue with server, application and data redundancy projects Continue server virtualization projects to take advantage of storage and site replication Failover strategy with little or no data loss with a recovery time within one to two hours for the server virtualization environment

25 Storage Consolidation: Benefits Lower Total Cost of Ownership 17 kw or 68% reduction in average power demand; 75% reduction in watts per usable terabytes 152,137 kilowatt-hours savings per year or 8% savings in data center energy usage $15,822 in annual utility cost savings 234,260 lbs of CO2 emissions reduction Better centralization and automation of storage administration and support better storage per administrator ratios

26 Storage Consolidation: Benefits Lower Total Cost of Ownership 43% savings in rack U s required for storage (54 rack-u instead of 95) Upwards of 80% capacity utilization (compared to 25-30%) and % availability 30% increase in disk capacity by increasing disk space from 55.3 to 72 Terabytes Ability to more proactively manage storage needs Capacity to address data redundancy and disaster recovery A foundation for the concurrent Server Virtualization project

27 Storage Consolidation: Benefits Lower Total Cost of Ownership Eliminate $63,675 per year in maintenance contracts; 3- year maintenance included in the new hardware purchase Avoided current capital cost to purchase (2) systems: $300,000 (Not to mention 7kW increase in power and more space requirement) Restart the replacement cycle with new hardware Avoided future capital cost to replace the (16) systems over the next 4 years: $844,300

28 Storage Consolidation: Project Economics Project economics without NYSERDA grant Energy Cost Savings ($/Yr) $15,822 Maintenance Cost Avoidance ($/Yr) $63,674 Total Annual Cost Savings ($/Yr) $79,496 Total Project Cost ($) $638,679 Current Capital Cost Avoidance ($) $300,000 Future Capital Cost Avoidance ($) $844,300 Current Incremental Project Cost ($) $338,679 Simple Payback (Yr) 4.3 Typical IT refresh cycle: 4-5 years Maintenance cost avoidance is only for 3 years Not an impressive business case

29 Storage Consolidation: Project Economics Project economics with NYSERDA grant Energy Cost Savings ($/Yr) $15,822 Maintenance Cost Avoidance ($/Yr) $63,674 Total Annual Cost Savings ($/Yr) $79,496 Total Project Cost ($) $638,679 Current Capital Cost Avoidance ($) $300,000 Future Capital Cost Avoidance ($) $844,300 Current Incremental Project Cost ($) $338,679 NYSERDA Incentives $200,000 Final Net Incremental Cost to UAlbany $138,679 Simple Payback (Yr) 1.8 Had no problems selling this project to senior management

30 Storage Consolidation: Current Status Project is 100% complete New high capacity storage system in primary data center Redundant storage system with equal capacity in secondary data center (16) old storage systems decommissioned Visitors welcome

31 Questions? University at Albany contacts Indumathi Lnu Energy Officer Brian Heaton Associate Director, Systems Management and Operations Nancy Beck Data Center Manager THANK YOU

TWO FINANCIAL IMPACT STUDIES. Seal IT Equipment Cabinets for Significant Annual Cost Savings and Simple Payback in a Few Short Months

TWO FINANCIAL IMPACT STUDIES. Seal IT Equipment Cabinets for Significant Annual Cost Savings and Simple Payback in a Few Short Months TWO FINANCIAL IMPACT STUDIES Seal IT Equipment Cabinets for Significant Annual Cost Savings and Simple Payback in a Few Short Months TWO FINANCIAL IMPACT STUDIES Seal IT Equipment Cabinets for Significant

More information

Data Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1

Data Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1 Energy for What s Ahead SM Energy Management Solutions Data Centers Powerful Solutions That Put You in Control Ready to take a byte out of your data center energy use and become more cost-effcient? Data

More information

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Future of Cooling High Density Equipment Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Agenda Issues facing the Data Center Managing the explosive

More information

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director Energy Logic: A Roadmap for Reducing Energy Consumption in the Data Center Emerson Network Power Ross Hammond Managing Director Agenda Energy efficiency Where We Are Today What Data Center Managers Are

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

Virtualization and consolidation

Virtualization and consolidation Virtualization and consolidation Choosing a density strategy Implementing a high-density environment Maximizing the efficiency benefit Anticipating the dynamic data center Schneider Electric 1 Topical

More information

DCIM Data Center Infrastructure Management Measurement is the first step

DCIM Data Center Infrastructure Management Measurement is the first step DCIM Data Center Infrastructure Management Measurement is the first step Presented by Julius Neudorfer Sponsored by DCIM Data Center Infrastructure Management Measurement is the first step Presented by

More information

Data Center Energy Savings By the numbers

Data Center Energy Savings By the numbers Data Center Energy Savings By the numbers Chris Kurkjian, PE HP Critical Facility Services provided by EYP Mission Critical Facilities 2008 Hewlett-Packard Development Company, L.P. The information contained

More information

Optimiz Chilled January 25, 2013

Optimiz Chilled January 25, 2013 Optimiz zing Existing Data Center Chilled Water Plants January 25, 2013 This White Paper describes factors to be consideredd when optimizing an existing data center chilledd water plant. Authored by Michael

More information

MSYS 4480 AC Systems Winter 2015

MSYS 4480 AC Systems Winter 2015 MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and

More information

CenterPoint Energy Retro-Commissioning Program Application

CenterPoint Energy Retro-Commissioning Program Application CenterPoint Energy Retro-Commissioning Program Application CenterPoint Energy Retro-Commissioning Program is offered to Commercial and Industrial customers in our service territory to enhance their facility

More information

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES PROCESS & DATA CENTER COOLING How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES CONGRATULATIONS 2 BOLD PREDICTION 3 Where We Are TODAY Computer Technology NOW advances more

More information

Introducing the Heat Wheel to the Data Center

Introducing the Heat Wheel to the Data Center Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure Specialist KyotoCooling International Critical Facilities Round Table 1 A New Free Cooling Technique

More information

Data Center Trends: How the Customer Drives Industry Advances and Design Development

Data Center Trends: How the Customer Drives Industry Advances and Design Development Bablu Kazi, PE MORRISON HERSHFIELD MISSION CRITICAL Data Center Trends: How the Customer Drives Industry Advances and Design Development What does the Customer Need? Scalability P U E Latest Technology

More information

Retro-Commissioning Report

Retro-Commissioning Report 10 Retro-Commissioning Report Retro-Commissioning Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism

More information

Power & Cooling Considerations for Virtualized Environments

Power & Cooling Considerations for Virtualized Environments Power & Cooling Considerations for Virtualized Environments Cisco Data Center Day 2008 31-01-2008 APC-MGE Vision & Mission OUR VISION APC-MGE products ensure availability wherever data is created, transmitted

More information

Inside the Data Center: Opportunities for Energy Efficiency

Inside the Data Center: Opportunities for Energy Efficiency Pacific Gas and Electric Company Presented to Technologies and Practices for Efficient & Reliable Data Centers Inside the Data Center: Opportunities for Energy Efficiency Mark Bramfitt Sunnyvale, California

More information

18 th National Award for Excellence in Energy Management. July 27, 2017

18 th National Award for Excellence in Energy Management. July 27, 2017 18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months

More information

Session 6: Data Center Energy Management Strategies

Session 6: Data Center Energy Management Strategies Session 6: Data Center Energy Management Strategies Data Center Energy Use and Opportunities: Applying Best Practices to meet Executive Order Requirements Dale Sartor, PE Lawrence Berkeley National Laboratory

More information

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to

More information

A Green Approach. Thermal

A Green Approach. Thermal A Green Approach to Thermal Management Thermal Management - AGENDA Definitions & Thermal Facts Density Trends Rack Level Management Passive Solutions Thermal Sources & Green Solutions Data Center Layout

More information

Case Study: Energy Systems Integration Facility (ESIF)

Case Study: Energy Systems Integration Facility (ESIF) Case Study: Energy Systems Integration Facility (ESIF) at the U.S. Department of Energy s National Renewable Energy Laboratory (NREL) in Golden, Colorado OFFICE HIGH BAY LABORATORIES DATA CENTER 1 Case

More information

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling While CRAH cooling has been

More information

Reducing Data Center Cooling Costs through Airflow Containment

Reducing Data Center Cooling Costs through Airflow Containment FEATURE Reducing Data Center Cooling Costs through Airflow Containment Implementing a containment solution in the data center costs much less than the alternatives of adding air handlers or other supplemental

More information

Green IT and Green DC

Green IT and Green DC Green IT and Green DC Alex SL Tay Regional Service Product Line Manager Site & Facilities Services, IBM ASEAN 1 What our clients are telling us We are running out of space in our data center We have environmental

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

CHAPTER 11 Data Centers and IT Equipment

CHAPTER 11 Data Centers and IT Equipment CHAPTER 11 Data Centers and IT Equipment OBJECTIVES Understand the linkages between data center efficiency and business profitability. Identify the major energy uses in data centers and the sources of

More information

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data

More information

where we are, where we could be, how we can get there. 12/14/2011

where we are, where we could be, how we can get there. 12/14/2011 Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo

More information

PROCESS COOLING STUDY WORKSHEET

PROCESS COOLING STUDY WORKSHEET PROCESS COOLING STUDY WORKSHEET January, 0 December, 0 DIRECTIONS: Please save a copy of this form to your computer by selecting FILE/SAVE AS before entering text and numbers. Then fll in your information

More information

Reliable, Energy Efficient, and Cost-Effective On-site Cogeneration and Back-up Power System for a Mission Critical Data Center

Reliable, Energy Efficient, and Cost-Effective On-site Cogeneration and Back-up Power System for a Mission Critical Data Center Reliable, Energy Efficient, and Cost-Effective On-site Cogeneration and Back-up Power System for a Mission Critical Data Center Critical Facilities Roundtable Dan Hoffman Director of Facilities May 19,

More information

Variable Density, Closed-Loop, Water-Cooled Data Center Solution

Variable Density, Closed-Loop, Water-Cooled Data Center Solution Variable Density, Closed-Loop, Water-Cooled Data Center Solution Overview Great Lakes Case & Cabinet Co., Inc. has worked with Naissus Thermal Management Solutions, of Toronto, Ontario to develop one of

More information

Achieving Operational Excellence

Achieving Operational Excellence Achieving Operational Excellence Energy Efficient Operations in a Shrinking Budget Environment 2010 Energy/Facilities Connections Conference Innovative Approaches for a New Decade DID YOU KNOW? Nine out

More information

Systems and Technology Group. IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development

Systems and Technology Group. IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development Systems and Technology Group IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development Power and cooling are complex issues There is no single fix. IBM is working

More information

Impact of Air Containment Systems

Impact of Air Containment Systems White Paper June 2012 WP-20 Impact of Air Containment Systems Reducing Energy Consumption Introduction: The Importance of Maintaining Data Center Cooling Energy Efficiency Data centers are mission-critical

More information

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation Ee The Efficient Enterprise All content in this presentation is protected 2008 American Power Conversion Corporation Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic!

More information

E e n rgy g y St S ud u y y Pr P og o r g ams December 2011

E e n rgy g y St S ud u y y Pr P og o r g ams December 2011 Energy Study Programs December 2011 1 Agenda Energy Study Programs Overview Recommissioning Engineering Studies Data Center Studies Custom Rebates What makes a good energy study? 2 Energy Study Program

More information

Ecoflair Air Economizers

Ecoflair Air Economizers Ecoflair Air Economizers Cooling to maximize value for the cloud schneider-electric.com/ecoflair Life is On Schneider Electric 1 Ecoflair takes data center efficiency to new heights 2 Imagine cooling your

More information

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System A Data Center Heat Removal System That Saves... Infrastructure Power Water up to 40% up to 80% up to 85% Discover Inertech s Award-winning Data Center Heat Removal System A Cool Solution; A Breakthrough

More information

Green Data Centers A Guideline

Green Data Centers A Guideline Green Data Centers A Guideline Sekhar Kondepudi Ph.D Associate Professor Smart Buildings & Smart Cities Vice Chair Focus Group on Smart Sustainable Cities ITU-TRCSL Workshop on Greening the Future: Bridging

More information

REPORT. Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD. Prepared for:

REPORT. Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD. Prepared for: REPORT Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD Prepared for: San Diego Supercomputer Center 10100 John J Hopkins Drive San Diego, CA 92037 May 11, 2009

More information

Liebert DCW CATALOGUE

Liebert DCW CATALOGUE Liebert DCW CATALOGUE Chilled Water-Based High Density Cooling For The Data Center LIEBERT DCW Flexible Approaches For Energy Efficient Cooling Save up to 70% in cooling energy usage Data center managers

More information

MEASURE MONITOR UNDERSTAND

MEASURE MONITOR UNDERSTAND MEASURE MONITOR UNDERSTAND Presented by Alistair Hunt Energy Monitoring, Measurement metrics Where and What 1 History & Background Company Timeline 18 Years Comrac & Sinetica founded 15 Years Raritan Integration

More information

LANL High Performance Computing Facilities Operations. Rick Rivera and Farhad Banisadr. Facility Data Center Management

LANL High Performance Computing Facilities Operations. Rick Rivera and Farhad Banisadr. Facility Data Center Management Slide-1 LANL High Performance Computing Facilities Operations Rick Rivera and Farhad Banisadr Facility Data Center Management Division Slide-2 Outline Overview - LANL Computer Data Centers Power and Cooling

More information

Constru January 15, 2013

Constru January 15, 2013 Use of Modula ar Design and its Relation to Energy Performance and Constru uction Costs January 15, 2013 The data center designerr and user now have a very wide range of modular options available with

More information

Moving Containment Inside the Enclosure. Jeff Markle Great Lakes Case & Cabinet

Moving Containment Inside the Enclosure. Jeff Markle Great Lakes Case & Cabinet Moving Containment Inside the Enclosure Presented by Jeff Markle Great Lakes Case & Cabinet Containment Containment : To put constraint upon; to restrain; to confine; to keep within bounds Containment

More information

Charles Nolan. Do more with less with your data centre A customer s perspective. Director IT Infrastructure, UNSW. Brought to you by:

Charles Nolan. Do more with less with your data centre A customer s perspective. Director IT Infrastructure, UNSW. Brought to you by: Charles Nolan Director IT Infrastructure, UNSW Do more with less with your data centre A customer s perspective Brought to you by: Today s Enterprise Data Centre Doing more with less High Density Data

More information

Presentation. Guaranteed Energy Savings Performance Project

Presentation. Guaranteed Energy Savings Performance Project Presentation Guaranteed Energy Savings Performance Project Greg Spiro, PE, CEM, LEED-AP Georgia Institute of Technology Senior Mechanical Engineer Facilities Design & Construction 470-351-9867151 6th Street

More information

Server room guide helps energy managers reduce server consumption

Server room guide helps energy managers reduce server consumption Server room guide helps energy managers reduce server consumption Jan Viegand Viegand Maagøe Nr. Farimagsgade 37 1364 Copenhagen K Denmark jv@viegandmaagoe.dk Keywords servers, guidelines, server rooms,

More information

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to

More information

ENCLOSURE HEAT DISSIPATION

ENCLOSURE HEAT DISSIPATION ENCLOSURE HEAT DISSIPATION DATA CENTER SOLUTIONS A White Paper by Great Lakes Case & Cabinet Company www.werackyourworld.com 814.734.7303 Page 2 Introduction Dangerous heat levels inside an enclosure threaten

More information

Efficiency of Data Center cooling

Efficiency of Data Center cooling Efficiency of Data Center cooling Comparison of data room layouts and cooling systems Bohumil Cimbal Product manager for Cooling Systems in CONTEG Company Objective Basic questions between investor and

More information

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101 Nick Gangemi Regional Sales Manager Data Aire Agenda Exactly what are we talking about ASHRAE TC 9.9 Design best practices

More information

Los Anseles W Department of 5* Water & Power

Los Anseles W Department of 5* Water & Power Los Anseles W Department of 5* Water & Power 3D RESOLUTION NO. BOARD LETTER APPROVAL DAVID H. WRIGHT MARCIE L. EDWARDS Chief Operating Officer General Manager DATE: May 26, 2016 SUBJECT: Lease Agreement

More information

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems Session: Low/No Cost Solutions Through BAS Saving Energy and Reducing Costs Through Better Use of Building Automation Systems Mark M. Duszynski Johnson Controls Federal Systems August 9, 2016 Rhode Island

More information

New Wisconsin Energy Code: What it Means for Me?

New Wisconsin Energy Code: What it Means for Me? 2018 Wisconsin Energy Efficiency Expo Hosted by the Wisconsin Association of Energy Engineers New Wisconsin Energy Code: What it Means for Me? May 17, 2018 Shana Scheiber, PE, LEED AP ID+C, WELL AP Building

More information

Green Sustainable Data Centres. Checklist - EU Code of Conduct on Data Centres. Annex

Green Sustainable Data Centres. Checklist - EU Code of Conduct on Data Centres. Annex Green Sustainable Data Centres Checklist - EU Code of Conduct on Data Centres Annex This course is produced under the authority of e-infranet: http://e-infranet.eu/ Course team prof. dr. Colin Pattinson,

More information

Internet-Scale Datacenter Economics: Costs & Opportunities High Performance Transaction Systems 2011

Internet-Scale Datacenter Economics: Costs & Opportunities High Performance Transaction Systems 2011 Internet-Scale Datacenter Economics: Costs & Opportunities High Performance Transaction Systems 2011 James Hamilton, 2011/10/24 VP & Distinguished Engineer, Amazon Web Services email: James@amazon.com

More information

DATA CENTER COLOCATION BUILD VS. BUY

DATA CENTER COLOCATION BUILD VS. BUY DATA CENTER COLOCATION BUILD VS. BUY Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for

More information

Chiller Replacement and System Strategy. Colin Berry Account Manager

Chiller Replacement and System Strategy. Colin Berry Account Manager Chiller Replacement and System Strategy Colin Berry Account Manager Current Situation 4 Existing RTAA chillers All units 23 years old Limited service history One unit MUST be replaced immediately One unit

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers APC White Paper #46 Richard L. Sawyer Director of Data Center Technology American Power Conversion Company 2005 APC corporation What has

More information

Developing an Action Plan: Building Energy Metering and Beyond

Developing an Action Plan: Building Energy Metering and Beyond Developing an Action Plan: Building Energy Metering and Beyond Angela Lewis, PE, PhD, LEED AP, FMP Project Manager Facility Engineering Associates (FEA) MANAGING CEUs AND CFM MAINTENANCE POINTS You are

More information

Survey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered

Survey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered Survey and Audit Service Schedule Airflow and Thermal Imaging Survey Service Schedule Data Centre Solutions Expertly Engineered Consult optimisation, audit and survey services Data Centre Services Workspace

More information

INNOVATE DESIGN APPLY.

INNOVATE DESIGN APPLY. INNOVATE DESIGN APPLY By A whole new cooling experience The Motivair ChilledDoor Rack Cooling System targets the critical cooling requirements of today s modern server rack designs. As technology continues

More information

Rittal Cooling Solutions A. Tropp

Rittal Cooling Solutions A. Tropp 1 Rittal Cooling Solutions Presented by Adam Tropp 2 Agenda Cooling Strategies Aisle Containment Chimney Solution Airstream Management Rittal Liquid Cooling Packages Data Monitoring 3 Cooling strategies.

More information

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary Datacenter Efficiency Trends Cary Roberts Tellme, a Microsoft Subsidiary Power Slashing Tools P3 Kill-A-WATT Measures min, max, and instantaneous voltage and current draw Calculates power (watts), kilowatt

More information

Energy Efficient Data Centers

Energy Efficient Data Centers IBM Systems and Technology Group Lab Services Energy Efficient Data Centers Steven Ahladas IBM Corp ahladas@us.ibm.com Keeping our clients in the race. All trends going the same way. IT Servers were an

More information

Recapture Capacity for Existing. and Airflow Optimization

Recapture Capacity for Existing. and Airflow Optimization Recapture Capacity for Existing Data Centers Through Cooling and Airflow Optimization Introduction Challenges and Trends Agenda Cooling & Airflow Optimization Takeaways Learning Objectives Recognize opportunities

More information

1.1 ANNUAL DATA CENTER HEALTH CHECK

1.1 ANNUAL DATA CENTER HEALTH CHECK Statement of Work Maintenance Service 1.0 Executive Summary - 1 - Service Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details of Service 4.0 Assumptions 5.0 Scope of Responsibility

More information

Schneider Electric Cooling Portfolio. Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions

Schneider Electric Cooling Portfolio. Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions Schneider Electric Cooling Portfolio Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions Data Center Cooling Agenda 1. How to size data center, server rooms, IDF rooms, etc in

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres Product Brochure DENCO Close Control Units Row-DENCO High Density Cooling for Data Centres Data Centre Cooling Through a history in close control, we have developed a broad and deep understanding of how

More information

Silicon Valley Power Data Center Program Rebate Application

Silicon Valley Power Data Center Program Rebate Application Contact Information Tax Status (check one) Sole Proprietor Contact Name Phone Corporation Partnership Company Email address Government Not-For-Profit Customer/Facility Information Company Name SVP Account

More information

DCIM Data Center Infrastructure Management

DCIM Data Center Infrastructure Management DCIM Data Center Infrastructure Management Part 2 Implementation Challenges & Strategic Advantages - Predictive Analysis August 8, 2013 Presented by Julius Neudorfer Sponsored by Today s Topics Implementation

More information

SRP Energy Efficiency Program Update SWEEP Regional Energy Efficiency Workshop

SRP Energy Efficiency Program Update SWEEP Regional Energy Efficiency Workshop SRP Energy Efficiency Program Update SWEEP Regional Energy Efficiency Workshop November 13, 2008 1 Objectives of SRP Energy Efficiency (EE) Programs Reduce/defer generation resource needs Meet SRP s Sustainable

More information

Google s Green Data Centers: Network POP Case Study

Google s Green Data Centers: Network POP Case Study Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice

More information

Evaporative free air cooling technology Providing evaporative free air cooling solutions.

Evaporative free air cooling technology Providing evaporative free air cooling solutions. Evaporative free air cooling technology Providing evaporative free air cooling solutions. Creating an effective workspace environment data centre free air cooling technology FreeCool - Evaporative Free

More information

DEDICATED HEAT RECOVERY UNIT (DHRC)

DEDICATED HEAT RECOVERY UNIT (DHRC) DEDICATED HEAT RECOVERY UNIT (DHRC) AHRI CERTIFICATION Air-Conditioning, Heating, and Refrigeration Institute Multistack is AHRI Certified and continues to certify products as they are developed AHRI Certification

More information

INNOVATE DESIGN APPLY.

INNOVATE DESIGN APPLY. INNOVATE DESIGN APPLY By A whole new cooling experience The Motivair ChilledDoor Rack Cooling System targets the critical cooling requirements of today s modern server rack designs. As technology continues

More information

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP This case study will evaluate the feasibility of data center free cooling in the Middle East using indirect

More information

Data Center Temperature Design Tutorial. Ian Seaton Chatsworth Products

Data Center Temperature Design Tutorial. Ian Seaton Chatsworth Products Data Center Temperature Design Tutorial Ian Seaton Chatsworth Products What are we going to do today? Explore a process for determining what data center operating temperature will deliver the best total

More information

1.0 Executive Summary. 2.0 Available Features & Benefits

1.0 Executive Summary. 2.0 Available Features & Benefits Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions

More information

Interested in conducting your own webinar?

Interested in conducting your own webinar? Interested in conducting your own webinar? Email webinars@bnpmedia.com July 17, 2012 TCO in the Data Center Audio Abstract Presenter Info Slides Handouts Group Chat Q & A Live Twitter Feed Help Survey

More information

Next Generation Cooling

Next Generation Cooling Next Generation Cooling Server Manufacturer Perspective Practical and Cost Effective David Moss Data Center Strategist Dell 1 Why Chip, Row, or Rack? Density? Energy Don t be scared; I don t see 50kW/rack

More information

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation Engineered Energy Solutions An Overview Controls, Automation and Energy Conservation Engineered Energy Solutions Independent Control System Integration and Engineering Firm specializing in the energy efficient

More information

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw IT COOLING CLOSE CONTROL AIR CONDITIONERS CHILLED WATER HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw 3 Versions available Single chilled water coil Double chilled water coil High temperature IT COOLING

More information

IT Energy Savings for Non-Techies Identifying & Understanding Opportunities

IT Energy Savings for Non-Techies Identifying & Understanding Opportunities IT Energy Savings for Non-Techies Identifying & Understanding Opportunities Mike Walker, President Beacon Consultants Network Inc. (An ENERGY STAR Technical Support Contractor) September 2013 Who are we?

More information

Cleanroom Energy Benchmarking In High-Tech and Biotech Industries

Cleanroom Energy Benchmarking In High-Tech and Biotech Industries ACEEE 2001 Paper #66 Cleanroom Energy Benchmarking In High-Tech and Biotech Industries William Tschudi; Lawrence Berkeley National Laboratory Kathleen Benschine, Stephen Fok; Pacific Gas and Electric Company

More information

<Insert Picture Here> Austin Data Center 6Sigma DC CFD Model

<Insert Picture Here> Austin Data Center 6Sigma DC CFD Model Austin Data Center 6Sigma DC CFD Model Keith Ward Keith Ward Data Center Facilities Engineering and Logistics Design Austin Data Center Statistics - Space Original AT&T Designed and

More information

survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1.

survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1. :: In a recent Uptime Institute survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1. 2 Maintain Assess Control ROI Monitor Optimize The Need for a Better Approach

More information

Total Modular Data Centre Solutions

Total Modular Data Centre Solutions Sector Data Centre Total Modular Data Centre Solutions www.airedale.com BRITISH MANUFACTURER ENERGY EFFICIENCY CONTROLS SERVICE TRAINING 01 Standardised Modular Designs to fit your needs Our modular system

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability

Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability Precision Cooling for Business-Critical Continuity TM Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability DATA CENTER SOLUTIONS For More Information:

More information

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Energy Efficiency Best Practice Guide Data Centre and IT Facilities 2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits

More information

Smart Data Centres. Robert M Pe, Data Centre Consultant HP Services SEA

Smart Data Centres. Robert M Pe, Data Centre Consultant HP Services SEA Smart Data Centres Robert M Pe, Data Centre Consultant Services SEA 2006 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Content Data center

More information

IT COOLING EVAPORATIVE COOLING SYSTEM. 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 80 TO 320 kw

IT COOLING EVAPORATIVE COOLING SYSTEM. 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 80 TO 320 kw IT COOLING EVAPORATIVE COOLING SYSTEM 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 8 TO 3 kw IT COOLING EVAPORATIVE COOLING SYSTEM ADIABATIC COOLING FOR HIGH EFFICIENCY - Variable

More information

Liebert DCW Family Chilled Water-Based High Density Cooling For The Data Center. Precision Cooling For Business-Critical Continuity

Liebert DCW Family Chilled Water-Based High Density Cooling For The Data Center. Precision Cooling For Business-Critical Continuity Liebert DCW Family Chilled Water-Based High Density Cooling For The Data Center Precision Cooling For Business-Critical Continuity Flexible Approaches For Energy Efficient Cooling Save up to 70% in cooling

More information

Aquaflair. Uniflair TRAC, TRAF and TRAH. Air-cooled chillers, free-cooling chillers and heat pumps with scroll compressors.

Aquaflair. Uniflair TRAC, TRAF and TRAH. Air-cooled chillers, free-cooling chillers and heat pumps with scroll compressors. Aquaflair Uniflair TRAC, TRAF and TRAH Air-cooled chillers, free-cooling chillers and heat pumps with scroll compressors 120-350kW Uniflair TRA ranges 115-350kW Air-cooled Chillers Cooling, Free cooling

More information