1 WECC Load Modeling Task Force Updates Irina Green California ISO, WECC LMTF Chair NERC Load Modeling Task Force Meeting November 1, 2017
2 Composite Load Model with Distributed Generation Composite Load Model Cmpldwg is for approval by the WECC Modeling and Validation Work Group in January Not approved yet by WECC. Is implemented in GE PSLF and Power World, but not in PSS/E. Will be in PSS/E in the new version It is a very simplified model, DER_A model will be more advance and more accurate. Distributed Generation (Behind the meter PV) cannot be ignored or netted with load because they are becoming widespread and have significant impact. Slide 2
3 Distributed Generation Model DER_A DER_A model can be stand alone and part of cmpld, also can be used as generator. It is a simplified model of a full PV plant, has 39 parameters, can be simplified a little further. Has droop, dead band, voltage control and time constants. Will be for approval in January. Hard to validate composite load models because they are aggregate. Slide 3
4 Modular Structure of the New Models New composite load model will be modular, thus easier to use than a model with many parameters. DER_A model represents a module that can be incorporated in the composite load model. Modular cmpld model including DER_A will be tested on a full WECC case. GE is working on the coding DER_A model and on including it in the composite load model. Expected to be completed by the end of November. Slide 4
5 Variable Frequency Drive Models EPRI is working on testing of variable frequency drives Did tests for tripping to determine voltage and time when trips by applying different voltage sags. Was modeled as electronic load in composite load model More variable frequency drives in the future, therefore their parameters are important Slide 5
6 Parameters of Composite Load Models BPA is working on determining parameters of composite load model and load composition for commercial buildings BPA conducted surveys of the Headquarters building in Portland, OR. They also did load monitoring in the building. All these studies resulted in improvement of the load models for commercial buildings. Slide 6
7 Next Steps in Load Modeling Dmitry Kosterev from BPA is developing next steps in load modeling. Questions include model structure of the current cmpldw composite load model and the future cmpld2 model that will be an update of the cmpldw. For the future needs, more flexible model structure is needed as well as model benchmarking. User feedback from the studies is important and will lead to the model improvements. Also important is understanding of load composition, surveys to develop model parameters and data management Slide 7
8 Load Composition Modeling Update PNNL (Yu Zhang) is working on the load composition modeling update. Load protection was studied, including motor response and protection in commercial buildings, and protection settings Aggregated load protection was developed from this data Price responsive load Data sources include PMU and SCADA data and statistic about customers, end-use load databases Measurements and test help to improve load models Slide 8
9 Benchmarking Work needed on benchmarking three programs: GE PSLF, PSS/E and Power World to have same models and same results in all three programs. Slide 9
10 Phase 2 of Composite Load Model Work of the California ISO on dynamic stability study results with Phase 2 (single-phase air conditioners stalling enabled) of the composite load model and comparison with Phase 1 (single-phase air conditioners stalling disabled). Model is sensitive to parameters, accurate parameters are important, including trip and re-connection settings Phase 2 results are significantly different from Phase 1 More studies are needed Slide 10
11 WECC Transient Voltage Recovery Criteria Need clarification of the WECC Transient Voltage Recovery Criteria. This criteria might have some ambiguous interpretation and is not very clear. It was decided to request the clarification of the criteria from WECC. It will be useful to know transient voltage criteria in other regions Slide 11
Dynamic Load Models in PowerWorld Simulator
Dynamic Load Models in PowerWorld Simulator Jamie Weber (weber@powerworld.com) Director of Software Development 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com
More informationDRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models
DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models Problem Statement With the proliferation of distributed energy resources (DER), Transmission Planners must adapt
More informationTechnology Innovation Delivering Value to BPA Organized, Disciplined, Focused
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power
More informationUsing WECC Composite Load Model and PowerWorld Time Step Simulation Tool. Eleanor Ewry
Using WECC Composite Load Model and PowerWorld Time Step Simulation Tool Eleanor Ewry Engineer October 21, 2014 Overview Introduction to Composite Load Model Introduction to Time Step Simulation (TSS)
More informationMeasurement Based Dynamic Load Modeling in Power Systems
Measurement Based Dynamic Load Modeling in Power Systems Alireza Rouhani 1 Bilgehan Donmez 2 Ali Abur Northeastern University 1 Currently with Dominion Power (Received his PhD in Spring 2017) 2 Cuurently
More informationISO New England Data Modeling Requirements
A U G U S T 1 5, 2 0 1 6 B O S T O N, M A ISO New England Data Modeling Requirements Renew Northeast Meeting Al McBride D I R E C T O R, T R A N S M I S S I O N S T R A T E G Y & S E R V I C E S Agenda
More informationLoad Composition Modeling Update
Load Composition Modeling Update JAN 24 TH, 2018 PRESENTER: YU ZHANG TEAM: YU ZHANG (PNNL) DAVE CHASSIN (SLAC) PAVEL ETINGOV, DAN JAMES, YUAN LIU, SOUMYA KUNDU, QIUHUA HUANG, YINGYING TANG, JIAN ZHANG,
More informationData Preparation Tools and Dynamic Models for System Studies with Distributed Series Impedances and Distributed Static Series Compensators
Data Preparation Tools and Dynamic Models for System Studies with Distributed Series Impedances and Distributed Static Series Compensators Presentation of Part 1 and Part 2 studies to MVWG Chifong Thomas
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationSMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2
SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:
More informationPG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.
Update History PG&E Transmission Interconnection Hbook Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug. 11, 2004 Parallel/Parallel Test Procedure. Addition of F-35 GE device to Table G2-4
More informationBenchmark systems for ElectroMagnetic Transient (EMT) and Transient Stability (TS) hybrid simulation
Benchmark systems for ElectroMagnetic Transient (EMT) and Transient Stability (TS) hybrid simulation Qiuhua (Tony) Huang Pacific Northwest National Laboratory, USA qiuhua.huang@pnnl.gov Liwei Wang, Xuekun
More informationApplications on openpdc platform at Washington State University
Applications on openpdc platform at Washington State University Mani V. Venkatasubramanian Washington State University Pullman WA WSU projects OMS - Oscillation Monitoring System Stand-alone system for
More informationSoftware Technologies
The Power of Trust. The Future of Energy. MAINTAINING GRID SECURITY Analysis tools for off-line and on-line Dynamic Security Assessment 02 Maintaining grid security is a fundamental requirement for power
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationPower System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017
Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability
More informationRequirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company
Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company December 29, 2016 APS Requirements for Data for Power System Modeling and Analysis Table of Contents
More informationPMU Emulator for Power System Electromechanical Dynamics Simulators
PMU Emulator for Power System Electromechanical Dynamics Simulators Evangelos Farantatos, Mahendra Patel EPRI Param Banerjee, Anurag Srivastava Washington State University NASPI WG Meeting Albuquerque,
More informationDER Data Collection Guideline. Rich Hydzik, DER Subgroup Lead ERSWG Meeting November 6, 2017
DER Data Collection Guideline Rich Hydzik, DER Subgroup Lead ERSWG Meeting November 6, 2017 Since the August 3, 2017, Meeting Data Collection Guideline has been through two rounds of comment from DER Subgroup
More informationRTDMS CAISO TRAINING SESSION
Consortium for Electric Reliability Technology Solutions Real-Time Dynamics Monitoring System (RTDMS ) RTDMS CAISO TRAINING SESSION January 31, 2006 Manu Parashar & Jim Dyer Electric Power Group (EPG)
More informationSynchrophasor Technology and Systems
PNNL-SA-106051 Synchrophasor Technology and Systems Jeff Dagle, PE Chief Electrical Engineer and Team Lead Electricity Infrastructure Resilience Pacific Northwest National Laboratory Richland, Washington
More informationNorth American SynchroPhasor Initiative (NASPI) Overview
North American SynchroPhasor Initiative (NASPI) Overview Data Exchange Panel ipcgrid 2013 hosted by Pacific Gas & Electric March 28, 2013 Jeff Dagle, PE Chief Electrical Engineer Advanced Power and Energy
More informationPotential CIP decision tree for PMUs
Potential CIP decision tree for PMUs Questions Is the PMU used to control and/or protect high or medium classified BES equipment? If Yes, device should be classified CIP JDK Comments If any type of automated
More informationCritical Asset Identification Methodology. William E. McEvoy Northeast Utilities
Critical Asset Identification Methodology William E. McEvoy Northeast Utilities Disclaimer This NPCC TFIST workshop provides a forum for the presentation and discussion of member experience in the implementation
More informationIntroduction to Generation Availability Data System (GADS) Wind Reporting
Introduction to Generation Availability Data System (GADS) Wind Reporting Registration and Reporting Fundamentals Donna Pratt, Performance Analysis Manager-Data Analytics NERC Webinar April 26, 2017 Topics
More informationTRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES October 16, 2014 Meeting from the ISO Headquarters Folsom, California
TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES October 16, 2014 Meeting from the ISO Headquarters Folsom, California Steve Rutty, Acting Chairperson of the Transmission Maintenance Coordination
More informationSoftware as a Service Model for Operator Training
Software as a Service Model for Operator Training EPCC Dublin, Ireland June 14-17, 2009 by Robin Podmore Incremental Systems, Issaquah, WA 2008 Copyright Incremental Systems Corporation Definition Software
More informationChallenges in Realtime Solutions for Power System Reliability. Jim Gotesky Senior System Dispatcher, Pacific Gas & Electric March 26, 2014
Challenges in Realtime Solutions for Power System Reliability Jim Gotesky Senior System Dispatcher, Pacific Gas & Electric March 26, 2014 ... out with the Old We all know the BIG PICTURE motivations for
More informationCaroline Marzinzik. CMPLDW Support in PowerWorld Simulator ext. 12
CMPLDW Support in PowerWorld Simulator Caroline Marzinzik caroline@powerworld.com 217 398 2340 ext. 12 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com
More informationDRAFT Agenda Synchronized Measurement Subcommittee (SMS) Meeting
DRAFT Agenda Synchronized Measurement Subcommittee (SMS) Meeting November 03, 2015 1:00 p.m. to 5:00 p.m. Pacific Time Zone November 04, 2015 8:30 a.m. to 5:00 p.m. Pacific Time Zone November 05, 2015
More informationHELICS Co-simulation Framework for the Smart Grid
HELICS Co-simulation Framework for the Smart Grid PHILIP TOP Lawrence Livermore National Lab ipc Grid 3/28/18 This work was performed under the auspices of U.S. Department of Energy by Lawrence Livermore
More informationPhasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005
Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated
More informationQuarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan
Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability
More informationUpdate on REPC_B Model
Update on REPC_B Model Pouyan Pourbeik WECC MVWG Meeting March, 206 206 Electric Power Research Institute, Inc. All rights reserved. REPC_A (existing plant controller) 2 206 Electric Power Research Institute,
More informationRevised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )
Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original
More informationPower Grid Simulator GridSim. Mani V. Venkatasubramanian Washington State University Pullman WA
Power Grid Simulator GridSim Mani V. Venkatasubramanian Washington State University Pullman WA GridSim - Real Time Simulation of Power Grid Operation & Control Funded by USDOE Project team: Mani Venkatasubramanian
More informationAdvanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security
Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,
More informationProject Data Update Package Instruction Manual (PDUP-IM)
Project Data Update Package Instruction Manual (PDUP-IM) Date: April 11, 2018 Prepared by: Reviewed by: Approved by: Khalid Rafiq, P. Eng. Modelling Engineer, Transmission Project Delivery Christopher
More informationAutomatic Identification of Power Quality Variations in the Power Quality Diagnostic System
Automatic Identification of Power Quality Variations in the Power Quality Diagnostic System Jeff Lamoree, Rob Scott & Pete Snow, Charles Saylor & Sid Bhatt Rory Dwyer John Rhea Electrotek Concepts, Inc.
More informationIEEE P1564 Voltage Sag Indices Task Force Meeting
IEEE P1564 Voltage Sag Indices Task Force Meeting Dan Sabin Electrotek Concepts, Inc. d.sabin@ieee.org January14, 2013 Memphis, Tennessee, USA IEEE P1564 Task Force Meeting Agenda Introductions Patent
More informationDRTS-DRTS Link for Distributed Real Time Simulation. Dr. Rob Hovsapian
DRTS-DRTS Link for Distributed Real Time Simulation Dr. Rob Hovsapian Digital Real Time Simulator High-fidelity transient power system simulation Time-domain solutions of dynamic system behaviors System
More informationGeneration Interconnection Feasibility Study Report
Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study
More information10 th Annual University of Pittsburgh Electric Power Industry Conference
10 th Annual University of Pittsburgh Electric Power Industry Conference System Studies for Grid Level Integration of Power Electronic Devices Presentation November 16, 2015 1:30 PM Session Adam R. Sparacino
More informationReal-time transient stability simulation tool
ephasorsim: Real-time transient stability simulation tool Vahid Jalili-Marandi, Ph.D. OPAL-RT Technologies Vahidj@opal-rt.com 1 Large 10 000+ Nodes Wide Area Simulation ephasorsim Large EMT Simulation
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationApplication of Undervoltage Protection to Critical Motors
Application of Undervoltage Protection to Critical Motors Matt Proctor GE Grid Solutions 2018 Texas A&M Protective Relaying Conference Agenda Undervoltage Scenarios (Transient, Sag & Complete Loss) Motor
More informationFacilities Evaluation Detailed Standards for New Renewable Energy
1/52 Facilities Evaluation Detailed Standards for New Renewable Energy Small Photovoltaic Inverter (Grid-connected, Stand-alone) New & Renewable Energy Assessment Center, Digital Industry Division, Korea
More informationCIP V5 Updates Midwest Energy Association Electrical Operations Conference
CIP V5 Updates Midwest Energy Association Electrical Operations Conference May 2015 Bob Yates, CISSP, MBA Principal Technical Auditor ReliabilityFirst Corporation Agenda Cyber Security Standards Version
More informationFINAL PROJECT REPORT REAL TIME GRID RELIABILITY MANAGEMENT 2005
FINAL PROJECT REPORT REAL TIME GRID RELIABILITY MANAGEMENT 2005 Prepared for CIEE By: Lawrence Berkeley National Laboratory Project Manager: Joe Eto Authors: Joe Eto, Manu Parashar, Bernard Lesieutre,
More informationENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013
ENTSO-e Operational Security Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OS
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationDraft CIP Standards Version 5
Draft CIP Standards Version 5 Technical Webinar Part 1 Project 2008-06 Cyber Security Order 706 Standards Drafting Team November 15, 2011 Agenda Opening Remarks John Lim, Consolidated Edison, Chair V5
More informationSeptember 2010 Version 0.9
TERMS OF REFERENCE September 2010 Version 0.9 Table of Contents Section 1. Purpose... 1 Section 2. Background... 1 Section 3. Scope... 2 Goals and Objectives... 2 Project Deliverables... 3 Deliverables
More informationB O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
B O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NERC Monitoring and Situational Awareness Conference Bonneville Power Administration Loss of EMS:
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More information( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy (x) Guideline ( ) Report or other ( ) Charter M&VWG. Physical location: Web URL:
Document name Cross-Current Compensation Model Specification Category Document date June 18, 2015 Adopted/approved by ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy (x) Guideline (
More informationOfficial Comment Form Reliability Guideline: Generating Unit Operations During Complete Loss of Communications
Official Comment Form Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Please use this form to submit comments on the proposed Reliability Guideline: Generating
More informationKarl Iliev, San Diego Gas & Electric Company
INTEGRATING DER THROUGH DISTRIBUTION SYNCROPHASORS Karl Iliev, San Diego Gas & Electric Company 2002 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights
More informationGrid Operations - Program 39
Grid Operations - Program 39 Program Description Program Overview In many ways, today's power system must be operated to meet objectives for which it was not explicitly designed. Today's transmission system
More informationTransmission Resiliency & Security
Transmission Resiliency & Security Response to High Impact Low Frequency Threats Richard Lordan, PE Senior Technical Executive NCSL-NARUC Energy Risk & Critical Infrastructure Protection Workshop May 25,
More informationPG&E Transmission Interconnection Handbook
Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New
More information3. SCHEDULED ACTIONS Scheduling Using Different Bases: Time, Temperature, Pricing Signals...32
Specification for PV & Storage Inverter Interactions using IEC 61850 Object Models and Capabilities (Draft v14) Table of Contents 1. OVERVIEW...1 1.1 Background of EPRI's Photovoltaic & Storage Integration
More informationRemote Real-Time Measurements of Voltage, Current and Energy
Remote Real-Time Measurements of Voltage, Current and Energy Chris Yakymyshyn Pam Hamilton Michael Brubaker yakymyshyn@fieldmetricsinc.com 727-319-0299 Slide 1 Outline Introduction FieldMetrics (FMI) Products
More informationJuly 26, Dear Mr. Millar:
July 26, 2012 Mr. Neil Millar Executive Director Infrastructure Development California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Dear Mr. Millar: As you are aware, Clean
More informationModifications to TOP and IRO Standards
Modifications to TOP and IRO Standards Jason Smith, Southwest Power Pool Industry Webinar July 22, 2016 NERC Antitrust Guidelines It is NERC's policy and practice to obey the antitrust laws to avoid all
More informationHaving communication issues? Model 6 intelligent Motor Control Centers communicate on all platforms. Make the most of your energy SM
Having communication issues? Model 6 intelligent Motor Control Centers communicate on all platforms. Make the most of your energy SM Model 6 intelligent Motor Control Centers An intelligent solution. Intelligence.
More informationT&D Challenges and Opportunities
T&D Challenges and Opportunities Mark McGranaghan Vice President, Power Delivery and Utilization Alberta Power Industry Consortium November 5, 2014 Tomorrow s Power System (vision) The Integrated Grid
More informationChapter 2 State Estimation and Visualization
Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation
More informationInformation Document PRC-001-AB3-1.1(ii) Protection System Coordination ID # RS
Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document
More informationUsing PMU Data to Increase Situational Awareness
Using PMU Data to Increase Situational Awareness Tom Overbye Fox Family Professor of Electrical and Computer Engineering University of Illinois at Urbana-Champaign December 2010 PSERC Webinar PSERC Project
More informationPurpose. ERO Enterprise-Endorsed Implementation Guidance
Lesson Learned CIP Version 5 Transition Program CIP-002-5.1 Requirement R1: Impact Rating of Generation Resource Shared BES Cyber Systems Version: January 29, 2015 Authorized by the Standards Committee
More informationCIM for Dynamics. Terry Saxton Xtensible Solutions Pat Brown EPRI CIM Users Group February, 2014
Terry Saxton Xtensible Solutions Pat Brown EPRI CIM Users Group February, 2014 What is Dynamics? Modeling of transient (sub-cycle) behavior of generators, motors and loads Why extend the CIM to cover it?
More informationRequirements for Model Validation
Draft Need Requirements Application for Model Validation Reporting Requirements for Model Validation Reporting for Generators and Generator Control Systems Revision 0 Wednesday 16 November 2005 Prepared
More informationGMLC Planning and Design Tools John Grosh GMLC Planning and Design Tools Technical Area Lead
GMLC Planning and Design Tools John Grosh GMLC Planning and Design Tools Technical Area Lead Lawrence Livermore National Laboratory i-pcgrid Workshop 2017, San Francisco, CA 1 Grid Planning and Design
More informationCAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012
CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of
More informationPower System Studies. The Power of Trust. The Future of Energy.
The Power of Trust. The Future of Energy. POWER SYSTEM ANALYSIS Consulting studies to investigate system events and optimize power system performance In todays competitive and rapidly changing operating
More informationReport to the Business Administration Committee Recommendation to Award a Contract for Datacenter Colocation and Associated Support Services
Report to the Business Administration Committee Recommendation to Award a Contract for Datacenter Colocation and Associated Support Services February 2018 Purpose Staff requests that the Business Administration
More informationUnofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )
Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project 2007-17.2) Please DO NOT use this form for submitting comments. Please use the electronic
More informationMultilin P30 Phasor Data Concentrator
Multilin P30 Phasor Data Concentrator Secure high performance Phasor Data Concentrator (PDC) for wide area monitoring and dynamic disturbance analysis KEY BENEFITS Reduce deployment and operation cost
More informationCalifornia ISO Audit Results for 2011 SSAE 16 & Looking Forward for 2012 December 15, 2011
www.pwc.com California ISO Audit Results for 2011 SSAE 16 & Looking Forward for 2012 December 15, 2011 Agenda SSAE 16 Background Results of Audit Scope of Audit Looking Forward Closing Thoughts Slide 1
More informationEntergy Phasor Project Phasor Gateway Implementation
Entergy Phasor Project Phasor Gateway Implementation Floyd Galvan, Entergy Tim Yardley, University of Illinois Said Sidiqi, TVA Denver, CO - June 5, 2012 1 Entergy Project Summary PMU installations on
More informationSmall Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662
Small Generator Interconnection Tier 4 Facilities Study Report Completed for ( Interconnection Customer ) A Qualifying Facility Q0662 Proposed Interconnection Klamath Falls-Fishhole 69 kv line at approximately
More informationMISO Transmission Planning BPM 020 Updates February 16, 2016
MISO Transmission Planning BPM 020 Updates February 16, 2016 Purpose Present final updated BPM 20 language Objectives for Today Purpose and Objectives Briefly discuss posted stakeholder comments and MISO
More informationNERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010
Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission
More informationRequests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure
Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification
More informationEXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule
More informationNASPI and Synchrophasor Technology Progress. Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013
NASPI and Synchrophasor Technology Progress Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013 1 Overview Intro why synchrophasors? Signs of progress Examples of synchrophasor
More informationGrid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010
Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum December 9, 2010 1 Who is GPA? A not-for-profit corporation to support the utility industry The Grid Solutions Division of GPA is an open-source
More informationProposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013
Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time November 12, 2013 Rationale Background Interconnection wide powerflow and dynamics cases are currently
More informationStudies Overview and Data Requirements. Robert Pan
Studies Overview and Data Requirements Robert Pan Outline 1. Introduction 2. BC Transmission System 3. BCTC Studies for Clean Power Call 4. Data Requirements for Interconnection Studies 5. Application
More informationDistributor Information Bulletin Distributed Generation (Codes, Publications & Standards)
GENERAL: This bulletin highlights some of the most commonly referenced technical codes, publications and standards when reviewing a connection to under the Feed-in Tariff (FIT) Program, including micro-fit.
More informationSummary of FERC Order No. 791
Summary of FERC Order No. 791 On November 22, 2013, the Federal Energy Regulatory Commission ( FERC or Commission ) issued Order No. 791 adopting a rule that approved Version 5 of the Critical Infrastructure
More informationDisturbance Monitoring Standard Drafting Team August 7, p.m. 5 p.m. August 8, a.m. 5 p.m. August 9, a.m. noon
Disturbance Monitoring Standard Drafting Team August 7, 2007 1 p.m. 5 p.m. August 8, 2007 8 a.m. 5 p.m. August 9, 2007 8 a.m. noon Florida Power and Light Offices 700 Universe Blvd. Juno Beach, Florida
More informationEquipment Operation & Maintenance
Equipment Operation & Maintenance Many Facilities have: Very complex distribution systems. Many inter-locked backup power systems. Maintaining and troubleshooting the complex distribution system requires
More informationDelaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation
Steve Rutty Director, Grid Assets Lou Fonte Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation Lead Engineer, Grid Assets September 3, 2014 Transmission Planning
More informationSynchrophasor Fact Sheet
Synchrophasors and SEL For more than 25 years, Schweitzer Engineering Laboratories, Inc. (SEL) has delivered reliable, high-quality solutions that lead the electric power industry in price, features, innovation,
More informationProject Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives
Project 2014-02 - Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives Violation Risk Factor and Justifications The tables
More informationWhite Paper Power and Its Connection to Network Reliability
White Paper Power and Its Connection to Network Reliability ALPHA TECHNOLOGIES Power and Its Connection to Network Reliability By Eric Wentz from Alpha Technologies, Inc. Reliability continues to be the
More informationTPC-Energy Benchmark Development: Mike Nikolaiev, Chairman of the TPC-Energy Specification Committee
TPC-Energy Benchmark Development: Mike Nikolaiev, Chairman of the TPC-Energy Specification Committee 1 TPC-Energy Specification TPC s Energy Specification subcommittee was formed in December 2007, and
More informationNetwork Assessor Overview HECO Integrated Grid Symposium - November 16, 2017
Network Assessor Overview HECO Integrated Grid Symposium - November 16, 2017 1 About Kevala Delivers data and actionable intelligence for planning and operations, not control. Provides services to all
More information