ESB Networks Market Release. Meeting of the IGG, 11 th March 2010
|
|
- Hilary Taylor
- 5 years ago
- Views:
Transcription
1 ESB Networks Market Release Meeting of the IGG, 11 th March 2010
2 ESB Networks Market Release : June 2010 MCR0169 Addition of Vulnerable customer flag to 102 MM ver 2.0 MCR0162 SOLR Process ver 2.0 [remainder] MCR0161 Increase the threshold for connection agreement ver 1.1 MCR0164 Include Meter Multiplier on Extranet ver 1.0 MCR0171 Proposal to add Acceptance/Completion/Cancellation message to Meter Works design ver Non-Schema affecting report and this will be in conjunction with the technical upgrade of the market hub and MPCC MCR0169 Two New Fields in Schema DisplayOnExtranet Boolean added to four messages Outbound from Suppliers viz : VCAttributeDeleted Boolean added to one message Inbound to Suppliers viz 102 Additional Data to be displayed on Extranet MCR0169 Life/Non Life Flag MCR0164 Meter Multiplier Five existing messages are being changed 1
3 ESB Networks Market Release : MCR Implementation Date MCR0161 Increase the threshold for connection agreement ver 1.1 Implementation is being rescheduled for after the June release, exact date tba There is no impact on the schema and the Central Market Systems will remain available at implementation of this MCR ESBN and one Supplier plan to carry out testing for this MCR. There is not a planned IPT however should any Supplier wish to conduct a test with ESBN then please inform RMDS by 25 th March. 2
4 ESB Networks Market Release : MCR0169 Vulnerable customer Update 1 of 3 Letter ESBN will issue a letter to all customers with a Priority Support Connection circa early April and again for any subsequent changes to the list closer to the go-live day The template for this letter will be circulated as soon as the final review of the text completes And ESBN has been working with Suppliers to confirm the list of relevant Vulnerable Customers, and we are still awaiting responses from some New Field Display on Extranet ESBN will at go-live update a value of y or n in the new field display on extranet in the Central Market Systems for the relevant Vulnerable Customers For this initial value there is no requirement for Suppliers to send in an 013 message and there will be no 114 messages issued. Subsequently an 013 will be required for any change. and ESBN will after go-live confirm with the relevant Suppliers the values uploaded for their MPRNs 3
5 ESB Networks Market Release : MCR0169 Vulnerable customer Update 2 of 3 WIP COLE MM016 ESBN will send a list of MPRNs to each Supplier who has sent in an 016 and which is still in progress just after go-live, and where the MPRN meets the criteria listed below an 016 has been sent and is not yet completed and if a MedicalEquipmentDetailsCode is entered on the 016 and there was no display on extranet flag on the 016 WIP Energisation MM017 ESBN will send a list of MPRNs to each Supplier who has sent in an 017 and which is still in progress just after go-live, and where the MPRN meets the criteria listed below an 017 has been sent and is not yet completed and if 017 is for a Re-Energisation with a COLE and if MedicalEquipmentDetailsCode is entered on the 017 and there was no display on extranet flag on the 017 NB : For the identified MPRNs, each Supplier would need to check themselves if they need to send an 013 message to update the Display on Extranet flag once the COLE or Energisation completes. 4
6 ESB Networks Market Release : MCR0169 Vulnerable customer Update 3 of 3 WIP COS MRSO will send a list of MPRNs to each Supplier who has sent in an 010 for a COS which is still in progress just after go-live, and where the MPRN meets the criteria listed below. NB : For the identified MPRNs, each Supplier would need to check themselves if they need to send an 013 message to update the Display on Extranet flag or the medical equipment details once the COS completes. Criteria a 102 has issued but the 105 has not yet issued, therefore the COS has not yet completed and where COT_LE_Flag was marked as N on the 010 and there was life or non life support data recorded previously for the customer on the Central Market Systems and there was no life or non life support data sent in by the new supplier on the 010 message in the field MedicalEquipmentDetailsCode Note there are no special circumstances for any WIP Change of Customer Details MM013 5
7 ESB Networks Market Release : MCR0171 Report - Update ESBN propose to carry out a test with Suppliers for the sending/receipt of an containing a sample attachment. As previously advised the attachment is a.exe executable file It is proposed to carry out this test shortly Can Suppliers who will require this report and have not yet supplied a generic address do so by return, and send it to RMDS. And all communications between ESBN and Suppliers for this test will be via RMDS Also, please note that after go-live there is no requirement for Suppliers to send in a withdrawal for any item that appears in the report. 6
8 ESB Networks Market Release : Thank You 7
ESB Networks Market Release. Meeting of the IGG, 12 th October 2010
ESB Networks Market Release Meeting of the IGG, 12 th October 2010 ESB Networks Market Release : MCR Update MCR0161 Increase the threshold for connection agreement ver 1.1 - Implementation effective from
More informationDiscussion Request 1173
Discussion Request 1173 Vulnerable Customers Implementation in RoI of SI 463 Status Issued to Market Priority High Status Date 27/04/2016 Date Version Reason for Change Version Status 02/03/2016 0.1 Vulnerable
More informationCo-Ordinated Retail Market Message Guide
Co-Ordinated Retail Market Message Guide ROI Implementation - Meter Works Document Information Business Area: Status: Author/s: ESB Networks Final ESBN Version Number: 3.1 Reason for Change Co-Ordinated
More informationDiscussion Request 1173
Discussion Request 1173 Vulnerable Customers Implementation in RoI of SI 463 Status Logged Priority TBD Status Date 28/10/2015 Date Version Reason for Change Version Status 28/10/2015 1.0 Vulnerable Customers
More informationMARKET PROCESS DESIGN. MPD 19 Market Process for Terminate Connection
MARKET PROCESS DESIGN MPD 19 Market Process for Terminate Connection TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 4 2.1 PROCESS DESCRIPTION... 5 Page
More informationCo-Ordinated Retail Market Message Guide
Co-Ordinated Retail Market Message Guide ROI Implementation Market Gateway Activity Document Information Business Area: Status: Author/s: ESB Networks Final ESBN Version Number: 3.1 Reason for Change Co-Ordinated
More informationMARKET PROCESS DESIGN. MPD 01 CoS NQH
MARKET PROCESS DESIGN MPD 01 CoS NQH TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 12 3. SUPPLEMENTARY INFORMATION...
More informationMARKET PROCESS DESIGN. MPD 02 Change of Supplier QH
MARKET PROCESS DESIGN MPD 02 Change of QH TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 6 2.1 PROCESS DESCRIPTION... 8 3. SUPPLEMENTARY INFORMATION...
More informationMARKET PROCESS DESIGN. MPD 04 Supplier of Last Resort (SoLR)
MARKET PROCESS DESIGN MPD 04 of Last Resort (SoLR) TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 9 3. SUPPLEMENTARY INFORMATION...
More informationCo-Ordinated Retail Market Message Guide
Co-Ordinated Retail Market Message Guide ROI Implementation - Customer Data and Agreements Document Information Business Area: Status: Author/s: ESB Networks Final ESBN Version Number: 3.1 Reason for Change
More informationPart 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST. RoI Request Originator Name. Theresa O Neill Date Raised 02/03/2015
Market Change Request 1140 Introduction of Eircodes into the Retail Market in Ireland Status Issued to Market Priority High Status Date 22/08/2018 Date Version Reason for Change Version Status 02/03/2015
More informationMARKET PROCESS DESIGN. MPD Change of Group MPRN_CoS
MARKET PROCESS DESIGN MPD 36 1.1 Change of Group MPRN_CoS TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 4 2.1 PROCESS DESCRIPTION... 5 3. SUPPLEMENTARY
More informationMARKET PROCESS DESIGN. MPD Change of Group MPRN_no_CoS
MARKET PROCESS DESIGN MPD 36 1.2 Change of Group MPRN_no_CoS TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 4 2.1 PROCESS DESCRIPTION... 5 3. SUPPLEMENTARY
More informationMARKET PROCESS DESIGN. MPD 10 - Market Process for Re-Energisation
MARKET PROCESS DESIGN MPD 10 - Market Process for Re-Energisation TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2 PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 8 3 SUPPLEMENTARY
More informationDate Version Reason for Change Version Status 02/03/ Issued to Market Final. Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST
Discussion Request 1140 Introduction of Eircodes into the Retail Market in Ireland Status Approved Priority High Status Date 08/07/2015 Date Version Reason for Change Version Status 02/03/2015 1.0 Issued
More informationCo-Ordinated Retail Market Message Guide
Co-Ordinated Retail Market Message Guide ROI Implementation - Data Processing Document Information Business Area: Status: Author/s: ESB Networks Final ESBN Version Number: 3.1 Reason for Change Co-ordinated
More informationMARKET PROCESS DESIGN. MPD 03 - Market Process for Objection & Cancellation
MARKET PROCESS DESIGN MPD 03 - Market Process for Objection & Cancellation TABLE OF CONTENTS TABLE OF CONTENTS... 2 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2 PROCESS MAP... 5 2.1
More informationMARKET PROCESS DESIGN. MPD New Unmetered Single Point Connection
MARKET PROCESS DESIGN MPD 28 1.2 New Unmetered Single Point Connection TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 4 2.1 PROCESS DESCRIPTION... 7
More informationMARKET PROCESS DESIGN. MPD 09 - Market Process for De-energisation
MARKET PROCESS DESIGN MPD 09 - Market Process for TABLE OF CONTENTS MPD 09 - MARKET PROCESS FOR DE-ENERGISATION... 1 TABLE OF CONTENTS... 2 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES...
More informationMARKET PROCESS DESIGN. MPD 05 - Market Process for New NQH Metered Connection
MARKET PROCESS DESIGN MPD 05 - Market Process for New NQH Metered Connection TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION...
More informationMARKET PROCESS DESIGN. MPD 24 - Market Process for Change to Customer Details
MARKET PROCESS DESIGN MPD 24 - Market Process for Change to Customer Details TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION...
More informationRMDS Working Practice 24 Guidelines for Handling Objections to Change of Supplier
Work Practice ID WP 0024 Title Type Status Guidelines for Handling Objections to Change of Supplier WA Implemented Date Raised 1 st July 2013 Implementation Date 7 th November 2011 Change History Version
More informationMARKET PROCESS DESIGN. MPD New Unmetered Grouped Connection
MARKET PROCESS DESIGN MPD 28 1.1 New Unmetered Grouped Connection TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 4 2.1 PROCESS DESCRIPTION... 6 3. SUPPLEMENTARY
More informationAuthority Public Lighting
Market Change Request 1167 Facilitate energy efficiencies in Local Authority Public Lighting High Approved Priority High Status Date 13/11/2018 Date Version Reason for Change Version Status 01/09/2015
More informationPart 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST. RoI Request Originator Name. Theresa O Neill Date Raised 01/09/2015
Market Change Request 1167 Facilitate energy efficiencies in Local Authority Public Lighting Status Issued to Market Priority High Status Date 06/01/2016 Date Version Reason for Change Version Status 01/09/2015
More informationAlice Mooney, Aileen O Connor
Date: 29 January 2014 Time & Location 10.30-11.40 am, Maldron Hotel, Tallaght Chair: Dana Paraschiv, CER Attendees: Name Location Apologies: Version Number Status Alice Mooney, Aileen O Connor Dana Paraschiv
More informationAuthority Public Lighting
Market Change Request 1167 Facilitate energy efficiencies in Local Authority Public Lighting High Approved Priority High Status Date 02/11/2016 Date Version Reason for Change Version Status 01/09/2015
More informationMARKET PROCESS DESIGN. MPD New Distribution Connected Participant Generator
MARKET PROCESS DESIGN MPD 07 1.2 New Distribution Connected Participant TABLE OF CONTENTS TABLE OF CONTENTS... 2 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 6 2.1
More informationScheduled NQH Meter Readings Message
Scheduled NQH Meter Readings Message Recommendation Version Number Date Issued Reason 1.0 23 Dec 2003 Final - MOIP 1.1 29 October 2012 Changed due to Harmonisation (HSP) nqh-scheduled-reads-finalb Page
More informationDate: 27 th July, 2016 Time & Location 3pm - Conference Call
Date: 27 th July, 2016 Time & Location 3pm - Conference Call Chair: David Walshe, RMDS Attendees: Name Location Tracy Caffrey, Catherine Keane RMDS Mary Mulcahy, John Bracken, Aileen Greaves & Paul Mallon
More informationDiscussion Request 1145 Market Design Process Diagrams conversion from ARIS to document format
Discussion Request 1145 Market Design Process Diagrams conversion from ARIS to document format Status Approved Priority High Status Date 26/03/2014 Date Version Reason for Change Version Status 19/03/2014
More informationNI Market Message Implementation Guide Meter Works
NI Market Message Implementation Guide Meter Works Document Information Business Area: NIE Status: Baseline Author/s: Version Number: 2.4.1 Document Updates Name Date Reason Version Shane O Neill Patrick
More informationTIBCO Upgrade Project New Hub Message Processing Issue ReMCoWG Update
TIBCO Upgrade Project New Hub Message Processing Issue ReMCoWG Update 4 th Nov 2015 Background Part of the project System Integration Test phase execution was to compare the same XML message files output
More informationDate Change Request. To allow for future flexibility in the values used in the SSAC field, all codified valid values for this field have been removed.
Market Change Request Number Title Priority MCR 0120 New Data s to satisfy new requirements for SEM HIGH Implementation. Date Version Reason For Change 24/10/2006 1.0 Draft for IGG Review 15/11/2006 1.1
More information117R Meter Point Status Request Rejection
117R Meter Point Status uest Rejection Header 117R Specific Information 117R MPRN Level Information Rejection Details M 117R Meter Point Status uest Rejection 117R Valid Codes uest Status uest Status:
More informationMARKET PROCESS DESIGN. MPD 15 - Market Process for Data Processing for QH Meters
MARKET PROCESS DESIGN MPD 15 - Market Process for Data Processing for QH Meters TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION...
More informationJob Aid for: Secure File Transfer Service (SFTS)
Jb Aid fr: Secure File Transfer Service (SFTS) Page 1 f 13 Dcument Updates Date Descriptin Versin 11.10.2011 Jb Aid Secure File Transfer 1.0 04.12.2015 Revised Versin Incrprates changes 1.1 related t MCR
More informationProcessing a Pre-Connection Certificate Online
Processing a Pre-Connection Certificate Online Upon entering the link to the ECC system (http://www.recicerts.ie/asp/logon/logon.asp) you need to enter your username and password on the logon screen. You
More informationInteractive Data Submission System (IDSS) Frequently Asked Questions
Interactive Data Submission System (IDSS) Frequently Asked Questions General Information What is the time frame for completing IDSS submissions for 2014? NCQA will release IDSS to the health plans between
More information131 Work Status. Message. Message Specific. Information. Message Header. MPRN Level. Information
131 Work Status 131 Specific Information Header 131 MPRN Level Information 131 Work Status Work Type code will appear on the 131 MM. Please see description below. When will the 131 be sent and when will
More informationGuidance on submitting your annual ROC meter reading
Meter Reading Guide Guidance on submitting your annual ROC meter reading In order to be awarded ROCs from your system, it is essential for you to take your annual generation meter reading on Saturday 31st
More informationOnline Support Tool. Revision History. Online support tool. Version: 0.1. Date Issued: 14 th March Version Date Author(s) Revision Notes
Online Support Tool Author: Rachael Walker Version: 0.1 Date Issued: 14 th March 2013 Revision History Version Date Author(s) Revision Notes 0.1 14/03/2013 Rachael Walker - - - - - Page 1 of 10 Contents
More informationUpgrade Notes. Version v200 V200
Upgrade Notes Version 200.2 V200 v200 Contents Contents... 1 Legislative Changes - General Data Protection Regulations... 2 Contact Record Consent Settings... 3 Existing Contacts... 4 New Contacts... 5
More informationAUTOMATED APPOINTMENT REMINDER AND ANNOUNCEMENT SYSTEM
SARS Messages AUTOMATED APPOINTMENT REMINDER AND ANNOUNCEMENT SYSTEM USER MANUAL 2011-2015 by SARS Software Products, Inc. All rights reserved. COPYRIGHT Copyright 2011-2015 SARS Software Products, Inc.
More informationIntroduction. Quick Steps to Submission. How to Read the ROC Meter. Important Things to Note. Queries. Sample Table for Recording your Readings
Meter Reading Guide Contents Introduction 1 Quick Steps to Submission 1 How to Read the ROC Meter 2 Important Things to Note 4 Queries 7 Sample Table for Recording your Readings 8 Introduction To be awarded
More informationDownloadable Meter Point Details Files
Market Change Request 1169 Addition of Postal Code to two Downloadable Meter Point Details Files Status Approved Priority High Status Date 04/11/2015 Date Version Reason for Change Version Status 26/08/2015
More informationRetail Markets Co-Ordination Working Group. Nigel Wray, Joan-Edel Smith, Emma Finnegan, Dave NIE Vincent Seán mac an Bhaird, Dana Paraschiv
Date: 14th August 2013 Time & Location 1 2pm NIAUR Offices, Belfast Chair: Aileen O Connor, ReMCoDS Attendees: Name Organisation Mary Baxter ReMCoDS Nigel Wray, Joan-Edel Smith, Emma Finnegan, Dave NIE
More informationFor more information, please see the WSIPC Guide to Attendance
Prior to generating letters, the entity configuration must be set depending on what type of letters your building chooses to generate. If you know your building will only be using Attendance Letters by
More informationInformation and Rules for Candidates taking IFE Examinations in March 2019
Information and Rules for Candidates taking IFE Examinations in March 2019 INTRODUCTION This document provides information and rules for candidates who have booked examinations in March 2019. Candidates
More informationUser Guide Aibel Agency Portal
Index 1. INTRODUCTION...2 2. YOUR SUPPLIER DETAILS...3 3. OPEN POSITIONS...4 4. DETAIL OF POSITION...4 5. PRESENTING A CANDIDATE FOR A POSITION...6 5.1 PRESENT A NEW CANDIDATE FOR THE POSITION... 6 5.2.
More informationNHS North West Leadership Academy Coaching Hub A guide to using the Coaching Hub as a coachee
NHS North West Leadership Academy Coaching Hub A guide to using the Coaching Hub as a coachee Coaching Hub is an online system which facilitates the matching of coachees with coaches, and allows the management
More informationDisclosure Online Scotland Guide Applicant Manager Guidance Notes
Disclosure Online Scotland Guide Applicant Manager Guidance Notes Applicant Manager Guidance Notes Section A Applicant Manager guidance notes Online Disclosure Scotland checks can be completed by accessing
More informationCo-Ordinated Retail Market Message Guide. ROI Implementation Meter Registration
C-Ordinated Retail Market Message Guide ROI Implementatin Meter Registratin Dcument Infrmatin Business Area: Status: Authr/s: ESB Netwrks Final ESBN Versin Number: 3.1 Reasn fr Change C-Ordinated Baseline
More informationBK-CSR-IG-0150 On-Line Meter Point Search Facility GTC User Guide
BK-CSR-IG-0150 On-Line Meter Point Search Facility GTC User Guide Revised October 2010 CONTENTS 1. Introduction...3 2. User Access...4 2.1 Successful Login...5 2.2 Failed Login...6 3. Services...7 3.1
More informationGetting Started. Supplier FAQ s
Supplier FAQ s Getting Started I don t have a computer I don t have a printer I don t have access to the internet Which internet browsers are supported? I don t have an e-mail address Does Coles support
More informationInteractive Data Submission System (IDSS) Frequently Asked Questions
Interactive Data Submission System (IDSS) Frequently Asked Questions General Information What is the time frame for completing IDSS submissions for 2017? NCQA releases IDSS to the health plans in April
More informationFrequently Asked Questions (FAQs) and Answers Paramedic Internship, 2016
SA Health Frequently Asked Questions (FAQs) and Answers Paramedic Internship, 2016 Welcome to the SA Ambulance Service (SAAS) Paramedic Internship for graduates of the Bachelor of Paramedic Science or
More informationIndividual Funding Requests (IFR) Guidance notes for referrers (GPs and Referring Clinicians)
Individual Funding Requests (IFR) Guidance notes for referrers (GPs and Referring Clinicians) ClaimIT User Guide Practice Managers (June 2016) 1 Index Item Description Page 1 Frequently asked questions
More informationPreparing to Submit an Abstract for PETEX 2018
Preparing to Submit an Abstract for PETEX 2018 Before you register for the abstract submissions system, you may wish to prepare your abstract so you are ready to submit it. You can download a copy of the
More informationGUIDELINES FOR DOCUMENT CONTROL
GUIDELINES FOR DOCUMENT CONTROL Issue Number Prepared (P), Reviewed (R), Amended (A) Approved by Date of Approval ONE (Superseded Tranz Rail document Q002 Company Documentation) P J O Connell (P) A E Neilson
More informationPorts and Protocols FAQ
CLASSIFICATION: UNCLASSIFIED Ports and Protocols FAQ 1. What is the timeline for closing ports and protocols? 2. What TCP/UDP ports are affected? 3. What about ports 1025-65,535? 4. Will outbound data
More informationRegistration Data Incident Management Policy
Registration Data Incident Management Policy Author: DCC Operational Policy Draft Version 1 Date: 1 st May 2014 Page 1 of 23 Contents 1 Document History 4 1.1 Document Location 4 1.2 Review Dates 4 1.3
More informationOur Customer Relationship Agreement NODELINE SERVICE DESCRIPTION
Our Customer Relationship Agreement NODELINE SERVICE DESCRIPTION Internode Pty Ltd ABN 82 052 008 581 Phone: 13 66 33 1/502 Hay Street, Subiaco WA 6008 20 February 2018 Rules of interpretation and capitalised
More informationMaryland Extensible Markup Language Test Plan and Certification for Competitive Gas Supply Version 1.0 July 2011
Maryland Extensible Markup Language Test Plan and Certification for Competitive Gas Supply Version 1.0 July 2011 Page 1 of 26 Table of Contents 1. INTRODUCTION... 3 1.1 VERSION CONTROL... 3 1.2 PURPOSE
More informationThe Psychology of Social Influence (PSYC 342) Cialdini, R. B. (2009). Influence: Science and Practice (Fifth Edition). Boston, MA: Allyn and Bacon.
Instructor: Natalie Kalmet Office: HUM 319 E-mail: 6nk11@queensu.ca Office Hours: By appointment TA: Andrew Smith E-mail: 01ams23@queensu.ca Office Hours: Held after exams. TBA. Required Text: The Psychology
More informationEHWLC Exams Terms & Conditions:
EHWLC Exams Terms & Conditions: Registration: Candidates will not be enrolled and accepted for the exam under any circumstances without payment. Late entries: Where spaces are available, a late entry fee
More informationScout RFP. User Guide for Applicant Companies Capability and Innovation Fund. Banking Competition Remedies Limited
Scout RFP User Guide for Applicant Companies Capability and Innovation Fund Banking Competition Remedies Limited 1 Contents Welcome Slide 3 Application Guidance Slide 4 5 Accessing the Application Documents
More informationTIP SHEET GETTING STARTED: HOW TO REQUEST A MTA (MATERIAL TRANSFER AGREEMENT)
WHAT IS IT? TIP SHEET A Material Transfer Agreement (MTA) is executed when proprietary materials are transferred in or out of Northwestern. An MTA documents the material being transferred and terms and
More informationExchange Network Schema Conformance Report Preparation and Review Process
Exchange Network Schema Conformance Report Preparation and Review Process Version: 2.0a Revision Date: December 29, 2009 Prepared for: Network Technology Group Prepared by: Schema Review Task Force Document
More informationEnergy through ACN in partnership with First Utility Order Process Guide
Energy through ACN in partnership with First Utility Order Process Guide 1 ORDER PROCESS Step 1: IBO to complete Registration Step 2: IBO to complete training and online test Step 3: Customer to choose
More informationFull-Time Logging In & Access Version 5.0
Full-Time Logging In & Access Version 5.0 Full-Time Logging In & Access Page 1 Logging In & Access From March 2016 onwards we have introduced a new system for logging in to Full-Time, to increase the security
More informationFibre & ADSL Broadband - Specific Terms and Conditions
Fibre & ADSL Broadband - Specific Terms and Conditions Issue date: 1 st March 2018 1 DEFINITIONS 1.1 These Specific Terms and Conditions are to be read in conjunction with TNBN Ltd Terms and Conditions
More informationECS, epcs and KIS Newsletter March 2012
ECS, epcs and KIS Newsletter March 2012 Work continues to develop the Emergency Care Summary to extend access for medicines reconciliation in hospitals. Improvements to the GP interface of epcs will be
More informationA dictator may use a digital hand-held recorder for dictation, in lieu of the telephone, which can be uploaded to the Sten-Tel ASP system.
INSTRUCTIONS FOR DICTATION VIA THE ASP WEBSITE Uploading voice files A dictator may use a digital hand-held recorder for dictation, in lieu of the telephone, which can be uploaded to the Sten-Tel ASP system.
More information403(b) & 457 TPA Participant Website Instructions
403(b) & 457 TPA Participant Website Instructions 403(b) & 457 TPA Participant Website Instructions In order to access the website via the login page (above), please do the following: Go to the main Envoy
More informationGeneral Questions/Answers
General Questions/Answers 1. If the client s address or email changes, can I submit the change on this site? You cannot change client information through the Folio site, but the client may do so by logging
More informationSt. Christopher (St. Kitts) & Nevis. FATCA Portal User Guide
St. Christopher (St. Kitts) & Nevis FATCA Portal User Guide Dated issued: February 19, 2016 Contact us: St. Kitts and Nevis Competent Authority 1-869 465 8485 or FATCA@sknird.com TABLE OF CONTENTS Introduction...
More informationREC01 Recruitment & Personnel
This guide refers to processes REC3_Set up Vacancy and REC4_Manage Panel/Advert (and should be read in conjunction with) the recruitment process outlined on the Services website. Go to Services>Recruiting
More informationREACH Recruitment System. SJA Volunteering HR quick reference guide External workflows
REACH Recruitment System SJA Volunteering HR quick reference guide External workflows General access questions Login The recruitment system login URL is: https://recruiter.sja.org.uk You will have received
More informationOSCA Tutorials. 1. Overview. 2. Start Up. 3. Reporting Schedule. 4. Uploading a Form: File Upload. 5. Uploading a Form: Online Editor
OSCA Tutorials 1. Overview 2. Start Up 3. Reporting Schedule 4. Uploading a Form: File Upload 5. Uploading a Form: Online Editor 6. Cross Validation 7. Accounts, User Details and Roles 8. Performance and
More informationOLP Connect Forward thinking technology
3 1 1 Menu 2 It's really important to ensure that you check your contact preferences and confirm that we have the correct email address for you, so that you can benefit from these changes. 4 Please check/update
More informationAssessment, communications and joining. This guide is for GFRP that has been converted to a qualifying workplace pension scheme.
Assessment, and joining This guide is for GFRP that has been converted to a qualifying workplace pension scheme. Welcome to GPZ When you ve logged into GPZ, you ll see your scheme home page. You can start
More informationData Migration Plan Updated (57) Fingrid Datahub Oy
1 (57) Street address Postal address Phone Fax Business Identity Code FI27455435, VAT reg. Läkkisepäntie 21 P.O.Box 530 forename.surname@fingrid.fi FI-00620 Helsinki FI-00101 Helsinki +358 30 395 5000
More informationaeod_pd6_gipa_act_matters.pdf
(WUFA) From: Sent: To: Subject: Attachments: (WUFA) Saturday, 18 April 20158:15 AM 'Chris Wilson' RE: Your GIPA Application lodged with Warringah Council
More informationElectricity Registration Data Interface Code of Connection
Electricity Registration Data Interface Code of Connection Author: DCC Version: v1.2 Date: 04/08/2014 Page 1 of 29 Contents 1 Introduction... 4 1.1 Document Purpose... 4 1.2 Document Scope... 4 1.3 d documents...
More informationFREQUENTLY ASKED QUESTIONS FOR MAILERS AND THE MAILING INDUSTRY
FREQUENTLY ASKED QUESTIONS FOR MAILERS AND THE MAILING INDUSTRY For Phase 2 Network Rationalization What is Network Rationalization? The Postal Service is responsible for maintaining an efficient mail
More informationSage Construction Anywhere Setup Guide
Sage Construction Anywhere Setup Guide Sage 100 Contractor Sage University This is a publication of Sage Software, Inc. Copyright 2014 Sage Software, Inc. All rights reserved. Sage, the Sage logos, and
More informationSupplier EMMA Schema 12 Upgrade Guide
Supplier EMMA Schema 12 Upgrade Guide Date: 15/01/2019 Version: 1.0 Contents Pre Upgrade Check... 2 Download upgrade script from the sftp site... 3 Running the schema upgrade script... 4 Post Upgrade Checks...
More informationLOCAL EFFORTS: GRAND VALLEY METRO COUNCIL
LOCAL EFFORTS: GRAND VALLEY METRO COUNCIL END OF 2015/EARLY 2016: METRO Act applications began to be received from a new type of telecommunications provider Applications and inquiries were coming from
More informationContents. V4.1 Printed March
Contents 1 Abstract... 5 2 Introduction... 5 3 Implementation... 5 4 Occurrence Identification... 7 4.1 In E5F Format... 7 4.2 In E5X Format... 7 4.3 Matching IDs in RIT/E5X... 8 5 Configuration... 9 5.1
More information2019 EARNED VALUE PROMOTION
Program Requirements 2019 EARNED VALUE PROMOTION CONTENTS I. Background and Program Description... 2 II. Program Parameters... 2 III. Registration Requirements... 2 IV. Mailing Requirements... 3 V. Earned
More informationSupport Portal Guide VERSION 1.0
Support Portal Guide VERSION 1.0 Release Date December 2017 Table of Contents Introduction... 3 Support Incidents... 4 LANSA Support Portal Login... 4 Log an Incident... 7 Search for Incidents... 12 Incident
More informationUser guide for the RFQ-process. Supplier. Updated:
User guide for the RFQ-process Supplier Updated: 2011-12-12 Table of Contents 1. General Guidelines...3 2. Respond to RFQ...3 2.1 Copy responses from a previous RFQ...5 2.2 Manually respond to RFQ...5
More informationOUTBOUND. Queue Manipulation Wizard. Synthesys CRM & Outbound Management
OUTBOUND Queue Manipulation Wizard 1 THE QUEUE MANIPULATION WIZARD THE QUEUE MANIPULATION WIZARD... 2 Introduction... 3 Opening the Queue Manipulation Wizard... 4 Entering a Prefix or Name... 5 Available
More informationManage Online Applications
HRIS Recruitment Training REC03 For use by all departments whether live with e-recruitment only or e-recruitment and Personnel Quick Reference Guide to Manage Online Applications in Core HR V1.11 What
More informationContact Management Must Read User Guide
Contact Management Must Read User Guide Meter Read Agency (MRA/IGT) Edition Version 2.0 1 Contents Page 1.Introduction 2. Log onto Contact Management 2.1 Log onto the Contact Management system 2.2 Contact
More informationA Guide for using MyStudyAbroad system
A Guide for using MyStudyAbroad system for students applying to HKUST for International Summer Exchange Program Exchange in Summer Term Table of Content Content Page MyStudyAbroad system 4-5 Stages in
More informationREC01 Managing a vacancy
This guide refers to processes REC3_Set up Vacancy and REC4_Manage Panel/Advert (and should be read in conjunction with) the recruitment process outlined on the Personnel Services website. Go to Personnel
More informationMarket Information Client System Manual
Market Information Client System Manual Ver. 3.0 Tokyo Stock Exchange, Inc Market Information Client System Manual 2 Table of Contents 1 About this Manual... 4 2 Flow of Procedures... 5 2.1 End-User License
More information