1 Document Number: ECP Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP SECONDARY SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the end-to-end process for commissioning a secondary substation including the associated telecontrol pre and post energisation tests. Author: James Ford Approved By: Paul Williams Approved Date: 16/02/2017 This document forms part of the Company s Integrated Business System and its requirements are mandatory throughout UK Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset Management. If you have any queries about this document please contact the author or owner of the current issue. Applicable To UK Power Networks External Asset Management G81 Website Capital Programme Contractors Connections ICPs/IDNOs Health & Safety Meter Operators Network Operations Procurement Technical Training UK Power Networks Services THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE

2 Revision Record Version 6.0 Review Date 10/02/2022 Date 10/02/2017 Author James Ford Why has the document been updated: Introduction of a revised range of secondary switchgear and new Type E RTUs What has changed: New end-to-end process for the commissioning of the RMUs/RTUs added (Section 5). Relevant commissioning tests and checks added (Sections 7 to 16). Test forms amended to match the procedure (ECP a and ECP b). Document title amended Documents fully reviewed and review date extended Version 5.0 Review Date 04/12/2020 Date 04/12/2015 Author Stephen Tucker Why has the document been updated: Renumbering of referenced documents. What has changed: HV polymeric cable sheath testing document reference updated (Section A.1). LV cable testing document reference updated (Section A.1). Reference to procedures for new Lucy and Remsdaq RTUs added (Section A.4). Test form ECP a updated to reflect above changes. Requirement to send copy of the test form to the ART added Version 4.0 Review Date 23/03/2015 Date 23/03/2015 Author Stephen Tucker Why has the document been updated: Minor update to ensure consistency with other documents. What has changed: LV cable testing added (Section A.1). Test form ECP a updated Version 3.0 Review Date 31/10/2018 Date 06/12/2013 Author Stephen Tucker Polymeric insulated cable sheath testing procedure added (Section A.1) Version 2.0 Review Date Date 01/05/2013 Author Stephen Tucker Revised to include latest procedures and test forms. Energisation tests added to ECP a Version 1.0 Review Date Date 23/09/2009 Author Stephen Tucker Original UK Power Networks 2017 All rights reserved 2 of 14

3 Contents 1 Introduction Scope References Abbreviations and Definitions Ordering, Installation and Commissioning Process Overview Design Equipment Ordering and Supply PowerOn Equipment Installation and Commissioning Telecontrol Pre-energisation Test Current Analogue Test Fault Passage Indicator Test FPI Primary Injection FPI Secondary Injection PLTU Test Substation Energisation Telecontrol Post-energisation Commissioning Final Checks Test Equipment Certification Asset Data and Information UK Power Networks Independent Connection Provider (ICP) Appendix A Commissioning Procedures A.1 Substation Commissioning Procedures A.2 Switchgear Commissioning Procedures A.3 FPI and PLTU Commissioning Procedures A.4 Ground-mounted Control Unit and RTU Commissioning Procedures UK Power Networks 2017 All rights reserved 3 of 14

4 1 Introduction 1.1 This procedure details the end-to-end process for commissioning a secondary substation including the associated telecontrol pre and post energisation tests. 1.2 This procedure details the energisation procedures for secondary distribution substations, and includes high voltage insulation testing, energisation and postenergisation checks, which shall be satisfied before the substation can be accepted as fit for service. 1.3 This procedure shall be carried out by the Commissioning Engineer or his appointed representative, who shall be an Authorised Person having appropriate training and experience. 1.4 This procedure shall be carried out in accordance with the requirements of the UK Power Networks Distribution Safety Rules. 1.5 This procedure shall be carried out having regard to the requirements and recommendations of the equipment manufacturer. If conflict exists between the requirements of the manufacturer and those of UK Power Networks, the matter shall be referred to Asset Management (or your UK Power Networks nominated contact). 1.6 The results of all observations, tests, adjustments and all relevant remarks shall be recorded on the appropriate test form. 2 Scope 2.1 The commissioning procedures and test forms apply to the commissioning of a secondary substation on the EPN, LPN and SPN networks. 2.2 This document is intended for use by UK Power Networks field staff, contractors and external connection providers. 3 References 3.1 This procedure should be read in conjunction with the following references: ECP Secondary Commissioning Requirements. 3.2 This procedure should be used with the following forms: ECP a Secondary Substation Commissioning Form. ECP b Secondary Substation PowerOn Commissioning Form (internal document). UK Power Networks 2017 All rights reserved 4 of 14

5 4 Abbreviations and Definitions 4.1 The following abbreviations are used throughout this procedure. Term ART DNP3 EFPI FPI PFPI IP PLTU PowerOn Radius RTU SAN SCADA Definition UK Power Networks Asset Registration Team Telcontrol protocol Earth Fault Passage Indicator Fault Passage Indicator Phase Fault Passage Indicator Internet Protocol Parasitic Load Trip Unit UK Power Networks Network Management System Authentication server for UKPN IP comms networks Remote Terminal Unit System Alteration Notice Supervisory, Control and Data Acquisition UK Power Networks 2017 All rights reserved 5 of 14

6 5 Ordering, Installation and Commissioning Process 5.1 Overview It is recommended that the telecontrol commissioning process is carried out in two separate visits, the first visit after the network equipment (switchgear, transformers, RTUs, LV board etc.) has been installed, but before it is made live on the network. The second visit after the site has been made live. However, if necessary the telecontrol commissioning can be carried out in a single visit after the site has been made live, providing the network can be configured to allow the operation of all automated switches/circuit-breakers and the FPIs can be properly tested by injecting current at the switchgear. 5.2 Design The network design will be carried out by the Distribution Planning or Connections Design Engineer. This will determine what installation type is required (GRP, brick, outdoor) The Commissioning Engineer shall determine which mobile network provider to use (O2 or Vodafone), or if there is no signal from either supplier PAKNET can be used (EPN and SPN only). This should be carried out during the pre-energisation commissioning. 5.3 Equipment Ordering and Supply The Commissioning Engineer shall order the required equipment. The ordering timescale is 4 weeks for delivery of equipment The Commissioning Engineer shall submit the SAN for the drawing office to build the site on PowerOn. The SAN should be submitted a minimum of 2 working days before proposed energisation of the site, and a maximum of 3 months All of the equipment ordered by the Commissioning Engineer shall be delivered to site by Logistics in a single delivery. 5.4 PowerOn Once the PowerOn drawing office team receive the SAN the site shall be created in a patch on PowerOn with a generic RTU symbol; the actual RTU symbol type cannot be added until the RTU is delivered to site. 6 Equipment Installation and Commissioning 6.1 Once the equipment has arrived the fitter/jointer shall install the equipment and connect it together. 6.2 The Commissioning Engineer shall then commission all individual items of equipment in accordance with the relevant commissioning procedures listed in Appendix A. UK Power Networks 2017 All rights reserved 6 of 14

7 7 Telecontrol Pre-energisation Test 7.1 Before the site has been made live on the network carry out the pre-energisation commissioning tests (as detailed on test form ECP a) to fully commission the switchgear to the RTU using the RTU batteries as follows: Connect the batteries to the RTU and power it up. Configure the RTU using the RTU commissioning wizard (use a dummy DNP3 address such as 1 ). Check operation of all automated switches/circuit-breakers (open/close) with the RTU set to Local. Check operation of all automated switches/circuit-breakers do not work with RTU set to Remote. Set the RTU to Local. 8 Current Analogue Test 8.1 Primary inject current into each switch and check the corresponding analogue readings on the RTU are correct Carry out the test as follows: Connect the injection test set between the L1 and L2 phase bushing in the cable box. Increase the current and check that the corresponding current analogue in the RTU changes. Repeat for phase L2 and L Repeat the test for all switches and circuit-breakers. 9 Fault Passage Indicator Test 9.1 Test all FPIs (both RTU and relay) using primary and secondary injection as detailed in the following sections. 9.2 FPI Primary Injection Carry out a primary injection test from the relevant cable box to test the FPI earth fault threshold Carry out the earth fault test as follows: Close the earth switch associated with the cable box under test. Connect the injection test set between the L1 phase bushing in the cable box and earth. Increase the current until the FPI illuminates this should be around 90A. Record the actual current on the test form. Reset the FPI. Repeat for phase L2 and L3. The earth fault threshold should be similar in all three tests. Open the earth switch Repeat the test for all other FPIs. UK Power Networks 2017 All rights reserved 7 of 14

8 9.3 FPI Secondary Injection Carry out a secondary injection test from the CT terminal block to test the FPI earth fault and overcurrent thresholds If primary injection was not possible carry out the earth fault test as follows: Connect the injection test set between the L1 phase CT and earth at the CT terminal block. Increase the injection current until the FPI illuminates this should be around 180mA for a 90A primary setting. Record the actual current on the test form. Reset the FPI. Repeat the test for L2 and L3 CTs. The earth fault threshold should be similar in all three tests Carry out the overcurrent test as follows: Connect the injection test set between the L1 and L2 phase CTs at the FPI CT terminal block. Increase the injection current until FPI illuminates this should be around 1.2A for a 600A primary setting. Record the actual current on the test form. Reset the FPI. Repeat the test for L2-L3 and L3-L1 CTs. The overcurrent threshold should be similar in all three tests Repeat the tests for all other FPIs. 10 PLTU Test 10.1 If installed, commission the PLTU in accordance with ECP PLTU Commissioning Procedure. 11 Substation Energisation 11.1 Energise the substation in accordance with ECP Secondary Substation Energisation Procedure. UK Power Networks 2017 All rights reserved 8 of 14

9 12 Telecontrol Post-energisation Commissioning 12.1 Complete the RTU Build Sheet tab of form ECP b and submit it to the PowerOn commissioning team via (using the button on the form) a minimum of 1 working day in advance of site going live Collect the modem from the office and to take to site The Control Engineer runs the switching schedule and applies the patch to PowerOn The PowerOn Commissioning Engineer checks patch is applied The PowerOn Commissioning Engineer loads SCADA and provides the DNP3 Address and IP Address, and the site specific Radius User Name to the commissioning engineer Run the RTU commissioning wizard on the laptop and change the dummy DNP3 Address used during pre-energisation commissioning to the site specific DNP3 Address provided by the PowerOn Commissioning Engineer Install the modem into the RTU Change the Radius User Name on modem from the dummy Radius User Name used in the office, to the site specific Radius User Name provided by the PowerOn Commissioning Engineer Check the correct IP Address is applied (as supplied by the PowerOn Commissioning Engineer), and enter the Site Name into the router config. If this information is available before attending site this step can be carried out in the office (recommended) After the site has been made live on the network carry out the post-energisation commissioning tests detailed on the test form ECP a, a summary of the procedure is as follows: Apply the correct comms settings to the comms bus connected devices (power meter/protection relay etc) and confirm it is communicating to the RTU. Initiate actuator disconnected alarm for each automated switch/circuit-breaker. Call PowerOn Commissioning Engineer. Ensure site is not communicating with PowerOn. Initiate AC fail alarm and confirm the RTU calls into PowerOn and alarm is received. Switch the RTU to Remote. PowerOn Commissioning Engineer disconnects RTU from PowerOn. PowerOn Commissioning Engineer initiates dummy circuit-breaker. Confirm PowerOn connected to RTU and dummy circuit-breaker operation received Reinstate the actuators on each switch/circuit-breaker in turn and check the corresponding alarm is reset on PowerOn to confirm the switch/circuit-breaker destinations are correct. UK Power Networks 2017 All rights reserved 9 of 14

10 12.12 For LPN Spec RMUs with external FPIs, send each FPI in turn and check the corresponding alarm is received on PowerOn. The PowerOn Commissioning Engineer will then reset the FPI Disconnect the comms bus at each comms device (power meter/protection relay) and check the correct device comms alarm is received. (Note, there is a delay of approx seconds in receiving the alarm) Commission the power meter as follows: If the power meter is installed in an LV cabinet, or connections to the power meter are made via connections in the LV cabinet, check the values received on PowerOn are the same as on the power meter. If the power meter is connected to external CTs/voltage connection use an ammeter/voltmeter to check the values received on PowerOn are correct Check the current analogues (one per switch/circuit-breaker) on PowerOn match those in the RTU. 13 Final Checks 13.1 On completion of the commissioning: Check correct protection settings applied. Check all equipment is correctly labelled. Check all connections/plugs are secure. Check cable guard if fitted to RTU and switchgear (outdoor sites only). Ensure the RTU is set to Remote. PowerOn Commissioning Engineer to set site on PowerOn to Commissioned and provide the Commissioning Engineer with date/time of commissioning. 14 Test Equipment 14.1 Record the make, type, serial or asset number and calibration date of all test equipment used during commissioning on the test form. 15 Certification 15.1 When all the tests have been satisfactorily completed, sign and date the test form. The test form should be left on-site in a plastic wallet and in a secure location. UK Power Networks 2017 All rights reserved 10 of 14

11 16 Asset Data and Information 16.1 UK Power Networks Send a copy of the completed test form and the asset data form to the Asset Registration Team (ART) via the appropriate mailbox below. ART.EPN@ukpowernetworks.co.uk. ART.LPN@ukpowernetworks.co.uk. ART.SPN@ukpowernetworks.co.uk Independent Connection Provider (ICP) Send a copy of the completed test form and the asset data form to the Competitionin-Connections Delivery Project Manager. UK Power Networks 2017 All rights reserved 11 of 14

12 Appendix A Commissioning Procedures A.1 Substation Commissioning Procedures Number ECP ECP a ECP b ECP ECP a ECP ECP ECP a ECP ECP a ECP ECP a ECP Procedure/Test Form This Document Secondary Substation Commissioning Form Secondary Substation PowerOn Commissioning Form Earthing Commissioning Procedure Earthing Test Form Substation Energisation Procedure Distribution Transformer Commissioning Procedure Distribution Transformer Test Form Compact Substation Commissioning Procedure Compact Substation Test Form HV Polymeric Cable Sheath Testing Procedure HV Polymeric Cable Sheath Test Form LV Cable Testing A.2 Switchgear Commissioning Procedures Number ECP ECP a ECP b ECP c ECP d ECP e ECP f ECP g ECP h ECP ECP a ECP b ECP c ECP d ECP e ECP f ECP g Procedure/Test Form Ground-mounted Switchgear Commissioning Procedure Schneider RN2, RN2c and RE2c Test Form Schneider CN2 and CE2 Test Form Schneider SE6 Test Form Lucy SCRMU, VRN and VRN2 Test Form Lucy VRN2a and VRE2a Test Form Lucy SSEa Test Form Lucy VCN2a and VCE2A Test Form Efacec Fluofix GCT Test Form Ground-mounted Switchgear with Relays Commissioning Procedure Withdrawn VIP 200 Test Form Schneider RN2, RN6, RN2c and RN6c with VIP 300 Test Form Schneider CE6 with VIP 300 Test Form SEPAM Test Form Lucy VRN6a with MiCOM P124S Test Form Lucy VRN6a with Argus 7SR11 Test Form UK Power Networks 2017 All rights reserved 12 of 14

13 Number ECP h ECP i ECP ECP a 1 ECP ECP a ECP ECP a ECP b ECP c ECP d Procedure/Test Form Schneider RN6c MiCOM P116 Test Form Schneider CE6 MiCOM P116 Test Form Reserved for Multi-panel Switchgear Commissioning Procedure Reserved for Schneider Genie Evo Test Form Air Circuit Breaker Commissioning Procedure Air Circuit Breaker Test Form Metering Unit Commissioning Procedure Lucy HV Air Metering Unit 3 Limb Test Form Lucy HV Air Metering Unit 5 Limb Test Form Schneider HV Metering Unit 3 Limb Test Form Schneider HV Metering Unit with Open Delta 5 Limb Test Form A.3 FPI and PLTU Commissioning Procedures Number ECP ECP a ECP b ECP ECP a ECP b Procedure/Test Form Nortroll CableTroll 2350 FPI Installation and Commissioning Procedure Nortroll CableTroll 2350 FPI Overcurrent and Earth Fault Test Form Nortroll CableTroll 2350 FPI Earth Fault Only Test Form PLTU Commissioning Procedure External PLTU Test Form Logic PLTU Test Form A.4 Ground-mounted Control Unit and RTU Commissioning Procedures Number ECP ECP a ECP b ECP ECP a ECP b ECP c ECP d ECP Procedure/Test Form Schneider T200E Control Unit and RTU Commissioning Procedure Schneider T200E Control Unit and RTU Test Form Schneider T200E Control Unit and RTU ENMAC Commissioning Form Schneider T200 Series 3 Control Unit and RTU Procedure Schneider T200E Series 3 Control Unit and RTU Test Form Schneider T200 Series 3 Control Unit and RTU ENMAC Commissioning Form Schneider T200P Series 3 Control Unit and RTU Test Form Schneider T200P Series 3 Control Unit and RTU ENMAC Commissioning Form Lucy Gemini 2 Control Unit and RTU Commissioning Procedure 1 If these forms are required please contact the author. UK Power Networks 2017 All rights reserved 13 of 14

14 Number ECP a ECP b ECP c ECP d ECP e ECP ECP Procedure/Test Form Withdrawn Withdrawn Lucy Gemini 2 Control Unit and RTU with DNP3 Test Form Lucy Gemini 2 Control Unit and RTU ENMAC Commissioning Form Lucy Gemini 2 Control Unit and RTU External FPI to Internal FPI Conversion Procedure Lucy Gemini 3 Control Unit and RTU Commissioning Procedure Remsdaq Callisto Nx Control Unit and RTU Commissioning Procedure UK Power Networks 2017 All rights reserved 14 of 14

ECP NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE

ECP NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0521 NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE EPN, LPN, SPN This document details the installation, testing

More information

ECS LUCY GEMINI 3 CONFIGURATION PROCEDURE

ECS LUCY GEMINI 3 CONFIGURATION PROCEDURE Document Number: ECS 05-9541 Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 05-9541 LUCY GEMINI 3 CONFIGURATION PROCEDURE EPN, LPN, SPN This document details the configuration procedure for

More information

EOS REMSDAQ CALLISTO NX TYPE E RTU

EOS REMSDAQ CALLISTO NX TYPE E RTU Document Number: EOS 05-9306 Network(s): Summary: ENGINEERING OPERATING STANDARD EOS 05-9306 REMSDAQ CALLISTO NX TYPE E RTU EPN, LPN, SPN This standard details the application, installation and operation

More information

EOS LUCY GEMINI 3 TYPE E RTU

EOS LUCY GEMINI 3 TYPE E RTU Document Number: EOS 05-9305 Network(s): Summary: ENGINEERING OPERATION STANDARD EPN, LPN, SPN EOS 05-9305 LUCY GEMINI 3 TYPE E RTU This standard details the application, installation and operation of

More information

EOS LUCY SABRE 'A' RANGE SWITCHGEAR

EOS LUCY SABRE 'A' RANGE SWITCHGEAR Document Number: EOS 03-0027 Network(s): Summary: ENGINEERING OPERATION STANDARD EOS 03-0027 LUCY SABRE 'A' RANGE SWITCHGEAR EPN, LPN, SPN This standard details the installation, commissioning and operation

More information

EOS SCHNEIDER RINGMASTER 'C' RANGE SWITCHGEAR

EOS SCHNEIDER RINGMASTER 'C' RANGE SWITCHGEAR Document Number: EOS 03-0018 Network(s): Summary: ENGINEERING OPERATION STANDARD EOS 03-0018 SCHNEIDER RINGMASTER 'C' RANGE SWITCHGEAR EPN, LPN, SPN This standard details the installation, commissioning

More information

EDS MW AND MVAR TRANSDUCER CONNECTION

EDS MW AND MVAR TRANSDUCER CONNECTION Document Number: EDS 05-5001 Network(s): Summary: ENINEERIN DESIN STANDARD EDS 05-5001 MW AND MVAR TRANSDUCER CONNECTION EPN, LPN, SPN This standard details the convention to be used when wiring MW and

More information

EDS SCADA NUMBERING SYSTEM

EDS SCADA NUMBERING SYSTEM Document Number: EDS 05-9007 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 05-9007 SCADA NUMBERING SYSTEM This standard describes the system for numbering SCADA wiring within switchgear

More information

ECS TYPE E RTU AND ANCILLARY ITEMS INSTALLATION PROCEDURE

ECS TYPE E RTU AND ANCILLARY ITEMS INSTALLATION PROCEDURE Document Number: ECS 05-9540 Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 05-9540 TYPE E AND ANCILLARY ITEMS INSTALLATION PROCEDURE EPN, LPN, SPN This procedure details the installation,

More information

ECP GPRS/3G/4G COMMS DEVICE CONFIGURATION AND COMMISSIONING PROCEDURE

ECP GPRS/3G/4G COMMS DEVICE CONFIGURATION AND COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0601 GPRS/3G/4G COMMS DEVICE CONFIGURATION AND COMMISSIONING PROCEDURE EPN, LPN, SPN Configuration and commissioning procedure for the GPRS/3G/4G

More information

EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES

EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES Network(s): Summary: ENGINEERING BULLETIN EBB 08-0061 PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES EPN, SPN This bulletin provides a framework for the pilot scheme for unmetered

More information

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

EDS KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES

EDS KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 05-0001 132KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES EPN, LPN, SPN This engineering design standard describes the requirements for

More information

Specification Voltage Limiting Device

Specification Voltage Limiting Device Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,

More information

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution

More information

EDS LV CUSTOMER UNMETERED SUPPLIES

EDS LV CUSTOMER UNMETERED SUPPLIES Document Number: EDS 08-2102 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2102 LV CUSTOMER UNMETERED SUPPLIES EPN, LPN, SPN This standard details the requirements for unmetered single-phase

More information

Company Directive STANDARD TECHNIQUE: TP18A/1. Application of Connection Control Panels for Soft Intertrip and/or Voltage Constraint Schemes

Company Directive STANDARD TECHNIQUE: TP18A/1. Application of Connection Control Panels for Soft Intertrip and/or Voltage Constraint Schemes Company Directive STANDARD TECHNIQUE: TP18A/1 Application of Connection Control Panels for Soft Intertrip and/or Voltage Constraint Schemes Summary This document provides guidance on the application of

More information

Rapier GX Gas Enclosed Load Break Switch and Sectionaliser up to 38kV with automation or remote control options ENGINEERING BRILLIANT SOLUTIONS

Rapier GX Gas Enclosed Load Break Switch and Sectionaliser up to 38kV with automation or remote control options ENGINEERING BRILLIANT SOLUTIONS Rapier GX Gas Enclosed Load Break Switch and Sectionaliser up to 38kV with automation or remote control options ENGINEERING BRILLIANT SOLUTIONS RAPIER GX Gas Enclosed Switch Our new RAPIER GX, pole-mounted

More information

Design Guidelines for SCADA & DSA

Design Guidelines for SCADA & DSA Design Guidelines for SCADA & 28 th February 2017 28 FEBRUARY 2017 ISSUE 4 PREPARED BY: PRINCIPAL ENGINEER SCADA & MANAGER AUTHORISED BY: MANAGER SECONDARY SYSTEMS DOCUMENT NUMBER: ISSUE 4 This plan is

More information

Independent Connections Provider (ICP) Unmetered Connections (UMC) Jointing to Services (UJ2S) Procedure

Independent Connections Provider (ICP) Unmetered Connections (UMC) Jointing to Services (UJ2S) Procedure Independent Connections Provider () Unmetered Connections (UMC) Jointing to Services (UJ2S) Procedure Owner Name Title Neil Clarke Head of Highway Services Signature Date 16 August 2018 Authoriser Name

More information

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are

More information

Substation Workshop. 7 th February 2018

Substation Workshop. 7 th February 2018 Substation Workshop 7 th February 2018 1 Agenda Welcome and Introductions Antony White Substation Design Overview Andy Moore Question & Answer Session Break 1500kVA Transformers James Devriendt & Andy

More information

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title s Reference Number PCP 07 - (RIC Standard: EP 99 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

EDS HV NETWORK DESIGN

EDS HV NETWORK DESIGN Document Number: EDS 08-3000 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-3000 HV NETWORK DESIGN This standard details the guidelines for the design and development of the 11kV

More information

MESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR

MESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR 22 kv Version: 2 Issued: 19 th December 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical

More information

CONTENTS... 2 COMTROLL SAS. SURVEILLANCE AND AUTOMATION SYSTEM...

CONTENTS... 2 COMTROLL SAS. SURVEILLANCE AND AUTOMATION SYSTEM... GENERAL INFORMATION Contents CONTENTS... 2 COMTROLL SAS. SURVEILLANCE AND AUTOMATION SYSTEM... 3 COMMUNICATION... 4 BUILDING-BLOCKS... 5 NETTROLL AND NETDRAW... 5 NETALERT... 6 NETGRAPH... 7 COMTROLL OUTSTATIONS...

More information

MESP TECHNICAL SPECIFICATION FOR SCADA CABLING IN SUBSTATIONS

MESP TECHNICAL SPECIFICATION FOR SCADA CABLING IN SUBSTATIONS Engineering Specification Electrical Networks MESP 081000-01 TECHNICAL SPECIFICATION FOR SCADA CABLING IN Version: 1 Issued: March 2014 Owner: Electrical Networks Asset Manager Approved By: George Marulli

More information

NPS/003/017 TECHNICAL SPECIFICATION FOR A GROUND MOUNTED DISTRIBUTION SWITCHGEAR REMOTE CONTROL SYSTEM.

NPS/003/017 TECHNICAL SPECIFICATION FOR A GROUND MOUNTED DISTRIBUTION SWITCHGEAR REMOTE CONTROL SYSTEM. Version:- 2.0 Date of Issue:- July 2015 Page 1 of 70 NPS/003/017 TECHNICAL SPECIFICATION FOR A GROUND MOUNTED DISTRIBUTION SWITCHGEAR REMOTE CONTROL SYSTEM. 1. Purpose This document is the technical specification

More information

POWER GRID AUTOMATION. Pág.. n. RMU Automation

POWER GRID AUTOMATION. Pág.. n. RMU Automation POWER GRID AUTOMATION RMU Automation Distribution Network Non-Controlled Secondary Distribution Systems Distribution Network RMU Automation - Levels RMU Automation - RTU / FRTU SMART CONTROLLER Monitoring

More information

ECP REMSDAQ CALLISTO 1 CONTROL UNIT AND RTU INSTALLATION PROCEDURE

ECP REMSDAQ CALLISTO 1 CONTROL UNIT AND RTU INSTALLATION PROCEDURE Network(s): Summary: ENGINEERING CONSTRUCTION PROCEDURE ECP 05-9535 REMSDAQ CALLISTO 1 CONTROL UNIT AND RTU INSTALLATION PROCEDURE LPN This document details the installation procedure for the Remsdaq Callisto

More information

VIP 40/45 VIP 400/410

VIP 40/45 VIP 400/410 40/45 400/410 Selection guide 01 PM100573 40/45 PM100576 400/410 self-powered integrated protection relay Optimised performance for transformer, incomer, feeder and bus riser protection Complete engineered

More information

Flexible Urban Networks Low Voltage Successful and safe installation, commissioning and operation of LV switches and circuit breakers on LV networks

Flexible Urban Networks Low Voltage Successful and safe installation, commissioning and operation of LV switches and circuit breakers on LV networks Flexible Urban Networks Low Voltage Successful and safe installation, commissioning and operation of LV switches and circuit breakers on LV networks (SDRC 9.2) Contents Executive Summary... 5 1. Introduction...

More information

MiCOM P111. Three phase and earth fault overcurrent relays

MiCOM P111. Three phase and earth fault overcurrent relays Three phase and earth fault overcurrent relays The relays are suitable for all the application where overcurrent and/or earth-fault protection are required. Thanks to its favorable price vs technical features

More information

Company Directive ENGINEERING SPECIFICATION EE SPEC: 136

Company Directive ENGINEERING SPECIFICATION EE SPEC: 136 Company Directive ENGINEERING SPECIFICATION EE SPEC: 136 Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels NOTE: The current version of this document is

More information

Source-Transfer Application Guide

Source-Transfer Application Guide S&C Model 6802 Automatic Switch Control Source-Transfer Application Guide Table of Contents Section Page Section Page Introduction Qualified Persons.... 2 Read this Instruction Sheet.... 2 Retain this

More information

CABLETROLL 3 CABLETROLL CABLETROLL CABLETROLL CABLETROLL LED-2 5 CABLETROLL CABLETROLL REMOTE INDICATION 7

CABLETROLL 3 CABLETROLL CABLETROLL CABLETROLL CABLETROLL LED-2 5 CABLETROLL CABLETROLL REMOTE INDICATION 7 CABLETROLL 3 CABLETROLL 2310 4 CABLETROLL 2320 4 CABLETROLL 2330 5 CABLETROLL 2350 5 LED-2 5 CABLETROLL 2410 6 CABLETROLL 2440 6 REMOTE INDICATION 7 The CableTroll indicators are fault current detectors

More information

7SR242 Duobias Multi-Function 2-Winding Transformer Protection Relay

7SR242 Duobias Multi-Function 2-Winding Transformer Protection Relay 7SR242 Duobias Multi-Function 2-Winding Transformer Protection Relay Document Release History This document is issue 2010/06. The list of revisions up to and including this issue is: 2010/06 Additional

More information

11 kv Indoor Switchgear - SCADA Controlled

11 kv Indoor Switchgear - SCADA Controlled Specification 11 kv Indoor Switchgear - SCADA Controlled Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

GENERAL INFORMATION. The time it takes to find the fault The time it takes to repair the fault.

GENERAL INFORMATION. The time it takes to find the fault The time it takes to repair the fault. GENERAL INFORMATION Improve customer satisfaction Customer satisfaction is often difficult to measure. One of the key figures used to indicate the performance of a distribution network is SAIDI. SAIDI

More information

DNP Points List and Implementation for Universal Controls

DNP Points List and Implementation for Universal Controls S&C 6800 Series Automatic Switch Control DNP Points List and Implementation for Universal Controls Table of Contents Section Page Section Page DNP Points List for 6801 Universal Controls...1 6801 Status

More information

STCP 04-1 Issue 005 Real Time Data Change Management

STCP 04-1 Issue 005 Real Time Data Change Management STCP 04-1 Issue 005 Real Time Data Change Management STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc

More information

PROCEDURE FOR TESTING P122 THREE PHASE OVERCURRENT & EARTH FAULT PROTECTION RELAY S.E.P TRAINING CENTRE

PROCEDURE FOR TESTING P122 THREE PHASE OVERCURRENT & EARTH FAULT PROTECTION RELAY S.E.P TRAINING CENTRE PROCEDURE FOR TESTING P122 THREE PHASE OVERCURRENT & EARTH FAULT PROTECTION RELAY INDEX CHAPTER 1: 1. INTERFACING PC WITH RELAY 2. EXTRACTING SETTINGS FROM THE RELAY CHAPTER 2: 1. SETTING VALUES AS PER

More information

Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements

Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements Standard Number: HPC-5DA-07-0001-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document

More information

TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT

TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN >>> TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN Tengiz is one of the largest oil fields in the world, and is located in western

More information

6 Check that the earth system is complete, undamaged and bonded to earth points ( including capacitor and control).

6 Check that the earth system is complete, undamaged and bonded to earth points ( including capacitor and control). NOTE: SAFETY: Tests must be carried out after the installation, alteration or repair and before putting back to service. At all times maintain suitable clearance to all other electrical equipment and verify

More information

Remotely Operable 1500V DC Disconnector & Short-Circuit Switch Assembly

Remotely Operable 1500V DC Disconnector & Short-Circuit Switch Assembly Specification Electrical Networks L1-CHE-SPE-128 Remotely Operable 1500V DC Disconnector & Short-Circuit Switch Assembly Version: 1 Issued: February 2016 Owner: Head of Engineering - Electrical Approved

More information

Products Portfolio. Pole mounted Vacuum Recloser

Products Portfolio. Pole mounted Vacuum Recloser Products Portfolio Pole mounted Vacuum Recloser Efacec Switchgear Efacec Switchgear is a leading company in Portugal and a worldwide reference in the development of solutions for power generation, transmission,

More information

SECTION ( ) LIGHTING CONTROL PANELBOARD

SECTION ( ) LIGHTING CONTROL PANELBOARD (26 24 16.02) LIGHTING CONTROL PANELBOARD PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install Lighting Control Panelboards as specified and as shown on the contract drawings. B. The Lighting

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16950 to 26 27 13, removed references to other section numbers 11/21/14

More information

Loop Automation. Technical Manual for the ADVC Controller Range

Loop Automation. Technical Manual for the ADVC Controller Range Loop Automation Technical Manual for the ADVC Controller Range Contents List of Figures 5 List of Tables 7 Acronyms 7 Symbols 7 Introduction 8 About this Manual 8 ADVC Controller Firmware Version 9 WSOS

More information

DNP Points List and Implementation

DNP Points List and Implementation S&C 6800 Series Automatic Switch Control DNP Points List and Implementation Table of Contents Section Page Section Page DNP Points List for 6801 Controls...1 6801 Status Points...2 6801 Double-bit Status

More information

iswitch imotor Compact QR

iswitch imotor Compact QR PRODUCT DATA SHEET iswitch imotor Compact QR Features: Compact design Fit for purpose Suitable for 2 feeder switches Quick Release for manual operation High operation torque Operation monitoring (max.

More information

Synchronous switching of distribution sub networks

Synchronous switching of distribution sub networks Synchronous switching of distribution sub networks Paul Stergiou ConEdison USA Manuel P Pimenta, - ConEdison USA Sergio A Rodriguez ConEdison USA Thomas Horan ConEdison USA Andre Smit- Siemens Industry

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Sapphire Wind Farm 330/33kV Substation

Sapphire Wind Farm 330/33kV Substation Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire

More information

DNP Points List and Implementation

DNP Points List and Implementation S&C IntelliRupter PulseCloser Fault Interrupter Outdoor Distribution (15.5 kv, 27 kv, and 38 kv) DNP Points List and Implementation Table of Contents Section Page Section Page Introduction...1 Status Points...2

More information

7SR21 Non-Directional 7SR22 Directional Overcurrent Relay

7SR21 Non-Directional 7SR22 Directional Overcurrent Relay 7SR21 Non-Directional 7SR22 Directional Overcurrent Relay Document Release History This document is issue 2010/05. The list of revisions up to and including this issue is: 2010/05 Additional Comms module

More information

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW SEL Distribution Substation Protection and Automation System Protection, Monitoring, and Control System for Distribution Substations Data Sheet SYSTEM ONE-LINE RELAY TARGETS ALARM HISTORY SYSTEM COMM.

More information

Performance. Simplicity. Sepam, over 20 years of experience of the world leader. Sepam protection relays. For your peace of mind

Performance. Simplicity. Sepam, over 20 years of experience of the world leader. Sepam protection relays. For your peace of mind Performance to serve your installation better Effective b Thermal based on temperature rise calculation with predictive data to optimize process control. b Directional phase overcurrent for ring networks.

More information

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES 1. Introduction Real time monitoring and control is necessary to ensure public and employee safety and to protect the integrity

More information

Company Directive STANDARD TECHNIQUE: TP14J. Management of Metering CT & VT Test Certificates

Company Directive STANDARD TECHNIQUE: TP14J. Management of Metering CT & VT Test Certificates Company Directive STANDARD TECHNIQUE: TP14J Management of Metering CT & VT Test Certificates Summary This standard technique document details the process for managing metering CT and VT test certificates.

More information

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE SECTION 16262 - APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE PART 1 - GENERAL 1.01 RELATED SECTIONS A. Section 01300 Submittals B. Section 16262 Static Frequency Converter C. Section 16262A Appendix A SFC

More information

CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected Generation (DCG)]

CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected Generation (DCG)] Project Name: Kitchener-Wilmot Hydro Inc. 301 Victoria Street South Kitchener, Ontario, Canada N2G 4L2 Appendix F2: Form DG06 CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected

More information

Recording and Reporting of High Voltage and Low Voltage Switching

Recording and Reporting of High Voltage and Low Voltage Switching 1 SCOPE This document details the procedures to be adopted prior to, during, and on completion of Switching operations, and details the manner in which HV and LV Switching shall be recorded in order to

More information

Supervisory Control and Data Acquisition (SCADA) Performance Criteria Transmission Maintenance Procedure No. 6

Supervisory Control and Data Acquisition (SCADA) Performance Criteria Transmission Maintenance Procedure No. 6 Supervisory Control and Data Acquisition (SCADA) Performance Criteria Transmission Maintenance Procedure No. 6 Version 3 Effective Date 10/17/2017 Approved by: Transmission Maintenance Coordination Committee

More information

ATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318

ATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318 ATS-16 HV Automatic Transfer Switch 16A / 230Vac USER MANUAL V090318 SAFETY Intended use The ATS-16 HV device serves as a power source selector to provide improved power supply for connected loads. ATS-16

More information

IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7

IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7 IMPROVE CUSTOMER SATISFACTION 3 FUNCTIONAL DESCRIPTION 5 DETECTION PRINCIPLE 6 WHERE SHOULD INDICATORS BE INSTALLED AND WHAT MODEL SHOULD BE USED 7 LINETROLL 110Eµ 8 LINETROLL 111K 9 LINETROLL L400D 10

More information

1. Project Description

1. Project Description Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal

More information

DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field

DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION The digital galvanic longitudinal differential protection of type DGSZV-EP is part of device family named EuroProt. This short description

More information

Distribution Code Review Panel Protection Engineer assessment Working Group. Draft Document for

Distribution Code Review Panel Protection Engineer assessment Working Group. Draft Document for Distribution Code Review Panel Protection Engineer assessment Working Group Draft Document for Procedure for Assessment of Protection Relay Testing Engineers INTRODUCTION Electrical Protection system testing

More information

Distribution Substation Manual (DSM) Section 6: Miscellaneous

Distribution Substation Manual (DSM) Section 6: Miscellaneous Distribution Substation Manual (DSM) Section 6: Miscellaneous Standard Number: HPC-5DA-07-0006-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name: Justin

More information

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 102904-ICX-CMOS-E-2006 Electrical / I&C Engineer Holds a B. Sc. in Electronics & Electrical Communications Engineering and has over 9 years hands-on experience working in I&C field. Has extensive experience

More information

NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS

NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS NEXT GENERATION NETWORK RESTORATION APPROACHES ON DISTRIBUTION FEEDERS John DULLER Ahsan HALIM Gordon PATON UK Power Networks UK UK Power Networks UK General Electric - UK john.duller@ukpowernetworks.co.uk

More information

Switching Process and Rules Systems Operations Framework. Document Number:

Switching Process and Rules Systems Operations Framework. Document Number: Switching Process and Rules Systems Operations Framework Document Number: 4808076 TABLE OF CONTENTS 1. INTRODUCTION... 5 1.1 PURPOSE... 5 1.2 HIERARCHY... 5 2. PROCESSES... 7 2.1 SWITCHING OPERATOR AUTHORISATION

More information

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal

More information

Operating instructions. Standstill monitor A / / 2011

Operating instructions. Standstill monitor A / / 2011 Operating instructions Standstill monitor A300 UK 1 2 3 4 5 6 7 8 7390337 / 01 02 / 2011 1 2 3 4 5 6 7 8 switchpoint min max pulse/min power Made in Germany ifm electronic gmbh D 45127 Essen func. I II

More information

LOW POWER INSTRUMENT TRANSFORMER BASED MV AUTOMATION: LESSONS LEARNED AND FUTURE APPLICATIONS

LOW POWER INSTRUMENT TRANSFORMER BASED MV AUTOMATION: LESSONS LEARNED AND FUTURE APPLICATIONS LOW POWER INSTRUMENT TRANSFORMER BASED MV AUTOMATION: LESSONS LEARNED AND FUTURE APPLICATIONS Ager LARRABEITI Zigor OJINAGA Virginia MACÍAS ARTECHE-Spain IBERDROLA-Spain IBERDROLA-Spain arla@arteche.es

More information

Electric T&D Capacity, Reliability, UG Asset Bulletin

Electric T&D Capacity, Reliability, UG Asset Bulletin UTILITY OPERATIONS FOR IMMEDIATE RELEASE Date: 11/01/04 Title: Check all appropriate boxes X Electric T&D Capacity, Reliability, UG Asset Bulletin Secondary Spot Network System Requirements for Distributed

More information

MiCOM P122C Time-Overcurrent Protection

MiCOM P122C Time-Overcurrent Protection Protection Relays 01 MiCOM P122C Time-Overcurrent Protection Customer Benefits 1A/5A software setting 4 function keys Compact unit for flush and wall-surface mounting Comprehensive measurements Disturbance

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

Operational Equipment Power and Environment Standard

Operational Equipment Power and Environment Standard Operational Equipment Power and Environment Standard Contents 1 Scope -3 2 Invitation to Tender Response -3 3 Generic Requirements for Equipment Environment -3 3.1 Environmental Conditions -3 3.2 Specific

More information

MiCOM P123R. Overcurrent Relays P123R/EN AD/A11. Upgrade Documentation

MiCOM P123R. Overcurrent Relays P123R/EN AD/A11. Upgrade Documentation MiCOM P123R Overcurrent Relays Upgrade Documentation MiCOM P123R Page 1/14 CONTENTS MiCOM P123R ADDENDUM: MiCOM P12X UPDATE DOCUMENTATION 3 P12X/EN IT/EB6: INTRODUCTION 4 P12x/EN TD/Eb6: TECHNICAL DATA

More information

EDS GUIDANCE FOR THE APPLICATION OF ENA ENGINEERING RECOMMENDATIONS G88 AND G81 - INSET NETWORKS (IDNOS AND OTHER LICENSED DNOS)

EDS GUIDANCE FOR THE APPLICATION OF ENA ENGINEERING RECOMMENDATIONS G88 AND G81 - INSET NETWORKS (IDNOS AND OTHER LICENSED DNOS) THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE ENGINEERING DESIGN STANDARD EDS 08-0113 GUIDANCE FOR THE APPLICATION OF ENA ENGINEERING RECOMMENDATIONS G88 AND G81 - INSET

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Substation Automation Products. High impedance differential busbar protection REB650 Relion 650 series

Substation Automation Products. High impedance differential busbar protection REB650 Relion 650 series Substation Automation Products High impedance differential busbar protection REB650 Relion 650 series One IED for a wide range of high impedance differential protection applications ABB introduces a new,

More information

SIA-B. Overcurrent & Earth Fault Protection Relay for Secondary Distribution. Dual & Self Powered / Standard CTs. Main characteristics

SIA-B. Overcurrent & Earth Fault Protection Relay for Secondary Distribution. Dual & Self Powered / Standard CTs. Main characteristics SIA-B Overcurrent & Earth Fault Protection Relay for Secondary Distribution Dual & Self Powered / Standard CTs Main characteristics The SIA-B is an protection relay with self powered and dual powered (Self-powering

More information

MESP MODULAR SUBSTATION USER REQUIREMENTS

MESP MODULAR SUBSTATION USER REQUIREMENTS Engineering Specification Electrical Networks MODULAR SUBSTATION USER Version: 2 Issued: November 2015 Owner: Head of Engineering/Electrical Approved By: Head of Engineering/Electrical PRINTOUT MAY NOT

More information

ST: TP14D/2 TEST SHEET COMBINED LV CT & METER CABINET INSTALLATIONS OFF-LOAD TESTING

ST: TP14D/2 TEST SHEET COMBINED LV CT & METER CABINET INSTALLATIONS OFF-LOAD TESTING COMBINED LV CT & METER CABINET INSTALLATIONS Summary This Test Sheet shall be employed during the off-load testing of Combined LV CT & Meter Cabinet Installations in accordance with Standard Technique

More information

Overcurrent and Arc Protection by Reyrolle Alexander Erokhin. 21, 2017 I Berlin

Overcurrent and Arc Protection by Reyrolle Alexander Erokhin. 21, 2017 I Berlin Overcurrent and Arc Protection by Reyrolle Alexander Erokhin VAR Partner Day September 20-21, 21, 2017 I Berlin Reyrolle Product Range by SIEMENS Challenges We Meet for our Customers Easy-to-use protection

More information

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP)

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number POP 07 - (RIC Standard: EP 99 00 00 04 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

Compact NSX communication

Compact NSX communication Functions and characteristics Compact NSX communication Communications modules All Compact NSX devices can be equipped with the communication function via a prewired connection system and a network interface.

More information

M-Bus Central Unit. Use

M-Bus Central Unit. Use 6 M-Bus Central Unit OZW The M-bus central unit is used for the remote readout, remote operation and supervision of an M-bus plant with a maximum of consumption meters and controllers featuring an M-bus

More information

IEC Test Equipment Requirements

IEC Test Equipment Requirements OMICRON K02 03 20060309 IEC 61850 Test Equipment Requirements Dr. Alexander Apostolov K02 03 20060309 Page: 1 Intelligent Substation Automation Systems OMICRON K02 03 20060309 Page: 2 Intelligent Sensor

More information

Communications Room Policy

Communications Room Policy Information Security Policies Communications Room Policy Author : David Rowbotham Date : 01/07/2014 Version : 1.1 Status : Initial Release MAG Information Security IT Policies Page: 1 1 Table of contents

More information

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011 Photovoltaic Solutions Make the most of your solar PV project Presented by: Oscar Araujo Photovoltaic Solutions Manager 4 th Canadian German Solar PV Conference March 2 nd 2011 Agenda Solutions for Renewable

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

Back-UPS RS 550 Installation & Operation

Back-UPS RS 550 Installation & Operation Back-UPS RS 550 Installation & Operation Inventory Safety Do not install the UPS in direct sunlight, in excessive heat, humidity, or in contact with fluids. bu001a Do not connect a laser printer or hair

More information

Abstract. GLV User Manual 1

Abstract. GLV User Manual 1 GLV User Manual 1 Abstract This user manual is a high level document that explains all operational procedures and techniques needed to operate the GLV system in a safe and effective manner. Anyone operating

More information