Manual: Distribution Substation Manual (DSM) Section 4: Equipment Installation Guide
|
|
- Rosamond O’Neal’
- 5 years ago
- Views:
Transcription
1 Manual: Distribution Substation Manual (DSM) Section 4: Equipment Installation Guide Standard Number: HPC-5DA
2 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name: Justin Murphy (May also be the Process Owner) Position: Manager Asset & Works Approved By * Name: Justin Murphy Position: Manager Asset & Works Date Created/Last Updated July 2013 Review Frequency ** 3 yearly Next Review Date ** July 2016 * Shall be the Process Owner and is the person assigned authority and responsibility for managing the whole process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business results. ** Frequency period is dependent upon circumstances maximum is 5 years from last issue, review, or revision whichever is the latest. If left blank, the default shall be 1 year unless otherwise specified. Revision Control Revision Date Description 0 12/07/2013 Initial Document Creation Manager Assets & Works Manager Engineering Services STAKEHOLDERS The following positions shall be consulted if an update or review is required: Manager Engineering Systems Planning DM# Page 2 of 18 Print Date 12/07/2013
3 TABLE OF CONTENTS 1 PURPOSE SCOPE CONTENTS Index of Drawings REFERENCE DOCUMENT REVISION INFORMATION... 6 DM# Page 3 of 18 Print Date 12/07/2013
4 1 PURPOSE This Standard specifies the arrangements for the Installation of Substation Equipment used on Horizon Power Distribution networks. This Standard supersedes the Western Power Document (DM# ] previously in use by Horizon Power since disaggregation. 2 SCOPE This Standard covers the requirements for the following range of distribution equipment: 50 kva / 63 kva District Substation Modular Packaged Substation (MPS) Transformers; Non Modular Packaged Substation (Non-MPS) Transformers; Low Voltage (LV) Switchgear Kiosk; and MV Switchgear Substation. 3 CONTENTS 3.1 Index of Drawings Drawing Number Drawing Title DSM kva / 63 kva MV Metering Non MPS Transformer Kiosk DSM kva To 1000 kva MPS Kiosk DSM-4-03 Drawing Number Not Used DSM-4-04 Schneider RM6 Switchgear (Non MPS) Kiosk & Stand DSM-4-05 LV Switchgear Kiosk DSM /315/630/1000 kva Non MPS Kiosk (Transformer Only) DM# Page 4 of 18 Print Date 12/07/2013
5 4 REFERENCE DOCUMENT The following Reference Documents have been used to prepare this Standard: Doc Ref. Document Title Record No DM# AS AS/NZS AS 3008 Substations & high voltage installations Wiring Rules Cables for Alternating Voltages up to and Including 0.6/1 kv Distribution Substation Manual - Section 4 Kiosk Arrangement & Installation Guide (Superseded) Publisher SAI Global SAI Global SAI Global Horizon Power HPC-5DC HPC-5DA HPC-5DA HPC-5DA HPC-5DA HPC-5DA HPC-5DA HPC-9DJ Distribution Design Manual: Volume Horizon Power Distribution Substation Manual Sect 1 Customer Supply Arrangements Distribution Substation Manual Sect 2 Medium Voltage Network Arrangements Distribution Substation Manual Sect 3 Substation Arrangements Distribution Substation Manual Sect 5 Substation Fire Protection Distribution Substation Manual Sect 6 Miscellaneous Distribution Substation Manual Sect 9 Environmental Requirements Horizon Power Horizon Power Horizon Power Horizon Power Horizon Power Horizon Power Substation Installation Requirements TBA Horizon Power Western Australian Distribution Connections Manual (WADCM) Western Australian Electrical Requirements Regional Power & Electricity Networks Corporation Office of Energy safety DM# Page 5 of 18 Print Date 12/07/2013
6 5 REVISION INFORMATION (Informative) Horizon Power has endeavoured to provide standards of the highest quality and would appreciate notification if any errors are found or even queries raised. Each Standard makes use of its own comment sheet which is maintained throughout the life of the standard, which lists all comments made by stakeholders regarding the standard. A comment sheet found in DM: , can be used to record any errors or queries found in or pertaining to this standard, which can then be addressed whenever the standard gets reviewed. Date Rev No. Notes 12/07/ Original Issue DM# Page 6 of 18 Print Date 12/07/2013
7 DM# Page 7 of 18 Print Date 12/07/2013
8 DM# Page 8 of 18 Print Date 12/07/2013
9 DM# Page 9 of 18 Print Date 12/07/2013
10 DM# Page 10 of 18 Print Date 12/07/2013
11 DM# Page 11 of 18 Print Date 12/07/2013
12 DM# Page 12 of 18 Print Date 12/07/2013
13 DM# Page 13 of 18 Print Date 12/07/2013
14 DM# Page 14 of 18 Print Date 12/07/2013
15 DM# Page 15 of 18 Print Date 12/07/2013
16 DM# Page 16 of 18 Print Date 12/07/2013
17 DM# Page 17 of 18 Print Date 12/07/2013
18 DM# Page 18 of 18 Print Date 12/07/2013
Manual: Distribution Substation Manual (DSM) Section 5: Substation Fire Protection Requirements
Manual: Distribution Substation Manual (DSM) Section 5: Substation Fire Protection Requirements Standard Number: HPC-5DA-07-0005- Document Control Author Name: Viswa Easwaran Position: Standards Engineer
More informationDistribution Substation Manual (DSM) Section 6: Miscellaneous
Distribution Substation Manual (DSM) Section 6: Miscellaneous Standard Number: HPC-5DA-07-0006-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document Owner Name: Justin
More informationManual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements
Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements Standard Number: HPC-5DA-07-0001-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document
More informationHPC-9DJ
Guideline General Application of Switching Devices on Distribution Networks Standard Number: HPC-2AA-07-0001-2012 Document Control Author Name: Anthony Seneviratne Position: Senior Standards Engineer Document
More informationDistribution Substation Manual (DSM) Section 8 Distribution Automation
(DSM) Section 8 Distribution Automation July 2010 Document release information Client Project name Western Power Distribution Substation Manual Document number 8 Document title Revision status Distribution
More informationNetwork Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY
Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY Original Issue: September 2007 Prepared by: Lee Chan & Rob Rogerson This Revision: 0 October 2007 Date For Next Review:
More informationEDS SCADA NUMBERING SYSTEM
Document Number: EDS 05-9007 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 05-9007 SCADA NUMBERING SYSTEM This standard describes the system for numbering SCADA wiring within switchgear
More informationABB Digital medium-voltage switchgear
NAMIBIA AMEU/AEDU MARCH 2018 ABB Digital medium-voltage switchgear Barry Addinall UniGear Digital Contents 1. Digital switchgear 2. Complexity of Distribution networks 3. New technologies using digital
More information1.0 Executive Summary
Statement of Work - 1 - Power and Cooling Assessment for Data Center Professional Services Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details of Service
More informationEDS MW AND MVAR TRANSDUCER CONNECTION
Document Number: EDS 05-5001 Network(s): Summary: ENINEERIN DESIN STANDARD EDS 05-5001 MW AND MVAR TRANSDUCER CONNECTION EPN, LPN, SPN This standard details the convention to be used when wiring MW and
More informationGuideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network
Tasmanian Networks Pty Ltd ABN 24 167 357 299 Guideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network (AS4777 Compliant) NG R PD 09 Version 2.0 July 2014 TABLE
More informationCAPABILITY STATEMENT. A full list of our services.
CAPABILITY STATEMENT A full list of our services. About Us MVLV Power Solutions Pty Ltd is a privately owned Western Australian based company, specialising in the Design and Manufacture of Electrical Switchboards
More informationDESIGN PRACTICE NOTE NEGATIVE BUSBAR SHUNTS
Approval Amendment Record Approval Date Version Description 27/05/2013 1 Initial issue under MTM. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 6 Table of Contents
More information1.0 Executive Summary. 2.0 Features and Benefits
Table of Contents 1.0 EXECUTIVE SUMMARY 2.0 FEATURES AND BENEFITS 3.0 DETAILS OF SERVICE 4.0 Deliverable 5.0 Exclusions 6.0 SCOPE OF RESPONSIBILITY 7.0 PROJECT WORK DETAILS 8.0 ORDERING INFORMATION 9.0
More informationRecording and Reporting of High Voltage and Low Voltage Switching
1 SCOPE This document details the procedures to be adopted prior to, during, and on completion of Switching operations, and details the manner in which HV and LV Switching shall be recorded in order to
More informationEngineering Recommendation G87 Issue
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G87 Issue 2-2015 Guidelines for the Provision of Low Voltage Connections to Multiple Occupancy Buildings
More informationSolution Railway. tgood.com
Solution Railway tgood.com TGOOD Introduction TGOOD is the global leader in prefabricated electric power distribution solutions. It is the company that first comes to mind when cost-effective electric
More informationBlueprint Data Center
Systems and Applications for Data Center Siemens Industy 1. Overview / Purpose In EM EA the datacenter market is seen as one of the fastest growing of the energy businesses. This blueprint is designed
More informationMARKET PROCESS DESIGN. MPD New Distribution Connected Participant Generator
MARKET PROCESS DESIGN MPD 07 1.2 New Distribution Connected Participant TABLE OF CONTENTS TABLE OF CONTENTS... 2 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 6 2.1
More informationMARKET PROCESS DESIGN. MPD 10 - Market Process for Re-Energisation
MARKET PROCESS DESIGN MPD 10 - Market Process for Re-Energisation TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2 PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 8 3 SUPPLEMENTARY
More informationPackage Substation. The efficient solution for your electrical distribution network
Package Substation The efficient solution for your electrical distribution network Why Prefabricated Substations? Biosco, safe and effective substations Safety: A fully tested electrical equipment > Much
More informationSOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY
SOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY Inverter Based Generators 25 kw and This document contains the interconnection requirements for inverter based generators, 25 kw and smaller, that operate
More informationENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER
smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS
More informationECP NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE
Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0521 NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE EPN, LPN, SPN This document details the installation, testing
More informationName: Denis Deschamps Position: Maintenance Business Process Specialist Department: Base Metals
MPROC-2008 207-08-07 of 8 Training Code (If applicable): Document Owner: Name: Denis Deschamps Position: Maintenance Business Process Specialist Department: Base Metals Table of Contents.0 PURPOSE... 2
More informationEBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES
Network(s): Summary: ENGINEERING BULLETIN EBB 08-0061 PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES EPN, SPN This bulletin provides a framework for the pilot scheme for unmetered
More informationDESIGN STANDARD DS 28
Assets Delivery Group Engineering DESIGN STANDARD DS 28 VERSION 1 REVISION 7 JANUARY 2018 FOREWORD The intent of Design Standards is to specify requirements that assure effective design and delivery of
More informationMESP MODULAR SUBSTATION USER REQUIREMENTS
Engineering Specification Electrical Networks MODULAR SUBSTATION USER Version: 2 Issued: November 2015 Owner: Head of Engineering/Electrical Approved By: Head of Engineering/Electrical PRINTOUT MAY NOT
More informationMF1 MOA4 S50. Contactless Chip Card Module Specification. This document gives specifications for the product MF1 MOA4 S50.
Rev. 3.2 19 December 2006 Product data sheet 083032 PUBLIC 1. General description 1.1 Addendum This document gives specifications for the product. The is the integrated circuit MF1 ICS50 in the package
More informationSpecification Voltage Limiting Device
Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,
More informationMESP TECHNICAL SPECIFICATION FOR SCADA CABLING IN SUBSTATIONS
Engineering Specification Electrical Networks MESP 081000-01 TECHNICAL SPECIFICATION FOR SCADA CABLING IN Version: 1 Issued: March 2014 Owner: Electrical Networks Asset Manager Approved By: George Marulli
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationSolution Oil & Gas. tgood.com
Solution Oil & Gas tgood.com TGOOD Introduction TGOOD is the global leader in prefabricated electric power distribution solutions. It is the company that first comes to mind when cost-effective electric
More informationEngineering Document Control
Division / Business Unit: Function: Document Type: Enterprise Services All Disciplines Procedure Engineering Document Control Applicability ARTC Network Wide SMS Publication Requirement Internal / External
More informationSchneider Electric Infrastructure Limited (India)
Schneider Electric Infrastructure Limited (India) Quarter ended Dec 2014 Feb 2015 1 Disclaimer All forward-looking statements are Schneider Electric Infrastructure Limited (India) management s present
More informationDocument C0. Use for:
Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized
More informationDesign Guidelines for SCADA & DSA
Design Guidelines for SCADA & 28 th February 2017 28 FEBRUARY 2017 ISSUE 4 PREPARED BY: PRINCIPAL ENGINEER SCADA & MANAGER AUTHORISED BY: MANAGER SECONDARY SYSTEMS DOCUMENT NUMBER: ISSUE 4 This plan is
More informationBalancing and Settlement Code BSC PROCEDURE
Balancing and Settlement Code BSC PROCEDURE Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points BSCP25 Version 8.0 Date: 29 June
More informationSector Case Study Integration of MVDC Technology. Jonathan Berry Innovation Engineer
Sector Case Study Integration of MVDC Technology Jonathan Berry Innovation Engineer Agenda Innovation Programme Overview Case Study Flexible Power Link Key Learnings and Outcomes Western Power Distribution
More informationMARKET PROCEDURE: METER DATA SUBMISSIONS
MARKET PROCEDURE: METER DATA SUBMISSIONS PREPARED BY: Market Operations (WA) DOCUMENT REF: VERSION: 3.0 EFFECTIVE DATE: 30 November 2015 STATUS: FINAL Approved for distribution and use by: APPROVED BY:
More informationPOWER GRID AUTOMATION. Pág.. n. RMU Automation
POWER GRID AUTOMATION RMU Automation Distribution Network Non-Controlled Secondary Distribution Systems Distribution Network RMU Automation - Levels RMU Automation - RTU / FRTU SMART CONTROLLER Monitoring
More informationOur Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium
Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Voltage Panels and Enclosures designed and built with
More informationSolution Mining. tgood.com
Solution Mining tgood.com TGOOD Introduction TGOOD is the global leader in prefabricated electric power distribution solutions. It is the company that first comes to mind when cost-effective electric power
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationMARKET PROCESS DESIGN. MPD 05 - Market Process for New NQH Metered Connection
MARKET PROCESS DESIGN MPD 05 - Market Process for New NQH Metered Connection TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION...
More informationCOMPANY PROFILE ELECTRO-MECHANICAL CONTRACTING SWITCHGEAR MANUFACTURING ELECTRICAL TRADING LOW VOLTAGE AND BMS
COMPANY PROFILE ELECTRO-MECHANICAL CONTRACTING SWITCHGEAR MANUFACTURING ELECTRICAL TRADING INFORMATION TECHNOLOGY LOW VOLTAGE AND BMS 1 of 11 1.0 INTRODUCTION Verger Delporte UAE Ltd. is a private company
More informationthe CA/PA Module Wizards and Templates
How to Set-up the CA/PA Module Wizards and Templates Using CA/PA Wizards and Templates is the most effective way for your users to add new CA/PA records. This course explains how to set up and configure
More informationDistribution Code Review Panel Protection Engineer assessment Working Group. Draft Document for
Distribution Code Review Panel Protection Engineer assessment Working Group Draft Document for Procedure for Assessment of Protection Relay Testing Engineers INTRODUCTION Electrical Protection system testing
More informationECP SECONDARY SUBSTATION COMMISSIONING PROCEDURE
Document Number: ECP 11-0501 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0501 SECONDARY SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the end-to-end process
More informationEFASOLAR PVStation Solutions
www.efacec.com EFASOLAR PVStation Solutions EFASOLAR PVStation EFASOLAR PVStation Solutions 0,5 MW 1 x EFASOLAR 50 0,50 MW 1 x EFASOLAR 500M 1 MW 1,46 MW Efacec is a century-long experienced company in
More informationSRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016
SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:
More informationUncontrolled document when printed. Large Customer Connection Manual
Large Customer Connection Manual Table of Contents 1. Foreword... 1 2. Purpose and Scope... 1 3. Definitions, Abbreviations and Acronyms... 2 4. References... 4 5. Network Connection Principles... 5 6.
More informationECS LUCY GEMINI 3 CONFIGURATION PROCEDURE
Document Number: ECS 05-9541 Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 05-9541 LUCY GEMINI 3 CONFIGURATION PROCEDURE EPN, LPN, SPN This document details the configuration procedure for
More informationAS/NZS ISO/IEC/IEEE 42010:2013
ISO/IEC/IEEE 42010:2011, IDT Australian/New Zealand Standard Systems and software engineering Architecture description AS/NZS ISO/IEC/IEEE 42010:2013 This Joint Australian/New Zealand Standard was prepared
More informationSeries 8000 RF Signal Switch Solution
RF Signal Switch Solution Operation Manual Operation Manual, Part Number 07508000 006, Rev. B, Oct 7, 2014 All technical data and specifications in this publication are subject to change without prior
More informationKEDS DSO Development Plan. George Karagutoff, KEDS CEO Prishtina, Kosovo 20 March, 2018
KEDS DSO Development Plan George Karagutoff, KEDS CEO Prishtina, Kosovo 20 March, 2018 1 INVESTMENTS AT A GLANCE KEDS begun its operations after the successful unbundling of Distribution and Supply business
More informationMGE Galaxy /50/60/80/100/130 kva. The recommended power protection for all critical applications
MGE Galaxy 5000 40/50/60/80/100/130 kva The recommended power protection for all critical applications 40 130 kva state-of-the-art three-phase power protection designed to meet a wide range of requirements
More informationSTCP Amendment Proposal Form
STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory
More informationRequest for Qualifications
Request for Qualifications May 4, 2017 Request for Qualifications Quality information Prepared by Checked by Approved by Jessica R. Chevreaux Program Manager Revision History Revision Revision date Details
More informationPresented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011
Photovoltaic Solutions Make the most of your solar PV project Presented by: Oscar Araujo Photovoltaic Solutions Manager 4 th Canadian German Solar PV Conference March 2 nd 2011 Agenda Solutions for Renewable
More informationU:\Sales\MQOP's\ABB Power Technology Capabilities.doc Page 1 ABB Power Technology
Introduction 2 The Group 3 Where are the Divisions of Power Technology 2 What do the Divisions Produce 4 What About Quality Assurance 7 Who Will Handle My Initial Request 8 Handling Your Request 8 Our
More informationIEEE 383 Standard for Qualifying Electric Cables and Splices for. NPEC July 2014 Robert Konnik. Nuclear Facilities Preview
IEEE 383 Standard for Qualifying Electric Cables and Splices for NPEC July 2014 Robert Konnik Nuclear Facilities Preview IEEE 383 Background This standard provides guidance for developing a program to
More informationELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS
ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 ELECTRICAL PLANT CONCEPT The electrical equipment, depending
More informationTENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT
TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN >>> TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN Tengiz is one of the largest oil fields in the world, and is located in western
More informationEDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES
Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution
More informationEDS LV CUSTOMER UNMETERED SUPPLIES
Document Number: EDS 08-2102 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2102 LV CUSTOMER UNMETERED SUPPLIES EPN, LPN, SPN This standard details the requirements for unmetered single-phase
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationSECTION ELECTRIC METERING
SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationPROTECTION RELAYS: INNOVATIONS FOR THE BENEFIT OF THE USER
PROTECTION RELAYS: INNOVATIONS FOR THE BENEFIT OF THE USER C. Petit Schneider Electric, France Innovation in the field of medium voltage protection devices is accelerating to meet the ever growing demands
More informationStrategic Planning Electrical, Lighting and Communications October 24 th, 2017
Strategic Planning Electrical, Lighting and Communications October 24 th, 2017 Strategic Planning Process of defining an organization s strategy or direction, and making decisions on allocating its resources
More informationElectronic Records Management System (ERMS)
Electronic Records Management System (ERMS) ERMS Folder Creation and Titling Conventions 2015 Contents 1. Introduction... 3 2. ERMS Folders... 3 3. Creating an ERMS Folder... 4 4. ERMS Folder Creation
More informationYour partner in energy solutions. Systems Division. Automation & services. (Formerly Pauwels Canada Inc)
Systems Division Automation & services The CG Systems Division has developed into an important division within the CG group. The Systems Division specializes in electrical turnkey projects and has an impressive
More informationCompany Directive STANDARD TECHNIQUE : NC2D/2. Relating to Specification of Connection Assets
Company Directive STANDARD TECHNIQUE : NC2D/2 Relating to Specification of Connection Assets Policy Summary This document describes the procedure to be followed for specification and approval where a customer
More informationDocument Title Issue Date. TBE/KBE-DOC TBE/KBE Document List TBE/KBE-REV TBE/KBE Revision List
Sid 1 (6) TBE/KBE DOCUMENT LIST Document Issue Date Supersedes TBE/KBE-DOC 12.0 2013-08-20 Issue 11.0 TBE/KBE-DOC TBE/KBE Document List 12.0 13-08-20 TBE/KBE-REV TBE/KBE Revision List 12.0 13-08-20 TBE/KBE
More informationQUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL... 2
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.8 SCADA, communication interface and data links Filename ONL 15-185-T8_SCADA, communication
More informationMGE Galaxy 5000 for emergency lighting and power equipment
MGE Galaxy 5000 for emergency lighting and power equipment UL 924 listed UPS and battery systems schneider-electric.com 2 schneider-electric.com State-of-the-art three-phase power protection designed to
More informationQUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.18 Data acquisition systems on offshore platform Filename ONL-TTB-03103 T18_Data acquisition
More informationQuotation Accuracy Scheme FOR SMALL CONNECTIONS. How to Challenge the Accuracy of your Quotation
Quotation Accuracy Scheme FOR SMALL CONNECTIONS How to Challenge the Accuracy of your Quotation Contents 1. General Information... 3 2. Scope... 3 3. How to check the accuracy of your Quotation... 4 4.
More informationGeneration, Transmission, and End User Facilities
Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3
More informationFEB2018 Rev H
Product Specification 108-32122 14FEB2018 Rev H PV Edge Solar Junction Box 1. SCOPE 1.1. Content This specification covers the performance, tests and quality standards for the SOLARLOK* PV Edge Solar Junction
More informationUNDERGROUND HV SUBSTATION DESIGN
3 for 2 Bundle Offer. SGD 2440 each for Team of 3! Topics Covered Underground Substations Overview Planning New Underground Substations S/S Design Overview Expert Course Faculty Leader In his 30 years
More information1.0 Executive Summary. 2.0 Available Features & Benefits
Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions
More informationGalaxy Shore Connection 500 kva. Operation 04/
Galaxy 7000 Shore Connection 500 kva Operation 04/2016 www.schneider-electric.com Legal Information The Schneider Electric brand and any registered trademarks of Schneider Electric Industries SAS referred
More informationC-Bus Network Bridge 5500NB. Series. Installation Instructions REGISTERED DESIGN REGISTERED PATENT
C-Bus Network Bridge 5500NB Series Installation Instructions REGISTERED DESIGN REGISTERED PATENT Contents 1.0 Description...3 1.1 Capabilities...3 1.2 Status Indicators...4 2.0 C-Bus Network Connections...5
More informationAlberta Reliability Standard Cyber Security Incident Reporting and Response Planning CIP-008-AB-5
A. Introduction Consultation Draft April 5, 2016 1. Title: 2. Number: 3. Purpose: To mitigate the risk to the reliable operation of the bulk electric system as the result of a cyber security incident by
More informationOE-PM Project Charter Document
Enter Project Name Here Enter Department Name OE-PM Project Charter Document Status: (Draft or Published) Version: (0.# or 1.#) Prepared by: Date Created: Date Last Revised: OE-PM Artifact ID: P01.00 Internal
More informationPOSITION PAPER. QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester Release.
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.18 Data acquisition systems on offshore platform Filename ONL-TTB-03103 T18_Data acquisition
More informationAn Urgent Bulletin from CSA Group
An Urgent Bulletin from CSA Group Photovoltaic Equipment No. 5 Date: September 21, 2015 See Attachment 1 for Effective Dates. See Attachment 1 for Application Due Dates Announcing: Publication of List
More informationPower Networks Demonstration Centre
European Research Infrastructure supporting Smart Grid Systems Technology Development, Validation and Roll Out TRANSNATIONAL ACCESS PROVISION RESEARCH INFRASTRUCTURE DESCRIPTION AND TRANSNATIONAL ACCESS
More informationDistributed by: www.jameco.com 1-800-831-4242 The content and copyrights of the attached material are the property of its owner. FEATURES AND SPECIFICATIONS Features and enefits Meets UL 1086 Section 8
More informationSAMPLE REPORT. Business Continuity Gap Analysis Report. Prepared for XYZ Business by CSC Business Continuity Services Date: xx/xx/xxxx
SAMPLE REPORT Business Continuity Gap Analysis Report Prepared for XYZ Business by CSC Business Continuity Services Date: xx/xx/xxxx COMMERCIAL-IN-CONFIDENCE PAGE 1 OF 11 Contact Details CSC Contacts CSC
More informationGoddard Procedures and Guidelines
Goddard Procedures and Guidelines DIRECTIVE NO.: GPG 1410.1 APPROVED BY Signature: Original Signed by NAME: A. V. Diaz TITLE: Director Responsible Office: 230/Logistics Management Division Title: DIRECTIVES
More informationFault and outage management
WEBINAR, SEPTEMBER 2017 Distribution Automation for electrical grids Fault and outage management Alain Aurus, Theodoros Oikonomou, Yasmine Vögele Introduction Facility Management Use the detach button
More informationISO/IEC/ IEEE INTERNATIONAL STANDARD. Systems and software engineering Architecture description
INTERNATIONAL STANDARD ISO/IEC/ IEEE 42010 First edition 2011-12-01 Systems and software engineering Architecture description Ingénierie des systèmes et des logiciels Description de l'architecture Reference
More informationP216. Condenser fan speed controller. Product bulletin. Features
P216 Condenser fan speed controller Product bulletin These controllers are designed for speed variation of single phase motors, especially for fan speed control on air cooled condensers. Head pressure
More informationELECTRICAL SUPPORT SERVICES
ELECTRICAL SUPPORT SERVICES CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT SERVICES Ampcontrol is committed to partnering with you to optimise the electrical equipment you have invested in to ensure its
More informationSapphire Wind Farm 330/33kV Substation
Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire
More informationTrendmaster* Galvanic Isolator
162459-01 Trendmaster* Galvanic Isolator Product Datasheet Bently Nevada* Asset Condition Monitoring Description The Trendmaster Galvanic Isolator enables the Trendmaster system to connect to intrinsically
More informationIt is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.
6. ENGINEERING SYSTEMS REQUIREMENTS G40 SITE ELECTRICAL UTILITIES SYSTEMS REQUIREMENTS SITE ELECTRICAL UTILITIES TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT
More informationWhen the template is complete, the whole Project Initiation Document can be printed and approved.
HOW TO USE THIS TEMPLATE: Introduction The template reflects the steps set out in the PRINCE2 Method and is designed to prompt the Project Manager and help in the creation of the Project Initiation Document
More information