1 SUNZIA SOUTHWEST TRANSMISSION PROJECT David Getts General Manager SouthWestern Power Group PROJECT UPDATE NEW MEXICO RETA
2 SouthWestern Power Group Independent developer of utility-scale generation and transmission in the Desert Southwest Project Manager/Developer of SunZia Staff of 10, based in Phoenix, in business for 12 years Major References: ~ 2,400 MW CCGT Panda Gila River power plant (in operation) ~ 1,000 MW CCGT Bowie Power Station (permitted) ~ 600 MW Lignite CFB Rockdale Power Plant (in operation) ~ 125 MW Solar PV power project (in development) Owned by MMR Group in Baton Rouge, LA 2
3 MMR Group Construction services firm based in Baton Rouge, LA 22 offices in USA, Canada & overseas In business +25 years; owned by senior management Approximately 2,000 employees Electrical & Instrumentation specialty Industrial markets only: power, oil & gas, process, etc. Built over 30,000 MWs of generation 3
4 4
5 Project Participants Salt River Project (Arizona utility) Tri-State G&T (multi-state G&T association) Shell WindEnergy (a Royal Dutch Shell company) Tucson Electric Power (Arizona utility) SouthWestern Power Group/ MMR Group (G&T development firm) 5
6 Project Description Two, single-circuit 500kV transmission project between central New Mexico and central Arizona Purpose is to deliver primarily renewable energy from NM and AZ to western markets (at the Palo Verde hub) Route will be ~500 miles long Configuration Options: ~ Two 500 kv AC lines (3,000 MW transfer capacity) ~ One 500 kv AC and one 500 kv DC line (4,500 MW transfer capacity) Interconnects up to five substations (two in AZ; three in NM) 6
7 7
8 Current Project Status WECC granted Phase 3 status in Mar 2011, which affirmed the transfer capacity at 3,000 MW s for 2 x 500kV AC lines Obtained Declaratory Order from FERC in May 2011 BLM achieved agreement with US Dept of Defense on acceptable route around White Sands Missile Range One of 7 pilot projects supported by the Federal Rapid Response Team for Transmission (RRTT), announced Oct 2011 Commenced anchor tenant discussions in Jan 2012 Draft EIS published in May
9 BLM s Timeline for Completing NEPA Source: BLM website (last visited 8/17/2012) 9
10 Project Development Schedule Draft EIS May 2012 Final EIS Q Record of Decision Q State permits Q ROW acquisition 2013/2014 Financial Close 2014 COD
11 SunZia Schedule 11
12 Customer Arrangements Commenced anchor tenant process in Nov 2011 Received numerous responses in 2011 Identified acceptable anchor tenant candidates based on: ~ development, ownership and O&M experience in the region ~ financial condition and credit worthiness ~ ability to win PPAs with load-serving entities Currently, in discussion with several potential anchor tenants regarding draft precedent agreement Anchor tenant process is open and on-going 12
13 SunZia Attributes Highly experienced, local development team Supportive partnership of utilities & independents Most advanced interstate project in AZ & NM Large, positive economic impacts Improves reliability of the regional grid Early, ongoing collaboration with conservation NGO s Well-received by AZ & NM Regulators Supported by AZ & NM Governors 13
14 David Getts General Manager (602) W SunZia Southwest Transmission Project Summer
15 Appendix
16 Where are the New Resources? SunZia Southwest Transmission Project New Mexico RETA
17 17
18 Economic Impacts during Construction in New Mexico 18
19 Economic Impacts during O&M in New Mexico 19
Presentation to Local/State/Federal Agency Mtg November 10, 2015
Presentation to Local/State/Federal Agency Mtg November 10, 2015 Summary Proposed 114 mile 500 kv transmission project that will connect with Delaney Substation near Palo Verde Nuclear Generating Station,
More informationPublic Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM
Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities
More informationTransWest Express Transmission Project Interregional Transmission Project Submittal
TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March
More informationTransWest Express and Gateway South
TransWest Express and Gateway South Co-developed by four leading entities: Arizona Public Service PacifiCorp National Grid Wyoming Infrastructure Authority Regional Stakeholder Meeting January 23, 2008
More informationProject Presentation April, 2017
Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern
More informationSRP Ten Year Transmission Plan
2018 SRP Ten Year Transmission Plan 2018-2027 Prepared for the Arizona Corporation Commission January 2018 Docket No. E-00000D-17-0001 Page1 Page1 Table of Contents 1. Introduction... 1 2. Planning Organizations...
More informationQ44 Generation Interconnection
A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,
More informationDOE Initiatives in the U.S. Transmission Sector
DOE Initiatives in the U.S. Transmission Sector David Meyer Senior Advisor Office of Electricity Delivery and Energy Reliability Northeast Power Coordinating Council 2009 Annual Meeting Three Topics Today
More informationLow Impact Generation CIP Compliance. Ryan Walter
Low Impact Generation CIP Compliance Ryan Walter Agenda Entity Overview NERC CIP Introduction CIP-002-5.1, Asset Classification What Should Already be Done CIP-003-7, Low Impact Requirements Tri-State
More informationBPA and NERC, WECC, ERO
BPA and NERC, WECC, ERO March 2006 1 Reliability Organizations BPA has relationship with two reliability organizations: 1. North American Electric Reliability Council (NERC) 2. Western Electric Coordinating
More informationNorth Gila-Imperial Valley #2 Transmission Project
North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------
More informationJuly 26, Dear Mr. Millar:
July 26, 2012 Mr. Neil Millar Executive Director Infrastructure Development California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Dear Mr. Millar: As you are aware, Clean
More informationWestern DSW Planning St k er eeti ting (Western OATT Attachment P) June 9, 2011
Western DSW Planning Stakeholder Meeting (Western OATT Attachment P) June 9, 2011 Agenda: 1. Welcome and Introductions of Attendees 2. Planning Process 3. Interconnection Requests 4. Comments/questions
More informationPublic Service Company of New Mexico
Public Service Company of New Mexico Open Transmission Planning Meeting November 2, 2017 Albuquerque, NM INTRODUCTION Public Stakeholder Meeting Order 890 Objective to improve transparency and stakeholder
More informationJanuary 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California
More informationWritten Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator
Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities
More informationInterconnection and Transmission
Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection
More informationFrom: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationWISP. Western Interconnection Synchrophasor Program. Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 17-18, 2012
WISP Western Interconnection Synchrophasor Program Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 17-18, 2012 1 Acknowledgement and Disclaimer Acknowledgment: This material is based
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationMocuba The First Utility Scale PV Project in Mozambique
Scatec Solar ASA Mocuba The First Utility Scale PV Project in Mozambique October 26th, 2017 Scatec Solar - Integrated Independent Power Producer Scatec Solar develops, builds, owns & operates solar plants
More informationMountain West Transmission Group. WECC MIC Update October 17, 2017
Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain
More informationNERC Overview and Compliance Update
NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance
More informationArizona Public Service Company Ten-Year Transmission System Plan Docket No. E-00000D
(.laps Lisa Malagon Leader Federal and State Compliance Mail Station 9704 PO Box 53999 Phoenix, Arizona 85072-3999 Tel 602-250- 5671 Elisa.Malagon@aps.com January 31, 2014 Docket Control Arizona Corporation
More informationINTERCONNECTION FACILITIES STUDY REPORT
Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
More informationMemorandum. This memorandum requires Committee action.
California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure
More informationWestern Spirit Clean Line Project. Non Tariff Interconnection Facilities Study
Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean
More informationTransmission Infrastructure By Public-Private Model
Portfolio Media, Inc. 648 Broadway, Suite 200 New York, NY 10012 www.law360.com Phone: +1 212 537 6331 Fax: +1 212 537 6371 customerservice@portfoliomedia.com Transmission Infrastructure By Public-Private
More informationBalance of Power in the Hudson Valley
1 Balance of Power in the Hudson Valley Chris Hogan, NYSDEC Major Project Management Unit May 3, 2017 2 Objective Provide an overview of the various state and federal processes by which energy projects
More informationADB s Energy Program in Myanmar
ADB s Energy Program in Myanmar March 2014 Chong Chi Nai Director, Energy Division Southeast Asia Regional Department 1 Current Sector Context Low electrification ratio Need to develop cost effective way
More informationHetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process
California Independent System Operator & Hetch Hetchy Water and Power of the City and County of San Francisco Joint Transmission Planning Base Case Preparation Process This is a living document. Please
More informationA Regulatory Perspective on Distributed Generation
A Regulatory Perspective on Distributed Generation Southwest Electrical Metering Association Spring Meeting Galveston June 10, 2015 Darryl Nelson Rates and Regulatory Agenda Why Rules are Needed Texas
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationProposed New Jersey Energy Resilience Bank ERB
Proposed New Jersey Energy Resilience Bank ERB Disclaimer The information contained herein is for the purpose of initiating a discussion on the proposed New Jersey Energy Resilience Bank (ERB). Any proposals
More informationMichael C. Krikava. Director; Shareholder IDS Center 80 South Eighth Street Minneapolis, MN 55402
Director; Shareholder 2200 IDS Center 80 South Eighth Street Minneapolis, MN 55402 p: 612.977.8566 f: 612.977.8650 mkrikava@briggs.com LoDo Towers 1331 17th Street Suite 520 Denver, CO 80202-1566 p: 720.778.5462
More informationITC HOLDINGS, CORP. Edison Electric Institute 9
ITC HOLDINGS, CORP. Company Background: ITC Holdings, Corp. is in the business of investing in electricity transmission infrastructure as a means to improve electric reliability, connect renewable energy
More informationPlanning for the Future
Gas/Electric Partnership Conference Planning for the Future February 1, 2018 Entergy Texas, Inc. Entergy Texas, Inc. Staci Meyer Manager, Resource Planning Jeff Dicharry Manager, Transmission Planning
More informationThe current state of the electrical grid And the technologies that will enable its transformation
ABB POWER GRIDS The current state of the electrical grid And the technologies that will enable its transformation IEEE POWER & ENERGY SOCIETY - SUBSTATIONS COMMITTEE May 7-11 th Agenda State of the Industry
More informationCommunity Microgrid Program: Request for Expressions of Interest
Community Microgrid Program: Request for Expressions of Interest Program Staff: Galen Nelson, Senior Director of Innovation & Industry Support gnelson@masscec.com Maeghan Lefebvre, Project Manager mlefebvre@masscec.com
More informationWestern Interconnection
Transmission Planning in the Western Interconnection Supporting Resource Development NWCC/NCSL Transmission Policy Institute Byron Woertz, Senior Project Manager Denver, CO June 17, 2010 Overview A Few
More informationNERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum
Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission
More informationChief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013
Mark W. Maher Chief Executive Officer Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013 Agenda WECC Overview WECC Strategic Planning Initiative Western Interconnection Synchrophasor
More informationDeveloping a Solar Project March 24, 2015
Developing a Solar Project March 24, 2015 Iberdrola Renewables, LLC A collection of exceptional assets #2 owner of wind projects in the U.S. with more than 5.7 GWs owned and contracted US Renewables $9.5
More informationMountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration
Mountain West Transmission Group Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group* Basin Electric Power Cooperative (BEPC) Black Hills Energy s three electric
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More informationGreen Power Connection TM. Solar Stakeholder Collaborative for Maryland
Green Power Connection TM Solar Stakeholder Collaborative for Maryland September 6, 2016 1 Welcome Dave Velazquez President and CEO, Pepco Holdings 2 Welcome Donna Cooper President for the Pepco Region
More informationInfraREIT: An Innovative Way to Finance Infrastructure Investment June 2015
InfraREIT: An Innovative Way to Finance Infrastructure Investment June 2015 The Elevator Speech: An Advantaged Financing Vehicle for an Industry in Transition The Opportunity in Electric Infrastructure
More informationStem Beach Solar 1041 Application
Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project
More informationP. O. Box 52025, MS POB100 Phoenix, Arizona (602) Feb 9, 2018
P. O. Box 52025, MS POB100 Phoenix, Arizona 85072-2025 (602) 236-8788 philip.augustin@srpnet.com Feb 9, 2018 Peter Mackin Chair, WECC Studies Subcommittee Utility System Efficiencies, Inc. Phone: (916)
More informationAC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland
The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"
More informationWide-Area Reliability Monitoring and Visualization Tools
OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research
More informationPacifiCorp Transmission Technical Workshop
PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt
More information6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $
1 Windstorm Power Ltd. 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 1 2 Canadian Wind Park 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 2 3 (40 Nordex N80 2.5 MW turbines) 0 days $0 0 days
More informationDelaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation
Steve Rutty Director, Grid Assets Lou Fonte Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation Lead Engineer, Grid Assets September 3, 2014 Transmission Planning
More informationsolar
solar www.yeosolar.com.tr TABLE OF CONTENT CEO s Message 04-05 16-17 Solar Power Plant Solutions Group Companies 06-09 18-19 Power Plant Central Monitoring Systems International Presence 10-11 20-21 Our
More informationNortheast Coordinated System Plan and Other Interregional Activities
Northeast Coordinated System Plan and Other Interregional Activities IPSAC10 November 6, 2009 Michael I. Henderson and John Buechler Background on Interregional Planning Order 890 requires regional coordination
More informationSmall Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility
Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS
More informationMidwest ISO Overview - ATC Customer Meeting. February 26, 2009
Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,
More informationPower Trade in Greater Mekong Sub-region
Power Trade in Greater Mekong Sub-region Priyantha Wijayatunga, PhD Principal Energy Specialist Asian Development Bank Workshop on Sustainable Development of Power Sector and Enhancement of Electricity
More informationInteroperability and Standardization: The NIST Smart Grid Framework
Interoperability and Standardization: The NIST Smart Grid Framework GridWeek Asia George W. Arnold, Eng.Sc.D. National Coordinator for Smart Grid Interoperability National Institute of Standards and Technology
More informationSMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2
SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:
More informationGrid Modernization at SDG&E
Grid Modernization at SDG&E Ali Yari Director, Electric Grid Operations 2017 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E Service Territory Subsidiary of Sempra
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationG. Larry Clark Principal Engineer Power Delivery Alabama Power Company, A Southern Company
2014 IEEE PES T&D Conference & Exposition Chicago, IL April 15, 2014 Panel Session: Technologies for Advanced Volt/VAR Control Implementation Volt/VAR Control as Part of an Integrated Distribution Management
More informationINTERCONNECTION FACILITIES STUDY REPORT
INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December
More informationAddressing Challenges Through Interconnection Wide
Addressing Challenges Through Interconnection Wide Transmission Analysis High Plains Regional Transmission Summit November 3, 2009 David A. Whiteley, Whiteley BPS Planning Ventures LLC 2 Challenge and
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationTUCSON ELECTRIC POWER COMPANY TEN YEAR PLAN FOR YEARS
TEN YEAR PLAN FOR YEARS 2012-2021 SUBMITTED TO THE ARIZONA CORPORATION COMMISSION JANUARY 2012 DOCKET NO: E-00000D-11-0017 CONTENTS INTRODUCTION... 3 Tortolita 500/138kV Transformer T3... 13 Vail 345/138kV
More informationGenerator Interconnection Process. Wholesale Transmission Overview
1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent
More informationHosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study
CIGRE US National Committee 2017 Grid of the Future Symposium Hosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study Huijuan Li EPRI Cleveland, OH October 23, 2017 Hosting
More informationSPP RTO Compliance Forum Western Area Power Administration March 11, 2015
SPP RTO Compliance Forum Western Area Power Administration March 11, 2015 Mark Buchholz WAPA Upper Great Plains Region Compliance Manager What is Western? One of four Power Marketing Administration within
More informationIntegrated Resource Planning April 20, 2010
Integrated Resource Planning April 20, 2010 Judy Stokey, Executive Government and External Affairs Jack McGinley, Development Director, Renewables Gary Smith, Project Director-Smart Technologies Presentation
More informationEssential Reliability Services NERC Staff Report
Essential Reliability Services NERC Staff Report Mark Lauby, Senior Vice President and Chief Reliability Officer Annual Meeting of the National Conference of State Legislators August 20, 2014 About NERC
More informationRE: National Alliance for Water Innovation Support for Clean Water Hub Application
September 28, 2017 Dr. Peter S. Fiske Director Water-Energy Resilience Institute Lawrence Berkeley National Laboratory 1 Cyclotron Road Mailstop 74R316C Berkeley, CA 94720-8099 Office: 074-0314 M: (415)
More informationStandards. Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013
Standards Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013 Geomagnetic Disturbance Operations EOP-010-1 Reliability benefits Enhance operating response to
More informationFlexible Connections for DG Customers
Flexible Connections for DG s Session 1b: Connections Paul Pretlove UK Power Networks Ruth Kemsley Wind Prospect In partnership with: Deployment Key outputs REQUIREMENTS Interface specification guidance
More informationATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service
Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network
More informationBusiness Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources.
Business Practice 1. General 1.1 Primary Network Service is a long-term firm service and should only be used by Network Customers when reserving and scheduling delivery of energy from Designated Network
More informationGeneration Interconnection Process. NEMSTF Education Session 1 January 19, 2012
Generation Interconnection Process NEMSTF Education Session 1 January 19, 2012 www.pjm.com Follows FERC Pro Forma Process Queues are open for a 3 month period Spreads Workload Out Over Year Generation,
More informationTSR A & B - FACILITIES STUDY REPORT
TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re The Narragansett Electric Company : : Docket No. SB-2017-01 () : Pre-Filed Testimony of Daniel Ewan, Clear River Energy
More informationInitiation of Periodic Regional Reviews: Region 1 Project Update
Section 368 Energy Corridors Energy Policy Act of 2005 Initiation of Periodic Regional Reviews: Region 1 Project Update James Gazewood, National Project Manager BLM Washington Office Section 368 West-wide
More informationSan Dimas TDC Solar Project. John Handy, Federal Business Development Manager September 28, 2016
San Dimas TDC Solar Project John Handy, Federal Business Development Manager September 28, 2016 Agenda 1. REC Overview 2. Project Objectives 3. Selection Criteria 4. Project as Bid and Constructed 5. Project
More informationRenewable Energy Investment Trends in sub-saharan Africa
Renewable Energy Investment Trends in sub-saharan Africa Wikus Kruger MIRA Graduate School of Business, University of Cape Town Nov 2018 Nr of Projects Number of utility-scale RE IPPs in SSA 25 (ex. RSA)
More informationEnergy Integration Program Submarine Base New London, CT
Utility Partnerships Helping the Agency Meet Strategic Goals Energy Integration Program Submarine Base New London, CT Craig S. Prather, PE, CEM, PMP, MBA Naval Facilities Engineering Command August 16,
More informationJohn P Buechler NYISO Executive Regulatory Policy Advisor. NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY
Eastern Interconnection Planning Collaborative Update John P Buechler NYISO Executive Regulatory Policy Advisor NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY November 30, 2010
More informationRocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER
Rocky Mountain Power Docket No. 17-035-36 Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Kelcey A. Brown August 2017 1 2 3 4
More informationERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018
ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 Purpose The purpose of this Practice Guide is provide a reference to be used
More informationAssessing Reliability in the Western Interconnection. Vijay Satyal and Byron Woertz, WECC
Assessing Reliability in the Western Interconnection Vijay Satyal and Byron Woertz, WECC 2 Overview Who/What is WECC? Current state of the Interconnection Assessing reliability 2017 2034 Stakeholder collaboration
More informationRocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH
Exhibit RMP (RTL-1) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Rick T. Link May 31, 2017 Pre-Issuance Bidders Conference Presentation
More informationSecuring the North American Electric Grid
SESSION ID: TECH-R02 Securing the North American Electric Grid Marcus H. Sachs, P.E. SVP and CSO North American Electric Reliability Corporation @MarcusSachs Critical Infrastructure s Common Denominator
More informationDHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs
DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure
More informationPower System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017
Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability
More informationEIM Entity Readiness Criteria May 6, 2015
EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM
More informationSystem Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa
System Engineering, IT/OT Integration and the Smart Grid Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa South African grid: large and complex Line (kv) Length (km) 765 1,859 533
More informationIndustry Webinar. Project Single Points of Failure. August 23, 2018
Industry Webinar Project 2015-10 Single Points of Failure August 23, 2018 Agenda Presenters Standard Drafting Team o Chair, Jonathan Hayes, SPP o Vice Chair, Delyn Kilpack, LGE-KU NERC Staff o Latrice
More informationThe Story of Gila River Telecommunications, Inc. ( GRTI )
The Story of Gila River Telecommunications, Inc. ( GRTI ) 2014 Rural Policy Forum Globe, AZ August 8, 2014 Mr. Derek E. White General Manager Gila River Telecommunications, Inc. The Beginning Before GRTI
More informationAnalysis of System Protection Misoperations
Analysis of System Protection Misoperations December 2015 Table of Contents Preface... ii Executive Summary...1 Introduction...2 Chapter 1 Misoperation Data Analysis...4 Misoperation Data Reported...4
More informationMR. PATRICIO CHRISTIAN VALENZUELA VÁSQUEZ Mobile: SUMMARY
MR. PATRICIO CHRISTIAN VALENZUELA VÁSQUEZ Mobile: +56 78073638 pcvalenzuelav@gmail.com SUMMARY Civil Electrical Engineer graduated from the Pontifical Catholic University of Valparaiso with an MBA degree
More information