CAD/PAD International Logistics Meeting (2018 ILM)

Size: px
Start display at page:

Download "CAD/PAD International Logistics Meeting (2018 ILM)"

Transcription

1 CAD/PAD International Logistics Meeting (2018 ILM) F-18 1

2 As of 2 April 2018 CAD/PAD Health Assessment 2

3 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS JM08 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE FA-18E JM09 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM10 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM11 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM12 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM13 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM14 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM15 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM16 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM17 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM18 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM19 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM20 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM21 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM22 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM23 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM24 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM25 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM26 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM27 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G JM28 Green Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18F, NEA-18G M012 Green Green Green Green 3-6 Months 0-1 Months No Risk FY20 8/23/2018 FA-18A, FA-18B MC50 Green Green Red Red No History 0-1 Months Med. Risk FY18 NONE EA-18G, FA-18A, FA-18C, FA-18D MD65 Green Green Green Green 6+ Months 1-3 Months No Risk FY20 5/3/2018 FA-18A, FA-18B MD68 Green Green Red Red No History 1-3 Months Med. Risk FY18 4/18/2019 FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D MD69 Green Green Red Red No History 3-6 Months Med. Risk FY18 4/18/2019 FA-18B, FA-18D, NFA-18D 3

4 DODICs with Trace Data Current data As of 2 April 2018 CAD/PAD Health Assessment Projected - lose largest lot Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS MF72 Green Green Red Yellow 3-6 Months 0-1 Months Med. Risk FY20 12/3/2018 AV-8B, EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NAV-8B, NEA-18G, NFA-18C, NFA-18D, T-45C, TAV-8B MG83 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG84 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG85 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18D MG86 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MG87 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG88 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MG90 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MG91 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MG92 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MG93 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG94 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18D MG95 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MG96 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG97 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG98 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MG99 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D MH01 Green Green Green Green 0-1 Months 0-1 Months No Risk FY19 NONE FA-18B, FA-18D MH02 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 5/9/2018 FA-18B, FA-18D MH03 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH04 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH05 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18B MH06 Yellow Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH07 Yellow Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH08 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH10 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D 4

5 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS MH11 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH12 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH13 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH14 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH15 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH16 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D MH17 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MH18 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D MH19 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH20 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH21 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH22 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH23 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH24 Red Red Red Red 1-3 Months 0-1 Months Critical FY19 12/31/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH25 Yellow Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH26 Yellow Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 9/1/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH27 Green Green Red Red No History 0-1 Months Med. Risk FY19 5/9/2018 FA-18B, FA-18D MH28 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH29 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MH30 Yellow Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MH32 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH33 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH34 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH35 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH36 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH37 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH38 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C 5

6 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS MH39 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH40 Yellow Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, NFA-18C MH41 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH42 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, FA-18E, NFA-18C MH71 Yellow Green Red Red 0-1 Months 0-1 Months Med. Risk Set ComponNONE EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D MJ98 Green Green Red Yellow 0-1 Months 0-1 Months Med. Risk FY18 NONE EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, NFA-18C, NFA-18D, S-3B, T-45C, TAV-8B MS68 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18B MS69 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, NFA-18D MS71 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D, FA-18F, NFA-18D MS72 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18A MS73 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D MS74 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, NFA-18C MS75 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18B, FA-18D MT13 Green Green Green Green 6+ Months 1-3 Months No Risk FY18 5/31/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT16 Green Green Red Red 6+ Months 1-3 Months Med. Risk FY18 8/31/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D, T-45C MT29 Green Green Green Green 6+ Months 1-3 Months No Risk FY19 4/26/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT30 Red Yellow Red Yellow 6+ Months 0-1 Months High Risk FY20 6/1/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, T-45C MT31 Red Yellow Red Red 6+ Months 0-1 Months High Risk FY20 6/1/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT73 Green Green Green Green No History 0-1 Months No Risk SMDC NONE NFA-18D MT74 Green Green Green Green 0-1 Months 0-1 Months No Risk SMDC NONE NFA-18D 6

7 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS MT88 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 5/31/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT89 Green Green Yellow Green 6+ Months 0-1 Months Low Risk FY18 NONE EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT91 Green Green Green Green 3-6 Months 1-3 Months No Risk FY18 4/30/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT97 Green Green Red Red 3-6 Months 0-1 Months Med. Risk FY18 5/31/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C MT98 Green Green Green Green 6+ Months 0-1 Months No Risk FY18 5/31/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, NFA-18C, NFA-18D, T-45C MU50 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU51 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU52 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU53 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU54 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU55 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU56 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU57 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU58 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 NONE FA-18A, FA-18C, NFA-18C MU59 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18C, NFA-18C MU61 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18C, FA-18E MU62 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18C, FA-18E MU63 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18C, FA-18E MU64 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU65 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU66 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU67 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU68 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18D, FA-18F, NEA-18G, NFA-18D 7

8 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS MU69 Green Green Green Green 0-1 Months 0-1 Months No Risk FY19 NONE FA-18D, NFA-18D MU70 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU71 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE EA-18G, FA-18D, FA-18F, NEA-18G, NFA-18D MU72 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE FA-18D, FA-18F, NFA-18D MU73 Red Red Red Red 6+ Months 3-6 Months Critical FY18 7/31/2018 FA-18C, NFA-18C MU94 Red Red Red Red 6+ Months 3-6 Months Critical FY18 1/31/2019 FA-18D, NFA-18D MW19 Red Red Red Red 6+ Months 3-6 Months Critical FY18 9/30/2018 AV-8, F-18, EA-6, T-45, T-6 (Not tracked in CAD/PAD VFS TRACE) SN97 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 9/30/2018 FA-18A, FA-18C, FA-18E, NFA-18C SN98 Green Green Red Red 3-6 Months 3-6 Months Med. Risk FY18 5/29/2019 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D SP04 Yellow Green Red Red 6+ Months 3-6 Months Med. Risk FY18 NONE EA-18G, FA-18D, FA-18F, NEA-18G, NFA-18D SP05 Red Red Red Red 6+ Months 3-6 Months Critical FY18 NONE EA-18G, FA-18D, FA-18F, NEA-18G, NFA-18D SP06 Yellow Green Red Red 6+ Months 3-6 Months Med. Risk FY18 9/30/2018 FA-18C, FA-18E, NFA-18C SP07 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY18 9/30/2018 FA-18C, FA-18D, FA-18E, FA-18F, NFA-18C, NFA-18D SP08 Yellow Yellow Red Red 6+ Months 3-6 Months High Risk FY18 9/30/2018 FA-18C, FA-18D, NFA-18C, NFA-18D SP09 Green Green Red Red 6+ Months 3-6 Months Med. Risk FY18 NONE FA-18D, FA-18E, FA-18F, NFA-18D SP10 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY18 NONE FA-18C, FA-18D, NFA-18C, NFA-18D SP11 Green Green Red Red No History 3-6 Months Med. Risk FY18 9/30/2018 FA-18C, FA-18D, NFA-18C, NFA-18D SP12 Red Red Red Red 1-3 Months 3-6 Months Critical FY18 9/30/2018 FA-18C, FA-18D, NFA-18C, NFA-18D SP14 Red Red Red Red 1-3 Months 3-6 Months Critical FY18 9/30/2018 FA-18C, FA-18D, NFA-18C, NFA-18D SP15 Green Green Red Red 6+ Months 3-6 Months Med. Risk FY18 NONE FA-18C, FA-18D, NFA-18C, NFA-18D SP16 Green Green Red Red 3-6 Months 3-6 Months Med. Risk FY18 NONE EA-18G, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18C, NFA-18D SP17 Green Green Red Red 6+ Months 3-6 Months Med. Risk FY18 9/30/2018 FA-18C, FA-18D, NFA-18C, NFA-18D SP18 Green Green Red Red 6+ Months 3-6 Months Med. Risk FY18 9/30/2018 FA-18C, NFA-18C SP19 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY18 NONE EA-18G, FA-18D, FA-18F, NEA-18G, NFA-18D SQ03 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY20 NONE EA-18G, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18C, NFA-18D 8

9 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS SQ04 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY20 NONE EA-18G, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18C, NFA-18D SQ23 Yellow Green Red Red 1-3 Months 3-6 Months Med. Risk FY19 NONE EA-18G, FA-18E, FA-18F, NEA-18G SQ24 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY19 NONE EA-18G, FA-18E, FA-18F, NEA-18G SQ25 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY19 9/30/2018 EA-18G, FA-18E, FA-18F, NEA-18G SQ26 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY19 NONE EA-18G, FA-18E, FA-18F, NEA-18G SQ27 Green Green Red Red 1-3 Months 3-6 Months Med. Risk FY19 NONE EA-18G, FA-18E, FA-18F, NEA-18G SQ28 Green Green Red Red No History 3-6 Months Med. Risk FY19 NONE FA-18E SQ31 Green Green Green Green No History 0-1 Months No Risk FY19 NONE FA-18E SQ32 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18E SQ33 Green Green Red Red No History 0-1 Months Med. Risk FY19 NONE FA-18E, FA-18F SR95 Red Yellow Red Red 3-6 Months 0-1 Months High Risk FY18 1/31/2019 FA-18C, FA-18D, NFA-18C, NFA-18D SS49 Green Green Green Green 1-3 Months 0-1 Months No Risk FY19 8/7/2018 EA-18G, FA-18E, FA-18F, NEA-18G SS67 Green Green Red Red 0-1 Months 1-3 Months Med. Risk FY20 8/10/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, NFA-18C, NFA-18D SS95 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 9/1/2018 FA-18E SS96 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 9/1/2018 FA-18F SS97 Green Green Red Red 3-6 Months 3-6 Months Med. Risk FY19 9/30/2018 FA-18F SS98 Green Green Green Green No History 3-6 Months No Risk FY19 NONE FA-18F SS99 Green Green Red Red No History 3-6 Months Med. Risk FY19 NONE FA-18E WA01 Green Green Green Green No History 3-6 Months No Risk FY19 NONE FA-18E WB15 Green Green Green Green 1-3 Months 0-1 Months No Risk FY18 6/29/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C WB16 Green Green Green Green 3-6 Months 0-1 Months No Risk FY18 6/29/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, T-45C WB19 Red Red Red Red 3-6 Months 0-1 Months Critical FY18 7/30/2018 EA-18G, FA-18E, FA-18F, NEA-18G 9

10 DODICs with Trace Data Current data Projected - lose largest lot As of 2 April 2018 CAD/PAD Health Assessment Next Est. Delivery Date No SLEs applied No SLEs applied Risk Technical Risk Overall Risk OA Scheduled TMS B55 Yellow Yellow Red Red 6+ Months 1-3 Months High Risk FY18 6/14/2018 EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA- 18G, NFA-18C, NFA-18D, S-3B B56 Red Red Red Red 0-1 Months 0-1 Months Critical FY19 8/31/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D W48 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 4/30/2018 FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D W49 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY19 5/31/2018 FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D W50 Green Green Green Green 3-6 Months 0-1 Months No Risk FY18 4/30/2018 FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D, T-38C, T- 6A, T-6B, T-6D W51 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 4/30/2018 FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D, T-6A, T-6B, T-6D W52 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY18 9/18/2018 AH-1W, AH-1Z, EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18C, NFA-18D W53 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 8/31/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D, T-45C, TAV- 8B W54 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY20 7/11/2019 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D, T-45C, TAV- 8B W55 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY20 7/25/2019 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D W56 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY18 NONE FA-18A, FA-18B, FA-18C, FA-18D, NFA-18C, NFA-18D W57 Green Green Red Red 6+ Months 0-1 Months Med. Risk FY19 6/30/2018 FA-18A, FA-18C, FA-18E, NFA-18C W58 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY20 6/30/2018 EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D W71 Green Green Red Red 0-1 Months 0-1 Months Med. Risk FY19 NONE AV-8B, EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NAV-8B, NEA-18G, NFA-18C, NFA-18D, T-45C, TAV-8B W72 Green Green Red Red 1-3 Months 0-1 Months Med. Risk FY19 6/13/2018 FA-18B, FA-18D, NFA-18D, TAV-8B 10

11 As of 2 April 2018 F-18 Trouble Item Summary DoDIC Name Issue Current Mitigation Get Well Date Future Mitigation N/A Line Support Late Arrival of Requirements/Funding - CAD/PAD procurement cycle is typically 2 years - Material needed to support production line as requirements/funding provided or sooner - Work with PMA- 265/planners to identify plan to support and sustainment units Approximately 2 years from plan implementation Will be derived from current mitigation WB56 JAU-77/A - Vendor has more demand than resources - WB56 production pending WB55 completion - SLE mitigate shortages - OA data supports 6 month increase Contract # 16CK084 - Delivery of units scheduled Dec 2019 Hazard Risk Assessment Jul 2018 WB55 JAU-76/A - Like item has a test failure in Oct 2017 that delayed delivery - Several items competing for priority from single production line - Early change-outs driven by deployments resulting in depleted stock - 24 month Service Life (no SLEs granted) - SLE to mitigate shortages - OA data limited to 2 months additional install Approximately Sep 2019 Pursuing MC50 production Qual of Digital in-line Timer (DIT) MW19 Seawater-Activated Release System (SEAWARS) - Lot failure has delayed deliveries - Contractor changing manufacture site - New site requires First Article Testing (FAT) - Shortage made worse by poor installed records - Combined FAT with Lot Acceptance Testing (LAT) to expedite delivery - Closely managing issuing stock Approximately May 2020 (will be based on date of FY18 contract award) Ensure new site acceptable then use traditional planning tools Look to incorporate item tracking in CAD/PAD system (currently in OOMA) CWDR Thermal Battery MXU-792A/A Obsolescence - Obsolescence issues hindering new procurement. Currently no contract in place. - Qualification required on replacement (Green Battery) - PR being routed in advance of Type III release Approximately Feb 2020 (will be based on FY18 contract award) Procure new Green Battery. 11

12 As of 2 April 2018 F-18 Trouble Item Summary Cont d DoDIC Name Issue Current Mitigation Get Well Date Future Mitigation AWAR, MH24 Shielded Mild Detonating Cord - Items have traditionally had no issues, but recent deliveries have been delayed - Service Life Extensions (SLE) should easily cover shortages AWAR: Dec 2018 MH24: Jan 2019 Monitor future deliveries and investigate delays if they persist JL97, JL98, MU73, MU94, SP05, SP08, SP12, SP14 Deployable Flight Incident Recorder Set (DFIRS) Detonating Cord Assembly Sets and lines - Multiple issues delayed production of DCA/TLX lines - Prioritization established and contractor is catching up on requirements - line support has further strained sustainment stock - Service Life Extensions (SLE) where applicable - Closely managing issuing stock JL97: Jul 2018 JL98: Jul 2018 MU73: Jul 2018 MU94: Jan 2019 SP05: Sep 2018 SP08: Sep 2018 SP12: Sep 2018 SP14: Sep 2018 Monitor contractor catchup progress and return to normal planning tools if contractor successful WB19, SR95 Deployable Flight Incident Recorder Set (DFIRS) Cutter Assembly Budget Constraints - Major budget cuts prior 2 years - Non man-rated - SLE to mitigate shortages WB19: Jul 2018 SR95: Sep 2021 Aircraft decreasing over the next 10 years MT30, MT31 Underseat Rocket Motor Transportation - International shipping and DCMA approvals delaying delivery of assets - Work with contractor and DCMA to address any issues - Closely managing issuing stock - Service Life Extensions (SLE) where applicable June 2018 Resolve standing shipping delay issues, or allow more time to receive assets in requirements planning 12

13 Likelihood EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, NFA-18D WB56 JAU-77/0.75 Sec. Time Delay Shelf Life 84 / Installed Life 48 As of 02 April P1 16CK084 Mar 2019 Aug S 2 P2 I 1 O 16C084 option May 2019 Dec 2019 : Successfully producing lots Several items vying for priority from single line at single contractor No failures to fire, but timing slows with age Current OA data supports 6 month SLE, additional extensions require HRA OA Testing scheduled FY19 Alternate Items: Qualification of Digital In-line Timer (DIT) in process line to submit requirements in time to support need date Ensure any units changed out are returned to IH for testing PMA 202 to expedite Class I ECP for DIT Notification for any long term down aircraft being brought back up : (P1) If another platform has a more urgent requirement, then deliveries would be delayed Mitigation: Joint assessment of needs across services and platforms to prioritize production (P2) If there are any issues with the production line or its operators, then deliveries would be delayed (I)nventory/E-Stock: If limited stock continues, then RIKs cannot be supported Mitigation: expedite qualification of DIT (S)LE: If additional extensions beyond 6 months are required, then higher level approval required due to increased delay times Mitigation: manually manage stock Future (O)A: If units are not returned to IH, then OA testing cannot be conducted Mitigation: coordinate with fleet to return replaced units 13

14 Likelihood EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, NFA-18C, NFA-18D WB55 JAU-76/A 0.3 Sec. Time Delay Shelf Life 48 / Installed Life 24 As of 02 April P1 16CK084 lot1 Apr 2018 Jun P2 16CK084 lot2 16CK084 lot3 May 2018 Jul 2018 May 2018 Oct 2018 : Successfully producing lots Several items vying for priority from single line at single contractor Limited to 2 additional months install, nothing available for shelf extensions FY13 OA found units that no-fired when tested. Testing conducted as sample permits Tested 23 Mar 2018 All units functioned, some newer lots showing fair performance (stats pending) Alternate Items: Qualification of Digital In-line Timer (DIT) in process Deliveries/Stock 1 S, I 16CK084 lot4 Jun 2018 Nov 2018 MC50 Jan 2019 Jan 2019 : (P1) If another platform has a more urgent requirement, then WB55 deliveries would be delayed Mitigation: Joint assessment of needs across services and platforms to prioritize production (P2) If there are any issues with the production line or its operators, WB55 deliveries would be delayed (I)nventory/E-Stock: If limited stock continues, then RIKs cannot be supported Mitigation: pursue MC50 production Mitigation: expedite qualification of DIT (S)LE: If additional extensions are required, then higher level approval required due to potential no-fires Mitigation: manually manage stock line to submit requirements in time to support need date PMA 202 to expedite Class I ECP for DIT Notification for any long term down aircraft being brought back up - 14

15 Likelihood AV-8, F-18, EA-6, T-45, T-6 MW19 Impulse Cartridge Shelf Life 150 / Installed Life 85 As of 02 April Potentially Grounded Operating on extension: 103 months Operating on extension: 97 months Operating Normally Uninstalled Deliveries 5 O 4 I 3 2 S P 15CK090 Nov 2016 Sep CK083 Jun 2019 Nov CK083 Aug 2019 Mar : Contractor make-up lot being reworked due to subassembly issue. Contractor moving production to a new location, will require First Article Test (FAT) A combined FAT/LAT was negotiated to expedite lot 1 delivery. IH extensions up to 12 months additional installed. Shelf thus far hasn t been an issue, no requests and data looks good. No installed data available, investigating OOMA data availability Last tested May 2016, next test scheduled Jun 2018 Current sample does not include contractors vintage lots Traceability: Units not traced in Virtual Fleet Support (VFS) Many item records lost, forcing fleet to use manufacture date as open date (lost useful life) 1 17CK083 Oct 2019 Jun NB028 EAD May 2020 May 2020 May 2020 (P)roduction: If FAT/LAT is not successful, then there will be significant delivery delays Mitigation: Provide technical assistance to the new production site (I)nventory/E-Stock: If deliveries are not received, then Boeing production line cannot be supported Mitigation: Manually control stock issue to preserve stock Mitigation: Process SLEs when possible to preserve stock (S)LE: If installed data is not available, then performance will be lower confidence leading to higher HRA risk category Mitigation: Investigate OOMA and other data sources for installed time Mitigation: Move MW19 into VFS TRACE Future (O)A: If the contractors lots are not returned to NSWC IHEODTD, then data to support extensions will be limited Mitigation: once units are delivered, direct a portion to change out contractors lots line to submit requirements in time to support need date Assist in gathering MW19 installed data and/or support moving MW19 into TRACE Notification for any long term down aircraft being brought back up Obsolescence 15

16 Likelihood EA-18G, FA-18A/B/C/D/E/F, NEA-18G, NFA-18C/D, T-45A/C CWDR Thermal Battery MXU-792A/A Shelf Life 120 / Installed Life 96 As of Apr MBA/PMA-202 Jul 2017 Jun 2019 : Obsolescence issues hindering new procurement. Currently no contract in place. Qualification required on new Green Battery. PR being routed in advance of Type III release Opportunity for final small buy on existing NAVAIR contract. 118 months units remain with specification. Current OA data may support additional SLE time. OA conducted at Hill AFB. Statistical analysis completed Jan 2018 Data analysis being worked. Risk analysis (if required) will be initiated Sep O P 1 I Contract Award Delivery over multiple lots Mar 2018 Jul 2018 Oct 2019 Feb 2020 (P)roduction: If new contract deliveries are not received by mid 2020, then an approved HRA would be required to keep aircraft operational Mitigation: with SLEs on current installed assets. (I)nventory/E-Stock: If too many items are issued, then RIK units and CODR replacements would not be available Mitigation: manually manage stock Mitigation: issue SLEs when appropriate Future (O)A: If too few units are returned for OA testing, then data may not be available to support extensions beyond 124 months Mitigation: work with the fleet to return all items replaced in the fleet line to submit requirements in time to support need date PMA 265 to request assistance from PMA 202 with Class I ECP approval to facilitate Type III release of green battery. Notification for any long term down aircraft being brought back up 16

17 Likelihood FA-18C, NFA-18C AWAR Shielded Mild Detonating Cord Set (SMDC) Shelf Life 240 / Installed Life 150 As of 02 April Potentially Grounded Operating on extension: 174 months Operating on extension: 162 months Operating Normally Uninstalled Deliveries : Vendor is experiencing delays. However, item has no history of production issues P 17CK062 Aug 2017 Dec 2018 (P)roduction: If deliveries are not received by July 2019, then an approved HRA would be required to keep aircraft operational. Current OA Data supports extension to at least 162 months installed time and 252 months total age Next OA is planned for FY19 Notification for any long term down aircraft being brought back up (including C++ mods) 17

18 Likelihood EA-18G, FA-18B, FA-18D, FA-18F, NE-18G, NFA-18D MH24 Shielded Mild Detonating Cord (SMDC) Shelf Life 240 / Installed Life 150 As of 2 April I CK062 Aug 2018 Dec CK062 Sep 2018 Jan 2019 : Vendor is experiencing delays. However, item has no history of production issues. (I)nventory: If production line requires item support, then production could not be supported Mitigation: pull back MH24 from fleet locations Current OA Data supports extension to at least 162 months installed time and 252 months total age Will require program office coordination to keep aircraft operational in Jun 2018 Next OA is planned for FY19 line to submit requirements in time to support need date Notification for any long term down aircraft being brought back up 18

19 Likelihood EA-18G, FA-18F, NEA-18G JL97 Detonating Cord Assembly (TLX) Shelf Life 240 / Installed Life 180 As of 02 April Total installs: 340 Potentially Grounded Operating on extension: 204 months Operating on extension: 192 months Operating Normally Uninstalled Deliveries Deliveries/Stock : 4 lots have been produced and are awaiting LAT and Ammo Data Cards at the manufacturer Severe Ammo Data Card backlog at contractor Still awaiting delivery of FY14 requirements Current OA Data supports extension to at least 192 months installed time and 252 months total age P I 1 14CK087 Aug 2015 Jul CK087 Oct 2015 Aug CK087 Nov 2015 Oct CK087 Nov 2015 Nov CK087 Jan 2016 Jan CK081 May 2019 May 2019 (P)roduction: If deliveries are delayed to Aug 2018 or later, then SLEs would be required to keep aircraft operational. (I)nventory: If production line needs more than one JL97 before deliveries are received, production line cannot be supported. Mitigation: start attempting to pull worldwide stock back to NSWC IHEODTD Next OA is planned for FY18 line to submit requirements in time to support need date Notification for any long term down aircraft being brought back up 19

20 Likelihood FA-18E JL98 Detonating Cord Assembly (TLX) Shelf Life 240 / Installed Life 180 As of 02 April Potentially Grounded Operating on extension: 204 months Operating on extension: 192 months Operating Normally Uninstalled Deliveries Deliveries/Stock : 4 lots have been produced and are awaiting LAT and Ammo Data Cards at the manufacturer Severe Ammo Data Card backlog at contractor Still awaiting delivery of FY14 requirements I 1 14CK087 Aug 2015 Jul CK087 Sep 2015 Jul CK087 Oct 2015 Aug CK081 Jun 2019 Jun 2019 (I)nventory: If production line needs more than one JL98 before deliveries are received, production line cannot be supported. Mitigation: start attempting to pull worldwide stock back to NSWC IHEODTD Current OA Data supports extension to at least 192 months installed time and 252 months total age Next OA is planned for FY18 line to submit requirements in time to support need date Notification for any long term down aircraft being brought back up 20

21 Likelihood FA-18C, NFA-18C MU73 Detonating Cord Assembly (TLX) Shelf Life 240 / Installed Life 180 As of 02 April Potentially Grounded Operating on extension: 204 months Operating on extension: 192 months Operating Normally Uninstalled Deliveries Deliveries/Stock : 4 lots have been produced and are awaiting LAT and Ammo Data Cards at the manufacturer Severe Ammo Data Card backlog at contractor Still awaiting delivery of FY14 requirements I 14CK087 Sep 2015 Jul CK087 Nov 2015 Oct CK087 Nov 2015 Nov CK087 Jan 2016 Jan CK081 Apr 2019 Apr 2019 (I)nventory/E-Stock: If worldwide inventory is not available where an aircraft need is, then the aircraft will be grounded until material is available. Mitigation: Ensure units dispersed worldwide are at required location(s) Current OA Data supports extension to at least 192 months installed time and 252 months total age Next OA is planned for FY18 Notification for any long term down aircraft being brought back up 21

22 FA-18D, NFA-18D MU94 Detonating Cord Assembly (TLX) Shelf Life 240 / Installed Life 180 As of 02 April 2018 Likelihood Potentially Grounded 4 14CK087 Jan 2016 Jan Operating on extension: 180 months Operating on extension: 180 months Operating Normally Uninstalled Deliveries Deliveries/Stock : 4 lots have been produced and are awaiting LAT and Ammo Data Cards at the manufacturer Severe Ammo Data Card backlog at contractor Still awaiting delivery of FY14 requirements I 14CK087 Mar 2016 Feb CK081 Jul 2019 Jul 2019 (I)nventory/E-Stock: If 4 aircraft are brought back online before deliveries are received, then lack of MU94 will keep one of those aircraft grounded. Current OA Data supports extension to at least 192 months installed time and 252 months total age Next OA is planned for FY18 Notification for any long term down aircraft being brought back up 22

23 High Risk and Critical DCA/TLX Members Shelf Life 240 / Installed Life 180 As of 02 April 2018 Several items are low available stock due to late delivery of detonation cord assemblies (DCA, a.k.a. thin-layer explosive, or TLX) SP05 is also needed for production line Can be pulled from multiple sets, but doing so removes a whole set being available to the fleet Stock will be closely monitored and placed as needed for change outs Sets will also be broken as required to support member need Material will be returned to NSWC IHEODTD from worldwide to support production line Member Set JL97 MU73 MU94 SS97 SS98 Line SP05 X X X X SP08 X X SP12 X X SP14 X X 23

24 Likelihood FA-18C, FA-18D, NFA-18C, NFA-18D SR95 BBU-57/A Cutter Assembly (DFIRS) Shelf Life 156 / Installed Life 126 As of 02 April Potentially Grounded Operating on extension: 150 months Operating on extension: 138 months Operating Normally Uninstalled Deliveries Deliveries/Stock : Lead Time is 48 months. First Delivery expected Jan 2019 Still awaiting delivery of FY14, FY15, FY16, and FY17 requirements. FY18 is currently on PR. Current OA data supports extension to at least 180 months total age and 138 months installed time P 2 1 I SPRPA1-11-G002Z EQ03 N FEF00 N FEF00 Sep 2017 Jan 2019 Mar 2021 Mar 2021 Sep 2021 Sep 2021 (P)roduction: If units are not delivered by Jul 2018, then an HRA would be required to keep aircraft operational (I)nventory/E-Stock: If all undetermined and expired material required change out, then no stock would be available to support the production line OA currently planned for 4 th QTR FY18. Ensure any units changed out are returned to IH for testing Future Decision Briefing will examine permanent life increase Notification for any long term down aircraft being brought back up 24

25 Likelihood EA-18G, FA-18E, FA-18F, NEA-18G WB19 Cutter Assembly (DFIRS) Shelf Life 156 / Installed Life 126 As of 02 April Potentially Grounded Operating on extension: 162 months Operating on extension: 150 months Operating Normally Uninstalled Deliveries : Lead Time is 48 months. First Delivery expected Jul 2018 (for FY14) Still awaiting delivery of FY14, FY15, FY16, and FY17 requirements. FY18 is currently on PR. Deliveries/Stock I SPRPA1-11- G002Z EQ03 SPRPA1-11- G002Z EQ03 Feb 2017 Jul 2018 Mar 2021 Mar FEF00 Apr 2022 Apr 2022 (I)nventory/E-Stock: If all undetermined and expired material required change out, then no stock would be available to support the production line Current OA data supports extension to at least 180 months total age and 150 months installed time. OA currently planned for FY18. line to submit requirements in time to support need date Ensure any units changed out are returned to IH for testing Future Decision Briefing will examine permanent life increase Notification for any long term down aircraft being brought back up 25

26 Likelihood EA-18G, FA-18B, FA-18D, FA-18F, NEA-18G, T-45C MT30 Underseat Rocket Motor Shelf Life 204 months / Installed Life N/A As of 2 April P CK076 Jan 2018 Jun CK076 Jan 2018 Jun P2 : Have had regular shipping delays from vendor Awaiting failure investigation for bent pin on x-ray and ballistic failures Deliveries/Stock : (P1) If delivery of the lots is delayed to July 2018 or later, service life extensions would be required to keep aircraft operational (P2) If lot is found unacceptable and rework lot delivers July 2019 or later, an approved HRA would be required to keep aircraft operational Positive performance history, extensions to 216 months shelf supported No propellant stability concerns (Item is low in the cockpit and shielded from the sun by the seat) Last tested in 2017, successfully tested units with oil present at input Next Planned OA is 2020 line to submit requirements in time to support need date Notification for any long term down aircraft being brought back up Shipping Delay 26

27 Likelihood EA-18G, FA-18A, FA-18B, FA-18C, FA-18D, FA-18E, FA-18F, NEA-18G, T-45C MT31 Underseat Rocket Motor Shelf Life 204 months / Installed Life N/A As of 2 April P CK076 Dec 2017 Jun CK076 Jan 2018 Jun 2018 : Have had regular shipping delays from contractor Awaiting failure investigation for bent pin on x-ray and ballistic failures Deliveries/Stock 1 P2 16CK076 Sep 2018 Nov 2018 : (P1) If delivery of the lots is delayed to July 2018 or later, service life extensions would be required to keep aircraft operational (P2) If lot is found unacceptable and rework lot delivers July 2019 or later, an approved HRA would be required to keep aircraft operational Positive performance history, extensions to 216 months shelf supported No propellant stability concerns (Item is low in the cockpit and shielded from the sun by the seat) Last tested in 2017, successfully tested units with oil present at input Next Planned OA is 2020 line to submit requirements in time to support need date Notification for any long term down aircraft being brought back up Shipping Delay 27

CAD/PAD International Logistics Meeting (2018 ILM)

CAD/PAD International Logistics Meeting (2018 ILM) CAD/PAD International Logistics Meeting (2018 ILM) CAD/PAD Health Metric T-45 1 As of 2 April 2018 CAD/PAD Health Assessment Current data Projected - lose largest lot DODICs with Trace Data applied applied

More information

CAD/PAD International Logistics Meeting (2018 ILM)

CAD/PAD International Logistics Meeting (2018 ILM) CAD/PAD International Logistics Meeting (2018 ILM) CAD/PAD Health Metric T/AV-8B 1 CAD/PAD Health Assessment Current data Projected - lose largest lot DODICs with Params Params Production Technical OA

More information

New Concept for Article 36 Networking and Management of the List

New Concept for Article 36 Networking and Management of the List New Concept for Article 36 Networking and Management of the List Kerstin Gross-Helmert, AFSCO 28 th Meeting of the Focal Point Network EFSA, MTG SEAT 00/M08-09 THE PRESENTATION Why a new concept? What

More information

NAC Institutional Committee Meeting

NAC Institutional Committee Meeting Meeting Jet Propulsion Lab July 28-29, 2015 Kathryn Schmoll Chair Membership Committee Members Current Employer Current Position 1 CHAIR: Kathryn (Katy) Schmoll Kathryn Schmoll and Associates, LLC 2 James

More information

UK Link Committee Meeting. Xoserve Report Pack. Meeting Date: 12 th January 2017 Reporting Month: December 2016

UK Link Committee Meeting. Xoserve Report Pack. Meeting Date: 12 th January 2017 Reporting Month: December 2016 UK Link Committee Meeting Xoserve Report Pack Meeting Date: 12 th January 2017 Reporting Month: December 2016 Authors (for this version): Amjad Hussain Version: V1.0 Date: 10 th January 2017 Xoserve Reports

More information

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last

More information

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013 e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013 Objectives of the afternoon parallel tracks sessions 2 Meeting objectives High level: Identification of shared interests with emphasis on those

More information

RPS Work Item: Beta Testing of Message Standard

RPS Work Item: Beta Testing of Message Standard RPS Work Item: Beta Testing of Message Standard IMDRF Stakeholder Forum San Francisco March 26, 2014 Nancy Shadeed Health Canada Recap Beta Testing Objective (Phase 1): Assess RPS Standard fitness for

More information

Space and Naval Warfare Systems Center Atlantic

Space and Naval Warfare Systems Center Atlantic Space and Naval Warfare Systems Center Atlantic Contracts Update Charleston Defense Contractors Association 49th Small Business Industry Outreach Initiative 30 August 2018 Ms. Kelly Cannady SSC Atlantic

More information

10th Maintenance Cost Conference Chairman s Report Athens Sept 10& Tiymor Kalimat Manager Technical Procurement Royal Jordanian Airlines

10th Maintenance Cost Conference Chairman s Report Athens Sept 10& Tiymor Kalimat Manager Technical Procurement Royal Jordanian Airlines 10th Maintenance Cost Conference Chairman s Report Athens Sept 10&11 2014 Tiymor Kalimat Manager Technical Procurement Royal Jordanian s Why We Are Here Operating Cost Direct Operating Cost Indirect Operating

More information

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015 Next Steps for WHOIS Accuracy Global Domains Division ICANN 53 24 June 2015 Agenda: Next Steps for WHOIS Accuracy Reporting System 1 2 3 Introduction and Implementation Approach Pilot Project and Lessons

More information

Markets Gateway Roadmap

Markets Gateway Roadmap Markets Gateway Roadmap As of April 17, 2018 www.pjm.com Background Markets Gateway allows users to submit information and obtain data needed to conduct business in the Day-Ahead, Regulation and Synchronized

More information

2018 CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC PECB ISO 9001: Quality PECB ISO 14001: Environmental PECB OHSA 18001: Occupational Health and

More information

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down. # Name Duration 1 Project 2011-INT-02 Interpretation of VAR-002 for Constellation Power Gen 185 days Jan Feb Mar Apr May Jun Jul Aug Sep O 2012 2 Start Date for this Plan 0 days 3 A - ASSEMBLE SDT 6 days

More information

2018 CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC PECB ISO 90: Quality PECB ISO 140: Environmental PECB OHSA 180: Occupational Health and Safety

More information

ERS IT Portfolio Report

ERS IT Portfolio Report Administration and Operations Committee ERS IT Portfolio Report January 21 st, 2014 1 Agenda Information Technology Projects Summary 2013 End of Year Metrics Project Management Office CMERS Website Applications

More information

C 17 Training System Sustainment Re Compete

C 17 Training System Sustainment Re Compete C 17 Training System Sustainment Re Compete 100 50 Mr. John Tackis Organization: 677 AESG/TS Phone: 937 255 2272 Email: john.tackis@wpafb.af.mil Date: 15 May 07 0 1st Qtr 3rd Qtr East West North Government

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

Welcome To The. Broward County Human Services Department. Community Partnerships Division FY2016 Provider Information Workshop

Welcome To The. Broward County Human Services Department. Community Partnerships Division FY2016 Provider Information Workshop Welcome To The Broward County Human Services Department Community Partnerships Division FY2016 Provider Information Workshop Topics Of Discussion Provider Resources Invoicing Quarterly Reports Other Required

More information

GSMA Embedded SIM 9 th December Accelerating growth and operational efficiency in the M2M world

GSMA Embedded SIM 9 th December Accelerating growth and operational efficiency in the M2M world GSMA Embedded SIM 9 th December 2013 Purpose of this Reference Messaging Pack Appropriate slides may be selected to used for within different presentations for multiple audiences To provide consistent

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary November, 2016 MTD MARKET UPDATE Data Current Through: November, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 0 Active, Pending, & Months

More information

Best Practices in CIS Implementation. TECO s CRB Implementation

Best Practices in CIS Implementation. TECO s CRB Implementation Best Practices in CIS Implementation TECO s CRB Implementation Katie Guice, Director, Customer Solutions & Strategic Projects Tampa Electric & Peoples Gas System 1 TECO Energy: An Emera Company Energy-related

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 June Status 06-30-04 Gunther Haller haller@slac.stanford.edu (650) 926-4257

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A)

ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A) ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A) JTC 1 SWG-A N 274 2007-06-06 Replaces: SWG-A N 262 Title: Source: SWG-A Project Plan Ken Salaets, Project Plan Editor Due Date: Requested Action:

More information

Grid Security Policy

Grid Security Policy CERN-EDMS-428008 Version 5.7a Page 1 of 9 Joint Security Policy Group Grid Security Policy Date: 10 October 2007 Version: 5.7a Identifier: https://edms.cern.ch/document/428008 Status: Released Author:

More information

Dan Lobb CRISC Lisa Gable CISM Katie Friebus

Dan Lobb CRISC Lisa Gable CISM Katie Friebus Dan Lobb CRISC Lisa Gable CISM Katie Friebus AGENDA Meet the speakers Compliance between QSA visits - Dan Lobb Transitioning from PCI DSS 3.1-3.2 - Katie Friebus Tips for Managing a PCI Compliance Program

More information

IT Services Executive Summary May 2017 1631 Incidents KPI As expected, the trend for a majority (1631) (4365) Incidents 78% Volumes Requests Requests 94% (4) (158) P1 Inc. 50% 4365 P2 Inc. 88% 2211 Phone

More information

Why UID? LeAntha Sumpter May 11, 2005

Why UID? LeAntha Sumpter May 11, 2005 Why UID? LeAntha Sumpter May 11, 2005 1 DoD, its coalition partners, and industry efficiently and effectively manage people, property, and intangible assets using globally unique identification 2 Ubiquitous

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

All King County Summary Report

All King County Summary Report September, 2016 MTD MARKET UPDATE Data Current Through: September, 2016 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Active, Pending, & Months Supply of Inventory 15,438 14,537 6.6 6.7

More information

SME License Order Working Group Update - Webinar #3 Call in number:

SME License Order Working Group Update - Webinar #3 Call in number: SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under

More information

June 2012 First Data PCI RAPID COMPLY SM Solution

June 2012 First Data PCI RAPID COMPLY SM Solution June 2012 First Data PCI RAPID COMPLY SM Solution You don t have to be a security expert to be compliant. Developer: 06 Rev: 05/03/2012 V: 1.0 Agenda Research Background Product Overview Steps to becoming

More information

Gateway Transportation Collaboration Forum. 21/01/2015 Gateway Transportation Collaboration Forum 1

Gateway Transportation Collaboration Forum. 21/01/2015 Gateway Transportation Collaboration Forum 1 Gateway Transportation Collaboration Forum 21/01/2015 Gateway Transportation Collaboration Forum 1 21/01/2015 Gateway Transportation Collaboration Forum 2 BACKGROUND AND CONTEXT 2006 Asia-Pacific Gateway

More information

A CMMS CASE STUDY: NEXGEN BOOSTS MAINTENANCE EFFICIENCY AND LABOR PRODUCTIVITY FOR CMSA

A CMMS CASE STUDY: NEXGEN BOOSTS MAINTENANCE EFFICIENCY AND LABOR PRODUCTIVITY FOR CMSA A CMMS CASE STUDY: NEXGEN BOOSTS MAINTENANCE EFFICIENCY AND LABOR PRODUCTIVITY FOR CMSA ABOUT CMSA Operational since 1985, the Central Marin Sanitation Agency (CMSA) operates the largest wastewater treatment

More information

Turn Stacked Summarized Bars into One Bridged Bar. Document No: SB001-P3 Revision No: Last Updated: March 18, 2003

Turn Stacked Summarized Bars into One Bridged Bar. Document No: SB001-P3 Revision No: Last Updated: March 18, 2003 BRIEF Here is a detailed Barchart schedule as shown below, which are grouped by Phase for one project. As we know, P3 can easily summarize them into the groups (See Figure 2). However, it would not be

More information

2019 CERTIFICATION TRAINING SCHEDULE

2019 CERTIFICATION TRAINING SCHEDULE 2019 CERTIFICATION TRAINING SCHEDULE COURSE TARGET AUDIENCE FEE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ISO 9001: Quality ISO 14001: Environmental ISO 45001: Occupational Health and Safety PECB

More information

Grade 4 Mathematics Pacing Guide

Grade 4 Mathematics Pacing Guide Jul 2014 ~ August 2014 ~ Sep 2014 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 Routines 19 Routines 20 Routines BOY 22 BOY 23 24 11 12 14 29 15 30 31 Notes: Found Online @ wwweverydaymathonlinecom 1 More Calendars

More information

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT IT Updates Maryland Health Benefit Exchange Board Meeting April 15, 2014 Presented by: Isabel FitzGerald Secretary, DoIT A service of Maryland Health Benefit Exchange Agenda Overview of process for CT

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary September, 2016 MTD MARKET UPDATE Data Current Through: September, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary Active, Pending, & Months Supply of Inventory 5,000 4,500 4,000 3,500 4,091

More information

Martin Purvis CEO. Presentation following the AGM. 26 April 2012

Martin Purvis CEO. Presentation following the AGM. 26 April 2012 Martin Purvis CEO Presentation following the AGM 26 April 212 IMPORTANT NOTICE Nothing in this presentation constitutes an offer of securities for sale. This presentation contains certain forward-looking

More information

OFFICE OF INTERNAL AUDIT Information Technology (IT) Audit Plan

OFFICE OF INTERNAL AUDIT Information Technology (IT) Audit Plan 2017 Information Technology (IT) Audit Plan Priority IT Audit Hours Start Duration 1 IT Vendors Selection (Procurement) 250 Apr 5-7 Weeks 2 Application Audit HUB (itslearning) 250 Apr 6 8 Weeks 3 Disaster

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary October, 2016 MTD MARKET UPDATE Data Current Through: October, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary Active, Pending, & Months Supply of Inventory 4,500 4,000 3,500 4,197 4,128

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603840F PE TITLE: Global Broadcast Service Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

More information

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego Maximizing Asset ROI for Self & Clients in a Public Sector Setting July 16 th San Diego State of Washington Population: 7.53 M Area: 71,303 Sq. Miles Population density: 107 population/mi² Puget Sound

More information

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015 San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015 Table of Contents Program Utilization Summary 3 PIC Reporting Rate 4-5 Operational Updates Recertifications and Inspections 6-7

More information

Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) July 2012

Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) July 2012 Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) 2 13 July 2012 1 Roll Call Region A Region B Region C Region D Region E Region F Region G Region H Region I STL UASI

More information

SAWS SSO Program Achievements

SAWS SSO Program Achievements SAWS SSO Program Achievements Jeff Haby, P.E. Vice President Production & Treatment September 21, 2018 September 21, 2018 Page 2 Path Forward Overview SAWS by the Numbers Consent Decree Key Elements Innovation

More information

Access Control and Physical Security Management. Contents are subject to change. For the latest updates visit

Access Control and Physical Security Management. Contents are subject to change. For the latest updates visit Access Control and Physical Security Management Page 1 of 6 Why Attend Today s security landscape requires individuals and businesses to take the threat to safety and security seriously. Safe and secure

More information

MHBE Compliance Program SECOND QUARTER FY 2019 REPORT. TO MHBE BOARD OF TRUSTEES January 22, 2019

MHBE Compliance Program SECOND QUARTER FY 2019 REPORT. TO MHBE BOARD OF TRUSTEES January 22, 2019 MHBE Compliance Program SECOND QUARTER FY 2019 REPORT TO MHBE BOARD OF TRUSTEES January 22, 2019 Presented by: Caterina Pañgilinan Audit Status Report Total Audit Findings Open Findings (3) SMART PY17

More information

MUC Archive - FTP Site Statistics. Top 20 Directories Sorted by Disk Space

MUC Archive - FTP Site Statistics. Top 20 Directories Sorted by Disk Space MUC Archive - FTP Site Statistics Property Value FTP Server ftp.muc.de Description MUC Archive Country Germany Scan Date 16/Nov/2015 Total Dirs 237 Total Files 1,033 Total Data 839.68 MB Top 20 Directories

More information

Previous Intranet Initial intranet created in 2002 Created solely by Information Systems Very utilitarian i Created to permit people to access forms r

Previous Intranet Initial intranet created in 2002 Created solely by Information Systems Very utilitarian i Created to permit people to access forms r ACHIEVA Cafe Steve McDonell Previous Intranet Initial intranet created in 2002 Created solely by Information Systems Very utilitarian i Created to permit people to access forms remotely Not much content

More information

Demand Estimation Sub Committee Ad-hoc Work Plan

Demand Estimation Sub Committee Ad-hoc Work Plan Demand Estimation Sub Committee Ad-hoc Work Plan Background The DESC Ad-hoc Work Plan was established in 2012 to capture any issues and ideas which arise during the year that DESC decide they may like

More information

Telecom Sector Outlook and Spectrum Trading: the Case of Pakistan

Telecom Sector Outlook and Spectrum Trading: the Case of Pakistan Telecom Sector Outlook and Spectrum Trading: the Case of Pakistan Shahbaz Nasir Pakistan Telecommunication Authority ITU Workshop on Economic Aspects of Spectrum Management 21 st 23 rd November 2016 Tehran

More information

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Working Session January 16 th, 2018

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Working Session January 16 th, 2018 North American Portability Management, LLC LNPA Transition Contingency Rollback Industry Working Session January 16 th, 2018 Agenda Resubmission Aid Issue 2 Refinements and updated plan Decision Process

More information

Powered by TCPDF (

Powered by TCPDF ( Powered by TCPDF (www.tcpdf.org) 1 FINANCE AND ACCOUNTING FOR NON-FINANCIAL PROFESSIONALS 28th Feb - 3rd Mar, 2017 1st - 4th Aug, 2017 2 MODERN APPROACHES TO CORPORATE AND INDIVIDUAL TAX COMPLIANCE 28th

More information

October Broward County Government Human Services Department. Community Partnerships Division FY2015 Provider Information

October Broward County Government Human Services Department. Community Partnerships Division FY2015 Provider Information October 2014 Broward County Government Human Services Department Community Partnerships Division FY2015 Provider Information TOPICS Provider Resources Invoicing Quarterly Reports Other Required Reports

More information

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants Training Schedule 2018 OUR SERVICES Asset Integrity Engineering Welding Engineering Consultancy Inspection Services API / ASME Training Welding Engineering NDT Services & Training # 4A, First Cross Street,

More information

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure

More information

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices Ed Batalla Director of Technology Florida Power & Light Company September 19, 2013 Florida

More information

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online CIMA Asia Interactive Timetable 2017 2018 Live Online Version 1 Information last updated 09 October 2017 Please note: Information and dates in this timetable are subject to change. CIMA Cert BA Course

More information

EVM & Project Controls Applied to Manufacturing

EVM & Project Controls Applied to Manufacturing EVM & Project Controls Applied to Manufacturing PGCS Canberra 6-7 May 2015 David Fox General Manager L&A Pressure Welding Pty Ltd Contents 1) Background Business & research context 2) Research Fitting

More information

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants Training Schedule Jan - June, 2018 OUR SERVICES Asset Integrity Engineering Welding Engineering Consultancy Inspection Services API / ASME Training Welding Engineering NDT Services & Training # 4A, First

More information

Canadian Association of Rocketry

Canadian Association of Rocketry Canadian Association of Rocketry CAR High Power Rocketry Level 1 3 Certification Program Overview The CAR HPR Level 1 3 Certification Program exists to allow rocketry enthusiasts access to rocket motors

More information

The Insider s Guide To Transfers. John Sweeting - Senior Director, Registration Services Cathy Clements Transfer Services Manager

The Insider s Guide To Transfers. John Sweeting - Senior Director, Registration Services Cathy Clements Transfer Services Manager The Insider s Guide To Transfers John Sweeting - Senior Director, Registration Services Cathy Clements Transfer Services Manager Overview Transfer Basics M&A Transfer Procedure & Tips Specified Recipient

More information

Versatile Link and GBT Chipset Production

Versatile Link and GBT Chipset Production and GBT Chipset Production Status, Issues Encountered, and Lessons Learned Lauri Olanterä on behalf of the and GBT projects Radiation Hard Optical Link Architecture: VL and GBT GBT GBT Timing & Trigger

More information

Page 1 of 13 Report Date: 16-May-2014 OPEN FAULT REPORT

Page 1 of 13 Report Date: 16-May-2014 OPEN FAULT REPORT Page 1 of 13 : 11014.7 NO STATUS A 03/05/2012 10:46 am 5 JA015264 10,045.2 #2 ENGINE COWLING HAS II COMPOSITE DAMAGE. ENGINE COWLING RESTRICTED FROM USE AS A WORK PLATFORM IAW H-60-11-ASAM-14 UNTIL REPLACED.

More information

URGENT: Cubist Pharmaceuticals issues Voluntary Nationwide Recall of Certain Lots of Cubicin (daptomycin for injection) 500 mg

URGENT: Cubist Pharmaceuticals issues Voluntary Nationwide Recall of Certain Lots of Cubicin (daptomycin for injection) 500 mg 3101 Gaylord Parkway Frisco, Texas 75034 P: 1.800.746.6273 www.asdhealthcare.com August 7, 2014 URGENT: Cubist Pharmaceuticals issues Voluntary Nationwide Recall of Certain Lots of Cubicin (daptomycin

More information

CLE Alabama. Banking Law Update. Embassy Suites Hoover Hotel Birmingham, Alabama Friday, February 19, 2016

CLE Alabama. Banking Law Update. Embassy Suites Hoover Hotel Birmingham, Alabama Friday, February 19, 2016 CLE Alabama Banking Law Update Embassy Suites Hoover Hotel Birmingham, Alabama Friday, February 19, 2016 Best Practices on Managing Cyber-Security Risks J.T. Malatesta III and Sarah S. Glover Maynard Cooper

More information

E-rate Program Integrity Assurance (PIA) Review Guide

E-rate Program Integrity Assurance (PIA) Review Guide E-rate Program Integrity Assurance (PIA) Review Guide Presented by Julie Tritt Schell PA E-rate Coordinator for the Pennsylvania Department of Education April 2019 You are here in the E-rate process: Plan

More information

State of Florida Enterprise

State of Florida Enterprise State of Florida Enterprise E-mail Florida House of Representatives Appropriations Committee October 6, 2011 AGENCY FOR ENTERPRISE INFORMATION TECHNOLOGY David Taylor, Executive Director Coleen Birch,

More information

Information Technology Services. Informational Report for the Board of Trustees October 11, 2017 Prepared effective August 31, 2017

Information Technology Services. Informational Report for the Board of Trustees October 11, 2017 Prepared effective August 31, 2017 Information Technology Services Informational Report for the Board of Trustees October 11, 2017 Prepared effective August 31, 2017 Information Technology Services TABLE OF CONTENTS UPDATE ON PROJECTS &

More information

Certificate in Security Management

Certificate in Security Management Certificate in Security Management Page 1 of 6 Why Attend This course will provide participants with an insight into the fundamentals of managing modern and effective security operations. It will address

More information

INTERTANKO Vetting seminar 24 th October 2017

INTERTANKO Vetting seminar 24 th October 2017 INTERTANKO Vetting seminar 24 th October 2017 SIRE Developments VIQ 7 New VIQ being developed Structure will remain the same with 13 chapters. Reduction in the number of questions, net approx. 70 decrease.

More information

Index of Technical Publications Issued on 27 November 2015 NOR

Index of Technical Publications Issued on 27 November 2015 NOR P.68 Variants (Including Partenavia P.68 and AP68TP Variants) Index of Technical Publications Issued on 27 November 2015 NOR10.763-1 i Total pages 13 Flight Manuals AIRCRAFT TYPE P.68 NOR10.707-12 6 APR

More information

For Official Use Only

For Official Use Only Born of Necessity Federal agencies with authority governing the safety of products imported into the United States acknowledge the need to share information about the safety of those products In response

More information

Annex 2. Procurement Plan by VEA/ISEA PMU for 2011

Annex 2. Procurement Plan by VEA/ISEA PMU for 2011 losure uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized nnex 2. Procurement Plan by V/IS PMU for 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Pack. Comp.

More information

Automatic Renewal Using DIY Technology to Create an Improved Patron Experience

Automatic Renewal Using DIY Technology to Create an Improved Patron Experience Using DIY Technology to Create an Improved Patron Experience Samantha Jekot-Graham, Patron Experience Lead Phil Feilmeyer, System Integration What is automatic renewal? A service that automatically renews

More information

Freedom of Information Act 2000 reference number RFI

Freedom of Information Act 2000 reference number RFI P. Norris By email to: xxxxxxxxxxxxxxxxxxxxxx@xxxxxxxxxxxxxx.xxm 02 November 2011 Dear P. Norris Freedom of Information Act 2000 reference number RFI20111218 Thank you for your request under the Freedom

More information

Monthly Statistical Digest

Monthly Statistical Digest Tucson Association of REALTORS Monthly Statistical Digest July 27 FOR IMMEDIATE RELEASE: August 13, 27 CONTACT: Judy Lowe, President - (52) 529-5189 Rick Hodges, CEO - (52) 327-4218 LETTER FROM THE PRESIDENT

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0604853F PE TITLE: Evolved Expendable Launch - EMD Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Launch - EMD 0004 (U) Cost ($ in Millions) FY 2004 FY 2005

More information

July RFC Editor Report. 69th IETF Meeting Chicago, Illinois. IETF 69 RFC Editor 1

July RFC Editor Report. 69th IETF Meeting Chicago, Illinois. IETF 69 RFC Editor 1 July 2007 RFC Editor Report 69th IETF Meeting Chicago, Illinois IETF 69 RFC Editor 1 IETF 69 RFC Editor Office Hours at IETF 69 Monday - Wednesday 9:30-4:00 RFC Editor Tutorial Sunday @ 3:00 pm Slides

More information

ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION

ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION Cathy Bates Senior Consultant, Vantage Technology Consulting Group January 30, 2018 Campus Orientation Initiative and Project Orientation Project

More information

2

2 May 2016 1 2 3 4 5 A. Consumer Confidence Index (CCI) - Consumer Confidence Index (CCI) - Current Economic Condition Index (CECI) - Consumer Expectation Index (CEI) Current Economic Condition Index - Current

More information

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud with SAP Hybris Marketing Cloud Courses Listed HY760 - SAP Hybris Marketing Cloud C_HYMC_1702 - SAP Certified Technology Associate - SAP Hybris Marketing Cloud (1702) Implementation Page 1 of 12 All available

More information

FedRAMP: Understanding Agency and Cloud Provider Responsibilities

FedRAMP: Understanding Agency and Cloud Provider Responsibilities May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration

More information

2

2 March 2016 1 2 3 4 5 A. Consumer Confidence Index (CCI) - Consumer Confidence Index (CCI) - Current Economic Condition Index (CECI) - Consumer Expectation Index (CEI) Current Economic Condition Index -

More information

Transition Implementation Status Reporting. 31 March 2016

Transition Implementation Status Reporting. 31 March 2016 Transition Implementation Status Reporting 31 March 2016 Content 1. Overall Timeline 2. Status Update 3. Projects Plans 2 Overall Timeline Implementation Timeline Proposals Delivered in Mar. 2016 Nov Dec

More information

2

2 February 2015 1 2 3 4 5 A. Consumer Confidence Index (CCI) - Consumer Confidence Index (CCI) - Current Economic Condition Index (CECI) - Consumer Expectation Index (CEI) Current Economic Condition Index

More information

Privacy and Proxy Service Provider Accreditation. ICANN58 Working Meeting 11 March 2017

Privacy and Proxy Service Provider Accreditation. ICANN58 Working Meeting 11 March 2017 Privacy and Proxy Service Provider Accreditation ICANN58 Working Meeting 11 March 2017 Agenda 13:45-15:00 15:00-15:15 15:15-16:45 Timeline Check; Policy Document Update; Third- Party Requests Break PSWG

More information

COMMISSIONED CONTENT REPORT November 2014

COMMISSIONED CONTENT REPORT November 2014 COMMISSIONED CONTENT REPORT November 214 (Reporting July Sept 214 Data) NICE COMMISSIONED CONTENT REPORT November 214 1 of 25 Contents All HEE LKSL Purchased Content Total Searches and Sessions (Data Source:

More information

NFX MARKET DATA FEED INTERFACE SPECIFICATIONS. NFX Market Data Feed

NFX MARKET DATA FEED INTERFACE SPECIFICATIONS. NFX Market Data Feed NFX Market Data Feed Table of Contents 1 INTRODUCTION... 3 1.1 PURPOSE... 3 1.2 ARCHITECTURE... 3 2 SESSION CHARACTERISTICS... 4 2.1 REAL-TIME PRODUCTION DATA... 4 2.2 PRE-LAUNCH TEST DATA... 4 2.3 TRANSMISSION

More information

IT Services Executive Summary August 2017 KPI (974) (4106) Incidents 89% Requests 95% (4) (100) P1 Inc. 80% P2 Inc. 80% Incident and Service Request KPIs were expected to breach mainly due to the resourcing

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

Getting in Gear with the Service Catalog

Getting in Gear with the Service Catalog Getting in Gear with the Service Catalog How an actionable Service Catalog can drive Service Management adoption, improve Customer Satisfaction and provide a Return On Investment......And do it quickly

More information

MULTI-YEAR TRAINING AND EXERCISE PLAN. Boone County Office of Emergency Management

MULTI-YEAR TRAINING AND EXERCISE PLAN. Boone County Office of Emergency Management 2017-2019 MULTI-YEAR TRAINING AND EXERCISE PLAN Boone County Office of February 2017 PREFACE The utilizes a coordinated preparedness strategy that combines enhanced planning, resource acquisition, innovative

More information

Network Rationalization Update

Network Rationalization Update TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Network Rationalization Update October 15, 2014 Subtitle (20pt. Arial, Bold, Title Case) Dave Williams FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) 1

More information

Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899)

Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899) Operation Name: Energy Community

More information

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Practitioner s Group February 11 th, 2015 Overview Background

More information

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017 North American Portability Management, LLC Transition Oversight Manager TOEP Webcast November 7, 2017 Welcome to today s webcast Submit Questions for Q&A Webcast Issues Click the Q&A widget at the bottom

More information