1 ESRP Stora Program EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 Teted with: ESRP Stora Verion 3. Teted Date: 3/2/21 EMC Corporation Corporate Headquarter Hopkinton, MA

2 EMC believe the information in thi publication i accurate a of it publication date. The information i ubject to chan without notice. The information in thi publication i provided a i. EMC Corporation make no repreentation or warrantie of any kind with repect to the information in thi publication, and pecifically diclaim implied warrantie of merchantability or fitne for a particular purpoe. Ue, copying, and ditribution of any EMC oftware decribed in thi publication require an applicable oftware licene. For the mot up-to-date regulatory document for your product line, go to the Technical Documentation and Adviorie ection on EMC Powerlink. For the mot up-to-date liting of EMC product name, ee EMC Corporation Trademark on EMC.com. All other trademark ued herein are the property of their repective owner. Copyright 21 EMC Corporation. All right reerved. Publihed May, 21 EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 Part number h7137 EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 2

3 Content Overview... 4 Diclaimer... 4 Feature... 4 Solution Decription... Tarted Cutomer Profile... 9 Teted Deployment... 9 Simulated Exchan Configuration... 9 Stora Hardware... 1 Stora Software... 1 Stora Dik Configuration (Mailbox Store Dik) Stora Dik Configuration (Tranactional Dik) Bet Practice Core Stora Backup trategy Contact Information Tet Reult Summary Reliability Stora Performance Reult Backup/Recovery Performance Only Performance Tranaction Recovery/Replay Performance Concluion... 1 Appendix A: Stre Tet Report Reult (24 hour performance tet)... 1 Microoft Exchan Server Jettre... 1 Stre Tet Reult Report... 1 Stre tet report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Appendix B: Performance Tet Reult... 2 Microoft Exchan Server Jettre... 2 Performance Tet Reult Report... 2 Performance tet report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Appendix C: Maximum Solution IOPS Tet Reult... 2 Microoft Exchan Server Jettre... 2 Performance Tet Reult Report... 2 Tet Summary... 2 Maximum Solution Tet Report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Appendix D: SoftRecovery Tet Reult... 3 Microoft Exchan Server Jettre... 3 SoftRecovery Tet Reult Report... 3 SoftRecovery Tet Report Tet Reult Microoft Exchan Server Jettre SoftRecovery Tet Reult Report EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 3

4 Overview Thi document provide information on an EMC Celerra NS-12 tora olution for Microoft Exchan Server, bd on the Microoft Exchan Solution Reviewed Program (ESRP) Stora program*. For any quetion or comment regarding the content of thi document, ee Contact Information. *The ESRP Stora program wa developed by Microoft Corporation to provide a common tora teting framework for vendor to provide information on it tora olution for Microoft Exchan Server oftware. For more detail on the Microoft ESRP Stora program, viit the webite Diclaimer Thi document ha been produced independently of Microoft Corporation. Microoft Corporation exprely diclaim reponibility for, and make no warranty, expre or implied, with repect to, the accura of the content of thi document. The information contained in thi document repreent the current view of EMC on the iue dicued a of the date of publication. Due to changing market condition, it hould not be interpreted to be a commitment on the part of EMC, and EMC cannot guarantee the accura of any information preented after the date of publication. Feature Thi document decribe an approach that can be ued to configure Microoft Exchan 21 with an EMC Celerra NS-12 tora ytem. The EMC Celerra NS-12 meet the tora need of a wide ran of application that include: Mail/Meaging File/Print and web ervice Ditributed application Remote replication In addition, the NS-12 upport a wide ran of erver operating ytem uch a Microoft Window, Linux, Solari, AIX, and HP-UX. Celerra NS-12 i a high performance, full function IP tora platform. It deliver NAS and iscsi capabilitie to conolidate application tora and file erver. Eay to deploy and imple to mana, the NS-12 i all-in-one IP EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 4

5 tora for cutomer looking for enterprie-cla capabilitie packad for pecific application, department, and location. Celerra NS-12 alo upport optical Fibre Channel connection. Regardle of the configuration, Celerra platform offer a full uite of advanced functionality: Robut nap and replication capabilitie offer protection of data Celerra File Mover API offer automated poli-bd movement of file between tier of tora File-level retention provide dik-bd Write Once Many (WORM) functionality, which i ueful for archiving Exchan Automated volume manament and Virtual Proviioning TM improve tora utilization The performance reult and bet practice decribed in thi document provide proven guideline for configuring Celerra NS-12 for high performance Exchan environment. For thi olution, an integrated Celerra NS-12 tora ytem with 4 GB 1k rpm FC dik wa ued and configured for 1, Exchan 21 uer. Each of the 1, uer had a very heavy profile of.1 IOPS and a mailbox ize of 2 GB. Solution Decription Sizing and configuring tora for Exchan Server i a complicated proce, driven by many variable and factor, which vary with different organization. The izing approach taken in thi olution i bd on performance, capacity, calability, and reliability to meet and exceed the Microoft Exchan Server recommended metric. Thi olution utilize three copie of each Exchan datab. Two of thee copie are on the primary ite tora array. To provide additional protection, a third copy of each datab i placed on a econdary ite tora array. The tora in the primary ite i configured on two different helve of Celerra NS-12 with three RAID (4+1) group in each helf and the tora in the econdary ite i configured on a ingle helf of Celerra NS-12 with three RAID (4+1) group. Each RAID group hold one datab and the log for the next datab. That mean, the firt RAID group hold the log for the econd datab, the econd RAID group hold the log for the third datab and the third RAID group hold the log for the firt datab. Thi tora deign enure that each datab and it correponding log are in different RAID group. Thi tora deign can be followed by any organization to implement a Availability Group (DAG) configuration. A DAG i a et of mailbox erver that ue continuou replication to provide automatic recovery in the event of failure. A DAG may contain up to 16 mailbox erver, each having a replicated copy of the production datab EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21

6 and log file. When three copie are ued within a DAG, EMC recommend that the third copy i placed on a eparate tora array. Thi will enure high availability within the ite and between two ite. If thi dik layout i properly configured, it will match Microoft Exchan Server recommendation of a well-performing ytem from both a dik capacity and end-uer perpective. In thi particular teting one erver wa ued to imulate the Exchan environment. Table 1 decribe the characteritic of the tora configuration. Table 1: Stora Configuration Number of uer 1, Number of Exchan Server 3 IOPS per uer.18 (including 2% overhead) Mailbox ize 2 GB Number of dik required for 1 datab and log Dik type 4 GB 1k FC drive RAID type RAID (4+1) Uing the performance characteritic of Celerra NS-12 architecture, dik drive (4 GB, 1k) and 1 pindle with capability are required to provide the neceary performance to match the requirement of 1, uer with.18 IOPS and a 3:2 read/write ratio. Figure 1 how the reference architecture for the teted Exchan olution on Celerra NS-12. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 6

7 Figure 1: Reference Architecture Figure 2 how the dik layout for the teted Exchan olution on Celerra NS-12. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 7

8 Production Site NS R (4GB 1K FC) 4+1 R (4GB 1K FC) 4+1 R (4GB 1K FC) DB1,2 Copy 1 DB2, 3 - Copy 1 DB3,1 - Copy R (4GB 1K FC) 4+1 R (4GB 1K FC) 4+1 R (4GB 1K FC) DB1,2 Active DB2, 3 - Active DB3,1 - Active HS Celerra Sytem Drive Diater Recovery Site NS R (4GB 1K FC) 4+1 R (4GB 1K FC) 4+1 R (4GB 1K FC) DB1,2 Copy 2 DB2, 3 - Copy 2 DB3,1 - Copy 2 HS Celerra Sytem Drive Figure 2: Dik Configuration The 1, uer are evenly ditributed among three Exchan datab. Each RAID group hold both datab and log but the log are not of the ame datab. The two dik volume in each RAID group are concatenated into one metavolume. The firt RAID group hold DB1 and 2, the econd RAID group hold DB2 and 3, and the third RAID group hold DB3 and 1. The ESRP-Stora program focue on tora olution teting to addre performance and reliability iue with tora deign. However, tora i not the only factor to take into conideration when deigning a cale-up Exchan olution. Other factor that affect the erver calability are erver proceor utilization, phyical erver and virtual memory limitation, reource requirement for other application, directory and network ervice latencie, network infratructure limitation, replication and recovery requirement, and client ua profile. All thee factor are beyond the cope for ESRP-Stora. Therefore, the number of mailboxe hoted per erver a part of the teted configuration may not necearily be viable for ome cutomer deployment. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 8

9 For more information on identifying and addreing performance bottleneck in an Exchan ytem, refer to Troublehooting Microoft Exchan Server Performance, available at Tarted Cutomer Profile The olution i intended for medium-to-lar enterprie Exchan cutomer to conolidate Exchan uer on a high-performance, highly-available tora platform. Thi olution i deigned to upport 1, Exchan uer with the following aumption: Three Exchan Jettre Server Uer profile teted Very heavy (.1 per uer) Uer mailbox ize - 2 GB Three Exchan datab per erver DAG ued for mailbox reilien Teted Deployment The table in thi ection ummarize the teting environment. Simulated Exchan Configuration Table 2 decribe the imulated exchan configuration. Table 2: Simulated Exchan Configuration Number of Exchan mailboxe 1, imulated Number of Availability 3 Group (DAG) Number of erver/dag 3 Number of active mailboxe/erver 1, Number of datab/hot 3 Number of copie/datab 3 Number of mailboxe/datab Simulated profile: per econd.18 per mailbox (IOPS, include 2% headroom) LUN ize 1,4 GB LUN ize 4 GB Total datab ize for performance 3,36 GB teting % tora capacity ued by 8% Exchan datab** **Stora performance characteritic chan bd on the percenta utilization of the individual dik. Tet that ue a mall EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 9

10 percenta of the tora (~2 percent) may exhibit reduced throughput if the tora capacity utilization i ignificantly incred beyond what i teted in thi paper. Stora Hardware Table 3 decribe the tora hardware. Table 3: Hardware Stora connectivity (Fibre Channel, iscsi SAS, SATA, iscsi) Stora model and OS/firmware EMC Celerra NS-12 and EMC DART reviion Stora cache 2 GB plit for /Write Number of tora controller 4 (2 front end and 2 back end) Number of tora port 4 (total 8 port of which 4 are paive/redundant) Maximum bandwidth of tora 2 x 1 Gb/S iscsi, total bandwidth connectivity to hot 2 Gb/ Switch type/model/firmware reviion Cico/69-E/IOS Verion 12.2 HBA model and firmware Broadcom BCM78C NetXtreme II GigE (NDIS VBD Client) without jumbo frame enabled Number of HBA/hot 2 dual port HBA Hot erver type Server 29 with 4 x Intel 2.99 GHz Xeon CPU and 32 GB memory Total number of dik teted in 1 olution Maximum number of pindle that 12 can be hoted in the tora Stora Software Table 4 decribe the tora oftware. Table 4: Stora Software HBA driver HBA QueueTart Setting HBA QueueDepth Setting Multipathing Hot OS ESE.dll file verion Replication olution name/verion N/A Microoft iscsi oftware initiator inbuilt with Microoft Window Server 28 R2 64-bit N/A N/A MCS with round-robin poli Microoft Window Server 28 R2 64-bit EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 1

11 Stora Dik Configuration (Mailbox Store Dik) Table lit the tora dik configuration for the environment Table : Stora Dik Configuration Dik type, peed and firmware 1k rpm Fibre Channel dik reviion Raw capacity per dik (GB) 4 GB Number of phyical dik in tet 1 Total raw tora capacity (GB) 6 GB Dik lice ize(gb) N/A Number of lice per LUN or dik per 2 LUN number of dik per LUN RAID-level RAID (4+1) Total formatted capacity 42 GB Stora capacity utilization 7% capacity utilization 6% Stora Dik Configuration (Tranactional Dik) Table 6 decribe the tora dik configuration of tranactional log dik for the environment. The tranactional log dik utilize the ame dik a the mailbox tore datab. Table 6: Stora Dik Configuration Dik type, peed, and firmware 1k rpm Fibre Channel dik reviion Raw capacity per dik (GB) 4 GB Number of pindle in tet 1 Total raw tora capacity (GB) 6, GB Dik lice ize (GB) N/A Number of lice per LUN or number dik per 2 LUN of dik per LUN RAID level RAID (4+1) Total formatted capacity 12 GB Bet Practice In thi olution, each RAID (4+1) configuration atifie the capacity and performance requirement for uer with a mailbox ize of 2 GB and a uer profile of.18 IOP (including 2 percent overhead), enuring that repone time remain well within the required Microoft threhold. Once the number of dik i determined for the original Exchan data, thi number mut be caled up to atify each copy of the data within a DAG. Microoft Exchan Server 21 ha chand ignificantly ince early verion of Exchan, particularly when it come to and tora. There EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 11

12 have been many chan to the core chema and the extenible tora engine (ESE) to reduce. The chan alo allow the ue of RAID a an optimal RAID configuration. For more information on EMC olution for Microoft Exchan Server, refer to Exchan erver i a dik-intenive application. Bd on the teting run uing the ESRP framework, EMC recommend the Exchan 21 bet practice to improve the tora performance. For Exchan 27 bet practice on tora deign, viit the webite Core Stora Bd on the teting run uing an ESRP framework, EMC recommend the following bet practice to improve the tora performance with Exchan olution: 1. Ue the default alignment (in Microoft Window 28) while creating volume for Microoft Exchan related dik. Format the iscsi dik with a 64 KB boundary. 2. Iolate Microoft Exchan erver datab workload from other intenive application or workload. Thi enure the highet level of performance for Exchan and implifie troublehooting in the event of a dik-related Microoft Exchan performance iue. 3. When DAG i being ued with a minimum of three datab copie, the maximum datab ize can be up to 2 TB. 4. Performance and capacity hould be the primary conideration while izing and configuring the dik. In other word, keep the mailbox ize requirement in mind while tuning for the bet performance.. The network traffic between the Exchan Server and the tora for iscsi traffic hould be iolated from the manament network and other network in the data center to t bet performance. Backup trategy N/A EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 12

13 Contact Information EMC recommend you to conult the EMC profeional ervice to ait with the deign and development of a imilar olution. For information regarding thi or any other EMC olution, ue the following number: United State: (8) (SVC-4EMC) Canada: (8) (43-4SVC) Worldwide: (8) For additional information on EMC product and ervice available to cutomer and partner, refer to or Tet Reult Summary Thi ection provide a high-level ummary of the tet data from ESRP and the link to the detailed html report, which are nerated by the ESRP teting framework. Reliability A number of tet in the framework are to check Reliability tet run for 24 hour. The goal i to verify if the tora can handle high load for a long period of time. Both log and datab file are analyzed for integrity after the tre tet to enure there i no datab or log corruption. The reliability tet executed on EMC Celerra NS-12 provided the following reult: No error are reported on the event log file for tora reliability teting No error reported during the datab and log checkum proce Appendix A: Stre Tet report (24 hour performance tet) provide the Jettre performance reult (24-hour performance tet). Stora Performance Reult The Primary Stora performance teting i deigned to exercie the tora with a maximum utainable Exchan type of for 2 hour. The tet i to how how long it take for the tora to repond to an under load. The data below i the um of all of the logical dik and avera of all the logical dik laten in the 2-hour tet duration. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 13

14 Individual Server Metric Table 7 how the um of acro all datab and the avera laten acro all the datab on the Exchan Server. Table 7: Individual Server Metric Dik Tranfer/ec 367 Dik /ec 29.2 Dik Write/ec Dik (m) Dik-Write.9 (m) Tranaction log Dik Write/ec Dik-Write 2.73 (m) Appendix B: Performance Tet Reult provide the 2-hour Jettre performance tet reult. Appendix C: Maximum Solution IOPS tet provide reult that characterize the maximum performance of the dik layout. Backup/Recovery Performance There are two tet report in thi ection. The firt tet i to meaure the equential read rate of the datab file, and the econd tet i to meaure the recovery/replay performance (playing tranaction log in to the datab). -Only Performance The tet i to meaure the maximum rate at which datab could be backed up uing VSS. Table 8 how the avera rate for a ingle datab file. Table 8: -Only Performance MB read/ec per datab MB read/ec total per erver N/A N/A Tranaction Recovery/Replay Performance Thi tet i to meaure the maximum rate at which the log file can be replayed againt the datab. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 14

15 Table 9 how the avera rate for log file played in a ingle tora group. Each log file i 1 MB in ize. Table 9: Tranaction Recovery/Replay Performance time to play one file 2.79 (e Appendix D: SoftRecovery Tet Reult how the reult that characterize the log replay performance. Concluion A thi document illutrate, EMC Celerra NS-12 i more than capable of upporting deployment of up to 1, uer at.18 IOPS per uer. A careful analyi of each environment mut be performed to undertand the pecific requirement of the architecture and to adopt a olution that bet fit thoe need. The information included in thi document verifie that the NS-12 can upport a high-performance Exchan configuration. Thi document i developed by EMC, and reviewed by the Microoft Exchan Product team. The tet reult/data preented in thi document are bd on the tet introduced in the ESRP tet framework. Cutomer hould not quote the data directly for the pre-deployment verification. It i till neceary to go through the exercie to validate the tora deign for a pecific cutomer environment. ESRP program i not deigned to be a benchmarking program; tet are not deigned to tting the maximum throughput for a given olution. Rather, it i focued on producing recommendation from vendor for Exchan application. So the data preented in thi document hould not be ued for direct comparion among the olution. Appendix A: Stre Tet Report Reult (24 hour performance tet) Microoft Exchan Server Jettre Stre Tet Reult Report Tet Summary Overall Tet Pa Reult Machine Name RTPSOL39 Tet Decription Tet Start Time 3/2/21 9:1:2 PM Tet End Time 3/26/21 9:18:4 PM Jettre Verion EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 1

16 Ee Verion Operating Sytem Performance Window Server 28 R2 Enterprie ( ) C:\Program File\Exchan Jettre\Reult\Stre_21_3_2_21_16_3.blg C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_26_21_18_4.blg Sizing and Throughput Achieved Tranactional per Second Capacity Percenta 1% Throughput Percenta 1% Initial Size (byte) Final Size (byte) File (Count) 3 Jettre Sytem Parameter Thread Count 3 (per datab) Minimum Cache 96. MB Maximum Cache 768. MB Inert Operation 4% Delete Operation 2% Replace Operation % Operation 3% Lazy Commit 7% Run Background Maintenance True Number of Copie per 3 Configuration Intance Path: J:\ : G:\db1\Jettre11.edb Intance Path: H:\ : F:\db2\Jettre21.edb Intance Path: E:\ : I:\db3\Jettre31.edb Tranactional Performance MSExchan ==> Intance (me Write (me /ec Write /ec Byte Write Byte a n (me Writ e a n (me /ec Write /ec a Byte Write Byte EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 16

17 Intance Intance Intance Background Maintenance Performance MSExchan ==> Intance Maintenance IO /ec Intance Intance Intance Maintenance IO Byte Replication Performance MSExchan ==> Intance /ec Byte Intance Intance Intance Total Performance MSExcha n ==> Intance Intance Intance Intance Data b (me Data b Write (me /ec Write /ec Byte Write Byte a n (me Writ e /ec a n (me Write /ec g e Byte Write Byte Hot Sytem Performance Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Pa Fault Stall/ec... EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 17

18 Tet 3/2/21 9:1:2 PM -- Jettre teting begin... 3/2/21 9:1:2 PM -- Prepare teting begin... 3/2/21 9:1:7 PM -- Attaching datab... 3/2/21 9:1:7 PM -- Prepare teting end. 3/2/21 9:1:7 PM -- Dipatching tranaction begin... 3/2/21 9:1:7 PM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/2/21 9:1:7 PM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/2/21 9:16:3 PM -- read laten threhold: (avera: 2 mec/read, maximum: 1 mec/read). 3/2/21 9:16:3 PM -- write laten threhold: (avera: 1 mec/write, maximum: 1 mec/write). 3/2/21 9:16:7 PM -- Operation mix: Seion 3, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/2/21 9:16:7 PM -- Performance logging begin (interval: 1 m). 3/2/21 9:16:7 PM -- Attaining prerequiite: 3/2/21 9:18:46 PM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/26/21 9:18:46 PM -- Performance logging end. 3/26/21 9:18:46 PM -- JetInterop batch tranaction tat: 21129, 2171, and /26/21 9:18:46 PM -- Dipatching tranaction end. 3/26/21 9:18:46 PM -- Shutting down datab... 3/26/21 9:18:4 PM -- Intance (complete), Intance (complete), and Intance (complete) 3/26/21 9:18:4 PM -- Performance logging begin (interval: 3 m). 3/26/21 9:18:4 PM -- Verifying datab checkum... 3/27/21 3:4:9 AM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/27/21 3:4:9 AM -- Performance logging end. 3/27/21 3:4:9 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_26_21_18_4.blg ha 69 ample. 3/27/21 3:4:12 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_26_21_18_4.html i aved. 3/27/21 3:4:12 AM -- Verifying log checkum... 3/27/21 3:4:13 AM -- J:\ (7 log() proceed), H:\ (6 log() proceed), and E:\ (7 log() proceed) 3/27/21 3:4:13 AM -- C:\Program File\Exchan Jettre\Reult\Stre_21_3_2_21_16_3.blg ha 767 ample. 3/27/21 3:4:13 AM -- Creating tet report... 3/27/21 3:4:36 AM -- Intance ha 13.4 for. 3/27/21 3:4:36 AM -- Intance ha 3.3 for Write. 3/27/21 3:4:36 AM -- Intance ha 3.3 for. 3/27/21 3:4:36 AM -- Intance ha 12.9 for. 3/27/21 3:4:36 AM -- Intance ha 3.2 for Write. 3/27/21 3:4:36 AM -- Intance ha 3.2 for. 3/27/21 3:4:36 AM -- Intance ha 13. for. 3/27/21 3:4:36 AM -- Intance ha 3.3 for Write. 3/27/21 3:4:36 AM -- Intance ha 3.3 for. 3/27/21 3:4:36 AM -- Tet ha Maximum Pa Fault Stall/ec. 3/27/21 3:4:36 AM -- Tet ha Pa Fault Stall/ec ample higher than. 3/27/21 3:4:36 AM -- C:\Program File\Exchan Jettre\Reult\Stre_21_3_2_21_16_3.xml ha 76 ample queried. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 18

19 Stre tet report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Checkum Statitic - All Seen pa Bad pa Correctable pa Wrong panumber pa File length / econd taken G:\db1\Jettre11.edb MByte / 2713 ec F:\db2\Jettre21.edb MByte / 198 ec I:\db3\Jettre31.edb MByte / ec (Sum) MByte / 2714 ec Dik Subytem Performance (of checkum) icaldik Avg. Dik ec/ Avg. Dik ec/write Dik /ec Dik Write/ec Avg. Dik Byte/ G: F: I: Memory Sytem Performance (of checkum) Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Tet 3/2/21 9:1:2 PM -- Jettre teting begin... 3/2/21 9:1:2 PM -- Prepare teting begin... 3/2/21 9:1:7 PM -- Attaching datab... 3/2/21 9:1:7 PM -- Prepare teting end. 3/2/21 9:1:7 PM -- Dipatching tranaction begin... 3/2/21 9:1:7 PM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/2/21 9:1:7 PM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/2/21 9:16:3 PM -- read laten threhold: (avera: 2 mec/read, maximum: 1 mec/read). 3/2/21 9:16:3 PM -- write laten threhold: (avera: 1 mec/write, maximum: 1 mec/write). 3/2/21 9:16:7 PM -- Operation mix: Seion 3, Inert 4%, Delete 2%, Replace %, EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 19

20 3%, Lazy Commit 7%. 3/2/21 9:16:7 PM -- Performance logging begin (interval: 1 m). 3/2/21 9:16:7 PM -- Attaining prerequiite: 3/2/21 9:18:46 PM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/26/21 9:18:46 PM -- Performance logging end. 3/26/21 9:18:46 PM -- JetInterop batch tranaction tat: 21129, 2171, and /26/21 9:18:46 PM -- Dipatching tranaction end. 3/26/21 9:18:46 PM -- Shutting down datab... 3/26/21 9:18:4 PM -- Intance (complete), Intance (complete), and Intance (complete) 3/26/21 9:18:4 PM -- Performance logging begin (interval: 3 m). 3/26/21 9:18:4 PM -- Verifying datab checkum... 3/27/21 3:4:9 AM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/27/21 3:4:9 AM -- Performance logging end. 3/27/21 3:4:9 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_26_21_18_4.blg ha 69 ample. Appendix B: Performance Tet Reult Microoft Exchan Server Jettre Performance Tet Reult Report Tet Summary Overall Tet Pa Reult Machine Name RTPSOL39 Tet Decription Tet Start Time 3/22/21 6:1:21 AM Tet End Time 3/22/21 8:18:1 AM Jettre Verion Ee Verion Operating Sytem Window Server 28 R2 Enterprie ( ) Performance C:\Program File\Exchan Jettre\Performance_21_3_22_6_1_31.blg C:\Program File\Exchan Jettre\DBCheckum_21_3_22_8_18_1.blg Sizing and Throughput Achieved Tranactional per Second Capacity Percenta 1% Throughput Percenta 1% Initial Size (byte) Final Size (byte) File (Count) 3 Jettre Sytem Parameter Thread Count 3 (per datab) EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 2

21 Minimum Cache 96. MB Maximum Cache 768. MB Inert Operation 4% Delete Operation 2% Replace Operation % Operation 3% Lazy Commit 7% Run Background Maintenance True Number of Copie per 3 Configuration Intance Path: J:\ : G:\db1\Jettre11.edb Intance Path: H:\ : F:\db2\Jettre21.edb Intance Path: E:\ : I:\db3\Jettre31.edb Tranactional Performance MSExchan ==> Intance Intance Intance Intance (me Write (me /ec Write /ec Byte Write Byte a n (me... Writ e a n (me /ec Write /ec a Byte... Write Byte Background Maintenance Performance MSExchan ==> Intance Maintenance IO /ec Intance Intance Intance Maintenance IO Byte Replication Performance MSExchan ==> Intance /ec Byte Intance EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 21

22 Intance Intance Total Performance MSExcha n ==> Intance Intance Intance Intance Data b (me Data b Write (me /ec Write /ec Byte Write Byte a n (me Writ e /ec a n (me Write /ec g e Byte Write Byte Hot Sytem Performance Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Pa Fault Stall/ec... Tet 3/22/21 6:1:21 AM -- Jettre teting begin... 3/22/21 6:1:21 AM -- Prepare teting begin... 3/22/21 6:1:26 AM -- Attaching datab... 3/22/21 6:1:26 AM -- Prepare teting end. 3/22/21 6:1:26 AM -- Dipatching tranaction begin... 3/22/21 6:1:26 AM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/22/21 6:1:26 AM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/22/21 6:1:31 AM -- read laten threhold: (avera: 2 mec/read, maximum: mec/read). 3/22/21 6:1:31 AM -- write laten threhold: (avera: 1 mec/write, maximum: mec/write). 3/22/21 6:1:3 AM -- Operation mix: Seion 3, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/22/21 6:1:3 AM -- Performance logging begin (interval: 1 m). 3/22/21 6:1:3 AM -- Attaining prerequiite: 3/22/21 6:18:6 AM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/22/21 8:18:6 AM -- Performance logging end. 3/22/21 8:18:6 AM -- JetInterop batch tranaction tat: 271, 278, and /22/21 8:18:7 AM -- Dipatching tranaction end. 3/22/21 8:18:7 AM -- Shutting down datab... 3/22/21 8:18:1 AM -- Intance (complete), Intance (complete), and EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 22

23 Intance (complete) 3/22/21 8:18:11 AM -- Performance logging begin (interval: 3 m). 3/22/21 8:18:11 AM -- Verifying datab checkum... 3/22/21 1:6:4 PM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/22/21 1:6:4 PM -- Performance logging end. 3/22/21 1:6:4 PM -- C:\Program File\Exchan Jettre\DBCheckum_21_3_22_8_18_1.blg ha 676 ample. 3/22/21 1:6:43 PM -- C:\Program File\Exchan Jettre\DBCheckum_21_3_22_8_18_1.html i aved. 3/22/21 1:6:43 PM -- Verifying log checkum... 3/22/21 1:6:44 PM -- J:\ (6 log() proceed), H:\ (7 log() proceed), and E:\ (7 log() proceed) 3/22/21 1:6:44 PM -- C:\Program File\Exchan Jettre\Performance_21_3_22_6_1_31.blg ha 489 ample. 3/22/21 1:6:44 PM -- Creating tet report... 3/22/21 1:6:46 PM -- Intance ha 13. for. 3/22/21 1:6:46 PM -- Intance ha 2.8 for Write. 3/22/21 1:6:46 PM -- Intance ha 2.8 for. 3/22/21 1:6:46 PM -- Intance ha 12.7 for. 3/22/21 1:6:46 PM -- Intance ha 2.8 for Write. 3/22/21 1:6:46 PM -- Intance ha 2.8 for. 3/22/21 1:6:46 PM -- Intance ha 12.8 for. 3/22/21 1:6:46 PM -- Intance ha 2.6 for Write. 3/22/21 1:6:46 PM -- Intance ha 2.6 for. 3/22/21 1:6:46 PM -- Tet ha Maximum Pa Fault Stall/ec. 3/22/21 1:6:46 PM -- Tet ha Pa Fault Stall/ec ample higher than. 3/22/21 1:6:46 PM -- C:\Program File\Exchan Jettre\Performance_21_3_22_6_1_31.xml ha 478 ample queried. Performance tet report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Checkum Statitic - All Seen pa Bad pa Correctable pa Wrong panumber pa File length / econd taken G:\db1\Jettre11.edb MByte / 237 ec F:\db2\Jettre21.edb MByte / ec I:\db3\Jettre31.edb MByte / 23 ec (Sum) MByte / 238 ec EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 23

24 Dik Subytem Performance (of checkum) icaldik Avg. Dik ec/ Avg. Dik ec/write Dik /ec Dik Write/ec Avg. Dik Byte/ G: F: I: Memory Sytem Performance (of checkum) Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Tet 3/22/21 6:1:21 AM -- Jettre teting begin... 3/22/21 6:1:21 AM -- Prepare teting begin... 3/22/21 6:1:26 AM -- Attaching datab... 3/22/21 6:1:26 AM -- Prepare teting end. 3/22/21 6:1:26 AM -- Dipatching tranaction begin... 3/22/21 6:1:26 AM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/22/21 6:1:26 AM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/22/21 6:1:31 AM -- read laten threhold: (avera: 2 mec/read, maximum: mec/read). 3/22/21 6:1:31 AM -- write laten threhold: (avera: 1 mec/write, maximum: mec/write). 3/22/21 6:1:3 AM -- Operation mix: Seion 3, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/22/21 6:1:3 AM -- Performance logging begin (interval: 1 m). 3/22/21 6:1:3 AM -- Attaining prerequiite: 3/22/21 6:18:6 AM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/22/21 8:18:6 AM -- Performance logging end. 3/22/21 8:18:6 AM -- JetInterop batch tranaction tat: 271, 278, and /22/21 8:18:7 AM -- Dipatching tranaction end. 3/22/21 8:18:7 AM -- Shutting down datab... 3/22/21 8:18:1 AM -- Intance (complete), Intance (complete), and Intance (complete) 3/22/21 8:18:11 AM -- Performance logging begin (interval: 3 m). 3/22/21 8:18:11 AM -- Verifying datab checkum... 3/22/21 1:6:4 PM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/22/21 1:6:4 PM -- Performance logging end. 3/22/21 1:6:4 PM -- C:\Program File\Exchan Jettre\DBCheckum_21_3_22_8_18_1.blg ha 676 ample. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 24

25 Appendix C: Maximum Solution IOPS Tet Reult The tora configuration illutrated in Figure 1 i the EMC recommended configuration for a 1, Exchan uer workload with.1 IOPS per uer. The reult hown in Figure 1 illutrate that thi configuration achieved excellent reult, with coniderable room for growth. Often the oberved uer workload in cutomer environment i greater than expected. For example, the ue of BlackBerry and MAPI journaling device can ignificantly incre the workload nerated by a et of uer. EMC pride itelf on delivering olution that meet and exceed cutomer requirement and hence the configuration are deigned with coniderable headroom. The teted configuration could eaily atify the ESRP criteria and ubequent tet were run to determine the upper limit of the configuration. The Jettre thread count wa incred from 3 to 9 without modifying any of the other component. The achieved IOPS incred from 367 to 746 with a 13 percent incre. While thi workload i not recommended for cutomer, a it i cloe to the maximum acceptable dik laten for ESRP, it highlight the headroom for the recommended olution. Microoft Exchan Server Jettre Performance Tet Reult Report Tet Summary Overall Tet Pa Reult Machine Name RTPSOL39 Tet Decription Tet Start Time 3/2/21 12:1:14 AM Tet End Time 3/2/21 2:3:37 AM Jettre Verion Ee Verion Operating Window Server 28 R2 Enterprie ( ) Sytem Performance C:\Program File\Exchan Jettre\Reult\Performance_21_3_2 1_24.blg C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_2_2_3_37.blg Sizing and Throughput Achieved Tranactional per Second EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 2

26 Capacity Percenta 1% Throughput Percenta 1% Initial Size (byte) Final Size (byte) File (Count) 3 Jettre Sytem Parameter Thread Count 9 (per datab) Minimum Cache 96. MB Maximum Cache 768. MB Inert Operation 4% Delete Operation 2% Replace Operation % Operation 3% Lazy Commit 7% Run Background Maintenance True Number of Copie per 3 Configuration Intance234.1 Path: J:\ : G:\db1\Jettre11.edb Intance234.2 Path: H:\ : F:\db2\Jettre21.edb Intance234.3 Path: E:\ : I:\db3\Jettre31.edb Tranactional Performance MSExchan ==> Intance Intance Intance Intance (me Write (me /ec Write /ec Byte Write Byte a n (me... Writ e a n (me /ec Write /ec a Byte... Write Byte Background Maintenance Performance MSExchan ==> Maintenance IO Maintenance IO EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 26

27 Intance /ec Byte Intance Intance Intance Replication Performance MSExchan ==> Intance /ec Byte Intance Intance Intance Total Performance MSExcha n ==> Intance Intance Intance Intance Data b (me Data b Write (me /ec Write /ec Byte Write Byte a n (me Writ e /ec a n (me Write /ec g e Byte Write Byte Hot Sytem Performance Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Pa Fault Stall/ec... Tet 3/2/21 12:1:14 AM -- Jettre teting begin... 3/2/21 12:1:14 AM -- Prepare teting begin... 3/2/21 12:1:19 AM -- Attaching datab... 3/2/21 12:1:19 AM -- Prepare teting end. 3/2/21 12:1:19 AM -- Dipatching tranaction begin... 3/2/21 12:1:19 AM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/2/21 12:1:19 AM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/2/21 12:1:24 AM -- read laten threhold: (avera: 2 mec/read, maximum: mec/read). 3/2/21 12:1:24 AM -- write laten threhold: (avera: 1 mec/write, maximum: mec/write). EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 27

28 3/2/21 12:1:28 AM -- Operation mix: Seion 9, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/2/21 12:1:28 AM -- Performance logging begin (interval: 1 m). 3/2/21 12:1:28 AM -- Attaining prerequiite: 3/2/21 12:3:34 AM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/2/21 2:3:3 AM -- Performance logging end. 3/2/21 2:3:3 AM -- JetInterop batch tranaction tat: 4791, 472, and /2/21 2:3:3 AM -- Dipatching tranaction end. 3/2/21 2:3:3 AM -- Shutting down datab... 3/2/21 2:3:37 AM -- Intance234.1 (complete), Intance234.2 (complete), and Intance234.3 (complete) 3/2/21 2:3:38 AM -- Performance logging begin (interval: 3 m). 3/2/21 2:3:38 AM -- Verifying datab checkum... 3/2/21 7:49:2 AM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/2/21 7:49:2 AM -- Performance logging end. 3/2/21 7:49:2 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_2_2_3_37.blg ha 691 ample. 3/2/21 7:49:28 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_2_2_3_37.html i aved. 3/2/21 7:49:28 AM -- Verifying log checkum... 3/2/21 7:49:29 AM -- J:\ (11 log() proceed), H:\ (11 log() proceed), and E:\ (11 log() proceed) 3/2/21 7:49:29 AM -- C:\Program File\Exchan Jettre\Reult\Performance_21_3_2 1_24.blg ha 488 ample. 3/2/21 7:49:29 AM -- Creating tet report... 3/2/21 7:49:32 AM -- Intance234.1 ha 19.8 for. 3/2/21 7:49:32 AM -- Intance234.1 ha. for Write. 3/2/21 7:49:32 AM -- Intance234.1 ha. for. 3/2/21 7:49:32 AM -- Intance234.2 ha 19.3 for. 3/2/21 7:49:32 AM -- Intance234.2 ha 4.7 for Write. 3/2/21 7:49:32 AM -- Intance234.2 ha 4.7 for. 3/2/21 7:49:32 AM -- Intance234.3 ha 19.2 for. 3/2/21 7:49:32 AM -- Intance234.3 ha. for Write. 3/2/21 7:49:32 AM -- Intance234.3 ha. for. 3/2/21 7:49:32 AM -- Tet ha Maximum Pa Fault Stall/ec. 3/2/21 7:49:32 AM -- Tet ha Pa Fault Stall/ec ample higher than. 3/2/21 7:49:32 AM -- C:\Program File\Exchan Jettre\Reult\Performance_21_3_2 1_24.xml ha 479 ample queried. Maximum Solution Tet Report Checkum tatitic Microoft Exchan Server Jettre Tet Reult Report Checkum Statitic - All Seen pa Bad pa Correctable pa Wrong panumber pa File length / econd taken G:\db1\Jettre11.edb MByte / 2746 ec F:\db2\Jettre21.edb EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 28

29 MByte / 1983 ec I:\db3\Jettre31.edb MByte / ec (Sum) MByte / 2746 ec Dik Subytem Performance (of checkum) icaldik Avg. Dik ec/ Avg. Dik ec/write Dik /ec Dik Write/ec Avg. Dik Byte/ G: F: I: Memory Sytem Performance (of checkum) Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Tet 3/2/21 12:1:14 AM -- Jettre teting begin... 3/2/21 12:1:14 AM -- Prepare teting begin... 3/2/21 12:1:19 AM -- Attaching datab... 3/2/21 12:1:19 AM -- Prepare teting end. 3/2/21 12:1:19 AM -- Dipatching tranaction begin... 3/2/21 12:1:19 AM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/2/21 12:1:19 AM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/2/21 12:1:24 AM -- read laten threhold: (avera: 2 mec/read, maximum: mec/read). 3/2/21 12:1:24 AM -- write laten threhold: (avera: 1 mec/write, maximum: mec/write). 3/2/21 12:1:28 AM -- Operation mix: Seion 9, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/2/21 12:1:28 AM -- Performance logging begin (interval: 1 m). 3/2/21 12:1:28 AM -- Attaining prerequiite: 3/2/21 12:3:34 AM -- \MSExchan (JettreWin)\ Cache Size, Lat: (lower bound: , upper bound: none) 3/2/21 2:3:3 AM -- Performance logging end. 3/2/21 2:3:3 AM -- JetInterop batch tranaction tat: 4791, 472, and /2/21 2:3:3 AM -- Dipatching tranaction end. 3/2/21 2:3:3 AM -- Shutting down datab... 3/2/21 2:3:37 AM -- Intance234.1 (complete), Intance234.2 (complete), and Intance234.3 (complete) 3/2/21 2:3:38 AM -- Performance logging begin (interval: 3 m). 3/2/21 2:3:38 AM -- Verifying datab checkum... 3/2/21 7:49:2 AM -- G: (1% proceed), F: (1% proceed), and I: (1% proceed) 3/2/21 7:49:2 AM -- Performance logging end. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 29

30 3/2/21 7:49:2 AM -- C:\Program File\Exchan Jettre\Reult\DBCheckum_21_3_2_2_3_37.blg ha 691 ample. Appendix D: SoftRecovery Tet Reult Microoft Exchan Server Jettre SoftRecovery Tet Reult Report SoftRecovery Statitic - All Intance file replayed Elaped econd Intance Intance Intance Configuration Intance Path: J:\ : G:\db1\Jettre11.edb Intance Path: H:\ : F:\db2\Jettre21.edb Intance Path: E:\ : I:\db3\Jettre31.edb Tranactional Performance MSExcha n ==> Intance Intance Intance Intance Data b (me Data b Write (me /ec Write /ec Byte Write Byte a n (me Writ e /ec a n (me... 4 Write /ec g e Byte Writ e a Byte Background Maintenance Performance MSExchan ==> Intance Maintenance IO /ec Intance Intance Intance Maintenance IO Byte EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 3

31 Total Performance MSExcha n ==> Intance Intance Intance Intance Data b (me Data b Write (me /ec Write /ec Byte Write Byte a n (me Writ e /ec a n (me... 4 Write /ec g e Byte Writ e a Byte Hot Sytem Performance Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... Pool Nonpad Byte Pool Pad Byte Pa Fault Stall/ec... Tet 3/23/21 4:41:17 AM -- Jettre teting begin... 3/23/21 4:41:17 AM -- Prepare teting begin... 3/23/21 4:41:22 AM -- Attaching datab... 3/23/21 4:41:22 AM -- Prepare teting end. 3/23/21 4:42:41 AM -- Jettre teting begin... 3/23/21 4:42:41 AM -- Prepare teting begin... 3/23/21 4:42:46 AM -- Attaching datab... 3/23/21 4:42:46 AM -- Prepare teting end. 3/23/21 4:42:46 AM -- Dipatching tranaction begin... 3/23/21 4:42:46 AM -- cache etting: (minimum: 96. MB, maximum: 768. MB) 3/23/21 4:42:46 AM -- fluh threhold: (tart: 7.7 MB, top: 1.3 MB) 3/23/21 4:42: AM -- read laten threhold: (avera: 2 mec/read, maximum: mec/read). 3/23/21 4:42: AM -- write laten threhold: (avera: 1 mec/write, maximum: mec/write). 3/23/21 4:42:3 AM -- Operation mix: Seion 3, Inert 4%, Delete 2%, Replace %, 3%, Lazy Commit 7%. 3/23/21 4:42:3 AM -- Performance logging begin (interval: 1 m). 3/23/21 4:42:3 AM -- Generating log file... 3/23/21 6:11:36 AM -- J:\ (11.% nerated), H:\ (11.% nerated), and E:\ (1.2% nerated) 3/23/21 6:11:36 AM -- Performance logging end. 3/23/21 6:11:36 AM -- JetInterop batch tranaction tat: 1878, 18668, and /23/21 6:11:36 AM -- Dipatching tranaction end. EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 31

32 3/23/21 6:11:36 AM -- Shutting down datab... 3/23/21 6:11:4 AM -- Intance (complete), Intance (complete), and Intance (complete) 3/23/21 6:11:4 AM -- C:\Program File\Exchan Jettre\Performance_21_3_23_4_42_.blg ha 34 ample. 3/23/21 6:11:4 AM -- Creating tet report... 3/23/21 6:11:42 AM -- Intance ha 13.2 for. 3/23/21 6:11:42 AM -- Intance ha 2. for Write. 3/23/21 6:11:42 AM -- Intance ha 2. for. 3/23/21 6:11:42 AM -- Intance ha 13. for. 3/23/21 6:11:42 AM -- Intance ha 2. for Write. 3/23/21 6:11:42 AM -- Intance ha 2. for. 3/23/21 6:11:42 AM -- Intance ha 13.1 for. 3/23/21 6:11:42 AM -- Intance ha 2. for Write. 3/23/21 6:11:42 AM -- Intance ha 2. for. 3/23/21 6:11:42 AM -- Tet ha Maximum Pa Fault Stall/ec. 3/23/21 6:11:42 AM -- Tet ha Pa Fault Stall/ec ample higher than. 3/23/21 6:11:42 AM -- C:\Program File\Exchan Jettre\Performance_21_3_23_4_42_.xml ha 33 ample queried. 3/23/21 6:11:42 AM -- C:\Program File\Exchan Jettre\Performance_21_3_23_4_42_.html i aved. 3/23/21 6:11:4 AM -- Performance logging begin (interval: 2 m). 3/23/21 6:11:4 AM -- Recovering datab... 3/23/21 6:3:34 AM -- Performance logging end. 3/23/21 6:3:34 AM -- Intance ( ), Intance ( ), and Intance ( ) 3/23/21 6:3:34 AM -- C:\Program File\Exchan Jettre\SoftRecovery_21_3_23_6_11_42.blg ha 79 ample. 3/23/21 6:3:34 AM -- Creating tet report... SoftRecovery Tet Report Tet Reult Microoft Exchan Server Jettre SoftRecovery Tet Reult Report Tet Summary Overall Tet Reult Pa Machine Name RTPSOL39 Tet Decription Tet Start Time 3/23/21 4:42:41 AM Tet End Time 3/23/21 6:11:4 AM Jettre Verion Ee Verion Operating Sytem Window Server 28 R2 Enterprie ( ) Performance C:\Program File\Exchan Jettre\Performance_21_3_23_4_42_.blg Sizing and Throughput Achieved Tranactional per Second Capacity Percenta 1% Throughput Percenta 1% EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 32

33 Initial Size (byte) Final Size (byte) File (Count) 3 Jettre Sytem Parameter Thread Count 3 (per datab) Minimum Cache 96. MB Maximum Cache 768. MB Inert Operation 4% Delete Operation 2% Replace Operation % Operation 3% Lazy Commit 7% Configuration Intance Path: J:\ : G:\db1\Jettre11.edb Intance Path: H:\ : F:\db2\Jettre21.edb Intance Path: E:\ : I:\db3\Jettre31.edb Tranactional Performance MSExchan ==> Intance Intance Intance Intance (me Write (me /ec Write /ec Byte Write Byte a n (me... Writ e a n (me /ec Write /ec Hot Sytem Performance Counter Minimum Maximum % Proceor Time Available MByte Free Sytem Pa Table Entrie Tranition Pa RePurpoed/ec... a Byte... Write Byte EMC Celerra NS-12 (1, Uer) Mailbox Reilien Stora Solution for Microoft Exchan 21 33

ESRP Storage Program EMC Celerra NX4 (500 User) Mailbox Resiliency Storage Solution for Microsoft Exchange 2010

ESRP Storage Program EMC Celerra NX4 (500 User) Mailbox Resiliency Storage Solution for Microsoft Exchange 2010 ESRP Stor Program EMC Celerra NX4 (5 Uer) Mailbox Reilie Stor Solution for Microoft Exchan 21 Teted with: ESRP Stor Verion. Teted Date: 6/25/21 EMC Corporation Corporate Headquarter Hopkinton, MA 1748-91

More information

ESRP Storage Program EMC VNXe3100 (500 User) Mailbox Resiliency Storage Solution for Microsoft Exchange 2010

ESRP Storage Program EMC VNXe3100 (500 User) Mailbox Resiliency Storage Solution for Microsoft Exchange 2010 ESRP Stor Program EMC VNXe31 (5 Uer) Mailbox Reilie Stor Solution for Microoft Exchan 21 Teted with: ESRP Stor Verion 3. Teted Date: 4/25/211 EMC Corporation Corporate Headquarter Hopkinton, MA 1748-913

More information

IBM Storwize V7000 Gen2 4,000 mailbox resiliency Microsoft Exchange 2013 storage solution

IBM Storwize V7000 Gen2 4,000 mailbox resiliency Microsoft Exchange 2013 storage solution IBM Storwize V7 Gen2 4, mailbox reiliency Microoft Exchan 23 tora olution IBM Sytem and Technology Group ISV Enablement September 24 Copyright IBM Corporation, 24 Table of content Abtract... Diclaimer...

More information

ESRP Storage Program

ESRP Storage Program ESRP Storage Program EMC CLARiiON AX4-5i (500 User) Exchange 2010 Mailbox Resiliency Storage Solution Tested with: ESRP - Storage Version 3.0 Tested Date: 25 November 2009 EMC Global Solutions Copyright

More information

Dell PowerVault MD1220 is a SAS based storage enclosure. The major features of the storage system include:

Dell PowerVault MD1220 is a SAS based storage enclosure. The major features of the storage system include: Tested with: ESRP Storage Version 3.0 Tested Date: June 09, 2011 Content Content... 2 Overview... 3 Disclaimer... 3 Features... 3 Solution Description... 4 Targeted Customer Profile... 6 Simulated Exchange

More information

The Association of System Performance Professionals

The Association of System Performance Professionals The Aociation of Sytem Performance Profeional The Computer Meaurement Group, commonly called CMG, i a not for profit, worldwide organization of data proceing profeional committed to the meaurement and

More information

Dell PowerVault MD3000i 5000 Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution

Dell PowerVault MD3000i 5000 Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution Dell PowerVault MD3000i 5000 Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution Tested with: ESRP Storage Version 2.0 Tested Date: October 2, 2007 Table of Contents Table of Contents...2

More information

Dell PowerVault MD Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution

Dell PowerVault MD Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution Dell PowerVault MD3000 3000 Mailbox Single Copy Cluster Microsoft Exchange 2007 Storage Solution Tested with: ESRP Storage Version 2.0 Tested Date: August 08, 2007 Table of Contents Table of Contents...2

More information

Dell EMC SCv3020 7,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K drives

Dell EMC SCv3020 7,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K drives Dell EMC SCv3020 7,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K drives Microsoft ESRP 4.0 Abstract This document describes the Dell EMC SCv3020 storage solution for Microsoft Exchange

More information

Dell EMC SC Series SC5020 9,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K Drives

Dell EMC SC Series SC5020 9,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K Drives Dell EMC SC Series SC5020 9,000 Mailbox Exchange 2016 Resiliency Storage Solution using 7.2K Drives Microsoft ESRP 4.0 Dell EMC Engineering June 2017 A Dell EMC Technical White Paper Revisions Date June

More information

Hitachi Unified Storage VM Dynamically Provisioned 21,600 Mailbox Exchange 2013 Mailbox Resiliency Storage Solution

Hitachi Unified Storage VM Dynamically Provisioned 21,600 Mailbox Exchange 2013 Mailbox Resiliency Storage Solution 1 Hitachi Unified Storage VM Dynamically Provisioned 21,600 Mailbox Exchange 2013 Mailbox Resiliency Storage Solution Tested with: ESRP Storage Version 4.0 Test Date: February - March 2014 Month Year Notices

More information

Keywords Cloud Computing, Service Level Agreements (SLA), CloudSim, Monitoring & Controlling SLA Agent, JADE

Keywords Cloud Computing, Service Level Agreements (SLA), CloudSim, Monitoring & Controlling SLA Agent, JADE Volume 5, Iue 8, Augut 2015 ISSN: 2277 128X International Journal of Advanced Reearch in Computer Science and Software Engineering Reearch Paper Available online at: www.ijarce.com Verification of Agent

More information

Laboratory Exercise 6

Laboratory Exercise 6 Laboratory Exercie 6 Adder, Subtractor, and Multiplier The purpoe of thi exercie i to examine arithmetic circuit that add, ubtract, and multiply number. Each type of circuit will be implemented in two

More information

Analyzing Hydra Historical Statistics Part 2

Analyzing Hydra Historical Statistics Part 2 Analyzing Hydra Hitorical Statitic Part Fabio Maimo Ottaviani EPV Technologie White paper 5 hnode HSM Hitorical Record The hnode i the hierarchical data torage management node and ha to perform all the

More information

HP StorageWorks 600 Modular Disk System 4,000 user 3GB Mailbox resiliency Exchange 2010 storage solution

HP StorageWorks 600 Modular Disk System 4,000 user 3GB Mailbox resiliency Exchange 2010 storage solution HP StorageWorks 600 Modular Disk System 4,000 user 3GB Mailbox resiliency Exchange 2010 storage solution Technical white paper Table of contents Overview... 2 Disclaimer... 2 Features... 2 Solution description...

More information

NetApp E-Series E ,000-Mailbox Microsoft Exchange Server 2013 Mailbox Resiliency Storage Solution

NetApp E-Series E ,000-Mailbox Microsoft Exchange Server 2013 Mailbox Resiliency Storage Solution NetApp E-Series E2700 20,000-Mailbox Microsoft Exchange Server 2013 Tested with: ESRP Storage Version 4.0 Niyaz Mohamed, NetApp March 2015 Abstract This document describes the NetApp E-Series 2700 storage

More information

Dell PowerEdge R720xd 6,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution. Tested with ESRP Storage Version 4.0 Tested Date: Feb 2014

Dell PowerEdge R720xd 6,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution. Tested with ESRP Storage Version 4.0 Tested Date: Feb 2014 Dell PowerEdge R720xd 6,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution Tested with ESRP Storage Version 4.0 Tested Date: Feb 2014 2014 Dell Inc. All Rights Reserved. Dell, the Dell logo,

More information

Sun ZFS Storage 7120 Appliance 5,000 Mailbox Resiliency Exchange 2010 Storage Solution

Sun ZFS Storage 7120 Appliance 5,000 Mailbox Resiliency Exchange 2010 Storage Solution An Oracle White Paper June 2012 Sun ZFS Storage 7120 Appliance 5,000 Mailbox Resiliency Exchange 2010 Storage Solution Tested with: ESRP Storage Version 3.0 Tested Date: 11/2010 Disclaimer This document

More information

Sun ZFS Storage 7320 Appliance 10,000 Mailbox Resiliency Exchange 2010 Storage Solution

Sun ZFS Storage 7320 Appliance 10,000 Mailbox Resiliency Exchange 2010 Storage Solution An Oracle White Paper June 2012 Sun ZFS Storage 7320 Appliance 10,000 Mailbox Resiliency Exchange 2010 Storage Solution Tested with: ESRP Storage Version 3.0 Tested Date: 12/2010 Disclaimer This document

More information

EMC Celerra NS20. EMC Solutions for Microsoft Exchange Reference Architecture

EMC Celerra NS20. EMC Solutions for Microsoft Exchange Reference Architecture EMC Solutions for Microsoft Exchange 2007 EMC Celerra NS20 EMC NAS Product Validation Corporate Headquarters Hopkinton, MA 01748-9103 1-508-435-1000 www.emc.com Copyright 2008 EMC Corporation. All rights

More information

Lessons Learned Migrating a Major Application to Exadata v2

Lessons Learned Migrating a Major Application to Exadata v2 Leon Learned Migrating a Major Application to Exadata v2 Oracle Open World 2010 Aaron Werman Bank of America aaron.werman@gmail.com Diclaimer All opinion are thoe of the author No endorement are intended:

More information

Edits in Xylia Validity Preserving Editing of XML Documents

Edits in Xylia Validity Preserving Editing of XML Documents dit in Xylia Validity Preerving diting of XML Document Pouria Shaker, Theodore S. Norvell, and Denni K. Peter Faculty of ngineering and Applied Science, Memorial Univerity of Newfoundland, St. John, NFLD,

More information

Dell PowerEdge R730xd 2,500 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution. Tested with ESRP Storage Version 4.0 Tested Date: June 2015

Dell PowerEdge R730xd 2,500 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution. Tested with ESRP Storage Version 4.0 Tested Date: June 2015 Dell PowerEdge R730xd 2,500 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution Tested with ESRP Storage Version 4.0 Tested Date: June 2015 Copyright 2015 Dell Inc. All rights reserved. This product

More information

Laboratory Exercise 6

Laboratory Exercise 6 Laboratory Exercie 6 Adder, Subtractor, and Multiplier The purpoe of thi exercie i to examine arithmetic circuit that add, ubtract, and multiply number. Each circuit will be decribed in VHL and implemented

More information

IBM System Storage DS3300 Storage System 1000 Mailbox Clustered Continuous Replication Microsoft Exchange 2007 Storage Solution

IBM System Storage DS3300 Storage System 1000 Mailbox Clustered Continuous Replication Microsoft Exchange 2007 Storage Solution DS3300 Storage System 1000 Mailbox Clustered Storage Solution Tested with: ESRP Storage Version 2.0 Tested Date: February 12, 2008 Authors: Joe Richards i, David Hartman ii Document Version: 2.1 Content...

More information

Service and Network Management Interworking in Future Wireless Systems

Service and Network Management Interworking in Future Wireless Systems Service and Network Management Interworking in Future Wirele Sytem V. Tountopoulo V. Stavroulaki P. Demeticha N. Mitrou and M. Theologou National Technical Univerity of Athen Department of Electrical Engineering

More information

Dell Compellent Storage Center 6.5 SC4020 4,500 Mailbox Exchange 2013 Resiliency Storage Solution

Dell Compellent Storage Center 6.5 SC4020 4,500 Mailbox Exchange 2013 Resiliency Storage Solution Dell Compellent Storage Center 6.5 SC4020 4,500 Mailbox Exchange 2013 Resiliency Storage Solution Microsoft ESRP 4.0 Mark Boeser, Exchange Product Specialist Dell Compellent Technical Solutions June 2014

More information

Performance of a Robust Filter-based Approach for Contour Detection in Wireless Sensor Networks

Performance of a Robust Filter-based Approach for Contour Detection in Wireless Sensor Networks Performance of a Robut Filter-baed Approach for Contour Detection in Wirele Senor Network Hadi Alati, William A. Armtrong, Jr., and Ai Naipuri Department of Electrical and Computer Engineering The Univerity

More information

ES205 Analysis and Design of Engineering Systems: Lab 1: An Introductory Tutorial: Getting Started with SIMULINK

ES205 Analysis and Design of Engineering Systems: Lab 1: An Introductory Tutorial: Getting Started with SIMULINK ES05 Analyi and Deign of Engineering Sytem: Lab : An Introductory Tutorial: Getting Started with SIMULINK What i SIMULINK? SIMULINK i a oftware package for modeling, imulating, and analyzing dynamic ytem.

More information

HP 3PAR StoreServ ,000 Mailbox Resiliency Exchange 2010 Storage Solution

HP 3PAR StoreServ ,000 Mailbox Resiliency Exchange 2010 Storage Solution Technical white paper HP 3PAR StoreServ 7400 60,000 Mailbox Resiliency Exchange 2010 Storage Solution Table of contents Overview... 2 Disclaimer... 2 Features of the tested solution... 2 HP 3PAR StoreServ

More information

Modelling the impact of cyber attacks on the traffic control centre of an urban automobile transport system by means of enhanced cybersecurity

Modelling the impact of cyber attacks on the traffic control centre of an urban automobile transport system by means of enhanced cybersecurity Modelling the impact of cyber attack on the traffic control centre of an urban automobile tranport ytem by mean of enhanced cyberecurity Yoana Ivanova 1,* 1 Bulgarian Academy of Science, Intitute of ICT,

More information

A Basic Prototype for Enterprise Level Project Management

A Basic Prototype for Enterprise Level Project Management A Baic Prototype for Enterprie Level Project Management Saurabh Malgaonkar, Abhay Kolhe Computer Engineering Department, Mukeh Patel School of Technology Management & Engineering, NMIMS Univerity, Mumbai,

More information

DWH Performance Tuning For Better Reporting

DWH Performance Tuning For Better Reporting DWH Performance Tuning For Better Sandeep Bhargava Reearch Scholar Naveen Hemrajani Aociate Profeor Dineh Goyal Aociate Profeor Subhah Gander IT Profeional ABSTRACT: The concept of data warehoue deal in

More information

13/ 12/ Am ade us IT Gro up and its affil iate s and sub sidi arie s. Development Last update: 04/27/2017 Page 1 of 12. amadeus-hospitality.

13/ 12/ Am ade us IT Gro up and its affil iate s and sub sidi arie s. Development Last update: 04/27/2017 Page 1 of 12. amadeus-hospitality. u it ub idi Lat date: 04/27/7 Page 1 of 12 amu-hopitality.com u it ub idi Index I-Server 2.0 AP4 I-Server 2.0 AP4 Sytem Requirement...3 Additional Server Requirement...4 Sytem Requirement Worktation Requirement...5

More information

ESRP Storage Program EMC Celerra NS-120 (1,500 User) Storage Solution for Microsoft Exchange Server 2007 SP1

ESRP Storage Program EMC Celerra NS-120 (1,500 User) Storage Solution for Microsoft Exchange Server 2007 SP1 ESRP Storage Program EMC Celerra NS-120 (1,500 User) Storage Solution for Microsoft Exchange Server 2007 SP1 Tested with: ESRP Storage Version 2.1 Tested Date: 04/28/2009 EMC Corporation Corporate Headquarters

More information

EMC CLARiiON AX4-5i (2,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1

EMC CLARiiON AX4-5i (2,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1 EMC CLARiiON AX4-5i (2,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1 Case Study EMC Global Solutions 42 South Street Hopkinton, MA 01748-9103 1-508-435-1000 www.emc.com Copyright and

More information

EMC Integrated Infrastructure for VMware. Business Continuity

EMC Integrated Infrastructure for VMware. Business Continuity EMC Integrated Infrastructure for VMware Business Continuity Enabled by EMC Celerra and VMware vcenter Site Recovery Manager Reference Architecture Copyright 2009 EMC Corporation. All rights reserved.

More information

Distributed Packet Processing Architecture with Reconfigurable Hardware Accelerators for 100Gbps Forwarding Performance on Virtualized Edge Router

Distributed Packet Processing Architecture with Reconfigurable Hardware Accelerators for 100Gbps Forwarding Performance on Virtualized Edge Router Ditributed Packet Proceing Architecture with Reconfigurable Hardware Accelerator for 100Gbp Forwarding Performance on Virtualized Edge Router Satohi Nihiyama, Hitohi Kaneko, and Ichiro Kudo Abtract To

More information

IBM Storwize V ,000 mailbox resiliency Microsoft Exchange 2013 storage solution. IBM Systems and Technology Group ISV Enablement March 2014

IBM Storwize V ,000 mailbox resiliency Microsoft Exchange 2013 storage solution. IBM Systems and Technology Group ISV Enablement March 2014 IBM Storwize V5000 16,000 mailbox resiliency Microsoft Exchange 2013 storage solution IBM Systems and Technology Group ISV Enablement March 2014 Copyright IBM Corporation, 2014 Table of contents Abstract...

More information

Virtual Exchange 2007 within a VMware ESX datastore VMDK file replicated

Virtual Exchange 2007 within a VMware ESX datastore VMDK file replicated EMC Solutions for Microsoft Exchange 2007 Virtual Exchange 2007 in a VMware ESX Datastore with a VMDK File Replicated Virtual Exchange 2007 within a VMware ESX datastore VMDK file replicated EMC Commercial

More information

EMC Backup and Recovery for Microsoft SQL Server

EMC Backup and Recovery for Microsoft SQL Server EMC Backup and Recovery for Microsoft SQL Server Enabled by Microsoft SQL Native Backup Reference Copyright 2010 EMC Corporation. All rights reserved. Published February, 2010 EMC believes the information

More information

Lecture 8: More Pipelining

Lecture 8: More Pipelining Overview Lecture 8: More Pipelining David Black-Schaffer davidbb@tanford.edu EE8 Spring 00 Getting Started with Lab Jut get a ingle pixel calculating at one time Then look into filling your pipeline Multiplier

More information

This document contains information about the EMC DMX SRDF/A Storage Solution for Microsoft Exchange Server.

This document contains information about the EMC DMX SRDF/A Storage Solution for Microsoft Exchange Server. ESRP Storage Program EMC Symmetrix DMX-3 4500 SRDF/A (60000 Users) Storage Solution for Microsoft Exchange Server Replicated Storage Rev 1.0 January 16, 2007 This document contains information about the

More information

EMC Business Continuity for Microsoft Applications

EMC Business Continuity for Microsoft Applications EMC Business Continuity for Microsoft Applications Enabled by EMC Celerra, EMC MirrorView/A, EMC Celerra Replicator, VMware Site Recovery Manager, and VMware vsphere 4 Copyright 2009 EMC Corporation. All

More information

ETSI TS V ( )

ETSI TS V ( ) TS 122 153 V14.4.0 (2017-05) TECHNICAL SPECIFICATION Digital cellular telecommunication ytem (Phae 2+) (GSM); Univeral Mobile Telecommunication Sytem (UMTS); LTE; Multimedia priority ervice (3GPP TS 22.153

More information

Dell Storage Center 6.6 SCv2000 SAS Front-end Arrays and 2,500 Mailbox Exchange 2013 Resiliency Storage Solution

Dell Storage Center 6.6 SCv2000 SAS Front-end Arrays and 2,500 Mailbox Exchange 2013 Resiliency Storage Solution Dell Storage Center 6.6 SCv2000 SAS Front-end Arrays and 2,500 Mailbox Exchange 2013 Resiliency Storage Solution Microsoft ESRP 4.0 Dell Storage Engineering October 2015 A Dell Technical White Paper Revisions

More information

ESRP Storage Program EMC CLARiiON CX3-20c (500 User) Storage Solution for Microsoft Exchange Server

ESRP Storage Program EMC CLARiiON CX3-20c (500 User) Storage Solution for Microsoft Exchange Server ESRP Storage Program EMC CLARiiON CX3-20c (500 User) Storage Solution for Microsoft Exchange Server February 28, 2007 This document contains information about the EMC CLARiiON CX3-20c Storage Solution

More information

Architecture and grid application of cluster computing system

Architecture and grid application of cluster computing system Architecture and grid application of cluter computing ytem Yi Lv*, Shuiqin Yu, Youju Mao Intitute of Optical Fiber Telecom, Chongqing Univ. of Pot & Telecom, Chongqing, 400065, P.R.China ABSTRACT Recently,

More information

ESRP Storage Program EMC Celerra NS40 (3,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1

ESRP Storage Program EMC Celerra NS40 (3,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1 ESRP Storage Program EMC Celerra NS40 (3,000 User) Storage Solution for Microsoft Exchange Server 2007 SP1 Tested with: ESRP Storage Version 2.1 Tested Date: 11/18/2008 EMC Corporation Corporate Headquarters

More information

Hassan Ghaziri AUB, OSB Beirut, Lebanon Key words Competitive self-organizing maps, Meta-heuristics, Vehicle routing problem,

Hassan Ghaziri AUB, OSB Beirut, Lebanon Key words Competitive self-organizing maps, Meta-heuristics, Vehicle routing problem, COMPETITIVE PROBABIISTIC SEF-ORGANIZING MAPS FOR ROUTING PROBEMS Haan Ghaziri AUB, OSB Beirut, ebanon ghaziri@aub.edu.lb Abtract In thi paper, we have applied the concept of the elf-organizing map (SOM)

More information

Advanced Encryption Standard and Modes of Operation

Advanced Encryption Standard and Modes of Operation Advanced Encryption Standard and Mode of Operation G. Bertoni L. Breveglieri Foundation of Cryptography - AES pp. 1 / 50 AES Advanced Encryption Standard (AES) i a ymmetric cryptographic algorithm AES

More information

Computer Arithmetic Homework Solutions. 1 An adder for graphics. 2 Partitioned adder. 3 HDL implementation of a partitioned adder

Computer Arithmetic Homework Solutions. 1 An adder for graphics. 2 Partitioned adder. 3 HDL implementation of a partitioned adder Computer Arithmetic Homework 3 2016 2017 Solution 1 An adder for graphic In a normal ripple carry addition of two poitive number, the carry i the ignal for a reult exceeding the maximum. We ue thi ignal

More information

A System Dynamics Model for Transient Availability Modeling of Repairable Redundant Systems

A System Dynamics Model for Transient Availability Modeling of Repairable Redundant Systems International Journal of Performability Engineering Vol., No. 3, May 05, pp. 03-. RAMS Conultant Printed in India A Sytem Dynamic Model for Tranient Availability Modeling of Repairable Redundant Sytem

More information

SLA Adaptation for Service Overlay Networks

SLA Adaptation for Service Overlay Networks SLA Adaptation for Service Overlay Network Con Tran 1, Zbigniew Dziong 1, and Michal Pióro 2 1 Department of Electrical Engineering, École de Technologie Supérieure, Univerity of Quebec, Montréal, Canada

More information

Cisco VM-FEX Best Practices for VMware ESX Environment

Cisco VM-FEX Best Practices for VMware ESX Environment Deployent Guide Cico VM-FEX Bet Practice for VMware ESX Environent Deployent Guide Deceber 211 Content 1 Executive Suary... 3 1.1 Target Audience... 3 1.2 Introduction... 3 2 Cico CS VM-FEX Bet Practice...

More information

AUTOMATIC TEST CASE GENERATION USING UML MODELS

AUTOMATIC TEST CASE GENERATION USING UML MODELS Volume-2, Iue-6, June-2014 AUTOMATIC TEST CASE GENERATION USING UML MODELS 1 SAGARKUMAR P. JAIN, 2 KHUSHBOO S. LALWANI, 3 NIKITA K. MAHAJAN, 4 BHAGYASHREE J. GADEKAR 1,2,3,4 Department of Computer Engineering,

More information

SIMIT 7. Component Type Editor (CTE) User manual. Siemens Industrial

SIMIT 7. Component Type Editor (CTE) User manual. Siemens Industrial SIMIT 7 Component Type Editor (CTE) Uer manual Siemen Indutrial Edition January 2013 Siemen offer imulation oftware to plan, imulate and optimize plant and machine. The imulation- and optimizationreult

More information

Multi-Target Tracking In Clutter

Multi-Target Tracking In Clutter Multi-Target Tracking In Clutter John N. Sander-Reed, Mary Jo Duncan, W.B. Boucher, W. Michael Dimmler, Shawn O Keefe ABSTRACT A high frame rate (0 Hz), multi-target, video tracker ha been developed and

More information

Ethernet Peer-To-Peer Communication With Model 353 And Procidia i pac Controllers

Ethernet Peer-To-Peer Communication With Model 353 And Procidia i pac Controllers iemen Energy & utomation pplication ata Ethernet Peer-To-Peer Communication With odel 353 nd Procidia ipac Controller 353-113 Rev. 1 July Ethernet i a leading form of network communication that i often

More information

ML85C. Data Sheet. Press fit monitoring module. Special features. Block. diagram PLC. B en

ML85C. Data Sheet. Press fit monitoring module. Special features. Block. diagram PLC. B en ML85C Pre fit monitoring module Special feature Data Sheet Meaurement and evaluation ytem for force/diplacement coure in fitting procee Graphical repreentation of the procee with zoom function Immediate

More information

Dell PowerEdge R720xd 12,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution

Dell PowerEdge R720xd 12,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution Dell PowerEdge R720xd 12,000 Mailbox Resiliency Microsoft Exchange 2013 Storage Solution Tested with ESRP Storage Version 4.0 Tested Date: 03/25/2014 1 2014 Dell Inc. All Rights Reserved. Dell, the Dell

More information

MAT 155: Describing, Exploring, and Comparing Data Page 1 of NotesCh2-3.doc

MAT 155: Describing, Exploring, and Comparing Data Page 1 of NotesCh2-3.doc MAT 155: Decribing, Exploring, and Comparing Data Page 1 of 8 001-oteCh-3.doc ote for Chapter Summarizing and Graphing Data Chapter 3 Decribing, Exploring, and Comparing Data Frequency Ditribution, Graphic

More information

Integration of Digital Test Tools to the Internet-Based Environment MOSCITO

Integration of Digital Test Tools to the Internet-Based Environment MOSCITO Integration of Digital Tet Tool to the Internet-Baed Environment MOSCITO Abtract Current paper decribe a new environment MOSCITO for providing acce to tool over the internet. The environment i built according

More information

Policy-based Injection of Private Traffic into a Public SDN Testbed

Policy-based Injection of Private Traffic into a Public SDN Testbed Intitut für Techniche Informatik und Kommunikationnetze Adrian Friedli Policy-baed Injection of Private Traffic into a Public SDN Tetbed Mater Thei MA-2013-12 Advior: Dr. Bernhard Ager, Vaileio Kotroni

More information

A Sparse Shared-Memory Multifrontal Solver in SCAD Software

A Sparse Shared-Memory Multifrontal Solver in SCAD Software Proceeding of the International Multiconference on ISBN 978-83-6080--9 Computer Science and Information echnology, pp. 77 83 ISSN 896-709 A Spare Shared-Memory Multifrontal Solver in SCAD Software Sergiy

More information

ESRP Storage Program EMC CLARiiON CX3-20c(1000 user) Storage Solution for Microsoft Exchange Server

ESRP Storage Program EMC CLARiiON CX3-20c(1000 user) Storage Solution for Microsoft Exchange Server ESRP Storage Program EMC CLARiiON CX3-20c(1000 user) Storage Solution for Microsoft Exchange Server February 28, 2007 This document contains information about the EMC CLARiiON CX3-20c(1000 User) Storage

More information

Key Terms - MinMin, MaxMin, Sufferage, Task Scheduling, Standard Deviation, Load Balancing.

Key Terms - MinMin, MaxMin, Sufferage, Task Scheduling, Standard Deviation, Load Balancing. Volume 3, Iue 11, November 2013 ISSN: 2277 128X International Journal of Advanced Reearch in Computer Science and Software Engineering Reearch Paper Available online at: www.ijarce.com Tak Aignment in

More information

Universität Augsburg. Institut für Informatik. Approximating Optimal Visual Sensor Placement. E. Hörster, R. Lienhart.

Universität Augsburg. Institut für Informatik. Approximating Optimal Visual Sensor Placement. E. Hörster, R. Lienhart. Univerität Augburg à ÊÇÅÍÆ ËÀǼ Approximating Optimal Viual Senor Placement E. Hörter, R. Lienhart Report 2006-01 Januar 2006 Intitut für Informatik D-86135 Augburg Copyright c E. Hörter, R. Lienhart Intitut

More information

HPE StoreVirtual 3200 Storage 1000 Mailbox Resiliency Exchange 2016 Storage Solution

HPE StoreVirtual 3200 Storage 1000 Mailbox Resiliency Exchange 2016 Storage Solution HPE StoreVirtual 3200 Storage 1000 Mailbox Resiliency Exchange 2016 Storage Solution Technical white paper Technical white paper Contents Introduction... 3 Solution overview... 3 Solution components...

More information

SIMIT 7. Profinet IO Gateway. User Manual

SIMIT 7. Profinet IO Gateway. User Manual SIMIT 7 Profinet IO Gateway Uer Manual Edition January 2013 Siemen offer imulation oftware to plan, imulate and optimize plant and machine. The imulation- and optimizationreult are only non-binding uggetion

More information

LinkGuide: Towards a Better Collection of Hyperlinks in a Website Homepage

LinkGuide: Towards a Better Collection of Hyperlinks in a Website Homepage Proceeding of the World Congre on Engineering 2007 Vol I LinkGuide: Toward a Better Collection of Hyperlink in a Webite Homepage A. Ammari and V. Zharkova chool of Informatic, Univerity of Bradford anammari@bradford.ac.uk,

More information

Floating Point CORDIC Based Power Operation

Floating Point CORDIC Based Power Operation Floating Point CORDIC Baed Power Operation Kazumi Malhan, Padmaja AVL Electrical and Computer Engineering Department School of Engineering and Computer Science Oakland Univerity, Rocheter, MI e-mail: kmalhan@oakland.edu,

More information

/06/$ IEEE 364

/06/$ IEEE 364 006 IEEE International ympoium on ignal Proceing and Information Technology oie Variance Etimation In ignal Proceing David Makovoz IPAC, California Intitute of Technology, MC-0, Paadena, CA, 95 davidm@ipac.caltech.edu;

More information

HP MSA 2040 Array 750 Mailbox Resiliency Exchange 2013 Storage Solution

HP MSA 2040 Array 750 Mailbox Resiliency Exchange 2013 Storage Solution Technical white paper HP MSA 2040 Array 750 Mailbox Resiliency Exchange 201 Storage Solution Table of contents Overview... 2 Disclaimer... 2 Features of the tested solution... 2 HP MSA 2040 Array overview...

More information

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1 US 2003O196031A1 (19) United State (12) Patent Application Publication (10) Pub. No.: US 2003/0196031 A1 Chen (43) Pub. Date: Oct. 16, 2003 (54) STORAGE CONTROLLER WITH THE DISK Related U.S. Application

More information

EMC VSPEX FOR VIRTUALIZED MICROSOFT EXCHANGE 2013 WITH MICROSOFT HYPER-V

EMC VSPEX FOR VIRTUALIZED MICROSOFT EXCHANGE 2013 WITH MICROSOFT HYPER-V IMPLEMENTATION GUIDE EMC VSPEX FOR VIRTUALIZED MICROSOFT EXCHANGE 2013 WITH MICROSOFT HYPER-V EMC VSPEX Abstract This describes the steps required to deploy a Microsoft Exchange Server 2013 solution on

More information

Domain-Specific Modeling for Rapid System-Wide Energy Estimation of Reconfigurable Architectures

Domain-Specific Modeling for Rapid System-Wide Energy Estimation of Reconfigurable Architectures Domain-Specific Modeling for Rapid Sytem-Wide Energy Etimation of Reconfigurable Architecture Seonil Choi 1,Ju-wookJang 2, Sumit Mohanty 1, Viktor K. Praanna 1 1 Dept. of Electrical Engg. 2 Dept. of Electronic

More information

SCHEDULE DOCUMENT CONNECT MPLS SERVICES PUBLIC NODE4 LIMITED 17/07/2017

SCHEDULE DOCUMENT CONNECT MPLS SERVICES PUBLIC NODE4 LIMITED 17/07/2017 SCHEDULE DOCUMENT CONNECT MPLS SERVICES PUBLIC NODE4 LIMITED 17/07/017 SCHEDULE DOCUMENT CONNECT MPLS SERVICES Additional term, Service Decription & Service Level Agreement for ConnectMPLS Service 1. SERVICE

More information

DAROS: Distributed User-Server Assignment And Replication For Online Social Networking Applications

DAROS: Distributed User-Server Assignment And Replication For Online Social Networking Applications DAROS: Ditributed Uer-Server Aignment And Replication For Online Social Networking Application Thuan Duong-Ba School of EECS Oregon State Univerity Corvalli, OR 97330, USA Email: duongba@eec.oregontate.edu

More information

A Load Balancing Model based on Load-aware for Distributed Controllers. Fengjun Shang, Wenjuan Gong

A Load Balancing Model based on Load-aware for Distributed Controllers. Fengjun Shang, Wenjuan Gong 4th International Conference on Machinery, Material and Computing Technology (ICMMCT 2016) A Load Balancing Model baed on Load-aware for Ditributed Controller Fengjun Shang, Wenjuan Gong College of Compute

More information

The development of the South African ehealth Strategy assessed against the recommendations of the WHO/ITU ehealth Strategy Toolkit

The development of the South African ehealth Strategy assessed against the recommendations of the WHO/ITU ehealth Strategy Toolkit The development of the South African ehealth Strategy aeed againt the recommendation of the WHO/ITU ehealth Strategy Toolkit Roemary Foter PhD a,b a ehealth Strategy and Policy Diviion, Medical Reearch

More information

ESRP Storage Program EMC Celerra NS20 (1,000 User) Storage Solution for Microsoft Exchange Server 2007

ESRP Storage Program EMC Celerra NS20 (1,000 User) Storage Solution for Microsoft Exchange Server 2007 ESRP Storage Program EMC Celerra NS20 (1,000 User) Storage Solution for Microsoft Exchange Server 2007 Tested with: ESRP Storage Version 2.0 Tested Date: 8/2/2007 EMC Corporation Corporate Headquarters

More information

EMC Solutions for Microsoft Exchange 2007 NS Series iscsi

EMC Solutions for Microsoft Exchange 2007 NS Series iscsi EMC Solutions for Microsoft Exchange 2007 NS Series iscsi Applied Technology Abstract This white paper presents the latest storage configuration guidelines for Microsoft Exchange 2007 on the Celerra NS

More information

See chapter 8 in the textbook. Dr Muhammad Al Salamah, Industrial Engineering, KFUPM

See chapter 8 in the textbook. Dr Muhammad Al Salamah, Industrial Engineering, KFUPM Goal programming Objective of the topic: Indentify indutrial baed ituation where two or more objective function are required. Write a multi objective function model dla a goal LP Ue weighting um and preemptive

More information

Stress-Blended Eddy Simulation (SBES) - A new Paradigm in hybrid RANS-LES Modeling

Stress-Blended Eddy Simulation (SBES) - A new Paradigm in hybrid RANS-LES Modeling Stre-Blended Eddy Simulation (SBES) - A new Paradigm in hybrid RANS-LES Modeling Menter F.R. ANSYS Germany GmbH Introduction It i oberved in many CFD imulation that RANS model how inherent technology limitation

More information

ESRP Storage Program EMC Celerra NS20 (700 User) Storage Solution for Microsoft Exchange Server 2007

ESRP Storage Program EMC Celerra NS20 (700 User) Storage Solution for Microsoft Exchange Server 2007 ESRP Storage Program EMC Celerra NS20 (700 User) Storage Solution for Microsoft Exchange Server 2007 Tested with: ESRP Storage Version 2.0 Tested Date: 8/2/2007 EMC Corporation Corporate Headquarters Hopkinton,

More information

Quadrilaterals. Learning Objectives. Pre-Activity

Quadrilaterals. Learning Objectives. Pre-Activity Section 3.4 Pre-Activity Preparation Quadrilateral Intereting geometric hape and pattern are all around u when we tart looking for them. Examine a row of fencing or the tiling deign at the wimming pool.

More information

Dynamically Reconfigurable Neuron Architecture for the Implementation of Self- Organizing Learning Array

Dynamically Reconfigurable Neuron Architecture for the Implementation of Self- Organizing Learning Array Dynamically Reconfigurable Neuron Architecture for the Implementation of Self- Organizing Learning Array Januz A. Starzyk,Yongtao Guo, and Zhineng Zhu School of Electrical Engineering & Computer Science

More information

Parameters, UVM, Coverage & Emulation Take Two and Call Me in the Morning

Parameters, UVM, Coverage & Emulation Take Two and Call Me in the Morning Parameter, UVM, Coverage & Emulation Take Two and Call Me in the Morning Michael Horn Mentor Graphic Corporation Colorado, USA Mike_Horn@mentor.com Bryan Ramirez Mentor Graphic Corporation Colorado, USA

More information

else end while End References

else end while End References 621-630. [RM89] [SK76] Roenfeld, A. and Melter, R. A., Digital geometry, The Mathematical Intelligencer, vol. 11, No. 3, 1989, pp. 69-72. Sklanky, J. and Kibler, D. F., A theory of nonuniformly digitized

More information

Comparison of Methods for Horizon Line Detection in Sea Images

Comparison of Methods for Horizon Line Detection in Sea Images Comparion of Method for Horizon Line Detection in Sea Image Tzvika Libe Evgeny Gerhikov and Samuel Koolapov Department of Electrical Engineering Braude Academic College of Engineering Karmiel 2982 Irael

More information

How to. write a paper. The basics writing a solid paper Different communities/different standards Common errors

How to. write a paper. The basics writing a solid paper Different communities/different standards Common errors How to write a paper The baic writing a olid paper Different communitie/different tandard Common error Reource Raibert eay My grammar point Article on a v. the Bug in writing Clarity Goal Conciene Calling

More information

Lecture 14: Minimum Spanning Tree I

Lecture 14: Minimum Spanning Tree I COMPSCI 0: Deign and Analyi of Algorithm October 4, 07 Lecture 4: Minimum Spanning Tree I Lecturer: Rong Ge Scribe: Fred Zhang Overview Thi lecture we finih our dicuion of the hortet path problem and introduce

More information

Development of an atmospheric climate model with self-adapting grid and physics

Development of an atmospheric climate model with self-adapting grid and physics Intitute of Phyic Publihing Journal of Phyic: Conference Serie 16 (2005) 353 357 doi:10.1088/1742-6596/16/1/049 SciDAC 2005 Development of an atmopheric climate model with elf-adapting grid and phyic Joyce

More information

ESRP Storage Program EMC Celerra NS20 (1,500 User) Storage Solution for Microsoft Exchange Server 2007

ESRP Storage Program EMC Celerra NS20 (1,500 User) Storage Solution for Microsoft Exchange Server 2007 ESRP Storage Program EMC Celerra NS20 (1,500 User) Storage Solution for Microsoft Exchange Server 2007 Tested with: ESRP Storage Version 2.0 Tested Date: 07/24/07 EMC Corporation Corporate Headquarters

More information

Resource Auto-Scaling and Sparse Content Replication for Video Storage Systems

Resource Auto-Scaling and Sparse Content Replication for Video Storage Systems 1 Reource Auto-Scaling and Spare Content Replication for Video Storage Sytem DI NIU 1, HONG XU 2 and BAOCHUN LI 3, Univerity of Alberta 1, City Univerity of Hong Kong 2, Univerity of Toronto 3 Many video-on-demand

More information

Reporting Checklist for Nature Neuroscience

Reporting Checklist for Nature Neuroscience Correponding Author: Manucript Number: Manucript Type: Jeremy Elman NNBC48172A Brief Communication Reporting Checklit for Nature Neurocience # Figure: 2 # Figure: 5 # Table: 6 # Video: 0 Thi checklit i

More information

On successive packing approach to multidimensional (M-D) interleaving

On successive packing approach to multidimensional (M-D) interleaving On ucceive packing approach to multidimenional (M-D) interleaving Xi Min Zhang Yun Q. hi ankar Bau Abtract We propoe an interleaving cheme for multidimenional (M-D) interleaving. To achieved by uing a

More information

Performance Evaluation of an Advanced Local Search Evolutionary Algorithm

Performance Evaluation of an Advanced Local Search Evolutionary Algorithm Anne Auger and Nikolau Hanen Performance Evaluation of an Advanced Local Search Evolutionary Algorithm Proceeding of the IEEE Congre on Evolutionary Computation, CEC 2005 c IEEE Performance Evaluation

More information

Aalborg Universitet. Published in: Proceedings of the Working Conference on Advanced Visual Interfaces

Aalborg Universitet. Published in: Proceedings of the Working Conference on Advanced Visual Interfaces Aalborg Univeritet Software-Baed Adjutment of Mobile Autotereocopic Graphic Uing Static Parallax Barrier Paprocki, Martin Marko; Krog, Kim Srirat; Kritofferen, Morten Bak; Krau, Martin Publihed in: Proceeding

More information