1 October 12, 2017 Project No Via David Yelton Deputy Building Official Department of Community Development - City of Beverly Hills 455 North Rexford Drive Beverly Hills, CA Re: April 24 to July 7, 2017 Dust Monitoring and Site Work Observations, Lots 12 and 13, Beverly Hills, California Dear Mr. Yelton: Lindmark Engineering (LE) is pleased to submit this report which documents the observations and dust monitoring for the additional maintenance work performed at Lots 12 and 13, south of North Santa Monica Boulevard (NSMB) and between Alden Drive and Doheny Drive, Beverly Hills (site). The site is depicted on Figures 1 through 3, Appendix A. The site consists of two vacant lots 12 and 13 which comprise the five parcels ; ; and , including the island property adjacent to and just west of Doheny Drive. The site majority owner is the Beverly Hills Land Company (BHLC), which was responsible for trimming all existing hedges, shrubs and plants, and cutting weeds at the site and abutting City of Beverly Hills (City) right of way. The BHLC completed maintenance work at the site on December 14, 2016, described by the City as Phase I, and LE prepared a report summarizing the observations and monitoring results performed, dated January 18, 2017 (Phase I report). Additional maintenance work was performed by the BHLC in February 2017, arsenic sampling was performed only on February 7, and LE conducted daily weather monitoring, and dust monitoring during landscaping maintenance activities. The additional observations and monitoring results were presented in a report, dated March 6, Additional maintenance activities were monitored by LE from March 23 through April 3, 2017, and presented in our report, dated April 28, The scope of work for the Phase I and additional maintenance work included fence repair and replacement, which had the potential to generate dust during the repair activities. No soil removal was conducted during the activities. Previous assessments at the site have found arsenic concentrations in soil above normal background for California soils with a maximum concentration of 996 milligrams per kilogram (mg/kg). Given the known site conditions and potential for dust generation, LE conducted dust monitoring at the site, on behalf of the City, including analytical testing for total arsenic in air. LE s Phase I report found that during site maintenance activities arsenic in dust was not detected in any project samples. The report also found the daily time-weighted average of total dust concentrations recorded during site work did not exceed a difference of 50 micrograms per cubic meter (μg/m 3 ) between upwind and downwind monitoring stations. This report summarizes the additional maintenance work performed on Lots 12 and 13, and on the island, by the BHLC between April 24 and July 7, The scope of the additional maintenance work was to: trim the grass and weeds within the interior of Lots 12 and 13, within 2 feet of NSMB at Lot Townsgate Road, Suite 330, Westlake Village, California T F
2 David Yelton October 12, 2017 and 13, trim the weeds along the fence line against Civic Center Drive at Lot 13, and trim the grass and weeds around the outer perimeter of the island. Maintenance work also including trimming the shooters and branches around the stumps in advance of stump removal activities. The additional maintenance involved similar work activities as performed during the Phase I maintenance. Arsenic sampling, dust monitoring, and weather monitoring was conducted daily during landscaping maintenance activities, and arsenic samples were analyzed as described in this report. SITE WORK OBSERVATIONS LE observed the site maintenance activities by the BHLC between April 24 and July 7, 2017 (see Table 1 for specific work dates). Site work was generally performed along the fence line adjacent to NSMB, along the fence line adjacent to Civic Center Drive, and on the island. A list of work dates and the approximate location of work performed each day is summarized on Table 1, Appendix B. A detailed description of work performed each day is summarized on the daily field reports, included as Appendix C. Landscaping maintenance work was performed by BHLC s contractor Westchester Landscape. Site work generally consisted of clipping, cutting, and sawing bushes, branches, and shrubs. Workers also performed weed whacking and hand clipping of weeds and grass. DUST MONITORING AND ARSENIC SAMPLING ACTIVITIES The community action level for total dust concentrations, based on South Coast Air Quality Management District (AQMD) regulations, is a difference of 50 μg/m 3 between upwind and downwind monitoring stations. Each day where landscaping maintenance was performed, monitoring stations for total dust in air were generally positioned upwind and downwind of the work area, located along the northern or southern fence line of Lots 12 and 13 and the island using MIE Model 1000 personal dust monitors. The monitoring station located on the north fence line was generally upwind of the work area when wind directions were coming from the north, west, or southwest, and the monitoring station located on the south fence line was generally upwind of the work area when wind directions were coming from the south, southeast, and east. LE monitored the on-site weather station and the dust monitoring instruments approximately every 15 minutes during site work. The stations were generally adjusted to follow the site workers and current wind conditions. Note, only one dust monitor was used for both upwind and downwind locations on July 3, 6, and 7, The field monitoring logs are included as Appendix D, which indicate total dust concentrations at each monitoring station, wind speed and direction, and site work observations. Each day the concentration of arsenic in dust was sampled during work hours using air sampling pumps attached to 37 mm MCE filter cartridges. With the exception of samples collected on June 2 and 14, the cartridges were submitted to a State-certified laboratory for analysis using NIOSH Method 7300M. Arsenic was sampled at the same locations where upwind and downwind monitoring stations were positioned. Beginning on May 12, 2017, arsenic samples were only collected at the downwind monitoring station. The laboratory analytical results for arsenic in air are included as Appendix E. The sample chain of custody forms are also included and document the sample identification number, sample location, sampling time and date. SUMMARY OF DUST MONITORING FINDINGS The daily time-weighted average of total dust concentrations recorded during site work did not exceed a difference of 50 μg/m 3 between upwind and downwind monitoring stations on any of the work days. April through July Maintenance Report Page 2 Lindmark Engineering
3 David Yelton October 12, 2017 Refer to the field monitoring logs, included in Appendix D, for each work day to determine which monitoring station was representative of the downwind sampling position. Small amounts of dust were observed on occasion. Note, no field monitoring log is available for April 26, 2017, however the daily field report did not indicate the activities produced excessive dust. On May 24 and 25, 2017, while collecting leaf cuttings in the eastern portion of Lot 12, LE observed a small amount of dust above the cuttings as they were loaded into the stake bed truck. LE recommended to cover the stake bed with a tarp, load the cuttings slower, and toward the back of the stake bed. LE observed some dust while workers removed weeds with powered tools at Lot 13 on June 6, LE immediately stopped work and workers misted the area with water. Similarly on June 9, LE observed some dust during weed whacking, however the dust may have been plant-derived and not soil dust, furthermore the dust readings did not indicate an increase in dust from upwind to downwind monitoring stations. After applying more water to the area, the visible dust was reduced to a very minimal amount. Observations of visible dust are documents on the daily field reports, included as Appendix C. Note, no daily field report is available for June 8, Samples of arsenic in air collected on these dates did not detect arsenic at or above their respective reporting limits. SUMMARY OF ARSENIC SAMPLING FINDINGS Based on the volume of air sampled during each work day, arsenic in air was not detected at or above the reporting limits ranging between µg/m 3 (equivalent to mg/m 3 ) and 1.5 µg/m 3 (equivalent to mg/m 3 ). The reporting limit is the lowest concentration that can be reported by the laboratory given the operational time of the pumps. CONCLUSIONS Based on the available data, concentrations did not exceed the site action level at the fence line. Furthermore, the time-weighted average of total dust concentrations between upwind and downwind monitoring stations was below the community action level of 50 μg/m 3. Based on LE s observations of site work activities, and our monitoring and analytical data, LE concludes the activities did not pose an environmental concern to the community during this project, however a water truck should be available at all times for dust suppression, since activities not involving power tools may still generate dust if the soil is sufficiently dry (eg. vehicle traffic, digging, and raking). RECOMMENDATIONS LE recommends to continue collecting downwind air samples for total arsenic in dust, however we recommend only analyzing the sample in the event dust is observed in the work area. Please call me at if you have any questions. Best regards, David W. Smith, PG Senior Project Geologist April through July Maintenance Report Page 3 Lindmark Engineering
4 David Yelton October 12, 2017 Ulf Lindmark, PE, BCEE President UML:dws Enclosures: Appendix A Figures 1 through 3 Appendix B Table 1 Appendix C Daily Field Reports Appendix D Field Monitoring Logs Appendix E Laboratory Analytical Results April through July Maintenance Report Page 4 Lindmark Engineering
5 APPENDIX A Figures 1 through 3 April through July Maintenance Report Lindmark Engineering
6 PROJECT COMPLETION REPORT LOTS 12 AND 13 1/17
7 HILLCREST DR. ARDEN DR. ALLEY WAY PLANTER PLANTER PLANTER ALLEY WAY ALTA DR. LAWN LAWN LAWN LOT 13 LOT 13 CIVIC CENTER DR. CIVIC CENTER DR. PROJECT COMPLETION REPORT LOTS 12 AND 13 1/17 2
8 ALLEY WAY ALLEY WAY CARMELITA DR. SIERRA DR. ALTA DR. PLANTER PLANTER LAWN LAWN LOT 13 LOT 13 CIVIC CENTER DR. PROJECT COMPLETION REPORT LOTS 12 AND 13 1/17 3
9 APPENDIX B Table 1 April through July Maintenance Report Lindmark Engineering
10 Table 1 Location of Daily Work Areas Lots 12 and 13, Beverly Hills, Ca Lot 12 Lot 13 Work Date Alpine Dr. Foothill Dr. Elm Dr. Maple Dr. Palm Dr. Palm Dr. Hillcrest Dr. Arden Dr. Alta Dr. Sierra Dr. Carmelita Dr. 4/24/2017 4/25/2017 4/26/2017 5/2/2017 5/3/2017 5/4/2017 5/8/2017 5/9/2017 5/10/2017 5/11/2017 5/12/2017 5/15/2017 5/16/2017 5/17/2017 5/18/2017 5/19/2017 5/22/2017 5/23/2017 5/24/2017 5/25/2017 5/26/2017 5/30/2017 5/31/2017 6/1/2017 6/2/2017 6/5/2017 6/6/2017 6/7/2017 6/8/2017 6/9/2017 6/12/2017 ` 6/13/2017 6/14/2017 6/15/2017 6/19/2017 6/26/2017 6/27/2017 6/28/2017 6/29/2017 6/30/2017 7/3/2017 7/6/2017 7/7/2017 Notes: = Site work predeminately located along North Santa Monica Boulevard = Site work predeminately located along Civic Center Drive = Site work located throughout the lot = Site work located throughout the island No site work where not color-coded Island
11 APPENDIX C Daily Field Reports April through July Maintenance Report Lindmark Engineering
12
13
14 Field Report Sheet _, of L Townsgate Road, Suite 330, Westlake Village, California T F Proj. # :{tj/('-156 Proj. Name CBIt hdsi~am f} MrMtrt. Date 1/:1,//" Proj. Addr. His Ic'l a'll 13 Arrival Time Departure Time Agency representatives on-site Equipmenton1te(~ ~~~~~~~~O~O~~~~~~~t~(~~~~~_S~~~/~~~~~~~~~~~~~~,~ Equipment on-site (s~c~kfr;rtors) r4h~ SJI6V; ~, hajj. htlf~ SUMMARY OF WORK PERFORMED ul,,,, Action Required
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54 APPENDIX D Field Monitoring Logs April through July Maintenance Report Lindmark Engineering
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97 APPENDIX E Laboratory Analytical Results April through July Maintenance Report Lindmark Engineering
98 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /25/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 04/26/17 Date Analyzed: 04/25/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1155 Arsenic <1.0 <0.87 < AS S 1155 Arsenic <1.0 <0.87 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
99 OrderID: Page 1 Of 1
100 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /27/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 04/28/17 Date Analyzed: 04/27/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1723 Arsenic <1.0 <0.58 < AS S 1723 Arsenic <1.0 <0.58 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
101 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /27/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: Revise Date: /28/17 05/02/17 Date Analyzed: 04/27/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1073 Arsenic <1.0 <0.93 < AS S 1723 Arsenic <1.0 <0.58 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. Note: #1 Revised Volume to 1073 L by JN. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
102 OrderID: Page 1 Of 1
103 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /27/ Project: CBH Lots 12 and 13 Maintennance Phone: Fax: Report Date: 04/28/17 Date Analyzed: 04/27/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1155 Arsenic <1.0 <0.87 < AS S 1155 Arsenic <1.0 <0.87 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
104 OrderID: Page 1 Of 1
105 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /03/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/04/17 Date Analyzed: 05/03/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1073 Arsenic <1.0 <0.93 < AA S 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
106 OrderID: Page 1 Of 1
107 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /04/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/05/17 Date Analyzed: 05/05/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1073 Arsenic <1.0 <0.93 < AS S 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
108 OrderID: Page 1 Of 1
109 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /05/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/08/17 Date Analyzed: 05/05/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1073 Arsenic <1.0 <0.93 < AS S 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
110 OrderID: Page 1 Of 1
111 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /10/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/11/17 Date Analyzed: 05/11/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 1031 Arsenic <1.0 <0.97 < AS S 1031 Arsenic <1.0 <0.97 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
112 OrderID: Page 1 Of 1
113 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /10/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/12/17 Date Analyzed: 05/11/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS N 990 Arsenic <1.0 <1.0 < AS S 990 Arsenic <1.0 <1.0 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
114 OrderID: Page 1 Of 1
115 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /12/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/19/17 Date Analyzed: 05/16/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S 831 Arsenic <1.0 <1.2 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
116 OrderID: Page 1 Of 1
117 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /12/ Project: CBH Lots 12 and 13 Tree Trimming Phone: Fax: Report Date: 05/19/17 Date Analyzed: 05/16/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS CBH 825 Arsenic <1.0 <1.2 < AS BHLC 1018 Arsenic <1.0 <0.98 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
118 OrderID: Page 2 Of 2
119 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /15/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/22/17 Date Analyzed: 05/16/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 1114 Arsenic <1.0 <0.90 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
120 OrderID: Page 1 Of 1
121 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /17/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/23/17 Date Analyzed: 05/19/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 990 Arsenic <1.0 <1.0 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
122 OrderID: Page 1 Of 1
123 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /17/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/23/17 Date Analyzed: 05/19/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
124 OrderID: Page 1 Of 1
125 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /18/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/24/17 Date Analyzed: 05/19/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
126 OrderID: Page 1 Of 1
127 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /22/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/30/17 Date Analyzed: 05/25/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC N/A Arsenic <1.0 NA NA 1.0 Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
128 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /22/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: Revised : /30/17 06/05/17 Date Analyzed: 05/25/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. Note: Sample volume added on 6/15/17 by JN. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
129 OrderID: Page 1 Of 1
130 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /22/ Project: CBH Lots 12 and 13 Maintenance Phone: Fax: Report Date: 05/30/17 Date Analyzed: 05/30/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC Arsenic <1.0 <0.89 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
131 OrderID: Page 1 Of 1
132 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 05/23/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 05/30/17 Date Analyzed: 05/25/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC 1144 Arsenic <1.0 <0.87 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
133 OrderID: Page 1 Of 1
134 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 05/24/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 06/01/17 Date Analyzed: 05/30/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC Arsenic <1.0 <0.89 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
135 OrderID: Page 1 Of 1
136 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 05/25/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 06/01/17 Date Analyzed: 05/30/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC Arsenic <1.0 <0.84 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
137 OrderID: Page 1 Of 1
138 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 05/26/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 06/05/17 Date Analyzed: 05/31/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC Arsenic <1.0 <0.85 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
139 OrderID: Page 1 Of 1
140 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 05/30/ Project: City of Beverly Hills Lots 12 & 13 and Island Phone: Fax: Report Date: 06/06/17 Date Analyzed: 05/31/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS BHLC Arsenic <1.0 <0.85 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
141 OrderID: Page 1 Of 1
142 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /31/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/06/17 Date Analyzed: 05/31/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S Arsenic <1.0 <1.1 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
143 OrderID: Page 1 Of 1
144 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/01/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/08/17 Date Analyzed: 06/06/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S Arsenic <1.0 <0.97 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
145 OrderID: Page 1 Of 1
146 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/02/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/08/17 Date Analyzed: 06/06/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS060117S Arsenic <1.0 <0.97 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
147 OrderID: Page 1 Of 1
148 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/06/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/08/17 Date Analyzed: 06/06/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS060517S Arsenic <1.0 <1.1 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
149 OrderID: Page 1 Of 1
150 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/07/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/12/17 Date Analyzed: 06/08/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS060617S Arsenic <1.0 <1.1 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
151 OrderID: Page 1 Of 1
152 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/08/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/14/17 Date Analyzed: 06/12/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS060717S Arsenic <1.0 <1.0 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
153 OrderID: Page 1 Of 1
154 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/09/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/16/17 Date Analyzed: 06/12/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S Arsenic <1.0 <1.0 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
155 OrderID: Page 1 Of 1
156 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM /12/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/19/17 Date Analyzed: 06/13/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S 1073 Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
157 OrderID: Page 1 Of 1
158 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/13/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/20/17 Date Analyzed: 06/13/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S Arsenic <1.0 <1.0 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
159 OrderID: Page 1 Of 1
160 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/14/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/20/17 Date Analyzed: 06/19/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS S Arsenic <1.0 <0.93 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
161 OrderID: Page 1 Of 1
162 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/16/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/23/17 Date Analyzed: 06/21/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS061517S Arsenic <1.0 <1.1 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
163 OrderID: Page 1 Of 1
164 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/20/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 06/27/17 Date Analyzed: 06/21/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS061917S Arsenic <1.0 <1.5 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
165 OrderID: Page 1 Of 1
166 LA Testing 5431 Industrial Drive, Huntington Beach, CA Order ID: Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road Suite 330 Westlake Village, CA Customer ID: Customer PO: Date Received: LA Testing Order: LNDM42 06/27/ Project: CBH Lots 12 & 13 Phone: Fax: Report Date: 07/05/17 Date Analyzed: 06/29/17 Metals in MCE cassette by ICP - NIOSH 7300M Lab ID Client ID Vol. (L) Analyte µg/filter µg/m 3 mg/m 3 Reporting Limit (µg/filter) AS062617S Arsenic <1.0 <1.1 < Sample received in acceptable condition unless otherwise noted. This report may not be reproduced except in full, without written approval by LA Testing. This report relates only to those items tested. Unless otherwise noted, the results in this report have not been blank corrected. Quality Control Data associated with this sample set is within acceptable limits, unless otherwise noted. JN Analyst Michael Chapman- Laboratory Manager Or other approved signatory AIHA- LAP, LLC Accredited - Laboratory ID # Page 1 of 1
167 OrderID: Page 1 Of 1
168 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/6/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 6/28/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 & 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
169 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 06/28/17 9:20 AM Project: CBH Lots 12 & 13 Analytical Results Client Sample Description AS062717S Collected: 6/27/2017 Lab ID: Downwind Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/3/2017 AE 7/3/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/6/ :15:54 AM Page 2 of 2
170 OrderID: Page 1 Of 1
171 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/6/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 6/29/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
172 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 06/29/17 9:20 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS062817S Collected: 6/28/2017 Lab ID: Downwind Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 6/29/2017 AE 6/29/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/6/ :34:46 AM Page 2 of 2
173 OrderID: Page 1 Of 1
174 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/6/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 6/30/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
175 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 06/30/17 9:20 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS062917S Collected: 6/29/2017 Lab ID: Downwind Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/3/2017 AE 7/3/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/6/ :35:20 AM Page 2 of 2
176 OrderID: Page 1 Of 1
177 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/6/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 7/3/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
178 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 07/03/17 9:10 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS063017S Collected: 6/30/2017 Lab ID: Downwind Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/5/2017 AE 7/5/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/6/2017 1:19:39 PM Page 2 of 2
179 OrderID: Page 1 Of 1
180 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/10/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 7/5/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
181 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 07/05/17 9:15 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS070317S Collected: 7/3/2017 Lab ID: Downwind 8:00:00 AM Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/6/2017 AE 7/6/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/10/2017 2:32:16 PM Page 2 of 2
182 OrderID: Page 1 Of 1
183 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/10/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 7/7/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
184 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 07/07/17 9:25 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS070617S/G Collected: 7/6/2017 Lab ID: Downwind 8:30:00 AM Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/7/2017 AE 7/7/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/10/2017 2:33:02 PM Page 2 of 2
185 OrderID: Page 1 Of 1
186 Attn: EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone: (856) Fax: (856) Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: 7/13/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 7/11/2017. The results are tabulated on the attached data pages for the following client designated project: CBH Lots 12 and 13 The reference number for these samples is EMSL Order # Please use this reference when calling about these samples. If you have any questions, please do not hesitate to contact me at (856) Approved By: Phillip Worby, Environmental Chemistry Laboratory Director AIHA-LAP, LLC-IHLAP Lab # NELAP Certification: NJ 03036; NY The samples associated with this report were received in good condition unless otherwise noted. This report relates only to those items tested as received by the laboratory. The QC data associated with the sample results meet the recovery and precision requirements unless specifically indicated. The final results are not blank corrected unless specifically indicated. The laboratory is not responsible for final results calculated using air volumes that have been provided by non-laboratory personnel. This report may not be reproduced except in full and without written approval by EMSL Analytical, Inc. Page 1 of 2
187 EMSL Analytical, Inc. 200 Route 130 North, Cinnaminson, NJ Phone/Fax: (856) / (856) EnvChemistry2@emsl.com EMSL Order: CustomerID: CustomerPO: ProjectID: LNDM42 Attn: Ulf Lindmark Lindmark Engineering 2625 Townsgate Road, Suite 330 Westlake Village, CA Phone: (818) Fax: Received: 07/11/17 7:45 AM Project: CBH Lots 12 and 13 Analytical Results Client Sample Description AS070717S Collected: 7/7/2017 Lab ID: Downwind Method Parameter Result RL Units Prep Date Analyst Analysis Date 7300 Modified Arsenic ND mg/m³ 7/11/2017 AE 7/11/2017 DM Analyst Definitions: ND - indicates that the analyte was not detected at the reporting limit RL - Reporting Limit (Analytical) ChemSmplw/RDL/AIHA Printed: 7/13/2017 2:00:55 PM Page 2 of 2
188 OrderID: Page 1 Of 1
Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:
ENVIRONMENTAL QUESTIONNAIRE City of Twentynine Palms Community Development Department 6136 Adobe Road Twentynine Palms, CA 92277 (760) 367-6799 Fax (760) 367-5400 29palms.org : Please complete each statement
More informationKaren O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL
5012 W. Lemon Street Tampa, Florida 33609 Ph 813.944.3464 Fax 813.944.4959 December 31, 2015 (via email) Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL 33602 kozwolak@tecoenergy.com
More informationEXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS
DOÑA ANA COUNTY COMMUNITY PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Building Planning GIS 845 North Motel Boulevard Las Cruces, New Mexico 88007 (575) 647-7350 Fax: (575) 525-6131 Toll Free: 1 (877)
More informationSECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS
SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES PROOF OF SERVICE NOTICE TO COMMUNITY ORGANIZATIONS PUBLIC NOTICE NOTICE IN UTILITY BILLS NOTICE OF OWNERS OF PROPERTY
More informationVariance Project Black Flag Attachments:
Variance 15-01 Project Black Flag Attachments: 1. Locator 2. VAR 15-01 Staff report 3. Variance Exhibit 4. Applicant s Statement E Lookout Dr N Plano Rd 1402 E. Lookout Dr. N Greenville Ave Woodglen Dr
More informationElectrical News. The Industry s Choice for News Media Kit
Electrical News The Industry s Choice for News 2018 Media Kit 2018 RATES FOR PRINT 90,000+ CIRCULATION PUBLISHED MONTHLY RATES ARE MONTHLY & BASED ON SIZE, FREQUNCY & ARE FOR BLACK AND WHITE SIZE & FREQUENCY
More informationPublic Notification Letter
2000 Powell Street, Ste. 600 Emeryville, CA 94608 USA +1.510.452.8000 main +1.510.452.8001 fax Public Notification Letter To: Interested Parties From: SCS Global Services Date: 29 th of March 2016 Re:
More informationEBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston
EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry
More informationPROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year
VREDEKLOOF COMMUNITY IMPROVEMENT DISTRICT 5 YEAR IMPLEMENTATION PLAN 1st July 2018 to 30th June 2019 PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS 1. Successful day-to-day management and operations
More informationFebruary 11, Mr. Michael Cox Arkansas Egg, LLC Mill Road Summers, AR Compliance Inspection AFIN: , Permit No.
February 11, 2013 Mr. Michael Cox Arkansas Egg, LLC 24185 Mill Road Summers, AR 72769 Re: Compliance Inspection AFIN: 72-00198, Permit No.: 5164-W Dear Mr. Cox: On January 29, 2013, I performed a routine
More informationATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application
Decision 2014-039 Dawes Substation and Telecommunications Tower Project Facility Application February 19, 2014 The Alberta Utilities Commission Decision 2014-039: Dawes Substation and Telecommunications
More informationJennie Bricker Land & Water Law
Jennie Bricker Land & Water Law 818 SW Third Avenue, PMB 1517 Portland, Oregon 97204 Email; iennie@ibrickeriaw,com Telephone: 503-928-0976 April I/ 2016 Public Utility Commission of Oregon Filing Center
More informationPermit Application Packet for Sand Pushing
Permit Application Packet for Sand Pushing Prior to pushing or redistributing sand on your property you must obtain a CAMA EMERGENCY GENERAL PERMIT; see attached activation letter and permit application.
More informationAGENDA 5. ALBERT ROBLES CENTER (ARC) DESIGN-BUILD PROJECT PROGRESS REPORT 6. ALBERT ROBLES CENTER (ARC) OUTREACH PROGRAMS UPDATE
CAPITAL IMPROVEMENT PROJECTS (CIP) COMMITTEE WATER REPLENISHMENT DISTRICT OF SOUTHERN CALIFORNIA 4040 PARAMOUNT BLVD., LAKEWOOD, CA. 90712 11:00 AM, WEDNESDAY, JULY 11, 2018 AGENDA Each item on the agenda,
More informationCity of Ames Street Banner Policy
The City of Ames is for regulating all banners to be placed in the following locations: Campustown, Downtown, University Boulevard - Lincoln Way to US 30, University Boulevard - ISU Research Park, South
More informationTransWest Express Transmission Project Interregional Transmission Project Submittal
TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March
More informationDATE: JANUARY 24,2008 REAL ESTATE DIVISION
Executive Director's Report to the Board of Harbor Commissioners DATE: JANUARY 24,2008 FROM: REAL ESTATE DIVISION SUMMARY: The proposed Agreement with Meridian Management Corporation (Meridian) provides
More informationNorth Gila-Imperial Valley #2 Transmission Project
North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------
More informationPlease refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.
October 3, 2013 Mr. Pravin Patel Hanumanta, LLC P.O. Box 185 Heth, AR, 72346 RE: Wastewater Compliance Inspection, Super 8 Motel AFIN: 62-00066 Permit No.: AR0044695 Dear Mr. Patel: On September 11, 2013
More informationENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE
1 of 6 List of Topics Covered in this Item: Primary and Secondary Accreditation...1 Personnel...2 Fields of Accreditation...2 Interim Accreditation...3 Notification and Reporting...3 Corrective Actions
More informationAppendix C.6. Best Management Practices for Construction Activities
Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has
More informationMalibu Civic Center Stakeholders Meeting. October 25, 2012
Malibu Civic Center Stakeholders Meeting October 25, 2012 Malibu Civic Center Stakeholders Meeting 1. RWQCB Agenda 2. Wastewater Facility Design 3. Formation of the Community Facilities District (CFD)
More informationDecision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement
Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,
More informationSTAFF REPORT. Meeting Date: To: From: La Cienega Station. Subject: Attachments:
Ii STAFF REPORT Meeting Date: To: From: Subject: June 20, 2017 Honorable Mayor & City Council Mark Cuneo, City Engineer Robert Welch, Project Manager Metro Purple Line Extension Section 1 Construction
More informationAppendix H PCB Inspection and Sampling Information for Building G (500, Angel Shark) at Malibu High School
Appendix H PCB Inspection and Sampling Information for Building G (500, Angel Shark) at Malibu High School ENVIRON Tables ENVIRON Table H-4 Summary of Pre- and Post-BMP Annual Cleaning Air Sampling Results
More informationQuanta Resources Corporation Superfund Site, Operable Unit 1 (OU1) Edgewater, New Jersey Progress Report July 2015
CH2M BOS 18 Tremont Street Suite 700 Boston, MA 02108-2307 O +1 617.523.2002 F +1 617.723.9036 www.ch2m.com August 7, 2015 Mr. Richard Ho, RPM/OSC U.S. Environmental Protection Agency Region 2 Emergency
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located
More informationReston Town Center North Development. Community Update
Reston Town Center North Development Community Update May 31, 2017 1 Presentation Agenda Project Overview Site and Current Property Ownerships Development Plan/Grid of Streets Proposed Ownership Comprehensive
More informationBEVRLYRLY STAFF REPORT. Meeting Date: August 4, 2015 Item Number: To: From:
BEVRLYRLY STAFF REPORT Meeting Date: August 4, 215 Item Number: To: From: Honorable Mayor & City Council Mark Cuneo, City Engineer Aaron Kunz, Deputy Director of Transportation Subject: Update on Metro
More informationORDNANCE NO. A municipal setting designation ordinance prohibiting the use of designated groundwater from
761111 6-22-16 ORDNANCE NO. 30 1 3 2 A municipal setting designation ordinance prohibiting the use of designated groundwater from beneath property generally located at 9365 and 9371 Garland Road and supporting
More informationAppendix F Notices
Appendix F Email Notices 2015 2016 Scoping Period From: Sent: To: Subject: CoSu Line Project on behalf of CoSu Line Project Friday, December
More informationOctober 2001 (June 2002 revision) Greenpoint Tittabawassee River Dioxin Study Area Phase I Sampling Study Report
October 2001 (June 2002 revision) Greenpoint Tittabawassee River Dioxin Study Area Phase I Sampling Study Report Summary Soil samples collected as part of a wetland mitigation project identified elevated
More informationFacebook West Campus. Planning Commission Meeting February 25, 2013
Facebook West Campus Planning Commission Meeting February 25, 2013 Meeting Purpose Review and make a recommendation to the City Council on the following items (Attachment C): Statement of Overriding Considerations
More informationPage 1 of 21. Friday, June 30, Mr. Eric Cureton THE EI GROUP, INC. 15 E SALEM AVENUE, SE SUITE 301 ROANOKE, VA TEL: FAX: (540)
REI Consultants, Inc. PO Box 286 Beaver, WV 25813 TEL: (304) 255-2500 Website: www.reiclabs.com 3029-C Peters Creek Road Roanoke, VA 24019 TEL: 540.777.1276 1557 Commerce Road, Suite 201 Verona, VA 24482
More information1. Significant Changes
Security Upgrades Project (NMSSUP) Phase II, Los Alamos National Laboratory (LANL), Los Alamos, New Mexico Project Data Sheet is for Construction 1. Significant Changes The most recent DOE O 413.3B approved
More informationEXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT
16 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 18, 2015 SUBJECT: ACTION: EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF
More informationCITY OF NORTH OLMSTED ORDINANCE NO
CITY OF NORTH OLMSTED ORDINANCE NO. 2011-74 BY: Mayor Kennedy AN ORDINANCE AMENDING SECTION 915.04 OF THE CODIFIED ORDINANCES OF THE CITY OF NORTH OLMSTED TO ESTABLISH REVISED CHARGES FOR THE USE OF THE
More information# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:
BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design
More informationEnvironmental Impact Questionnaire
Community Development Department 11 English Street Petaluma, CA 94952 Phone: 707-778-4301 Email: cdd@ci.petaluma.ca.us Web: www.cityofpetaluma.net/cdd Building Geographic Information Systems Housing Neighborhood
More informationMetrobus 30s Line Enhancements
Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationAURA BOCA COLONNADE Project #RW
LWDD Board Workshop 03/06/2018 - Agenda Item #3 AURA BOCA COLONNADE Project #RW-18-0027 March 6, 2018 Nicole Smith, Right-of-Way Coordinator SITE Looking East from Congress Avenue Congress Avenue L-42
More informationStem Beach Solar 1041 Application
Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project
More informationBEFORE THE CHRISTCHURCH DISTRICT PLAN INDEPENDENT HEARINGS PANEL
BEFORE THE CHRISTCHURCH DISTRICT PLAN INDEPENDENT HEARINGS PANEL IN THE MATTER OF The Resource Management Act 1991 AND IN THE MATTER OF The Canterbury Earthquake (Christchurch Replacement District Plan)
More informationUE CONNECTION APPLICATION - POLE to PIT (Underground Electricity Supply)
Phone 1300 131 689 Business Hours 8:00AM 5:00PM United Energy ABN 70 064 651 029 Scan & Email undergroundsupply@ue.com.au Attn: Customer and Market Operations PO Box 449 Mount Waverley VIC 3149 Thank you
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 11, 2016 SUBJECT: Request to ratify advertisement of public hearings by the Planning Commission and the County
More informationThe North American Electric Reliability Corporation ( NERC ) hereby submits
March 3, 2011 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric
More information4215 Exchange Ave, Vernon
4215 Exchange Ave, Vernon 112,933 SF on 5.03 Acres USDA Processing Facility Rail Served (LAJ) 21 DH Positions / 1,273 Sewer Units Call for Leaseback Details ** Exclusively Listed By: John Repstad Senior
More informationTOWN MANAGER S WEEKLY REPORT
TOWN MANAGER S WEEKLY REPORT UPCOMING MEETINGS & EVENTS Planning Commission Meeting: Wednesday, February 15, 6:00 PM, Town Hall 1. Shops of College Park Retail and Hotel 2. VA Clinic Additional Signage
More informationINDUSTRIAL DRYCLEANER WOES, VERNON, CALIFORNIA Kevin Green R.G., SCS ENGINEERS Darren Ness, R.E.A., SCS ENGINEERS Thomas Dong, R.E.A.
BACKGROUND INDUSTRIAL DRYCLEANER WOES, VERNON, CALIFORNIA Kevin Green R.G., SCS ENGINEERS Darren Ness, R.E.A., SCS ENGINEERS Thomas Dong, R.E.A., SCS ENGINEERS A fire at a former industrial dry cleaning
More informationPLANNING COMMISSION WORK SESSION
DEPARTMENT OF BUILDING AND DEVELOPMENT Date of Meeting: STAFF REPORT PLANNING COMMISSION WORK SESSION SUBJECT: ELECTION DISTRICT: FIDP-2016-0002, Ashburn Station North Broad Run CRITICAL ACTION DATE: STAFF
More informationDowntown Boise Multimodal Center
Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department
More informationBicycle Access & Parking Plan Project List Review
Bicycle Access & Parking Plan Project List Review Bicycle Advisory Committee September 19th, 2013 Strategy Overview New Bicycle Issues and Ideas (BAC, staff, public) Funding External Agency Lead BAPP s
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 22, 2017 DATE: April 10, 2017 SUBJECT: U-3481-17-1 USE PERMIT for a telecommunications facility located at 1200 Fort Myer Drive (RPC#
More informationCDSN Universal Minimum Data Elements Physical/Chemical Data 2015
COLORADO WATER QUALITY MONITORING COUNCIL COLORADO DATA SHARING NETWORK P.O. Box 2058 Ridgway, CO 81432 970-258-0836 cdsn@coloradowater.org www.coloradowaterdata.org July 1, 2015 CDSN Universal Minimum
More informationRainforest Alliance. Spatial data requirements and guidance. June 2018 Version 1.1
Rainforest Alliance Spatial data requirements and guidance June 2018 Version 1.1 More information? For more information about the Rainforest Alliance, visit www.rainforest-alliance.org or contact info@ra.org
More informationKamaole Sands 2695 South Kihei Road, Kihei, Hawaii, Association of Apartment Owners (808) facsimile: (808)
Kamaole Sands 2695 South Kihei Road, Kihei, Hawaii, 96753 Association of Apartment Owners (808) 270-1206 facsimile: (808) 270-1255 To: Distribution From: J. Delos Santos/AOAO GM Date: 8/16/10 RE: Project
More informationRE: National Alliance for Water Innovation Support for Clean Water Hub Application
September 28, 2017 Dr. Peter S. Fiske Director Water-Energy Resilience Institute Lawrence Berkeley National Laboratory 1 Cyclotron Road Mailstop 74R316C Berkeley, CA 94720-8099 Office: 074-0314 M: (415)
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 18, 2016 DATE: June 7, 2016 SUBJECT: U-3279-11-1 USE PERMIT AMENDMENT to add an antenna and equipment to an existing telecommunications
More informationPlanning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado TTY/TDD Lakewood.
Planning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado 80226-3127 303.987.7505 303.987.7057 TTY/TDD Lakewood.org/Planning PLANNING COMMISSION REPORT SPECIAL USE PERMIT CASE
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 25, 2012
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 25, 2012 Item 23, Report No. 33, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re The Narragansett Electric Company : : Docket No. SB-2017-01 () : Pre-Filed Testimony of Daniel Ewan, Clear River Energy
More informationResponse to Santa Barbara County Grand Jury Reports (1) Santa Barbara County Emergency Operations Center (2) Emergency Public Information
County of Santa Barbara FIRE DEPARTMENT / OFFICE OF EMERGENCY SERVICES 4410 CATHEDRAL OAKS ROAD SANTA BARBARA, CALIFORNIA 93110-1042 TEL 805.681.5526 FAX 805.681.5553 John M. Scherrei Fire Chief Bruce
More informationBC OnLine. Site Registry User s Guide. Last Updated June 11, 2014
BC OnLine Site Registry User s Guide Last Updated June 11, 2014 Copyright Copyright 2014 Province of British Columbia. All rights reserved. This user s guide is for users of the BC OnLine services who
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2016 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2017 Introduction The
More informationRevised 2018 LESLIE KARR MANAGER, CURRENT PLANNING. Attachment. Dear Preliminary Plat Applicant:
Revised 2018 Dear Preliminary Plat Applicant: As part of your application process, you are required to notify surrounding property owners of your public hearing before the Planning Commission to consider
More informationThe Institute of Internal Auditors San Gabriel Valley Chapter
The Institute of Internal Auditors San Gabriel Valley Chapter Presents INFORMATION TECHNOLOGY (IT) and PERFORMANCE AUDITING SEMINAR February 4 and 5, 2014 The San Gabriel Valley Chapter of the IIA is hosting
More informationSEPTIC SYSTEM RECORDS CATALOG RFP QUESTIONS AND ANSWERS February 13, 2017
Department of Public Health and Environment Lowell Johnson Director David Brummel Deputy Director SEPTIC SYSTEM RECORDS CATALOG RFP QUESTIONS AND ANSWERS February 13, 2017 1. Can companies from outside
More informationValidation Report 11 September 2007
Validation Report DCM SHRIRAM CONSOLIDATED LTD. VALIDATION OF THE REVISED MONITORING PLAN OF THE REGISTERED CDM-PROJECT NO. 0332 AJBAPUR SUGAR COMPLEX COGENERATION PROJECT REPORT NO. 962892-RM 11 September
More informationAugust 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner
August 10, 2010 Sacramento County Planning and Community Development 827-7th Street Sacramento, CA 95814 Attn: RE: Tricia Stevens, Principal Planner Conditional Use Permit Application Material / Justification
More informationGORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801
GORE BUILDING 238 N. Massachusetts Avenue, Lakeland, FL 33801 CDB LOCATION REDEVELOPMENT PROJECT MUNN PARK HISTORIC DISTRICT INCENTIVES AVAILABLE ADJACENT PARKING INCLUDED BK698301 Phone: (863) 683-3425
More informationSTRUCTURAL STABILITY ASSESSMENT REPORT
STRUCTURAL STABILITY ASSESSMENT REPORT Economizer Ash System, Big Bend Power Plant Apollo Beach, Florida PREPARED FOR: Tamp Electric Company Structural Stability Assessment Report Economizer Ash System
More informationSan Diego County Water Authority vs. Metropolitan Water District of Southern California
San Diego County Water Authority vs. Metropolitan Water District of Southern California 1 2 Metropolitan Water District: 26 Member Agencies City of Anaheim City of Beverly Hills City of Burbank City of
More informationEMSL Analytical, Inc.
EMSL Analytical, Inc. Phone: (856) 303-2500 Fax: (856) 858-4571 Email: 10/21/2016 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 10/7/2016.
More informationRevised Dear Board of Zoning Appeals Applicant:
Revised 2018 Dear Board of Zoning Appeals Applicant: As part of your application process, you are required to notify surrounding property owners of the Board of Zoning Appeals public hearing to consider
More informationAtlantic Coast Service Center
Atlantic Coast Service Center Robert W. Pearson, PE Senior Forensic Civil/Structural Engineer 704-533-3250 rpearson@uis-usa.com EDUCATION: Virginia Tech Blacksburg, Virginia Bachelor of Science in Civil
More informationMount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010
Mount Pleasant Waterworks Cross-Connection Control Program Guidelines October 2010 1 PREFACE The purpose of this policy is to protect the public water supply from the possibility of contamination. The
More informationMatthew H. Brown Curriculum Vitae. Education
Matthew H. Brown Curriculum Vitae Education Valley City State University o September 2012 to May 2014 o Bachelor of Science in Career and Technical Education North Dakota Highway Patrol Academy, Bismarck,
More informationHigh Visibility Enforcement TN Grants Tip Sheets
High Visibility Enforcement TN Grants Tip Sheets Tennessee Highway Safety Office Updated October 26, 2017 High Visibility Enforcement Grant Tip Sheets 1 Table of Contents Claim without Expenses (Zero Quarter
More information10.1 BIBLIOGRAPHY Noise and Vibration Study Yard and
10 Bibliography 10.1 BIBLIOGRAPHY ATS Consulting, Noise and Vibration Study Yard and Shops Segment, March 31, 2006. ATS Consulting, Station Noise Mitigation and Acoustical Treatment Study, January 28,
More informationJuly 1, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION
Donald A. Fellows, Jr. Manager of Revenue and Tariffs July 1, 1999 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction of Facilities
More informationGREEN POINT CITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN
GREEN POINT CITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN 1st July 2019 to 30 June 2020 1. ADMINISTRATIVE ACTION STEPS RESPONSIBLE DURATION IN MONTHS ACTION 1. Appointment of staff CEO / CID Board / Chairman
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2015 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2016 Introduction The
More informationGROUND FAULT CIRCUIT INTERUPTERS
Title: GFCI Effective Date: 11/14/2014 Control Number: THG_0031 Revision Number: 1 Date: 10/21/2015 Annual Review Completed: 5/13/2015 GROUND FAULT CIRCUIT INTERUPTERS CONTENTS I. PURPOSE II. GENERAL REQUIREMENTS
More informationMANITOBA LANDFILL OPERATOR CERTIFICATION PROGRAM SUSTAINABLE DEVELOPMENT
MANITOBA LANDFILL OPERATOR CERTIFICATION PROGRAM MANITOBA SUSTAINABLE DEVELOPMENT 2017 TABLE OF CONTENTS FOREWORD... 3 Landfill Operator Certification Program Overview... 4 DEFINITIONS... 5 1.0 PROGRAM
More informationSQF Program. March 28, 2018
220 East Second Ave., P.O. Box 248 Selah, WA 98942-0248 p 509.697.7251 f 509.698.1460 treetop.com March 28, 2018 SQF Program The SQF Program is a leading, global food safety and quality certification program
More informationUNITED STATES ACCEREDITATION SERVICES
Page 1 of 8 A. Language Policy: All documentation must be provided in English and the assessment conducted in English. An appropriate English translation of pertinent documentation must be provided as
More informationAPPENDIX S HORIZONTAL DIRECTIONAL DRILLING (HDD) ENVIRONMENTAL SOUND LEVEL ASSESSMENT REPORT
ALASKA LNG PROJECT DOCKET NO. CP17- -000 RESOURCE REPORT NO. 9 APPENDIX S HDD ENVIRONMENTAL SOUND LEVEL ASSESSMENT REPORT PUBLIC DOC NO: USAI-PE-SRREG-00-000009-000 DATE: APPENDIX S HORIZONTAL DIRECTIONAL
More informationA RESOLUTION IN THE COUNCIL OF THE DISTRICT OF COLUMBIA. July 10, 2013
A RESOLUTION 20-256 IN THE COUNCIL OF THE DISTRICT OF COLUMBIA July 10, 2013 To declare the existence of an emergency with respect to the need to approve certain contracts, and purchase orders under the
More informationIMPORTANT: PLEASE READ INSTRUCTIONS FIRST Deadline: January 31st (Annually)
Annual Lifeline Eligible Telecommunications Carrier Certification Form All carriers must complete all or portions of all sections Form must be submitted to USAC and filed with the Federal Communications
More informationUTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 CERTIFICATE SHEET DCB
More informationAD SIZE FREQUENCY: 1X 2X 3 or 5X 8X (ANNUAL RATE)
CCCA Bulletin Display Advertising Rates The CCCA Bulletin is the official newsletter of the Classic Car Club of America. It is published eight times a year and distributed exclusively to CCCA Members.
More informationDealing With a Disaster and Its Effect on the Utility Operation
Nashville Electric Service Dealing With a Disaster and Its Effect on the Utility Operation UTA Fall Conference Florence, Alabama October 12-14, 2011 Outline Who We Are Typical Emergency Response Challenges
More informationSTATE OF NORTH CAROLINA
STATE OF NORTH CAROLINA AUDIT OF THE INFORMATION SYSTEMS GENERAL CONTROLS CARTERET COMMUNITY COLLEGE OCTOBER 2007 OFFICE OF THE STATE AUDITOR LESLIE MERRITT, JR., CPA, CFP STATE AUDITOR AUDIT OF THE INFORMATION
More information26 th Street North and Old Dominion Drive Master Planning Task Force
26 th Street North and Old Dominion Drive Master Planning Task Force Presentation to Arlington Joint Facilities Advisory Commission October 24, 2018 Site Master Planning Task Force On September 2018, the
More informationChildren s Services Council of Palm Beach County
COVER SHEET FOR PROCEDURE RECOMMENDATIONS CSC PROCEDURE: Reporting Mismanagement, Fraud, Theft, or Bribery to CEO Process Owner: General Counsel Effective Date: February 22, 2012 Document #: 126348 Supersedes:
More informationProject Presentation April, 2017
Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern
More informationVILLAGE AT PLAYA VISTA
McConnell Avenue Westlawn Avenue Campus Center Drive DRAFT ENVIRONMENTAL IMPACT REPORT (DEIR) VILLAGE AT PLAYA VISTA Urban Development Component Jefferson Boulevard Augustin Place Runway Road Runway Road
More informationDecember 27, Mr. Paul Tabor Mr. Clean Car Wash #3 Ball Park Lane Center Ridge, AR RE: AFIN: ; Permit No.
December 27, 2007 Mr. Paul Tabor Mr. Clean Car Wash #3 Ball Park Lane Center Ridge, AR 72027 RE: AFIN: 71-00033; Permit No.: 3813-WR-1 Dear Mr. Tabor: On December 19, 2007, I performed a routine compliance
More informationPLANNING COMMISSION WORK SESSION
1 DEPARTMENT OF BUILDING AND DEVELOPMENT Date of Meeting: STAFF REPORT PLANNING COMMISSION WORK SESSION SUBJECT: ELECTION DISTRICT: FIDP-2016-0001, Broad Run CRITICAL ACTION DATE: STAFF CONTACTS: APPLICANT:
More informationIB Event Calendar Please check regularly for updates Last Update: April 30, 2013
IB Event Calendar 2012-2013 Please check regularly for updates Last Update: April 30, 2013 April 2013 24: (Sophomores): Required orientation meeting for all sophomores entering into IB their junior year.
More information