1 Addendum No.1 to: Engineering Request for Proposals BJWSA Project CIP #2185 Galvanized Water Line Replacement Phase I Program Management Contract Posting Date 06/29/18 Purpose Engineers submitting qualifications for the above-named project shall take note of the following updates, changes, additions, deletions, clarifications, etc., in the Request for Qualifications, which shall become a part of and have precedence over anything contrarily shown or described in the Request for Qualifications, and as such shall be taken into consideration and be included in the Engineers Statement of Qualifications. Engineer shall indicate receipt, where appropriate, in the executive summary. Questions/Clarifications Requests Received as of 6/29/18 Q: Can you provide a site map of the Phase 1 locations? We noticed that some of the roads listed are longer than the water line replacement so we cannot narrow down the exact location. A: See attached maps of anticipated Phase I locations. These maps are provided as reference only and no guarantees are provided to final accuracy at this level. The BJWSA will work with the selected Engineer to identify final work locations as required. Q: On page 4 A twelve (12) month duration for phase 1 should be assumed for scheduling purposes. Do you anticipate construction being completed within 12 months? A: Yes, design and construction of Phase I in its entirety is desired to maximize our yearly budget for galvanized water line replacement. We anticipate that bidding of Divisions will happen as soon as design is complete and design of the next Division will overlap subsequent Division construction to maintain constant progress. Beaufort Jasper Water & Sewer Authority Galvanized Water Line Replacement Phase I Program Management Request for Proposals Addendum No /29/2018

2 Q: Div. 2, 3 and 4 total over 31,000 feet of waterline. This is a significant survey, design and construction effort to accomplish within 12 months within established neighborhoods. This is not a problem for us if we need to provide multiple teams of surveyors and we can propose several contracts to bid out if that is your goal, A: See response above but yes, we will bid each Division as a separate contract to keep the Program moving along. I know it s aggressive but we want to get as much done as possible each fiscal year as our budget allows. Q: Please confirm that the covers, tabs, transmittal, table of contents and cover letter do not count towards the page limit. A: Proposal cover, back and dividing tabs will not count towards the page limit. All sheets with informative information will count towards the page limit (to include the cover letter). Q: Can 11" x 17" exhibits be included within the Project Understanding and Approach? If so, please confirm that they will count as one (1) page. A: No, page size is Letter (8.5 x11 ) with exception of the project schedule as listed in the RFP. Q: Please confirm that the Project Schedule (11 x 17", tabloid format) counts as one (1) page. A: Confirmed. Q: For the Cost Proposal, is the Price Proposal - Exhibit 1 the only requirement or does BJWSA also require a separate cost proposal in addition to this form? Please clarify. A: The Price Proposal Exhibit 1 is the only requirement. Please be sure to fill out both pages of the Exhibit. Q: Can BJWSA provide a sample professional services contract for our internal review? A: See attached Master Services Agreement template. ATTACHMENTS Phase I anticipated location maps by proposed Division BJWSA Master Services Agreement template - END OF ADDENDUM - Beaufort Jasper Water & Sewer Authority Galvanized Water Line Replacement Phase I Program Management Request for Proposals Addendum No /29/2018

3 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,552 1,758.6 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,758.6 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

4 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,552 1,758.6 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,758.6 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

5 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,552 1,758.6 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,758.6 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

6 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,552 1,758.6 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,758.6 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

7 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,552 1,758.6 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,758.6 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

8 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Hydrants No Yes Nodes_Water Control_Valves_Water Air Release System_Valves_Water Vaults_Water Casings_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 2, NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

9 BJWSA Distribution and Collection System Asset Map Legend Plants_Water Supply_Water Storage_Water Boosters_Water Pipes_Water Streets Main Hydrant Lateral Fire Service 1: 10,540 1,756.7 NAD_1983_StatePlane_South_Carolina_FIPS_3900_Feet_Intl Latitude Geographics Group Ltd ,756.7 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes A Red X denotes the asset is abandoned. This map was automatically generated using Geocortex Essentials.

10

11

12

13

14

ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS #

ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS # ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS # 6825-18 April 23, 2018 The attached addendum supersedes the original Information and Specifications regarding

More information

INSTRUCTIONS TO RESPONDENTS

INSTRUCTIONS TO RESPONDENTS Florida State University Competitive Solicitation Addendum Acknowledgement Form Procurement Services Florida State University 282 Champions Way, UCA 1400 Tallahassee, FL 32306-2370 Phone (850) 644-6850

More information

This cover sheet must be signed by the individual signing the Proposal and returned with the Proposal.

This cover sheet must be signed by the individual signing the Proposal and returned with the Proposal. Florida State University Competitive Solicitation Addendum Acknowledgement Form Procurement Services Florida State University 282 Champions Way, UCA 1400 Tallahassee, FL 32306-2370 Phone (850) 644-6850

More information

port Ager1da March 3, 2014 TO: Honorable Mayor and City Council FROM: Department of Information Technology

port Ager1da March 3, 2014 TO: Honorable Mayor and City Council FROM: Department of Information Technology Ager1da port TO: FROM: SUBJECT: Honorable Mayor and City Council Department of Information Technology AUTHORIZATION TO ENTER INTO A CONTRACT WITH ARNOLD AND WALTERS TELECOMMUNICATIONS CONSULTANTS FOR FIBER

More information

ADDENDUM No. 1. Please contact Ed Bonnette, CPPB, CPM, Buyer, Buyer at (970) with any questions regarding this addendum.

ADDENDUM No. 1. Please contact Ed Bonnette, CPPB, CPM, Buyer, Buyer at (970) with any questions regarding this addendum. Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS

More information

ADDENDUM 1 April 13, 2018 Request for Proposals: Professional Services for Server Backup Solution

ADDENDUM 1 April 13, 2018 Request for Proposals: Professional Services for Server Backup Solution Following are the questions submitted on or before April 6, 2018, in accordance with RFP specifications. All questions are published verbatim as received, without regard to errors in spelling, punctuation,

More information

ADDENDUM #1. Date: 12/21/2018

ADDENDUM #1. Date: 12/21/2018 Minnesota State Colleges and Universities Request for Proposals for Architectural and Engineering Services Physical Security Enhancements at St. Cloud State University Date: 12/21/2018 ADDENDUM #1 1. The

More information

State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV voice facsimile

State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV voice facsimile State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV 89701 775.684.1310 voice 775.684.1333 facsimile REQUEST FOR PROPOSAL for: PROFESSIONAL WEB DEVELOPMENT SERVICES AND RELATED

More information

City of North Kansas City Request for Proposals Microsoft Office 365

City of North Kansas City Request for Proposals Microsoft Office 365 City of North Kansas City Request for Proposals Microsoft Office 365 Project Overview The City of North Kansas City, Missouri is soliciting proposals to contract with a vendor to assist the City in the

More information

RAMP DCIM Data Center Infrastructure Management Software

RAMP DCIM Data Center Infrastructure Management Software RAMP DCIM Data Center Infrastructure Management Software RFP TEMPLATE 1-866-612-3637 SALES@TUANGRU.COM TUANGRU.COM DCIM RFP TEMPLATE Dear Sir or Madam, Your company has been invited to submit your company

More information

2018 General Consultant Services On-Call RFP. Pre-Proposal Meeting April 30, 2018

2018 General Consultant Services On-Call RFP. Pre-Proposal Meeting April 30, 2018 2018 General Consultant Services On-Call RFP Pre-Proposal Meeting April 30, 2018 RFP Personnel Construction Management Disciplines Planning Consulting Services Contract Questions Technical Disciplines

More information

ADDENDUM # 8 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2

ADDENDUM # 8 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2 ADDENDUM # 8 BID # FY 2017-2018-019 INFLOW AND INFILTRATION REMOVAL PHASE 2 Please ensure you check the City s website for the latest addendum released for this project. Below find the link to the City

More information

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS 1.0 PROJECT ADMINISTRATION SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS Project Administration services shall consist of project management and other support services for

More information

Request for Proposals. Information Technology Consultant and Network & Information Technology Support Services

Request for Proposals. Information Technology Consultant and Network & Information Technology Support Services Request for Proposals Information Technology Consultant and Network & Information Technology Support Services July 18, 2018 General Description The City of Greenville is looking to select a qualified firm

More information

The Firm Experience. Updated May Copyright World Bank Group All Rights Reserved

The Firm Experience. Updated May Copyright World Bank Group All Rights Reserved The Firm Experience Updated May 2017 Welcome! econsultant2 is the World Bank Group tendering platform for the selection of operational consulting firms. A business does not need to be an approved World

More information

Administrative & Operations Network Security Assessment

Administrative & Operations Network Security Assessment TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Letter of Clarification No. 1 FOR REQUEST FOR QUALIFICATIONS (RFQ) Administrative & Operations Network Security Assessment RFQ No. O-00418 Page 1 of 15 Letter

More information

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA) SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA) 10.0 INTRODUCTION The purpose of this procedure is to provide guidance for hiring professional firms for architectural,

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.bid.ci.norwalk.ct.us. Adobe Acrobat reader is required to view this document.

More information

Instructions for Applying for Consultants Competitive Negotiation Act (CCNA) Certification with Palm Beach County (PBC)

Instructions for Applying for Consultants Competitive Negotiation Act (CCNA) Certification with Palm Beach County (PBC) Instructions for Applying for Consultants Competitive Negotiation Act (CCNA) Certification with Palm Beach County (PBC) In accordance with the Consultants Competitive Negotiation Act (CCNA), Florida Statutes

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group August 7, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Server Hardware and VMware vsphere Enterprise

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: FY 2017 CIP Authorizations STAFF CONTACT(S)/PREPARER: Peter C. Gorham, P.E., Director of Engineering AGENDA DATE: March 16,

More information

Understanding Program Integrity Assurance (PIA)

Understanding Program Integrity Assurance (PIA) Understanding Program Integrity Assurance (PIA) Helping You Succeed Schools and Libraries Division Washington, DC Newark Atlanta Chicago Orlando Los Angeles Portland Houston September/October 2009 Overview

More information

Questions 1-3 relate to Item 4 Data Sheet on page 12:

Questions 1-3 relate to Item 4 Data Sheet on page 12: Florida Division of Emergency Management RFP-DEM-15-16-037 Florida Statewide Emergency Alert and Notification System Questions and Answers (Answers are in bold) Questions 1-3 relate to Item 4 Data Sheet

More information

REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR )

REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR ) POSTED 4/20/17 REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR 16-034) The City received the following questions regarding this project.

More information

The following changes or clarifications shall be made part of the Bid Documents and shall be taken into consideration when submitting bids.

The following changes or clarifications shall be made part of the Bid Documents and shall be taken into consideration when submitting bids. ADDENDUM, February 3, 0 RE: Chowchilla Elementary School District Wilson MS / Fuller ES Lease Leaseback Contractor BCA Project Number 0 / From: Bunton Clifford Associates, Inc. dba BCA Architects 0 th

More information

REQUEST FOR PROPOSALS For Uniform Services

REQUEST FOR PROPOSALS For Uniform Services REQUEST FOR PROPOSALS For Uniform Services PROPOSAL SUBMITTAL DATE, TIME, & LOCATION: August 17, 2018 @ 10:00 AM Mount Pleasant Waterworks Operations Center 1619 Rifle Range Road Mount Pleasant, SC 29464

More information

CHAP LinQ User Guide. CHAP IT Department Community Health Accreditation Partner 1275 K Street NW Suite 800 Washington DC Version 1.

CHAP LinQ User Guide. CHAP IT Department Community Health Accreditation Partner 1275 K Street NW Suite 800 Washington DC Version 1. 2015 CHAP LinQ User Guide CHAP IT Department Community Health Accreditation Partner 1275 K Street NW Suite 800 Washington DC 2005 Version 1.1 CHAP LINQ USER GUIDE - OCTOBER 2015 0 Table of Contents ABOUT

More information

Request For Proposals. Information Technology (IT) Services. General: The City of Bishop requests proposals from consultants to provide IT services.

Request For Proposals. Information Technology (IT) Services. General: The City of Bishop requests proposals from consultants to provide IT services. Release: 10 June 2014 Closes: 27 June 2014 CITY OF BISHOP 377 West Line Street - Bishop, California 93514 Post Office Box 1236 - Bishop, California 93515 760-873-8458 publicworks@ca-bishop.us www.ca-bishop.us

More information

FULL AND OPEN COMPETITION Purchasing Procedures Request for Qualifications (RFQ) Purchasing Policies 3.02 F and 3.02 G

FULL AND OPEN COMPETITION Purchasing Procedures Request for Qualifications (RFQ) Purchasing Policies 3.02 F and 3.02 G FULL AND OPEN COMPETITION Request for Qualifications (RFQ) Purchasing Policies 3.02 F and 3.02 G SPECIAL NOTES: Policy 3.02F: Professional Design Services (per ORC 153.65) Policy 3.02G: Other than Professional

More information

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 Overview Martinsville City Public Schools District (hereafter collectively referred to as MCPS) seeks a Request for Proposal

More information

Please contact the undersigned if you have any questions concerning this filing.

Please contact the undersigned if you have any questions concerning this filing. !! November 29, 2016 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 Re: North American Electric Reliability Corporation

More information

SOLICITATION AMENDMENT

SOLICITATION AMENDMENT North Dakota University System Core Technology Services 4349 James Ray Dr. Grand Forks, ND 58202 September 29, 2014 Solicitation Number and Title: CTS-14-001 Datacenter Operations, Monitoring and Maintenance

More information

1. From the Tyler Menu, go to Financials>Purchasing>Purchase Order Processing> Requisitions (i.e. click on requisitions)

1. From the Tyler Menu, go to Financials>Purchasing>Purchase Order Processing> Requisitions (i.e. click on requisitions) TO REQUEST A PURCHASE ORDER 1. From the Tyler Menu, go to Financials>Purchasing>Purchase Order Processing> Requisitions (i.e. click on requisitions) 2. The following screen will appear. Click New. The

More information

County of El Paso Purchasing Department 800 E. Overland Room 300 El Paso, Texas (915) / Fax: (915)

County of El Paso Purchasing Department 800 E. Overland Room 300 El Paso, Texas (915) / Fax: (915) County of El Paso Purchasing Department 800 E. Overland Room 300 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 www.epcounty.com ADDENDUM 1 To: From: All Interested Proposers Blanca Carbajal,

More information

Accountable Care Organizations: Testing Their Impact

Accountable Care Organizations: Testing Their Impact Accountable Care Organizations: Testing Their Impact Eligibility Criteria * * Indicates required Preference will be given to applicants that are public agencies or are tax-exempt under Section 501(c)(3)

More information

IBM IoT Connected Vehicle Insights

IBM IoT Connected Vehicle Insights Service Description IBM IoT Connected Vehicle Insights This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users and recipients

More information

Unifier Project Controls User Guide

Unifier Project Controls User Guide Unifier Project Controls User Guide 16 R2 September 2016 Contents Introduction to Project Controls... 17 Components of Project Controls... 19 About the Owner Template... 19 About the Contractor Template...

More information

General Ledger Subsystems Reference Manual. Version 11.0 Revision Date 5/1/04

General Ledger Subsystems Reference Manual. Version 11.0 Revision Date 5/1/04 Reference Manual Version 11.0 Revision Date 5/1/04 The documentation in this publication is provided pursuant to a Sales and Licensing Contract for the Prophet 21 System entered into by and between Prophet

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6 th Floor Los Angeles, California 90017

LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6 th Floor Los Angeles, California 90017 LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6 th Floor Los Angeles, California 90017 RFP Number: 18-11 RFP Title: Workgroup Departmental and Print Center Digital Copiers,

More information

Certified Government Finance Officer (CGFO) Exam and Review Request for Qualifications

Certified Government Finance Officer (CGFO) Exam and Review Request for Qualifications Florida Government Finance Officers Association (FGFOA) Certified Government Finance Officer (CGFO) Exam and Review Request for Qualifications CGFO Exam Committee Last updated 1-11-2018 FLORIDA GOVERNMENT

More information

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service CITY OF CONCORD, CALIFORNIA March 13, 2013 ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service NOTICE TO PROPOSERS

More information

Resolving Actions and Completion Policy Status About Non-Workflow BPs Creating a BP Record... 40

Resolving Actions and Completion Policy Status About Non-Workflow BPs Creating a BP Record... 40 Unifier Project Controls User Guide Version 17 September 2017 Contents Introduction to Project Controls... 17 Downloading and Configuring Project Controls Base Product (On-Premises Deployment)17 Downloading

More information

Creating Purchase Orders in Core-CT

Creating Purchase Orders in Core-CT Creating an Online Purchase Order in Core-CT-9.2 Navigation: Main Menu > Core-CT Financial > Purchasing > Purchase Orders > Add/Update POs Your Business Unit should default in and the PO ID field should

More information

REQUEST FOR QUOTES # Website Design and Development RESPONSE TO CLARIFYING QUESTIONS #1 March 12, 2018

REQUEST FOR QUOTES # Website Design and Development RESPONSE TO CLARIFYING QUESTIONS #1 March 12, 2018 REQUEST FOR QUOTES #2018-21 Website Design and Development RESPONSE TO CLARIFYING QUESTIONS #1 March 12, 2018 Note that these are questions submitted by interested firms to the above referenced solicitation.

More information

RFQ OIT-1 Q&A. Questions and Answers, in the order received.

RFQ OIT-1 Q&A. Questions and Answers, in the order received. Question Does the system have an existing SSP? Do they use a system like Xacta or CSAM to generate the SSP. Will they provide us the current POAM list? Will they provide scanning tools or we have to bring

More information

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017 SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3 SAWS Job No. 17-4528 SAWS Solicitation No. CO-00139 September 27, 2017 To Bidder of Record: This addendum, applicable to work referenced above, is an

More information

City of Topeka e-procurement Supplier User Guide

City of Topeka e-procurement Supplier User Guide City of Topeka, Kansas Financial Services Department Contracts & Procurement Division 215 SE 7 th Street, Room 60 Topeka, KS 66603 City of Topeka e-procurement Supplier User Guide Entering Event Responses

More information

Fluor Procurement. RFx SmartSource. Bidder s Guide

Fluor Procurement. RFx SmartSource. Bidder s Guide Fluor Procurement RFx SmartSource Bidder s Guide April 2014 Copyright Fluor Corporation All Rights Reserved SmartSource (rel9.1.1) is a trademark of Iasta.com, Inc. 2 TABLE OF CONTENTS CONTACTS: SMARTSOURCE

More information

Welcome to the supplier training session

Welcome to the supplier training session Welcome to the supplier training session 1 INDEX 2 Open a Browser and enter the URL https://css.gesupplier.com Login with the USER ID and Password sent by the GE Supplier Team Refer to the snapshot below:

More information

Question & Answer #3

Question & Answer #3 DARPA Blackjack Reference: HR001118S0032 Link: https://www.fbo.gov/spg/oda/darpa/cmo/hr001118s0032/listing.html Question & Answer #3 Question 80: Is there any guidance on how to plan for material procurement?

More information

BHP GCMS Supplier Guide Work Instruction

BHP GCMS Supplier Guide Work Instruction BHP GCMS Supplier Guide Work Instruction Intent and description This Work Instruction details Supplier(s) actions in BHP s Global Contract Management System. Audience Supplier(s) Document Control VERSION

More information

Question. Answer. Question

Question. Answer. Question 1 The following questions were submitted from potential bidders to ITCA s solid waste Request for Proposal RFP EQP GAP-01. The Inter Tribal Council s responses to the questions are listed below. In 1.2

More information

CDKN Invitation to Tender Q&A - Project Name KMGL-0047b

CDKN Invitation to Tender Q&A - Project Name KMGL-0047b CDKN Invitation to Tender Q&A - Project Name KMGL-0047b Question Answer 1. Regarding the trouble-shooting and technical support service for the editorial users - do you require a specific response time

More information

Indefinite Delivery, Indefinite Quantity (IDIQ)

Indefinite Delivery, Indefinite Quantity (IDIQ) CONTRACT ADMINISTRATION MANUAL Minnesota Department of Transportation Chapter 7 Section 7.1 Indefinite Delivery, Indefinite Quantity (IDIQ) General Disclaimer: This manual section not currently approved

More information

OFFICE OF PROCUREMENT AND CONTRACTING 301 LARGO ROAD, LARGO MARYLAND PHONE: 301/

OFFICE OF PROCUREMENT AND CONTRACTING 301 LARGO ROAD, LARGO MARYLAND PHONE: 301/ OFFICE OF PROCUREMENT AND CONTRACTING 301 LARGO ROAD, LARGO MARYLAND 20774-2199 PHONE: 301/546-0641 REQUEST FOR PROPOSAL #16-11 LEASE FOR NEW COPIERS/MFDS AND PRINT MANAGEMENT SOFTWARE Addendum No. 2 Issued:

More information

OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018

OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018 To Respondent of Record: OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R-18-001-JAM ADDENDUM NO. 1 February 28, 2018 This addendum, applicable to project referenced above, is an amendment

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION 682 Prospect Street Berea, Ohio 44017

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION 682 Prospect Street Berea, Ohio 44017 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION 682 Prospect Street Berea, Ohio 44017 REQUEST FOR INFORMATION ON ELECTRONIC TOLLING CUSTOMER SERVICE CENTER SYSTEMS, ROADSIDE TOLL COLLECTION SYSTEMS AND UNPAID

More information

DemandStar. Agency Buyer User Guide. Onvia, Inc 509 Olive Way, Suite 400 Seattle, WA Phone Fax

DemandStar. Agency Buyer User Guide. Onvia, Inc 509 Olive Way, Suite 400 Seattle, WA Phone Fax DemandStar Agency Buyer User Guide Onvia, Inc 509 Olive Way, Suite 400 Seattle, WA 98101 Phone 800.331.5337 Fax 206.373.9008 www.demandstar.com 1 Overview DemandStar by Onvia connects business to government

More information

ewell User Guide Created by: Applications Support Help Desk Version: 1.1 Date: 03 October 2016

ewell User Guide Created by: Applications Support Help Desk Version: 1.1 Date: 03 October 2016 Created by: Applications Support Help Desk Version: 1.1 Date: 03 October 2016 [THIS PAGE LEFT INTENTIONALLY BLANK] [THIS PAGE LEFT INTENTIONALLY BLANK] Table of Contents Introduction... 1 What to Do If

More information

REQUEST FOR PROPOSAL. Web Application for Tariff Request for Proposal. February 15, 2018

REQUEST FOR PROPOSAL. Web Application for Tariff Request for Proposal. February 15, 2018 REQUEST FOR PROPOSAL Web Application for Tariff Request for Proposal February 15, 2018 Proposals are due no later than 4:00pm, Thursday, March 8, 2018. Table of Contents 1. Summary... 2 2. Proposal Guidelines

More information

Amcor Supplier Portal. Supplier Manual

Amcor Supplier Portal. Supplier Manual Amcor Supplier Portal Supplier Manual Content This document describes the Supplier Portal and how to navigate. Content of this document Registration process Login Main page / Dashboard Modules Projects

More information

REQUEST FOR PROPOSAL. Proposal No Website Redesign and Implementation

REQUEST FOR PROPOSAL. Proposal No Website Redesign and Implementation Page 1 REQUEST FOR PROPOSAL Proposal No. 13-01-05 Website Redesign and Implementation Proposal Opening: Friday, October 12, 2018 at 2:00pm Northeast DuPage Special Recreation Association NEDSRA Board Room

More information

University of Nebraska-Lincoln

University of Nebraska-Lincoln University of Nebraska-Lincoln Bid Information Contact Information Ship to Information Bid Owner Claudette Biskup Sourcing Address 1700 Y Street Address 1110 S 67th Street Specialist Email claudette.biskup@unl.edu

More information

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841 The Contractor shall notify the Inspection Division at the LVVWD (702-258-3227) 48 hours prior to the requested removal time to allow the District to take the final meter reading. After the final reading

More information

Siebel Project and Resource Management Administration Guide. Siebel Innovation Pack 2013 Version 8.1/8.2 September 2013

Siebel Project and Resource Management Administration Guide. Siebel Innovation Pack 2013 Version 8.1/8.2 September 2013 Siebel Project and Resource Management Administration Guide Siebel Innovation Pack 2013 Version 8.1/ September 2013 Copyright 2005, 2013 Oracle and/or its affiliates. All rights reserved. This software

More information

RFQ OIT-1 Q&A. Questions and Answers, in the order received.

RFQ OIT-1 Q&A. Questions and Answers, in the order received. Question Does the system have an existing SSP? Do they use a system like Xacta or CSAM to generate the SSP. Will they provide us the current POAM list? Will they provide scanning tools or we have to bring

More information

Modifications to DSF 2 License Agreement and supporting documents

Modifications to DSF 2 License Agreement and supporting documents Modifications to DSF 2 License Agreement and supporting documents July 30, 2018 Agreement The license agreement was updated and current Licensees were required to sign new licenses for the October 1, 2018

More information

Section 3.0 Financial Requirements

Section 3.0 Financial Requirements Section 3.0 Financial Requirements Section 3.0 Financial Requirements 3.1 Impact Fees 3.1.1 What are Impact Fees 3.1.2 How are Impact Fees Calculated 3.1.3 Assignment of Impact Fees 3.2 Summary of Required

More information

Fuel and Odometer Report Catalog

Fuel and Odometer Report Catalog Fuel and Odometer Report Catalog Fuel and Odometer Report Catalog 1 Introduction... 4 Terminology... 5 Reports Detail Listing Report... 7 Summary Listing Report... 9 MPG Report... 11 Latest Odometer Report...

More information

ADDENDUM NO. 02 INVITATION NUMBER:

ADDENDUM NO. 02 INVITATION NUMBER: ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DEPARTMENT OF PROCUREMENT

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DEPARTMENT OF PROCUREMENT DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSALS (RFP) for An Independent Review of Architectural and Engineering Consultant Overhead Rates RFP NUMBER: 17-PR-DETS-45

More information

Commonwealth of Kentucky SOLICITATION

Commonwealth of Kentucky SOLICITATION Doc ID No: RFB 605 1700000805 version 1 Page: 1 of 26 TITLE: Salt Brine Production Systems DATE ISSUED SOLICITATION CLOSES 04/04/2017 Date: 04/19/2017 RECORD DATE Time: 10:00:00 04/04/2017 I S S U E D

More information

IBM App Connect Enterprise on IBM Cloud

IBM App Connect Enterprise on IBM Cloud Service Description IBM App Connect Enterprise on IBM Cloud This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users and

More information

HUPX Information Packages

HUPX Information Packages HUPX Information Packages Introduction Effective as of 1 th September, 2017 HUPX is licensed by the Hungarian Energy Office to operate the organized electricity market in Hungary. The company was established

More information

Vendor Name: (A copy must be attached to the Addenda Acknowledgement Form)

Vendor Name: (A copy must be attached to the Addenda Acknowledgement Form) #18512 RFP PUBLIC SAFETY VHF RADIO COMMUNICATIONS SYSTEMS ADDENDUM #1 Return to: Dawson County Purchasing Department 25 Justice Way, Suite 2223 Dawsonville, GA 30534 Bid Closing Date: November 26, 2012

More information

Setting the Standard for Online Project Management Collaboration

Setting the Standard for Online Project Management Collaboration Setting the Standard for Online Project Management Collaboration SIMPLE ELEGANT INTUITIVE POWERFUL CUSTOMIZABLE COMPREHENSIVE FULLY INTEGRATED THE FINEST FULL FEATURED PROJECT MANAGEMENT COLLABORATION

More information

STA TE OF NEBRASKA CONTRACT AWARD PAGE 1 of 2 BUSINESS UNIT 9000 VENDOR NUMBER: 526689 ORDER DATE 03/07/17 BUYER NANCY STORANT AS Slate Purchasing Bureau 1526 K Street, Suite 130 Lincoln, Nebraska 68508

More information

Purchasing for Purchasing Agents

Purchasing for Purchasing Agents Purchasing for Purchasing Agents VERSION: 9/20/2014 New Table of Contents About the Purchasing Process 2 Entering a Request for Quote (RFQ) or Invitation for Bid (IFB) 4 Entering Vendor Responses 15 Awarding

More information

LAKE MICHIGAN AIR DIRECTORS CONSORTIUM

LAKE MICHIGAN AIR DIRECTORS CONSORTIUM REQUEST FOR PROPOSAL Website Development for the Lake Michigan Air Directors Consortium The Lake Michigan Air Directors Consortium (LADCO) is seeking contractor assistance to update the LADCO website.

More information

PSC Selection Process (PSP) Committee Chair

PSC Selection Process (PSP) Committee Chair PSC Selection Process (PSP) Committee Chair STEP #1 PROJECT INITIATION PRZM: AE/CM/P&A/ESCO Committee Information 1. From the Phases menu, select AE/CM/P&A/EPC Selection & Administration. QBS: select AE

More information

eprocurement Web Site

eprocurement Web Site eprocurement Web Site of Wyandotte County, Kansas City Kansas Supplier s Guide Document Author: UG WYCOKCK Document Date: 7/30/2015 Document Version: 3.60 Table of Contents 1. Introduction... 3 2. Contact

More information

Qualification Answering qualifications

Qualification Answering qualifications Draexlmaier Group Qualification Answering qualifications Training document for DRÄXLMAIER Group Suppliers Page 1 of 9 Internal: All rights reserved. Distribution within DRÄXLMAIER Group, customer and partners.

More information

Anna Independent School District

Anna Independent School District Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology

More information

RFP No R. e-discovery SYSTEM. ADDENDUM NO. 2 March 9, 2016 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES:

RFP No R. e-discovery SYSTEM. ADDENDUM NO. 2 March 9, 2016 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES: County Executive Steven R. Schuh RFP No. 16-031R e-discovery SYSTEM ADDENDUM NO. 2 March 9, 2016 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES: QUESTIONS: 1. The RFP states the system should be able

More information

Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION

Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority Procurement and Contracts Dept., MA-29 2733 Crystal Drive

More information

etendering PORTAL User Manual Product Version 7-0-4

etendering PORTAL User Manual Product Version 7-0-4 etendering PORTAL User Manual Product Version 7-0-4 Open Windows Software Pty Ltd ABN 22 605 191 375 635 Glenferrie Road, Hawthorn VIC 3122, Australia Phone: +61 3 9819 5088 Email: support@openwindows.com.au

More information

On Line Bid ID code You must create your On-Line Bid ID code to submit your bid.

On Line Bid ID code You must create your On-Line Bid ID code to submit your bid. On Line Bidding User Guide Welcome to VirtuBid with the Quest Construction Data Network! VirtuBid (vbid ) is a state of the art electronic bidding service that benefits the bidder by allowing more time

More information

FY2017 FCC Form 470 and Competitive Bidding

FY2017 FCC Form 470 and Competitive Bidding and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 30 Form 470

More information

Request for Quotations

Request for Quotations AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) 5517700 Fax: (251-11) 5517844 www.au.int Request for Quotations Consultancy for Provision of Training Service

More information

User support Marketing Director profile Management of manual campaigns DataCar CRM, Expert version

User support Marketing Director profile Management of manual campaigns DataCar CRM, Expert version Contents 1 Manual campaigns... 2 1.1 - Creating a manual campaign... 2 1.2 - Campaign supervision page... 6 Page 1 of 14 1 Manual campaigns The application's manual campaigns enable you to meet specific

More information

Respondent Help Guide

Respondent Help Guide Respondent Help Guide https://nqphnetender.openwindowscontracts.com Welcome to the Northern Queensland Primary Health Network etendering Portal. Using NQPHN s etendering Portal is free for all users. There

More information

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP #

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # 6822-18 March 26, 2018 The attached addendum supersedes the original Information and Specifications

More information

AMENDMENT NO.: 3 INVITATION FOR BID. IFB FQ16005 requesting bids for the above referenced project is hereby changed in part as listed below:

AMENDMENT NO.: 3 INVITATION FOR BID. IFB FQ16005 requesting bids for the above referenced project is hereby changed in part as listed below: Invitation for Bid (IFB) FQ16005/WJG Date of Issue: October 23, 2015 Amendment One: November 16, 2015 Amendment Two: November 19, 2015 November 25, 2015 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA)

More information

University of Northern Iowa Centric Project Web Site User Guide

University of Northern Iowa Centric Project Web Site User Guide University of Northern Iowa Centric Project Web Site User Guide Overview On all projects in excess of $1,000,000 and other select projects, the University of Northern Iowa utilizes an internet based project

More information

2-TIER AUTHORIZED INFORMATICA RESELLER PROGRAM GUIDE

2-TIER AUTHORIZED INFORMATICA RESELLER PROGRAM GUIDE 2-TIER AUTHORIZED INFORMATICA RESELLER PROGRAM GUIDE 2017 Informatica. For Authorized Informatica Partners Only -1- The Informatica Partner Program The Informatica Partner Program is a holistic membership

More information

Attribute Name Attribute Note QUILL CORPORATION Olmsted Kirk

Attribute Name Attribute Note QUILL CORPORATION Olmsted Kirk Attribute Name Attribute Note QUILL CORPORATION Olmsted Kirk DISCOUNT OFFERED BY VENDOR VENDOR MUST LIST PERCENTAGE DISCOUNT OR RANGE OF PERCENTAGE DISCOUNT BEING OFFERED. IN THE EVENT THAT VENDOR CATALOG,

More information

State of New Jersey Department of Transportation. Proposal Estimating System and Letting & Award System Guide

State of New Jersey Department of Transportation. Proposal Estimating System and Letting & Award System Guide State of New Jersey Department of Transportation Proposal Estimating System and Letting & Award System Guide Prepared by Trns port Team December 2006 Ver 1.0 Proposal Estimating System and Letting & Award

More information

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.

More information

TIP SHEET GETTING STARTED: HOW TO REQUEST A MTA (MATERIAL TRANSFER AGREEMENT)

TIP SHEET GETTING STARTED: HOW TO REQUEST A MTA (MATERIAL TRANSFER AGREEMENT) WHAT IS IT? TIP SHEET A Material Transfer Agreement (MTA) is executed when proprietary materials are transferred in or out of Northwestern. An MTA documents the material being transferred and terms and

More information

INFRACON OPERATION PROCEDURE

INFRACON OPERATION PROCEDURE INFRACON OPERATION PROCEDURE Infracon portal has been developed for enabling all the consultancy firms and key personnel to register themselves for procurement of highway consultancy contracts for preparation

More information