Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi

Size: px
Start display at page:

Download "Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi"

Transcription

1

2 Distribution List: Southern Region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Managing Director Solar Energy Corporation of India Ltd. D-3, 1 st Floor, A wing, Religare Building, District Centre, Saket, New Delhi Director (Transmission) Transmission Corp. of Telangana Ltd. (TSTRANSCO) Vidyut Soudha, Khairatabad Hyderabad Director (Trans. & System Op.), Kerala State Electricity Board Ltd. Vidyuthi Bhawanam, Pattom, P.B Thiruvananthapuram Superintending Engineer I First Floor, Electricity Department Gingy Salai, Puducherry Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. (APTRANSCO) Vidyut Soudha, Gunadala, Eluru Rd, Vijayawada, Andhra Pradesh Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore Member (Distribution), electricity Board (TNEB) 6th Floor, Eastern Wing, 800 Anna Salai, Chennai CMD POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi General Manager Southern Regional Load Dispatch Centre 29, Race Course Cross Road, Bangalore

3 Distribution List: Connectivity/Long-term Access Applicants 1. Shri Phuntsok Wangyal Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon Ph.: , Shri Rakesh Garg AVP - Project Development ReNew Power Ltd. Commercial Block-I, Zone-6, Golf Course Road, DLF city Phase-V Gurgaon, Haryana Ph.: / rakesh@renewpower.in vinod@renewpower.in 5. Shri Padmanabhan M Joshi GM Projects BD Saffron Ecopower Venture Pvt. Ltd. 484, Kamaraj road, Uppilipalayam PO, Coimbatore , Ph.: pmj@leapgreenenergy.com 7. Shri Hari Paul General Manager Anurudra Renewable Pvt. Ltd. Town Centre 2, Andheri Kurla Road, Mumbai Ph.: hari.paul@egreenpwr.com 9. Shri Ankush Dhane AGM, Electrical Orange Ashok Wind Power Pvt. Ltd. 301B, 3 rd floor, D21 Corporate Park, Sec-21, dwarka new Delhi Ph.: ankushraodhane@orangerenewable.net 2. Shri Hari Paul General Manager Viento Renewables Pvt. Ltd. 306, Town Centre 2, Andheri Kurla Road, Mumbai Ph.: hari.paul@egreenpwr.com 4. Shri Livington Emmanuel DGM Wind Business Development Sprng Renewable Energy Private Ltd. 201, Level 2, Pentagon, P-2, Magarapatta City, Hadapsar, Pune Ph.: , elivingston@sprngenergy.com 6. Shri Mohan B. Sr. Project Engineer Greenmint Power Pvt. Ltd. 17 th Floor, The Hub, One Indiabulls Center, Senapati Bepat Marg, Elphinstone(West), Mumbai , Maharashtra Ph.: projects@greenmintpower.com 8. Shri K. Subba Raju Director Axis Wind Farms (Anantapur) Pvt. Ltd. H /8/3, Plot no.3, 2 nd floor PMR Plaza, Thakur Mansion Lane, Somajiguda, Hyderabad Ph.: subbaraju.k@axisenergy.in 10. Shri Rakesh Chandra Hungund Renewable Energy Pvt. Ltd. The Futura IT Park, B-Block, 8 th floor No 334, Rajiv gandhhi Salai, Shollinganallur, Chennai Ph.: rakesh.c.singhal@hotmail.com

4 11. Shri Sanjeev Kumar Manager, Project Development Cuddalore Bioenergy Pvt. Ltd. A-24, Sev-51, Noida Ph.: Shri Rakesh Rathore Deputy General Manager Green Infra Renewable Energy Ltd. 5 th Floor, Tower C, Building 8, DLF Cyber City, Gurgaon , Haryana Ph.: rakesh.rathore@sembcorp.com 15. Managing Director VSF Projects Limited Plot no. 89/A, Aiswarya Sagar Society Road 2, Banjara Hills Hyderabad Ph.: vsfprojectsltd91@gmail.com 12. Shri Ankush Dhane Assistant General Manager Orange Sironj Wind Power Pvt. Ltd. 301B, 3 rd Floor, D-21 Corporate Park, Sector-21, Dwarka, New Delhi Ph.: ankushraodhane@orangerenewable.net 14. Shri V. Kiran General Manager Mytrah Energy (India) Pvt. Ltd. 8001, Q-City, S.109, Gachibowli Hyderabad , Telangana Ph.: v.kiran@mytrah.com 16. Director Surana Power Limited No: 29, Whites Road, 2nd floor, Royapettah, Chennai Ph.: loganathan@suranapower.com

5 Minutes of the 24 th Southern Region constituents meeting regarding Connectivity/LTA Applications in SR chaired by Member (PS), CEA held on at POWERGRID, Gurgaon 1.0 The List of the participants are enclosed at Annexure-I. 2.0 COO (CTU-Plg & SG), POWERGRID welcomed the participants to the 24 th meeting of Southern Region constituents regarding connectivity/lta applications in Southern Region. 3.0 Member (PS), CEA in his opening remarks highlighted that in the meeting, Stage-I & Stage-II Connectivity and the LTA applications are proposed to be discussed in accordance with the Detailed Procedure notified by CERC on and requested GM (CTU-Plg) to take-up the agenda for discussion. 4.0 Minutes of the 22 nd and 23 nd Meeting of Southern Region constituents regarding Connectivity / LTA Applications It was informed that the Minutes of the 22 nd and 23 rd Meeting of Southern Region constituents regarding Long Term Access and Connectivity applications of Southern Region held on and respectively were issued vide letters and respectively. As no comments were received from the stake holders, the minutes were confirmed as circulated. 5.0 Proposal for grant of connectivity and LTA to the applications received from renewable energy sources CTU informed that 4 nos. of completed applications for Stage-I Connectivity and 7 nos. of completed applications for Stage-II Connectivity has been received online till 30 th June, 2018 as per the CERC Detailed Procedure for Grant of connectivity to projects based on renewable sources to ISTS. Further 7 nos. of connectivity applications were not discussed in the 23 rd meeting of Southern Region constituents held on due to non-participation of the applicants, are being taken up for discussions again for grant of Stage-I connectivity. 1

6 (i) Stage-I Connectivity applications CTU further informed that the Connectivity application of M/s Green Infra Renewable Energy Limited has been agreed under Stage-I Connectivity in the 23 rd meeting of SR held on , however from the details it appears that it had again submitted the Stage-I Connectivity application for same capacity, accordingly the representative was requested to clarify. Towards this, representative from M/s Green Infra Renewable Energy Limited informed that the Stage-I Connectivity application no submitted on may be treated as withdrawn and earlier agreed application may be processed. Representative also confirmed that they shall be submitting the formal request for withdrawal of above application within a day. After detailed deliberations, the Grant of Stage-I Connectivity to the following application was agreed: Sl. Application Applicant Location Date of Application Connectivity applications near Tirunelveli Connec tivity Sought (MW) Nature of Applicant Proposed primary location for Connectivity Dedicated Tr. System Proposed Alternative location for Connectivity / Tr. System under ISTS Dedicated Tr. System for alternative connectivity Betam Wind Energy Private Limited Viento Renewables Private Limited Anurudra Renewables Pvt Ltd Tuticorin, Wind Tirunelveli, Wind Tuticorin-II GIS PS (erstwhile Tirunelveli GIS PS) Betam Wind Tuticorin-II 230kV S/c line Viento Renewables Tuticorin-II 230kV S/c line Anurudra Thuthukudi, Wind Tuticorin-II 230kV S/c line Tuticorin-III Establishment of Tuticorin-III(new) 400/230kV S/s at suitable location near Tuticorin along with 1x500 MVA, 400/230kV ICT Tuticorin-III(new) Tuticorin-II(existing) 400kV Quad/HTLS D/c line with carrying capacity of 2000 MW at nominal voltage Betam Wind Tuticorin-III 230kV S/c line Viento Renewables Tuticorin-III 230kV S/c line Anurudra Tuticorin-III 230kV S/c line 2

7 Connectivity applications near Munirabad Axis Wind farm (Anantapur) Pvt. Ltd Orange Ashok Wind Power Pvt. Ltd. (Jakkali Wind Farm) Hungund Renewable Energy Pvt Ltd Connectivity applications near Hiriyur ReNew Power Ltd. Connectivity application at Pavagada Cuddalore Bioenergy Pvt. Ltd. (Pavagada Wind Farm) Koppal / Koppal, Karnataka Wind Munirabad-II(new) Establishment of Koppal / Orange Ashok Gadag, Munirabad-II Karnataka Wind Koppal/Munirabad- 400/220kV S/s at II 220kV D/c line suitable location near Koppal / Hungund Gadag, Munirabad along Karnataka Wind Koppal/Munirabadwith 1x500 MVA, 400/220kV ICT Axis Wind Koppal/Munirabad- II 220kV S/c line II 220kV S/c line Davangere, Karnataka Wind Hiriyur (Existing) ReNew Power Hiriyur 220kV S/c line Tumkur, Karnataka Wind Tumkur (Pavagada) Existing Cuddalore Bioenergy Pavagada 220kV S/c line Munirabad-III(new) Establishment of Munirabad-III 400/220kV S/s at suitable location near Munirabad along with 1x500 MVA, 400/220kV ICT Hiriyur-II (new) Establishment of Hiriyur-II 400/220kV S/s at suitable location near Hiriyur along with 1x500 MVA, 400/220kV ICT Hiriyur-II Hiriyur (existing) 400kV Quad/HTLS D/c line with carrying capacity of 2000 MW at nominal voltage Pavagada-II (new) Establishment of Pavagada-II 400/220kV S/s at suitable location near Pavagada along with 1x500 MVA, 400/220kV ICT Pavagada-II Pavagada (Existing) 400kV Quad/HTLS D/c line with carrying capacity of 2000 MW at nominal voltage Axis wind Munirabad-III 220kV S/c line Orange Ashok Munirabad-III 220kV D/c line Hungund Munirabad-III 220kV S/c line ReNew Power Hiriyur-II 220kV S/c line Cuddalore Bioenergy Pavagada-II 220kV S/c line 3

8 Further, following application were agreed to be closed/withdrawn as per the details below: Sl. Application Applicant Location Date of Application Green Infra Renewable Energy Limited Saffron Ecopower Venture Pvt. Ltd. Greenmint Power Pvt. Ltd. Tirunelveli, Tuticorin, Thoothukdi, Connectivity Sought (MW) Nature of Applicant Remarks Wind The applicant requested to withdraw the application Wind No representative attended last two consecutive Wind meetings nor they have submitted the requisite documents as per the Detailed Procedure, accordingly the committee decided to close the applications. It was informed that the grant of Stage-I Connectivity shall not create any vested right in favor of the grantee on ISTS infrastructure including bays at any location. The Stage-I Connectivity grantee shall be required to update the quarterly progress of development of their generation project and associated transmission infrastructure as per format RCON-I-M, failing which appropriate action shall be taken. Further Stage-I Connectivity grantee is required to secure the Stage-II Connectivity for physical connection with the ISTS grid within 24 months from grant of Stage-I Connectivity. The Stage-I Connectivity grantees who fail to apply for Stage-II Connectivity within 24 months from grant of Stage-I Connectivity shall cease to be Stage-I grantee and their Application fees shall be forfeited. It was also informed that the new substation/location, if needed to be established, shall be planned in consultation with CEA, MNRE and other stakeholders. Further, the proposed alternative locations for connectivity are yet to be discussed and shall be firmed up, if needed, in consultation with CEA and other stakeholders. Implementation of new substations and other infrastructure shall be undertaken only after grant of Stage-II Connectivity and fulfillment of all terms and conditions by the applicants including submission of Connectivity Bank Guarantee. (ii) Stage-II Connectivity applications CTU informed that 7 nos. of completed Stage-II connectivity applications have been received as per the criteria stipulated in the detailed procedure. Further it was observed that like the Stage-I Connectivity applications, M/s Green Infra Renewable Energy Limited has submitted 2 nos. of Stage-II Connectivity applications for same capacity. Representative of M/s Green Infra Renewable 4

9 Energy Limited confirmed that the application no submitted on may be processed and the application no submitted on may be treated as withdrawn. Representative also confirmed that they shall be submitting the formal request for withdrawal of above application within a day. After detailed deliberations, following applications were agreed for grant of Stage-II connectivity, the details given as below: Sl. Application Applicant Location Date of Application Connectivity applications near Tirunelveli Orange Sironj Wind Power Pvt. Ltd. Green Infra Renewable Energy Limited Betam Wind Energy Private Limited Betam Wind Energy Private Limited Connectivity applications near Palakkad Mytrah Energy (India) Private Limited Connectivity applications near Pugalur Sprng Renewable Energy Private Limited Tuticorin, Tuticorin, Tuticorin, Tuticorin, Coimbatore, Tirupur, Quantum of Stage-I Sought / Granted (MW) Stage-II Connectivity Sought (MW) Start Date of Stage-II connectivity Proposed location for Grant of Stage-II Connectivity Tuticorin-II GIS PS (erstwhile Tirunelveli GIS PS) Palakkad (Existing) Pugalur (Existing) Dedicated Tr. System Orange Sironj Tuticorin-II 230kV S/c line along with terminal bays at Tuticorin- II GIS & generation switchyard Green Infra Renewable Tuticorin-II 230kV S/c line along with terminal bays at Tuticorin-II GIS & generation switchyard Betam Wind Energy Tuticorin-II 230kV S/c line along with terminal bays at Tuticorin-II & generation switchyard Mytrah Energy Palakkad 220kV S/c line along with terminal bays at Palakkad & generation switchyard Sprng Renewable Pugalur 230kV S/c line along with terminal bays at Pugalur & generation switchyard It was informed that as per the Detailed procedure, the dedicated transmission line including line bays at generation pooling station shall be under the scope of the applicant and the terminal bays at the ISTS sub-station shall be under the scope of transmission licensee owning the ISTS sub-station subject to compliance of relevant provision of tariff policy. Further, wind power developers who have emerged successful in the bidding conducted by Central/State Government designated agency, before coming into force 5

10 of this Procedure, shall have the option to implement the bays associated with their dedicated lines at the ISTS sub-station by themselves or through the transmission licensee owning the sub-station subject to compliance of relevant provisions of tariff policy. Towards this, the applicants confirmed that looking into the tight time lines they themselves shall take up the implementation of the terminal bays at ISTS substations at their own cost. CTU informed that irrespective of the Connectivity quantum, as per the Detailed Procedure, the minimum capacity of the dedicated transmission line (per circuit) shall be 300 MW for 220/230 kv lines and 900 MW for 400kV lines. It was also informed that considering Right-of-Way constraints near substation for termination of number of 220/230kV dedicated transmission lines, 220/230kV lines shall be implemented through multi circuit tower near the substation entry for about 2-3 kms stretches. For this applicants may coordinate among themselves, applicants agreed for the same. Following application was withdrawn by the applicant, the details given as below: Sl. Application Applicant Location Date of Application Green Infra Renewable Tuticorin, Energy Limited Connectivity Sought (MW) Remarks The applicant requested to withdraw the application. It was informed that the Stage-II Connectivity grantees are required to the sign the Transmission Agreement within 30 days from the date of intimation of Grant of Stage-II Connectivity and shall furnish the applicable Connectivity Bank Guarantee (Conn-BG), no extension shall be granted on any ground and in case of failure to sign the Agreement and / or to furnish the Conn-BG, Grant of Stage-II Connectivity shall be revoked without any prior notice. It was also informed that in accordance with the CERC Regulations, 2009 / Detailed Procedure as amended from time to time, the grant of Connectivity shall not entitle an applicant to interchange any power with the grid unless it obtains LTA/MTOA/STOA for power transfer requirements. In case of LTA, there may be requirement of further transmission system strengthening, therefore, the applicants are advised to apply for LTA to enable power transfer to its beneficiaries on long term basis. It was further informed that Stage-II Connectivity grantee shall furnish progress of the monitoring parameters on quarterly basis in the format given at FORMAT-RCON-II-M by the last day of each quarter. Failure to update progress of the monitoring parameters shall be considered as adverse progress and in such case CTU shall approach the Commission for appropriate directions. Further, the Stage-II Connectivity grantees shall be required to complete the dedicated transmission line(s) and pooling sub-station(s) within 6

11 24 months from the date of intimation of bay allocation at existing or new / under-construction ISTS sub-station. If the grantee fails to complete the dedicated transmission line within the stipulated period, the Conn-BG of the grantee shall be encashed and Stage- II connectivity shall be revoked. (iii) LTA applications CTU informed that following LTA applications are due for processing with the details given below: Sl. Date of Status of Stage-I / II Applicant Location Application connectivity LTA Sought (MW) 1. Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, Deemed Stage-I / 60 (NR) 2. Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, Stage-II Connectivity 60 (NR) 3. Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, application not yet 60 (NR) 4. Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, submitted 60 (NR) 5. Green Infra Renewable Energy Ltd. Tirunelveli, Applied for Stage-II (NR), 100 (ER) 6. Sprng Renewable Energy Private Ltd. Tirupur, Applied for Stage-II 300 (WR) With the notification of the Detailed Procedure on , the Connectivity granted to the Regen Wind Farm (TN) Pvt. Ltd. is to be considered as deemed Stage-I Connectivity grantee. As the applicant has yet to submit the Stage-II Connectivity application, the LTA applications shall be processed alongwith or after the grant of Stage-II Connectivity applications. Further the Sprng Renewable Energy Private Ltd. has submitted the revised application in the month on July, 2018 due to change in beneficiaries / region and the application shall be due for processing in August, LTA applications of M/s Green Infra Renewable Energy Ltd. only is being considered for grant of LTA. It was informed that in the Tirunelveli area of, following LTA applications have been granted / received : Sl. Applicant LTA quantum (MW) Status of LTA Target / Firm beneficiaries (MW) Status of Stage-I / II connectivity 1. Suzlon Power Infrastructure Ltd. 75 Granted NR-40 MW + NER-35 MW Deemed St-I 2. Suzlon Power Infrastructure Ltd. 75 Granted NR-40 MW + NER-35 MW Deemed St-I 3. Suzlon Power Infrastructure Ltd. 75 Granted NR-40 MW + NER-35 MW Deemed St-I 4. Mytrah Energy India Pvt. Ltd. 75 Granted NR-75 MW Deemed St-II 5. Orange Sironj Wind Power Pvt. Ltd. 200 Agreed for grant NR-50 MW + ER-100 MW, SR-50 MW Applied for St-II 6. Mytrah Energy India Pvt. Ltd. 175 (revised Agreed for grant ER-100 MW + NER-50 MW + NR-25 Deemed St-II from 225) MW 7. Green Infra Renewable Energy Ltd To be discussed NR MW + ER-100 MW Applied for St-II 7

12 The LTA applications of M/s Orange Sironj Wind Power Pvt. Ltd. (OSWPPL) and M/s Mytrah Energy (India) Pvt. Ltd. (MEIPL) were discussed in the 22 nd meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR held on During the meeting, it was deliberated that the LTA of 300 MW {MEIPL-75 MW & Suzlon - 3x75 MW} has already granted at Tirunelveli PS and with the grant of LTA of 200 MW to M/s Orange Sironj Wind Power Pvt. Ltd. at Tirunelveli,, total 500 MW of LTA shall be evacuated from 2x500 MVA transformers at Tuticorin-II PS (erstwhile Tirunelveli PS GIS). Further for the grant of additional 225 MW of LTA to MEIPL, augmentation of 1x500 MVA transformer at Tuticorin-II PS was agreed for considering N-1 redundancy criteria at Tirunelveli PS. Subsequently, CERC has notified the Detailed Procedure for Grant of connectivity to projects based on renewable sources to ISTS on as per which the LTA shall be granted along with grant of Stage-II Connectivity or after the grant of Stage-II Connectivity. In line with the above, SPIL is deemed Stage-I Connectivity grantee and the LTA granted for 3x75 MW is to be considered upon receipt of Stage-II Connectivity application. Accordingly, it was proposed that the LTA to OSWPPL (200 MW) and MEIPL (225 MW) may be granted with the existing transmission system and LTA to M/s Green Infra Renewable Energy Ltd. for MW may be granted with the augmentation of 1x500 MVA (3 rd ) 400/230kV transformer at Tuticorin-II GIS (erstwhile Tirunelveli GIS PS). The representative of MEIPL informed that they have won the SECI bid for 250 MW only and therefore would like to reduce the LTA quantum of the application from 225 MW to 175 MW as per the provisions of the Detailed Procedure and submitted the formal request vide letter dated The representative of M/s Green Infra Renewable Energy Ltd. has stated that as per the Transmission Planning Criteria para-16.2 the N-1 criteria may not be applied to the immediate connectivity of wind/solar farms with the ISTS/Intra-STS grid i.e. the line connecting the farm to the grid and the step-up transformers at the grid station and accordingly they may be granted the LTA on the existing transmission system with 2x500 MVA transformers at Tuticorin-II GIS. Towards this CTU had opined that as per the planning philosophy and the general guidelines of the Transmission Planning Criteria, the transmission system is generally augmented to cater to the long term requirements and to operate within permissible limits both under normal as well as credible contingency(ies). Representative of SRLDC stated that the N-1 contingency of the transformer shall be considered for grant of LTA, as under the outage of one transformer the other transformer may also trip due to the overloading conditions and may cause disturbance in the grid. 8

13 Member (PS), CEA stated that the Transmission Planning Criteria has been formed after the detailed deliberations and feedbacks from the stakeholders as well as the wind/solar generation developers wherein it is specifically provided that N-1 may not be considered for the wind/solar generation for immediate connectivity including step-up transformers at the grid station. Representative of TANGEDCO stated that the implementation of the termination bays at ISTS stations shall not be taken-up without having commitment from the wind developers to bear the applicable charges and firm beneficiaries through a suitable agreement. In this regard, it was clarified that the proposal for grant of Stage-II Connectivity and LTA are for SECI bid winners from Tranche-I to IV and shall have the firm PPAs through SECI. After detailed deliberations, it was agreed that the N-1 criteria may not be applied to the immediate connectivity of wind/solar farms with the ISTS/Intra-STS grid i.e. the line connecting the farm to the grid and the step-up transformers at the grid station and in case of outage of the Transformer at Tuticorin-II GIS, suitable mechanism including SPS for backing down the corresponding generation on pro-rata basis of wind generators may be incorporated by the applicants at their own cost in consultation with POSOCO and SRPC. Accordingly, LTA to the following applications was agreed to be granted with existing transmission system and 2x500MVA transformer at Tuticorin-II GIS. Further to cater to the long term requirements, augmentation of 3 rd, 1x500 MVA transformer at Tuticorin-II GIS has already been agreed. Sl. Applicant LTA quantum (MW) Beneficiaries (MW) Date of start of LTA 1. Orange Sironj Wind Power Pvt. Ltd. 200 NR-50 MW + ER-100 MW, SR-50 MW Mytrah Energy India Pvt. Ltd. 175 ER-100 MW + NER-50 MW + NR-25 MW 50 MW MW Green Infra Renewable Energy Ltd NR MW + ER-100 MW It was also informed that the LTA grantees are required to the sign the Long Term Access Agreement within 30 days from the date of intimation of Grant of LTA and shall furnish the applicable Construction phase Bank Guarantee (CBG), no extension shall be granted on any ground and in case of failure to sign the Agreement and / or to furnish the CBG, Grant of LTA shall be revoked without any prior notice. 9

14 6.0 Review of Generation Projects granted only Connectivity Sl. Generation Developer/ Open Access Applicant Connectivity Quantum (MW) Connectivity transmission system Start date of connectivity as per intimation 1 Surana Power Limited (2x210 MW) 350 Surana Power Raichur (New) 400kV D/c line Project stalled as informed vide letter dtd VSF Projects Ltd. (1x350 MW) 350 VSF Projects Nellore PS 400 kv D/c line Unknown M/s Surana Power Limited was granted connectivity at Raichur (New) 765/400 kv substation (PGCIL) in 2011 through Surana Power Raichur (New) 400kV D/c line to be implemented by applicant. There has been consistent non-participation from Surana Power Limited since 13th JCC held on The issue was discussed in various JCC meetings wherein it was opined that representative not attended JCC, however submitted status through , project uncertain due funding problems, award for line yet to be placed. Further the issue was also discussed in the 19 th Connectivity/LTA meeting of SR, wherein in the applicant was advised to approach POWERGRID for provision of bays at Raichur (New) S/s and also advised to apply for LTA. However, no response has been received so far. After deliberations, it was decided to close the Connectivity application. M/s VSF Projects Ltd. has been granted connectivity at Nellore PS in 2011 through VSF Projects Nellore PS 400 kv D/c line to be taken up by the applicant. There has been consistent non-participation from VSF Projects Ltd. since 16th JCC held on The issue was discussed in various JCC meetings wherein it was opined that Representative repetitively not attending JCC meetings. After deliberations, it was decided to close the Connectivity application. Meeting ended with the vote of thanks x x x x x x x x

15 Annexure-I List of participants of 24 th Meeting of Southern Region Constituents regarding LTA and Connectivity applications in Southern Region as per Detailed Procedure for Grant of Connectivity to projects based on Renewable Sources Sl. Name and Organization Designation Central Electricity Authority (CEA) 1. Shri P S Mhaske Member (PS) 2. Shri B S Bairwa Director (PSP&A-II) Power Grid Corporation of India Limited (POWERGRID) 1. Shri Subir Sen COO (CTU-Planning) 2. Shri Mukesh Khanna GM (CTU-Planning) 3. Shri K Rathore GM (Engineering) 3. Smt Jyoti Prasad DGM, Law (CTU-Planning) 4. Shri Anil Kumar Meena CM (CTU-Planning) 5. Smt Trupti Panigrahi CM (BDD) 6. Shri Ajay Dahia Dy. Manager (CTU-Planning) 7. Shri Ankush Patel Sr. Engineer (CTU-Planning) 8. Shri Venkatesh Gorli Sr. Engineer (CTU-Planning) 9. Shri Sandeep Behera Sr. Engineer (CTU-Planning) 10. Shri Narendra Sathvik Sr. Engineer (Smartgrid) Power System Operation Corporation Limited (POSOCO) 1. Shri Madhukar Goodelli Manager, SRLDC 2. Shri Phanisankar C Sr. Engineer, NLDC Electricity Board (TNEB) / TANTRANSCO 1. Shri D Ravichandran SE 2. Shri M. Sudarsan EE(SS) 11

16 Karnataka Power Transmission Corporation Limited (KPTCL) 1. Shri H.R. Prakash Exe Engineer (Electrical) Connectivity/LTA Applicants 1. Shri Gaurav Sood CEO Sprng Energy Private Ltd 2. Shri Abhishek Bansal Director Sprng Energy Private Ltd 3. Shri Avinash Mirajkar Head, B&R Sprng Energy Private Ltd 4. Shri K.A. Vishwanath Sr. Manager Renew Power Ltd. 5. Shir Kiran V GM Mytah Energy (India) Pvt. Ltd. 6. Shri Ankush Malik VP Orange Renewable Pvt. Ltd. 7. Shri Ashish Shukla Sr. Mgr Hungund Renewable Energy Pvt. Ltd 8. Shri Mahesh Vipradas VP Sembcorp Pvt. Ltd. 9. Shri Sanjay Nagrere Head-BD& C Green Infra Renewable Energy Ltd. 10. Shri Rakesh Rathore DGM Green Infra Renewable Energy Ltd. 11. Shri Ankur Rajan Head-P&P Green Infra Renewable Energy Ltd 12. Nandkumar Deo Sr. VP Green Infra Renewable Energy Ltd Suzlon Power 13. Shri Pavan Gupta Dy. Manager Orange Renewable Pvt. Ltd. 14. Ankushrao Dhane AGM Orange Renewable Pvt. Ltd. 15. Shri. Naresh Panchal Head PE Suzlon Power 16. Shri Anil Asthana Advisor/ Consultant Suzlon Power 17. Shri. Sourabh Mishra AGM Viento Renewables Evergreen Power 18. Deepak Khare VP (Engg & Const) ENGIE (Betam Wind) 19. Ranjith Nair Senior VP (Development) ENGIE, Betam, Anurudra 20. Vaibhav Bansal Financial Advisor ENGIE, Betam, Anurudra 21. Nidhi Dutta Sr. Manager Axis Wind Farms Pvt. Ltd. 22. J. Venkata Kumar Sr. Manager Axis Wind Farms Pvt. Ltd. 23. Priyadarshan S. GM Cuddalore Energy Pvt. Ltd. 24. Siddharth Mehra Director Vish Wind 25. M. Mathur AGM Vish Wind 26. M. Krishnakumar Sr. Advisor Vish Wind 12

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary To 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 2. Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Copy to: With a kind request to make it convenient to attend the above meeting. Shri S.K. RAY Mohapatra Chief Engineer (PSP&A-II) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi 110 066.

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2009/ 529-538 Date: June 05, 2009 To 1.The Member Secretary, Southern

More information

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX : Distribution List 1 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 3. Member Secretary Southern Regional Power Committee 29, Race Course Cross

More information

Distribution List: Constituents of Southern region.

Distribution List: Constituents of Southern region. Distribution List: Constituents of Southern region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 3. Member Secretary Southern Regional Power Committee 29, Race

More information

Copy: with a request to kindly make it convenient to attend the above meeting

Copy: with a request to kindly make it convenient to attend the above meeting Copy: with a request to kindly make it convenient to attend the above meeting 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 2. Chief Executive Officer Power System

More information

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon Distribution List: 1. Managing Director Andhra Pradesh Solar Power Corporation Pvt Ltd Room No: 218, 2 nd Floor, Vidyut Soudha, Khairatabad, Hyderabad- 500 082 Tel : 040-23499401 / +91-9848543434 Email:

More information

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II) Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110

More information

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: ) 1. Member, Secretary, NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) 4. Director (Technical), Punjab State Transmission Corperation Ltd. (PSTCL) Head

More information

Minutes of 4 th Meeting of the National Reliability Council for Electricity (NRCE) held on at NRPC, New Delhi

Minutes of 4 th Meeting of the National Reliability Council for Electricity (NRCE) held on at NRPC, New Delhi GOVERNMENT OF INDI1A MINISTRY OF POWER CENTRAL ELECTRICITY AUTHORITY SEWA BHAWAN, R.K.PURAM NEW DELHI-110066 Website: www.cea.nic.in (आई.एस.ओ. 9001:2008) No. CEA/ NRC/RA 2014 Dated 3.11.2014 To As per

More information

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Distribution List - SR:. GM, (Commercial) NTPC Limited (Kudgi TPS) NTPC Bhavan, Core-7, Scope Complex 7, Institutional Area,

More information

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

FORUM LOAD DESPATCHERS (FOLD)

FORUM LOAD DESPATCHERS (FOLD) CHARTER OF FORUM OF LOAD DESPATCHERS (FOLD) FOLD Secretariat NLDC,B-9 Qutab Institutional Area, New Delhi http://www.forumofld.in http://www.forumofloaddespatchers.in Table of Contents 1. Background...3

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg New Delhi, Dated, io" October, 2014 To 1. Chief Secretary(Power), Government of Arunachal Pradesh, Itanagar. 2.

More information

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m. DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING (1/2016 series) DATE: 14/03/2016 TIME: 11.30 a.m. Agenda for the 25 the Meeting (1/2016 series) of the Approval Committee of Divyasree Technopark

More information

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on Minutes of the Special Meeting on URTDSM / SCADA / Communication held on 13.03.2018 1. Introduction A Special Meeting on URTDSM / SCADA / Communication was held on 13.03.2018 at SR-II, PGCIL, Bengaluru.

More information

qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

qlq:~ ~ CbIlq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise) qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise) ~ 'l>mr>m : "41tU fii'1'1', '

More information

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. 1 Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. of Federal Republic of Germany. Registered as a non-profit

More information

Distribution List: Constituents of Northern Region.

Distribution List: Constituents of Northern Region. Distribution List: Constituents of Northern Region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. Chief Engineer (PSP&A-I) Central Electricity Authority Sewa

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011 Power Grid Corporation of India Limited Analysts Presentation February 9, 2011 1 Listed Company with public holding of 30.58% and balance by Government of India Central Transmission Utility of the country

More information

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Distribution List: Northern Region. Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member

More information

up of SPMU in States/UTs under NeGP A

up of SPMU in States/UTs under NeGP A 1/12/2015 Guidelines for Setting up of SPMU in States/UTs under NeGP A Department of Agriculture & Cooperation (DAC), Ministry of Agriculture, New Delhi Contents 1. Introduction... 2 2. Scope of Work of

More information

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD)

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD) Copy to: With a kind request to make it convenient to attend the above meeting. Shri Pardeep Jindal Chief Engineer (PSP&A-II) Central Electricity Authority, Sewa Bhawan, New Delhi 110 066. ED (Commercial)

More information

Reliance Infrastructure Limited

Reliance Infrastructure Limited Reliance Infrastructure Limited Reg. : H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections / suggestions on Reliance Infrastructure

More information

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION MANAGEMENT SOFTWARE Maharashtra State Load Dispatch Centre (Maharashtra State Electricity Transmission Co. Ltd.) Developed & Prepared by India s Largest

More information

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) TABLE OF CONTENTS 1 INTRODUCTION... 5 1.1 Background... 5 1.2 EXISTING NETWORK OF TATA POWER IN MUMBAI CITY AREA...

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR ********** ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR 751012 ********** Present : Shri B K Das, Chairperson Shri K C Badu, Member Shri B K Mishra, Member Case No. 101/2009

More information

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB Memorandum of Understanding for Joint Working by Ministry of Health and Sanitation, Ministry of Information and Communication on the Government of Sierra Leone ehealth Coordination Hub Dated 3 rd of November

More information

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 1 SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 2 SOLAR ENERGY CORPORATION OF INDIA A Government of India Enterprise under the administrative

More information

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network Inviting Expression of Interest for Leasing of Dark fiber on DMRC Network Delhi Rail Corporation is engaged in the business of constructing, operating & maintaining Mass Rapid Transport Network. DMRC is

More information

Terms of Reference for the EIF Trust Fund Manager (TFM)

Terms of Reference for the EIF Trust Fund Manager (TFM) Terms of Reference for the EIF Trust Fund Manager (TFM) Introduction 1. The EIF is financed through a multi-donor trust fund (EIFTF) and contributions, whether bilateral, regional or multilateral. The

More information

Advanced Ultra Power Transmission Consultancy

Advanced Ultra Power Transmission Consultancy 2100 Advanced Ultra Power Transmission Consultancy AUPTC the Complete Solutions to Power Infrastructure, Electrical, Electronics, Automation, HVAC Advanced Ultra Power Transmission Consultancy About AUPTC

More information

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network Inviting Expression of Interest for Leasing of Dark fiber on DMRC Network Delhi Metro Rail Corporation is engaged in the business of constructing, operating & maintaining Mass Rapid Transport Network.

More information

Introduction. F:\bhandarkar\Empanelment of Consultants.doc Page 1 of 1

Introduction. F:\bhandarkar\Empanelment of Consultants.doc Page 1 of 1 Empanelment of Consultants to render Financial Engineering/ Transaction Advisory Services for the implementation of Public Private Partnership and other types of Projects in the Maharashtra State Government

More information

e-filing Process At a glance

e-filing Process At a glance e-filing Process At a glance 1 Select appropriate type of Return Form 2 Download Return Preparation Software for selected Return Form. 3 Fill your return offline and generate a XML file. 4 Register and

More information

Private D.Ed., Colleges Grant of Fresh /Renewal of Affiliation for the year in respect 163 Private D.EI.Ed colleges order issued.

Private D.Ed., Colleges Grant of Fresh /Renewal of Affiliation for the year in respect 163 Private D.EI.Ed colleges order issued. PROCEEDINGS OF THE DIRECTOR OF SCHOOL EDUCATION: TELANGANA STATE: HYDERABAD-4 Rc.No.172 /N1 3/TSCERT/2015 Dated: 10 02 2016 Sub: Private D.Ed., Colleges Grant of Fresh /Renewal of Affiliation for the year

More information

Distribution List: Constituents of Northern Region

Distribution List: Constituents of Northern Region Distribution List: Constituents of Northern Region Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member Secretary NRPC 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai,

More information

Certified Program By-Laws

Certified Program By-Laws National Ski Patrol Eastern Division Certified Program By-Laws Adopted Sarah S. Keating- secretary 4/2/2016 Purpose and Objectives Section 1: To provide a professional level from which professional patrollers

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated REMINDER-III: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH From Er. A. ASHOK KUMAR, B.E., Chief Engineer/ Personnel, 144, Anna Salai, Chennai 600 002. To The Superintending

More information

Established in 1995, Suzlon Energy Limited, was the first Indian company to make a place for itself in the global wind energy industry.

Established in 1995, Suzlon Energy Limited, was the first Indian company to make a place for itself in the global wind energy industry. Established in 1995, Suzlon Energy Limited, was the first Indian company to make a place for itself in the global wind energy industry. In spite of competing with international players, we established

More information

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID:

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID: CONTACT DETAILS For any information/clarification/grievance on matters connected with NRIs, please contact our BRANCHES spread across the country: NRIs may also contact the following NRI Cells/Offices.

More information

MFC Power General Partner Ltd.,

MFC Power General Partner Ltd., Decision 21950-D01-2016 Preferential Sharing of Records Between, MFC Power Limited Partnership, URICA Energy Real Time Ltd., and URICA Asset Optimization Ltd. October 12, 2016 Alberta Utilities Commission

More information

Corrigendum: RFP by MAB IT Ops for procurement of SIM cards for use in PoS terminals RFP ref: SBI/GITC/MAB/2017/2018/418

Corrigendum: RFP by MAB IT Ops for procurement of SIM cards for use in PoS terminals RFP ref: SBI/GITC/MAB/2017/2018/418 Corrigendum: RFP by MAB IT Ops for procurement of SIM cards for use in PoS terminals RFP ref: SBI/GITC/MAB/2017/2018/418 Sr No Page of RFP 1 19 Award criteria-i, Clause Present clause / condition / criteria

More information

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Public Table of contents 1 Connection Framework... 3 2 Connection Types...

More information

ljnkj ivsy Òou Sardar Patel Bhawan, Lkaln ekxz] uã fnyyh& Sansad Marg, New Delhi

ljnkj ivsy Òou Sardar Patel Bhawan, Lkaln ekxz] uã fnyyh& Sansad Marg, New Delhi No.12021/1/2016-SSS Hkkjr ljdkj Government of India lakf[;dh,oa dk;zøe dk;kzuo;u ea=ky; Ministry of Statistics and Programme Implementation v/khulfk lk f[;dh; lsok ÁÒkx Subordinate Statistical Service

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

European Code of Conduct on Data Centre Energy Efficiency

European Code of Conduct on Data Centre Energy Efficiency EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit European Code of Conduct on Data Centre Energy Efficiency Introductory guide for applicants

More information

INDIA TOURISM DEVELOPMENT CORPORATION LIMITED Unit : Ashok Travels & Tours, Bangalore

INDIA TOURISM DEVELOPMENT CORPORATION LIMITED Unit : Ashok Travels & Tours, Bangalore GENERAL TERMS & CONDITIONS FOR APPOINTMENT OF CONSOLIDATOR FOR ATT BANGALORE 1. Should own minimum of 5 Coaches ( High Tech 35 Seater registration not earlier than 2003). 2. Should have minimum of three

More information

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE 1 The Short Term Open Access (STOA) in Inter State Transmission System (ISTS) was commenced in the year 2004 through a

More information

The SLG discussion was initiated with opening remarks by Chairman, Shri Vivek Agrawal, Chief Operating Officer, Godawari Power & Ispat Limited.

The SLG discussion was initiated with opening remarks by Chairman, Shri Vivek Agrawal, Chief Operating Officer, Godawari Power & Ispat Limited. Minutes of the 1 st Sector Learning Group Meeting of the Iron & Steel Sector 3 rd March, 2016 at Raipur, Chhattisgarh The first Sector Learning Group (SLG) meeting of the Iron & Steel Sector was organized

More information

Post Graduate Diploma Course In O & M of Transmission & Distribution System

Post Graduate Diploma Course In O & M of Transmission & Distribution System Post Graduate Diploma Course In O & M of Transmission & Distribution System (6 th Batch) Central Board of Irrigation and Power Malcha Marg, Chanakyapuri, New Delhi-110021 Web Site: www.cbip.org Email:cbip@cbip.org

More information

Procedure for Issue and Withdrawal of Certificates

Procedure for Issue and Withdrawal of Certificates IC/PR/11- Rev.01 Pages: 1/6 Procedure for Issue and Withdrawal of Certificates Inter Cert Pvt. Ltd. C-46, Ground Floor, Sector 10, Noida 201301, U.P., India Tel: +91-120-4542204, 4542205, Fax: 91-120-4542205

More information

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL Request For Quotation from Service Providers for Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL Release Date: 07-FEB-2015 Page 1 of 8 UTI Infrastructure

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

CLASS - III Digital Signature Certificate Application Check List (To be filled by applicant)

CLASS - III Digital Signature Certificate Application Check List (To be filled by applicant) Delhi Mumbai Kolkata Nagpur Bengaluru Pune 1 Year DSC 2 Year DSC CLASS - III Digital Signature Certificate Application Check List (To be filled by applicant) Name: User ID: City: e-mail: Company: Ph /

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

RITES LIMITED (A Govt. of India Enterprise) RITES Bhawan, Plot No. 1, Sector 29, Gurgaon

RITES LIMITED (A Govt. of India Enterprise) RITES Bhawan, Plot No. 1, Sector 29, Gurgaon RITES LIMITED (A Govt. of India Enterprise) RITES Bhawan, Plot No. 1, Sector 29, Gurgaon 122001 Recruitment of Engineers in various disciplines on contract basis in pay-scale RITES Ltd., a Mini Ratna Central

More information

By-laws of the Board of AusIMM Chartered Professionals

By-laws of the Board of AusIMM Chartered Professionals By-laws of the Board of AusIMM Chartered Professionals 01 By-laws the Board of AusIMM Chartered Professionals Contents 1. Definitions Page`3 2. Objectives page 3 3. Chartered Professional Disciplines page

More information

Request For Quotation from Service Providers. for

Request For Quotation from Service Providers. for Request For Quotation from Service Providers for Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation and Certification for UTIITSL Release Date: 17-DEC-2014 Page 1 of

More information

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP Executive Summary The Generic Names Supporting Organization (GNSO) unanimously approved at its meeting on

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

Zero Defect Zero Effect (ZED) Certification Scheme Rating Process

Zero Defect Zero Effect (ZED) Certification Scheme Rating Process QUALITY COUNCIL OF INDIA (QCI) 2 nd Floor, Institution of Engineers Building, Bahadur Shah Zafar Marg, New Delhi 110002 Phone: +91-11-2337 8056 / 57; Fax: +91-11-2337 8678; Web: www.qcin.org Zero Defect

More information

REQUEST FOR EXPRESSIONS OF INTEREST

REQUEST FOR EXPRESSIONS OF INTEREST REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION) Country : INDIA Project : FINANCING PUBLIC PRIVATE PARTNERSHIP THROUGH SUPPORT TO THE INDIA INFRASTRUCTURE FINANCE COMPANY LIMITED

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

IDBI BANK LIMITED IDBI TOWER, WTC COMPLEX, CUFFE PARADE MUMBAI

IDBI BANK LIMITED IDBI TOWER, WTC COMPLEX, CUFFE PARADE MUMBAI IDBI BANK LIMITED IDBI TOWER, WTC COMPLEX, CUFFE PARADE MUMBAI 400 005 Invitation for EXPRESSION OF INTEREST (EOI) From Telecom Service Providers For MPLS Network Connectivity in India Address communication

More information

RfP No. APSFL/CCTVPMA/231/2016, Dated:

RfP No. APSFL/CCTVPMA/231/2016, Dated: S.No 1 2 3 RfP No. APSFL/CCTVPMA/231/2016, Dated: 30.05.2018 RfP for Selection of Project Monitoring Agency (PMA) for implementation of cloud based IP CCTV Surveillance System in AP Corrigendum 2 Dated:

More information

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,

More information

Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017

Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017 Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017 Copyright 2017 International Finance Corporation. All rights reserved. The material in this publication is copyrighted by International

More information

APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME

APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME Contents Scope... 3 A. Application for the Notification of the Certification Body... 3 B. Approval from

More information

INDIAN SOCIETY FOR NON-DESTRUCTIVE TESTING Mumbai Chapter ANNOUNCEMENT NDT LEVEL III REFRESHER/TRAINING COURSES AT MUMBAI, INDIA February / March 2019

INDIAN SOCIETY FOR NON-DESTRUCTIVE TESTING Mumbai Chapter ANNOUNCEMENT NDT LEVEL III REFRESHER/TRAINING COURSES AT MUMBAI, INDIA February / March 2019 Dear All NDT Personnel INDIAN SOCIETY FOR NON-DESTRUCTIVE TESTING Mumbai Chapter ANNOUNCEMENT NDT LEVEL III REFRESHER/TRAINING COURSES AT MUMBAI, INDIA February / March 2019 ISNT Mumbai Chapter is happy

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

Tamil Nadu: Current Power scenario and projects in pipeline

Tamil Nadu: Current Power scenario and projects in pipeline Tamil Nadu: Current Power scenario and projects in pipeline 1. Tamil Nadu per capita consumption is over 1000 Units, which is as against 11 th plan national target of 1000 units. Presently, the national

More information

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho TERMS OF REFERENCE Scaling-up Renewable Energy Program (SREP) Joint Mission September 27-29, 2017 Lesotho 1 SUMMARY 1. Mission objectives. The main objective of the Joint Mission ( the Mission ) is to

More information

CYBER SECURITY & CYBER LAWS

CYBER SECURITY & CYBER LAWS NATIONAL LAW SCHOOL OF INDIA UNIVERSITY, BANGALORE ADVANCED CENTRE FOR RESEARCH, DEVELOPMENT AND TRAINING IN CYBER LAWS AND FORENSICS [ACRDTCLF] NATIONAL SEMINAR ON CYBER SECURITY & CYBER LAWS ISSUES &

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

Appendix 08: Details of Location under Each Category

Appendix 08: Details of Location under Each Category Appendix 08: Details of Location under Each Category Dated: Sr. No. A Bank Location CATEGORY - A Type of 1 Hyderabad - DR DR Site Telangana 2 Mumbai - DC DC Site 3 Mumbai- DC 4 Bangalore-

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

CALL LOGGING PROCESS

CALL LOGGING PROCESS CALL LOGGING PROCESS 1. TO REGISTER A COMPLAINT, FIRST YOU NEED TO REGISTER YOUR PRODUCT ON VIVITEK WEB SITE. BELOW ARE THE STEPS TO REGISTER YOUR PRODUCT ON VIVTEK WEB SITE. 2. LOG ON TO WWW.VIVITEK.IN

More information

GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED PROCEDURE

GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED PROCEDURE GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED Document No. P-04 PROCEDURE Version. 2.00 Granting, Maintaining, Extending, Reducing, Date of Issue 04.04.2016 Reviewed & Approved By Name Designation

More information

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook) ABOUT THE COMPANY A Navaratna Central Public Sector Enterprise, incorporated in 1989 The Central Transmission Utility of India Consistently Rated Excellent By GoI Created synchronously connected Country-wide

More information

Communication Networks & Cyber Security Workshop and Sixteenth GISFI Standardisation Series Meeting (GSSM),

Communication Networks & Cyber Security Workshop and Sixteenth GISFI Standardisation Series Meeting (GSSM), Series of GISFI s Five Years Anniversary First Series Event PROGRAMME Communication Networks & Cyber Security Workshop and Sixteenth GISFI Standardisation Series Meeting (GSSM), March 10-12, 2014 Organizing

More information

Telecommunications Regulation. TAIWAN Tsar & Tsai Law Firm

Telecommunications Regulation. TAIWAN Tsar & Tsai Law Firm Telecommunications Regulation TAIWAN Tsar & Tsai Law Firm CONTACT INFORMATION June Su James Cheng Tsar & Tsai Law Firm 8F, 245 Dunhua S. Rorad, Sec. 1 Taipei 106, Taiwan 886-2-2781-4111 law@tsartsai.com.tw

More information

Pilot Study on Big Data: Philippines. World Telecommunications/ICT Indicators Symposium (WTIS) November 2017 Hammamet, Tunisia

Pilot Study on Big Data: Philippines. World Telecommunications/ICT Indicators Symposium (WTIS) November 2017 Hammamet, Tunisia Pilot Study on Big Data: Philippines World Telecommunications/ICT Indicators Symposium (WTIS) 14-16 November 2017 Hammamet, Tunisia Background, Objective, Scope - In June 2016, ITU initiated a pilot project

More information

International cooperation on power interconnection: Mongolian Regulatory perspective

International cooperation on power interconnection: Mongolian Regulatory perspective 4 th Northeast Asia Energy Security Forum International cooperation on power interconnection: Mongolian Regulatory perspective ENKHTUVSHIN Ganbaatar Ph.D. candidate Energy and Environmental Department,

More information

Sub : ADDENDUM/CORRIGENDUM for Request for Proposal for Providing Managed Networking Solutions using SDWAN Technology for ESIC Offices across India

Sub : ADDENDUM/CORRIGENDUM for Request for Proposal for Providing Managed Networking Solutions using SDWAN Technology for ESIC Offices across India EMPLOYEES STATE INSURANCE CORPORATION ESIC Hqrs. Extension office, Express Building, BSZ Marg, Ground Floor, New Delhi-02 VOIP No. 10011008/10011048 PH: 011-23701356, email: ac_icthq@esic.nic.in F. No.

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

STANDARD OPERATING PROCEDURE CERTIFICAT ION OF SOLAR PV / WIND SYSTEM VENDORS/ INSTALLERS /SERVICE PROVIDERS

STANDARD OPERATING PROCEDURE CERTIFICAT ION OF SOLAR PV / WIND SYSTEM VENDORS/ INSTALLERS /SERVICE PROVIDERS STANDARD OPERATING PROCEDURE CERTIFICAT ION OF SOLAR PV / WIND SYSTEM VENDORS/ INSTALLERS /SERVICE PROVIDERS ALTERNATIVE ENERGY DEVELOPMENT BOARD 2 nd Floor, OPF Building G-5/2 Islamabad. www.aedb.org

More information

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE