Distribution List: Constituents of Southern region.

Size: px
Start display at page:

Download "Distribution List: Constituents of Southern region."

Transcription

1

2 Distribution List: Constituents of Southern region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore Director (Transmission) Transmission Corp. of Telangana Ltd. (TSTRANSCO) Vidyut Soudha, Khairatabad Hyderabad Director (Trans. & System Op.), Kerala State Electricity Board Ltd. Vidyuthi Bhawanam, Pattom, P.B. No Thiruvananthapuram Superintending Engineer I First Floor, Electricity Department Gingy Salai, Puducherry Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Director (Transmission) Transmission Corp. of Ltd. (APTRANSCO) Vidyut Soudha Hyderabad Member (Transmission) State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore Member (Distribution), electricity Board (TNEB) 6 th Floor, Eastern Wing, 800 Anna Salai, Chennai Chief Executive Officer POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi Additional General Manager Southern Regional Load Dispatch Centre 29, Race Course Cross Road, Bangalore

3 Distribution List: Constituents of Eastern region. 1. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi , Jharkhand 3. Chairman Odisha Power Transmission Corporation Ltd. (OPTCL) Jan path, Bhubaneshwar Odisha 5. Director (System Operation) West Bengal State Electricity Transmission Company Ltd. (WBSETCL) Vidyut Bhavan, 5 th Floor Block-D, Bidhannagar Sector-II, Kolkata West Bengal 7. General Manager Eastern Regional Load Dispatch Centre (ERLDC) 14, Gold Course Road Tollygunge, Kolkata West Bengal 2. Principal Chief Engineer cum Secretary Power Department Government of Sikkim Kazi Road, Gangtok, Sikkim 4. Managing Director Bihar State Power Transmission Company Ltd. (BSPTCL) Vidyut Bhavan, Bailey Road Patna , Bihar 6. Director (Commercial) Grid Corporation of Orissa Ltd. (GRIDCO) Jan path, Bhubaneshwar Odisha 8. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata , West Bengal

4 Distribution List: Constituents of Northern region. 1. Member Secretary, NRPC 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi Chief Engineer (Operation) Ministry of Power, UT Secretariat, Sector-9 D, Chandigarh Director(W&P), UPPTCL, Shakti Bhawan Extn, 3rd floor, 14, Ashok Marg, Lucknow Managing Director, HP Power Transmission Corporation Ltd., Barowalias, Khalini, Shimla Chief Engineer(SO&C), HVPNL, Planning Directorate, Shakti Bhawan,Sector-6, Panchkula , Haryana. 11. Development Commissioner (Power) Power Development Department, Grid Substation Complex, Janipur, Jammu 2. GM (NRLDC) 18-A, Qutab Institutional Area, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi Director (Operations), Delhi Transco Ltd., Shakti Sadan, Kotla Road, New Delhi Director (Technical), PSTCL, Head Office, The Mall, Patiala , Punjab. 8. Director (Technical), RRVPNL, Vidyut Bhawan, Jaipur, Rajasthan Director (Projects), PTCUL, Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. 12. Member (Power), Bhakra Beas Management Board, Sector-19 B, Madhya Marg, Chandigarh Chief Engineer (Operation) Ministry of Power, UT Secretariat, Sector-9 D, Chandigarh

5 Distribution List: /Long-term Access Applicants 1. Sh. V. Kiran General Manager Mytrah Energy (India) Pvt. Ltd. 8001, Q-City, S.No.109, Gachibowli Hyderabad , Telangana Ph.: v.kiran@mytrah.com 3. Sh. Lalit Birla Assistant General Manager Orange Sironj Wind Power Pvt. Ltd. 301B, 3 rd Floor, D-21 Corporate Park, Sector-21, Dwarka, New Delhi Ph.: lalitbirla@orangerenewable.net 5. Sh. Pratik Poddar Head, Project Development Ostro Dakshin Power Pvt. Ltd. Unit no. G-0, Ground Floor, Mira Corporate Suites, 1&2, Ishwar Industrial Estate, Mathura Road, New Delhi Ph.: p.pratikpoddar@gmail.com 7. Sh. Sreenivasulu N Chief Manager Clean Wind Power Tuticorin Pvt. Ltd. 212, Ground floor, Okhla Industrial Estate Phase-3, New Delhi Ph: srini.n@herofutureenergies.com 9. Sh. Rakesh Chandra General Manager Devarabanda Renewable Energy Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com 2. Sh. Dheeraj Jain AGM-REGULATORY AFFAIRS Regen Wind Farm (TN) Pvt. Ltd. S7 Krishna Arcade, old No. 36, new No. 10, Rajabathar street, T.Nagar, Chennai , Ph.: dheeraj.j@regenpowertech.com 4. Sh. Rakesh Rathore Deputy General Manager Green Infra Renewable Energy Ltd. 5 th Floor, Tower C, Building No. 8, DLF Cyber City, Gurgaon , Haryana Ph.: rakesh.rathore@sembcorp.com 6. Shri. K. Subba Raju Director Axis Wind Farms (Anantapur) Pvt. Ltd. H.No /8/3, Plot no.3, 2 nd floor PMR Plaza, Thakur Mansion Lane, Somajiguda, Hyderabad Telangana Ph.: subbaraju.k@axisenergy.in 8. Sh. Sambuvarayan Sr. GM IMPEL Renewable Power Pvt. Ltd. C/O. SITAC Group, , Ashoka Estate, 24, Barakhamba Road, New Delhi Ph.: sambu.sk@sitacre.com 10. Sh. Rakesh Chandra General Manager Tuljapur Windfarms Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com

6 11. Sh. Rakesh Chandra General Manager Kutch Renewable Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com 14. Sh. Saroj Sahoo Manager, Carbon & Energy Powerica Ltd. 9 th Floor, Godrej Coliseum, C Wing, Sion- Trombay road, Sion (East), Mumbai , Maharashtra Ph.: saroj.sahoo@powericaltd.com 16. Sh. M S Ramakumar General Manager Ecoren Energy India Pvt. Ltd. 1202, II Floor, S.L. Jubilee, Road No 36, Jubilee Hills, Hyderabad , Ph.: ramkumar.sheshadri@ecorenenergy.com 18. Sh. Sivakumar A Managing Director Soganur Power Pvt. Ltd. Flat no. 2, GHMC No /5/A/402, 4 th Floor, Amogh Plaza, Somajiguda, Hyderabad , Telangana Ph.: info@topviewtech.com 20. Sh. R Venkatesan Vice President Praptha Renewable Energy Pvt. Ltd. No. 34, 1 st Floor, Defence Officers Colony, Ekkattuthangal, Chennai 32, Ph.: dhinakar.babu@kshemapower.com 12. Sh. Rakesh Chandra General Manager Poovani Wind Farms Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com 15. Sh. V B K Raju Gokaraju Director Sreeja Infrastructure Pvt. Ltd. Flat no. 301, Wings, /6/2, Srinagar Colony, Hyderabad , Telangana Ph.: gokarajumail@gmail.com 17. Sh. Sivakumar A Managing Director Anemoi Energy Pvt. Ltd. Plot no. 108, Sai Priya Colony, Saket road, Dammaiguda, Hyderabad , Telangana Ph.: info@topviewtech.com 19. Sh. Sreenivasulu N Chief Manager Clean Wind Power (Kurnool) Pvt. Ltd. 212, Ground floor, Okhla Industrial Estate Phase-3, New Delhi Ph.: srini.n@herofutureenergies.com 21. Sh. Padmanabhan M Joshi GM Projects BD Saffron Ecopower Venture Pvt. Ltd. 484, Kamaraj road, Uppilipalayam PO, Coimbatore , Ph.: pmj@leapgreenenergy.com

7 22. Sh. Mohan B. Sr. Project Engineer Greenmint Power Pvt. Ltd. 17 th Floor, The Hub, One Indiabulls Center, Senapati Bepat Marg, Elphinstone(West), Mumbai , Maharashtra Ph.: FAX: Sh. Rakesh Rathore Deputy General Manager Green Infra Wind Energy Ltd. 5 th Floor, Tower C, Building No. 8, DLF Cyber City, Gurgaon , Haryana Ph.: rakesh.rathore@sembcorp.com 26. Sh. SR Singhal Sr. GM Wind World (India) Ltd. Mumbai A-9, Veera Desai Road, Laxmi Industrial Estate, Wind World Tower, Andheri West, Mumbai , Maharashtra Ph.: sitaram.singhal@windworldindia.com 28. Sh. Rakesh Chandra General Manager Saunshi Renewable Energy Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com 30. Sh. Rakesh Chandra General Manager Umrani Renewable Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai , Tamil Nadu Ph.: rakesh.c.singh@hotmail.com 23. Sh. M S Ramakumar General Manager Ecoren Anemoi Winds Pvt. Ltd /82/A/1202, S.L. Jubilee, Road No 61, Jubilee Hills, Hyderabad , Telangana Ph.: ramkumar.sheshadri@ecorenenergy.com 25. Sh. Sambuvarayan Sr. GM SITAC Starcap Buildwel Pvt. Ltd. C/o. SITAC Group, Ashoka Estate, 24, Barakhamba Road, New Delhi Ph.: sambu.sk@sitacre.com 27. Sh. Rakesh Chandra General Manager Viralipatti Renewable Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Ph.: rakesh.c.singh@hotmail.com 29. Sh. Rakesh Chandra General Manager Zalki Renewable Pvt. Ltd. The FUTURA IT Park, B-Block, 8 th floor, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai , Tamil Nadu Ph.: rakesh.c.singh@hotmail.com 31. Sh. M S Ramakumar General Manager Hertz Wind Parks Pvt. Ltd , Lakshmi Nilayam, Prajasaktinagar, Vijayawada ,. Ph.: ramkumar.sheshadri@ecorenenergy.com

8 32. Sh. Sambuvarayan Sr. GM IMPEL Power Solutions Pvt. Ltd. C/o. SITAC Group, Ashoka Estate, Barakhamba Road, New Delhi Ph.: sambu.sk@sitacre.com 34. Soumya R Parida General Manager Induvasi Wind farm Pvt. Ltd. Flat No. 2, GHMC No /5, Amogh Plaza, Somajiguda, Hyderabad, Telangana Ph.: soumya.parida@continuumenergy.in 36. Sh. A. Siva Kumar Managing Director Achyuta Power Pvt. Ltd. F-204, H.No /2, Viswa Central, Near Lalbunglow, Ameerpet, Hyderabad, Telangana Ph.: info@topviewtech.com 38. Sh. Sambuvarayan Sr. GM Impel Alternate Energy Pvt. Ltd. C/o. SITAC Group, Ashoka Estate, Barakhamba Road, New Delhi Ph.: sambu.sk@sitacre.com 33. Sh. Alok Gupta General Manager-PE INOX Wind Infrastructure Service Ltd. INOX Towers, Plot No. 17, Sector 16A, Film City, Noida, Uttar Ph.: alok@inoxwind.com 35. Soumya R Parida General Manager Kondapalli Wind farm Pvt. Ltd. Flat No. 2, GHMC No /5, Amogh Plaza, Somajiguda, Hyderabad, Telangana Ph.: soumya.parida@continuumenergy.in 37. Sh. J. Dhanasekaran Deputy General Manager NLC India Ltd. Commercial Department, Corporate Office, Block-1, Neyveli , Tamil Nadu Ph.: commercial@nlcindia.com 39. Sh. Sivakumar A Managing Director Benigere Energy Pvt. Ltd. Flat no. 2, GHMC No /5/A/402, 4 th Floor, Amogh Plaza, Somajiguda, Hyderabad , Telangana Ph.: info@topviewtech.com

9 Agenda for the 22 nd Southern Region constituents meeting regarding /LTA Applications of IPPs in SR 1.0 Minutes of Follow up meeting of 21 st /LTA applications of Southern Region Constituents and New applications of IPPs in SR received during November & December, 2016 held on The Minutes of follow up meeting of 21 st /LTA applications of Southern Region Constituents and New applications of IPPs in SR received during November & December, 2016 was held on at POWERGRID office, Gurgaon were issued vide letter dated 24 th March, No observations received so far. The Minutes may kindly be confirmed. 2.0 LTA & Applications Total 7 nos. of LTA applications for cumulative quantum of 949 MW and 55 nos. (including 3 nos. of old applications) of connectivity applications have been received. The details of the applications are as below: Table 1: New LTA Applications Sl. No. 1 Applicant Mytrah Energy (India) Pvt. Ltd. Location Tirunelveli, Date of Application Start Date (As per application) LTA Sought (MW) st Aug, 225 (NR) 2 Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, st Feb, 60 (NR) 3 Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, st Feb, 60 (NR) 4 Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, st Feb, 60 (NR) 5 Regen Wind Farm (TN) Pvt. Ltd. Tirunelveli, st Feb, 60 (NR) 6 Orange Sironj Wind Power Pvt. Ltd. Tirunelveli, th Nov, 150 (NR) 84 (ER) 7 Green Infra Renewable Energy Ltd. Tirunelveli, th Mar, (NR) 100 (ER) 1

10 Table 2: Applications Sl. No Applicant Location applications near Munirabad Ostro Dakshin Power Pvt. Ltd. Axis Wind farm (Anantapur) Pvt. Ltd. Clean Wind Power Tuticorin Pvt. Ltd. Mytrah Energy (India) Pvt. Ltd. (Kyadiguppa Wind Farm) IMPEL Renewable Power Pvt. Ltd. Koppal, Koppal, Gadag & Koppal, Koppal Dist., Koppal, Date of Application Start Date (As per application) Sought (MW) th Sept, Latitude/ Longitude N E st Dec, N E N E N E N E applications near Gooty/Kurnool Devarabanda Renewable Energy Pvt. Ltd. Tuljapur Windfarms Pvt. Ltd. Kutch Renewable Pvt. Ltd. Mytrah Energy (India) Pvt. Ltd. (Veldurthi Wind Farm) Mytrah Energy (India) Pvt. Ltd. (Karadikonda Wind Farm) Poovani Wind Farms Pvt. Ltd. Powerica Ltd. (Yerukalacheruvu) Powerica Ltd. (Dharmavaram) Sreeja Infrastructure Pvt. Ltd. Ecoren Energy India Pvt. Ltd. Kurnool, Dhone, Dhone, Kurnool, Anantapur, Kurnool, Kurnool, Anantapur, Kurnool, Kurnool, th Sept, 30 th Sept, 30 th Sept, st May, th Sep, st April, st April, th Sept, th Dec, N E N E N E N E N E N E N E N E N E N E 2

11 Anemoi Energy Pvt. Ltd. Soganur Pvt. Ltd. Anemoi Energy Pvt. Ltd. Anemoi Energy Pvt. Ltd. Clean Wind Power (Kurnool) Pvt. Ltd. Kurnool, Kurnool, Kurnool, Kurnool, Kurnool, applications near Tuticorin/Tirunelveli Mytrah Energy (India) Private Ltd (Maniyachi Wind Farm) Praptha Renewable Energy Pvt. Ltd. (Thoothukudi Wind Farm) Saffron Ecopower Venture Pvt. Ltd. Tirunelveli, Thoothukdi,Tamil Nadu Tuticorin, st June, st Sept, st Sept, st May, th Sep, N E N E N E N E N E N E th Mar, th Sept, N E N E 24. Green Infra Renewable Energy Ltd. Tuticorin, th March, N E 25. Greenmint Power Pvt. Ltd. Thoothukdi, Tamil Nadu st March, N 78.7 E 26. Ecoren Anemoi Winds Pvt. Ltd. Madathuptti, Tamil Nadu th March, N E 27. Green Infra Wind Energy Ltd. Tuticorin, th Sept, N E 28. Sitac Starcap buildwell Private ltd Tuticorin, sr Mar, Clean Wind Power (Tuticorin) Pvt. Ltd Tuticorin, sr Mar,

12 applications at Narendra 30. Wind World (India) Ltd. Dharwad Dist, N E 31. Mytrah Energy (India) Pvt. Ltd. (Guledakoppa Wind Farm) Dharwad Dist, N E 32. Clean Wind Power (Tuticorin) Pvt. Ltd. Belgaum Dist, applications at Trichy Viralipatti Renewable Pvt. Ltd. (Viralipatti Wind Farm) Saunshi Renewable Energy Pvt. Ltd. Karur, Karur, applications at Pugalur 35. Mytrah Energy (India) Pvt. Ltd. (KParamathi Wind Farm) Karur, th Sept, N E N E N E 36. Zalki Renewable Pvt. Ltd. Karur, N E 37. Umrani Renewable Pvt. Ltd. Karur, N E 38. Hertz Wind Parks Pvt. Ltd. Karur, st Mar, N E 39. Clean Wind Power (Tuticorin) Pvt. Ltd. Tripur, application at Hyderabad 40. Mytrah Energy (India) Pvt. Ltd. (Tapaspalle Wind Farm) Rangareddy, Telangana N E 4

13 applications at Hiriyur 41. Mytrah Energy (India) Pvt. Ltd. (Lakkenahalli Wind Farm) Hiriyur, st May, N E 42. IMPEL Power Solutions Pvt. Ltd. Chitradurga, st Dec, N E INOX Wind Infrastructure Service Ltd. Clean Wind Power (Tuticorin) Pvt. Ltd. Chitradurga, Hiriyur, st Dec, N E application at Udumalpet 45. Mytrah Energy (India) Pvt. Ltd. (Devanallur Wind Farm) Tiruppur, N E application at Palakkad 46. Mytrah Energy (India) Pvt. Ltd. (Mettupalayam Wind Farm) Coimbatore, Tamil Nadu N E applications at Mahaboob Nagar 47. Induvasi Wind farm Pvt. Ltd. Mahaboob Nagar, Telangana st June, N E 48. Kondapalli Wind farm Pvt. Ltd. Mahaboob Nagar, Telangana st June, N E 49. Achyuta Power Pvt. Ltd. Mahaboob Nagar, Telangana st June, N E 50. Clean Wind Power (Tuticorin) Pvt. Ltd Raichur, application at Khammam 51. Mytrah Energy (India) Pvt. Ltd. (Gowravaram Wind Farm) Krishna, N E 5

14 application at Neyveli 52. NLC India Ltd. (TPS-II Second Extn) Cuddalore, st April, N to N E to E application at NP Kunta/Cudappah 53. Impel Alternate Energy Pvt. Ltd. Kadapa, st Dec, N E 54. Ecoren Energy India Pvt. Ltd. Kadapa, th Mar, N E application at Pavgada 55. Benigere Energy Pvt. Ltd. Ananthapur, st Mar, N E LTA applications. Seven nos. of LTA applications has been received with injection at Tirunelveli and NR & ER as target regions. The details of applications are as below. As they have common injection and drawl region the applications are dealt together. Sl. No. Applicant Location Mytrah Energy 1. (India) Pvt. Ltd.- 2. Regen Wind Farm (TN) Pvt. Ltd. 3. Regen Wind Farm (TN) Pvt. Ltd. 4. Regen Wind Farm (TN) Pvt. Ltd. 5. Regen Wind Farm (TN) Pvt. Ltd. 6. Orange Sironj Wind Power Pvt. Ltd. Green Infra 7. Renewable Energy Ltd.- Tirunelveli, Tirunelveli, Tirunelveli, Tirunelveli, Tirunelveli, Tirunelveli, Tirunelveli, Date of Application Start Date st Aug, st Feb, st Jun, st Nov, st Feb, th Nov, th Mar, LTA Sought (MW) 225 Target-NR 60 Target-NR 60 Target-NR 60 Target-NR 60 Target-NR 150 (NR) 84 (ER) (NR) 100 (ER) 6

15 Sl. No. 1 - Mytrah Energy (India) Pvt. Ltd. was earlier granted connectivity for 300 MW at Tirunelveli PS & LTA for 75 MW with NR-45 MW & SR-30 MW as target regions for the same wind generation project. The present LTA application is for balance 225 MW with NR as target region. Sl. No. 2 to 5 - Regen Wind Farm (TN) Pvt. Ltd. was earlier granted connectivity for 384 MW at Tirunelveli PS. Now Regen has submitted four LTA applications for cumulative capacity of 240 MW (4x60 MW) out of above 384 MW with NR as target region. Sl. No. 6 - Orange Sironj Wind Power Pvt. Ltd. was earlier granted connectivity for 200 MW at Tirunelveli PS. Now Orange Sironj has submitted request to enhance the connectivity from 200 MW to 250 MW and also submitted a LTA application for cumulative capacity of 234 MW out of above 250 MW (150MW NR and 84MW ER as target regions). Presently at Tirunelvelli PS 2x500MVA transformation capacity is under implementation. Here, it may be mention that LTA of 300MW has already been granted at Tirunelvelli PS. With present applications (Sl. No. 1-6) the total LTA will be 999 MW, which needs to be exported from SR to NR/ER. Sl. No. 7 - Green Infra Renewable Energy Ltd. has applied for connectivity of 250 MW at Tirunelveli PS, discussed in this agenda at para 4.3. Further, Green Infra has submitted LTA application for cumulative capacity of MW (149.9MW NR and 100MW ER as target regions). During the 21 st /LTA meeting a new substation was proposed in the vicinity of existing Tirunelveli 400/230 kv PS along with 1x500 MVA, 400/230kV ICT. Application at Sl. No. 7 has been proposed to provide connectivity at this substation. The details of proposal for connectivity have been discussed at para 4.3. POWER TRANSFER UNDER LTA: The aforesaid LTAs shall involve power transfer from SR to NR & ER. Presently SR is importing power and considering load-generation scenario in the region, it is expected to continue to import power. Hence power export from SR would be 7

16 through displacement and no constraint is envisaged in exporting power out of Southern Region. POWER TRANSFER TO ER: The LTA applications at Sl.No.(6) & (7) also involve power transfer from SR to ER. Presently SR is importing power and considering future load-generation scenario in the region, it is expected to continue to import power. Hence power export from SR would be through displacement. Accordingly, based on the detailed studies as covered in the agenda (Exhibits-I(a) & I(b)), for power transfer to ER the existing SR-ER & SR-WR-ER interconnections are adequate. Accordingly, it is proposed to grant LTA of 84 MW of Orange Sironj Wind Power Pvt. Ltd. for power transfer to ER from 30 th Nov, and 100 MW of Green Infra Renewable Energy Ltd. for power transfer to ER from 15 th Mar, subject to approval in various forums of Eastern Region constituents. POWER TRANSFER TO NR: Aforesaid LTAs shall involve power transfer from SR to WR and WR to NR. Presently the Available Transfer Capability between WR & NR is MW and entire capacity has been allocated under LTA/MTOA. Further, to enhance the ATC between WR & NR corridor various strengthening schemes are under implementation. Also, after considering various Relinquished/Abandoned generating plants in WR & ER for power transfer to NR, adequate margin shall be available between WR & NR corridor after the commissioning of second pole of 3000 MW Champa-Kurukshetra HVDC Bipole link & Jabalpur-Orai 765 kv D/c line. These links are expected to commission in. Considering the above, for transfer of MW power to NR, system studies have been carried out from generation to target region and the study results are enclosed at Exhibits-I(a) & I(b). It has been observed that all line loadings are generally in order. Accordingly, it is proposed to grant LTA of (a) 225 MW of Mytrah Energy (India) Pvt. Ltd. for power transfer to NR from 1 st Aug,, (b) 240 MW(4x60 MW) of Regen Wind Farm(TN) Pvt. Ltd. for power transfer to NR progressively from 1 st Feb, (c) 150 MW of Orange Sironj Wind Power Pvt. Ltd. for power transfer to NR progressively from 30 th Nov, and (d) MW of Green Infra Renewable 8

17 Energy Ltd. for power transfer to NR progressively from 15 th Mar, with progressive enhancement in ATC between WR & NR Corridor which is envisaged with the progressive commissioning of elements as listed below and approval in various forums of Northern & Western Region constituents. Transmission system for LTA: Inter-regional System Strengthening Scheme for NR & WR: Jabalpur Pooling station - Orai 765 KV D/c line Orai Aligarh 765kV D/c line Orai Orai(UPPTCL) 400kV D/c (Quad) line LILO of one circuit of Satna-Gwalior 765 KV line at Orai S/s 2x1000MVA, 765/400KV substation at Orai S/s LILO of Agra-Meerut 765 kv S/c line at Aligarh S/s 765KV Switching Station at Aligarh (GIS) LILO of Kanpur Jhatikara 765 kv S/c at Aligarh S/s Transmission System Strengthening in WR-NR Transmission Corridor For IPPs in Chhattisgarh Up gradation of 800kV, 3000MW HVDC bipole between Champa Pooling Station Kurukshehtra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad) Members may deliberate. 4.0 Applications The connectivity applications have been grouped on the basis of their location and deliberated as below. 4.1 applications near Munirabad. There are five applications seeking connectivity at Munirabad 400/220kV S/s with a cumulative capacity of 1350 MW. The details of applications are given below: Sl. No Applicant Ostro Dakshin Power Pvt. Ltd.- Axis Wind farm (Anantapur) Pvt. Ltd. Location Koppal, Koppal, Date of Application Start Date Completion Schedule - Mar 18 to Mar 19 Sought (MW)

18 Clean Wind Power Tuticorin Pvt. Ltd. Mytrah Energy (India) Pvt. Ltd. (Kyadiguppa Wind Farm) IMPEL Renewable Power Pvt. Ltd.- Gadag & Koppal, Koppal, Koppal, th Sept, st Dec, Sept 18 to Sept 19 Mar 22 to Mar 23 Dec 18 to May The applications at Sl.No 1-2 were also discussed in the follow-up meeting of 21 st /LTA Applications meeting in SR, however due to absence of applicant/non finalization of connectivity system, the same is being taken up in this agenda. Here it may be mentioned, Munirabad 400kV substation is a POWERGRID S/s wherein 220kV switchyard is owned and operated by STU. Further, additional space is not available to create separate 220 kv switchyard at existing S/s. During the 21 st /LTA meeting a new substation was proposed in the vicinity of existing Munirabad 400/220 kv S/s, inter connected with existing substation through 400 kv (High Capacity) D/c line and connectivity for 3 IPPs with cumulative capacity of 1050 MW through 5 nos. 220kV lines have been agreed. It is proposed to grant connectivity to above applications through following system, subject to conditions enclosed at Annexure-I. Common ISTS System for providing : Establishment of new 400/220kV S/s at Munirabad along with 1x500 MVA, 400/220kV ICT Munirabad(New) Munirabad (Existing) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicants: Ostro Dakshin Power Pvt. Ltd. Munirabad(New) 220kV S/c line (with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Munirabad(New) & generation switchyard. 10

19 Axis Wind farm (Anantapur) Pvt. Ltd. Munirabad(New) 220kV S/c line (with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Munirabad(New) & generation switchyard. Clean Wind Power Tuticorin Pvt. Ltd. Munirabad(New) 220kV S/c line (with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Munirabad(New) & generation switchyard. Mytrah Energy (India) Pvt. Ltd. (Kyadiguppa Wind Farm) Munirabad(New) 220kV S/c line along with the associated bays at Munirabad(New) & generation switchyard. IMPEL Renewable Power Pvt. Ltd. Munirabad(New) 220kV S/c line along with the associated bays at Munirabad(New) & generation switchyard. Further, it may be mentioned that grant of connectivity shall not entitle an applicant to interchange any power with the grid unless it obtains long-term access. Further, considering the quantum of generation to be pooled at Munirabad(New) S/s, augmentation of transformation capacity would be required. The same would be determined based on the LTA quantum and location of drawl. Accordingly, the applicants are advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.2 applications near Gooty/Kurnool. There are fifteen applications seeking connectivity at Gooty/Kurnool 400/220 kv substation with a cumulative capacity of 3650 MW. The details of applications are given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) Devarabanda Renewable Energy Pvt. Ltd.- Tuljapur Windfarms Pvt. Ltd. Kutch Renewable Pvt. Ltd.- Kurnool, Dhone, Dhone, th Sept, 30 th Sept, 30 th Sept, 31 st March, 31st March, 31st March,

20 Mytrah Energy (India) Pvt. Ltd. (Veldurthi Wind Farm) Mytrah Energy (India) Pvt. Ltd. (Karadikonda Wind Farm) Poovani Wind Farms Pvt. Ltd.- Powerica Ltd. (Yerukalacheruvu)- Powerica Ltd. (Dharmavaram)- Sreeja 9. Infrastructure Pvt. Ltd.- Ecoren Energy 10. India Pvt. Ltd Anemoi Energy Pvt. Ltd.- Anemoi Energy Pvt. Ltd.- Anemoi Energy Pvt. Ltd.- Soganur Pvt. Ltd.- Clean Wind Power (Kurnool) Pvt. Ltd. Kurnool, Anantapur, Kurnool, Kurnool, Anantapur, Kurnool, Kurnool, Kurnool, Kurnool, Kurnool, Kurnool, Kurnool, st May, th Sep, st April, st April, th Sept, th Dec, st June, st Sept, st May, st Sept, th Sep, st May, 2020 to 31 st May, to 31 st Mar, st March, 31 st Dec, to 31 st Dec, st Dec, to 31 st Dec, st Jan, 13 th Dec, 1 st Sep, 2020 to 31 st Dec, st Dec, 2020 to 1 st Mar, st Aug, 2020 to 31 st Dec, st Dec, to 1 st Mar, th Sep, Here it may be mentioned, Gooty 400kV substation is a POWERGRID S/s wherein 220kV switchyard is owned and operated by STU. Further, additional space is not available to create separate 220 kv switchyard at existing S/s. During the 21 st /LTA meeting a new substation was proposed in the vicinity of existing Gooty 400/220 kv S/s, inter connected with existing substation through 400 kv (High Capacity) D/c line. Here it may be mentioned that connectivity for 10 IPPs with cumulative capacity of 3722 MW through 15 nos. 220kV lines have been agreed. 12

21 With the present applications (3650 MW), the total generation capacity to be pooled at Gooty(New) would be about 7400 MW. Considering the above, it is proposed to grant connectivity to present applications at Gooty(New) with bus sectionalisation arrangement. Accordingly, following system is proposed for connectivity subject to conditions enclosed at Annexure-I. Common ISTS System for providing : Establishment of new 400/220kV S/s near Gooty along with 1x500 MVA, 400/220kV ICT with bus sectionaliser Gooty(New) Gooty(Existing) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicants: Devarabanda Renewable Energy Pvt. Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Tuljapur Windfarms Pvt. Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Kutch Renewable Pvt. Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Mytrah Energy (India) Pvt. Ltd. (Veldurthi Wind Farm) Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Mytrah Energy (India) Pvt. Ltd. (Karadikonda Wind Farm) Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Poovani Wind Farms Pvt. Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Powerica Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Powerica Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. Sreeja Infrastructure Pvt. Ltd. Gooty(New) 220 kv D/c line along with the associated bays at Gooty(New) & generation switchyard. Ecoren Energy India Pvt. Ltd. Gooty(New) 220 kv S/c line along with the associated bays at Gooty(New) & generation switchyard. 13

22 Anemoi Energy Pvt. Ltd. Gooty(New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Gooty(New) & generation switchyard. Anemoi Energy Pvt. Ltd. Gooty(New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Gooty(New) & generation switchyard. Anemoi Energy Pvt. Ltd. Gooty(New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Gooty(New) & generation switchyard. Clean Wind Power (Kurnool) Pvt. Ltd. Gooty(New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Gooty(New) & generation switchyard. Soganur Pvt. Ltd. Gooty(New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Gooty(New) & generation switchyard. Here it may be mentioned that grant of connectivity shall not entitle an applicant to interchange any power with the grid unless it obtains long-term access. Further, considering the quantum of generation to be pooled at Gooty(New) S/s, augmentation of transformation capacity would be required. In addition, augmentation of transmission system may be required. The same would be determined based on the LTA quantum and location of drawl. Accordingly, the applicants are advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.3 applications at near Tuticorin/Tirunelveli. There are nine applications seeking connectivity at Tuticorin/Tirunelveli 400/230kV PS with a cumulative capacity of 2750 MW. The details of applications are given below: 14

23 Sl. No Applicant Mytrah Energy (India) Private Ltd (Maniyachi Wind Farm) Praptha Renewable Energy Pvt. Ltd. (Thoothukudi Wind Farm) Saffron Ecopower Venture Pvt. Ltd.- Green Infra Renewable Energy Ltd.- Greenmint Power Pvt. Ltd.- Location Tirunelveli, Thoothukudi, Tuticorin, Tuticorin, Thoothukudi, Date of Application Start Date th Mar, 30 th Sept, 15 th March, 31 st March, Completion Schedule 31 st March, 2020 to 31 st March, 2021 Sought (MW) th September, 15 th March, to 1 st September, Ecoren Anemoi Winds Pvt. Ltd.- Madathupatti, th March, 14 th Mar, Green Infra Wind Energy Ltd. Sitac Starcap buildwell Private ltd- Clean Wind Power (Tuticorin) Pvt. Ltd Tuticorin, Tuticorin, Tuticorin, th Sept, 31 sr Mar, 31 sr Mar, 30 th Sept, to 31 st Mar, to 31 st Mar, sr Mar, Here it may be mentioned that after allocating bays for applications received earlier, there is no space available at Tirunelveli PS for providing connectivity to the above applicants. Also space is not available to create separate 230 kv switchyard. During the 21 st /LTA meeting a new substation was proposed in the vicinity of existing Tirunelveli 400/230 kv PS, inter connected with existing substation through 400 kv (High Capacity) D/c line. Here it may be mentioned that connectivity 15

24 for 7 IPPs with cumulative capacity of 1350 MW through 7 nos. 230kV lines were agreed. It is proposed to grant connectivity to above applicants through following system subject to conditions enclosed at Annexure-I. Common ISTS System for providing : Establishment of new 400/230kV S/s near Tirunelveli PS along with 1x500 MVA, 400/230kV ICT Tirunelveli PS (New) Tirunelveli PS (Existing) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicants: Mytrah Energy (India) Private Ltd (Maniyachi Wind Farm) Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Praptha Renewable Energy Pvt. Ltd. Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Saffron Ecopower Venture Pvt. Ltd. Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Green Infra Renewable Energy Ltd. Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Greenmint Power Pvt. Ltd. Tirunelveli PS (New) 230 kv D/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Ecoren Anemoi Winds Pvt. Ltd. Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Green Infra Wind Energy Ltd. Tirunelveli PS (New) 230 kv S/c line along with the associated bays at Tirunelveli PS (New) & generation switchyard. Sitac Starcap buildwell Private ltd Tirunelveli PS (New) 230 kv D/c line (with high capacity conductor suitable to carry at least 600 MW at nominal voltage) along with the associated bays at Tirunelveli PS (New) & generation switchyard. Clean Wind Power (Tuticorin) Pvt. Ltd Tirunelveli PS (New) 230 kv S/c line (with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Tirunelveli PS (New) & generation switchyard. 16

25 Here it may be mentioned that grant of connectivity shall not entitle an applicant to interchange any power with the grid unless it obtains long-term access. Further, considering the quantum of generation to be pooled at Tirunelveli PS (New), augmentation of transformation capacity would be required at Tirunelveli PS (New). Further, augmentation of transmission system may be required. The same would be determined based on the LTA quantum and location of drawl. Accordingly, the applicants are advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.4 application at Narendra. There are three applications seeking connectivity at Narendra(Existing) 400/220kV S/s with a cumulative capacity of 1000 MW. The details of applications are given below: Sl. No Applicant Wind World (India) Ltd. Mytrah Energy (India) Pvt. Ltd. (Guledakoppa Wind Farm) Clean Wind Power (Tuticorin) Pvt. Ltd. Location Dharwad Dist., Dharwad Dist, Belgaum Dist, Date of Application Start Date 31 st Mar Completion Schedule Mar 19 to Jul st March, 2022 to 31 st March, Sought (MW) The applications at Sl.No.1 was discussed in the 21 st follow-up meeting for /LTA Applications, however, due to non-finalization of connectivity system, the same is being taken up in this agenda. Clarification regarding location of generation project has been sought from the applicant at Sl.No.1. Applicant may indicate the coordinates. There is no space available at existing 220kV switchyard of Narendra S/s for providing connectivity to the applicants. 17

26 Accordingly, it is proposed to grant connectivity to above applications with following system subject to availability of land adjacent to existing substation and conditions enclosed at Annexure-I. Common ISTS System for providing : Establishment of 400kV Narendra along with 1x500 MVA, 400/220kV ICT on adjacent land/new location Inter connection with existing 400kV Narendra through 400kV bus extension/ Narendra(existing) to Narendra(New) through 400kVHTLS(Quad moose equivalent) D/c line Establishment of separate 220kV GIS/AIS bus System specific to applicants: Wind World (India) Ltd. Narendra 220 kv D/c line along with the associated bay at Narendra & generation switchyard. Mytrah Energy (India) Pvt. Ltd. Narendra 220 kv S/c line along with the associated bay at Narendra & generation switchyard. Clean Wind Power (Tuticorin) Pvt. Ltd. Narendra 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bay at Narendra & generation switchyard. Here it may be mentioned that grant of connectivity shall not entitle applicants to interchange any power with the grid unless it obtains long-term access. Accordingly, the applicants are advised to apply for LTA to enable reliable evacuation of power. 4.5 application at Trichy. There are two applications seeking connectivity at Trichy 400/230kV S/s. The details of applications are given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) 1 Viralipatti Renewable Pvt. Ltd.- Karur, th Sept, 31 st March,

27 2 Saunshi Renewable Energy Pvt. Ltd.- Karur, Here it may be mentioned, Trichy 400/230kV substation is a POWERGRID S/s wherein 230kV switchyard is owned and operated by STU. During the 21 st /LTA meeting establishment of separate 230kV bus and installation of 1x500 MVA, 400/230kV ICT at Trichy was proposed. Further, separate 230kV bus proposed at Trichy S/s can accommodate only one 230kV bay for which connectivity for M/s Gamesa Renewable Pvt. Ltd. has already been agreed. Further, it may be mentioned that M/s Viralipatti Renewable Pvt. Ltd. and M/s Gamesa Renewable Pvt. Ltd. have indicated exactly same co-ordinates for their generation projects, which is practically not feasible. Therefore, clarification has been sought from the generation developers. It was informed by the developers that land identified for the construction of pooling station is flat in nature and suitable for construction of 2 nos. 230/33kV pooling stations. It was further informed that M/s Gamesa Renewable Pvt. Ltd. is the parent company and M/s Viralipatti Renewable Pvt. Ltd. Is wholly owned company of M/s Gamesa Renewable Pvt. Ltd. and both the projects shall be developed independently. Due to space constraints development of AIS 230kV bus would be difficult within the available space at Trichy. Feasibility of establishment of 230kV bus as GIS has been explored and it was found that GIS bus can be accommodated along with 2 nos. of 230kV bays. Accordingly, it is proposed to review the connectivity transmission system proposed for M/s Gamesa Renewable Pvt. Ltd. and connectivity may be granted to both Gamesa Renewable Pvt. Ltd. and Viralipatti Renewable Pvt. Ltd. at this separate 230kV GIS bus. Keeping above in view, it is proposed to grant connectivity to M/s Viralipatti Renewable Pvt. Ltd. with following system subject to conditions enclosed at Annexure-I. Common ISTS System for providing : Installation of 1x500 MVA, 400/230kV ICT at Trichy S/s 19

28 Establishment of separate 230kV GIS bus System specific to applicant: Viralipatti Renewable Pvt. Ltd. Trichy 230 kv S/c line along with the associated bays at Trichy & generation switchyard. However after grant of connectivity to this application, the entire space at Trichy shall be utilized and space for terminating additional 220 kv lines would not be available. Keeping above in view, a new substation was proposed in the vicinity of existing Trichy 400/230 kv PS, inter connected with existing substation through 400 kv (High Capacity) D/c line. Accordingly, it is proposed to grant connectivity to Saunshi Renewable Energy Pvt. Ltd. through following system subject to conditions enclosed at Annexure-I. Common ISTS System for providing : Establishment of new 400/230kV S/s near Trichy S/s along with 1x500 MVA, 400/230kV ICT Trichy S/s (New) Trichy S/s (Existing) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicants: Saunshi Renewable Energy Pvt. Ltd. Trichy S/s (New) 230 kv S/c line along with the associated bays at Trichy S/s (New) & generation switchyard. Further, the applicant is advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.6 application at Pugalur. There are five applications seeking connectivity at Pugalur 400/230kV S/s. The details of applications are given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) 20

29 1 Mytrah Energy (India) Pvt. Ltd. (K Paramathi Wind Farm) Karur, st March, 2022 to 31 st March, Zalki Renewable Pvt. Ltd.- Karur, Umrani Renewable Pvt. Ltd.- Hertz Wind Parks Pvt. Ltd.- Clean Wind Power (Tuticorin) Pvt. Ltd. Karur, Karur, Tripur, st Mar, st Mar, Here it may be mentioned, after grant of connectivity to earlier applications, no space is available at Pugalur S/s for terminating additional 400 kv & 230 kv lines. Keeping above in view, it is proposed that a new substation at suitable location in the vicinity of Pugalur area may be established and to be inter connected with Dharmapuri(Salem New) substation through 400 kv (High Capacity) D/c line. Accordingly, it is proposed to grant connectivity to above applicants with following system subject to conditions enclosed at Annexure-I. ISTS System for providing : Establishment of new 400/230kV S/s near Pugalur area along with 1x500 MVA, 400/230kV ICT Pugalur(New) Dharmapuri(Salem New) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicant: Mytrah Energy (India) Pvt. Ltd. Pugalur(New) 230 kv S/c line along with the associated bays at Pugalur S/s (New) & generation switchyard. Zalki Renewable Pvt. Ltd. Pugalur(New) 230 kv S/c line along with the associated bays at Pugalur S/s (New) & generation switchyard. 21

30 Umrani Renewable Pvt. Ltd. Pugalur(New) 230 kv S/c line along with the associated bays at Pugalur S/s (New) & generation switchyard. Hertz Wind Parks Pvt. Ltd. Pugalur(New) 230 kv S/c line along with the associated bays at Pugalur S/s (New) & generation switchyard. Clean Wind Power (Tuticorin) Pvt. Ltd. Pugalur(New) 230 kv S/c line (with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Pugalur(New) S/s & generation switchyard. Members may deliberate. 4.7 application at Hyderabad. There is one application seeking connectivity at Hyderabad 400/220kV S/s. The detail of application is given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) 1 Mytrah Energy (India) Pvt. Ltd. (Tapaspalle Wind Farm) Rangareddy, Telangana st March, 2022 to 31 st March, Here it may be mentioned, Hyderabad 400/220kV substation is a POWERGRID S/s wherein 220kV switchyard is owned and operated by STU. Further no space is available for establishment of separate 220kV switchyard. However, space is available at Maheshwaram(Hyderabad) 765/400kV GIS substation for establishment of separate 220kV GIS switchyard. Accordingly, connectivity for Mytrah Energy (India) Pvt. Ltd. may be granted at 220kV Maheshwaram GIS substation through 220 kv S/c line as indicated below subject to conditions enclosed at Annexure-I. ISTS Transmission System for : Establishment of separate 220kV GIS bus with 1x500 MVA, 400/220kV ICT at Maheshwaram 765/400kV S/s 22

31 System specific to applicant: Mytrah Energy (India) Pvt. Ltd. Maheshwaram(Hyderabad) 220 kv S/c line along with the associated bays at Maheshwaram & generation switchyard. Further, the applicant is advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.8 application at Hiriyur. There are four applications seeking connectivity at Hiriyur 400/220kV S/s. The details of applications are given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) Mytrah Energy (India) Pvt. Ltd. (Lakkenahalli Wind Farm) IMPEL Power Solutions Pvt. Ltd.- INOX Wind Infrastructure Service Ltd. Clean Wind Power (Tuticorin) Pvt. Ltd. Hiriyur, Chitradurga, Chitradurga, Hiriyur, st May, st Dec, 01 st Dec, st March, 2022 to 31 st March, st Dec, to 31 st May, 30 th June, Here it may be mentioned that space for two 220kV bay is available at Hiriyur (Existing) S/s. It is proposed to grant connectivity to M/s Mytrah Energy (India) Pvt. Ltd. and M/s IMPEL Power Solutions Pvt. Ltd. at Hiriyur (Existing) S/s through 220 kv S/c line as indicated below subject to conditions enclosed at Annexure-I. Transmission System for providing : Mytrah Energy (India) Pvt. Ltd. Hiriyur (Existing) 220 kv S/c line along with the associated bay at Hiriyur & generation switchyard. IMPEL Power Solutions Pvt. Ltd. Hiriyur (Existing) 220 kv S/c line along with the associated bay at Hiriyur & generation switchyard. 23

32 However after grant of connectivity to this application, the entire space at Hiriyur shall be utilized and space for terminating additional 220 kv lines would not be available. Keeping above in view, it is proposed that a new substation in the vicinity of existing Hiriyur 400/220 kv S/s may be established and inter connected with existing substation through Quad/HTLS 400 kv D/c line and connectivity to M/s INOX Wind Infrastructure Service Ltd. & Clean Wind Power (Tuticorin) Pvt. Ltd. can be provided at this new Hiriyur S/s as indicated below subject to conditions enclosed at Annexure-I. ISTS Transmission System for : Establishment of new 400/230kV S/s near Hiriyur along with 1x500 MVA, 400/220kV ICT Hiriyur (New) Hiriyur (Existing) 400kV HTLS(Quad moose equivalent) D/c line System specific to applicant: INOX Wind Infrastructure Service Ltd. Hiriyur (New) 220 kv D/c line along with the associated bays at Hiriyur (New) & generation switchyard. Clean Wind Power (Tuticorin) Pvt. Ltd. Hiriyur (New) 220 kv S/c line(with high capacity conductor suitable to carry at least 300 MW at nominal voltage) along with the associated bays at Hiriyur (New) & generation switchyard. Further, the applicant is advised to apply for LTA to enable reliable evacuation of power. Members may deliberate. 4.9 application at Udumulpet. There is one application seeking connectivity at Udumulpet 400/230kV S/s. The details of application is given below: Sl. No. Applicant Location Date of Application Start Date Completion Schedule Sought (MW) 24

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary To 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 2. Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II) Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110

More information

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: ) 1. Member, Secretary, NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) 4. Director (Technical), Punjab State Transmission Corperation Ltd. (PSTCL) Head

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi

Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi Distribution List: Southern Region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram,

More information

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Copy to: With a kind request to make it convenient to attend the above meeting. Shri S.K. RAY Mohapatra Chief Engineer (PSP&A-II) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi 110 066.

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2009/ 529-538 Date: June 05, 2009 To 1.The Member Secretary, Southern

More information

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX : Distribution List 1 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 3. Member Secretary Southern Regional Power Committee 29, Race Course Cross

More information

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

Copy: with a request to kindly make it convenient to attend the above meeting

Copy: with a request to kindly make it convenient to attend the above meeting Copy: with a request to kindly make it convenient to attend the above meeting 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 2. Chief Executive Officer Power System

More information

Controllers Address, Phone No., Fax No. &

Controllers Address, Phone No., Fax No. & Controllers Address, Phone No., Fax No. & Email S.No. Address, Phone No., Fax No., E-mail 1. Controller, Legal Metrology Department, Door.No: 48-8-12 & 12A, Boddupativari Street, Near ESI Hospital, Gunadala,

More information

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD)

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD) Copy to: With a kind request to make it convenient to attend the above meeting. Shri Pardeep Jindal Chief Engineer (PSP&A-II) Central Electricity Authority, Sewa Bhawan, New Delhi 110 066. ED (Commercial)

More information

Address and Tel.No. of the Director, Legal Metrology GOI

Address and Tel.No. of the Director, Legal Metrology GOI Address and Tel.No. of the Director, Legal Metrology GOI 1) Mr. B.N. Dixit, Director. Deptt. of Consumer Affairs, Room No.461-A, Krishi Bhawan, New Delhi - 110 001. Tel. No. 23389489 Fax No. 23385322 Controllers

More information

Distribution List: Constituents of Northern Region.

Distribution List: Constituents of Northern Region. Distribution List: Constituents of Northern Region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. Chief Engineer (PSP&A-I) Central Electricity Authority Sewa

More information

Minutes of 4 th Meeting of the National Reliability Council for Electricity (NRCE) held on at NRPC, New Delhi

Minutes of 4 th Meeting of the National Reliability Council for Electricity (NRCE) held on at NRPC, New Delhi GOVERNMENT OF INDI1A MINISTRY OF POWER CENTRAL ELECTRICITY AUTHORITY SEWA BHAWAN, R.K.PURAM NEW DELHI-110066 Website: www.cea.nic.in (आई.एस.ओ. 9001:2008) No. CEA/ NRC/RA 2014 Dated 3.11.2014 To As per

More information

Distribution List: Constituents of Northern Region

Distribution List: Constituents of Northern Region Distribution List: Constituents of Northern Region Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member Secretary NRPC 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai,

More information

Appendix 08: Details of Location under Each Category

Appendix 08: Details of Location under Each Category Appendix 08: Details of Location under Each Category Dated: Sr. No. A Bank Location CATEGORY - A Type of 1 Hyderabad - DR DR Site Telangana 2 Mumbai - DC DC Site 3 Mumbai- DC 4 Bangalore-

More information

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Distribution List: Northern Region. Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member

More information

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID:

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID: CONTACT DETAILS For any information/clarification/grievance on matters connected with NRIs, please contact our BRANCHES spread across the country: NRIs may also contact the following NRI Cells/Offices.

More information

POWER TRANSMISSION IN INDIA 2018

POWER TRANSMISSION IN INDIA 2018 Now Available POWER TRANSMISSION IN INDIA 2018 Segment Trends and Developments; Outlook and Projections Report (PDF) Data-set (Excel) India Infrastructure Research Power Transmission in India 2018 Table

More information

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects Proposed transmission system in WR for various generation projects in Jharkhand, Orissa, West Bengal, Chhattisgarh, M.P. and Maharashtra and other NTPC projects System studies have been carried out to

More information

CALL LOGGING PROCESS

CALL LOGGING PROCESS CALL LOGGING PROCESS 1. TO REGISTER A COMPLAINT, FIRST YOU NEED TO REGISTER YOUR PRODUCT ON VIVITEK WEB SITE. BELOW ARE THE STEPS TO REGISTER YOUR PRODUCT ON VIVTEK WEB SITE. 2. LOG ON TO WWW.VIVITEK.IN

More information

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. 1 Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. of Federal Republic of Germany. Registered as a non-profit

More information

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon Distribution List: 1. Managing Director Andhra Pradesh Solar Power Corporation Pvt Ltd Room No: 218, 2 nd Floor, Vidyut Soudha, Khairatabad, Hyderabad- 500 082 Tel : 040-23499401 / +91-9848543434 Email:

More information

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011 Power Grid Corporation of India Limited Analysts Presentation February 9, 2011 1 Listed Company with public holding of 30.58% and balance by Government of India Central Transmission Utility of the country

More information

Ahmedabad Amritsar Bangalore Bathinda

Ahmedabad Amritsar Bangalore Bathinda Ahmedabad 3rd Floor, Navneet Plaza, Near Municipal Market, CG RoadAhmedabad 380001 Guj arat Tel: +91 079 400 491 00-104 Email:ahmedabad@canamgroup.com Amritsar SCO-37, 3rd Floor, District Shopping Complex,

More information

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg New Delhi, Dated, io" October, 2014 To 1. Chief Secretary(Power), Government of Arunachal Pradesh, Itanagar. 2.

More information

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m. DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING (1/2016 series) DATE: 14/03/2016 TIME: 11.30 a.m. Agenda for the 25 the Meeting (1/2016 series) of the Approval Committee of Divyasree Technopark

More information

Highlights of Telecom Subscription Data as on 28 th February, 2018

Highlights of Telecom Subscription Data as on 28 th February, 2018 For immediate release (Press Release No.48/2018) Information Note to the Press TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 24 th April, 2018 (www.trai.gov.in) 20 Glorious Years (1997-2017) Highlights

More information

Highlights of Telecom Subscription Data as on 31 st October, 2018

Highlights of Telecom Subscription Data as on 31 st October, 2018 For immediate release (Press Release No. 01/2019) Information Note to the Press TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 2 nd January, 2019 (www.trai.gov.in) 20 Glorious Years (1997-2017) Highlights

More information

State-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices

State-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices Andhra Pradesh Andaman & N. Islands Arunachal Pradesh Assam State-wise Gross State Domestic Product by of Origin (at 2004-05 25.07 24.28 22.27 23.34 22.00 21.09 19.84 18.61 18.99 19.04 20.58 20.04 18.31

More information

Advanced Ultra Power Transmission Consultancy

Advanced Ultra Power Transmission Consultancy 2100 Advanced Ultra Power Transmission Consultancy AUPTC the Complete Solutions to Power Infrastructure, Electrical, Electronics, Automation, HVAC Advanced Ultra Power Transmission Consultancy About AUPTC

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS LOK SABHA UNSTARRED QUESTION NO.2496 TO BE ANSWERED ON 26 TH DECEMBER, 2018 2496. SHRI KAUSHALENDRA KUMAR: SHRIMATI NEELAM

More information

List of PNB Bank Branches for Sale of Information Brochure of All India SLIET Entrance Test (SET)-2013 of SLIET Longowal, District Sangrur (Punjab)

List of PNB Bank Branches for Sale of Information Brochure of All India SLIET Entrance Test (SET)-2013 of SLIET Longowal, District Sangrur (Punjab) List of PNB Bank Branches for Sale of Information Brochure of All India SLIET Entrance Test (SET)-2013 of SLIET Longowal, District Sangrur (Punjab) Sr.No. 1. 2. 3. 4. 5. 6. PUNB0478300 ARUNACHAL PRADESH

More information

FORUM LOAD DESPATCHERS (FOLD)

FORUM LOAD DESPATCHERS (FOLD) CHARTER OF FORUM OF LOAD DESPATCHERS (FOLD) FOLD Secretariat NLDC,B-9 Qutab Institutional Area, New Delhi http://www.forumofld.in http://www.forumofloaddespatchers.in Table of Contents 1. Background...3

More information

"'-- :...:. ~ ~ ~ '''''tlr'

'-- :...:. ~ ~ ~ '''''tlr' "'-- :...:. ~ ~ ~ '''''tlr' ql""! '''..IS Cb,,!ql.t'llOl 3f1t5 ;>'5«' IMI

More information

Tamil Nadu: Current Power scenario and projects in pipeline

Tamil Nadu: Current Power scenario and projects in pipeline Tamil Nadu: Current Power scenario and projects in pipeline 1. Tamil Nadu per capita consumption is over 1000 Units, which is as against 11 th plan national target of 1000 units. Presently, the national

More information

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC) Distribution List - SR:. GM, (Commercial) NTPC Limited (Kudgi TPS) NTPC Bhavan, Core-7, Scope Complex 7, Institutional Area,

More information

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 1 SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 2 SOLAR ENERGY CORPORATION OF INDIA A Government of India Enterprise under the administrative

More information

Handout on. Mobile Number Portability. For Sales Channels

Handout on. Mobile Number Portability. For Sales Channels Handout on Mobile Number Portability For Sales Channels Contents 1. Introduction of MNP 2. Areas where MNP is permitted 3. Some terminologies related to MNP 4. Why a customer should join BSNL? 5. Porting

More information

No. Tech 4562/NIB-Addr/04/ 06 March A separate letter is being issued for IP addresses for nodes of MP Telecom Circle.

No. Tech 4562/NIB-Addr/04/ 06 March A separate letter is being issued for IP addresses for nodes of MP Telecom Circle. Bharat Sanchar Nigam Limited (A Government of India Undertaking) Data Networks, Network Management Center 4 th Floor, Kidwai Bhawan, Janpath, New Delhi 100 No. Tech 4562/NIB-Addr/04/ 06 March 2004 To NIB

More information

qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

qlq:~ ~ CbIlq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise) qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise) ~ 'l>mr>m : "41tU fii'1'1', '

More information

Reliance Infrastructure Limited

Reliance Infrastructure Limited Reliance Infrastructure Limited Reg. : H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections / suggestions on Reliance Infrastructure

More information

Mother and Child Tracking System. Achievements and Challenges

Mother and Child Tracking System. Achievements and Challenges Mother and Child Tracking System Achievements and Challenges 17 th November 2011 MCTS- A Path Breaking Initiative MCTS was launched in December 2009 A comprehensive system for improving delivery of health

More information

Smart Cities & Urban Development

Smart Cities & Urban Development Cities & Urban Development November 2015 Market Entry Partnerships Growth India Today & Tomorrow India Today - 2015 India Tomorrow - 2030 Total population of 1.2 billion Population Growth Rate: 1.28 %

More information

Monthly changes in the General Indices and CFPIs are given below: Monthly changes (%) in All India CPI (General) and CFPI: Dec over Nov.

Monthly changes in the General Indices and CFPIs are given below: Monthly changes (%) in All India CPI (General) and CFPI: Dec over Nov. Monthly changes in the General Indices and CFPIs are given below: Monthly changes in All India CPI (General) and CFPI: 20 over Nov. 20 Indices Rural Urban Combined Value % Change Nov. Value % Change Nov.

More information

Indian Power Grid Developments

Indian Power Grid Developments Indian Power Grid Developments Rathin Basu Country President, Alstom Grid, March 25 th 2015 Evolution of Voltage level of Indian Grid kv Anticipated the evolution & Timely Investment in Indian Facilities

More information

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist 14 th September, 2015, New Delhi NHP Project Background Achievements of HP-I & HP-II:- establishment of hydro-meteorological equipment in the States

More information

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated REMINDER-III: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH From Er. A. ASHOK KUMAR, B.E., Chief Engineer/ Personnel, 144, Anna Salai, Chennai 600 002. To The Superintending

More information

up of SPMU in States/UTs under NeGP A

up of SPMU in States/UTs under NeGP A 1/12/2015 Guidelines for Setting up of SPMU in States/UTs under NeGP A Department of Agriculture & Cooperation (DAC), Ministry of Agriculture, New Delhi Contents 1. Introduction... 2 2. Scope of Work of

More information

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network Inviting Expression of Interest for Leasing of Dark fiber on DMRC Network Delhi Rail Corporation is engaged in the business of constructing, operating & maintaining Mass Rapid Transport Network. DMRC is

More information

F.No. 1/20/CIT(OSD)/efiling/Electronic Verification/ Dated: 27/12/2016

F.No. 1/20/CIT(OSD)/efiling/Electronic Verification/ Dated: 27/12/2016 आयकर न द श लय (पद धन ) DIRECTORATE OF INCOME TAX (SYSTEM) ए आर ए स टर, भ - ल, ई-2 झ ड व ल एक स IDS Instruction No.3 ARA Center, Ground Floor, E-2, Jhandewalan Extension, ई ददल ल 110055, New Delhi 110055

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

SMART WIREFREE. Home Automation Solutions

SMART WIREFREE. Home Automation Solutions Home Automation Solutions Collection 2017 What is Home Automation? Home automation systems are designed to make a home owners life more comfortable, convenient and secure. With a range of solutions available

More information

DESIGN YOUR WORLD WITH YOUNG ENERGY

DESIGN YOUR WORLD WITH YOUNG ENERGY DESIGN YOUR WORLD WITH YOUNG ENERGY S w i tc h es & Plat e s List Price w.e.f. 23rd Oct. 2017 STANDARD SWITCHES 2 STANDARD SWITCHES 3 Switches & Plates SWITCH MODULE 10AX One way switch ASZSXXW101 8536

More information

9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited)

9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited) India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited) 299 300 9. TELECOMMUNICATION Concepts and Definitions Code-Division Multiple Access- refers to any of several

More information

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network Inviting Expression of Interest for Leasing of Dark fiber on DMRC Network Delhi Metro Rail Corporation is engaged in the business of constructing, operating & maintaining Mass Rapid Transport Network.

More information

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited) HDFC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1st Floor, HDFC House, 165-166 Backbay Reclamation, H. T. Parekh Marg, Churchgate, Mumbai - 400020. 1800 2 092 020 care@hdfcgi.com HDFC 1st Floor, HDFC House, 165-166

More information

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding Government of India Central Electricity Authority PFA Monitoring Division Sewa Bhawan, R K Puram, New Delhi-110066 cepfacea@rediffmail.com, ce.pfam.cea@gov.in Telefax :011-2671 5396 Ph:011-2673 2607 (आई

More information

Video Door Phone Collection 2017

Video Door Phone Collection 2017 Door Phone Collection 2017 Safe Home with Crabtree Door Phone Add Security to your lifestyle Crabtree VDP products are designed and developed to the highest quality standards for individual residential

More information

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

Q3 FY Press & Analysts Meet Mumbai January 28, 2016 Q3 FY 2015-16 Press & Analysts Meet Mumbai January 28, 2016 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound by the following

More information

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi. Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi. A. CTU welcomed the participants and informed that Minutes of the 7

More information

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook) ABOUT THE COMPANY A Navaratna Central Public Sector Enterprise, incorporated in 1989 The Central Transmission Utility of India Consistently Rated Excellent By GoI Created synchronously connected Country-wide

More information

Economic Corridors: The Rationale. 10 September 2010

Economic Corridors: The Rationale. 10 September 2010 Economic Corridors: The Rationale 10 September 2010 Presentation structure 1. IL&FS AN OVERVIEW About IL&FS Key initiatives of IL&FS 2. Economic Corridor Concept of Economic Corridors Benefits of Economic

More information

INDIA SECTION. India. Secretary M.ASCE. India

INDIA SECTION. India. Secretary M.ASCE. India SECTION ROSTER 2014 2015 SECTION President Section Arvind B Shah, P.E., F.ASCE Matungaa King Circle 6 Satya Sadan,Near Aurora Theatre MH, Mumbai 400019 Work Phone: 011 91 22 2409 5846 Fax: 011 91 22 2407

More information

Details pertaining to Mahindra World City- Engineering & Related Industries SEZ at Jaipur S.No. Particulars Description

Details pertaining to Mahindra World City- Engineering & Related Industries SEZ at Jaipur S.No. Particulars Description Details pertaining to Mahindra World City- Engineering & Related Industries SEZ at Jaipur S.No. Particulars Description 1 Location of the SEZ Located in Jaipur, Off Ajmer Road, on National Highway-08.

More information

The Institute of Chartered Accountants of India

The Institute of Chartered Accountants of India (1) Date of Examination INFORMATION SYSTEMS AUDIT (ISA) COURSE ASSESSMENT TEST December, 2011 (Under Schedule 'F' of e Chartered Accountants Regulations, 1988) Cost of Application Form : Rs. 100/- Last

More information

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Agenda for Connectivity/Long term Access to Generation projects in Northern Region Agenda for Connectivity/Long term Access to Generation projects in Northern Region POWERGRID has received Connectivity and Long term Access applications for new generation projects in NR. In addition,

More information

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd.

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd. Distribution List : 1. Shri R. K. Singh Sr. Vice President Sterlite Energy Ltd. 1 st Floor, City Mart Commercial Complex Baramunda, Bhubansehwar 751 003 Phone : 0674-6610300 Mobile : 09777451777 Email

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / ED (NR-I) / ED (NR-II) / ED (NR-III) / COO (BDD)

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / ED (NR-I) / ED (NR-II) / ED (NR-III) / COO (BDD) Copy to: With a kind request to make it convenient to attend the above meeting. Shri Pardeep Jindal Chief Engineer (PSP&A-II) Central Electricity Authority, Sewa Bhawan, New Delhi 110 066. ED (Commercial)

More information

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax )

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax ) 1. Member Secretary NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-01 1-26865206) 4. Director (T&RE) NHPC Office Complex, Sector - 33, NHPC, Faridabad - 121 003 (Fax-0129-2256055)

More information

Telecom Regulatory Authority of India

Telecom Regulatory Authority of India 20 Glorious Years (1997-2017) Telecom Regulatory Authority of India The Indian Telecom Services Performance Indicators January - March, 2017 New Delhi, India 5 th July, 2017 Mahanagar Doorsanchar Bhawan,

More information

lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise)

lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise) lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise) 91 F * --'. ----0 ~~ Qla:zRus ~ ~ : ";ffi~if?l'1"i" ~~. 2, ~ 29, ~ 122

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited) HDFC HDFC 1 2 3 4 5 HDFC Ltd. care@hdfcgi.com www.hdfcgi.com 1st Floor, HDFC House, 165-166 Backbay Reclamation, H. T. Parekh Marg, Churchgate, Mumbai - 400020. www.hdfcgi.com hdfcgi.com HDFC 6 AHMEDABAD

More information

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) TABLE OF CONTENTS 1 INTRODUCTION... 5 1.1 Background... 5 1.2 EXISTING NETWORK OF TATA POWER IN MUMBAI CITY AREA...

More information

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB 80 CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB 4.1 INTRODUCTION The preliminary study conducted to evaluate the potential due to the application of SVC and STATCOM on the

More information

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology Connectivity for NeGP Presented By: Anil Kumar Balani Director Department of Information Technology NeGP Connectivity Components SWAN (min 2 Mbps connectivity) Vertical Locations: 7500+ PoPs Horizontal

More information

GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC)

GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC) GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC) Company Overview GRAS Academy ( GRAS ) is engaged in providing vocational

More information

Inspired By Nature List Price w.e.f. 1st July 2017

Inspired By Nature List Price w.e.f. 1st July 2017 Inspired By Nature Inspired by genuine elements of nature, Amare has been aesthetically designed to complement the latest interior trends. These masterfully crafted wooden, glass and metal switch plates

More information

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on Minutes of the Special Meeting on URTDSM / SCADA / Communication held on 13.03.2018 1. Introduction A Special Meeting on URTDSM / SCADA / Communication was held on 13.03.2018 at SR-II, PGCIL, Bengaluru.

More information

Telecom Regulatory Authority of India

Telecom Regulatory Authority of India Telecom Regulatory Authority of India The Indian Telecom Services Performance Indicators April - June, 2015 New Delhi, India 23 rd November, 2015 Mahanagar Doorsanchar Bhawan, Jawahar Lal Nehru Marg, New

More information

ACET - Gateway to the World of Actuary - FAQs (ver. 2.00/March 2012)

ACET - Gateway to the World of Actuary - FAQs (ver. 2.00/March 2012) ACET - Gateway to the World of Actuary - FAQs (ver. 2.00/March 2012) Note: i) The Frequently Asked Questions (FAQs) as under are designed to assist potential examinees and IAI does not claim that these

More information

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control ENERGY CONTROL CENTERS To generated, Transmission and Distribution system, Number of customers and Total investment. Installed capacity in India exceeds 206 GW with annual energy generated energy exceeding

More information

June 2017 Hon ble President of India inaugurated Phase 1 of Bengaluru Metro

June 2017 Hon ble President of India inaugurated Phase 1 of Bengaluru Metro June 2017 Hon ble President of India inaugurated Phase 1 of Bengaluru Metro SPML Infra and L&T Consortium executed part of Phase 1 of Bengaluru Metro project that was inaugurated by the Hon ble President

More information

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , ,

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , , Distribution List - ER: 1. Shri S.K.Thatte Managing Director Brahmani Thermal Power Pvt. Ltd. (earlier Navabharat Power Pvt. Ltd.) 3 rd Floor, Fortune Towers, Chandrasekharpur, Bhubaneshwar-751023 Phone

More information

CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY

CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY BUREAU OF ENERGY EFFICIENCY MINISTRY OF POWER 24/11/2014 2 Rationale.. Demand Side Management (DSM) Cost effective

More information

Energy Efficiency Improvements in Commercial Buildings (EECB)

Energy Efficiency Improvements in Commercial Buildings (EECB) UNDP GEF BEE Project: Energy Efficiency Improvements in Commercial Buildings (EECB) November 2016, New Delhi Dr. S N Srinivas Program Analyst, UNDP India sn.srinivas@undp.org Energy Efficiency Improvements

More information

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited) HDFC 1 2 HDFC HDFC 3 4 5 6 7 8 9 10 HDFC care@hdfcgi hdfcgi HDFC 1st Floor, HDFC House, 165-166 Backbay Reclamation, H. T. Parekh Marg, Churchgate, Mumbai - 400020. care@hdfcgi CHANDIGARH SCO No.101-103,2nd

More information

Development of Infrastructure, through Private Sector participation.

Development of Infrastructure, through Private Sector participation. Uttar Pradesh Infrastructure Highest priority will now be provided, by the State to the creation of high quality infrastructural facilities. The speed, with which decisions have been taken and implemented,

More information

List containing names and addresses of AD Cat. II licenced by Kanpur Regional Office. Sr /1207, Ansari Road, Sahaaranapur (U.P.

List containing names and addresses of AD Cat. II licenced by Kanpur Regional Office. Sr /1207, Ansari Road, Sahaaranapur (U.P. November 09, 2017 List containing names and addresses of AD Cat. II licenced by Kanpur Regional Office Sr. Name and address of AD Cat.- No. II 1 Prathama Bank Ram Ganga Vihar, Phase II Moradabad Uttar

More information

About Us: Encl: Details of Shree Technocrat Communication System

About Us: Encl: Details of Shree Technocrat Communication System About Us: Shree Technocrat Communication System Pvt Ltd is one of the most valued, System Integration Company, providing Integration services and network solutions to leading Telecom companies across the

More information

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) POWER SYSTEM BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Vision Statement 3. Why us? 4. Engineering Procurement Construction Services

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

Applications Granted Medium Term Open Access (MTOA) by POWERGRID 1 B.N.Mehta, Superintending Engineer, 32 1-Jun-2011 31-Mar-2012 UT-DNH UT DNH 2 M.R.Ingle, Executive Engineer, UTDD 22 1-Jun-2011 31-Mar-2012 UT-DD 3 SAIL - VISP NSPCL, Bhilai, 10.92 1-Nov-2011 31-May-2014

More information