Objective. High Level Overview of Dynamic Model Building Process. Inputs, Outputs. MISO 16 Dynamic Model Suite. MISO 16 Dynamic Data Request
|
|
- Hilary Gardner
- 6 years ago
- Views:
Transcription
1 1
2 Objective High Level Overview of Dynamic Model Building Process Inputs, Outputs MISO 16 Dynamic Model Suite MISO 16 Dynamic Data Request Reference Material for New Data Submitters High level Timeline Process Improvements Initiatives
3 Dynamic Model Building Process Send Dynamic Data Request Previous year MTEP Dynamics Data Update MISO information Previous MTEP Dynamic Data Update Neighbor Information from ERAG MMWG Package Develop Dynamic Model Post Initial Models MTEP 16 final power flow models Iterations Incorporate Stakeholder s Feedback Post Final Models 3
4 Developing Dynamics Model 1. Capture Dynamics related Power flow updates 2. Update Dynamic data (.dyr) file 3. Create Snapshot 4. Initialize/ Troubleshoot 5. Run 20 Sec No Disturbance 6. Stress Test, Plot Results 7. Initial Posting for Stakeholder s review 8. Incorporate updates 9. Repeat Steps 1 though Final Posting Each step involves troubleshooting and sanity checks 4
5 Inputs: MISO Dynamics Package MTEP Final Power flow cases Dynamic Models Dynamic Modeling requirement and responsibilities specified in MISO MOD-032 Model Data Requirements & Reporting Procedures Active Elements ( generators, SVC, HVDC etc.) Dynamic Load Models Protective Devices PSSE compatible data format required Updates are collected through data request sent at the beginning of each cycle Sign up for PAC, PSC distribution list on MISO Extranet to get notifications 5
6 Output: MISO Dynamics Package bin Contains channel outputs generated after running each disturbance Fault Contains all the disturbances which are required to be run ipl Contains iplan files for tuning the models lf mdl ps Contains all the powerflow cases for running dynamic simulation Contains the snap shot, dyr file, conec, conet files, user dll models and other necessary files for the dynamic simulation. Contains the pdf output from PSSEPLT tool for all the disturbances run tsc work Contains the transcript of all the disturbances run during the simulation This directory contains all the python scripts /.idvs required to run the dynamic case A documentation is included containing details of each model type a plant uses, GNET list, details about channel output 6
7 2016 MISO Dynamics Model Suite Model Year Year 1 Year 5 Base case 2017 Summer Peak, Wind at 15.6% UFLS Study 2021 Summer Peak, Wind at 15.6% TPL requirement R Summer Shoulder (70-80% peak) Wind at 40% TPL requirement R2.4.2 Sensitivity 2021 Light Load (minimum load level) Wind up to 90% TPL requirement R Summer Shoulder (70-80% peak) Wind at 90% TPL requirement R2.4.3 Year Summer Peak, Wind at 15% * * Will be developed if required based on material change in generation in year
8 2016 MISO Dynamic Data Request Data is requested for Updates Issues identified by MISO Dynamic load models NEW: MOD Compatible data Any corrections/ updates to existing dynamic database (.dyr file) Generators missing data, Suspect Model Type Correct Wind plant Modeling 2021Summer Peak 2021 Light Load 2021 Shoulder Governors show actual frequency response To Assist Data Request, MISO provides A workbook containing list of generator representation Dynamics Data Files (Active elements files, Dynamic Load models files) MTEP Final Power flow Cases in.raw Format 8
9 Reference materials for New Data Submitters New Members ( Non PSSE Users) Can download PSSE Reference Material for understanding Dynamic Data Format Requirements Link Requires Signing Model Library Acceptance of Terms and Conditions with SEIMENS Provide Transmission Planning contact and company name (MISO) 9
10 10 How to Provide the Dynamic Model? Obtain PSSE Referenc e material Choose a suitable model from PSSE Standard library Identify BUS, ID in PSSE model Provide Data to MISO Contact MISO for any Support e.g. GENROU for Round- Rotor machines WT4 for type 4 wind machine Coordina te with Interconn ecting TO Instructio ns in Data request
11 Sample Generator Dynamic Data OTHER CONTROLS (PSS) Turbine-Governor Model GEN MODEL EXCITER MODEL 'GENROU' / 'ESST4B' / 'GGOV1' / 'PSS2A' / 11
12 High Level Timeline for MTEP 16 Dynamics 2016 Data request Pass 1 posted for review Final Dynamics Package posted 12
13 Process Improvements Powerflow Models finalized, Not Dynamic Ready Dynamic Modeling starts Dynamics related Powerflow Changes made Dynamics related changes Dynamics Finalized Pull the Step ahead: Making sure that submissions are captured in MOD Test Dynamics readiness, Capture and fix Dynamics related changes in MOD Powerflow model finalized Dynamic Modeling starts Dynamic related Changes Dynamics Finalized 13
14 Summary Scenarios 4 Scenarios will be created as per TPL Needed for NERC TPL compliance studies, PRC requirements Generation Interconnection studies Status Dynamics data request will be send shortly, starting point MTEP 15 dynamics Will be similar to last year s request Process Improvement s: Dynamics Ready Steady State Data MOD-033 Ready Modeling 14
15 Dynamic Modeling Contact Information Nihal Mohan ( nmohan@misonenergy.org) Warren Hess (whess@misonenergy.org) Cody Doll (cdoll@misonenergy.org) Manager David Duebner (dduebner@misoenergy.org ) 15
ISO New England Data Modeling Requirements
A U G U S T 1 5, 2 0 1 6 B O S T O N, M A ISO New England Data Modeling Requirements Renew Northeast Meeting Al McBride D I R E C T O R, T R A N S M I S S I O N S T R A T E G Y & S E R V I C E S Agenda
More informationUnused Generation Capacity Study Scope. Informational Analysis
Unused Generation Capacity Study Scope Informational Analysis MISO Jan 9, 2014 Table of Contents 1.0 Project Overview... 3 2.0 Scope of Work... 4 2.1 Phase 1 - Preliminary Analysis... 5 2.2 Phase 2 System
More informationMISO Transmission Planning BPM 020 Updates February 16, 2016
MISO Transmission Planning BPM 020 Updates February 16, 2016 Purpose Present final updated BPM 20 language Objectives for Today Purpose and Objectives Briefly discuss posted stakeholder comments and MISO
More informationSMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2
SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:
More informationUse case for the south Portuguese network - Results -
Use case for the south Portuguese network - Results - Nélio Machado, REN, Portugal Milenko Halat, AIA, Spain Network Security Assessment Days November 5 th 2015, Brussels Content Description of Portuguese
More informationFACTS and HVDC for Grid Connection of Large Wind Farms
David Larsson Power-Gen Europe 2005 Milan, Italy FACTS and HVDC for Grid Connection of Large Wind Farms www.abb.com/facts FACTS Agenda Wind Generators Response to Grid Faults PICTURE JPG-FORMAT WEB OPTIMIZED
More informationDisturbance Monitoring and
PRC-002-2 R1 Notification Disturbance Monitoring and Reporting Requirements Compliance Spring Workshop May 10, 2017 Objectives This presentation will discuss: Requirement R1 Part 1.2 notifications Definition
More informationRequirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company
Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company December 29, 2016 APS Requirements for Data for Power System Modeling and Analysis Table of Contents
More informationExample Studies Using Hybrid Simulation
1 Example Studies Using Hybrid Simulation 2017 IEEE PES General Meeting/ Analytics Methods for Power s Committee Panel Session Panel Session Title: Challenges and solutions of interfacing techniques for
More informationConsideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013
Project 2010-03 Modeling Data (MOD B) October 7, 2013 Para 290. Project 2010-03 - Modeling Data The Commission directs public utilities, working through NERC, to modify the reliability standards MOD- 010
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationPower System Studies. The Power of Trust. The Future of Energy.
The Power of Trust. The Future of Energy. POWER SYSTEM ANALYSIS Consulting studies to investigate system events and optimize power system performance In todays competitive and rapidly changing operating
More informationRequirements for Model Validation
Draft Need Requirements Application for Model Validation Reporting Requirements for Model Validation Reporting for Generators and Generator Control Systems Revision 0 Wednesday 16 November 2005 Prepared
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationNERC MOD List of Acceptable Models and Model Library Block Diagrams for Use in Dynamic Simulation (MOD-026-1, R1)
NERC MOD-026-1 List of Acceptable Models and Model Library Block Diagrams for Use in Dynamic Simulation (MOD-026-1, R1) PJM Interconnection Original Document Date: July 1, 2014 Current Document Date: March
More informationNERC and Regional Coordination Update. Operating Committee Preston Walker January 9, 2018
NERC and Regional Coordination Update Operating Committee Preston Walker January 9, 2018 Standards Project Action End Date Project 2017-07 Standards Alignment with Registration NERC Standards Under Development
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationMOD Standards Experiences. David Lemmons EthosEnergy Group
MOD Standards Experiences David Lemmons EthosEnergy Group EthosEnergy Group Overview Ethos operates approximately 40 BES plants across 6 of the 7 NERC regions. Ethos provides NERC services to approximately
More informationGenerator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281
Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationCASE STUDY : Transient Stability Simulation Package
CASE STUDY : Transient Stability Simulation Package CLIENT NAME : A major T&D solutions provider in the world END CUSTOMER : A public T&D utility in one of the SAARC nations PROJECT TITLE : Customized
More informationJoint Transmission Planning Base Case Preparation Process
California Independent System Operator & Southern California Edison Joint Transmission Planning Base Case Preparation Process NERC Reliability Standard MOD-032-1 Version 1.2 August 31, 2017 INTENTIONALLY
More informationProcedure to convert CONEC and CONET type models to the new CCT form
Siemens Power Technologies International Procedure to convert CONEC and CONET type models to the new CCT form As of version 31 and above, there are two connection routines in PSS E subroutines CONEC and
More informationInterconnection Feasibility Study Report GIP-IR377-FEAS-R1
Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.
More informationProposed Improvements for NERC MOD Standards July 10, 2012
Agenda Item 3.6 Planning Committee Meeting September 18-19, 2012 Proposed Improvements for NERC MOD Standards July 10, 2012 Background This paper outlines proposed improvements for NERC Reliability Standards
More informationCIM for Dynamic 2010 CIM Workshop
Answers for energy. CIM for Dynamic 2010 CIM Workshop T&D Service Solutions Chuck DuBose Siemens PTI September 09, 2010. History CIM for Planning Interop New York: 11/11/2008 EPRI CIM for Planning Results
More informationNERC and Regional Coordination Update
NERC and Regional Coordination Update Mark Kuras Sr. Lead Engineer, NERC and Regional Coordination Planning Committee April 7, 2016 NERC Standards Under Development Standards Project Activity Due Date
More informationEPRI CIM for Dynamic Models Project Report. Terry Saxton Xtensible Solutions November 11, 2009
Project Report Terry Saxton Xtensible Solutions November, 2009 CIM for EPRI project started March 2008 Project Objectives Develop a standard way to exchange dynamic models for each generator, load or other
More informationD DAVID PUBLISHING. Integration of PSS E Web Application with Power System Simulation Platform. 1. Introduction
Journal of Mechanics Engineering and Automation 7 (207) 262-268 doi: 0.7265/259-5275/207.05.003 D DAVID PUBLIHING Integration of P E Web Application with Power ystem imulation Platform YU Hao, LIANG Xiaopeng
More informationNERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016
NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons
More informationBritish Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia
Page 1 of 15 British Columbia Utilities Reliability Standards with s adopted in British Columbia BAL-001-2 Standard Real Power Balancing Control Performance R-14-16 July 1, 2016 BAL-002-1 1 Disturbance
More informationFeasibility Study on Load Flow and Short Circuit Project
Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November
More informationStandards. Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016
Standards Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016 Real-time Monitoring and Analysis Reliability Benefits Ensure entities have capabilities for maintaining high quality
More informationMidwest ISO Overview - ATC Customer Meeting. February 26, 2009
Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,
More informationReal Time Digital Simulator Testing of an On Line Integrated Stability Control System
Real Time Digital Simulator Testing of an On Line Integrated Stability Control System R.P. Wierckx, M. Kawasaki, N. Saito, K. Anzai, S.C. Verma Abstract The paper describes the testing of an on line integrated
More informationChristian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1
Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms May 22, 2009 Slide 1 FACTS Applications Flexible AC Transmission Systems May 22, 2009 Slide 4 System Studies - Grid Codes
More informationProposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013
Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time November 12, 2013 Rationale Background Interconnection wide powerflow and dynamics cases are currently
More informationReliability Compliance Update. Reliability Standards and Compliance Subcommittee Preston Walker August 16, 2018
Reliability Compliance Update Reliability Standards and Compliance Subcommittee Preston Walker August 16, 2018 NERC Standards Under Development Standards Project Action End Date Comment 08/27/2018 Draft
More informationIJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613 Comparison of Shunt Facts Devices for the Improvement of Transient Stability of Two Machine
More informationReal-Time Simulation Solutions for Power Grids and Power Electronics
Real-Time Simulation Solutions for Power Grids and Power Electronics The Most Advanced Real-Time Simulation Systems Available The power system industry is changing considerably with the shift from centralized
More informationUnofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )
Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project 2007-17.2) Please DO NOT use this form for submitting comments. Please use the electronic
More informationMeeting- Overview of. Development
NPCC 2008 General Meeting- Standards Program Area- Overview of Regional Standards Development Guy V. Zito Assistant Vice President Standards September 25, 2008 September 25, 2008 1 Standards Program Area
More information10 th Annual University of Pittsburgh Electric Power Industry Conference
10 th Annual University of Pittsburgh Electric Power Industry Conference System Studies for Grid Level Integration of Power Electronic Devices Presentation November 16, 2015 1:30 PM Session Adam R. Sparacino
More informationATC Zone 2 Projects Update U.P. Energy Summit
ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project
More informationAchieving Smarter Grid Operation With On-Line DSA Technology
Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of
More informationYear Assessment Preliminary Needs
2018 10-Year Assessment Preliminary Needs Stakeholder and Customer Presentation March 1, 2018 Jeremy Voigt Purpose Key Study Assumptions Reminder Summarize Preliminary Changes to Needs Solicit Input on
More informationHVDC Control and Protection Testing Using the RTDS Simulator
HVDC Control and Protection Testing Using the RTDS Simulator Yong-Beum Yoon, Tae-Kyun Kim, Seung-Tae Cha Power System Research Laboratory, Korea Electric Power Research Institute, Korea Abstract: Many
More informationUnofficial Comment Form Project Disturbance Monitoring
Unofficial Comment Form Project 2007-11 Disturbance Monitoring Please DO NOT use this form for submitting comments. Please use the electronic form to submit comments on the Standard Authorization Request
More informationNew Brunswick 2018 Annual Implementation Plan Version 1
New Brunswick Energy and Utilities Board Reliability Standards, Compliance and Enforcement Program New Brunswick 2018 Annual Implementation Plan Version 1 December 28, 2017 Table of Contents Version History...
More informationApproval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9
PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6
More informationTable of Issues and Directives Project Relay Loadability: Stable Power Swings
Table of Issues and Directives Project 2010-13.3 Relay Loadability: Stable Power Swings FERC Order 733 150. We will not direct the ERO to modify PRC-023-1 to address stable power swings. However, because
More informationStandard: PRC System Protection Coordination Requirement in Approved Standard Translation to New Standard or Other Action
Mapping Document Mapping Document Showing of PRC-001-2 System Protection Coordination to PRC-027-1 Protection System Coordination for Performance During Faults Updated 10-31 to reflect changes made to
More informationMISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO
1 MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 2 MISO Overview MISO is an independent, non-profit, memberbased organization committed to reliability. We serve as
More informationSystem Studies for American Transmission Co. s Benson Lake SVC Project
Helping to keep the lights on, businesses running and communities strong System Studies for American Transmission Co. s Benson Lake SVC Project Adam Manty, Transmission Planning Engineer, ATC Outline Introduction
More informationGlencoe Light and Power
Glencoe Light and Power REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS 1 Table of Contents Page I. INTRODUCTION...5 A. Authority... 5 B. Objectives...5 C. Interconnection
More informationMONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS
MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS Table of Contents I. Introduction... 5 A. Authority... 5 B. Objectives... 5 C. Interconnection
More informationReal-time visualization for detecting and solving power system challenges
SEL-5078-2 synchrowave Central Software Real-time visualization for detecting and solving power system challenges Automatically detect transients induced by renewable generation. Gain power system insight
More informationProject Data Update Package Instruction Manual (PDUP-IM)
Project Data Update Package Instruction Manual (PDUP-IM) Date: April 11, 2018 Prepared by: Reviewed by: Approved by: Khalid Rafiq, P. Eng. Modelling Engineer, Transmission Project Delivery Christopher
More informationi-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection
i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection 1 Process PG&E Order No. 754 Analysis Receive Bus List from Planning that Meet the Criteria in Table A Protection Computes Actual Clearing
More informationReliability Standards Development Plan
Reliability Standards Development Plan Steven Noess, Director of Standards Development Standards Oversight and Technology Committee Meeting November 1, 2016 2017-2019 Reliability Standards Development
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationPSS SINCAL Hosting Capacity Analysis. IEEE PES General Meeting 2017 Chicago - July 16-21, 2017
PSS SINCAL Hosting Capacity Analysis IEEE PES General Meeting 2017 Chicago - July 16-21, 2017 usa.siemens.com/digitalgrid Advantages at a Glance Maximal Hosting Capacity Analysis or How much Distributed
More informationUSE CASE 14 CONTROLLED ISLANDING
I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve
More informationInterconnection Application
Interconnection Application Member interested in applying for the interconnection of a distributed energy resource to the Utility s distribution system through the Fast Track or Study Processes are to
More informationNERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010
Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission
More informationAlberta Reliability Standards Compliance Monitoring Program. Version 1.1
Version 1.1 Effective: January 14, 2011 Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Applicability... 1 4. Definitions... 1 5. Compliance Monitoring Overview... 2 6. Monitoring Tools... 1
More informationOVERVIEW: KEY APPLICATIONS
WECC Reliability Coordinator Website OVERVIEW: KEY APPLICATIONS presented by Kirk Stewart, Manager Applications Agenda WECCRC.org Website Wide-Area Views (WAV) Historical Data Archiving and Reporting My
More information2016 Fall ITO Stakeholder Meeting. Topics in Operations
2016 Fall ITO Stakeholder Meeting Topics in Operations 11/17/2016 TOP-003-3 Requirement R1. Each Transmission Operator shall maintain a documented specification for the data necessary for it to perform
More informationMISO-PJM Cross-Border Planning. February 19, 2014 MISO-PJM JCM
MISO-PJM Cross-Border Planning February 19, 2014 MISO-PJM JCM Planning Issues at the Seam 2 Background JOA Historical and Projected Congestion Study - 2012 to 2014 Future Scenario based 80+ major project
More informationWind Plant Systems Grid Integration Plant and Turbine Controls SCADA
GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/
More informationFRCC Disturbance Monitoring Equipment Outage Reporting
FRCC Disturbance Monitoring Equipment Outage FRCC-RE-OP-004-I Effective Date: May 30, 2018 Version: Inactive 3000 Bayport Drive, Suite 600 Tampa, Florida 33607-8410 (813) 289-5644 - Phone (813) 289-5646
More information2017 RTEP Assumptions for Western Sub-Region
CLICK TO EDIT MASTER TITLE STYLE Click to edit Master text styles 2017 RTEP Assumptions for Western Sub-Region CLICK 2017 RTEP TO EDIT Assumptions MASTER TITLE STYLE Click Duquesne to edit uses Master
More informationFINIST OPERATOR TRAINING SIMULATOR QUICK START REVISION 2.0 OF 01/18/2011
FINIST OPERATOR TRAINING SIMULATOR QUICK START REVISION 2.0 OF 01/18/2011 MONITOR ELECTRIC, 2011 FINIST: OPERATOR TRANING SIMULATOR Contents 1. About This Manual.. 8 1.1. Introduction...... 5 1.1.1. How
More informationStudy of Transient Stability Improvement of IEEE 9-Bus System by using SVC
Study of Transient Stability Improvement of IEEE 9-Bus System by using SVC Rathnasagar Rangu 1, Poonam Upadhyay 2 1 PG Student, VNR VJIET, Hyderabad, India 2 Professor, VNR VJIET, Hyderabad, India Abstract
More informationLaPave Online. Patrick Icenogle, P.E. Materials Engineer - Automation LADOTD Materials Lab.
LaPave Online Patrick Icenogle, P.E. Materials Engineer - Automation LADOTD Materials Lab www.dotd.la.gov Outline LaPave History Moving to Web Application Ongoing Development Demonstration LaPave History
More informationMapping of Previous Planning Standards to Proposed New Standards
Planning ID.M1 ID.M2 Mapping of Previous Planning s to New s Planning Title Adequate voltage resources to meet future customer demands Coordinate and optimize the use of generator reactive capability IF.M2
More informationMISO PJM Joint and Common Market Cross Border Transmission Planning
MISO PJM Joint and Common Market Cross Border Transmission Planning February 28, 2017 1 Agenda 2 Targeted Market Efficiency Projects 2-Year Coordinated System Plan Study FERC Order No. 1000 Interregional
More informationSMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)
Attachment 2 Transmission Provider: SMALL GENERATOR INTERCONNECTION REQUEST Designated Contact Person: Address: Telephone Number: (Application Form) An Interconnection Request is considered complete when
More informationProposed Convention for Numbering of NERC Reliability Standards Draft September 9, 2004
Proposed Convention for ing of NERC Reliability s Draft September 9, 2004 Introduction The Version 0 Drafting Team proposes to initiate a new convention for numbering NERC reliability standards concurrent
More informationempowering power system engineers
PRDC Transmission Sub-transmission Distribution Planning Analysis Design Simulation TM empowering power system engineers th nd # 5, 11 Cross, 2 Stage, West of Chord Road, Bangalore, IIA, PIN 560086 Tel:
More informationDeveloping a Roadmap for A Smart(er) and Strong Transmission Grid
Developing a Roadmap for A Smart(er) and Strong Transmission Grid By: Navin Bhatt Manager, Advanced Transmission Studies & Technologies American Electric Power (AEP) PSERC 2009 Summer Workshop Breckenridge,
More informationInstallation Guide and Users Manual
DSATools TM Dynamic Security Assessment Software VSAT Voltage Security Assessment Tool VERSION 6.0 Installation Guide and Users Manual A product of Powertech Labs Inc. 12388-88 th Avenue Tel: (604) 590-7500
More informationStudies Overview and Data Requirements. Robert Pan
Studies Overview and Data Requirements Robert Pan Outline 1. Introduction 2. BC Transmission System 3. BCTC Studies for Clean Power Call 4. Data Requirements for Interconnection Studies 5. Application
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationXXXXX XXXX Wind Generation Project
A subsidiary of Pinnacle West Capital Corporation XXXXX XXXX Wind Generation Project XXXX XXXXX XXXXXXX Co., Inc. Interconnection System Impact Study Final Report Prepared By Arizona Public Service Company
More informationReal-time transient stability simulation tool
ephasorsim: Real-time transient stability simulation tool Vahid Jalili-Marandi, Ph.D. OPAL-RT Technologies Vahidj@opal-rt.com 1 Large 10 000+ Nodes Wide Area Simulation ephasorsim Large EMT Simulation
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Wksheet 1 PRC-002-2 Disturbance Moniting and Repting Requirements This section to be completed by the Compliance Enfcement Authity. Audit ID: Registered Entity: NCR Number: Compliance
More informationMAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPALLI EE-2401 POWER SYSTEM OPERATION AND CONTROL UNIT-III REACTIVE POWER VOLTAGE CONTROL
MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPALLI 621213 EE-2401 POWER SYSTEM OPERATION AND CONTROL UNIT-III REACTIVE POWER VOLTAGE CONTROL TWO MARKS: 1. What are the sources of reactive power? How it is
More informationIntroduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure
1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationService Training. Course Catalogue
Service Training Course Catalogue 2 Contents About Us...4...6 Fundamentals of AC Generators...7 Bearings I...8 Bearings II...9 Sleeve Bearings...10 AVR Adjustments...11 STAMFORD Analogue AVR...12 AVR Paralleling...13
More informationBulk Electric System Definition Changes and Reporting
Bulk Electric System Definition Changes and Reporting June 12, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Overview BES Definition Change BES Definition Reference
More informationMUSCATINE POWER & WATER FACILITY CONNECTION REQUIREMENTS
MUSCATINE POWER & WATER FACILITY CONNECTION REQUIREMENTS 3/30/17 Next Revision: 3/30/19 Reviewed by: MPW s Engineering Department MPWFACILITYCONNECTION_2017.docx 1 3/30/17 Table of Contents I. SCOPE...
More informationStandard Development Timeline
CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationTechnology Innovation Delivering Value to BPA Organized, Disciplined, Focused
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power
More informationQuarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan
Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability
More informationSMALL GENERATOR INTERCONNECTION REQUEST (Application Form)
SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: _Cleco Power LLC Designated Contact Person: Cindy Guillot Address: P.O Box 70, (2180 St. Landry Hwy) St. Landry, LA 71367
More informationNew Resource Implementation & Market Modeling
New Resource Implementation & Market Modeling Resource Interconnection Fair February 24, 2016 Page 1 Topics Discuss the New Resource Implementation (NRI) process. Structure and timeline for any resource
More informationGrid Code Planner EU Code Modifications GC0100/101/102/104
Grid Code Planner EU Code Modifications GC0100/101/102/104 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a
More informationOM650 Process Control and Management System
OM650 Process Control and System l Instrumentation & Controls Process Control and 1... 4 1... 4 External Network OT... OT... OT / ET OPC XU web-server Terminal bus PU... PU SU Plant bus P P P TELEPERM
More information