PacifiCorp Transmission Energy Gateway Update. John Cupparo Vice President, Transmission January 2010

Size: px
Start display at page:

Download "PacifiCorp Transmission Energy Gateway Update. John Cupparo Vice President, Transmission January 2010"

Transcription

1 PacifiCorp Transmission Energy Gateway Update John Cupparo Vice President, Transmission January 2010

2 Topics Overview and current status Rightsizing Challenges and opportunities Summary 2

3 Energy Gateway Overview Key Principles Secure capacity for the long-term benefit of customers Load service needs first, regional needs second Support multiple resource scenarios Secure regulatory and community support Build it Energy Gateway is a transmission strategy within the integrated resource plan Energy Gateway is an essential, reliability backbone for energy delivery Energy Gateway is under construction and progressing on several fronts 3

4 Energy Gateway Progress Update Gateway Central: Populus to Terminal (Segment B) 135 miles double-circuit 345kV construction In-service date Phase 1 June 2010 Phase 2 December 2010 Status Contract awarded October 2008 Commenced February 2009 On schedule and within budget 80% of foundations and structures installed 50% of conductor pulled All access roads built Three substations on schedule Regulatory recovery process underway 4

5 Energy Gateway Progress Update Populus substation (Downey, Idaho) Sized to integrate Populus to Terminal, existing Bridger West lines (from Wyoming) and future Gateway West 500kV line (from Wyoming) 5

6 Energy Gateway Progress Update Gateway Central: Mona to Oquirrh (Segment C) 114 miles double-circuit 345kV and single circuit 500kV construction In-service June 2013 Status Permitting and bid process underway Contract award target October 2010 Key risks/issues Federal and local permitting timing Sigurd to Red Butte (Segment G) 165 miles single circuit 345kV In-service June 2014 Status Federal permitting underway Key risks/issues Load growth timing 6

7 Energy Gateway Progress Update Gateway West: Windstar to Populus to Hemingway (Segment D & E) 1,050 miles single-circuit 500kV and single circuit 230kV In-service December 2014 December 2018 Status Permitting underway Key risks/issues Public resistance to wind and transmission development Policy conflicts with energy, environmental and land use Elongated permitting process Potential for increased federal participation 7

8 Energy Gateway Progress Update Gateway South: Aeolus to Mona (Segment F) 395 miles single circuit 500kV construction In-service December 2017 December 2019 Status Permitting initiated Westside: Hemingway to Captain Jack (Segment H), Walla Walla to McNary (Segment A) 431 combined miles single circuit 500kV and single circuit 230kV construction In-service 2019 or after Status Regional planning underway Negotiating joint development with other transmission providers 8

9 Rightsizing Phase 1 Load service needs Phase 2 Expanded for third parties 9

10 Single-circuit tower Rightsizing Constructability Double-circuit tower 10

11 Rightsizing Managing Rate Impacts Estimated Transmission Rates $/kw-year $150.0 $125.0 $100.0 $75.0 $50.0 $25.0 $ Current Wy-Ca Pancaked Rates Estimated Rates with Upsized Gateway Estimated PacifiCorp Rates w/ Gateway Est. Upsized w/ 3000 MW Wheeling Rates are indicative and should not be considered official 11

12 Challenges and Opportunities Regional and federal influence on planning, permitting and cost allocation Balancing environmental, energy and reliability policies Stakeholders balkanizing on resources and transmission Stakeholders unable to differentiate between multiple proposed transmission projects 12

13 Summary Energy Gateway is an essential, reliability backbone for energy delivery Delivery capability in place to deliver Energy Gateway Energy Gateway is under construction and progressing on several fronts Key principles have been consistently validated Indefinite delays will require alternatives to meet obligation to serve Regulatory recovery process underway Regional support required to deliver larger segments 13

RFP Attachment 13. January 2010

RFP Attachment 13. January 2010 PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt

More information

PacifiCorp Transmission Technical Workshop

PacifiCorp Transmission Technical Workshop PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt

More information

TransWest Express and Gateway South

TransWest Express and Gateway South TransWest Express and Gateway South Co-developed by four leading entities: Arizona Public Service PacifiCorp National Grid Wyoming Infrastructure Authority Regional Stakeholder Meeting January 23, 2008

More information

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Exhibit RMP (RTL-1) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Rick T. Link May 31, 2017 Pre-Issuance Bidders Conference Presentation

More information

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update October 30, 2018 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission

More information

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update January 7, 2019 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission

More information

TransWest Express Transmission Project Interregional Transmission Project Submittal

TransWest Express Transmission Project Interregional Transmission Project Submittal TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March

More information

Boardman to Hemingway Project Advisory Team

Boardman to Hemingway Project Advisory Team Boardman to Hemingway Project Advisory Team Central Project Advisory Team Meeting 5 Tonight s Objectives Review progress of the Community Advisory Process and discuss next steps Present analysis of revised

More information

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update July 11, 2018 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission

More information

NTTG 2019 Annual Interregional Information

NTTG 2019 Annual Interregional Information NTTG 2019 Annual Interregional Information Annual Interregional Coordination Meeting Salt Lake City February 19, 2019 Topics NTTG s Planning Process Overview NTTG s 2018-2019 Draft Regional Transmission

More information

ColumbiaGrid Planning Overview. Marv Landauer July 13, 2010

ColumbiaGrid Planning Overview. Marv Landauer July 13, 2010 ColumbiaGrid Planning Overview Marv Landauer July 13, 2010 1 Overview The three levels of transmission planning Overview of ColumbiaGrid and its activities in the area of renewable generation integration

More information

Project Presentation April, 2017

Project Presentation April, 2017 Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern

More information

MEMORANDUM. June 30, Council Members. Update on Transmission Planning Activities

MEMORANDUM. June 30, Council Members. Update on Transmission Planning Activities Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon June 30,

More information

July 26, Dear Mr. Millar:

July 26, Dear Mr. Millar: July 26, 2012 Mr. Neil Millar Executive Director Infrastructure Development California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Dear Mr. Millar: As you are aware, Clean

More information

From: Laura Manz, Vice President of Market & Infrastructure Development

From: Laura Manz, Vice President of Market & Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional

More information

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision

More information

Integrated Resource Planning April 20, 2010

Integrated Resource Planning April 20, 2010 Integrated Resource Planning April 20, 2010 Judy Stokey, Executive Government and External Affairs Jack McGinley, Development Director, Renewables Gary Smith, Project Director-Smart Technologies Presentation

More information

Western Interconnection

Western Interconnection Transmission Planning in the Western Interconnection Supporting Resource Development NWCC/NCSL Transmission Policy Institute Byron Woertz, Senior Project Manager Denver, CO June 17, 2010 Overview A Few

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

North Gila-Imperial Valley #2 Transmission Project

North Gila-Imperial Valley #2 Transmission Project North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------

More information

ATC Zone 2 Projects Update U.P. Energy Summit

ATC Zone 2 Projects Update U.P. Energy Summit ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

Mocuba The First Utility Scale PV Project in Mozambique

Mocuba The First Utility Scale PV Project in Mozambique Scatec Solar ASA Mocuba The First Utility Scale PV Project in Mozambique October 26th, 2017 Scatec Solar - Integrated Independent Power Producer Scatec Solar develops, builds, owns & operates solar plants

More information

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities

More information

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: New 240 kv Montana Alberta Tie Ltd. (MATL) Substation 120S and Reconfigure 240kV Transmission Line 923L AltaLink Management Ltd. 2611 3 rd

More information

Rocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER

Rocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Rocky Mountain Power Docket No. 17-035-36 Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Kelcey A. Brown August 2017 1 2 3 4

More information

Q44 Generation Interconnection

Q44 Generation Interconnection A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,

More information

1200 West 7th Street, Los Angeles, CA Smart.

1200 West 7th Street, Los Angeles, CA Smart. Overview 1200 West 7th Street, Los Angeles, CA 90017 West 7 Center is conveniently located at 1200 West 7th Street in downtown Los Angeles near the 10 and 110 freeway. This tier III datacenter facility

More information

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

Entergy Arkansas, Inc. Transition Plan Technical Conference #1 Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues

More information

Mountain West Transmission Group. WECC MIC Update October 17, 2017

Mountain West Transmission Group. WECC MIC Update October 17, 2017 Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re The Narragansett Electric Company : : Docket No. SB-2017-01 () : Pre-Filed Testimony of Daniel Ewan, Clear River Energy

More information

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is

More information

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017 2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP

More information

Public Service Company of New Mexico

Public Service Company of New Mexico Public Service Company of New Mexico Open Transmission Planning Meeting November 2, 2017 Albuquerque, NM INTRODUCTION Public Stakeholder Meeting Order 890 Objective to improve transparency and stakeholder

More information

New England Telehealth Consortium. Healthcare Connect Fund Network Plan

New England Telehealth Consortium. Healthcare Connect Fund Network Plan New England Telehealth Consortium Healthcare Connect Fund Consortium Overview The (NETC) is a regional healthcare consortium developed in 2007 in response to the creation of the FCC s Rural Health Care

More information

Northeast Coordinated System Plan and Other Interregional Activities

Northeast Coordinated System Plan and Other Interregional Activities Northeast Coordinated System Plan and Other Interregional Activities IPSAC10 November 6, 2009 Michael I. Henderson and John Buechler Background on Interregional Planning Order 890 requires regional coordination

More information

Presentation to Local/State/Federal Agency Mtg November 10, 2015

Presentation to Local/State/Federal Agency Mtg November 10, 2015 Presentation to Local/State/Federal Agency Mtg November 10, 2015 Summary Proposed 114 mile 500 kv transmission project that will connect with Delaney Substation near Palo Verde Nuclear Generating Station,

More information

Corridor Management Committee. January 12, 2017

Corridor Management Committee. January 12, 2017 Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major

More information

LADWP POWER INFRASTRUCTURE PLAN

LADWP POWER INFRASTRUCTURE PLAN LADWP 2017-18 POWER INFRASTRUCTURE PLAN Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million

More information

Kent Wind Energy Networking Event. Wednesday 26 th September

Kent Wind Energy Networking Event. Wednesday 26 th September Kent Wind Energy Networking Event Wednesday 26 th September Consortium partners Dong Energy is a leading offshore wind developer, having built around half of all offshore wind farms globally. (50%) E.ON

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2016 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2017 Introduction The

More information

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L September 15, 2017 Alberta Utilities Commission Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L Proceeding 22769 Application

More information

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application Decision 2014-039 Dawes Substation and Telecommunications Tower Project Facility Application February 19, 2014 The Alberta Utilities Commission Decision 2014-039: Dawes Substation and Telecommunications

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: January 30, 2019 Re: Decision on

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Expanding Transmission Capacity: Options and Implications. What role does renewable energy play in driving transmission expansion?

Expanding Transmission Capacity: Options and Implications. What role does renewable energy play in driving transmission expansion? Expanding Transmission Capacity: Options and Implications What role does renewable energy play in driving transmission expansion? Beth Soholt Director, Wind on the Wires bsoholt@windonthewires.org Office:

More information

TSR A & B - FACILITIES STUDY REPORT

TSR A & B - FACILITIES STUDY REPORT TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345

More information

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures APPENDIX A COLSTRIP TRANSMISSION SYSTEM TRANSMISSION SERVICE AND INTERCONNECTION PROCESSES AND PROCEDURES Colstrip Transmission System Transmission Service and Interconnection Processes and Procedures

More information

Owner/Operator Forum 12 December

Owner/Operator Forum 12 December Owner/Operator Forum 12 December Steve Halsey DG Development Manager Today s Agenda Transition to DSO Breakout session What we do the role of the DNO Our vision Welcome and Introduction (DNO) Distribution

More information

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission

More information

Progress Report on the GCC Electricity Grid Interconnection in the Middle East

Progress Report on the GCC Electricity Grid Interconnection in the Middle East GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY Progress Report on the GCC Electricity Grid Interconnection in the Middle East by: Adnan Al-Mohaisen, GM, GCCIA Luc Chausse, Project Director, SNC-Lavalin

More information

Warrenton Wheeler Gainesville 230kV Reliability Project

Warrenton Wheeler Gainesville 230kV Reliability Project Warrenton Wheeler Gainesville 230kV Reliability Project February 28, 2013 Key Messages Dominion Virginia Power and Northern Virginia Electric Cooperative (NOVEC) have been working together to address three

More information

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION In the Matter of the Application of Getty Wind Company, LLC for a Site Permit for a Large Wind Energy Conversion System in Stearns County, Minnesota In the

More information

Appendix F Notices

Appendix F  Notices Appendix F Email Notices 2015 2016 Scoping Period From: Sent: To: Subject: CoSu Line Project on behalf of CoSu Line Project Friday, December

More information

Silicon Valley Power:

Silicon Valley Power: Critical Facilities Roundtable Silicon Valley Power: Santa Clara s Hometown Advantage John Roukema Assistant Director Silicon Valley Power June 2, 2006 1 SVP: Santa Clara s Hometown Advantage High value

More information

More Power to the Future. Frank Lambert VP Chapters IEEE PES Switchgear Committee October, 2017

More Power to the Future. Frank Lambert VP Chapters IEEE PES Switchgear Committee October, 2017 1 More Power to the Future Frank Lambert VP Chapters IEEE PES Switchgear Committee October, 2017 IEEE 420,000+ members Founded 1963 PES Governing Board includes Vice Presidents which oversee IEEE PES 37,000+

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2015 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2016 Introduction The

More information

13174/15 AT/tl 1 DGE 2B

13174/15 AT/tl 1 DGE 2B Council of the European Union Brussels, 6 November 2015 (OR. en) 13174/15 ER 359 COEST 325 RELEX 833 INFORMATION NOTE From: General Secretariat of the Council To: Delegations Subject: External energy relations

More information

GSA Renewable Energy Purchasing Update

GSA Renewable Energy Purchasing Update U.S. General Services Administration Northwest/Arctic Region GSA Renewable Energy Purchasing Update Indian Country Energy & Infrastructure Working Group George Northcroft, Regional Administrator & GSA

More information

API Best Practices and Standards. Glen Benge

API Best Practices and Standards. Glen Benge API Best Practices and Standards Glen Benge 1 Topics API History API Standards and Standards Development API HF related standards and publications Use of API Standards Conclusions 2 API History 1919: API

More information

This report is printed on recycled paper

This report is printed on recycled paper This 2015 Integrated Resource Plan Update Report is based upon the best available information at the time of preparation. The IRP action plan will be implemented as described herein, but is subject to

More information

COMPANY PROFILE

COMPANY PROFILE COMPANY PROFILE www.khweza.co.za Introduction Khweza Imikhono Khweza Imikhono (Pty) Limited is a black woman-owned company which operates in the area of infrastructure expansion projects. The company implements

More information

Nextgen Group Overview Destination Digital-Geraldton. 16 th October 2013

Nextgen Group Overview Destination Digital-Geraldton. 16 th October 2013 Nextgen Group Overview Destination Digital-Geraldton 16 th October 2013 WHAT WE DO We transport, house and secure critical data for Australian industry and government CORE BUSINESS STRATEGY Specialised

More information

6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $

6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $ 1 Windstorm Power Ltd. 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 1 2 Canadian Wind Park 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 2 3 (40 Nordex N80 2.5 MW turbines) 0 days $0 0 days

More information

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES PROOF OF SERVICE NOTICE TO COMMUNITY ORGANIZATIONS PUBLIC NOTICE NOTICE IN UTILITY BILLS NOTICE OF OWNERS OF PROPERTY

More information

EXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Western States Power Crisis EPRI White Paper - An Overview -

Western States Power Crisis EPRI White Paper - An Overview - Western States Power Crisis EPRI White Paper - An Overview - Dejan J. Sobajic July, 2001 Western States Power Crisis.1 Origins of the White Paper The roots of the document go back to several discussions

More information

American Transmission Company U.P. Energy Summit

American Transmission Company U.P. Energy Summit American Transmission Company U.P. Energy Summit John Flynn Vice President Strategic Planning & Business Development October 26, 2011 Helping to keep the lights on, businesses running and communities strong

More information

GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY

GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY INTERCONNECTION PROJECT PHASE I STATUS & DEVELOPMENTS By: Adnan I. Al-Mohaisen - CEO Introduction Established in July 2001 by a Royal Decree No. M/21.

More information

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB)

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Asian Development Bank Project Number: 2974-GEO Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Bi-Annual Land Acquisition and Resettlement Plan, November 2013

More information

Grid Interconnection of Renewable Generation

Grid Interconnection of Renewable Generation Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

The EU OPEN meter project

The EU OPEN meter project Open Public Extended Network ing 7 TH FRAMEWORK PROGRAMME The EU project ERGEG workshop on Smart Metering Authors: Date: Nicolas Arcauz 14th December 2009, Brussels ENERGY 2008.7.1.1 Official Journal of

More information

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT: BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design

More information

Transmission Planning Update. Board Meeting August 18, 2010 Jeffrey Miller/Marv Landauer

Transmission Planning Update. Board Meeting August 18, 2010 Jeffrey Miller/Marv Landauer Transmission Planning Update Board Meeting August 18, 2010 Jeffrey Miller/Marv Landauer 1 Contents 2010 System Assessment 2011 Biennial Transmission Expansion Plan Northwest Area Coordinator Study Team

More information

VERIZON TELEPHONE COMPANIES TARIFF FCC NO.

VERIZON TELEPHONE COMPANIES TARIFF FCC NO. Director-Tariffs 1st Revised Page 19-1 600 Hidden Ridge Cancels Original Page 19-1 Irving, Texas 75038 Issued: September 28, 2001 Effective: October 13, 2001 1 (A) INTERCONNECTION BETWEEN COLLOCATED SPACES

More information

Modeling and Simulation in XENDEE

Modeling and Simulation in XENDEE Modeling and Simulation in XENDEE IEEE 34 Node Test Feeder Shammya Saha Graduate Research Assistant Electrical Engineering Ira A. Fulton School of Engineering Arizona State University shammya.saha@asu.edu

More information

345kV Transmission Line Thermal Uprating Using Connector Shunts

345kV Transmission Line Thermal Uprating Using Connector Shunts 345kV Transmission Line Thermal Uprating Using Connector Shunts Douglas P. Harms, P.E. Sr. Consulting Engineer Transmission Engineering CenterPoint Energy (Ret.) Presented At The 46 th Annual Transmission

More information

POWER INFRASTRUCTURE PLAN 2016

POWER INFRASTRUCTURE PLAN 2016 POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people

More information

Community Update. May 31, 2011

Community Update. May 31, 2011 Community Update May 31, 2011 Presented to: Leaside Community Presented by: Honourable Kathleen Wynne, Minister of Transportation Councillor Karen Stintz, Chair, Toronto Transit Commission Eglinton-Scarborough

More information

March 4, Mona Substation Line position & assoc relaying, communications & metering

March 4, Mona Substation Line position & assoc relaying, communications & metering 700 N.E. Multnomah, Suite 550 Portland, OR 97232 March 4, 2004 Merrill Brimhall PacifiCorp Merchant 201 South Main, Suite 2200 Salt Lake City, Utah 84111 Dear Mr. Brimhall: PacifiCorp Transmission Systems

More information

Dealing With a Disaster and Its Effect on the Utility Operation

Dealing With a Disaster and Its Effect on the Utility Operation Nashville Electric Service Dealing With a Disaster and Its Effect on the Utility Operation UTA Fall Conference Florence, Alabama October 12-14, 2011 Outline Who We Are Typical Emergency Response Challenges

More information

BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER

BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER Contact: Joe Verkennes, Director of Marketing, (734) 384-4207 January 24, 2011 FOR IMMEDIATE RELEASE BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER MONROE, Mich. At its

More information

Update from the European Audiovisual Observatory

Update from the European Audiovisual Observatory 0 Update from the European Audiovisual Observatory EPRA meeting Vienna, 11-13 October 2017 Maja Cappello Head of the Department for Legal Information Overview 1 1. The latest from the organisation 2. Market

More information

WIND. Representing clients across the renewable energy industry. Troutman Sanders LLP. troutman.com

WIND. Representing clients across the renewable energy industry. Troutman Sanders LLP. troutman.com WIND Representing clients across the renewable energy industry Troutman Sanders renewable energy attorneys offer innovative legal solutions to help clients succeed in the wind energy industry. Our deep

More information

Mountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration

Mountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group* Basin Electric Power Cooperative (BEPC) Black Hills Energy s three electric

More information

Southeast Florida Regional Climate Change Compact Update. Broward Climate Change Task Force February 16, 2017

Southeast Florida Regional Climate Change Compact Update. Broward Climate Change Task Force February 16, 2017 Southeast Florida Regional Climate Change Compact Update Broward Climate Change Task Force February 16, 2017 Overview Recent Activities RCAP Update Forthcoming Efforts Regional Resilience Projects Summit

More information

DOE Initiatives in the U.S. Transmission Sector

DOE Initiatives in the U.S. Transmission Sector DOE Initiatives in the U.S. Transmission Sector David Meyer Senior Advisor Office of Electricity Delivery and Energy Reliability Northeast Power Coordinating Council 2009 Annual Meeting Three Topics Today

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection

More information

Specific topics covered in this brief include:

Specific topics covered in this brief include: April 2008 Summary Welcome to the Fifteenth National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 28, 2008, Transmission Update conference

More information

Benbow 397S Substation Upgrade Needs Identification Document

Benbow 397S Substation Upgrade Needs Identification Document APPENDIX C AESO PIP Benbow 397S Substation Upgrade Needs Identification Document 1.0 Participant Involvement Program (PIP) From June to December 2015, the AESO conducted a Participant Involvement Program

More information

ART CENTER AND SATELLITE PLANT

ART CENTER AND SATELLITE PLANT CSU The California State University Office of Audit and Advisory Services CONSTRUCTION California State University, Bakersfield ART CENTER AND SATELLITE PLANT Audit Report 15-09 May 7, 2015 EXECUTIVE SUMMARY

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

MISO PJM Joint and Common Market Cross Border Transmission Planning

MISO PJM Joint and Common Market Cross Border Transmission Planning MISO PJM Joint and Common Market Cross Border Transmission Planning May 30, 2018 1 Coordinated System Plan Study 2 Using information from the March 30 Annual Issues Review, the JRPC has decided to perform

More information