Full Network Model Scope for FNM DB2017Q4
|
|
- Easter Armstrong
- 6 years ago
- Views:
Transcription
1 Transmission Projects PG&E SCE 1. Cooley Landing BK2, 115/60 kv Transformer Replacement (Formerly Resource ID P.07237), phase # 1 2. Cortina #3 60kV Line Reconductoring, phase # 1 3. Dyer Summit Wind Repower Generation Interconnection 4. ESSEX JUNCT SUB-REPL 60KV CB Evergreen Sub Upgrade Project 6. Helm-Kerman 70 kv Line Reconductor (Resource ID formerly P.05765/P.10530) 7. Kearney-Caruthers 70 kv Line Reconductor 8. Phelps Solar Generation Interconnection 9. Ravenswood-Cooley Landing 115kV reconductoring (Resource ID was formerly T1040), phase # Sanger- convert 115KV Bus to BAAH + 2 MPAC, remove BK 2 from service, phase # Santa Nella: Install 70kV SCADA SWS 12. Sobrante: Add 2 Bus Sectnlzng 115kV CBs, phase # Support Distribution Install Cottle BK Warnerville-Wilson Series reactors 1. City Moreno Valley 115 kv Interconnection Project 2. Johanna 1A bank 3. Lugo-Victorville 500 kv T/L RAS Phase 2 4. Vincent Sub 500kV CB722 Replacement SDGE 1. CNF MSUP and Power Line Replacements, phase # 4 2. Generation Interconnection (Q137, Q189, & Encina 5 repower) VEA None External 1. AESO: Model updates for the DB2017Q4 Model 2. AVA: Model updates for the DB2017Q4 Model 3. AZPS: Model updates for the DB2017Q4 Model 4. BANC: Model updates for the DB2017Q4 Model 5. BCHA: Model updates for the DB2017Q4 Model 6. BPAT: Model updates for the DB2017Q4 Model 7. CEN: Model updates for the DB2017Q4 Model 8. EPE: Model updates for the DB2017Q4 Model 9. IPCO: Model updates for the DB2017Q4 Model 10. LDWP: Model updates for the DB2017Q4 Model 11. NEVP: Model updates for the DB2017Q4 Model 12. NWMT: Model updates for the DB2017Q4 Model 13. PACE: Model updates for the DB2017Q4 Model 14. PACW: Model updates for the DB2017Q4 Model 15. PGE: Model updates for the DB2017Q4 Model 16. PNM: Model updates for the DB2017Q4 Model California ISO Public Page 1 of 5
2 17. PSCO: Model updates for the DB2017Q4 Model 18. PSEI: Model updates for the DB2017Q4 Model 19. SCL: Model updates for the DB2017Q4 Model 20. SRP: Model updates for the DB2017Q4 Model 21. TEPC: Model updates for the DB2017Q4 Model 22. TPWR: Model updates for the DB2017Q4 Model 23. WACM: Model updates for the DB2017Q4 Model 24. WALC: Model updates for the DB2017Q4 Model 25. WAUW: Model updates for the DB2017Q4 Model California ISO Public Page 2 of 5
3 Generation Projects 1. Madera Digester Genset 2 Capacity: 0.8 MW RES_ID: DAIRLD_1_MD2BM1 POD: Dairyland 115kV Bus 2. Weststar Dairy Biogas RES_ID: GANSO_1_WSTBM1 POD: Ganso 115kV Bus 3. Lone Oak 2 Digester Capacity: 1.1 MW RES_ID: MCMULN_2_LO2BM1 POD: McMullin 230kV Bus 4. CES Dairy Biogas RES_ID: OLDRIV_6_CESDBM POD: Old River 70kV Bus 5. Lakeview Dairy Biogas RES_ID: OLDRIV_6_LKVBM1 POD: Old River 70kV Bus 6. Open Sky Digester Genset 2 Capacity: 0.8 MW RES_ID: SCHNDR_1_OS2BM2 POD: Schindler 115kV Bus 7. SP PVUSA Solar Farm Capacity: 12 MW RES_ID: SPVUSA_1_SPVSB1 POD: Woodland-Davis 115kV Line at Pole 008/ Difwind Capacity: 7.9 MW RES_ID: GARNET_2_DIFWD1 POD: Devers 230kV Bus 9. Wintec Palm Capacity: 6 MW California ISO Public Page 3 of 5
4 RES_ID: GARNET_2_WPMWD6 POD: Devers 230kV Bus 10. Gaskell West 1 Capacity: 20 MW RES_ID: GASKW1_2_GW1SR1 POD: Whirlwind 230kV Bus 11. Kramer Junction 5 Capacity: 30 MW RES_ID: KRAMER_1_KJ5SR5 POD: Kramer 115kV Bus 12. Green Beanworks C Capacity: 3 MW RES_ID: LITLRK_6_GBCSR1 POD: Antelope 66kV Bus 13. Green Beanworks D Capacity: 3 MW RES_ID: OASIS_6_GBDSR4 POD: Antelope 66kV Bus 14. Ramona Solar Energy Capacity: 4.4 MW RES_ID: CRELMN_6_RAMSR3 POD: Creelman 69kV Bus 15. Vista Energy Storage Capacity: 40/-40 MW RES_ID: VSTAES_6_VESBT1 POD: Melrose 69kV Bus 16. Bakersfield Industrial 1 RES_ID: MAGUND_1_BKISR1 POD: Magunden 115kV Bus 17. Bakersfield Solar 1 Capacity: 5.25 MW RES_ID: MAGUND_1_BKSSR2 POD: Magunden 115kV Bus 18. Manteca Land 1 RES_ID: MANTEC_1_ML1SR1 California ISO Public Page 4 of 5
5 POD: Manteca 115kV Bus 19. Delano Land 1 RES_ID: SMYRNA_1_DL1SR1 POD: Smyrna 115kV Bus 20. ONeill Pump-Gen Increase EMS PMax from 12.6 MW to 25.2 MW Capacity: 25.2 MW Aggregated RES_ID: ONLLPP_6_UNITS Child RES_IDs: ONLLPP_6_UNIT 1 (4.2 MW) ONLLPP_6_UNIT 2 (4.2 MW) ONLLPP_6_UNIT 3 (4.2 MW) ONLLPP_6_UNIT 4 (4.2 MW) ONLLPP_6_UNIT 5 (4.2 MW) ONLLPP_6_UNIT 6 (4.2 MW) 21. Wheelabrator Shasta QF Conversion Capacity: 63 MW RES_ID: WSENGY_1_UNIT 1 POD: Cottonwood-Panorama 115kV Line at Pole 2/6A 22. MMC Escondido Aggregate Decrease EMS PMax from 53 MW to 49.5 MW Capacity: 49.5 MW RES_ID: ESCNDO_6_PL1X2 23. Jacumba Solar Farm Decrease EMS PMax from 30 MW to 19.7 MW Capacity: 19.7 MW RES_ID: JACMSR_1_JACSR1 24. GAS RECOVERY SYS. (COYOTE CANYON) Generation Termination Capacity: 27.5 MW RES_ID: SANTGO_6_COYOTE 25. KEARNY GAS TURBINE UNIT 1 Generation Termination Capacity: 17.5 MW RES_ID: KEARNY_7_KY1 26. KEARNY GT2 AGGREGATE Generation Termination Capacity: 72 MW Aggregated RES_ID: KEARNY_7_KY2 Child RES_IDs: KEARNY_7_KY2A (18 MW) KEARNY_7_KY2B (18 MW) KEARNY_7_KY2C (18 MW) KEARNY_7_KY2D (18 MW) California ISO Public Page 5 of 5
Updates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (JANUARY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (APRIL 2017) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationOpening. 2013/2014 Transmission Planning Process Stakeholder Meeting. Tom Cuccia Sr. Stakeholder Engagement and Policy Specialist November 20-21, 2013
Opening 2013/2014 Transmission Planning Process Stakeholder Meeting Tom Cuccia Sr. Stakeholder Engagement and Policy Specialist November 20-21, 2013 Yesterday s Agenda November 20 th Topic Opening Introduction
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (JANUARY 2017) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision
More informationDecision on the 2012/2013 ISO Transmission Plan
Decision on the 2012/2013 ISO Transmission Plan Neil Millar Executive Director, Infrastructure Development Board of Governors Meeting General Session March 20-21, 2013 Approving the plan means approving
More information2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012
2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Agenda Introduction 2012 Grid Assessment
More informationFebruary 25, Subject: Southern California Edison 2015 Annual Progress Report
February 25, 2015 Mr. Tracy Rolstad, Chair WECC Technical Studies Subcommittee Avista Corp. 1411 East Mission Avenue Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff Salt Lake City, UT 84103-1114
More informationJanuary 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California
More informationQuarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan
Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability
More informationUpdates and Modifications to Report
QUARTERLY COMPLIANCE REPORT (APRIL 2011) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS Pursuant to Commission Decision ( D. ) 06-09-003, SCE hereby provides
More informationGrid Modernization at SDG&E
Grid Modernization at SDG&E Ali Yari Director, Electric Grid Operations 2017 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E Service Territory Subsidiary of Sempra
More informationMemorandum. This memorandum requires Committee action.
California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure
More informationTable of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure
No. 3140 Table of Contents Purpose... 2 Responsibilities... 2 2. Scope/Applicability... 4 2.1 Background... 4 2.2 Scope / Applicability... 4 3. Detail... 5 3.1... 5 Introduction... 5 3.2 Data Specification
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) )
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) for a Permit to Construct Electrical Facilities: Leatherneck
More informationPG&E 500 kv Protection Standard Design and Development
PG&E 500 kv Protection Standard Design and Development Davis Erwin, Rafael Pineda, and Monica Anderson Pacific Gas and Electric Company Eric Udren Quanta Technology, LLC Jordan Bell and Neal Jones Schweitzer
More informationLADWP POWER INFRASTRUCTURE PLAN
LADWP 2017-18 POWER INFRASTRUCTURE PLAN Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million
More informationFrom: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationPurpose: To demonstrate DTS navigation and Island creation/control. DTS Practice Exercise
1 Dispatch Training Simulator - Worksheet Name: Date: Purpose: To demonstrate DTS navigation and Island creation/control. 1. DTS Status: DTS Practice Exercise Selecting the DTS (purple) button will display
More informationSilicon Valley Power:
Critical Facilities Roundtable Silicon Valley Power: Santa Clara s Hometown Advantage John Roukema Assistant Director Silicon Valley Power June 2, 2006 1 SVP: Santa Clara s Hometown Advantage High value
More informationInterconnection and Transmission
Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection
More informationISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO
ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call
More information2015 General Rate Case
Application No.: Exhibit No.: Witnesses: A.1--00 SCE-0, Vol. 0 R. Woods E. Takayesu (U -E) 01 General Rate Case ERRATA Transmission and Distribution (T&D) Volume System Planning Capital Projects Before
More informationJoint Transmission Planning Base Case Preparation Process
California Independent System Operator & Southern California Edison Joint Transmission Planning Base Case Preparation Process NERC Reliability Standard MOD-032-1 Version 1.2 August 31, 2017 INTENTIONALLY
More informationResource Interconnection Management System (RIMS) Quick Start Guide
Resource Interconnection Management System (RIMS) Quick Start Guide New Resource Implementation (NRI) Starting a New Project, Document Submission, and Project Information Updates for: Solar Wind/Wind Repower
More informationSDG&E s Accomplishments and Future Plans
SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego
More informationLocal Area Studies Update - PACW Kevin Putnam
Transmission Planning Attachment K Q5 Public Input Meeting Local Area Studies Update - PACW Kevin Putnam March 23, 2017 Hermiston-Pendleton-Enterprise Study Finding Report Jerry Vang PAGE 3 Hermiston-Pendleton
More informationWestern DSW Planning St k er eeti ting (Western OATT Attachment P) June 9, 2011
Western DSW Planning Stakeholder Meeting (Western OATT Attachment P) June 9, 2011 Agenda: 1. Welcome and Introductions of Attendees 2. Planning Process 3. Interconnection Requests 4. Comments/questions
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationPhasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005
Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated
More informationDispatch Training Simulator Worksheet
Dispatch Training Simulator Worksheet Name: Date: Purpose: To demonstrate DTS navigation and Island creation/control. 1. DTS Status: Selecting the DTS (purple) button will display the DTS Status: 2. Overview
More informationBusiness Update. Al Fohrer Chief Executive Officer Southern California Edison Company. Merrill Lynch Power & Gas Conference September 2006
Business Update Al Fohrer Chief Executive Officer Southern California Edison Company Merrill Lynch Power & Gas Conference September 2006 Forward-Looking Statement This presentation contains forward-looking
More informationOctober 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way
California Independent System Operator October 30, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent
More informationContingency Modeling Enhancements Prototype Analysis with Production Cases
August 17, 2017 Table of contents 1. Executive summary... 4 2. Purpose... 4 3. Analysis of stressed system scenarios... 5 Methodology... 5 Non-binding scenarios... 6 Binding scenario... 7 Other observations...
More information4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More information2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning
Application No.: Exhibit No.: Witnesses: A.1-0- SCE-0, Vol. 0 R E. Takayesu A (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume R System Planning Before the nd Errata Public Utilities
More informationColstrip Transmission System. Transmission Service and Interconnection Processes and Procedures
APPENDIX A COLSTRIP TRANSMISSION SYSTEM TRANSMISSION SERVICE AND INTERCONNECTION PROCESSES AND PROCEDURES Colstrip Transmission System Transmission Service and Interconnection Processes and Procedures
More informationINTERCONNECTION FACILITIES STUDY REPORT
Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
More informationDeveloping a Solar Project March 24, 2015
Developing a Solar Project March 24, 2015 Iberdrola Renewables, LLC A collection of exceptional assets #2 owner of wind projects in the U.S. with more than 5.7 GWs owned and contracted US Renewables $9.5
More informationTransmission Planning Attachment K Public Input Meeting
Transmission Planning Attachment K Public Input Meeting FERC Order 1000, 2018-19 Biennial Planning Cycle Quarter 2 Meeting June 14, 2018 PAGE 2 Agenda Pacific Time Topic Presenter 9:00 9:05 Greetings and
More informationTRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES October 16, 2014 Meeting from the ISO Headquarters Folsom, California
TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES October 16, 2014 Meeting from the ISO Headquarters Folsom, California Steve Rutty, Acting Chairperson of the Transmission Maintenance Coordination
More informationSmall Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662
Small Generator Interconnection Tier 4 Facilities Study Report Completed for ( Interconnection Customer ) A Qualifying Facility Q0662 Proposed Interconnection Klamath Falls-Fishhole 69 kv line at approximately
More informationTSR A & B - FACILITIES STUDY REPORT
TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345
More informationChallenges in Realtime Solutions for Power System Reliability. Jim Gotesky Senior System Dispatcher, Pacific Gas & Electric March 26, 2014
Challenges in Realtime Solutions for Power System Reliability Jim Gotesky Senior System Dispatcher, Pacific Gas & Electric March 26, 2014 ... out with the Old We all know the BIG PICTURE motivations for
More informationQ44 Generation Interconnection
A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,
More informationMarket Performance Report December 2015
Market Performance Report December 215 February 1, 216 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationMarket Performance Report January 2016
Market Performance Report January 216 February 29, 216 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance
More informationRevised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )
Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original
More informationTri-State Generation & Transmission Association, Inc.
Tri-State Generation & Transmission Association, Inc. Available Transfer Capability Implementation Document (ATCID) Determination and Posting of Total Transfer Capability (TTC) and Available Transfer Capability
More informationSMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM
SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM 1. Instructions By completing this request form, an Interconnection Customer may request a preapplication report from the NYISO regarding the
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ERRATA TO SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) REPLY TO PROTESTS
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) for a Certificate of Public Convenience and Necessity
More informationELECTRIC SYSTEM. Rain or Shine LOVE IS LIKE A KITE By Alan League
CIP_2015 Title Pages 2016:Layout 1 6/19/15 11:24 AM Page 16 ELECTRIC SYSTEM Rain or Shine LOVE IS LIKE A KITE By Alan League Description 1 Local Generation Repowering Project - Phase II (3194) 131,886,388
More informationReliability Coordinator Procedure
No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...
More informationPower and Telecommunications
Project for Formulation of Comprehensive Development Master Plan in the Mombasa Gate City in Republic of Kenya Working Group Power and Telecommunications Power Sector Current Conditions MoEP, ERC, Kengen,
More informationPOWER INFRASTRUCTURE PLAN 2016
POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people
More informationKarl Iliev, San Diego Gas & Electric Company
INTEGRATING DER THROUGH DISTRIBUTION SYNCROPHASORS Karl Iliev, San Diego Gas & Electric Company 2002 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights
More informationSDG&E s EPIC Demonstration Projects on Emerging Communication Standards. IEC Europe 2017 Conference. Frank Goodman, SDG&E EPIC Program Manager
SDG&E s EPIC Demonstration Projects on Emerging Communication Standards Frank Goodman, SDG&E EPIC Program Manager IEC 61850 Europe 2017 Conference September 26-28, 2017 2017 San Diego Gas & Electric Company.
More informationSection 10 of BPM for TPP- Generator modeling webinar
Section 10 of BPM for TPP- Generator modeling webinar Songzhe Zhu, Irina Green, Riddhi Ray, Mudita Suri Market and Infrastructure Development September 11, 2018 Presentation overview Overview of PRR 1067
More informationWind Plant Systems Grid Integration Plant and Turbine Controls SCADA
GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/
More informationAchieving Smarter Grid Operation With On-Line DSA Technology
Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of
More informationENTERPRISE ZONE - FTZ SERVICE AREA - POTENTIAL CITY/STATE INCENTIVES
FOR SALE LAND 226.83 ACRES at GURLER & PEACE DEKALB, IL > $39,900 per acre ENTERPRISE ZONE - FTZ SERVICE AREA - POTENTIAL CITY/STATE INCENTIVES Bethany Rd Peace Rd ADT 16,000 226.83 Acres 2.5 miles Peace
More informationAPI ANALYSIS.
2011-2012 API ANALYSIS www.aspirepublicschools.org Aspire serves 12,500 students in 34 schools across CA Bay Area Oakland Aspire Berkeley Maynard Academy (K-8) Aspire California College Preparatory Academy
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More informationSmall Generator Interconnection System Impact Study Report. Completed For Q0047
Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection
More informationTri-State Generation & Transmission Association, Inc.
Tri-State Generation & Transmission Association, Inc. Available Transfer Capability Implementation Document (ATCID) Determination and Posting of Total Transfer Capability (TTC) and Available Transfer Capability
More information_ Dear Secretary Bose: The attached. Folsom, CA
California Independent System Operator June 29, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System
More informationFeasibility Study on Load Flow and Short Circuit Project
Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November
More informationGenerator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281
Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection
More informationCopyright 2013 OSIsoft, LLC. 1
1 Industry Benefits and Trends of "PI" for Utilities Presented by Ann Moore, OSIsoft, LLC PI System for Transmission 3 California ISO On the front Lines of the Power Grid - New York Times, October 2011
More informationEnergy Security: A Global Challenge
A presentation from the 2009 Topical Symposium: Energy Security: A Global Challenge Hosted by: The Institute for National Strategic Studies of The National Defense University 29-30 September 2009 By SCOTT
More informationPower System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017
Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability
More informationSummary. Registration RULE 21 ONLINE PORTAL PILOT PG&E CONTACT DETAILS
PG&E Interconnection Portal Contents List Summary... 1 Registration... 1 Account Details... 2 Starting a New Application... 3 Select Program... 3 Enter Generators... 4 Form Builder... 5 Tab Options...
More information2012 General Rate Case
Application No.: Exhibit No.: SCE-0, Vol. 0 Part 0 & 0, Ch. I-II Witnesses: P. Arons K. Varnell (U -E) 01 General Rate Case Transmission And Distribution Business Unit (TDBU) Volume Part - Transmission
More informationOPF Automation Examples
OPF Automation Examples 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com OPF Automation Examples Standardize settings with Auxiliary
More informationXXXXX XXXX Wind Generation Project
A subsidiary of Pinnacle West Capital Corporation XXXXX XXXX Wind Generation Project XXXX XXXXX XXXXXXX Co., Inc. Interconnection System Impact Study Final Report Prepared By Arizona Public Service Company
More informationCollector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.
Collector System Design Considerations for Wind Farms Sean Carr Ernst Camm S&C Electric Co. 1 Overview Challenges in wind farm collector systems Design considerations for collector systems Summary The
More informationGeneration Interconnection Impact Study Report. For. Interconnection Customer Q0022
Generation Interconnection Impact Study Report For Interconnection Customer Q0022 Prepared by: PacifiCorp Date: 10/29/2003 Generation Interconnection System Impact Study Report Interconnection Customer
More informationThe Water, Energy, & Communications Nexus
California Water Service October 2nd, 2016 Quality. Service. Value. The Water, Energy, & Communications Nexus Quality. Service. Value. 1 California Water Service Co. (Cal Water) Established in 1926 Largest
More informationDominion Supplemental Projects
Dominion Supplemental Projects Transmission Expansion Advisory Committee October 11, 2018 Needs Need Number: DOM-2018-0017 Meeting Date: 10/11/2018 Process Stage: NEED Supplemental Project Driver: Customer
More informationAdvanced SIPS using PMU and SCADA data
Advanced SIPS using and SCADA data June 3, 2013 Yutaka Kokai Hitachi America, Ltd. Hitachi, Ltd. 2013. All rights reserved. Hitachi Group s Industry Segments Copy Right Hitachi, Ltd. 2013. All rights reserved.
More informationICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
102904-ICX-CMOS-E-2006 Electrical / I&C Engineer Holds a B. Sc. in Electronics & Electrical Communications Engineering and has over 9 years hands-on experience working in I&C field. Has extensive experience
More informationPower Infrastructure Plan
Power Infrastructure Plan 2015 Introduction Background LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4
More informationTransWest Express Transmission Project Interregional Transmission Project Submittal
TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March
More informationUsing CIM-IEC Harmonization for Detailed Data Modeling
Using CIM-IEC 61850 Harmonization for Detailed Data Modeling Ralph Mackiewicz SISCO, Inc. 2 June 2015 CIM Users Group Gdynia, Poland 1-4, June 2015 Agenda Review of the CIM IEC 61850 Harmonization activities
More informationSub Regional RTEP Committee Mid-Atlantic
Sub Regional RTEP Committee Mid-Atlantic October 27, 2010 2010 RTEP Baseline Analysis Update Potential loss of load exceeding 300 MW for the loss of the Smithburg Englishtown 230 kv and Raritan River Deep
More informationCost of Electricity (CoE)
Cost of Electricity (CoE) Cost reduction Road to 40% reduction in CoE 2 June 2014 Christian Juul For External usage Reduction in cost is essential to make offshore wind competitive and reduce dependency
More informationSRP Ten Year Transmission Plan
2018 SRP Ten Year Transmission Plan 2018-2027 Prepared for the Arizona Corporation Commission January 2018 Docket No. E-00000D-17-0001 Page1 Page1 Table of Contents 1. Introduction... 1 2. Planning Organizations...
More informationSmall Hydro Regulatory and Permitting Requirements California
Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator
More informationBenbow 397S Substation Upgrade Needs Identification Document
APPENDIX C AESO PIP Benbow 397S Substation Upgrade Needs Identification Document 1.0 Participant Involvement Program (PIP) From June to December 2015, the AESO conducted a Participant Involvement Program
More informationGrid Operations and Reliability Monitoring/Analysis at American Transmission Company
1 Grid Operations and Reliability Monitoring/Analysis at American Transmission Company Presented by Jim Kleitsch Principal System Operations Engineer Discussion Topics ATC Company Overview ATC Grid Operations
More informationSmall Generator Interconnection System Impact Study Report. Completed for Q0373
Small Generator Interconnection Completed for Q0373 Proposed Interconnection To the Existing Q0006 500kV substation on the 13.8kV side of the bus July 7, 2011 TABLE OF CONTENTS 1.0 DESCRIPTION OF THE GENERATING
More informationCAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012
CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of
More informationPacifiCorp Transmission Technical Workshop
PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt
More information2018 General Rate Case
Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 0 Witnesses: M. Flores B. Tolentino A (U -E) 01 General Rate Case ERRATA Transmission & Distribution (T&D) Volume 0 Substation Construction & Maintenance
More informationUPDATES EPC Contract Signed August 2017
ACO SOLAR HV BOP PROJECT NUMBER 2655 Convalt Energy LLC MOEE Myanmar Power Generation, Substation UPDATES EPC Contract Signed August 2017 Convalt Energy LLC are developing a 300MW AC solar farm in Myanmar
More informationWelcome and Workshop Opening Ted Reguly, Director Growth and Technology Integration Department SDG&E EPIC Fall Symposium.
Welcome and Workshop Opening Ted Reguly, Director Growth and Technology Integration Department SDG&E 2017 EPIC Fall Symposium October 18, 2017 1 Welcome to the Symposium and San Diego 2 SDG&E EPIC Program
More informationRFP Attachment 13. January 2010
PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt
More informationExhibit to Agenda Item #1a
Exhibit to Agenda Item #1a Sandra Kopp Wednesday, Board Finance September & Audit 28, Committee 2011 Meeting and Special SMUD Board of Directors Meeting Budget 2018 Wednesday,, scheduled to begin at 5:00
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationCopyright 2015, First Solar, Inc.
Copyright 2015, First Solar, Inc. Forward-Looking Statements During the course of this presentation the Company will make projections and other statements that are forward-looking statements within the
More information