November 20, Dear Ms. Crabb:

Size: px
Start display at page:

Download "November 20, Dear Ms. Crabb:"

Transcription

1 November 20, 2018 Ms. Andrea Crabb, PE Director, Department of Residential Facilities University of Maryland 1200 Leonardtown Office Building 4725 Rossborough Lane College Park, Maryland Re: Report of Findings: Post-Remediation Efficacy Assessments University of Maryland - Elkton Hall 3981 Denton Service Lane College Park, MD VERTEX Project Number: Dear Ms. Crabb: The Vertex Companies, Inc. (VERTEX) is pleased to provide this report which presents the observations, conclusions, and recommendations of a limited evaluation of microbial remediation effectiveness in residential units on the 1 st through 5 th floors at the Elkton Hall student dormitory addressed 3981 Denton Service Lane in College Park, Maryland. BACKGROUND INFORMATION It was reported that students began moving in to Elkton Hall between August 24-26, 2018, for the fall semester. Shortly after move-in, some students began reporting suspected microbial growth on furniture such as desks and the backs of beds. Around September 10, 2018, University representatives reportedly began spot cleaning and/or replacing furniture items in a small number of units. During this time weather was unseasonably hot and humid, which is believed to have contributed to the reported conditions. Additionally, there were reports of students moving beds or other belongings in a manner that caused the blockage of airflow to/from the fan coil units. Reports of suspected microbial growth began to increase to the point where spot cleaning/replacement no longer was considered feasible. Remediation contractors Sandow Construction Inc. (Sandow) and Infinity Restoration Inc. (Infinity) were contracted by the University of Maryland (the University) to perform cleaning on a floor-by-floor basis. Additionally, mechanical contractor, WL Gary Companies, Inc., was contracted to perform assessment and cleaning of the fan coil units (FCUs). REMEDIATION ACTIVITES As noted, Sandow and Infinity performed the remediation in the units, with each contractor performing work in one wing of a floor. VERTEX was on-site during remediation activities of floors 1 through 5 and observed engineering controls utilized within the work areas to include 6-mil polyethylene barriers and High Efficiency Particulate Air (HEPA)-filtered air filtering machines to create negative air pressure within the contained spaces. Prior to work being performed on a floor, students were relocated to hotels and THE VERTEX COMPANIES, INC COLUMBIA GATEWAY DRIVE, SUITE 325 COLUMBIA, MARYLAND VERTEXENG.COM

2 University of Maryland Elkton Hall Page 2 all personal belongings, linens, etc. were removed from the Units. It was reported that students were offered off-site cleaning/laundering services of any clothes/personal belongings removed from the units. The units were left for remediation with only University-issued furniture remaining, which included desks, chairs, dressers, refrigerators, bed frames, vinyl blinds, and vinyl-sealed mattresses. The scope of work within each unit included remedial cleaning of the ceiling, walls, entry doors, closet components (folding doors, shelves, pipes, hooks, etc.), blinds, window frame, bed frame/mattress cover, wood trim, furniture (all surfaces, including the insides and undersides of all drawers), FCU internal components (coils, drip pans, pipes, diffuser fins), floors, and chairs. Cleaning was performed via wet-wiping using Shockwave antimicrobial solution, and HEPA-filtered vacuums. It was also reported that the FCUs were being assessed for proper operation including repositioning of temperature sensors, verifying temperature set points and sealing any open chilled water piping penetrations. It should be noted that remediation activities on the 6 th through 8 th floors were performed between September 25 and September 30, 2018, prior to VERTEX s involvement on the project. VERTEX did not perform visual assessment in any units on these floors. METHODOLOGIES The following assessment methods were utilized. Visual Observation Review of the work areas included observation of accessible portions of the work area and remaining building materials for evidence of residual water and/or microbial damage as well as associated remediation engineering controls. VERTEX s inspections included pulling out drawers to assess the inside, underside tops and backs (interior and exterior). POST-REMEDIATION OBSERVATIONS The following schedule identifies the dates that VERTEX was on-site to oversee remediation activities and perform visual assessments: 5 th Floor October 1, th Floor October 4, rd Floor October 5, nd Floor October 9, st Floor October 8, 2018 During each shift VERTEX representatives performed visual assessment of a residential unit and the FCU once VERTEX was notified that the remediation contractors, mechanical contractor, University Student Housing representatives, and University Mechanical Plant staff that remedial cleaning and repairs were complete, and that inspection and approval/certification from the referenced University departments had been issued for both the residential unit and the FCU. Ultimately, University Mechanical Plant staff was unable to perform assessment and certification in a timely manner, and since time was of the essence, VERTEX eventually performed assessment of the FCUs upon notification directly from the mechanical contractor that the FCU work was considered complete. VERTEX utilized a site checklist to ensure that a thorough assessment was performed. If any areas were deemed unsatisfactory and required re-cleaning during the initial assessment, VERTEX informed the respective contractor, and the required cleaning was completed. VERTEX then performed re-inspection to ensure satisfactory completion.

3 University of Maryland Elkton Hall Page 3 Once deemed complete, VERTEX posted a certification note at the door to the unit to inform other contractors and University representatives that the visual assessment was completed and further restoration activities (replacing FCU cover, reconfiguring/arranging furniture, etc.) could be performed. Appendix A includes a complete list of units that were assessed and the date the assessment and certification was completed. Appendix B includes the field checklists. The field checklists were not created until after 5 th floor inspections were completed, therefore there are no checklists for the 5 th floor. It should be noted that VERTEX s visual assessments were limited to residential units and did not include the common areas or associated bathrooms. Assessment also included limited surficial assessment of the Resident Advisor (RA) apartment units located on Floor 1, which were only partially cleared of the occupant s belongings. CONCLUSIONS / RECOMMENDATIONS During the final post-remediation visual inspection, VERTEX did not observe visible microbial contamination, debris, or water damaged materials within the work areas. Based on observations VERTEX concluded that remediation in each work area met established industrial efficacy standards. It is recommended that the source(s) of suspected microbial growth be identified and corrected. LIMITATIONS It should be noted that VERTEX s scope of work was limited to performing visual post-remediation efficacy assessments. VERTEX did not provide any input into developing the scope of work or performing initial assessments within the units. Additionally, VERTEX was not involved in investigating the source of the suspected microbial growth nor potential source correction actions. VERTEX also did not assess any personal belongings that had been removed from the units. VERTEX provided these services consistent with the level and skill ordinarily exercised by members of the profession currently practicing under similar conditions. This statement is in lieu of other statements either expressed or implied. This report is intended for the sole use of The University of Maryland. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document, the findings, conclusions, or recommendations is at the risk of said user. Although a reasonable attempt has been made to identify suspect fungi (mold) in the areas identified, the inspection techniques used are inherently limited in the sense that only full demolition procedures will reveal all building materials of a structure, and therefore, all areas of potential fungal growth. Additionally, the passage of time may result in a change in the environmental characteristics at this site. This report does not warrant against future operations or conditions that could affect the recommendations made. The results, findings, conclusions, and recommendations expressed in this report are based only on conditions that were observed during VERTEX s inspection of the site.

4 University of Maryland Elkton Hall Page 4 Thank you for this opportunity to be of service to University of Maryland. Should you have any questions, please contact us at Sincerely, The Vertex Companies, Inc. Derek R. Dauberman Division Manager Columbia, MD Michael D. Plainte Vice President Mid-Atlantic Attachments: Appendix A Post-Remediation Efficacy Assessment Summary Table Appendix B Field Visual Assessment Checklists Appendix C Photographic Documentation

5 APPENDIX A Post Remediation Efficacy Assessment Summary Table

6 Elkton Hall Post Remediation Efficacy Assessment Summary Table Unit Number Date of Inspection First Floor /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/2018 Second Floor /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/2018

7 Elkton Hall Post Remediation Efficacy Assessment Summary Table Unit Number Date of Inspection /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/2018 Third Floor /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/2018

8 Elkton Hall Post Remediation Efficacy Assessment Summary Table Unit Number Date of Inspection /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/ /5/2018 Fourth Floor /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/2018

9 Elkton Hall Post Remediation Efficacy Assessment Summary Table Unit Number Date of Inspection /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/ /4/2018 Fifth Floor /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/2018

10 Elkton Hall Post Remediation Efficacy Assessment Summary Table Unit Number Date of Inspection /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/ /1/2018

11 APPENDIX B Field Visual Assessment Checklists

12 1 st Floor

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33 2 nd Floor

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71 3 rd Floor

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110 4 th Floor

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149 APPENDIX B Photographic Documentation

150 Photographic Documentation Elkton Hall 3981 Denton Service Lane College Park, MD VERTEX Proj. No Photo #1: View of typical room setup with HEPA-filtered negative air machine ducted outdoors and dehumidifier. Photo #2: View of University checklist posted at entry to each room. Photo #3: View of typical closeout layout. Cleaning included shelves, pipe, doors and walls. Photo #4: View of typical dresser unit Photo #5: View of typical dresser unit with drawers removed following cleaning. Photo #6: View of typical dresser drawer underside following cleaning. Photographs taken between October 1-9, 2018 by VERTEX

151 Photographic Documentation Elkton Hall 3981 Denton Service Lane College Park, MD VERTEX Proj. No Photo #7: Asbestos-containing black window glazing. Photo #8: LBP on metal door frame (typical) Photo #9: View of typical desk following cleaning Photo #10: View of typical desk drawer underside following cleaning. Photo #11: View of typical chair cover underside. Photo #12: View of typical bunk bed/mattress underside following cleaning. Photographs taken between October 1-9, 2018 by VERTEX

The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order

The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order submission? Examples of Vague Work Order Requests What

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES PART I--GENERAL 1.1 Work Included [Edit this specification to eliminate tests not required. Place tests in the desired sequence of performance] A. This

More information

October 13, From: Larry Snyder, Associate Director for Administrative Services. Subject: Solutions Center Facilities Emergency Response Plan

October 13, From: Larry Snyder, Associate Director for Administrative Services. Subject: Solutions Center Facilities Emergency Response Plan October 13, 2015 From: Larry Snyder, Associate Director for Administrative Services Subject: Solutions Center Facilities Emergency Response Plan Purpose: To document the procedure for responding and communicating

More information

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment Installation Service Statement of Work Start-up Service for Cooling Start-up - 1 - Service for Cooling Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0

More information

Keys To Disaster Preparedness

Keys To Disaster Preparedness Keys To Disaster Preparedness Presented By: Rob Robbins 2012 Setting up your Chess Board Identify your Queen Decide who s going to be King How many assets to protect and in what order (moving your pieces)

More information

Property Maintenance & Operations Manual Training

Property Maintenance & Operations Manual Training Property Maintenance & Operations Manual Training Introduction to Property Operations Management and Building Security October 16, 2007 Property Maintenance & Operations Manual Training April 12, 2007

More information

24-HOUR QUIET HOURS Start on Wednesday, May 1 st at 11 pm

24-HOUR QUIET HOURS Start on Wednesday, May 1 st at 11 pm 24-HOUR QUIET HOURS Start on Wednesday, May 1 st at 11 pm Please be respectful of others during finals and control noise by: Keeping your door closed Using headphones when listening to music Avoid having

More information

Definitions To understand the application of RST on restoration related services, it is important to understand the meaning of the following terms:

Definitions To understand the application of RST on restoration related services, it is important to understand the meaning of the following terms: BULLETIN NO. 011 Issued April 2002 Revised December 2010 THE RETAIL SALES TAX ACT RESTORATION SERVICES This bulletin provides information on how the retail sales tax (RST) is to be applied by businesses

More information

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540)

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540) COMPANY RESUME MEIengineering, inc. mechanical electrical industrial consultants 1780 South Main Street, Harrisonburg, VA 22801 (540) 432-6272 www.meiengineeringinc.com 2018 About our Firm Founded in 1989,

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

Ventilation of Health Care Facilities

Ventilation of Health Care Facilities CMS Adoption of ANSI/ASHRAE/ASHE Standard 170-2008 Ventilation of Health Care Facilities Michael P. Sheerin, PE LEED AP Chief Executive Officer TLC Engineering for Architecture Vice Chair - ASHRAE 170

More information

HOW TO SELECT A CLEANROOM: MODULAR CLEANROOMS FOR NEW BUSINESSES, NEW PRODUCT DEVELOPMENT

HOW TO SELECT A CLEANROOM: MODULAR CLEANROOMS FOR NEW BUSINESSES, NEW PRODUCT DEVELOPMENT HOW TO SELECT A CLEANROOM: MODULAR CLEANROOMS FOR NEW BUSINESSES, NEW PRODUCT DEVELOPMENT By Kevin Weist, president Clean Air Products A well-designed, aesthetically pleasing modular hardwall cleanroom

More information

APRIL 2010 VOL. 13 NO. 4. Modular Cleanrooms for Business Startups and New Product Development

APRIL 2010 VOL. 13 NO. 4. Modular Cleanrooms for Business Startups and New Product Development APRIL 2010 VOL. 13 NO. 4 Modular Cleanrooms for Business Startups and New Product Development Modular Cleanrooms for Business Startups and New Product Development www.cemag.us Modular Cleanrooms for Business

More information

Tulane University. Reducing energy waste. Smart is...

Tulane University. Reducing energy waste. Smart is... Tulane University Reducing energy waste Smart is... Lowering energy expenses and increasing sustainability with intelligent buildings. In the wake of a major natural disaster, Tulane University made a

More information

ABB i-bus KNX. Room Solutions. ABB STOTZ-KONTAKT GmbH - 2CDC N0202, page 1

ABB i-bus KNX. Room Solutions. ABB STOTZ-KONTAKT GmbH - 2CDC N0202, page 1 ABB i-bus KNX Room Solutions 2CDC 514 049 N0202, page 1 Room Master RM/S x.1 The Room Master RM/S 1.1 and RM/S 2.1 offers smart home and intelligent building control for hotel rooms and apartments Modern

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

XAVIER UNIVERSITY Building Access Control Policy

XAVIER UNIVERSITY Building Access Control Policy Effective: March 25, 2019 Last Updated: March 20, 2019 XAVIER UNIVERSITY Building Access Control Policy Responsible University Office: Auxiliary Services, Physical Plant Responsible Executive: Vice President,

More information

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II Lesson 4: Sections Review of last class (0:20) Section 1: AHU: Discharge air temperature control (0:45) Break (0:10) Section 2: AHU: Heating

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

Hurricane and Storm Commercial Damage Assessment

Hurricane and Storm Commercial Damage Assessment Hurricane and Storm Commercial Continue to follow all evacuation orders. Stay up-to-date on current hurricane and storm information by visiting the U.S. National Hurricane Center. How to Conduct s:. PREPARE

More information

OUTSOURCED FACILITIES MANAGEMENT SERVICES CAPE TOWN

OUTSOURCED FACILITIES MANAGEMENT SERVICES CAPE TOWN OUTSOURCED FACILITIES MANAGEMENT SERVICES CAPE TOWN LOCATION OF SERVICE REQUIRED 141 Voortrekker road Parow Cape Town Areas: Offices Entrance foyers Balcony Toilets Basements Conference rooms Store rooms

More information

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry

More information

Evaluation of Energy Conservation Measures by Model Simulation

Evaluation of Energy Conservation Measures by Model Simulation Evaluation of Energy Conservation Measures by Model Simulation Tim Giebler. Mingsheng Liu, and David Claridge Energy Systems Laboratory Texas A&M University Abstract Numerous energy conservation measures

More information

Data and Voice Line Installation Procedure. Revision History

Data and Voice Line Installation Procedure. Revision History Data and Voice Line Installation Procedure OBJECTIVE SCOPE Data and Voice Line Installation Procedure Information Services Technical Revision History Date Detail of Change Change Made By 1/14/11 Revision

More information

Security Surveillance Camera and Video Policy

Security Surveillance Camera and Video Policy UW-Madison Security Surveillance Camera and Policy Effective Date: Oct. 1, 2014 Last Updated: August 1, 2018 Last Reviewed: August 1, 2018 Functional Owner Executive Sponsor Policy Contact Dir. of Security

More information

OUR HISTORY OUR MISSION. We believe that good service is based on good communications

OUR HISTORY OUR MISSION. We believe that good service is based on good communications OUR HISTORY Established in 2000 MacAir Services is focused on the maintenance and installations of air conditioning systems in commercial office buildings, retail stores, schools, medical centres, gymnasiums,

More information

STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT

STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT CURRENT STATE THE C&W WAY College athletic departments throughout the country are spending at an unprecedented pace to develop and renovate facilities

More information

Northern Virginia Community College. Security Awareness Training Plan. Revised: November 2014

Northern Virginia Community College. Security Awareness Training Plan. Revised: November 2014 Northern Virginia Community College Security Awareness Training Plan Revised: November 2014 NOVA Security Awareness Training Overview All individuals involved in the management, operation, programming,

More information

The City of St. Petersburg (City) initiated

The City of St. Petersburg (City) initiated FWRJ Remote Facility Condition Inspections and Subsequent Integration into the City of St. Petersburg s Asset Management Program Laura Baumberger, Robert Labrie, and Rebecca Overacre The City of St. Petersburg

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-364X

More information

Interior Design Tutorial

Interior Design Tutorial Controlling the Display of Objects Chapter 4: Interior Design Tutorial The Interior Design Tutorial picks up where the House Design Tutorial left off. The basic structure of the plan is complete, but the

More information

Running Your Data Center Under Ideal Temperature Conditions

Running Your Data Center Under Ideal Temperature Conditions TECHNICAL BRIEF Mastering Data Center Environmental Controls to Help Drive Your Bottom Line Running Your Data Center Under Ideal Temperature Conditions Challenge Many data centers waste energy using inefficient

More information

PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE. Purpose

PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE. Purpose PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE Section Subject Effective date Procedure Number Administration Key(s) and Lock(s) May 30, 2013 A-01 Purpose To provide a procedure that

More information

CCBC is equipped with 3 computer rooms, one at each main campus location:

CCBC is equipped with 3 computer rooms, one at each main campus location: Policy: Computer Room Procedures Policy: Draft 12/14/2009 1.0 Purpose The purpose of this document is to establish procedures for the Community College of Baltimore County (CCBC) Information Technology

More information

Reducing Energy Consumption with

Reducing Energy Consumption with Reducing Energy Consumption with Passive Cooling Ian Cathcart, RCDD Technical Support Manager Technical Support Manager Chatsworth Products, Inc. Thermal Management: Mission Critical Data center heat loads

More information

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101 Nick Gangemi Regional Sales Manager Data Aire Agenda Exactly what are we talking about ASHRAE TC 9.9 Design best practices

More information

Florida ACCESS Mailing/Scanning/ Indexing Services

Florida ACCESS Mailing/Scanning/ Indexing Services Florida ACCESS Mailing/Scanning/ Indexing Services State of Florida Department of Children and Families ITN#: 01F12GC1 Submitted on: October 2, 2012, 12:00 p.m. EST Submitted by: Xerox State & Local Solutions,

More information

Lead-Based Paint Inspection and Stabilization Report

Lead-Based Paint Inspection and Stabilization Report Lead-Based Paint Inspection and Stabilization Report Performed at: Heightstown Housing Authority 131 Rogers Ave, Hightstown, NJ 08520 Executive Director: Keith LePrevost Date of Inspection: May 25th, 2016

More information

Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms

Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms Problem Several cooling system mistakes are very common and avoidable Mistakes compromise availability and increase

More information

2016 COOLING THE EDGE SURVEY. Conducted by Vertiv Publication Date: August 30, 2016

2016 COOLING THE EDGE SURVEY. Conducted by Vertiv Publication Date: August 30, 2016 2016 COOLING THE EDGE SURVEY Conducted by Vertiv Publication Date: August 30, 2016 TWO STAGE POWER DISTRIBUTION Table of Contents Section I: Methodology Section II: Key Findings 1. Strategic Importance

More information

National Museums & Galleries of Wales Standard Facilities Report

National Museums & Galleries of Wales Standard Facilities Report NAME OF BORROWING INSTITUTION: National Museums & Galleries of Wales Standard Facilities Report [A] BUILDING (a) General information 1 Are your premises purpose-built galleries / museums / other? 2 If

More information

Planned Preventative Maintenance Schedule. Raised Access Floor PPM Schedule

Planned Preventative Maintenance Schedule. Raised Access Floor PPM Schedule Planned Preventative Maintenance Schedule Raised Access Floor PPM Schedule Support... Planned and contracted maintenance services To ensure that data centre or building services are always operating to

More information

SELF-CATERING MOVING OUT GUIDE

SELF-CATERING MOVING OUT GUIDE SELF-CATERING MOVING OUT GUIDE SUMMER 2013 SELF-CATERING MOVING OUT GUIDE SUMMER 2013 CONTENTS Page No. Introduction. 1. When do I need to vacate my room? 1. What do I have to do on/before departure? 2.

More information

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS All noted standards apply to the current revisions applicable at the time of construction or intended construction. NO SUBSTITUTIONS

More information

Interior Design Tutorial

Interior Design Tutorial Interior Design Tutorial The Interior Design Tutorial picks up where the Roof Tutorial left off. The basic structure of the plan is complete, but the plan still needs lights, outlets, and fixtures to be

More information

Thermal management. Thermal management

Thermal management. Thermal management Thermal management Thermal management Managing thermal loads is a major challenge for all Data Centre operators. Effecting proper control of the thermal environment drives energy consumption and ultimately

More information

ECP New Program. Hygienic Air Handling Units 29 September Krakow

ECP New Program. Hygienic Air Handling Units 29 September Krakow ECP New Program Hygienic Air Handling Units 29 September 2016 - Krakow Quentin LIEBENS Project Development Manager q.liebens@eurovent-certification.com Introduction Introduction Introduction Table of contents

More information

Designing, Building, and Maintaining a Compliant Sterile Compounding Facility Focusing on incorporating USP <800> Requirements

Designing, Building, and Maintaining a Compliant Sterile Compounding Facility Focusing on incorporating USP <800> Requirements 1 Designing, Building, and Maintaining a Compliant Sterile Compounding Facility Focusing on incorporating USP Requirements NCHEA Spring Seminar March 2018 Presented by Leach Wallace Associates, Inc.

More information

10 COMMON TRAPS IN DESIGNING A CLEANROOM

10 COMMON TRAPS IN DESIGNING A CLEANROOM 10 COMMON TRAPS IN DESIGNING A CLEANROOM Executive summary Cleanrooms provide a controlled environment with a low level of pollutants. They are typically used for manufacturing or scientific research activities

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

Residential Design Using Autodesk Revit 2015

Residential Design Using Autodesk Revit 2015 Residential Design Using Autodesk Revit 2015 Includes video instruction Multimedia Disc Daniel John Stine CSI, CDT SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com Includes

More information

Select Agents and Toxins Security Plan Template

Select Agents and Toxins Security Plan Template Select Agents and Toxins Security Plan Template 7 CFR Part 331.11, 9 CFR Part 121.11, 42 CFR Part 73.11 Prepared by U.S. Department of Health and Human Services (HHS) Centers for Disease Control and Prevention

More information

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities Western Illinois University Quad Cities FACILITIES FY17 Planning and Accomplishments Submitted by: William Brewer Director of Facilities Quad Cities I. Accomplishments and Productivity for FY17 WIU-QC

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Replacement of Unit Ventilation System

More information

ASSE PROFESSIONAL CERTIFICATION PROGRAMS PROCTOR GUIDE

ASSE PROFESSIONAL CERTIFICATION PROGRAMS PROCTOR GUIDE ASSE International ASSE PROFESSIONAL CERTIFICATION PROGRAMS PROCTOR GUIDE This guide was established to provide uniformity and requirements for proctoring ASSE Certification program exams. An ASSE accredited

More information

Survey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered

Survey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered Survey and Audit Service Schedule Airflow and Thermal Imaging Survey Service Schedule Data Centre Solutions Expertly Engineered Consult optimisation, audit and survey services Data Centre Services Workspace

More information

Improving Situational Awareness for Utilities Operators and Energy Managers

Improving Situational Awareness for Utilities Operators and Energy Managers Improving Situational Awareness for Utilities Operators and Energy Managers Presented by: Mary-Ann Ibeziako PI World Conference September 24-27, 2018 Barcelona, Spain 1 University of Maryland, College

More information

Reclaim Wasted Cooling Capacity Now Updated with CFD Models to Support ASHRAE Case Study Data

Reclaim Wasted Cooling Capacity Now Updated with CFD Models to Support ASHRAE Case Study Data White Paper EC9005A Reclaim Wasted Cooling Capacity Now Updated with CFD Models to Support ASHRAE Case Study Data Peer reviewed case study data from ASHRAE now updated with CFD model analysis revealing

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D May 5-6, 2016 Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered

More information

IT CONTINUITY, BACKUP AND RECOVERY POLICY

IT CONTINUITY, BACKUP AND RECOVERY POLICY IT CONTINUITY, BACKUP AND RECOVERY POLICY IT CONTINUITY, BACKUP AND RECOVERY POLICY Effective Date May 20, 2016 Cross- Reference 1. Emergency Response and Policy Holder Director, Information Business Resumption

More information

Precision Cooling Mission Critical Air Handling Units

Precision Cooling Mission Critical Air Handling Units M I S S I O N C R I T I CA L C O O L I N G Precision Cooling Mission Critical Air Handling Units Global Expertise for Precision Cooling Solutions STULZ is a privately owned, global manufacturer of highly

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility. High Tech Cleanroom Laboratory & Production Facility www.technologyincubationcenter.com Jay Chmieleski 612 275 3775 mobile Dan Friedner FOR SALE OR LEASE Technology Incubation Center VADNAIS HEIGHTS, MINNESOTA

More information

Qs & As from CSD RFP pre-submission conference

Qs & As from CSD RFP pre-submission conference Qs & As from CSD RFP 19-503 pre-submission conference Q: Who was there? A: The attendance sheet follows. Q: There are 4 exterior cameras on light poles shown in the prints, are 3 of those 360 cameras and

More information

Deactivation & Decommissioning and Facility Engineering (DD/FE) Working Group

Deactivation & Decommissioning and Facility Engineering (DD/FE) Working Group Deactivation & Decommissioning and Facility Engineering (DD/FE) Working Group Waste Management 2008 Symposia Panel: US DOE - Energy Facility Contractors Group's Knowledge Portal (EFCOG) Review February

More information

Energy Engineering: Tools and Trends

Energy Engineering: Tools and Trends Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and

More information

Five-Year Capital Plan Request FY through FY

Five-Year Capital Plan Request FY through FY Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance Seniors bonded $690,706 Health and Safety bonded Facilities Preservation

More information

Programming Document. for: Knight Abbey Program Spring Semester 1 P age

Programming Document. for: Knight Abbey Program Spring Semester 1 P age Programming Document for: Knight Abbey Program Spring Semester 1 P age Administration/ Executive Division Reception Area Function: Serves as the main customer and employee entrance and provides the first

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

Approval Block. Prepared by: Signature Date Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date

Approval Block. Prepared by: Signature Date Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date ATS-ATP-3440 Page: 1 of 6 Approval Block Prepared by: Signature Date Evan Parnell 08 NOV 2013 Reviewed by: Signature Date Brian Flynn 08 NOV 2013 Approved by: Signature Date Kristal Jewell 08 NOV 2013

More information

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO Hurricane Florence Response and Recovery October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO Event Impact Campus Grounds Approximately 400 downed trees Light poles Power lines Page

More information

Approval Block. Prepared by: Signature Date. Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date

Approval Block. Prepared by: Signature Date. Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date ATS-ATP-3441 Page: 1 of 5 Approval Block Prepared by: Signature Date Evan Parnell 08 NOV 2013 Reviewed by: Signature Date Brian Flynn 08 NOV 2013 Approved by: Signature Date Kristal Jewell 08 NOV 2013

More information

SECTION CLEANROOM CERTIFICATION

SECTION CLEANROOM CERTIFICATION SECTION 3 60 9 PART - GENERAL. CONDITIONS AND REQUIREMENTS A. Clean Zone requirements are specified in Sections 0 50 3 and 3 60 3. B. Cleanroom cleaning procedures are specified in Section 3 60 6. C. ing

More information

Introducing the Heat Wheel to the Data Center

Introducing the Heat Wheel to the Data Center Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure Specialist KyotoCooling International Critical Facilities Round Table 1 A New Free Cooling Technique

More information

Session 6: Data Center Energy Management Strategies

Session 6: Data Center Energy Management Strategies Session 6: Data Center Energy Management Strategies Data Center Energy Use and Opportunities: Applying Best Practices to meet Executive Order Requirements Dale Sartor, PE Lawrence Berkeley National Laboratory

More information

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010)

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010) Summary This 2010 document is the first in a series of documents by Western HVAC Performance Alliance (WHPA) industry volunteers of ASHRAE/ANSI/ACCA Standard 180. More recent WHPA documents provide detailed

More information

GENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN

GENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN Contact Person: Philip McCollum - Administrator Magnolia Gardens Assisted Living AL Lic# 10314 3800 62 nd Avenue North Pinellas Park, FL 33781 Phone: 727.489.6440 GENERATOR ADDENDUM TO MAGNOLIA GARDENS

More information

FOOD INNOVATION CENTER. Nebraska Innovation Campus 2021 Transformation Dr Suite 2220 / Lincoln, NE innovate.unl.

FOOD INNOVATION CENTER. Nebraska Innovation Campus 2021 Transformation Dr Suite 2220 / Lincoln, NE innovate.unl. FOOD INNOVATION CENTER Nebraska Innovation Campus 21 Transformation Dr Suite 2220 / Lincoln, NE 68508 4.472.5535 innovate.unl.edu Tetrad Property Group 21 Transformation Dr Suite 1100 / Lincoln, NE 68508

More information

The Certified Indoor Air Quality Professional (CIAQP ) Program

The Certified Indoor Air Quality Professional (CIAQP ) Program The Certified Indoor Air Quality Professional (CIAQP ) Program Date: Venue: 15 17 November 2007 (Tentative) IVE(Morrison Hill), Oi Kwan Road, Wanchai (Tentative) Course Code: CIAQP 01/07/HK THE MARK of

More information

Optimiz Chilled January 25, 2013

Optimiz Chilled January 25, 2013 Optimiz zing Existing Data Center Chilled Water Plants January 25, 2013 This White Paper describes factors to be consideredd when optimizing an existing data center chilledd water plant. Authored by Michael

More information

Building the Future. Energy Efficiency on Campus Real World Data. ERRAPPA Spill Prevention and Emergency Response/Contingency Plans 7/27/2017

Building the Future. Energy Efficiency on Campus Real World Data. ERRAPPA Spill Prevention and Emergency Response/Contingency Plans 7/27/2017 CLICK Click TO EDIT to edit MASTER Master TITLE title STYLE style Energy Efficiency on Campus Real World Data Building the Future APPA/PCAPPA/BayAPPA 2017: Annual Conference and July Exhibition 21, 2017

More information

Interior Design Tutorial

Interior Design Tutorial Controlling the Display of Objects Chapter 4: Interior Design Tutorial The Interior Design Tutorial picks up where the House Design Tutorial left off. The basic structure of the plan is complete, but the

More information

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems Session: Low/No Cost Solutions Through BAS Saving Energy and Reducing Costs Through Better Use of Building Automation Systems Mark M. Duszynski Johnson Controls Federal Systems August 9, 2016 Rhode Island

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

CLEAN BUILD PROTOCOLS

CLEAN BUILD PROTOCOLS CLEAN BUILD PROTOCOLS ISO Class Cleanroom Environments Copyright Florida Cleanroom Systems Inc. 2010 1 May 2010 Table of Contents Section 1: Preparation of Clean Zone Construction Site Preliminary Cleaning

More information

2.1. Scope of environmental site assessment

2.1. Scope of environmental site assessment 1. PURPOSE AND SCOPE This document contains the criteria used by the Québec Association of Environmental Auditors (QAEA) to determine whether a person may obtain the title of certified environmental site

More information

Interior Design Tutorial

Interior Design Tutorial Controlling the Display of Objects Chapter 4: Interior Design Tutorial The Interior Design Tutorial picks up where the Roof Tutorial left off. The basic structure of the plan is complete, but the plan

More information

Cleanroom manufacture and online supplies

Cleanroom manufacture and online supplies Cleanroom manufacture and online supplies cleanroomshop.com Introduction 1 Welcome to CONNECT 2 CLEANROOMS Connect 2 Cleanrooms Ltd design, manufacture, install and validate cleanrooms, specialising in

More information

ENCLOSURE HEAT DISSIPATION

ENCLOSURE HEAT DISSIPATION ENCLOSURE HEAT DISSIPATION DATA CENTER SOLUTIONS A White Paper by Great Lakes Case & Cabinet Company www.werackyourworld.com 814.734.7303 Page 2 Introduction Dangerous heat levels inside an enclosure threaten

More information

Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL

Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL 5012 W. Lemon Street Tampa, Florida 33609 Ph 813.944.3464 Fax 813.944.4959 December 31, 2015 (via email) Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL 33602 kozwolak@tecoenergy.com

More information

Case Study: the ICL explosion, 2004

Case Study: the ICL explosion, 2004 Case Study: the ICL explosion, 2004 Multiple failures of H&S Management Interfaces Highlands & Islands Branch February 2013 Ian Waldram, CFIOSH Outline The Incident (2004) The Court Case (2007) The Public

More information

UNIVERSITY POLICY STUDENT LIFE & INTERNATIONAL EDUCATION POLICIES

UNIVERSITY POLICY STUDENT LIFE & INTERNATIONAL EDUCATION POLICIES UNIVERSITY POLICY STUDENT LIFE & INTERNATIONAL EDUCATION POLICIES Number: 705 Subject: Posting Policy Covered Individuals: UIU Employees, Students and Visitors Covered Campus Locations: Fayette Effective

More information

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX 453.1 Scope: Public educational facilities X X X 453.2 Public schools and Florida colleges general requirements X X X 453.2.1 Owner X X X 453.2.2 Exemption from local requirements X X X 453.3 Code enforcement

More information

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage GRC COMPLEX 535 S. Fir Street Medford, Oregon F O R S A L E CONTACT: Robert Boggess PHONE: (541) 608-1732 FAX: (541) 772-2135 EMAIL: rboggess@naumes.com 65,723± sq ft Cold Storage 21,600± sq ft Freezer

More information

Reservation QA Desk Review Procedure

Reservation QA Desk Review Procedure Reservation QA Desk Review Procedure A. Start the DESK Review: 1. Open the project s Reservation JRT. 2. Open blank Advanced DESK template 4-8-4-8. 3. Import JRT data into DESK template: Home >> Data >>

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Introduction The Commercial Retro-Commissioning Program (RCx) is designed to achieve demand and energy savings in commercial facilities.

More information