Vendor Questions and Responses Ongwanada RFP #08-06

Size: px
Start display at page:

Download "Vendor Questions and Responses Ongwanada RFP #08-06"

Transcription

1 Vendor Questions and Responses Ongwanada RFP # , 2, 3 yr options can only be offered on all EWP service agreements. Will you revise the RFP and accept these as compliant since the Manufactures will not support the hardware past this time. Yes. We will accept the maximum manufacturers warranty available. Can you please confirm that a WAN is provided at the 3 main sites? Yes, a WAN is available at all 3 sites. Is it the intent to provide pricing for a Managed WAN with QoS for the remaining 24 sites? Yes. Can you provide LAN requirements and details for 85 Grosvenor and 114 Wright Crescent? At 85 Grosvenor, 42 drops should be considered. At 114 Wright Crescent, 47 drops should be considered. Managed switches, capable of L3 routing, PoE and VLANs are required. These will be re-wired to terminate in the electrical rooms at both locations. Can you please provide the number of sets per location for the 24 community homes? Each location is equipped with one (1) set at this time. One exception is 1234 Sunnyside Road, where up to three (3) telephone sets will be required. Clarification on the proposal: The scope of the RFP is providing VoIP telephone system and the associated LAN at each of the 3 major facilities with a remote connection to the 24 homes. Page 4, point 1, of the RFP states >turn key LAN/WAN= solution. From the bidders meeting, a WAN proposal is in the approval process (offered by the Kingston Public Utility). Please clarify? Ongwanada has proceeded with the WAN fibre optic link through the City of Kingston. If WAN is proposed by the utility, what type of service (dark fibre, LAN extension or managed L3 service, etc)? Will the utility be providing a smart termination device like a router? If managed, what is the QOS reserved on the 10Mbs circuits? The WAN fiber links will be terminated on FX to TX media adapters.

2 They will be live, and will carry VLAN information assigned by Utilities Kingston. Devices capable of L3 routing, PoE and VLANs will be required. Page 4 point 2, wireless is mentioned. To do wireless VoIP solution, wireless site surveys are required at all the facilities. To estimate the survey, and number APs floor plans are required of all buildings. Also quantity of wireless handsets required at all the facilities. Wireless capabilities are not required. Please ignore. Page 4 point 2, it is mentioned that conventional and VoIP solution. What is the split between to two connection types? It is our assumption that some handsets need not be digital sets. Ongwanada will evaluate any proposed split, upon evaluation of the proposals submitted. Page 4 point 4 (first one), Does Ongwanada have a list of >IT needs= that can be checked against? There is no list, per se, of IT needs. Ongwanada has a rare opportunity to advance its network capabilities dramatically, since the PoE capabilities required for the phone systems need a "forklift" replacement of our existing infrastructure. Part of the decision-making process in choosing the successful vendor will be based on the demonstrated abilities of the equipment and the flexibility that they lend to the overall IT requirements. For example, in weighting the overall network solution, these are some of the considerations which shall be addressed: What is the inter-connect speed between switches and the forwarding rate of the switch backplane? For example, some switches may list 50 gigabit ports on the switch, but only provide an 8Gbps actual performance rate across the backplane - meaning that they are built with a "blocking" architecture that could and most likely will cause a bottleneck in the network. Similarly, cascading switches often have inter-connections which perform at a dramatically lower rate than the switches themselves can operate at. We are concerned with the maintenance and configuration of VLAN s, monitoring and management of switches both at the core and remote sites. We do not want to get in to a situation where a Telco will not permit a third party to directly manage switch gear that they have installed for the purpose of phone system traffic; resulting in potential conflict, delays in problem resolution and significant costs to make configuration changes. Ongwanada will carefully examine the proposed network switches. Any modem switch proposed to be deployed should at minimum support the following criteria: - Layer 3 and 4 IP forwarding and routing at wire speed - hardware layer 3, 4 IP access control lists and MAC-based control - power over ethernet (for switches used with IP phones)

3 - native VLAN support (not pass-through) - wire-speed / non-blocking architecture for chassis backplanes - if cascading switches, inter-connect speeds of at least 50% the port count - server load balancing capabilities and failover - VLAN aggregation / trunking with broadcast/multicast forwarding - gigabit capabilities on each port with 10 gigabit option in the core - SNMP / RMON management & statistics - IPv4 and IPv6 support looking towards future requirements - quality of service (QoS) on all ports - denial of service, CPU protection and threat detection/response - redundant power supply capabilities - jumbo frame capabilities for NAS/SAN and network requirements - VLAN and/or port-based bandwidth control Because the opportunity is there to dramatically improve the feature set available to the IT staff, it will also make the telephony solution much more manageable in terms of detecting and responding to network issues. These requirements will make it possible to bring Ongwanada's general network connectivity to a level which will future-proof the investment. Because IP telephony is very sensitive to network latency, these requirements should also guarantee that the network will not be a significant contributor to "jitter," affecting overall quality of conversations. Page 4 point 4 (second one), Is structured cabling in the proposal, if so, site surveys by structured cabling estimator must be arranged and floor plans of the facilities provided. Re-cabling for Cat 5e, if the vendor solution so requires, must form part of the vendor submission. Should the vendor require a cabling estimator to visit our sites, this can be arranged by contacting Ongwanada. Cost for any such work by an estimator must be borne by the vendor. Floor plans for the three main sites will also be provided upon inspection. Page 5 point 5. Site extensions are listed. We assume this is also the number phones required. What type of phones (single line for reception, 2 line phones, multi-line phones colour or b/w, operator consoles, conference phones, etc.)? The RFQ requests unit pricing for all proposed solutions. Please supply pricing for all types of components available. The actual breakdown of required sets will be a matter of discussion with the successful vendor. Need complete listing of the 24 homes with high speed data service supplied (cable/dsl none) That information was distributed by on June 20, 2008 Page 10: E911 requirements- is the building identification sufficient or is more detailed locations required?

4 Building ID is sufficient. Failover phones? Does Ongwanada want a redundant system or is the failover phones completely separate? Ongwanada will entertain a solution that addresses situation like the ice storm of 1998 or the power black out of How this is achieved will be up to the vendor. Page 17: server? (Believe to be First Class) What version? What client do the users have? What mail protocols are supported? Ongwanada is currently using Firstclass 9.0. The following protocols are supported: - STMP - IMAP4 - POP3 Balsam Grove and Wright Crescent is there sufficient Cat5 / Cat5e cable to support IP phones at all locations? Cat 5 exists at Balsam and Crescent to support IP. Cat 5e does not exist and, if required, should form part of vendor submissions. In regard to sets do you have a breakdown of sets that you require, i.e. Director sets with Speaker and hands free down to a Basic hand set with a Hold key, and any requirements in between? Unit pricing is required for all components. Ongwanada will enter in to discussions with vendors the actual break down of required sets. Is there a specific location that we could install a 4th closet that would eliminate the distance, issues in part of the main floor? The only possibility might be the Mechanical Room which resides under the Pool and adjoining walkway. Page 11 System and User features, question 1 - is it a correct assumption that you are asking for a complete soft-phone solution at headquarters, (Portsmouth Ave) and in the Homes? No. Soft phone solutions will not at this time be possible for any of the community residence locations. Limited soft phone capabilities may be possible for the Resource Centre, although this again is not a preferred option. Page 17 Voice messaging services, question 2 - does this mean that Ongwanada is supplying the Voice mail from Firstclass and all we have to do is

5 integrate to it? If so how many channels do you need of the PBX? Ongwanada wishes to continue to utilize Firstclass for our services. First Class will support POP3 and IMAP4 and STMP. Our desire is that the successful vendor will integrate with it. If the vendor s proposed solution does not integrate with Firstclass, feel free to propose an alternate solution which will. Regarding how many channels may be needed for the PBX, Ongwanada feels 12 channels will be required. Are all Desk tops / Laptops, both Internal and External set up as thin client terminals? No. We currently have 27 thin client terminals spread out between Baxter CR, Sydenham Road CR, Henrietta CR, Napanee APS Office (1 at each of the preceding locations). The rest are spread out between 85 Grosvenor, 114 Wright Crescent and 191 Portsmouth Avenue. Page 17 Security question 3 - could you expand on this when would you see a user have to have a password and Login? We would envision a password and login when accessing services from an external location i.e. when staff travel out of town.

ADDENDUM No. 1. Request for Proposals (RFP) VoIP Telephone System April 18, 2011

ADDENDUM No. 1. Request for Proposals (RFP) VoIP Telephone System April 18, 2011 ADDENDUM No. 1 Request for Proposals (RFP) 11168 VoIP Telephone System April 18, 2011 A. CLARIFICATIONS AND MODIFICATIONS TO THE RFP 1. This Addendum is posted on the West Virginia Higher Education Policy

More information

Current Phone System & Handset Info:

Current Phone System & Handset Info: Telephone System RFP Addendum #1 Issued: July 20, 2016 To: All Planholders of Record This addendum modifies the RFP documents as noted below. Questions & Clarifications: Current Phone System & Handset

More information

Is there a preferred vendor (Cisco? ShoreTel? Etc) or a vendor that you wish to avoid?

Is there a preferred vendor (Cisco? ShoreTel? Etc) or a vendor that you wish to avoid? MVWIB TELECOM RFP QUESTIONS AND ANSWERS AS OF 2 NOV 2016 Is there a preferred vendor (Cisco? ShoreTel? Etc) or a vendor that you wish to avoid? Our preference would be Cisco, but it is not a requirement.

More information

6. Are you looking for color screen or touch screen features on any of the phones?

6. Are you looking for color screen or touch screen features on any of the phones? Q# Category Questions Answers 1 Hardware WHAT FEATURES AND FUNCTIONALITY DO YOU REQUIRE FOR THE OFFICE STATION HIGH TRAFFIC, MEDIUM TRAFFIC AND BASIC CLASSROON STATION HANDE SET TYPES THAT TOTAL 584 Is

More information

The Madison Metropolitan Sewerage District requests quotations for. IP Telephony System

The Madison Metropolitan Sewerage District requests quotations for. IP Telephony System The Madison Metropolitan Sewerage District requests quotations for IP Telephony System Request Madison Metropolitan Sewerage District (MMSD) is soliciting bids for a new IP telephony system. These quotes

More information

Save installation time and money with PoE.

Save installation time and money with PoE. 16-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports 16 x PoE ports, IEEE 802.3at/af Power over Ethernet (PoE+/PoE), 2 x SFP, Endspan, Desktop, 19" Rackmount Part No.: 560931 Save installation

More information

CAT RFP , Addendum 2 February15, 2013 Page 1

CAT RFP , Addendum 2 February15, 2013 Page 1 CHATHAM AREA TRANSIT AUTHORITY RFP 2013-04, ADDENDUM NO.2 DATE: February 15, 2013 ORIGINAL RFP NUMBER: 2013-04 PROJECT: CHATHAM AREA TRANSIT AUTHORITY VOIP This Addendum forms a part of Chatham Area Transit

More information

Save installation time and money with PoE.

Save installation time and money with PoE. 48-Port Gigabit Ethernet PoE+ Layer2+ Managed Switch with 10 GbE Uplink 48 x PoE ports, IEEE 802.3at Power over Ethernet (PoE+), Layer 2+, 2 x 10 GbE SFP+ open slots, Endspan, 19" Rackmount Part No.: 561112

More information

Addendum #1 VOIP RFP Questions & Answers 12/13/17

Addendum #1 VOIP RFP Questions & Answers 12/13/17 1. Can the potential bidders tour the existing phone system? Yes. To schedule a tour, please email Holly Barfield at barfieldh@forsythpl.org. Please note that no questions will be answered during this

More information

We don t see the IP Phones that currently being used included with this RFP? We are essentially looking for a basic caller ID function.

We don t see the IP Phones that currently being used included with this RFP? We are essentially looking for a basic caller ID function. VoIP Q & A: Do you have a need for an Auto-Attendant? If yes, how many? o We are looking for a minimum of one auto-attendant per building (5), plus one main auto-attendant for the Central Office. How many

More information

Addendum & Corrigendum-2 Request for Proposal

Addendum & Corrigendum-2 Request for Proposal Addendum & Corrigendum-2 Request for Proposal For Creation of OFC Network for BRTS Corridor and other important SMC Locations Connected Surat Project Part 1 RFP No.: SSCDL-ConnectedSurat-OFC-RFP-01-2017

More information

Save installation time and money with PoE. Power over Ethernet 802.3at

Save installation time and money with PoE. Power over Ethernet 802.3at 24-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports 24 x PoE ports, IEEE 802.3at/af Power over Ethernet (PoE+/PoE), 2 x SFP, Endspan, 19" Rackmount Part No.: 560559 Save installation time

More information

Save installation time and money with PoE

Save installation time and money with PoE 16-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports IEEE 802.3at/af Power over Ethernet (PoE+/PoE) Compliant, 220 W, Endspan, 19" Rackmount Part No.: 561341 Save installation time and money

More information

Save installation time and money with PoE.

Save installation time and money with PoE. 8-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports 8 x PoE ports, IEEE 802.3at/af Power-over-Ethernet (PoE+/PoE), 2 x SFP, Endspan, Desktop, 19" Rackmount Part No.: 561051 Save installation

More information

Hosted VoIP Unified Communications Service

Hosted VoIP Unified Communications Service Request for Proposals: Hosted VoIP Unified Communications Service June 2018 Hosted VoIP Unified Communications Service Published: July 3, 2018 Responses Due: July 27, 2018 Submit bid to: Goleta Union School

More information

Telephone System RFQ (18-WIOA-05) Bidder s Conference - Questions and Answers posted 11/14/18

Telephone System RFQ (18-WIOA-05) Bidder s Conference - Questions and Answers posted 11/14/18 Telephone System RFQ (18-WIOA-05) Bidder s Conference - Questions and Answers posted 11/14/18 Meetings held on November 12, 2018 & November 14, 2018 @ 2pm Clemson SC Works Center, Clemson, SC 1. Internet

More information

COURSE PROJECT SEM ATTENTION ALL ADVANCED DIPLOMA & BACHELOR STUDENTS

COURSE PROJECT SEM ATTENTION ALL ADVANCED DIPLOMA & BACHELOR STUDENTS COURSE PROJECT SEM 2 2014 2015 ATTENTION ALL ADVANCED DIPLOMA & BACHELOR STUDENTS The students who have pre registered for Networking Course Project are required to submit your project proposal. The titles

More information

Abstract. Avaya Solution & Interoperability Test Lab

Abstract. Avaya Solution & Interoperability Test Lab Avaya Solution & Interoperability Test Lab Application Notes for Extreme Networks Summit X450e-24p Switch with Avaya IP Office and Avaya IP Telephones in a Converged VoIP and Data Network - Issue 1.0 Abstract

More information

Data Network Guidelines for Ships

Data Network Guidelines for Ships Data Network Guidelines for Ships VINGTOR ACM Solution Emergency Communication External Communication PC & TV Communication DEPLOYMENT GUIDE Zenitel Norway AS and its subsidiaries assume no responsibilities

More information

GPON Gigabit Passive Optical Network

GPON Gigabit Passive Optical Network GPON Gigabit Passive Optical Network A comprehensive product portfolio for high demand networks. Datacom products meet the various requirements for fiber optical network solutions, providing outstanding

More information

Exam Questions N10-006

Exam Questions N10-006 Exam Questions N10-006 CompTIA Network+ https://www.2passeasy.com/dumps/n10-006/ 1.A technician has verified that a recent loss of network connectivity to multiple workstations is due to a bad CAT5 cable

More information

Surat Smart City Development Ltd. Surat Municipal Corporation 1

Surat Smart City Development Ltd. Surat Municipal Corporation 1 Surat Smart City Development Ltd. Surat Municipal Corporation 1 Surat Smart City Development Limited (SSCDL) ADDENDUM AND CORRIGENDUM-1 Name of the work: - [SSCDL-Network-01-2018] The Bidders are requested

More information

THE INTERCONNECTED NETWORK

THE INTERCONNECTED NETWORK THE INTERCONNECTED NETWORK The Interconnected Network The number of applications / Services on a network increases from year to year. New applications are permanently in preparation. Server and Server

More information

ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR VOICE OVER IP SYSTEM September 16, 2014

ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR VOICE OVER IP SYSTEM September 16, 2014 ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR VOICE OVER IP SYSTEM September 16, 2014 This Addendum No. 1 is issued in connection with the above described Bid Documents. The Louisville Regional Airport Authority,

More information

AXON. AWS Direct Connect CUSTOMER GUIDE. Technical Brief. Direct Connect. AXON ethernet

AXON. AWS Direct Connect CUSTOMER GUIDE. Technical Brief. Direct Connect. AXON ethernet AXON Technical Brief AWS Direct Connect CUSTOMER GUIDE Direct Connect where the cloud lives 13 NEXT sales@nextdc.com www.nextdc.com Contents AWS Direct Connect 4 AWS Direct Connect Local POP 5 AWS Direct

More information

This course prepares candidates for the CompTIA Network+ examination (2018 Objectives) N

This course prepares candidates for the CompTIA Network+ examination (2018 Objectives) N CompTIA Network+ (Exam N10-007) Course Description: CompTIA Network+ is the first certification IT professionals specializing in network administration and support should earn. Network+ is aimed at IT

More information

Gigabit Networks, VLANs & Wireless LANs

Gigabit Networks, VLANs & Wireless LANs Hands-On Gigabit Networks, VLANs & Wireless LANs ( Advanced Local Area Networks ) Course Description This Hands-On course will discuss traditional Ethernet as it is evolving today and its future. Ethernet

More information

E-RATE YEAR Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060

E-RATE YEAR Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060 E-RATE YEAR 2016-2017 Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060 470 Application # 160043013 Submission Deadline: Thursday,

More information

ERATE Year 18 ( ) Patrick County Public Schools

ERATE Year 18 ( ) Patrick County Public Schools ERATE Year 18 (2015-2016) Patrick County Public Schools Switches REQUEST FOR PROPOSALS TERMS AND CONDITIONS OF REQUEST FOR PROPOSAL (RFP) General Considerations: Patrick County Public Schools is requesting

More information

Special Provision No. 683S27 June 2017

Special Provision No. 683S27 June 2017 GATEWAY ROUTERS - Item No. Special Provision No. 683S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of Gateway Routers with integrated digital subscriber line

More information

31270 Networking Essentials Focus, Pre-Quiz, and Sample Exam Answers

31270 Networking Essentials Focus, Pre-Quiz, and Sample Exam Answers 31270 Networking Essentials Focus, Pre-Quiz, and Sample Exam Answers CONTENTS Focus Questions... 2 Chapter 1: Explore the Network... 2 Chapter 2: Configure a Network Operating System... 5 Chapter 3: Network

More information

SWITCH Implementing Cisco IP Switched Networks

SWITCH Implementing Cisco IP Switched Networks Hands-On SWITCH Implementing Cisco IP Switched Networks CCNP Course 2 Course Description Revised CCNP Curriculum and Exams Cisco has redesigned the CCNP courses and exams to reflect the evolving job tasks

More information

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 Overview Martinsville City Public Schools District (hereafter collectively referred to as MCPS) seeks a Request for Proposal

More information

LAN design. Chapter 1

LAN design. Chapter 1 LAN design Chapter 1 1 Topics Networks and business needs The 3-level hierarchical network design model Including voice and video over IP in the design Devices at each layer of the hierarchy Cisco switches

More information

Configuring Gigabit Ethernet Interfaces (J-Web Procedure)

Configuring Gigabit Ethernet Interfaces (J-Web Procedure) Configuring Gigabit Ethernet Interfaces (J-Web Procedure) An Ethernet interface must be configured for optimal performance in a high-traffic network. To configure properties on a Gigabit Ethernet interface

More information

CECIL COUNTY, MARYLAND. ADDENDUM #4 RFP 18-17: Cecil County Communication Equipment January 17, 2018

CECIL COUNTY, MARYLAND. ADDENDUM #4 RFP 18-17: Cecil County Communication Equipment January 17, 2018 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

Cisco ESW 500 Series Switches Small Business Pro

Cisco ESW 500 Series Switches Small Business Pro Cisco ESW 500 Series Switches Small Business Pro A Cost-Effective, High-Performance Network Foundation to Keep Your Business Moving In a world that never slows down, your business needs to keep moving.

More information

CHAPTER. Introduction. Last revised on: February 13, 2008

CHAPTER. Introduction. Last revised on: February 13, 2008 CHAPTER 1 Last revised on: February 13, 2008 The Cisco Unified Communications System delivers fully integrated communications by enabling data, voice, and video to be transmitted over a single network

More information

Scope and Sequence: CCNA Discovery

Scope and Sequence: CCNA Discovery Scope and Sequence: CCNA Discovery Last updated June 19, 2009 Target Audience The Cisco CCNA Discovery curriculum is primarily designed for Cisco Networking Academy students who are seeking entry-level

More information

Basic IP Phones Advanced IP Users

Basic IP Phones Advanced IP Users Village of Frankfort RFP Q and A. There is no data network requirements specified. Can we assume that the network is VoIP Ready? Attached in the email is the network diagram at the village and PD. It is

More information

City of Overland Park, KS. SIP Trunking Services RFP Bidder s Questions 05/22/2017

City of Overland Park, KS. SIP Trunking Services RFP Bidder s Questions 05/22/2017 City of Overland Park, KS. SIP Trunking Services RFP Bidder s Questions 05/22/2017 Q1: What is the City s SIP Trunk codec of preference, G.729 or G.711? A1: Since we anticipate the majority of the traffic

More information

Abstract. Avaya Solution & Interoperability Test Lab

Abstract. Avaya Solution & Interoperability Test Lab Avaya Solution & Interoperability Test Lab Application Notes for Foundry Networks FastIron SuperX Switch, FastIron GS Switch and FastIron Edge Switch connected to Avaya Communication Manager, Avaya SIP

More information

EXAM - N CompTIA Network+ Certification Exam. Buy Full Product.

EXAM - N CompTIA Network+ Certification Exam. Buy Full Product. CompTIA EXAM - N10-006 CompTIA Network+ Certification Exam Buy Full Product http://www.examskey.com/n10-006.html Examskey CompTIA N10-006 exam demo product is here for you to test the quality of the product.

More information

Scope and Sequence: CCNA Discovery v4.0

Scope and Sequence: CCNA Discovery v4.0 Scope and Sequence: CCNA Discovery v4.0 Last Updated August 30, 2007 The course objectives and outline for the final two CCNA Discovery courses, Introducing Routing and Switching in the Enterprise and

More information

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463 Request for Proposal Network Infrastructure and WIFI E-Rate Form 470: 170062975 Date of Bid Due: On or before March 3, 2017 at 11:00 AM is requesting bids for E-Rate Category 2 Internal Connections as

More information

Network Service Assurance

Network Service Assurance Service Assurance Embedded 'Always-On' Ethernet Devices for Circuit 'Turn-Up' Testing & In-Service Assurance for Layer- 2 and Layer-3 infrastructures Ethernet (L-2) - Typical Scenario HQ & Operations Centre

More information

ANSWERS TO CONSULTANT QUESTIONS FOR CITY OF GALT FIBER OPTIC LINE PROJECT

ANSWERS TO CONSULTANT QUESTIONS FOR CITY OF GALT FIBER OPTIC LINE PROJECT ANSWERS TO CONSULTANT QUESTIONS FOR CITY OF GALT FIBER OPTIC LINE PROJECT Questions from Iteris dated 11.15.11: 1. Page 1 of the RFP lists the due date and time as 2:00 pm noon, Wed. January 4, 2011. We

More information

Save installation time and money with PoE

Save installation time and money with PoE 8-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports IEEE 802.3at/af Power over Ethernet (PoE+/PoE) Compliant, 140 W, Endspan, Desktop, 19" Rackmount Part No.: 561167 Save installation time

More information

IP Telephony. FRUUG Presentation 29-Jan-2004 Jeff Custard

IP Telephony. FRUUG Presentation 29-Jan-2004 Jeff Custard IP Telephony FRUUG Presentation 29-Jan-2004 Jeff Custard Voice over Internet Protocol (VoIP) Internet Protocol Telephony (IPT) Outline for today s presentation IPT basics Standards, QoS, phone power options,

More information

RFP No C047 Emergency Communication System. July 24, 2017

RFP No C047 Emergency Communication System. July 24, 2017 RFP No. 1-17-C047 Emergency Communication System July 24, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: Is CrashPhone the current provider of

More information

Abstract. Avaya Solution & Interoperability Test Lab

Abstract. Avaya Solution & Interoperability Test Lab Avaya Solution & Interoperability Test Lab Configuring Avaya W310 Mobility Gateway with the Avaya W110 Light Access Point for Avaya Wireless IP Telephones and Avaya IP Softphone in an Avaya IP Telephony

More information

Scope and Sequence: CCNA Discovery

Scope and Sequence: CCNA Discovery Scope and Sequence: CCNA Discovery Last updated April 22, 2008 Target Audience CCNA Discovery is primarily designed for Cisco Networking Academy students who are looking for career-oriented, information

More information

Statewide WAN + Remote Dial-in connectivity

Statewide WAN + Remote Dial-in connectivity Design Dost Statewide WAN + Remote Dial-in connectivity Client: One of the Railway offices in a Southern State The customer wanted to establish WAN connectivity between 6 Zonal offices and 7 branch offices

More information

Addendum # 1 Cumberland County, PA CPE RFP Clarifications January

Addendum # 1 Cumberland County, PA CPE RFP Clarifications January . Request for Submittal Extension ANSWER: All date references listed in the document for submittal deadline shall now be FRIDAY FEBRUARY, 20 at 2:00 PM. All other requirements remain the same. 2. Are we

More information

Campus Network Design

Campus Network Design Modular Network Design Campus Network Design Modules are analogous to building blocks of different shapes and sizes; when creating a building, each block has different functions Designing one of these

More information

PowerConnect 'HOO_3RZHU&RQQHFW. Key Points. Product Description

PowerConnect 'HOO_3RZHU&RQQHFW. Key Points. Product Description 'HOO_3RZHU&RQQHFW, 1)2Brief PowerConnect 5012 1 Key Points Gigabit Ethernet was first introduced as a technology using fiber media. Today, Copper Gigabit Ethernet is offering two critical advantages for

More information

Networks with Cisco NAC Appliance primarily benefit from:

Networks with Cisco NAC Appliance primarily benefit from: Cisco NAC Appliance Cisco NAC Appliance (formerly Cisco Clean Access) is an easily deployed Network Admission Control (NAC) product that allows network administrators to authenticate, authorize, evaluate,

More information

IBM BladeCenter Layer 2-7 Gigabit Ethernet Switch Module (Withdrawn) Product Guide

IBM BladeCenter Layer 2-7 Gigabit Ethernet Switch Module (Withdrawn) Product Guide IBM BladeCenter Layer 2-7 Gigabit Ethernet Switch Module (Withdrawn) Product Guide The IBM BladeCenter Layer 2-7 Gigabit Ethernet Switch Module serves as a switching and routing fabric for the IBM BladeCenter

More information

IT114 NETWORK+ Learning Unit 1 Objectives: 1, 2 Time In-Class Time Out-Of-Class Hours 2-3. Lectures: Course Introduction and Overview

IT114 NETWORK+ Learning Unit 1 Objectives: 1, 2 Time In-Class Time Out-Of-Class Hours 2-3. Lectures: Course Introduction and Overview IT114 NETWORK+ Course Objectives Upon successful completion of this course, the student will be able to: 1. Identify the devices and elements of computer networks; 2. Diagram network models using the appropriate

More information

Request for Proposal: Wireless System

Request for Proposal: Wireless System Request for Proposal: Wireless System December 19, 2014 Diller-Odell Public Schools 506 Perry Street Diller, NE 68415 Erate Identifier: Category Two RFP Wireless 1 Table of Contents Overview...3 1.1 Description

More information

Selling the Total Converged Solution Module #1: Nortel Enterprise Networking Overview of the 4 Pillars and Why Nortel Tom Price Nortel HQ Sales

Selling the Total Converged Solution Module #1: Nortel Enterprise Networking Overview of the 4 Pillars and Why Nortel Tom Price Nortel HQ Sales Selling the Total Converged Solution Module #1: Nortel Enterprise Networking Overview of the 4 Pillars and Why Nortel Tom Price Nortel HQ Sales Engineer 1 Nortel Value Proposition >Nortel has an End-to-End

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 Service Offerings... 2 Private Network Services... 2 Ethernet Connectivity... 2 T-1 Connectivity... 3 Other Connectivity... 3 Internet

More information

Campus Networking Workshop. Layer 2 engineering Spanning Tree and VLANs

Campus Networking Workshop. Layer 2 engineering Spanning Tree and VLANs Campus Networking Workshop Layer 2 engineering Spanning Tree and VLANs Switching Loop When there is more than one path between two switches What are the potential problems? Switching Loop If there is more

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 General... 2 Levels and Offerings... 2 Private Network Services... 2 Features... 2 Internet Access... 3 Features... 3 Service Level Metrics...

More information

Management Software AT-S67 AT-S68. User s Guide FOR USE WITH AT-FS7016 AND AT-FS7024 SMART SWITCHES VERSION PN Rev A

Management Software AT-S67 AT-S68. User s Guide FOR USE WITH AT-FS7016 AND AT-FS7024 SMART SWITCHES VERSION PN Rev A Management Software AT-S67 AT-S68 User s Guide FOR USE WITH AT-FS7016 AND AT-FS7024 SMART SWITCHES VERSION 1.0.0 PN 613-50494-00 Rev A Copyright 2003 Allied Telesyn, Inc. 960 Stewart Drive Suite B, Sunnyvale,

More information

FAQ Guide. i-mo 310 & 540 Series Bonding Routers. FAQ Guide. for the i-mo 310 & 540 Series Appliances

FAQ Guide. i-mo 310 & 540 Series Bonding Routers. FAQ Guide. for the i-mo 310 & 540 Series Appliances FAQ Guide i-mo 310 & 540 Series Bonding Routers FAQ Guide for the i-mo 310 & 540 Series Appliances Content Content... 2 i-mo OptiBond - answers to frequently asked questions.... 4 How many cellular links

More information

Power over Ethernet Optimal Power Solution anywhere

Power over Ethernet Optimal Power Solution anywhere 28 Optimal Solution anywhere 29 Office VoIP Phone, Wireless AP & IP Surveillance power deployment solution IP Telephony PLAET IEEE 802.3af compliant IP phones can be installed without requirement of an

More information

EX 3500 ETHERNET SWITCH

EX 3500 ETHERNET SWITCH PRODUCT SPEC SHEET EX 3500 ETHERNET SWITCH EX 3500 ETHERNET SWITCH EQUIPPED THE WIRED ETHERNET SWITCH FOR UNIFIED WIRED-WIRELESS NETWORKS GET ALL THE WIRED NETWORKING FEATURES YOU NEED, PLUS THE SIMPLICITY

More information

Features > 10/100/1000 Mbps Gigabit Ethernet Ports

Features > 10/100/1000 Mbps Gigabit Ethernet Ports Simplified Management & Optimal Network Performance for Small-to-Mid-Size Organizations The EnGenius Neutron PoE Gigabit WLAN Management Smart Switches featuring 8-, 24- or 48- PoE Gigabit ports and support

More information

About VLAN IEEE 802.1Q. Voice VLAN

About VLAN IEEE 802.1Q. Voice VLAN About VLAN VLAN (Virtual Local Area Network) is used to logically divide a physical network into several broadcast domains. VLAN membership can be configured through software instead of physically relocating

More information

Communication Service Provider

Communication Service Provider Communication Service Provider Rigstar Industrial Telecom Calgary, Alberta rigstar.ca 227 Exploration Avenue SE 403.243.0600 info@rigstar.ca Content Vision Section #1. Vision & Mission Statement 02 Section

More information

CCNA Discovery 4.0 Designing and Supporting Computer Networks

CCNA Discovery 4.0 Designing and Supporting Computer Networks CCNA Discovery 4.0 Designing and Supporting Computer Networks Creating the Network Design Chapter 5 1 Objectives 2 Analyzing Business goals and technical requirements Determining how to design a network

More information

EXECUTIVE SUMMARY. Our Pedigree

EXECUTIVE SUMMARY. Our Pedigree LORDS VIEW INDUSTRIAL PARK TECHNOLOGY OVERVIEW 2013 EXECUTIVE SUMMARY As part of the commitment from the developer to provide only the latest and most exciting services, the developer, together with IT

More information

Networks. Computer Technology

Networks. Computer Technology Networks Computer Technology Network Two or more computers and other devices (printers or scanners) that are connected, for the purpose of sharing data and programs Advantages of Networks Communication

More information

3COM OFFICECONNECT MANAGED GIGABIT POE SWITCH

3COM OFFICECONNECT MANAGED GIGABIT POE SWITCH DATA SHEET SWITCHING 3COM OFFICECONNECT MANAGED GIGABIT POE SWITCH Enterprise class, Layer 2 10/100/1000 switch for business of all sizes, as well as remote branch offices, voice ready with PoE and advanced

More information

Layer 2 Engineering VLANs

Layer 2 Engineering VLANs Layer 2 Engineering VLANs Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

MINUTES OF PRE BID MEETING

MINUTES OF PRE BID MEETING MINUTES OF PRE BID MEETING Tender for Supply, Delivery, Installation & Commissioning of Computer & Computer Related Equipment for Department of Computer Science, Faculty of Science and Technology and Technology

More information

The Future of IT. A Hoteliers View June 18 th, Matthew Baio Vice President IT, Americas Marriott International

The Future of IT. A Hoteliers View June 18 th, Matthew Baio Vice President IT, Americas Marriott International The Future of IT A Hoteliers View June 18 th, 2017 Matthew Baio Vice President IT, Americas Marriott International Agenda Trends Where are we Headed Network Basics Practical Analogy Infrastructure Investments

More information

Abstract. Avaya Solution & Interoperability Test Lab

Abstract. Avaya Solution & Interoperability Test Lab Avaya Solution & Interoperability Test Lab Application Notes for ProCurve 5400zl, 3500yl and 2600 Series Switches by HP connected to Avaya Distributed Office in a Converged VoIP and Data Network - Issue

More information

Gigabit SSL VPN Security Router

Gigabit SSL VPN Security Router As Internet becomes essential for business, the crucial solution to prevent your Internet connection from failure is to have more than one connection. PLANET is the ideal to help the SMBs increase the

More information

Running head: PROJECT PART VII: FINAL PROJECT PAPER WITH FINAL 1

Running head: PROJECT PART VII: FINAL PROJECT PAPER WITH FINAL 1 Running head: PROJECT PART VII: FINAL PROJECT PAPER WITH FINAL 1 Project Part VII: Final Project Paper with Final Budget Recommendations Sharon C. Perelman Northwestern University School of Continuing

More information

COMMUNITY COLLEGE OF ALLEGHENY COUNTY PURCHASING DEPARTMENT 800 ALLEGHENY AVENUE, PITTSBURGH, PA 15233

COMMUNITY COLLEGE OF ALLEGHENY COUNTY PURCHASING DEPARTMENT 800 ALLEGHENY AVENUE, PITTSBURGH, PA 15233 COMMUNITY COLLEGE OF ALLEGHENY COUNTY PURCHASING DEPARTMENT 800 ALLEGHENY AVENUE, PITTSBURGH, PA 15233 ADDENDUM 3 REQUEST FOR PROPOSAL 3093 3094 3095 NETWORK HARDWARE AND SOFTWARE JULY 27, 2017 The following

More information

Networks: Communicating and Sharing Resources

Networks: Communicating and Sharing Resources Networks: Communicating and Sharing Resources 1 Local Area Networks Client/server networks o Made up of one or more file servers and clients (any type of computer) o Client software enables requests to

More information

Laredo Independent School District Data Transmission Fiber Services E-Rate Round 20 (FY2017) RFP#16-039

Laredo Independent School District Data Transmission Fiber Services E-Rate Round 20 (FY2017) RFP#16-039 Q&A Summary Laredo Independent School District 1. Please clarify the ownership statement on pg 4 of the RFP? " All equipment and materials required to deliver the service will be owned and maintained by

More information

Campus Network Design. 2003, Cisco Systems, Inc. All rights reserved. 2-1

Campus Network Design. 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design 2003, Cisco Systems, Inc. All rights reserved. 2-1 Design Objective Business Requirement Why do you want to build a network? Too often people build networks based on technological,

More information

Anna Independent School District

Anna Independent School District Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology

More information

What is the total IP bandwidth being used from the core router handling the current network?

What is the total IP bandwidth being used from the core router handling the current network? TECHNICAL CLARIFICATIONS FOR THE VSAT CONTRACT 2 ND BATCH What is the total IP bandwidth being used from the core router handling the current network? A) The table in section 3.2 provides the information.

More information

TECHNOLOGY BRIEF. 10 Gigabit Ethernet Technology Brief

TECHNOLOGY BRIEF. 10 Gigabit Ethernet Technology Brief TECHNOLOGY BRIEF 10 Gigabit Ethernet Technology Brief The 10 Gigabit Ethernet Standard In June 2002, the IEEE standard for 10 Gigabit Ethernet, IEEE Std 802.3ae- 2002, was unanimously approved by the IEEE

More information

Never Drop a Call With TecInfo SIP Proxy White Paper

Never Drop a Call With TecInfo SIP Proxy White Paper Innovative Solutions. Trusted Performance. Intelligently Engineered. Never Drop a Call With TecInfo SIP Proxy White Paper TecInfo SD-WAN product - PowerLink - enables real time traffic like VoIP, video

More information

Appendix 3-A: Planning Workshop Template

Appendix 3-A: Planning Workshop Template Appendix 3-A: Planning Workshop Template The Planning Workshop is intended to help articulate the customer requirements and expectations for the solution. It also allows you to clarify the existing network.

More information

Request for Information Project Provide Enhance and Sustain Core Transport Capability Project Serial Number 2017/0CM03301

Request for Information Project Provide Enhance and Sustain Core Transport Capability Project Serial Number 2017/0CM03301 6 June 2018 Request for Information Project Provide Enhance and Sustain Core Transport Capability Project Serial Number 2017/0CM03301 Capability Package (CP) 9C0123 NATO Core Communication Network Services

More information

Tellabs Optical Network Terminals

Tellabs Optical Network Terminals TELLABS Tellabs Optical Network A broad portfolio of choices to best result in lowest costs and optimize energy and space savings Overview With explosive demand for high bandwidth in the access network

More information

COMPLETE YOUR GO-TO-MARKET PLAN BUSINESS SOLUTIONS BARRY DERRICK PRODUCT MARKETING MANAGER

COMPLETE YOUR GO-TO-MARKET PLAN BUSINESS SOLUTIONS BARRY DERRICK PRODUCT MARKETING MANAGER COMPLETE YOUR GO-TO-MARKET PLAN BUSINESS SOLUTIONS BARRY DERRICK PRODUCT MARKETING MANAGER AGENDA ADTRAN OVERVIEW GO-TO-MARKET WITH WINNING SOLUTIONS! Market Leading Cloud Connectivity Solutions that Outperform

More information

Exam: Title : Routing & Switching Exam (RSS) Ver :

Exam: Title : Routing & Switching Exam (RSS) Ver : Exam: 646-521 Title : Routing & Switching Exam (RSS) Ver : 01.02.04 Missing answer will be provided shortly. QUESTION 1 What does the Catalyst 6500 Network Analysis Module (NAM) do? (Choose two) A. Gives

More information

Boundary control : Access Controls: An access control mechanism processes users request for resources in three steps: Identification:

Boundary control : Access Controls: An access control mechanism processes users request for resources in three steps: Identification: Application control : Boundary control : Access Controls: These controls restrict use of computer system resources to authorized users, limit the actions authorized users can taker with these resources,

More information

Management Software AT-S79. User s Guide. For use with the AT-GS950/16 and AT-GS950/24 Smart Switches. Version Rev.

Management Software AT-S79. User s Guide. For use with the AT-GS950/16 and AT-GS950/24 Smart Switches. Version Rev. Management Software AT-S79 User s Guide For use with the AT-GS950/16 and AT-GS950/24 Smart Switches Version 1.0.0 613-000207 Rev. A Copyright 2005 Allied Telesyn, Inc. All rights reserved. No part of this

More information

ATTACHMENT A Statement of Work

ATTACHMENT A Statement of Work ATTACHMENT A Statement of Work Albuquerque Public Schools is soliciting proposals for a fiber optic wide area network solution for all locations identified in the Scope of Services below. SCOPE OF SERVICES

More information

Network Design Clinic

Network Design Clinic Network Design Clinic A Network Design should be as simple as possible, but no simpler! Presented by: Jason Bomar, CCIE #9316 Introduction We will cover a number of topics, at a high level they are: Hierarchy

More information

ES Port Managed Gigabit Switch with 4 SFP ports

ES Port Managed Gigabit Switch with 4 SFP ports ES220-28 28-Port Managed Gigabit Switch with 4 SFP ports Overview With the increasing number of wired and wireless network device, the SOARNEX SOAR series, ES220-28, provides a cost-effective solution

More information

Meraki MS22 / MS42 Cloud Managed Gigabit PoE Switch Family

Meraki MS22 / MS42 Cloud Managed Gigabit PoE Switch Family DATASHEET Meraki MS22 / MS42 Cloud Managed Gigabit PoE Switch Family Overview The Meraki MS line of cloud-managed access switches bring the benefits of cloud computing, including management simplicity,

More information