ENGINEERING DEPARTMENT

Size: px
Start display at page:

Download "ENGINEERING DEPARTMENT"

Transcription

1 ENGINEERING DEPARTMENT MEMORANDUM TO: FROM: City of La Porte City Council Members Nicholas Minich, Director of Engineering DATE: May 1, 1 RE: DRAFT -Year Pavement Management Program Project Background In October 1 the Board of Public Works and Safety signed a contract with the team of CHA Consulting & Lochmueller Group to perform a pavement management study for the City. This study included Project Research; a Pavement Inventory (using the PASER rating method); Development of an Asset Management System for Streets; Estimation of Project Costs; a -year Pavement Improvement Plan; and Development of a Design Template for efficient in-house design of federal aid paving projects. Funds for this project came from INDOT Group II funds through NIRPC, with the local match funds provided from the City s America s Best Communities Award. One of the primary reasons this project was initiated was to make available federal funds for street maintenance that were not previously available. Pavement Inventory All City streets were assessed based on the PASER rating method, which is the INDOT preferred rating method. The Average PASER Rating (APR) for the City was.; which correlates to Fair. Pavement (Asset) Management System The City selected to use the Roadsoft Pavement Management System, this system was developed by the State of Michigan s LTAP and has a proven track record of success. This system was used to optimize investment in pavement over the next years. From this optimization (based on funding w/ wheel tax) we see a potential increase in APR from. to between. and.. Attachments: 1. PASER Rating System Summary. City PASER Rating Summary. PASER Rating Map. -YR Funding Plan. -YR Plan Summary (w/wheel tax). -YR Plan (w/o wheel tax). 1 Paving Plan. 1 Paving Plan. 1 Paving Plan. 1 Paving Plan 11. Paving Plan 1 MICHIGAN AVENUE LAPORTE, IN Phone: 1.. Fax: 1..1

2 Rating pavement surface condition 1 Rating system Surface rating Visible distress* General condition/ treatment measures Excellent None. New construction. Excellent None. Recent overlay. Like new. Very Good No longitudinal cracks except reflection of paving joints. Occasional transverse cracks, widely spaced ( or greater). All cracks sealed or tight (open less than 1 ). Recent sealcoat or new cold mix. Little or no maintenance required. Good Very slight or no raveling, surface shows some traffic wear. Longitudinal cracks (open 1 ) due to reflection or paving joints. Transverse cracks (open 1 ) spaced or more apart, little or slight crack raveling. No patching or very few patches in excellent condition. First signs of aging. Maintain with routine crack filling. Good Slight raveling (loss of fines) and traffic wear. Longitudinal cracks (open 1 1 ). Transverse cracks (open 1 1 ), some spaced less than. First sign of block cracking. Sight to moderate flushing or polishing. Occasional patching in good condition. Shows signs of aging. Sound structural condition. Could extend life with sealcoat. Fair Moderate to severe raveling (loss of fine and coarse aggregate). Longitudinal and transverse cracks (open 1 or more) show first signs of slight raveling and secondary cracks. First signs of longitudinal cracks near pavement edge. Block cracking up to % of surface. Extensive to severe flushing or polishing. Some patching or edge wedging in good condition. Surface aging. Sound structural condition. Needs sealcoat or thin non-structural overlay (less than ) Fair Severe surface raveling. Multiple longitudinal and transverse cracking with slight raveling. Longitudinal cracking in wheel path. Block cracking (over % of surface). Patching in fair condition. Slight rutting or distortions ( 1 deep or less). Significant aging and first signs of need for strengthening. Would benefit from a structural overlay ( or more). Poor Very Poor Closely spaced longitudinal and transverse cracks often showing raveling and crack erosion. Severe block cracking. Some alligator cracking (less than % of surface). Patches in fair to poor condition. Moderate rutting or distortion (greater than 1 but less than " deep). Occasional potholes. Alligator cracking (over % of surface). Severe rutting or distortions ( or more deep). Extensive patching in poor condition. Potholes. Needs patching and repair prior to major overlay. Milling and removal of deterioration extends the life of overlay. Severe deterioration. Needs reconstruction with extensive base repair. Pulverization of old pavement is effective. 1 Failed Severe distress with extensive loss of surface integrity. Failed. Needs total reconstruction. * Individual pavements will not have all of the types of distress listed for any particular rating. They may have only one or two types.

3 Current Surface Rating Mileage Summary PASER Rating Total Surface Subtype 1 Not Rated Centerline Mileage APR* Asphalt-Standard Concrete-Standard Gravel-Standard Total Centerline Mileage *APR=Average Paser Rating calculated by weighting the mileage with the paser value /1/1 11:: AM Roadsoft Version.. Page of CurSurfSum

4 I A F K J L 1TH US SR E FAIL TH ND SR OHIO 1ST B BOYD PARK C H FOX G PINE LAKE TH SEVERS RD TH JOLIET ANDREW MCCLUNG SCOTT TH MICHIGAN ZIGLER CLAY WELLER WAVERLY RUMELY 1TH ROSE NILES RIDGE GARDEN D JEFFERSON TH ROBERTS OAK STEVENS PLAIN MONROE ISLAND ERIE TRUESDELL TYLER VIRGINIA GRAND DETROIT NOWAK TH TALLY STATE BOND JOHNSON HARRISON BACH LAKE MADISON JACKSON GENESIS M CURTIS WASHINGTON LAKE SHORE FARRAND GROVE LONGWOOD LINCOLNWAY NIESEN ELM 1ST 1TH COLFAX OAKDALE PULASKI TH 1TH POWELL CENTRAL JOHN INDIANA POLK ND RD HILLCREST ORCHARD ALBIN 1TH ASH HOLTON TAYLOR COLLINS CLEAR LAKE GREENWAY PHILADELPHIA SOUTH ADAMS 1TH BRIGHTON REDBUD LAWRENCE FACTORY CRESCENT 11TH LINDEN 1TH FRONTAGE CHICAGO TIPTON KINGSBURY ROCKWOOD KOOMLER WRIGHT OBERREICH CHERRY HOELOCKER HOME DAVID WARSAW NORTH WARREN KOLAR BOSTON CABLE ALLEN COOK WILLIAMS MARQUETTE WEBBER WARDNER BERKEL WARWICK LAUREL JAVELIN FIELDSTONE MILLER TH EGGEBRECHT PERRY FEDERAL HILL FOREST CLEMENT COUGAR WEST SAGAMORE WALNUT BLUFFSIDE HAWTHORNE LAKESIDE MELROSE ROOSEVELT BELDEN PINE SOUTHMOOR MORRISON GREENWOOD TORINO SWANSON MUSTANG TIMBER WABASH GRANDVIEW DIVISION VINE LANE SMALL BURSON OAKWOOD JUDSON LEONARD WALTON COMMUNITY GRAYSON SR SILVERBROOK GLENVIEW STANTON BEECHWOOD SHORE DARLINGTON ARDMORE NOBLE FEIKES GREENLEAF WILLOW MAPLE GRANDSTAND ALLEY LARSON MAYFLOWER VALLEYWOOD NORRIS ROYAL WALKER HOLCOMB WOODWARD TORONADO SEYMOUR TIMOTHY KUCHAR BUTTERNUT EDWARD WHITEHEAD WHIRLPOOL DAYTONA WORDEN CLOSSER LARCH RANGE FRANK STANLEY MEADOW REGENCY KESTON ELM PLACE NURSERY MORGAN OSBORN STONE LAKE ALEXANDER PATTON HOWARD WILLARD GREENACRES DOGWOOD MAPLE LEAF FURNACE LINWOOD EISENHOWER DALE EDGEWOOD SOUTHWEST KINGSPORTE SIEGEL EVERGREEN DEERFIELD KUEHNE UNNAMED ALLEN ELM DIVISION STATE 1TH MICHIGAN L ALLEY OAK D US KINGSBURY LAKESIDE CLOSSER INDIANA JEFFERSON JOHN LINCOLNWAY D WEBBER C MAPLE 1TH LAKE SHORE LAKE SHORE H MAPLE BOYD 1ST 1ST CABLE US 1TH J K NORTH ALLEY VIRGINIA INDIANA SR SR OAK 1TH TH I MARQUETTE MAPLE MAPLE LINCOLNWAY JUDSON PINE 11TH LAKE City of La Porte F City of La Porte PASER Ratings Legend La Porte PASER Ratings CURRRATING 1 1,,,, Feet

5 La Porte -Year Plan - Mileage Breakdown Roadway Improvements: Year Totals Arterial Roadways (Lane-miles) (Lane-miles) (Lane-miles) (Lane-miles) (Lane-miles) Reconstruction.. Rehab (Structural Improvements).. Preventative Maintenance.. 1. subtotal Major Collectors Reconstruction Rehab (Structural Improvements) Preventative Maintenance subtotal Minor Collectors Reconstruction Rehab (Structural Improvements) Preventative Maintenance subtotal Local Roads Reconstruction Rehab (Structural Improvements)... Preventative Maintenance subtotal Total Budget $ 1,,. $ 1,,. $ 1,,. $,. $,. Summary of Miles by Treatment Reconstruction Rehab (Structural Improvements) Preventative Maintenance.1 Lane-Miles. Lane-Miles. Lane-Miles * This chart does not account for crack sealing of roadways to be done by the Street Department utilizing alternate funding sources

6 La Porte -Year Plan - Mileage Breakdown No Wheel Tax Roadway Improvements: Year Totals Arterial Roadways (Lane-miles) (Lane-miles) (Lane-miles) (Lane-miles) (Lane-miles) Reconstruction.. Rehab (Structural Improvements).. Preventative Maintenance.. 1. subtotal Major Collectors Reconstruction Rehab (Structural Improvements) Preventative Maintenance subtotal Minor Collectors Reconstruction Rehab (Structural Improvements)... Preventative Maintenance subtotal Local Roads Reconstruction.. Rehab (Structural Improvements). 11. Preventative Maintenance....1 subtotal Total Budget $ 1,,. $,. $,. $,. $,. Summary of Miles by Treatment Reconstruction Rehab (Structural Improvements) Preventative Maintenance.1 Lane-Miles. Lane-Miles. Lane-Miles * This chart does not account for crack sealing of roadways to be done by the Street Department utilizing alternate funding sources

7 YR FUNDING PLAN (W/WHEEL TAX) Trash Impact Fee $,. $,. $,. $,. $,. "Wheel Tax" $,. $,. $,. $,. CEDIT $,. 1 LOIT Reserves $,. Local Road & Bridge Grant $,. $,. $,. CDBG $,. $,. $,. Group STP $,. $,. $,. $ 1,,. $ 1,,. $ 1,,. $,. $,. YR FUNDING PLAN (NO WHEEL TAX) Trash Impact Fee $,. $,. $,. $,. $,. CEDIT $,. 1 LOIT Reserves $,. Local Road & Bridge Grant $,. CDBG $,. $,. $,. Group STP $,. $,. $,. $ 1,,. $,. $,. $,. $,.

8 City of La Porte *DRAFT* -Year Pavement Management Plan 1 - Identified Roads for Improvement Year Road Segment from Segment to NFC Current PASER Treatment Length Avg Width Area (SY) Total Cost 1 1th Andrew I Arterial " HMA Recon $,. 1 Boyd US SR Arterial various Sealcoat + $,. 1 I 1st th Arterial " Mill/Resurf $ 1,. 1 Jefferson Tyler Rose Arterial " Mill/Resurf 11 $,. 1 Jefferson Tyler Rose Arterial 1." Mill/Resurf $,1. 1 Jefferson Rose Boyd Arterial Sealcoat + 1 $ 1,. 1 Jefferson Rose Boyd Arterial Sealcoat $ 1,. 1 Rose Maple Jefferson Arterial " HMA Recon $,. 1 Tyler Washington 1st Arterial " HMA Recon $,. 1 Tyler Washington 1st Arterial 1." Mill/Resurf $,. 1 Washington US Jackson Arterial 1." Mill/Resurf $,. 1 Washington US Jackson Arterial Sealcoat + 1 $,. 1 Tipton/Park Washington McClung Arterial Sealcoat 1 $,. 1 Maple Michigan Rose Arterial Sealcoat 1 $,. 1 Park Furnace West Arterial Sealcoat + $,. 1 Keston Elm 1th 1th Local 1." Mill/Resurf 11 $,. 1 Michigan Washington Lincolnway Major Coll 1." Mill/Resurf. $,. 1 Andrews SR th Major Coll 1." Mill/Resurf. $ 1,. 1 Andrews th L st Major Coll 1." Mill/Resurf. $ 1,. 1 Andrews 1th SR Major Coll " HMA Recon. $,. 1 I City Limits 1th Major Coll " HMA Recon 1. $ 1,. 1 I City Limits 1th Major Coll 1." Mill/Resurf. $,. 1 Lawrence Jefferson North Major Coll 1." Mill/Resurf. $,. 1 Lawrence Jefferson North Major Coll Sealcoat +. $,. 1 North Lawrence Boston Major Coll 1." Mill/Resurf. $,1. 1 Roberts Division Ohio Major Coll Sealcoat +. 1 $,. 1 Rose Monroe Maple Major Coll " HMA Recon 1. $,. 1 Rose Monroe Maple Major Coll 1." Mill/Resurf. $ 1,1. 1 Rose Monroe Maple Major Coll 1." Mill/Resurf. $,. 1 State Michigan Tipton Major Coll 1." Mill/Resurf 1. $,. 1 State Michigan Tipton Major Coll Sealcoat +. $,. 1 nd Zigler Colfax Major Coll Sealcoat +. $ 1,1. 1 Weller nd Central Major Coll Sealcoat 1. $,. 1 Ohio Rose Roberts Major Coll Sealcoat + 1. $,. 1 Factory Boston Darrow Minor Coll Sealcoat + 1 $ 1,. 1 Lake Hawthorne Perry Minor Coll Sealcoat $ 1,.

9 City of La Porte *DRAFT* -Year Pavement Management Plan 1 - Identified Roads for Improvement 1 Hawthorne Lake Fairfield Minor Coll Sealcoat + 11 $,. 1 State 1st Teegarden Minor Coll Sealcoat + $,. 1 Erie Roosevelt Berkel Minor Coll Sealcoat + $,. 1 Erie Park Berkel Minor Coll 1." Mill/Resurf 1 $,. 1 Erie Park Berkel Minor Coll 1." Mill/Resurf $ 1,. 1 Erie Park Berkel Minor Coll Sealcoat + $,. 1 Fieldstone A st A st Minor Coll 1." Mill/Resurf 1 $ 11,. 1 Niesen Bach Erie Minor Coll 1." Mill/Resurf 1 $,. 1 Niesen Bach Erie Minor Coll Sealcoat + 1 $,. 1 Allen Lawrence Dead End Local 1." Mill/Resurf $,. 1 Allen Dead End Lawrence Local 1." Mill/Resurf 1 $,. 1 Allen Dead End Lawrence Local 1." Mill/Resurf $ 1,. 1 Allen Dead End Lawrence Local Sealcoat + $,. 1 Ridge Monroe Plain Local 1." Mill/Resurf 1 $,. 1 F Maple Garden 1th Local 1." Mill/Resurf 1 $,. 1 Federal Maple Garden Fairfield Local 1." Mill/Resurf 1 $,. 1 Kingsporte Ave F Circle Dr Local 1." Mill/Resurf $ 11,. 1 Clay Lincolnway State Local Sealcoat + $,. 1 Clay State Dead-end Local 1." Mill/Resurf 1 $ 1,. 1 Wabash th nd Local Sealcoat + $,. 1 Stone Lake Jurisdiction 1st Local Sealcoat + 1 $ 1,. 1 1st dead-end weller Local Sealcoat + $,. 1 Illinois Upper Lake Shore Greenleaf Local Sealcoat + $,. 1 Vine Pennsylvania Lake Shore Local Sealcoat + $,1. 1 Pennsylvania Greenleaf Vine Local Sealcoat + $,. 1 L th 1th Local Sealcoat + $ 1,. 1 K SR th Local Sealcoat + $,. 1 K 1th 1th Local Sealcoat + 1 $ 1,. 1 1th A Phil Local Sealcoat $ 1,. 1 1th Phil C Local Sealcoat + 1 $,. 1 Toronto Warsaw Cable Local Sealcoat + $,. 1 Closser Waverly Lane Local Sealcoat + 1 $,. 1 Lakeside Dead-end Pine Lake Local Sealcoat + 1 $,. 1 Budget = Total $ 1,,. $1,,. % of budget %

10 City of La Porte *DRAFT* -Year Pavement Management Plan 1-Identified Roads for Improvement Year Road Segment from Segment to NFC Current PASER Treatment Length Avg Width Area (SY) Total Cost 1 Boyd SR Ohio Arterial various Sealcoat + $,. 1 Kingsbury Greenacres Graceland Arterial Sealcoat $,. 1 1th SR Andrew Arterial Sealcoat + 11 $ 1,. 1 Boyd Lincolnway Jefferson Arterial Sealcoat + 1 $,. 1 Fail Rd Lincolnway Jurisdiction Line Arterial Sealcoat + 1 $ 1,. 1 Maple Michigan Indiana Arterial Sealcoat + 1 $,. 1 1st I Jefferson Major Coll Sealcoat +. $,. 1 A st th nd Major Coll 1." Mill/Resurf. $,. 1 Michigan Harrison Kingsbury Major Coll 1." Mill/Resurf. $ 1,. 1 Michigan Harrison Kingsbury Major Coll 1." Mill/Resurf 1. $,. 1 Edgewood Division Ohio Major Coll Sealcoat +. 1 $,. 1 Michigan Maple Linconlway Major Coll 1." Mill/Resurf. $ 1,. 1 th I G Major Coll Sealcoat +. $,. 1 Colfax SR th Major Coll Sealcoat + 1. $,. 1 Larson Bach Berkel Major Coll Sealcoat +. $,. 1 Madison Lincoln Hwy Perry Major Coll Sealcoat $ 1,. 1 Park Niesen Koomler Major Coll Sealcoat +. $,. 1 Philadelphia Ohio Lincoln Hwy Major Coll Sealcoat +. $ 1,. 1 Philadelphia Ohio Lincoln Hwy Major Coll Sealcoat. $,. 1 State Detroit Linwood Major Coll Sealcoat +. $,. 1 Andrew 1th 1th Major Coll Sealcoat. $,. 1 Boston North Bach Major Coll Sealcoat 1. $,. 1 Colfax th nd Major Coll Sealcoat. $,. 1 Philadelphia Virginia Jefferson Major Coll Sealcoat. $,. 1 Genesis Koomler Jurisdiction Line Major Coll Sealcoat. $,. 1 L nd 1st Major Coll Sealcoat. 1 $ 1,. 1 Michigan Harrison Maple Major Coll Sealcoat 1. $ 1,. 1 Fox Southmoor Marion Major Coll Sealcoat 1. $,. 1 Fox Plummer Alexander Major Coll Sealcoat. $. 1 Lake St Central Ave Hawthorne Minor Coll 1." Mill/Resurf 1 $,. 1 Lake Shore Dr Oakwood Pine Lake Ave Minor Coll 1." Mill/Resurf $,. 1 th Zigler Colfax Minor Coll 1." Mill/Resurf 1 $,1. 1 th Zigler Colfax Minor Coll Sealcoat + 1 $ 11,. 1 nd Wabash L st Minor Coll 1." Mill/Resurf $,1. 1 nd Wabash L st Minor Coll 1." Mill/Resurf 1 $ 1,.

11 City of La Porte *DRAFT* -Year Pavement Management Plan 1-Identified Roads for Improvement 1 Edgewood Monroe Roberts Minor Coll 1." Mill/Resurf $ 1,. 1 Edgewood Monroe Roberts Minor Coll Sealcoat + $,. 1 Roberts Edgewood Division Minor Coll Sealcoat + 1 $,. 1 th Wabash G Minor Coll Sealcoat + 11 $,. 1 nd Colfax Wabash Minor Coll Sealcoat + 1 $,. 1 F rd nd Minor Coll Sealcoat + $,. 1 Harrison Chicago Michigan Minor Coll Sealcoat + 1 $,. 1 Detroit Maple Clear Lake Minor Coll Sealcoat + 1 $ 1,. 1 Bach Park Neisen Minor Coll Sealcoat + $,. 1 Industrial Darlington Boyd Minor Coll Sealcoat + $,. 1 Farrand Norris th Minor Coll Sealcoat + 1 $,. 1 Monroe Lincolnway Washington Local 1." Mill/Resurf 1 1 $ 1,. 1 Mustang Corvette Toronado Local 1." Mill/Resurf $,. 1 Cougar Corvette Toronado Local 1." Mill/Resurf $,. 1 th Andrew I Local 1." Mill/Resurf 1 $ 1,. 1 Talley Scott Lawrence Local 1." Mill/Resurf $ 1,. 1 Talley Lawrence Philadelphia Local 1." Mill/Resurf $,. 1 Oberreich Dead-End Burson Local 1." Mill/Resurf 1 $,. 1 Oberreich Dead-End Burson Local 1." Mill/Resurf 1 $ 1,. 1 Planett Bosserman Burson Local 1." Mill/Resurf 1 $,. 1 Planett Bosserman Burson Local 1." Mill/Resurf 1 $ 1,. 1 Adams Lincolnway dead-end Local 1." Mill/Resurf 1 $,. 1 Linwood Lincolnway dead-end Local 1." Mill/Resurf 1 $ 1,. 1 Jackson Lincolnway dead-end Local 1." Mill/Resurf $,. 1 Warsaw Niesen Dead-End Local 1." Mill/Resurf 1 $,. 1 Cable Pine Erie Local 1." Mill/Resurf 1 $,. 1 Belden Bach Erie Local 1." Mill/Resurf $,. 1 Pine Park Belden Local 1." Mill/Resurf $,. 1 Roosevelt Bach Erie Local 1." Mill/Resurf 1 $,. 1 Cherry Park Larson Local 1." Mill/Resurf 1 1 $ 1,1. 1 Oak Park Roosevelt Local 1." Mill/Resurf $,. 1 Ellis Park Niesen Local 1." Mill/Resurf $,. 1 Rockwood Williams Dead-End Local 1." Mill/Resurf $,. 1 Haviland Williams Dead-End Local 1." Mill/Resurf $,. 1 Home Williams Dead-End Local 1." Mill/Resurf $,. 1 Fremont Williams dead-end Local 1." Mill/Resurf $ 1,. 1 Polk Pine Lake Fremont Local 1." Mill/Resurf 1 $,1.

12 City of La Porte *DRAFT* -Year Pavement Management Plan 1-Identified Roads for Improvement 1 Orchard Bluff Dead-End Pine Lake Ave Local 1." Mill/Resurf $,. 1 Hill Orchard Bluff Dead-End Local 1." Mill/Resurf $ 1,. 1 Lane Lakeside Closser Local 1." Mill/Resurf 1 $,. 1 Lakeside Orchard Bluff Dead-End Local 1." Mill/Resurf 1 $,. 1 th Andrew J Local Sealcoat + $,. 1 nd I E Local Sealcoat + $,. 1 rd G F Local Sealcoat + $,. 1 D th th Local Sealcoat + 1 $,. 1 Michigan Kingsbury Forest Local Sealcoat + $,. 1 Woodlawn Indiana Forest Local Sealcoat + $,. 1 Albin Ohio Dead-End Local Sealcoat + 1 $,1. 1 Niles Woodward Stanley Ct Local Sealcoat + 1 $,. 1 Rumely Maple Jefferson Local Sealcoat + $,. 1 Scott Ohio Lincoln Hwy Local Sealcoat + 1 $ 1,. 1 Cherry Park Larson Local Sealcoat + $,. 1 Oak Park Roosevelt Local Sealcoat + $,1. 1 Larson Bach Berkel Local Sealcoat + $,. Total $ 1,,. inflation % Total cost (1$) $ 1,,. % of Budget %

13 City of La Porte * DRAFT* -Year Pavement Management Plan 1 - Identified Roads For Improvement Year Road Segment from Segment to NFC Current PASER Treatment Length Avg Width Area (SY) Total Cost 1 Andrews 1th 1th Major Coll 1." Mill/Resurf 1. $ 1,1. 1 F st th th Major Coll 1." Mill/Resurf. $,. 1 th J I Major Coll 1." Mill/Resurf. $ 11,. 1 th A st Wright Major Coll 1." Mill/Resurf 1. $ 1,1. 1 Wright th Fox Major Coll 1." Mill/Resurf. $ 1,. 1 th G F Major Coll 1." Mill/Resurf. 1 $,. 1 Weller Greenleaf Oakwood Major Coll Sealcoat + 1. $ 1,. 1 th I G Major Coll Sealcoat +. $,. 1 A st City limits th Major Coll 1." Mill/Resurf. 11 $,. 1 Lake Shore Dr Craven Oakwood Minor Coll 1." Mill/Resurf $,. 1 Lake Shore Dr Craven Oakwood Minor Coll Sealcoat + $ 1,. Total $,. inflation Total Cost (1$) % $,. % of Budget %

14 1 Based on available funding in 1 the following additional work can be performed: Additional Roads will be identified based on additional pavement rating following the 1 construction season Arterial Lane Miles Cost P = SealCoat + P = Sealcoat $ - Major Collector Lane Miles P = 1." Mill/Resurf P = SealCoat + P = Sealcoat Minor Collector Lane Miles P = 1." Mill/Resurf 1 $ 1,. P = SealCoat + P = Sealcoat 1.1 $,. Local Lane Miles P = " HMA Recon 1 $ 11,. P = 1." Mill/Resurf $ 1,. P = 1." Mill/Resurf. $,. P = SealCoat +. $ 11,. P = Sealcoat. $,. Total $,. Identified Road funding total $,. Year Total $ 1,,.

15 City of La Porte -Year Pavement Management Plan Roads Identified for Improvement are all addressed in years 1-1 Available funds for 1 and are $,/year Roads identified by NFC, PASER rating, and length to be improved Additional Roads will be identified based on additional pavement rating following the 1 construction season 1 Arterial Cost/Lane-Mile Lane Miles Cost P = " HMA Recon $,. $ - P = " Mill/Resurf $ 1,. $ - P = 1." Mill/Resurf $,. $ - P = SealCoat + $,. $ - P = Sealcoat $,. $ - Major Collector Cost/Lane-Mile Lane Miles P = " HMA Recon $ 1,. $ - P = 1." Mill/Resurf $,. $ - P = 1." Mill/Resurf $ 1, $ 1,.11 P = SealCoat + $ 1,. $ - P = Sealcoat $,. $ - Minor Collector Cost/Lane-Mile Lane Miles P = " HMA Recon $ 1,. $ - P = 1." Mill/Resurf $,. $ - P = 1." Mill/Resurf $ 1,1.. $ 1,. P = SealCoat + $ 1,. $ - P = Sealcoat $,. $ - Local Cost/Lane-Mile Lane Miles P = " HMA Recon $ 11,. 1 $ 11,. P = 1." Mill/Resurf $,. $ 1,. P = 1." Mill/Resurf $,. $,. P = SealCoat + $ 1,. $ - P = Sealcoat $,. $ - Total $,11.1 inflation %/ $,.

16 City of La Porte -Year Pavement Management Plan Roads Identified for Improvement are all addressed in years 1-1 Available funds for 1 and are $,/year Roads identified by NFC, PASER rating, and length to be improved Additional Roads will be identified based on additional pavement rating following the 1 construction season Arterial Cost/Lane-Mile Lane Miles Cost P = " HMA Recon $,. $ - P = " Mill/Resurf $ 1,. $ - P = 1." Mill/Resurf $,. $ - P = SealCoat + $,. $ - P = Sealcoat $,. 1 $,. Major Collector Cost/Lane-Mile Lane Miles P = " HMA Recon $ 1,. $ - P = 1." Mill/Resurf $,. 1 $,. P = 1." Mill/Resurf $ 1,1. $ - P = SealCoat + $ 1,. $ - P = Sealcoat $,. 1. $ 1,1. Minor Collector Cost/Lane-Mile Lane Miles P = " HMA Recon $ 1,. $ - P = 1." Mill/Resurf $,. 1. $,. P = 1." Mill/Resurf $ 1,1. $ - P = SealCoat + $ 1,. $ - P = Sealcoat $,. 1 $,. Local Cost/Lane-Mile Lane Miles P = " HMA Recon $ 11,. $,. P = 1." Mill/Resurf $,. $,. P = 1." Mill/Resurf $,. $ - P = SealCoat + $ 1,. $ - P = Sealcoat $,. $ - Total $,. inflation %/yr $,1.

City of San Gabriel. Updated Street Paving Information and Current Project Information. Great Streets Construction Update October 2011

City of San Gabriel. Updated Street Paving Information and Current Project Information. Great Streets Construction Update October 2011 City of San Gabriel Updated Street Paving Information and Current Project Information Great Streets Construction Update October 2011 Construction progresses on the Great Streets Program -- the City s approach

More information

Criteria: State: Indiana County: ALL COUNTIES ID #: All. Results: 363 records found.

Criteria: State: Indiana County: ALL COUNTIES ID #: All. Results: 363 records found. Criteria: State: Indiana County: ALL COUNTIES ID #: All Results: 363 records found. Name ID# Type Score Designation Date Update Date Adams CountyNo MUAs in this county. Allen County Southside Fort Wayne

More information

New Technologies for Pavement Evaluation

New Technologies for Pavement Evaluation New Technologies for Pavement Evaluation TxDOT 3-D Pavement Survey Technology For 86 th Annual Transportation Short Course at Texas A&M University, 2012 Dr. Yaxiong (Robin) Huang, Robin.Huang@txdot.gov

More information

TWO RIVERS BUS STOPS AND BUS INFORMATION

TWO RIVERS BUS STOPS AND BUS INFORMATION TWO RIVERS BUS STOPS AND BUS INFORMATION ALL BUS PASS STUDENTS MUST PRE-REGISTER and purchase the first pass prior to first day of school to ride. Students that require a bus pass are: *Students within

More information

APPENDIX E. Expenditures by Department

APPENDIX E. Expenditures by Department APPENDIX E Expenditures by Department 199 AIRPORT 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal

More information

APPENDIX F. Expenditures by Year

APPENDIX F. Expenditures by Year APPENDIX F Expenditures by Year 209 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal 90% 2,700,000 3,000,000

More information

Dakota County Transportation CIP Process Requests from cities/townships

Dakota County Transportation CIP Process Requests from cities/townships City of Apple Valley Letter: e-mail w/traffic Engineer City of Apple Valley Engineer coordinating CIP Project County Traffic Staff is in the process of assessing Requests directly with Dakota County Traffic

More information

3D TECHNOLOGY FOR PAVEMENT PRESERVATION

3D TECHNOLOGY FOR PAVEMENT PRESERVATION 3D TECHNOLOGY FOR PAVEMENT PRESERVATION Technical Discussion for WASHTO 2015 Magdy Mikhail, P.E. Robin Huang Todd Copenhaver Footer Text March 23, 2015 Date Capabilities of 3D Technology for Pavement Preservation

More information

Medically Underserved Areas/Populations (MUA/P) And Primary Care Health Professional Areas (HPSA) May, 2010

Medically Underserved Areas/Populations (MUA/P) And Primary Care Health Professional Areas (HPSA) May, 2010 Allen Southside Fort Wayne SA 955 MUA CTs 11, 15, 17, 18, 20, 21, 27-30 53.5 Allen Fr. Wayne-Inner City 1189991855 Geographic CTs 11-18, 20, 21, 23, 25-27, 29-31, 40 9 Allen Neighborhood Health Clinics,

More information

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice 1 of 6 Date Generated: 10/30/2018 Projects Returned: 75 Let Date Contract ID Project ID Project Name Project Type County Route Work

More information

Sheffield Ave. Anticipated Acquisition Areas** Residential Commercial. Industrial. Municipal Exempt Non-Municipal !!!! Utility !!!! !!!!

Sheffield Ave. Anticipated Acquisition Areas** Residential Commercial. Industrial. Municipal Exempt Non-Municipal !!!! Utility !!!! !!!! R9 R8 R5 R6 R7 Pierce Ave 205th Pl R4 Eagle Ct R3 R2 R1 206th Pl Northgate Dr Blue Jay Way riole Ct Sheffield Ave Seminary Dr Polk Ave Swan Dr Tyler Ave Barberry Dr Harrison Ave Jackson Ave DLTN SUTH HLLAND

More information

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008 Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View Minnesota Pavement Conference February 14, 2008 1 The Situation 2 WSDOT policy, in essence, mandated use of BSTs

More information

Road Surface Texture Evaluation with 3-D Laser Data

Road Surface Texture Evaluation with 3-D Laser Data Road Surface Texture Evaluation with -D Laser Data Shuvo Islam 1, Mustaque Hossain, and Humaira Zahir ( 1 Kansas State University, Manhattan, KS, USA, sislam@ksu.edu) ( Kansas State University, Manhattan,

More information

Sewer System Capital Budget Process

Sewer System Capital Budget Process Sewer System Capital Budget Process Presentation to New Castle County Council Department of Special Services Committee Meeting Jason P. Zern, P.E. Operations Engineer March 1, 2016 1 Outline Review Asset

More information

Facility Condition Assessments

Facility Condition Assessments Facility Condition Assessments City Council Work Session: July 1, 2014 Department of Public Works Introduction Andrew Clough, Director, Public Works Phil Harrington, Deputy Director, Public Works Lorin

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE. September 12, :00 p.m. Public Works Facility 711 Laramie Avenue, Wilmette, IL

MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE. September 12, :00 p.m. Public Works Facility 711 Laramie Avenue, Wilmette, IL 1200 Wilmette Avenue WILMETTE, ILLINOIS 60091 MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE September 12, 2016 7:00 p.m. Public Works Facility 711 Laramie Avenue, Wilmette, IL 1) Call to

More information

S TR EET L IG HT I NG

S TR EET L IG HT I NG S TR EET L IG HT I NG ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 FY 214-218 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 213 Adopted

More information

Getting Started with Stormwater Asset Management

Getting Started with Stormwater Asset Management Getting Started with Stormwater Asset Management Fall Conference Broken Arrow, OK September 17, 2018 Trey Shanks CFM, IAM, PACP ts@freese.com Asset management roadmap STEP 4 Risk Based Analysis STEP 3

More information

Traverse City Asset Management Plan

Traverse City Asset Management Plan Utilities and Public Services Larry LaCross, GISP, Asset Management/GIS Analyst Traverse City Department of Public Services Introduction About Traverse City (TC) TC Assets Department of Public Services

More information

Recent Innovations in the Management of Irish National Roads

Recent Innovations in the Management of Irish National Roads Recent Innovations in the Management of Irish National Roads Dr. Kieran Feighan PMS Ray McGowan PMS Tom Casey NRA (Ireland) Andrew O Sullivan NRA (Ireland) NRA Pavement Management System dtims version

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee April 28, 2015 City Council May 4, 2015 Agenda Item: Plans and Specifications for City Projects: 7263, District No. 185 Street Lights for Prairiewood

More information

GREEN VALLEY LAWN CARE & SNOW PLOW JOLIET, IL SITE MOWING PRICE (PER YEAR) MAINT. PRICE (PER YEAR)

GREEN VALLEY LAWN CARE & SNOW PLOW JOLIET, IL SITE MOWING PRICE (PER YEAR) MAINT. PRICE (PER YEAR) ULATION CITY OF JOLIET - DEPARTMENT OF PUBLIC UTILITIES PROJECT: 2017 LAWN MOWING SERVICES - UTILITIES ENGINEER'S ESTIMATE - 2017: $ 55,000.00 BIDS OPENED: March 14, 2017, at 9:45 A.M. LOCATION: 150 W.

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET STREET LIGHTING

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET STREET LIGHTING FY 212-216 Capital Improvement Program Priority Description FY 211 FY 212 FY 213 FY 214 FY 215 FY 216 1 For Residential Streets - Various Locations

More information

James L. Brown, Larry J. Buttler and William P. Ezzell

James L. Brown, Larry J. Buttler and William P. Ezzell ~.,_~w._'''... SURVEY OF STRUCTURAL FAILURES IN A CONTINUOUSLY REINFORCED CONCRETE PAVEMENT By James L. Brown, Larry J. Buttler and William P. Ezzell Special Study No.. Highway Design Division, Research

More information

Georeferencing West Virginia DOT s Roadside Assets: An Asset Inventory Case Study. Geoff Dew April 13,

Georeferencing West Virginia DOT s Roadside Assets: An Asset Inventory Case Study. Geoff Dew April 13, : An Asset Inventory Case Study Geoff Dew April 13, 2010 General Project Scope 17,817 miles collected across all systems. System Type Delivered Miles 1 Interstates 1100.820 2 US Routes 2184.538 3 WV Routes

More information

2014 BOND PROGRAM UPDATE

2014 BOND PROGRAM UPDATE 2014 BOND PROGRAM UPDATE Presented to the City Council By the City Manager s Office August 11, 2015 1 Topics Previous Debt Programs 2014 Bond Program o Goals o Funding Commitments o Progress Communication

More information

Development of Warm Mix Asphalt Policies and Specifications in Minnesota

Development of Warm Mix Asphalt Policies and Specifications in Minnesota Development of Warm Mix Asphalt Policies and Specifications in Minnesota Tim Clyne, Greg Johnson, John Garrity MnDOT 2 nd International Warm Mix Conference October 13, 2011 Acknowledgements MnDOT Greg

More information

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSAL

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSAL CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSAL ENGINEERING CONSULTING SERVICES FOR THE UPDATING OF THE CITY OF BEVERLY HILLS PAVEMENT MANAGEMENT

More information

Lakeland, Florida Entitled 44 Acre Site: Retail / Multi-Family

Lakeland, Florida Entitled 44 Acre Site: Retail / Multi-Family Lakeland, Florida Entitled 44 Acre Site: Retail / Multi-Family Internal street, utilities storm retention system in place hauger Property information Outparcels, Major Retail, and Multi-Family entitled

More information

Adoption Preparation Training Schedule 2018

Adoption Preparation Training Schedule 2018 Adoption Preparation Training Schedule 2018 WEST MIDDLE EAST May Dates: May 3, 10, 17, & 24 Time: 5:15 7:15pm CDT Location: First United Methodist Church 215 North Main Street Dickson, TN 37055 Dates:

More information

Construction Projects Report Starting Oct 02-08, 2017

Construction Projects Report Starting Oct 02-08, 2017 Construction Projects Report Starting Oct 02-08, 2017 road closures Barthold Rd at Intersection of I35 Service Rd going West 700' will be closed (Jun 12-Oct 15) lane closures Street / Intersection Detour

More information

North Shore Residence Addition 1619 Chicago Avenue Evanston, Illinois 60201

North Shore Residence Addition 1619 Chicago Avenue Evanston, Illinois 60201 North Shore Residence Addition 1619 Chicago Avenue Evanston, Illinois 60201 Construction Management Plan General Contractor: Valenti Builders, Inc. Owner: Horizon Realty Group Architect: Myefski Architects

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

Finance & Personnel ~ Agenda ~ City Hall, Second Floor Rockford, IL Committee Meeting

Finance & Personnel ~ Agenda ~ City Hall, Second Floor Rockford, IL Committee Meeting Finance & Personnel ~ Agenda ~ City Hall, Second Floor Rockford, IL 61104 Committee Meeting http://www.rockfordil.gov/ Monday, March 14, 2016 5:30 PM The following represents, in general, the chronological

More information

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry

More information

Kansas Division. January 31, 2018

Kansas Division. January 31, 2018 Division January 31, 6111 SW 29 th, Suite 100 Topeka, 66614 (785) 273-2600 (785) 273-2620 (fax) www.fhwa.dot.gov/ksdiv/index.htm Catherine M. Patrick, P.E. State Transportation Engineer Department of Transportation

More information

Permits Issued from 3/1/2019 to 3/31/2019

Permits Issued from 3/1/2019 to 3/31/2019 Page 1 of 14 Permit # Primary Name / Project Description Site Address Issued Valuation 2018-00744 STEVEN A SEE 1814 LAY ST Homeowner OK'd by MRMinnick 2019-00318 3703 54TH ST 2019-00506 4501 FLAMINGO CT

More information

INTELLIGENT TRANSPORTATION SYSTEM PLAN ECIA

INTELLIGENT TRANSPORTATION SYSTEM PLAN ECIA INTELLIGENT TRANSPORTATION SYSTEM PLAN ECIA Table of Contents Purpose 1 Local Efforts 2-3 Equipment 4-5 Justification 6-7 Priority 1: U.S. 20 From Cousins Road To Julien Dubuque Bridge 8-13 Priority 2:

More information

TRAFFIC COUNT PROGRAM

TRAFFIC COUNT PROGRAM TRAFFIC PROGRAM OCTOBER 008 CITY OF RICHARDSON Development Services Transportation Division 4 W. Rd. (97) 744-40 City of Richardson - Traffic Volume Flow Map Pres. George Bush Tollway SH90 Waterview Pkwy

More information

TRAFFIC COUNT PROGRAM. DECEMBER 2015 CITY OF RICHARDSON Development Services Transportation Division 411 W. Arapaho Rd.

TRAFFIC COUNT PROGRAM. DECEMBER 2015 CITY OF RICHARDSON Development Services Transportation Division 411 W. Arapaho Rd. TRAFFIC PROGRAM DECEMBER 05 CITY OF RICHARDSON Development Services Transportation Division 4 W. Rd. (97) 744-40 City of Richardson - Traffic Volume Flow Map Pres. George Bush Tollway SH90 () Coit Road

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

Report run on 01/27/16 at 2:31pm

Report run on 01/27/16 at 2:31pm Sales Comparison Report: Single Family Residential (New and Existing) The following information does not indicate appreciation rates by suburbs / municipality. Report run on // at :pm Page ADAMS County

More information

EAGLE COUNTY TOWNHOME SALES

EAGLE COUNTY TOWNHOME SALES *TIME ADJUSTED SALES : The price for which a property sold adjusted for the effects of inflation or deflation between the date of sale and the date of appraisal (6/30/10) EMPLOYEE HOUSING/DEED RESTRICTED

More information

APPENDIX N. PACSES Domestic Relations Sections Locations. RFP Appendix N PACSES Domestic Relations Sections Locations Page 1 of 16

APPENDIX N. PACSES Domestic Relations Sections Locations. RFP Appendix N PACSES Domestic Relations Sections Locations Page 1 of 16 APPENDIX N PACSES Domestic Relations s Locations RFP 02-15 Appendix N PACSES Domestic Relations s Locations Page 1 of 16 Adams County Domestic Relations Adams 123 BALTIMORE ST GETTYSBURG PA 17325 County

More information

Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG

Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas Flexible Pavement Research Symposium Denver, Colorado

More information

Open house April 26 & 27, 2017

Open house April 26 & 27, 2017 Open house April 26 & 27, 2017 ROAD MAP ENVIRONMENTAL ASSESSMENT Approved by City Council 2012 and Province of Ontario 2013 LA SALLE CAUSEWAY Traffic Operations Study ACTION PLAN SHOVEL-READY Approved

More information

EXISTING STRUCTURE 2252 THIRD AVENUE

EXISTING STRUCTURE 2252 THIRD AVENUE EXISTING STRUCTURE 2252 THIRD AVENUE 50 WIDE DEVELOPMENT SITE: ~ 51,000 BSF Within The New East Harlem Rezoning 2252 THIRD AVENUE - PROPERTY FEATURES ASKING PRICE: $12,000,000 PPBSF: $236 Property Features:

More information

Town Center - Mixed Use Site 44+ Acres

Town Center - Mixed Use Site 44+ Acres Town Center - Mixed Use Site 44+ Acres Lakeland, Florida Property information Outparcels, Major Retail, and Multi-Family entitled Infrastructure in place: All Utilities, Spine Road, Master Retention At

More information

EAGLE COUNTY TOWN HOME SALES 7/1/2014-6/30/2016

EAGLE COUNTY TOWN HOME SALES 7/1/2014-6/30/2016 EAGLE COUNTY TOWN HOME S 7/1/2014-6/30/2016 SUPER *USTED : The amount for which a property sold adjusted for market conditions (inflation or deflation) between the date of sale and the date of appraisal

More information

Construction Projects Report Starting Nov 27-Dec 03, 2017

Construction Projects Report Starting Nov 27-Dec 03, 2017 Construction Projects Report Starting Nov 27-Dec 03, 2017 road closures Barthold Rd at Intersection of I35 Service Rd going West 700' will be closed (Jun 12-Dec 18) lane closures Street / Intersection

More information

STATE STREET CORRIDOR

STATE STREET CORRIDOR CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

Brook Street all addresses 2/B Brunswick Avenue all addresses 8 Buchanan Street all addresses 7/A Carnegie Street / A Carnegie Street 900

Brook Street all addresses 2/B Brunswick Avenue all addresses 8 Buchanan Street all addresses 7/A Carnegie Street / A Carnegie Street 900 The following index of Linden City Streets is a guide for RESIDENTIAL garbage * trash* recycling collection only. Voting wards and districts have not been changed. Street Address District/ Zone Academy

More information

U.S. System Summary: OHIO HUB

U.S. System Summary: OHIO HUB U.S. System Summary: OHIO HUB Ohio Hub High-Speed Rail System (Source: Ohio Hub Study, 2007) The Ohio Hub high-speed rail system is a system of proposed routes containing 864 miles in four segments with

More information

State of the City Address

State of the City Address #1 IN TEXAS, #2 IN NATION State of the City Address Presented by Allen Mayor Stephen Terrell SAFEST CITIES IN TEXAS - #16 MORE SIGNIFICANT RECOGNITIONS GOVENOR S COMMUNITY ACHIEVEMENT AWARD BEST PLACES

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 6 Date: 4.0.4 Request to File Sectional Map Amendment to Implement Recommendations of the

More information

Polymer-Modified Asphalts Enhancing HMA Performance. New Orleans, Louisiana January 28, 2003

Polymer-Modified Asphalts Enhancing HMA Performance. New Orleans, Louisiana January 28, 2003 Polymer-Modified Asphalts Enhancing HMA Performance New Orleans, Louisiana January 28, 2003 Presentation Overview 1. Introduction 2. Phase I Overview 3. Summary of Interim Results & Findings Study Objectives

More information

Services DSL / Broadband Coax Integrated T 29 Ethernet MPLS Fiber Wireless Internet

Services DSL / Broadband Coax Integrated T 29 Ethernet MPLS Fiber Wireless Internet Services DSL / Broadband Coax Integrated T 20 Ethernet MPLS Fiber Wireless Internet 502 Bell St Call Box Services DSL / Broadband Coax Integrated T 21 Ethernet MPLS Fiber Wireless Internet 348 Bell St

More information

of it all. Dane Hooks Managing Director T: F:

of it all. Dane Hooks Managing Director T: F: 555Oakland s City Center premier office tower at the center of it all. ±485,000 Square Feet of Class A Office in the Heart of Oakland www.555citycenter.net For more information, contact: John Dolby Executive

More information

Diversified Electrical Systems. Corporate Resume

Diversified Electrical Systems. Corporate Resume Diversified Electrical Systems Corporate Resume 4283 SW High Meadows Ave. Palm City, FL 34990 Phone: 772-219-9942 CONTENTS Section 1 Section 2 Company Overview References Section 3 Section 4 Section 5

More information

Construction Projects Report Starting Nov 13-19, 2017

Construction Projects Report Starting Nov 13-19, 2017 Projects Report Starting Nov 13-19, 2017 road closures Barthold Rd at Intersection of I35 Service Rd going West 700' will be closed (Jun 12-Dec 18) lane closures Street / Intersection RESIDENTIAL Bellemead

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

Route Stop Locations

Route Stop Locations Route Locations : PR 70 PM 49:53 20.32 14-16 Marianne Simonson 3:16 pm (2) 10730 MORRIS RD SE 3:21 pm (3) 11601 VAIL RD SE 3:21 pm (4) 11647 VAIL RD SE 3:21 pm (5) 11710 VAIL RD SE 3:22 pm (6) 11804 VAIL

More information

Incident Analysis Report

Incident Analysis Report 11/07/2011 00:26 2011-00031686 Loud Music 405 E GOLF AVE NC 911 5854 - Bretes 11/07/2011 00:28 2011-00031685 Traffic Offense E MAIN ST / STAR RD 11/07/2011 00:44 2011-00031687 Traffic Offense S BROWN ST

More information

Pavemetrics. Automatic detection of sealed cracks using images and 3D data. PAVEMETRICS Systems Inc.

Pavemetrics. Automatic detection of sealed cracks using images and 3D data. PAVEMETRICS Systems Inc. Automatic detection of sealed cracks using images and 3D data Vision Technology for Inspection of Transportation Infrastructures PAVEMETRICS Systems Inc. 150 Boulevard René-Lévesque Est, Suite 1820 Québec,

More information

2016 MPMA Active Membership

2016 MPMA Active Membership 2016 MPMA Active Membership Todd Leyse ADAM'S Pest Control, Inc. Phone: 763-478-9810 922 Highway 55 Suites 100 Email: tleyse@adamspestcontrol.com Medina, MN 55340-0233 Nathan Danielson Alliance Pest Protection,

More information

MONROE COMMERCE CENTER

MONROE COMMERCE CENTER MONROE COMMERCE CENTER Salzman Rd. 35 Acre Development Site Salzman Road at State Route 63 Mark Volkman +1 513 252 2123 mark.volkman@am.jll.com Tom Fairhurst +1 513 297 2511 tom.fairhurst@am.jll.com PROPERTY

More information

Highlighting Key: Green - grade went up, yellow - stayed the same, red - grade went down

Highlighting Key: Green - grade went up, yellow - stayed the same, red - grade went down PUBLIC SCHOOLS Highlighting Key: Green - grade went up, yellow - stayed the same, red - grade went down SCHOOL MODEL SUB EMS SUB HS CHARTER CORP ID CORPORATION NAME ID SCHOOL NAME County CODE CODE CODE

More information

SUBURBAN MARYLAND IN THIS ISSUE OFFICE Q RESEARCH MARKET REPORT. State of the Economy. Leasing Activity. Development Pipeline.

SUBURBAN MARYLAND IN THIS ISSUE OFFICE Q RESEARCH MARKET REPORT. State of the Economy. Leasing Activity. Development Pipeline. RESEARCH MARKET REPORT SUBURBAN MARYLAND OFFICE IN THIS ISSUE State of the Economy p.2 Leasing Activity p.3 Development Pipeline p.4 Market Outlook p.5 Market Breakdown p.6 Much Needed Trophy Development

More information

Local Road Surface Selection Tool Technical Report

Local Road Surface Selection Tool Technical Report Department Publication No. 293 April 2017 Local Road Surface Selection Tool Technical Report Prepared by: Andrew Wrucke, P.E. Brad Wentz, P.E. Kimberly Vachal, Ph.D. Program development for this project

More information

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801 GORE BUILDING 238 N. Massachusetts Avenue, Lakeland, FL 33801 CDB LOCATION REDEVELOPMENT PROJECT MUNN PARK HISTORIC DISTRICT INCENTIVES AVAILABLE ADJACENT PARKING INCLUDED BK698301 Phone: (863) 683-3425

More information

Pennsylvania One Call System, Inc.

Pennsylvania One Call System, Inc. Pennsylvania One Call System, Inc. Bill Kiger President & CEO 412.464.7111 wgkiger@pa1call.org Pennsylvania One Call System, Inc. Our purpose is to prevent damage to underground facilities. To promote

More information

(TSZ) 4: 5: 6: 7: : 9: 10: 11: (2030 AM

(TSZ) 4: 5: 6: 7: : 9: 10: 11: (2030 AM APPENDIX A: Maps Figure 1: Corridor Improvement Map Figure 2: Project Location Map Figure 3: FEMA Floodplain and USGS Quadrangle Maps Figure 4: Tree Removal Maps Figure 5: Mobile Source Air Toxics (MSAT)

More information

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU KANSAS MAP CHANGES KANSAS DEPARTMENT O TRANSPORTATION I 635 WYANDOTTE K 4890-01 GR&SU 12/23/2004 502101031 Re-CONSTRUCTION O I-635 ROM K-32 (KANSAS AVE.), NORTH TO JUST NORTH O US-24 (STATE AVE.). INCLUDES

More information

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014 Treatment Facility Asset Management and Risk Based Assessment NE Texas WEAT Biennial Conference May 7, 2014 Asset Management What is? A set of processes to minimize infrastructure life cycle costs at an

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

UTILITIES AND PIPELINE OPERATORS THROUGHOUT NORTH AMERICA CHOOSE INFRASOURCE FOR ITS EXTENSIVE KNOWLEDGE, EXPANSIVE RESOURCES, AND UNMATCHED SCOPE OF

UTILITIES AND PIPELINE OPERATORS THROUGHOUT NORTH AMERICA CHOOSE INFRASOURCE FOR ITS EXTENSIVE KNOWLEDGE, EXPANSIVE RESOURCES, AND UNMATCHED SCOPE OF UTILITIES AND PIPELINE OPERATORS THROUGHOUT NORTH AMERICA CHOOSE INFRASOURCE FOR ITS EXTENSIVE KNOWLEDGE, EXPANSIVE RESOURCES, AND UNMATCHED SCOPE OF SERVICES. INDUSTRY LEADER With legacy companies dating

More information

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition CASE 1 2 (0.6m) Joint Line See sheet #5 for description of variables 4 (1.2m) Transition taper is tangent to Edge of Pavement curve at this point. 1:25 Paved shoulder transition 16 (4.m) Median width 16

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM FROM: Joel Rae, Director of Public Safety (ext. 113) THROUGH: Deb Hinsvark, Interim City Manager (ext. 228) DATE: December 18, 2012 RE: Police and Fire

More information

WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes

WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes WINDSTREAM CARRIER ETHERNET: E-NNI Guide & ICB Processes Version.0, April 2017 Overview The Carrier Ethernet (E-Access) product leverages Windstream s MPLS and Ethernet infrastructure to provide switched

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: January 18, 2018 # 8 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Traffic Analysis and Safety Study of Waxpool Road

More information

Important Announcements

Important Announcements Important Announcements Regarding your funds The funds you currently have in your account are secure and safeguarded under, and according to, the regulatory guidelines of your state. We are unable to complete

More information

Proposed Five Year Capital Improvement Plan

Proposed Five Year Capital Improvement Plan Proposed Five Year Capital Improvement Plan July 1, 2015-June 30, 2020 Overview FY 2016 Total FY16 CIP $39,451,538 Presenters: Brian Cason Capital Projects Manager Steve Davidek IT Manager Ron Korman Public

More information

How to Read the TIP Amendment Project Lis ngs

How to Read the TIP Amendment Project Lis ngs How to Read the TIP Project Lis ngs The project lis ng is a complete list of all projects in the TIP amendment. The state is noted in the heading. Bistate projects are listed first, followed by Kansas,

More information

QM31/QM35/QM36. Fresh Meadows, Glen Oaks, Lake Success, Queens, and Midtown, Manhattan. Special Schedule. Between

QM31/QM35/QM36. Fresh Meadows, Glen Oaks, Lake Success, Queens, and Midtown, Manhattan. Special Schedule. Between Special Bus Timetable Effective 2018 MTA Bus Company Special Schedule The Day After Thanksgiving Martin Luther King Day QM1/QM5/QM6 QM31/QM35/QM36 Express Service Between Fresh Meadows, Glen Oaks, Lake

More information

APPENDIX F: PUBLIC AGENCY INTEREST REVIEW (Copy of Notice of Availability, Copies of comment letters and responses, Copies of compliance

APPENDIX F: PUBLIC AGENCY INTEREST REVIEW (Copy of Notice of Availability, Copies of comment letters and responses, Copies of compliance APPENDIX F: PUBLIC AGENCY INTEREST REVIEW (Copy of Notice of Availability, Copies of comment letters and responses, Copies of compliance correspondence, Regulatory Requirements, Permits and Agency Coordination

More information

AGENDA: THURSDAY, MARCH 14, 2019 AT 1:30 P.M. SPECIAL MEETING

AGENDA: THURSDAY, MARCH 14, 2019 AT 1:30 P.M. SPECIAL MEETING AGENDA: THURSDAY, MARCH 14, 2019 AT 1:30 P.M. SPECIAL MEETING SPECIAL MEETING AGENDA A. CALL TO ORDER B. INFORMATION ITEM: C. ACTION ITEM: D. ADJOURN ATTACHMENT A INTERMODAL TRANSPORTATION TECHNICAL COMMITTEE

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re The Narragansett Electric Company : : Docket No. SB-2017-01 () : Pre-Filed Testimony of Daniel Ewan, Clear River Energy

More information

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT: BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design

More information

ROSS TOWNSHIP FIVE YEAR PAVING PLAN

ROSS TOWNSHIP FIVE YEAR PAVING PLAN 1 2017 Crestvale Road Woodsdale Road Ridgewood Road 02-012A Mill & Overlay 3.5" 1,850 1 2017 Kinvara Drive Kinsdale Drive Rebecca Court 02-031A Mill & Overlay 3.5" 580 1 2017 Kinvara Drive Erin Court Kinsdale

More information

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities - Central Corridor Rail-Volution - Weaving Transit into Existing Communities Management Committee, October 31, 2009 June Improving 11, 2008 mobility Easing congestion Strengthening our communities Twin

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018 MARTA BOARD OF DIRECTORS OCTOBER 4, 2018 TODAY S AGENDA o Key driver of the program o Recommended plan o Project summaries o Next steps 2 KEY DRIVER: PUBLIC INPUT o Atlanta City Design o Atlanta s Transportation

More information

Route 18 New Brunswick Improvement Project

Route 18 New Brunswick Improvement Project The State of New Jersey Department of Transportation Route 18 New Brunswick Improvement Project February 17, 2011 PMO Organization Chart Project Team Purpose and Need Improve motorist safety & traffic

More information

STEP Projects

STEP Projects -2013 Projects Project: Iona & Hunter Project #: BL-33-053E 2013 Township: Warren 21 Description: Part of Southeastern Phase II; Boundaries: N - Brookville Rd.; S - Iona Rd.; E - I-74; W - Lick Creek.

More information

California Pavement Preservation (CP 2 ) Center

California Pavement Preservation (CP 2 ) Center California Pavement Preservation (CP 2 ) Center ROGER D. SMITH Senior Pavement Specialist CSU, Chico Western States Regional In-Place Recycling Conference Ontario, CA September 13, 2012 Overview Caltrans

More information

Absent: Kevin W., Chris

Absent: Kevin W., Chris SilverHawk HOA Board Meeting Monday May 4 th, 2015 7:00 PM - Clubhouse Attendance: Kevin M., Ryan, Nick, Jesse, Mandy, Lisa Absent: Kevin W., Chris Old Business: What did we decide to do about the improvement

More information