1 Network & Substations HV SUBSTATION PROJECT Speaker : SIMON BATTANI & NICOLAS CHIDIAC Company : MATELEC 1
2 CONFERENCE OUTLINE - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS: MANAGEMENT & PROCUREMENT. PRIMARY & SECONDARY ENGINEERING. CONSTRUCTION & ERECTION. TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA. 2
3 ENGINEERING & CONTRACTING DIVISION HISTORY 3
4 BRIEF HISTORY Et Established blih in 1987 for the realization of complex HV, MV and LV projects. The Division starts with 5 engineers in the Construction of the Congress Palace 60/20kV S/S in Syria and the Rehabilitation of Jamhour & Bsalim 150kV S/S in Lebanon. Kept growing up and making new challenge in working for new markets and different standards. d Nowadays, the division count more than 100 Engineers, works in more than 10 countries and have build around 60 Substations. 4
5 ACHIEVED PROJECTS Algeria : Construction of (13) 400, 220 & 60kV GIS & AIS S/S. Extension of (9) 220 & 60kV AIS S/S. Nigeria : Construction of (2) 330 & 132kV AIS S/S. Extension of (1) 330/132kV AIS S/S. Senegal : Construction of (1) 67.5MW Power Plant with 90/15kV AIS S/S. Egypt : Construction of (1) () 66/11kV GIS S/S. KSA : Construction of (1) 34.5/13.8kV Indoor S/S. Lebanon : Construction & Extension of more than (15) 220 & 66kV GIS & AIS S/S. Rehabilitation of more than (60) 66/15-11kV AIS S/S. Syria : Construction of (10) 230 & 66kV GIS & AIS S/S. Extension of (2) 220/66kV GIS S/S. 5
6 Beirut Central District 220/66/20kV GIS S/S: (4) 220kV U/G Cable, (3) TR 220/20kV 80MVA. (4) 66kV U/G Cable, (2) TR 66/20kV 40MVA. (5) 20kV Incoming, (62) 20kV O/G, (5) 20kV Coupler. Client : Solidere Consultant : Dar El Handasah LEBANON MAIN PROJECT 6
7 ARAMOUN 220/150/20kV GIS S/S: (8) 220kV O/G Feeder, (2) TR 220/20kV 70MVA. (2) 150kV O/G Feeder, (1) TR 220/150kV 100MVA. (2) 20kV Incoming, (22) 20kV O/G, (1) 20kV Coupler. Client : EDL Consultant : EDF LEBANON MAIN PROJECT 7
8 GANMO 330/132/33kV AIS Breaker and a Half S/S: (4) 330kV Line, (2) Auto TR 330/132kV 150MVA. (2) 132kV Line, (2) TR 132/330kV 60MVA. (2) 33kV Incoming, (6) 33kV O/G. Client : Niger Delta Power Holding Consultant : STUCKY NIGERIA MAIN PROJECT 8
9 BANIAS 230/66kV GIS S/S: SYRIA MAIN PROJECT (9) 230kV Line, (6) 230kV Inc. Generator, (3) TR 230/66kV 125MVA. (8) 66kV Line, (3) 66kV Incoming, (1) 66kV Inc. Gaz Turbine, (3) 66kV Starting ti Transformer, (3) TR 66/20kV 30MVA. Client : PEEGT 9
10 MEKKERA 60/10kV GIS S/S: (5) 60kV U/G Cable, (3) TR 60/10kV 30MVA. (4) 10kV Incoming, (24) 10kV O/G, (2) 10kV Coupler. Client : SONELGAZ ALGERIA MAIN PROJECT 10
11 ACTIVITIES PROCESS MANAGEMENT & PROCUREMENT - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS - MANAGEMENT & PROCUREMENT. - PRIMARY & SECONDARY ENGINEERING. - CONSTRUCTION & ERECTION. - TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA. 11
12 Very Important Work to Accomplish The Essential Goal : Respect The Deadlines of all the Project Activities. All these Activities (Design, Approval, Procurements, Construction, Erection, Testing & Commissioning, etc) are Mentioned in Primavera Tables with the Starting & Finishing Days to Facilitate their Follow Up. PLANNING 12
13 BUDGET A Critical Activity to Respect The Budget of Each Order And To Stay Within the Overall Project Budget. All the Purchase Order are Done in ERP Software which Automatically Compare the Sum of Each Order to the Correspondent Item Budget in the Main Contract. 13
14 Once the Equipments are Defined & Approved, Procurements Responsible Put the Order Using ERP Software. PROCUREMENTS Telecom Prot. HV Relay Equipments & Microscada - ABB Switzerland ABB Finland (8 (6 (9 pages). g g ) ) They Check the Budget and Follow up the Suppliers to Respect the Deadline, Send the Filled Routine Test and to Prepare the Factory Acceptance Test in Manufacturer House. 14
15 ACTIVITIES PROCESS PRIMARY & SECONDARY ENGINEERING - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS - MANAGEMENT & PROCUREMENT. - PRIMARY & SECONDARY ENGINEERING. - CONSTRUCTION & ERECTION. - TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA. 15
16 PRIMARY & SECONDARY ENGINEERING The Engineers of Matelec are Skilled & Experienced in Executing all the Necessary Activities to Design in House: Different Types of New GIS & AIS Substations (Single BB, Double BB, UI type BB, Breaker and a Half, ). Extensions of Existing S/S Choosing Feasible & Optimized Solution to have Minimum Cut-Out Period with Respect to the Existing Status. Engineers Mains Scope of Works: Primary & Secondary Engineering (SLD, General Layout & Sections, Scada Architecture, Functional DWG, Grounding System, Design Criteria, Calculation Note, Auxiliary Services, Civil Guide, Gantries & Metallic Structure, etc), Definition & Checking the Supplier Primary & Secondary Engineering (HV, MV & LV Equipments). Coordination with the Client & the Responsible of the other Activities (Management, Procurement, Construction & Erection, Testing & Commissioning). All the Engineering Activities are Done According to the International Standards, Client Requirements and to the Following ISO Design Chart. 16
17 Project Planning Create Design Requirement Sales PRIMARY & SECONDARY ENGINEERING DESIGN CHART Design Requirement Review Purchasing NO Make Design In house? YES Detail Design Detail Design - Internal Review Conceptual Design Conceptual Design -Internal Review Customer Approval Required YES Get Customer Approval Customer Approval Required YES Get Customer Approval NO Design Release Purchasing No Plan Design Verification & Validation Project Realization 17
18 PRIMARY & SECONDARY ENGINEERING Client requirements stated t in the contractual t references Required Standards (IEC or ANSI, ) Climatic and environmental Condition System characteristics Particular of System Insulation level Creepage distances Clearances in Air BASIC DESIGN CRITERIA 18
19 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT PRIMARY & SECONDARY ENGINEERING 19
20 PRIMARY & SECONDARY ENGINEERING GENERAL LAYOUT DRAWING 220kV LEVEL DOUBLE BUSBAR TYPE 220kV LEVEL SECTION DOUBLE BUSBAR TYPE 66kV LEVEL SECTION UI BUSBAR TYPE 66kV LEVEL UI BUSBAR TYPE 20
21 PRIMARY & SECONDARY ENGINEERING 21
22 Wind Load PRIMARY & SECONDARY ENGINEERING Loads Distribution Nodes Displacement Perspective View Stress Analysis in Bar Stress Diagram 22
23 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, The image and cannot then be open displayed. the file Your again. computer If the red may x still not appears, have enough you may memory have to delete open The the image, cannot and or then be image displayed. insert may it again. have Your been computer corrupted. may not Restart have your enough computer, memory and to then open open the image, the file or again. the image If the may red x have still appears, been corrupted. you may Restart have to your delete computer, the image and and then then open insert the it file again. If the red x still appears, you may have to delete the image and then insert it again. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT PRIMARY & SECONDARY ENGINEERING 23
24 SOFTWARE TOOLS USED IN ENGINEERING 24
25 ACTIVITIES PROCESS CONSTRUCTION & ERECTION - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS - MANAGEMENT & PROCUREMENT. - PRIMARY & SECONDARY ENGINEERING. - CONSTRUCTION & ERECTION. - TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA. 25
26 CONSTRUCTION & ERECTION For our turnkey projects, our qualified subcontractors partners are handling the construction and erection works under Matelec team supervision Matelec site manager and supervisors are daily present to follow up the site work progress and to assure the best quality of work. Matelec supervisors liaise with the client representatives by conducting regular meetings to discuss the work progress and solve arising gproblems Matelec specialists handle the site quality control as well as the safety rules and regulations. 26
27 CONSTRUCTION & ERECTION Full coordination between the engineering Department and the Site Upon drawings approval, a complete file including documents and drawings is prepared by the engineering department and sent to site for constructions and erection phase The engineering department is always ready to find a solution for unexpected technical inconvenience and arising site problems A regular progress report is prepared by the site supervision to follow up and update the site planning 27
28 ACTIVITIES PROCESS TESTING & COMMISSIONING - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS - MANAGEMENT & PROCUREMENT. - PRIMARY & SECONDARY ENGINEERING. - CONSTRUCTION & ERECTION. - TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA. 28
29 TESTING & COMMISSIONING For Every Substation, a Testing Engineer from Matelec is Dedicated to Manage the Testing & Commissioning Activities of the S/S. He Performs Several Tests (Functional Test, CT/VT Test, CB/DS/ES Test,..etc) & Prepares the Filled Site Test Documents for the Client. He is Supported by Matelec Specialists for the Testing of Certain Equipments (Protection Relays Setting, Scada System, Fault Recorder, Telecom,.etc) and in some case Supplier Specialist Perform the Testing & Commissioning of their Equipments for example GIS Equipments. All the Tests are Done According to Protocols Prepared in Matelec House with Respect to the Relevant International Standard, Manufacturer Recommendations & Client Requirement. They are Completely or Partially Witnessed by the Client. 29
30 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT LIST & EXAMPLE OF PROTOCOLS TESTING & COMMISSIONING - HV, MV & LV Equipments Test (Power & Aux. Transformer, CB, DS, ES, CT, VT, SA, LT, Charger, Battery, Diesel Group, ). - Functional Test (Line, Transf, Coupler,..). - Panels Test (AC, DC, Common, Busbar Prot., Fault & Event Recorder, Telecom,...). -System Test (Scada, Transformer Monitoring on Line, Metering,..). - HV, MV & LV Cables Test. - Control, Prot. & Metering Relays Test. - Details Procedure for Testing & Commissioning in Case of S/S Extension. LIST OF SUBMITTED PROTOCOLS (More than 40) 30
31 TESTING EQUIPMENTS Multi Function System T 3000 for Current, Voltage & Power Transformers Tests. Circuit Breaker Analyzer and Micro Ohmmeter. Multi Tasking Equipment for Testing Protection ti Relays, Energy Meters & Transducers. CMC 256 (Omicron) (ISA-Italy) CBA 1000 (ISA-Italy) CPC 100 (Omicron) DRT-6 (ISA-Italy) Italy) 31
32 CASE STUDY CHEFFIA S/S 400/220/31.5kV - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS ALGERIA - MANAGEMENT & PROCUREMENT. - PRIMARY & SECONDARY ENGINEERING. - CONSTRUCTION & ERECTION. - TESTING & COMMISSIONING. - CASE STUDY FOR 400kV CHEFFIA S/S IN ALGERIA ALGERIA -
33 LOCATION & IMPORTANCE 400kV Network in Algeria 400kV Power Plant 400kV Substation 400kV Line 33
34 LOCATION & IMPORTANCE 400kV Network in Algeria 400kV Power Plant 400kV Substation 400kV Line 34
35 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT 400kV SLD SUBSTATION COMPOSITION 1 Double Bus Bar 5000A, 40kA 3 Incoming 400kV 2 Line 400kV 1 International Line 400kV 3 AutoTransf 400/220/31.5kV-300MVA 300MVA 1 Coupler 400kV 35
36 220kV SLD SUBSTATION COMPOSITION 1 Double Bus Bar 4000A, 31.5kA 3 Incoming Auto TR 220kV 4 Line 220kV 1 Coupler 220kV 36
37 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT 400 meters SUBSTATION GENERAL LAYOUT meters 400kV S/S 400kV ATR 400kV L.K. 220kV L.K. 220kV S/S Control Building 37
38 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. HV SUBSTATION PROJECT 150 m. 400kV LAYOUT & SECTIONS 30 m. 21 m. ATR 400/220kV 21 m. Line 400kV L.K. ATR 400/220kV & 220kV SA SA, CT, ES, CB & ES of ATR Busbar 1 & 2 and BDS 1 & BDS 2 ES, CB, ES, CT, DS/ES, LT, CVT, & SA of Line 38
39 SCADA ARCHITECTURE Dot Matrix Printer Color Printer 2 Operators 1 Engineering PC Industrial PCs GPS for Network Synchronizing Fall Back Switch for Master Connection 2 Central Units Redundant Hot-Standby Configuration Ethernet Switches (61850) To 220kV Loop To 400kV Loop To 220kV Loop To 400kV Loop 39
40 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again. SCADA ARCHITECTURE From 400kV SCADA Loop 40
41 Case of 400kV Int. Line - Jendouba Control & Metering Relays (1 panel +S1): Bay Unit REC670 (ABB) SynchroSwitch L183 (ABB) 2 Meters Cl 0.2 A1800 (Elster) Protection Relays (2 panels +R1 & +R2): Panel +R1: Main 1 Distance Prot. REL670 (ABB) Main 2 Distance Prot. D60 (GE) Breaker Failure 7VK611 (Siemens) Autorecloser REC670 (ABB) Directional E/F 7SJ621(Siemens) Panel +R2: Directional Active Power F60 (GE) Frequency Relay F35 (GE) Decoupling Relay DRS-N1 (ICE) CTRL, PROT. & METERING SCHEME 41
42 Case of 400/220/31.5kV AutoTransfo Control & Metering Relays (1 panel +S1): Bay Unit REC670 (ABB) SynchroSwitch T183 (ABB) Protection Relays (2 panels +R1 & +R2): Panel +R1: Main 1 TR Differential RET670 (ABB) Main 2 TR Differential T60 (GE) Breaker Failure 7VK611 (Siemens) 400kV O/C Prot. REJ523 (ABB) Panel +R2: 220 & 31.5kV O/C Prot. REJ523 (ABB) Overload Prot. REX521 (ABB) E/F Prot. REJ521 (ABB) Lockout Relay HAS (GE) CTRL, PROT. & METERING SCHEME 42
43 CHEFFIA S/S PHOTOS 43
44 CHEFFIA S/S FINAL RECEPTION 44
45 WHY MATELEC 45
46 WHY MATELEC? Working with MATELEC for HV Substation Turnkey Projects, means choosing the following Advantages & Benefits: - Skilled & Experienced Teams in all the Activities. - Application of IEC, ANSI & ISO Standards. - Respect & Adoption of Client Standards d & Requests. - Willpower not to Exceed the Deadlines and to Accomplish a High Quality Projects. - An Effective & Quick After Sale Services. - Partnership with the Client. 46
47 THANK YOU 47
48 QUESTIONS SESSION 48
ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
102904-ICX-CMOS-E-2006 Electrical / I&C Engineer Holds a B. Sc. in Electronics & Electrical Communications Engineering and has over 9 years hands-on experience working in I&C field. Has extensive experience
More informationPower Transmission Division Link between power generation and distribution
Power Transmission Division Link between power generation and distribution Seite 4 High Voltage Substations Schemes, Devices and Types of AIS Installation Content Link between power generation and distribution
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationBenefits, offering and references
DOC ID: 9AKK107045A9180 DISTRIBUTION SOLUTIONS Digital medium-voltage switchgear Benefits, offering and references Contents Digital switchgear for medium-voltage applications Digital switchgear definition
More informationUPDATES EPC Contract Signed August 2017
ACO SOLAR HV BOP PROJECT NUMBER 2655 Convalt Energy LLC MOEE Myanmar Power Generation, Substation UPDATES EPC Contract Signed August 2017 Convalt Energy LLC are developing a 300MW AC solar farm in Myanmar
More informationElegant Power Engineering Services & Consultants
Elegant Power Engineering Services & Consultants Registered Office Address : SRI RAM APARTMENTS, No. A5 PLOT NO. 28/8, LENIN NAGAR 10 TH MAIN ROAD, AMBATTUR, CHENNAI 600053. INDIA Operating Office Address
More information1. Project Description
Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal
More informationTHE INTEGRATED TESTING SOLUTION
Test & Data Management Software TDMS protective relays energy meters transducers power quality CT-VT-PT transformers ground grid circuit breakers batteries surge arresters THE INTEGRATED TESTING SOLUTION
More informationSubstation Automation Products. Line differential protection RED670 Relion 670 series
Substation Automation Products Line differential protection RED670 Relion 670 series For maximum reliability of your power system The RED670 IED (Intelligent Electronic Device) is designed for protection,
More informationELE-CS-E-2005 Senior Electrical Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
103702-ELE-CS-E-2005 Senior Electrical Commissioning Engineer Holds a B. Sc. in Industrial Electronics & Automatic Control Engineering and has over 9 years hands-on experience working in construction and
More informationSubstation Automation Products. High impedance differential busbar protection REB650 Relion 650 series
Substation Automation Products High impedance differential busbar protection REB650 Relion 650 series One IED for a wide range of high impedance differential protection applications ABB introduces a new,
More informationSapphire Wind Farm 330/33kV Substation
Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire
More informationSession Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers
Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are
More informationABB Digital medium-voltage switchgear
NAMIBIA AMEU/AEDU MARCH 2018 ABB Digital medium-voltage switchgear Barry Addinall UniGear Digital Contents 1. Digital switchgear 2. Complexity of Distribution networks 3. New technologies using digital
More informationABB Group - Bob van Evelingen. March 26, 2009 Slide Series. 600-Series. Transmiss. ABB Group - Bob van Evelingen. March 26, 2009 Slide 5
Arc Protection REA101 REA 101 A01 REA101 REA101 Open Close Bob van Evelingen Seminar / Maart-April 2009 Protection & Testing Relays, Breakers, Busbars, Transformers, Batteries Close March 26, 2009 Slide
More informationApril 2010 Power Systems division A brief introduction. ABB Group August 25, 2011 Slide 1
April 2010 Power Systems division A brief introduction August 25, 2011 Slide 1 Facts about ABB 117,000 employees in about 100 countries $32 billion in revenue (2009) Formed in 1988 merger of Swiss and
More informationSIPROTEC 5 Application Note. Breaker-and-a-half solutions. SIP5-APN-002, Edition 2.
-and-a-half solutions SIP5-APN-002, Edition 2 www.siemens.com/protection SIPROTEC 5 Application Note -and-a half solutions SIP5-APN-002, Edition 2 -and-a-half solution Content 1 -and-a-half solutions 3
More informationNon-conventional instrument transformers Advanced GIS substations with IEC LE process bus
Non-conventional instrument transformers Advanced GIS substations with IEC 61850-9-2LE process bus Content Towards the digital GIS substations Optimized substation design NCIT for gas-insulated switchgears
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationSubstation Automation Products. Bay control REC670/650 Relion 670 and 650 series
Substation Automation Products Bay control REC670/650 Relion 670 and 650 series For optimized control and reliable operation of your switchyard The REC670 and REC650 Bay control IEDs (Intelligent Electronic
More informationRelion 630 series. Load-shedding controller PML630 High performing load-shedding solution for industrial and utility power networks
Relion 630 series Load-shedding controller PML630 High performing load-shedding solution for industrial and utility power networks Integrated load-shedding and protection solution The PML630 is a freely-configurable
More informationOvercurrent and Arc Protection by Reyrolle Alexander Erokhin. 21, 2017 I Berlin
Overcurrent and Arc Protection by Reyrolle Alexander Erokhin VAR Partner Day September 20-21, 21, 2017 I Berlin Reyrolle Product Range by SIEMENS Challenges We Meet for our Customers Easy-to-use protection
More informationBusbar protection REB 670
Gunnar Stranne Busbar protection REB 670 Rio de Janeiro April 23-25, 2006 ABB Power Technologies AB 2 3 4 REB 500 is enabled for use with IEC61850 communication Benefits of REB 670 outstanding features
More informationHugo E. Meier, Heidelberg, Germany, June 2014 Integrator Partner Seminar2014 Substation automation trends
Hugo E. Meier, Heidelberg, Germany, June 2014 Integrator Partner Seminar2014 Substation automation trends Substation automation trends Contents Product Portfolio Trends in substation automation Cyber Security
More informationEFASOLAR PVStation Solutions
www.efacec.com EFASOLAR PVStation Solutions EFASOLAR PVStation EFASOLAR PVStation Solutions 0,5 MW 1 x EFASOLAR 50 0,50 MW 1 x EFASOLAR 500M 1 MW 1,46 MW Efacec is a century-long experienced company in
More informationENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER
smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS
More informationPortable Power Solutions
http://siemens.com/energy/portable-power-solutions Portable Power Solutions Plug and play High Voltage E-Houses, skids and mobile high voltage substations up to 420 kv Plug & play solutions for flexible
More informationTitle System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)
Discipline Engineering Standard - NSW Category Electrical Title s Reference Number PCP 07 - (RIC Standard: EP 99 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards
More informationJim McGhee, Utility Market Manager, RuggedCom Inc.
First Practical Experience with IEEE 1588 High Precision Time Synchronization in High Voltage Substation with IEC 61850 Process Bus Jim McGhee, Utility Market Manager, RuggedCom Inc. (JimMcGhee@RuggedCom.com)
More informationPackage Substation. The efficient solution for your electrical distribution network
Package Substation The efficient solution for your electrical distribution network Why Prefabricated Substations? Biosco, safe and effective substations Safety: A fully tested electrical equipment > Much
More informationSOUTHERN REGIONAL POWER COMMITTEE BENGALURU
SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid
More informationGrid Automation Controller COM600 How it fits into the Smart Grid?
ABB Oy Distribution Automation Grid Automation Controller How it fits into the Smart Grid? May 27, 2014 Slide 1 1MRS756763 E Content Technical Presentation May 27, 2014 Slide 2 Description Grid Automation
More informationIEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems
Alexandre Oudalov, ABB Switzerland Ltd., Corporate Research, 2014-04-30 Microgrid Protection IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems Microgrid Protection
More informationExperience with IEC based Systems
Klaus-Peter Brand April 2006 Experience with IEC 61850 based Systems ABB - 1 - IEC61850 Experience Content IEC 61850 Experience with Systems ABB University Switzerland - 2 - First experiences Experience
More informationYour partner in energy solutions. Systems Division. Automation & services. (Formerly Pauwels Canada Inc)
Systems Division Automation & services The CG Systems Division has developed into an important division within the CG group. The Systems Division specializes in electrical turnkey projects and has an impressive
More informationELE-CG-E-2005 Project Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101015-ELE-CG-E-2005 Project Manager Holds a B. Sc. in Electrical Power & Machines Engineering and has about 12 years hands-on experience working in construction field and became a Project Manager. PERSONAL
More informationSubstation Automation Products. Generator protection REG670/650 Relion 670 and 650 series
Substation Automation Products Generator protection REG670/650 Relion 670 and 650 series A new protection standard for your valuable assets Based on ABB s extensive experience, REG670 and REG650 IEDs (Intelligent
More informationIEC Test Equipment Requirements
OMICRON K02 03 20060309 IEC 61850 Test Equipment Requirements Dr. Alexander Apostolov K02 03 20060309 Page: 1 Intelligent Substation Automation Systems OMICRON K02 03 20060309 Page: 2 Intelligent Sensor
More informationDGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field
DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION The digital galvanic longitudinal differential protection of type DGSZV-EP is part of device family named EuroProt. This short description
More informationApplication Notes on Generator Protection Schemes
Application Notes on Generator Protection Schemes Single Line Diagram Examples 1. Introduction The application notes provide selected single line diagrams for the SIPROTEC 4 generator protection device
More informationVerification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation
111 Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation Z. Gajić (ABB, Sweden) JP Wang / PW Gong / YS Xu (ABB China) ZX Zhou (CERPI, China) Summary Power utilities
More informationCommission Testing Methods for Protection Systems
Commission Testing Methods for Protection Systems Tom Ernst GE Grid Solutions Ken Sletten Minnesota Power Abstract Commission testing should be designed to assure that the protection system is set and
More informationGrid Automation packaged solutions Optimal automation of medium voltage grids
Grid Automation packaged solutions Optimal automation of medium voltage grids Application principles of the Zone concept Grid Automation (GA) packaged solutions The zone concept offers a method to analyze
More informationPresented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011
Photovoltaic Solutions Make the most of your solar PV project Presented by: Oscar Araujo Photovoltaic Solutions Manager 4 th Canadian German Solar PV Conference March 2 nd 2011 Agenda Solutions for Renewable
More informationEDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES
Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution
More informationSelling PFIFFNER in Mexico. Genaro Pérez
Selling PFIFFNER in Mexico. Genaro Pérez Contents Country & Market Overview México. PFIFFNER Value proposition. Requirements for success Conclusions. www.pfiffner-group.com / page 2 / 12.06.2017 Contents
More informationSUBSTATION AUTOMATION SYSTEMS
SUBSTATION AUTOMATION SYSTEMS Engineering Services 2018 SUBSTATION SCADA INDUSTRIAL AUTOMATION TELECOMMUNICATION SECONDARY DESIGN PROTECTION SYSTEMS C O N S U L T A N C Y İDEA GRUBU ELEKTRİK OTOMASYON
More informationPower Systems Communications Implementation of IEC61850 in a Substation Environment
Power Systems Communications Implementation of IEC61850 in a Substation Environment 26 October 2009 Reference VEE4700-01 Revision 0 Document Control Document ID: DOCUMENT1 Rev No Date Revision Details
More informationPSSS/PSAC Engineering, Muhammad Adil, Substation Automation Systems. ABB Group October 29, 2014 Slide 1
PSSS/PSAC Engineering, Muhammad Adil, 30-10-2014 Substation Automation Systems October 29, 2014 Slide 1 CONTENT INTRODUCTION IEC61850 ABB s BAY LEVEL SOLUTIONS ABB s STATION LEVEL SOLUTIONS ABB s AS A
More informationSTCP 04-3 Issue 005 Real Time Data Provision
STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish
More informationElectrical Equipment and Comprehensive Power Grid Solutions
Integration into the future Electrical Equipment and Comprehensive Power Grid Solutions About us Joint-Stock Company Rusatom Automated Control Systems (JSC RASU) is a subsidiary of State Atomic Energy
More informationSubstation Automation Products. Line distance protection REL670/650 Relion 670 and 650 series
Substation Automation Products Line distance protection REL670/650 Relion 670 and 650 series For maximum reliability of your power system REL670 and REL650 line distance protection IEDs (Intelligent Electronic
More informationSIPROTEC 7SC80 Feeder Protection and Automation Answers for infrastructure and cities.
www.siemens.com/protection SIPROTEC 7SC80 Feeder Protection and Automation Answers for infrastructure and cities. designed for feeder automation applications This solution allows very fast fault detection
More informationHow smart can the grid really be?
How smart can the grid really be? by Dale Pudney, HVT Power Systems and Luo Wei, NR Electric With the improvement of electronic communications and computing technology, it becomes possible to integrate
More informationBus Protection Application Challenges
Bus Protection Application Challenges KN Dinesh Babu - Megger JC Theron, Lubomir Sevov GE Grid Solutions 2017 Texas A&M Protective Relay Conference Content Introduction Application Challenges Increase
More informationTENDER CLAUSE NO. Clarification. Ite m No. information sought by tenderers. EMPLOYER REQUIREMENTS (a)
KENYA 2 EMPLOYER REQUIREMENTS 2 1.13.2.3 (a) One (1) Three Phase Motorised Variable Transforers (Variac) for testing purposes with the following features: (i) Transforer shall be cast resin dry type with
More informationProtective Relays & SCADA Systems
14 SWITCHGEAR Protective Relays & SCADA Systems SCADA Substation Automation SICAM PAS & PQ Analyzer SICAM PAS (Power Automation System) is a complete substation automation control and protection system
More informationSubstation Automation based on IEC Claes Rytoft ABB Power Systems
Substation Automation based on IEC 61850 Claes Rytoft ABB Power Systems BayNetworks Development of SA SA conventional MMI / Control Board NCC SA with interbay bus NCC SA with interbay & process bus NCC
More informationPG&E Transmission Interconnection Handbook
Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New
More informationUsing the Bitronics 70 Series to Improve Local Monitoring and Control
Automate a Substation and Preserve the Electromechanical Relay Investment Part Two of Four Using the Bitronics 70 Series to Improve Local Monitoring and Control Paul Grabowski - Bitronics Senior Application
More informationAutomation System Solutions
Automation System Solutions Automation Systems for Power Grid, Power Plant and Industries NR Electric Corporation Automation for Power Grid Substation Automation System Conventional Substation Automation
More informationCAPABILITY STATEMENT. A full list of our services.
CAPABILITY STATEMENT A full list of our services. About Us MVLV Power Solutions Pty Ltd is a privately owned Western Australian based company, specialising in the Design and Manufacture of Electrical Switchboards
More informationGround Breaking MV Switchgear
ISO 9001:2008 and ISO 14001:2004 certification ETALON Ground Breaking MV Switchgear Etalon is vacuum switchgear that fits most of the switchgear applications available and meets the most strict safety
More informationCompany Profile
Company Profile Introduction ArabTech Trading and Contracting Company was incorporated in 2004 with the purpose of providing support systems and services for the Saudi Electric Company in the Western Province
More informationT48 - Integrating Your Power and Automation Control Systems
T48 - Integrating Your Power and Automation Control Systems PUBLIC Copyright 2018 Rockwell Automation, Inc. All Rights Reserved. 1 Integrated Power & Automation The Evolution of End Client Requirements
More informationCOMPANY PROFILE. Kontrolmatik has accomplished local and international projects with great success. Some of fields that KONTROLMATIK serves,
MOBILE SUBSTATIONS COMPANY PROFILE Kontrolmatik has accomplished local and international projects with great success. As one of the leading engineering companies in Turkey, Kontrolmatik has successfully
More informationMNS Platform, low voltage systems Rear Access Power Motor Control Center. Alberto Carini, Global Product Manager
MNS Platform, low voltage systems Rear Access Power Motor Control Center Alberto Carini, Global Product Manager MNS Platform, low voltage systems Add Value to our customers Sales After sales Maximum safety;
More informationElectrical Integration with Smart Communication
Electrical Integration with Smart Communication New possibilities with Industrial Ethernet ABB Group September 24, 2009 Slide 1 Unified Integration Approach MES and Business Systems Knowledge Portals as
More informationUR Universal Relay Series
GE Digital Energy UR Universal Relay Series Revision 4.43 Release Notes GE Publication Number: GER-4380Rev1 Copyright 2010 GE Multilin Summary Overview GE Multilin issues the UR 4.43 release that introduces
More informationRecloser Controller for feeder protection and automation siemens.com/distribution-automation
SIPROTEC 7SC80 Control Controller for feeder protection and automation siemens.com/distribution-automation SIPROTEC 7SC80 Control Designed for feeder automation applications This solution allows very fast
More information////// SUBSTATIONS. Control command and local Scada
////// SUBSTATIONS Control command and local GENERAL INFORMATION The solution provided by Sécheron for local control and monitoring of traction substations is a significant step in supporting operations
More informationDRTS 64. The new generation of advanced test equipment for Relays, Energy meters, Transducers and Power quality meters.
The new generation of advanced test equipment for Relays, Energy meters, Transducers and Power quality meters Testing all relay technologies: electromechanical, solid state, numerical and IEC61850 Manual
More informationCMC 353. The Compact and Versatile Three-Phase Relay Testing Solution
CMC 353 The Compact and Versatile Three-Phase Relay Testing Solution CMC 353 Compact and Versatile Relay Testing With its compact design and low weight of 12.9 kg / 28.4 lbs, the CMC 353 provides the perfect
More informationNU-LEC. Loop Automation. Reclosers & Sectionalizers
NU-LEC Loop Automation Reclosers & Sectionalizers 1 NU-LEC LLC NU-LEC LLC is a wholly unit of NU-LEC Industries, Pty, Ltd. Sales and service center for United States, Canada, and the Caribbean. Warehouse
More informationRemote Real-Time Measurements of Voltage, Current and Energy
Remote Real-Time Measurements of Voltage, Current and Energy Chris Yakymyshyn Pam Hamilton Michael Brubaker yakymyshyn@fieldmetricsinc.com 727-319-0299 Slide 1 Outline Introduction FieldMetrics (FMI) Products
More informationTest Universe 3.10 Module: IEC Client/Server. Efficient and reliable protection testing in IEC Substation Automation Systems
Test Universe 3.10 Module: IEC 61850 Client/Server Efficient and reliable protection testing in IEC 61850 Substation Automation Systems Content 1. Introduction 3 2. Access and set IEDs automatically 4
More informationVIP 40/45 VIP 400/410
40/45 400/410 Selection guide 01 PM100573 40/45 PM100576 400/410 self-powered integrated protection relay Optimised performance for transformer, incomer, feeder and bus riser protection Complete engineered
More informationUniSec, MV AIS for Secondary Distribution Smart Grid applications
Ing. Natalia Moizzes- Switchgear Product Specialist Chile Abril 14 th 2015 UniSec, MV AIS for Secondary Distribution Smart Grid applications Slide 1 Concept - Needs and Solutions Requests are: Manage faults
More information.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical
Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of
More informationUNDERGROUND HV SUBSTATION DESIGN
3 for 2 Bundle Offer. SGD 2440 each for Team of 3! Topics Covered Underground Substations Overview Planning New Underground Substations S/S Design Overview Expert Course Faculty Leader In his 30 years
More informationOrdering Information CIBANO 500
Ordering Information CIBANO 500 CIBANO 500 Packages CIBANO 500 Package including cables and accessories Description Package for standard tests on MV and HV CBs. No additional measuring accessories. Rewiring
More informationEXPERIENCE WITH IEC IN THE REFURBISHMENT OF AN IMPORTANT EUROPEAN 380 KV SUBSTATION. Switzerland
21, rue d Artois, F-75008 PARIS B5-109 CIGRE 2006 http : //www.cigre.org EXPERIENCE WITH IEC 61850 IN THE REFURBISHMENT OF AN IMPORTANT EUROPEAN 380 KV SUBSTATION S. LAEDERACH* 1, W. BAASS 2, K.P. BRAND
More informationSmall Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility
Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS
More informationDTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field
DTRV-EP COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS Application field The DTRV type of complex transformer protection is designed to protect 120 kv / medium voltage transformers,
More informationSIGMA. Advanced Generator Protection and Control. Short Form Catalogue
Short Form Catalogue SIGMA Advanced Generator Protection and Control Generator protection, synchronizing and load sharing Power management system Easy to install and commission Control most governors/avrs
More informationSeries 2400 Paralleling Switchgear
Series 2400 Paralleling Switchgear SERIES 2400 PARALLELING SWITCHGEAR TYPICAL SERIES 2400 MULTIPLE GENERATOR/UTILITY PARALLELING SWITCHGEAR Intelligent, Configurable Switchgear for Distributed Generation,
More informationHigh and Medium Voltage Substation Design, Testing and Maintenance. KSA, Jeddah, Holiday Inn Jeddah Gateway Hotel.
Training Course : High and Medium Voltage Substation Design, Testing and Maintenance Training Course For One Week In KSA, Jeddah, Holiday Inn Jeddah Gateway Hotel Which Be Held As Under Details : Tel.
More informationDistribution Code Review Panel Protection Engineer assessment Working Group. Draft Document for
Distribution Code Review Panel Protection Engineer assessment Working Group Draft Document for Procedure for Assessment of Protection Relay Testing Engineers INTRODUCTION Electrical Protection system testing
More informationSIPROTEC 5 Application Note
www.siemens.com/protection SIPROTEC 5 Application Note SIP5-APN-012 : Control of Breaker-and-a-half diameters and double busbar configurations and use of Phasor Measurement Unit (PMU) Answers for infrastructure
More informationGAS. POWER. WATER. TELCO. POWER
GAS. POWER. WATER. TELCO. POWER Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of engineering, construction and maintenance
More informationISIO 200. Binary Input/Output (I/O) terminal with IEC interface
ISIO 200 Binary Input/Output (I/O) terminal with IEC 61850 interface Compact and easy ISIO 200 Put your Binary I/Os where you need them ISIO 200 is a simple and versatile binary I/O terminal with IEC 61850
More informationOMICRON CMC 356. The Universal Relay Test Set and Commissioning Tool
OMICRON CMC 356 The Universal Relay Test Set and Commissioning Tool CMC 356 Universal Relay Testing and The CMC 356 is the universal solution for testing all generations and types of protection relays.
More informationMESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR
Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR 22 kv Version: 2 Issued: 19 th December 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical
More informationOTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER
Parsons Brinckerhoff Associates OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER A report prepared for 23 March 2007 Disclaimer Notice Report for
More informationSECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE
SECTION 16262 - APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE PART 1 - GENERAL 1.01 RELATED SECTIONS A. Section 01300 Submittals B. Section 16262 Static Frequency Converter C. Section 16262A Appendix A SFC
More informationSpecification Voltage Limiting Device
Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,
More informationPerformance considerations in digital substations
Performance considerations in digital substations Stefan Meier*, Thomas Werner, Constantin Popescu-Cirstucescu # *ABB Switzerland Ltd, Switzerland, stefan.meier@ch.abb.com ABB Switzerland Ltd, Switzerland
More informationCOMPACT SUBSTATION WITH 34.5kV GIS (GAS-INSULATED SWITCHGEAR. Cleverson Shindi Takiguchi S&C Electric Europe LTd. Cape Town/WC South Africa
COMPACT SUBSTATION WITH 34.5kV GIS (GAS-INSULATED SWITCHGEAR Cleverson Shindi Takiguchi S&C Electric Europe LTd. Cape Town/WC South Africa Alexandre Taijun Ohara S&C Electric Company Curitiba/PR Brazil
More informationThe complete application guide to specifying a Smart-Gear power distribution solution (PDS) E50001-F710-A123-V1-4A00. Answers for energy.
The complete application guide to specifying a Smart-Gear power distribution solution (PDS) E50001-F710-A123-V1-4A00 Answers for energy. Smart-Gear power distribution solution (PDS) Siemens, a world leader
More information115 kv / 34.5 kv Solar Power Plant / Substation
115 kv / 34.5 kv Solar Power Plant / Substation Project Plan MAY1602 INDUSTRY CLIENT: ADVISORS: TEAM EMAIL: TEAM: Black and Veatch Corporation Venkataramana Ajjarapu, Anne Kimber may1602@iastate.edu Chase
More information