MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

Size: px
Start display at page:

Download "MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER"

Transcription

1 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient, and informative travel experience. PERFORMANCE MEASURES FEBRUARY % RELIABILITY: DEVICE AVAILABILITY Percentage of intersections along major county corridors which have active communications to the Traffic Operations Center SAFETY: ROADWAY UPGRADES EFFICIENCY: F/C REVIEWS Number of projects in Macomb County in which new hardware was installed, geometric configurations were implemented, and timings were optimized along a corridor. Number of times the Traffic Operations Center staff reviewed an intersection based on a service request. Reviews occurred in the field (F) or at a console (C) through the network. INFORMATIVE: SUCCESS STORIES A citizen s to the Macomb County Department of Roads was received by the Traffic Operations Center this past month. The citizen had expressed concern with the operation of the traffic light at 11 Mile Road (I-696 Service Drive) and Dequindre Road, primarily the fact that the timing was not correct and was causing motorists to become impatient. The concern was addressed by MCDR shortly after the service request was verified. The citizen ed back and expressed gratitude for correcting the issue in such a prompt manner. INFORMATIVE: SERVICE REQUESTS There were 106 Service Requests this month. This is an increase in the amount of service requests from the previous month by 32. Service Requests are requests from the public or other agencies regarding troubleshooting a potential issue with intersection operations. Adam L Merchant, PE, PTOE Traffic Engineer Macomb County Department of Roads 117 S Groesbeck Hwy Mount Clemens, MI AMerchant@RCMCWeb.org

2 Field/Console Reviews Completed TRAFFIC OPERATIONS Date Intersection Identification Investigative Result Review Type 02/03/ : Garfield at Dove Upload Database Field 02/03/14 600: Garfield at Klein Upload Database Field 02/03/14 495: Garfield at Millar Upload Database Field 02/03/14 239: Garfield at Moravian Upload Database Field 02/03/14 141: Garfield at 14 Mile Upload Database Field 02/04/14 659: Harper at Quinn Upload Database Field 02/04/14 121: Little Mack at 11 Mile Intersection Operations Field 02/04/14 320: 12 Mile at Utica Intersection Operations Field 02/04/14 072: M-97 (Groesbeck) at Cass Detection Changes Field 02/04/14 135: Little Mack at 15 Mile Upload Database Field 02/06/14 307: Schoenherr at 12 Mile Construction Timing Console 02/10/14 258: 9 Mile at Logue Operations Review Field 02/10/14 441: EB I-696 SD at Crossover W of M-53 (Van Dyke) Intersection Operations/Set Clocks Field 02/10/14 125: EB I-696 SD at M-53 (Van Dyke) Intersection Operations/Set Clocks Field 02/10/14 013: WB I-696 SD at M-53 (Van Dyke) Intersection Operations/Set Clocks Field 02/10/14 440: WB I-696 SD at Crossover E of M-53 (Van Dyke) Intersection Operations/Set Clocks Field 02/13/14 441: EB I-696 SD at Crossover W of M-53 (Van Dyke) Operations Review Field 02/13/14 125: EB I-696 SD at M-53 (Van Dyke) Operations Review Field 02/13/14 013: WB I-696 SD at M-53 (Van Dyke) Operations Review Field 02/13/14 440: WB I-696 SD at Crossover E of M-53 (Van Dyke) Operations Review Field 02/13/14 420: Chicago at GM Gate Flash Schedule Change Field 02/13/14 425: 13 Mile at Lorraine Pedestrian Operation Check Field 02/18/14 964: Jefferson at 21 Mile Pictures of Existing Cabinet Field 02/18/14 258: 9 Mile at Logue Timing Changes Field 02/18/14 067: Harper at California Pedestrian Timing Changes Field 02/18/14 062: 10 Mile at Brittany Detection Review Field 02/26/14 350: Mound at 23 Mile Operations Review Field 02/26/14 660: Ryan at 23 Mile Detection Review Field Service Requests By Intersection Executed Roadway Upgrades Tracks the field/console reviews completed by the Traffic Operations Engineers as well as date, result, and review type. Field/console reviews are assigned after a public/stakeholder concern warrants an investigation. Reviews are either conducted in the field or at an Operator console through a network connection. Motorists and public agencies contact the Traffic Operations Center to provide feedback on intersection functionality. This month, the intersection accruing the most feedback was 27 Mile at Van Dyke. All callers stated a similar issue: the light stops 27 Mile Road traffic for at least 5 to 7 minutes. Date Intersection Identification Organization Upgrade 02/03/14-02/04/14 235: Hoover at Toepfer MCDR Detection Activation 02/04/14 & 02/10/14 232: Hoover at Stephens MCDR Detection Activation 02/10/14 297: Hoover at Engleman MCDR Detection Activation - 150: Hoover at Frazho MCDR Detection Activation 02/12/14 & 02/20/14 414: Hoover at Carousel Shopping MCDR Detection Activation 02/20/14 336: Hoover at Martin MCDR Detection Activation 02/13/14 537: Hoover at St. John Hospital MCDR Detection Activation - 236: Hoover at 12 Mile MCDR Detection Activation 02/13/14 & 02/14/14 379: Hoover at Common MCDR Detection Activation - 231: Hoover at Robinwood MCDR Detection Activation - 234: Hoover at 13 Mile MCDR Detection Activation - 24: Hoover at Masonic MCDR Detection Activation 02/06/14 307: 12 Mile at Schoenherr MCDR Construction Staging 02/24/14-02/28/14 Schoenherr MCDR Detection Activation 02/24/14-02/28/14 Hoover MCDR Detection Activation 02/26/14 275: Mound at 17 Mile MCDR New ITS Cabinet, Radar Detection - 377: Mound at 18 Mile MCDR New ITS Cabinet, Radar Detection 02/28/14 284: Schoenherr at 9 Mile MCDR Detection Activation 02/24/14 to 02/28/14 Schoenherr KH Toepfer to 26 Mile Tracks the roadway upgrades executed in Macomb County, including those done by other transportation agencies, also lists a description of the upgrade performed. Page 2 of 6

3 Camera Availability ITS MAINTENANCE ITS Equipment Repair Statuses Trouble Ticket Status The percentage of cameras which are Online, in Offline, and Standby relating to the Traffic Operations Center accessibility. An Online camera means that TOC personnel are able to view and control the camera from the control room. Online cameras are limited to 36 due to current bandwidth capacities. Offline cameras do not have capabilities to be displayed in the TOC yet. Standby cameras are functional Cameras which are currently not viewable by TOC personnel. A current construction project is underway to bring Standby cameras online. Equipment Type Awaiting Sent Out Received MCDR Return This Month This Month In-House Fix Integrated Radio Dual Radio Camera Encoder Access Point Statuses of equipment types which have been shipped back to the manufacturer for repair. Also, number of in house fixes by the MCDR electrical department. Statuses of trouble tickets issued by Intelligent Transportation System (ITS) Maintenance staff. Page 3 of 6

4 MCDR Web Site Hits * INFORMATION TECHNOLOGY Web site hits accrued at the web page. * Note that this day followed a large snow storm. Major County Corridor Communications Availability Percentage of intersections along the noted major (focus) corridors which have active communications to the Traffic Operations Center (referred to as Online ). Also included are percentages of intersections which fail, these are intersections which are not communicating properly to the TOC (referred to as Offline ). An intersection in Standby does not have the capability to connect to the TOC as of yet. Corridors represented here are focus corridors. Other corridors which have active communications to the TOC include Schoenherr Road, 9 Mile Road, Ryan Road, Garfield Road, and Hayes Road, which may be depicted in future reports. Intersection Communication Report Card Online Offline Standby Device Availability % Overall, the four major (focus) corridors numbers for communications to the Traffic Operations Center. Page 4 of 6

5 Frequent Crash Locations TRAVELER EXPERIENCE Jurisdiction Intersection Identification Crashes Sterling Hts Delco at M-59 (Hall) 13 Fraser M-97 (Groesbeck) at Utica 11 Clinton Twp Cass at M-97 (Groesbeck) 10 Sterling Hts 18 Mile at M-53 (Van Dyke) 9 Macomb Twp Garfield at M-59 (Hall) 8 Sterling Hts 14 Mile at Schoenherr 8 Warren 12 Mile at Schoenherr 8 Sterling Hts Metro Parkway at Ryan 8 St Clair Shores 11 Mile at Little Mack 8 Center Line 10 Mile at M-53 (Van Dyke) 8 Customer Service Communications Source of service requests taken by Traffic Operations Center staff during the target report month. Web based source is Utilizing crash data from Michigan State Police, the top ten intersections by number of crashes. Note: the crash data is from January 2013 due to delayed availability of data. Status of all service requests compiled by Traffic Operations Center staff through the end of the month. Major Construction and Maintenance Summary Project Parameters Start Date Approximate Completion Date Location(s) Construction 7/12/2013 Construction 11/11/2013 Construction 10/28/2013 Spring 2014 (currently open to traffic) Spring 2014 (currently open to traffic) Spring 2014 (currently open to traffic) 24 Mile from North Avenue to Fairchild 33 Mile over Cemetery Creek and Highbank Creek Russ Road over Highbank Creek/Wheeler Drain between 34 Mile and School Section Road Out of the many projects that occur on Macomb County roads, these projects potentially have the most impact to motorists. Page 5 of 6

6 CAMERA COVERAGE Current Camera Locations Cameras currently deployed and under Macomb County Department of Roads jurisdiction. See the chart Camera Availaibility on page 3 of this report for definitions of Online, Offline, and Standby cameras. Page 6 of 6

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Macomb County Department of Roads. Presentation Overview

Macomb County Department of Roads. Presentation Overview Macomb County Department of Roads Traffic & Operations Division - Overview John Abraham, PhD, PE, PTOE Director of Traffic & Operations Presentation Overview Introduction Mission Statements Organizational

More information

Columbus Regional Signal System

Columbus Regional Signal System Columbus Regional Signal System Identifying need for system upgrade Existing proprietary systems that had surpassed their design life Limited signal coordination and traffic monitoring ability Older character

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

Traffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM

Traffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM Traffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM TODAY What is Traffic Management Enhancements Phase 3? Traffic Information Center (TIC) Network Design Downtown Multimodal

More information

Adaptive Traffic Signal System Lebanon County, PA

Adaptive Traffic Signal System Lebanon County, PA Adaptive Traffic Signal System Lebanon County, PA Ross Buchan, P.E. Gannett Fleming Harrisburg, PA Craig Hinners, P.E. Civilogix Baltimore, MD http://goo.gl/uvadt3 Project Overview CCIP Study conducted

More information

Assessor Report 01/02/18

Assessor Report 01/02/18 Assessor Report 01/02/18 11651 21 MILE RD 23-07-26-351-022 CONST. VALUE: $6,000 ISSUE DATE: 12/12/17 11737 21 MILE RD PERMIT #: PB17-0153 SHELBY TWP MI 48315 RESIDENTIAL DEMOLITION - HOUSE ONLY GARAGE

More information

Mountain Corridor Incident Management Program

Mountain Corridor Incident Management Program Mountain Corridor Incident Management Program Colorado Department of Transportation Background The I- Incident Management study was initiated in response to CDOT s I- MIS. The resulting program was the

More information

I. Replacement and upgrade of Span Wire Traffic Signal at Indian River Road and Princess Anne Road

I. Replacement and upgrade of Span Wire Traffic Signal at Indian River Road and Princess Anne Road January - 2012 I. Replacement and upgrade of Span Wire Traffic Signal at Indian River Road and Princess Anne Road The City of Virginia Beach is in the process of replacing many of its existing span wire

More information

Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier

Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier Average Annual Number of Responders Struck and Killed Nationally 12 Law Enforcement Officers 5 Fire and Rescue Personnel 60 Towing

More information

Deployment of ITS Projects in Pasadena A Local Agency Perspective

Deployment of ITS Projects in Pasadena A Local Agency Perspective Deployment of ITS Projects in Pasadena A Local Agency Perspective ITS California Annual Meeting October 2, 2013 Norman Baculinao, PE Pasadena and the Region Source: Census Transportation Planning Package,

More information

South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT)

South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT) South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT) APPLICABILITY South Central PA ITS Deployment Plan Update Lebanon County ITS deployment Lancaster County ITS deployment

More information

Executive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc.

Executive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc. Goodyear Intelligent Transportation Systems Strategic Plan Executive Summary Prepared for: City of Goodyear Prepared by: 191376000 Copyright 2008, Kimley-Horn and Associates, Inc. I. INTRODUCTION The City

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

Assessor Report 04/01/14

Assessor Report 04/01/14 8655 PEARSON 23-07-03-126-037 CHERRY CREEK BUILDING LLC CONST. VALUE: $293,416 ISSUE DATE: 03/24/14 15065 32 MILE RD PERMIT #: PB14-0043 ROMEO MI 48065 EYSTERS VAN DYKE FARMS - LOT 5 0 REPLACE 1 STREET

More information

Model Concept of Operations - Remotely Operated and Dynamic Systems for Road Closures and Advisory Messages in Remote Areas

Model Concept of Operations - Remotely Operated and Dynamic Systems for Road Closures and Advisory Messages in Remote Areas Model Concept of Operations - Remotely Operated and Dynamic Systems for Road Closures and Advisory Messages in Remote Areas MnDOT Project: Systems Engineering for Snow and Ice Control (SEASIC) Prepared

More information

Assessor Report 02/03/14

Assessor Report 02/03/14 Assessor Report 02/03/14 CONST. VALUE: $0 53010 DEQUINDRE (METR) 23-07- ISSUE DATE: 01/30/14 HARMON SIGN INC 46593 GRAND RIVER PERMIT #: PB12-0717 NOVI MI 48374 GROUND SIGN SHELBY TOWNSHIP WELCOME SIGN

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

City Spotlight- City of Santa Clarita ITS Efforts. Andrew Yi, P.E., P.T.O.E City Traffic Engineer

City Spotlight- City of Santa Clarita ITS Efforts. Andrew Yi, P.E., P.T.O.E City Traffic Engineer City Spotlight- City of Santa Clarita ITS Efforts Andrew Yi, P.E., P.T.O.E City Traffic Engineer About Santa Clarita Santa Clarita Downtown LA Located 30 miles northwest of Downtown LA Geographically isolated

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24

More information

Automated Traffic Enforcement Technology Guidelines. Province of Alberta

Automated Traffic Enforcement Technology Guidelines. Province of Alberta Automated Traffic Enforcement Technology Guidelines Province of Alberta Automated Traffic Enforcement Technology Guidelines Province of Alberta A. PREAMBLE Automated traffic enforcement technology is an

More information

KENTUCKY TRANSPORTATION CABINET

KENTUCKY TRANSPORTATION CABINET KENTUCKY TRANSPORTATION CABINET Transportation Operations Center (TOC) The TOC is a multi-functional center located within the Kentucky Transportation Office Building in Frankfort. Our mission is to collect

More information

Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations

Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations Initial Panel Charge August 2009 To review existing policies and

More information

Assessor Report 11/02/16

Assessor Report 11/02/16 4259 KINGMONT DR 23-07-20-101-024 CONST. VALUE: $500 ISSUE DATE: 10/31/16 4259 KINGMONT PERMIT #: PF11-0002 SHELBY TWP MI 48317 RESIDENTIAL - PRIVACY FENCE 6' HEIGHT, 84' LENGTH Sidewalk CONST. VALUE:

More information

Connected Vehicle Safety Pilot Overview and Infrastructure Readiness

Connected Vehicle Safety Pilot Overview and Infrastructure Readiness Connected Vehicle Safety Pilot Overview and Infrastructure Readiness Scott Shogan, PE, PTOE Infrastructure Team Lead Engineer March 28, 2013 Agenda Safety Pilot Program overview V2V and V2I communications

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Automated Photo Enforcement Annual Report 2017

Automated Photo Enforcement Annual Report 2017 Automated Photo Enforcement Annual Report 7 Automated Photo Enforcement Program Sustainable Streets Division San Francisco Municipal Transportation Agency January, 9 Automated Photo Enforcement Annual

More information

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1 CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1 The Charter Township of Shelby is soliciting proposals to install

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

Assessor Report 12/01/15

Assessor Report 12/01/15 14293 23 MILE + 23-07-13-300-023 GLOBAL SIGNS & AWNING CONST. VALUE: $3,100 22907 DEQUINDRE PERMIT #: PB15-0175 HAZEL PARK MI 48030 WALL SIGN 50 SF EXOTIC GRANITE TOPS 13350 24 MILE 23-07-14-200-009 TORCH

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014 I-20 EAST TEXAS CORRIDOR STUDY TxDOT Planning Conference, Corpus Christi June 4 th, 2014 Table of Contents 1 Introduction 3-5 2 I-20 East Texas Corridor Advisory Committee 6-10 3 Study Schedule 11-12 4

More information

San Antonio TransGuide: TOC Update ITS Texas 2009

San Antonio TransGuide: TOC Update ITS Texas 2009 San Antonio TransGuide: TOC Update ITS Texas 2009 Brian G. Fariello, P.E. Traffic Management Engineer TxDOT- San Antonio bfariel@dot.state.tx.us (210) 731-5247 San Antonio TransGuide Partner Agencies Current

More information

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX Fox River Grove, 20 Years Later Brian Vercruysse, PE November 3, 2015 Arlington, TX Interconnect Awareness October 25, 1995 Fox River Grove, Illinois Everything that could go wrong went wrong Was the start

More information

-P~~. November 24, The Honorable Thomas V. Mike Miller, JI. Senate President State House, H-107 Annapolis, MD 21401

-P~~. November 24, The Honorable Thomas V. Mike Miller, JI. Senate President State House, H-107 Annapolis, MD 21401 ROCKVILLE, MARYLAND November 24, 2009 The Honorable Thomas V. Mike Miller, JI. Senate President State House, H-107 Annapolis, MD 21401 The Honorable Michael E. Busch House Speaker State House, H-101 Annapolis,

More information

Traveler Information System

Traveler Information System Traveler Information System Regional Safety Advisory Committee January 27, 2017 Marian Thompson, P.E. Transportation System Operations Supervisor 511DFW.org 511DFW Regional in DFW Multimodal 2 511DFW.org

More information

The Benefits of Regional Collaboration in Managing Network Transportation Operations

The Benefits of Regional Collaboration in Managing Network Transportation Operations The Benefits of Regional Collaboration in Managing Network Transportation Operations PIARC Technical Committee 1.4 Prepared by: Wayne Berman Office of Transportation Management Federal Highway Administration

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

City of La Mirada System Architecture Diagram Draft (Deliverable )

City of La Mirada System Architecture Diagram Draft (Deliverable ) Submitted to Los Angeles County City of La Mirada System Architecture Diagram Draft (Deliverable 2.1.7.1) Gateway Cities Traffic Signal Synchronization and Bus Speed Improvement Project - I-105 Corridor

More information

PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year

PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year VREDEKLOOF COMMUNITY IMPROVEMENT DISTRICT 5 YEAR IMPLEMENTATION PLAN 1st July 2018 to 30th June 2019 PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS 1. Successful day-to-day management and operations

More information

Coordinated Highways Action Response Team

Coordinated Highways Action Response Team Coordinated Highways Action Response Team PANEL 3: EVENT RESPONSE TOOLS YOU CAN USE AT YOUR AGENCY Richard R. Dye CHART Systems Administrator Maryland State Highway Administration I-95 CORRIDOR COALITION

More information

Medicaid Service Capture. Users Manual

Medicaid Service Capture. Users Manual Medicaid Service Capture Users Manual 9/23/2013 Accessing Service Capture....3 Calendar Views & Shortcuts....4 Creating, Editing & Deleting Caseload Groups.......5 Creating Service Records in Service

More information

Assessor Report 06/01/17

Assessor Report 06/01/17 CONST. VALUE: $89,488 55555 JEWELL RD 23-07-03-426-010 ISSUE DATE: 05/02/17 55555 JEWELL PERMIT #: PB14-0267 SHELBY TWP MI 48315 Res, Addition RESIDENTIAL - GARAGE ADDITION AND 2ND FLOOR ADDITION Sidewalk

More information

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Branch Avenue at Alabama Avenue SE Study Area and Location District PSA Ward ANC Phase Description 6

More information

2

2 1 2 3 4 PennDOT has 11 engineering districts that provide engineering, maintenance, construction, traffic and related services for the state transportation system. PennDOT s Central Office provides administrative,

More information

Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework

Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework Anita Vandervalk-Ostrander Iteris, Inc. Santa Ana, California, USA Steven Gota, Deputy Executive

More information

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017 Chattanooga 2045 RTP Chattanooga 2045 RTP addresses both transportation supply and demand Continued

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY Chapter 15: Safety and Security A. INTRODUCTION This chapter discusses safety and security as they relate to the Proposed Project and summarizes how potential safety and security issues are identified

More information

GIS Based Tools for County Road Management Crash Data Analysis Application. January 12, 2012

GIS Based Tools for County Road Management Crash Data Analysis Application. January 12, 2012 GIS Based Tools for County Road Management Crash Data Analysis Application January 12, 2012 Good News: Crash Rates for All Types of Crashes in Unincorporated Maricopa County Are Declining 2,000 Crashes

More information

CLAYTON COUNTY TRANSIT INITIATIVE. Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017

CLAYTON COUNTY TRANSIT INITIATIVE. Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017 CLAYTON COUNTY TRANSIT INITIATIVE Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017 AGENDA Welcome! Introduction of Speakers Webinar Housekeeping Project Overview & Status

More information

WHAT CAN BE DONE? MICHIGAN TRANSPORTATION PLANNERS ASSOCIATION 2011 CONFERENCE JIM SANTILLI EXECUTIVE DIRECTOR AT THE TRAFFIC IMPROVEMENT ASSOCIATION

WHAT CAN BE DONE? MICHIGAN TRANSPORTATION PLANNERS ASSOCIATION 2011 CONFERENCE JIM SANTILLI EXECUTIVE DIRECTOR AT THE TRAFFIC IMPROVEMENT ASSOCIATION DISTRACTED DRIVING WHAT CAN BE DONE? MICHIGAN TRANSPORTATION PLANNERS ASSOCIATION 2011 CONFERENCE JIM SANTILLI EXECUTIVE DIRECTOR AT THE TRAFFIC IMPROVEMENT ASSOCIATION LIEUTENANT DAVE LIVINGSTON SPECIAL

More information

I. City of Virginia Beach Intelligent Transportation Systems Workshop, November 2 and 3, 2011

I. City of Virginia Beach Intelligent Transportation Systems Workshop, November 2 and 3, 2011 November -2011 I. City of Virginia Beach Intelligent Transportation Systems Workshop, November 2 and 3, 2011 The City of Virginia Beach Intelligent Transportation Systems (ITS) Workshop was organized and

More information

DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY

DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY SUBMITTED TO: and the Dixie Regional ITS Stakeholders Draft Report August 14, 2006 SUBMITTED BY: DRAFT FINAL REPORT Table of Contents 1.0 INTRODUCTION...

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: January 18, 2018 # 8 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Traffic Analysis and Safety Study of Waxpool Road

More information

Cornerstone of downtown; Gateway to the state

Cornerstone of downtown; Gateway to the state Paving the information highway Building public trust through reliable communications Brian Manthey Communications Officer Marquette Interchange Team Wisconsin Department of Transportation September 12,

More information

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario Abstract Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection Kamal Banger, Ministry of Transportation of Ontario Nancy Adriano, P.Eng., Ministry of Transportation of Ontario For

More information

LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY

LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY L-DC REGIONAL ITS ARCHITECTURE AND STRATEGIC DEPLOYMENT PLAN EXECUTIVE SUMMARY The Lawrence-Douglas County Metropolitan Planning Organization (L- DC MPO) has

More information

UDOT Freeway and Traffic Signal Performance Metrics

UDOT Freeway and Traffic Signal Performance Metrics UDOT Freeway and Traffic Signal Performance Metrics September 26, 2016 Grant Farnsworth, PE, PTOE UDOT Traffic Mobility Engineer Kelly Burns Eric Rasband Utah Demographics Speed Report Benefit of Past

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

Assessor Report 10/05/17

Assessor Report 10/05/17 14867 21 MILE RD 23-07-25-400-003 KIMBERLY FENCE CO CONST. VALUE: $9,300 ISSUE DATE: 09/14/17 6470 E 9 MILE RD PERMIT #: PF17-0132 Warren MI 48091 RESIDENTIAL - REPLACING FENCE WITH 6' HIGH PVC FENCE 6'

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

Downtown to NAIT LRT Concept Plan Attachment 4 Public Involvement Summary

Downtown to NAIT LRT Concept Plan Attachment 4 Public Involvement Summary north, lrt, light, transit, rail, track, line, closure, close, road, interuption, partial, lane, construction, bulletin, NAIT, line, motorist, pedestrian, map, metro, line,downtown to NAIT LRT Concept

More information

Assessor Report 05/03/16

Assessor Report 05/03/16 14348 HAVERHILL (EXTRA) SCHLABACH WAYNE R CONST. VALUE: $8,000 ISSUE DATE: 04/19/16 9341 JAMES PERMIT #: PB15-0699 Fredericksburg OH 44627 MAIL KIOSK - RIVER BIRCH BEND 11541 21 MILE 23-07-27-476-001 KNIGHTS

More information

TASER. EVIDENCE Sync. User Manual

TASER. EVIDENCE Sync. User Manual EVIDENCE Sync User Manual TASER For use with: AXON body and AXON flex cameras TASER CAM and TASER CAM HD recorders X2, X26, and X26P conducted electrical weapons IMPORTANT SAFETY INSTRUCTIONS Read all

More information

FIBER OPTIC RESOURCE SHARING IN VIRGINIA

FIBER OPTIC RESOURCE SHARING IN VIRGINIA FIBER OPTIC RESOURCE SHARING IN VIRGINIA Commonwealth Transportation Board Innovation & Technology Subcommittee Dean Gustafson, P.E., PTOE February 20, 2018 Why Fiber? Enormous bandwidth available to support

More information

Response to Santa Barbara County Grand Jury Reports (1) Santa Barbara County Emergency Operations Center (2) Emergency Public Information

Response to Santa Barbara County Grand Jury Reports (1) Santa Barbara County Emergency Operations Center (2) Emergency Public Information County of Santa Barbara FIRE DEPARTMENT / OFFICE OF EMERGENCY SERVICES 4410 CATHEDRAL OAKS ROAD SANTA BARBARA, CALIFORNIA 93110-1042 TEL 805.681.5526 FAX 805.681.5553 John M. Scherrei Fire Chief Bruce

More information

NCTCOG MTP Policy Bundle Application for TXDOT

NCTCOG MTP Policy Bundle Application for TXDOT MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

Assessor Report 04/01/16

Assessor Report 04/01/16 13455 25 MILE RD 23-07-02-400-015 D & J BUILDING CONST. VALUE: $22,800 ISSUE DATE: 03/07/16 6422 FOSTORIA RD PERMIT #: PB15-0774 Otter Lake MI 48464 RES - ACC STRUCTURE (POLE BARN) 23'9" X 39'9" 54429

More information

South Central ROP Projects

South Central ROP Projects Pennsylvania Department of Transportation ROP Overview and Summary South Central ROP Projects November 2007 77 INCIDENT MANAGEMENT (IM) Draft Version 1 July 2007-40 - IM 1: SOUTH CENTRAL PA ITS DEPLOYMENT

More information

Portable Work Zone Data Collection. Blaine Van Dyke ODOT ITS Designer

Portable Work Zone Data Collection. Blaine Van Dyke ODOT ITS Designer Portable Work Zone Data Collection Blaine Van Dyke ODOT ITS Designer Year 1 Construction Zone Travel Time project. Provide work zone information to public. Test OSU Bluetooth travel time sensors in new

More information

SPECIAL PROVISION Scope of Work

SPECIAL PROVISION Scope of Work 2004 Specifications CSJ 0914-00-301 & 0914-00-314 SPECIAL PROVISION 004---018 Scope of Work For this project, Item 004, Scope of Work, of the Standard Specifications, is hereby amended with respect to

More information

Assessor Report 01/04/16

Assessor Report 01/04/16 Assessor Report 01/04/16 53094 JEWELL RD 23-07-11-352-017 CONST. VALUE: $53,556 53094 JEWELL PERMIT #: PB15-0785 RES - ACC STRUCTURE 1200 S.F. 11650 PARK CT 23-07-23-152-011 B & L CONTRACTING INC Accessory

More information

NORTHWEST PA REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 1-0

NORTHWEST PA REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 1-0 MINUTES OF MEETING (FINAL) PROJECT: PURPOSE OF MEETING: LOCATION: PENNDOT Agreement E00229 Open-end Agreement for ITS, Traffic and Highway Safety Engineering Services Work Order 015- District 1-0 Regional

More information

Hartford Area Incident Management. Using ITS To Improve Safety on the Greater Hartford Area Expressways

Hartford Area Incident Management. Using ITS To Improve Safety on the Greater Hartford Area Expressways Hartford Area Incident Management Using ITS To Improve Safety on the Greater Hartford Area Expressways Presenters: Joe Balskus, P.E., PTOE, Senior Project Manager, Fuss & O Neill Hartford Area IMS Project

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

Assessor Report 06/02/15

Assessor Report 06/02/15 49329 HEYWARD (PRIMARY) + 23-07-21-376-139 CONST. VALUE: $329,490 ISSUE DATE: 05/04/15 2163 ROCHESTER RD PERMIT #: PB14-0358 OAKLAND TWP MI 48363 LOT 139 - MEADOWS @ CENTRAL PARK 4 STREET 0 REPLACEMENT

More information

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776)

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) AGENCY: Florida Department of Transportation TITLE InSync Adaptive Signal Control System Equipment Short description of the commodity or service

More information

Metropolitan Topeka Planning Organization

Metropolitan Topeka Planning Organization TOPEKA-SHAWNEE COUNTY REGIONAL ITS ARCHITECTURE ITS COMMUNICATIONS PLAN DELIVERABLE NO.5 DRAFT Submitted to Metropolitan Topeka Planning Organization Submitted by In association with February 13, 2007

More information

DEPARTMENT OF SAFETY & SECURITY ANNUAL REPORT

DEPARTMENT OF SAFETY & SECURITY ANNUAL REPORT DEPARTMENT OF SAFETY & SECURITY 2014 ANNUAL REPORT LETTER FROM THE ASSOCIATE VICE PRESIDENT & CHIEF OF POLICE 3 CONTENTS MISSION WHO WE ARE THE AREA WE SERVE BY THE NUMBERS 5 7 9 11 NOTABLE ACCOMPLISHMENTS

More information

MS2. Modern Traffic Analytics ms2soft.com

MS2. Modern Traffic Analytics ms2soft.com MS2 ms2soft.com Updated: October 31, 2014 The Traffic Crash Location System (TCLS) was designed to manage all crash statistics and crash events within a designated area. This guide is intended for users

More information

PRIME FREQUENTLY ASKED QUESTIONS

PRIME FREQUENTLY ASKED QUESTIONS Frequently Asked Questions (FAQs) offer a quick reference to getting the most effective use of PRIME. FAQs can be accessed under the Support menu located on the PRIME Navigation Bar. Accounts and Data

More information

Smarter Work Zones Webinar Series

Smarter Work Zones Webinar Series Smarter Work Zones Webinar Series Webinar #3: Smarter Work Zone Corridor-Based Project Coordination Martha Kapitanov, John Habermann, and Steve Brink Efficiency through technology and collaboration October

More information

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission Road Intersections Near Level Crossings: Intersection Awareness in Illinois Brian Vercruysse Illinois Commerce Commission Illinois Freight & Passenger Rail Systems Metra Commuter Illinois Rail Crossing

More information

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance.

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance. Policy Number: 10-09-02 Section: Roads and Traffic Subsection: Traffic Operations Effective Date: April 25, 2012 Last Review Date: Approved by: Council Owner Division/Contact: For information on the CCTV

More information

Escambia-Santa Rosa Regional ATMS. Escambia-Santa Rosa Regional Advanced Traffic Management System (ATMS) Florida Alabama TPO

Escambia-Santa Rosa Regional ATMS. Escambia-Santa Rosa Regional Advanced Traffic Management System (ATMS) Florida Alabama TPO Escambia-Santa Rosa Regional ATMS Escambia-Santa Rosa Regional Advanced Traffic Management System (ATMS) Florida Alabama TPO TCC/CAC Meeting: April 11, 2016 TPO Meeting: April 13, 2016 Ben Faust, P.E.

More information

Cuyahoga County Addressing Notification System Cuyahoga County Department of Information Technology

Cuyahoga County Addressing Notification System Cuyahoga County Department of Information Technology Page(s) 1 of 10 Administrative Standard Operating Procedure Cuyahoga County Addressing Notification System Cuyahoga County Department of Information Technology Document Revision History Date of Revision

More information

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Verification Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from

More information

Cleburne, Texas Johnson County Seat 35 Square Miles 4 Police Districts 54 Sworn Officers $7.75 Million Police Budget

Cleburne, Texas Johnson County Seat 35 Square Miles 4 Police Districts 54 Sworn Officers $7.75 Million Police Budget Cleburne, Texas Johnson County Seat 35 Square Miles 4 Police Districts 54 Sworn Officers $7.75 Million Police Budget Preparing for Growth 102 Square Miles in Cleburne s ETJ May 2014: CTP - Cleburne & Fort

More information

Crow Wing County Policy on INSTALLATION AND MAINTENANCE OF MAILBOX SUPPORTS ON COUNTY ROADS AND COUNTY STATE AID HIGHWAYS

Crow Wing County Policy on INSTALLATION AND MAINTENANCE OF MAILBOX SUPPORTS ON COUNTY ROADS AND COUNTY STATE AID HIGHWAYS Crow Wing County Policy on INSTALLATION AND MAINTENANCE OF MAILBOX SUPPORTS ON COUNTY ROADS AND COUNTY STATE AID HIGHWAYS Adopted by Crow Wing County Board of Commissioners 09.22.09 Revised 5-27-14 It

More information

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 17 Block North Portal Drive NW Study Area and Location District PSA Ward ANC Phase Description 4 41

More information

STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013

STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013 STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013 WHAT IS THE CENTERLINE INITIATIVE? The Centerline Initiative is a joint effort between the Minnesota Department of Transportation (MnDOT), Minnesota

More information

Chattanooga Regional ITS Architecture Update Project Overview. January 7, 2014

Chattanooga Regional ITS Architecture Update Project Overview. January 7, 2014 Chattanooga Regional ITS Architecture Update Project Overview January 7, 2014 Project Overview Update of the 2010 Chattanooga Regional ITS Architecture and Deployment Plan Provides a long range plan for

More information

OEMC 2016 Budget Statement of Executive Director Gary W. Schenkel to the Committee on Budget and Operations September 30, 2015

OEMC 2016 Budget Statement of Executive Director Gary W. Schenkel to the Committee on Budget and Operations September 30, 2015 OEMC 2016 Budget Statement of Executive Director Gary W. Schenkel to the Committee on Budget and Operations September 30, 2015 Good morning, Chairman Austin, Vice Chairman Ervin and members of the City

More information

Innovative Policing in the 21 st Century Orlando Police Department February 2010

Innovative Policing in the 21 st Century Orlando Police Department February 2010 Innovative Policing in the 21 st Century Orlando Police Department February 2010 OPD Technology Committee Committee was created drawing members from all areas of the Police Department and members of Technology

More information

Precision Roadway Feature Mapping Jay A. Farrell, University of California-Riverside James A. Arnold, Department of Transportation

Precision Roadway Feature Mapping Jay A. Farrell, University of California-Riverside James A. Arnold, Department of Transportation Precision Roadway Feature Mapping Jay A. Farrell, University of California-Riverside James A. Arnold, Department of Transportation February 26, 2013 ESRA Fed. GIS Outline: Big picture: Positioning and

More information