LOADS, CUSTOMERS AND REVENUE

Size: px
Start display at page:

Download "LOADS, CUSTOMERS AND REVENUE"

Transcription

1 EB04-06 Corrected: 0 Jan Page of LOADS, CUSTOMERS AND REVENUE 4 Toronto Hydro s total load, customer and distribution revenue forecast is summarized in Table. The revenue forecast is calculated based on proposed distribution rates, excluding commodity, rate riders, and all other non-distribution rates. 6 7 Table : Total Load, Revenues and Customers Total Normalized Total Normalized YEAR GWh MVA Total Distribution Revenue ($M) Total Customers 009 Actual,7.8 4,74.7 $ ,99 00 Actual,607. 4,7. $9. 696,79 0 Actual,49.0 4,00. $. 70,76 0 Actual,69. 4,44. $6. 7,09 0 Actual,. 4,68.7 $8.6 74,44 04 Bridge,08. 4,7.7 $9.4 76,974 0 Test 4,99. 4,697. $ , Test,07.4 4,806. $ ,09 07 Test 4,84.6 4,6. $7.9 77,80 08 Test 4, ,84.4 $ ,07 09 Test 4,6.4 4,9. $ ,86 Notes:. Total Normalized GWh are purchased GWh (before losses), and are weather normalized to the Test Year heating and cooling degree day assumptions.. Total Normalized MVA are weather normalized MVA.. Total Distribution Revenue is weather normalized and includes an adjustment for the Transformer allowance. 4. Total Customers are as of mid-year and exclude street lighting devices and unmetered load connections. /C The detailed load forecasts by rate class are shown at,,, Appendix B. Forecasts of customers by rate class are shown at,,, Appendix C. Forecast of distribution revenues by rate class are shown at,,, Appendix E.

2 EB04-06 Corrected: 04 Sep Page of The information provided for the Load, Customers and Revenue exhibit is prepared according to the Board s Filing Requirements for Electricity Distribution Rate Applications (July 7, 0) HISTORICAL LOADS Historical total system load (actual and weather-normalized) for Toronto Hydro is illustrated in Figure below. 7,00.0 7, ,00.0 6,000.0,00.0, ,00.0 4,000.0 Annual Historic Purchased Energy, GWh /C Actuals Weather Normalized 9 Figure : Historical Purchased Energy 0 4 Since 007, there has been a significant decrease in total energy consumption. Essentially flat growth over the period has been replaced by declining loads over the period. While it is difficult to precisely attribute this decline to any particular event, Toronto Hydro believes that the effect of conservation activities both program driven and naturally occurring - continue to have a significant impact on the overall load change. Furthermore, in late 008 and 009, economic conditions also

3 EB04-06 Corrected: 04 Sep Page of contributed to the load decline. Table shows a summary of the total historical normalized annual loads and growth. 4 Table : Historical Annual Load Year Total Normalized GWh Growth GWh Percentage Change (%) 00 6, ,69. 0.% 00 6, % 006 6, % 007 6, % 008 6, % 009, % 00, % 0, % 0, % 0, % /C LOAD FORECAST METHODOLOGY Toronto Hydro s load forecast methodology consists of the three-step process which explicitly takes into account historic and forecast CDM impacts. First, the actual historical cumulative CDM impacts are added back to the system purchased energy. Second, the load (gross of CDM) is forecasted based on multifactor regression techniques. Third, the cumulative forecast CDM impacts are deducted from the gross load forecast to derive to the load forecast (net of CDM). 4 6 Energy forecasts are developed for each rate class separately. Peak demand at the rate class level is based on historical relationships between energy and demand. Total system load is summed from the individual rate class loads. The forecast of customers by rate class is determined using time-series econometric methodologies. Revenues are

4 EB04-06 ORIGINAL Page 4 of determined by applying the proposed distribution rates to the rate class billing determinants for the forecast period. 4. kwh LOAD FORECAST Multivariate Regression Model The process of developing a model of energy usage involves estimating multifactor models using different input variables to determine the best fit. Different models were fit based on a priori assumptions about which input variables impact energy use. Using stepwise regression techniques, numerous explanatory variables were tested with the ultimate model being determined based on model statistics and judgement Models are developed for each rate class separately. This methodology allows for greater detail in modelling loads, and allows for the different interactions to be modelled independently. All of the regression models use monthly kwh per day as the dependent variable, and monthly values of independent variables from July, 00 through to the latest actual values (December 0) to determine the monthly regression coefficients The main drivers of the energy consumption over time are weather, energy conservation activities both program and natural related, as well as calendar, economic and demographic conditions. While load impacts related to the CDM program activities are explicitly taken into account prior to and after the modelling (see section below on CDM forecast), the remainder of the effects are captured through the multivariate regression model The primary driver of consumption within years remains weather. Weather impacts on load are apparent in both the winter heating season, and in the summer cooling season.

5 EB04-06 ORIGINAL Page of For that reason, both Heating Degree Days ( HDD a measure of coldness in winter) and Cooling Degree Days ( CDD a measure of summer heat) are captured in the multifactor regression model. In previous rate filings, Toronto Hydro has indicated that the standard definition of HDD, which uses 8 degrees Celsius as the point at which loads start to be impacted by temperature, was not as effective as a measure which uses 0 degrees Celsius as the balance point for the HDD measure. Figure below shows the relationship between temperatures and loads for the period of July 00-December 0. It is clear that the relationship between heating loads and temperature changes at 0 degrees Celsius. Toronto Hydro uses this 0 degrees Celsius balance point for construction of its HDD measure. THELS purchased energy vs average temperature,700 Monthly purchased energy, GWh,600,00,400,00,00,00,000,900, Average monthly temperature, C Figure : Purchased Energy vs Average Temperature 4 Dew point temperature is another type of weather factor, included as an explanatory variable for the GS <0 kw, GS kw, GS kw, and Large Use customer classes. This variable captures the impact of humidity on consumption and

6 EB04-06 ORIGINAL Page 6 of shows the positive impact of temperature on loads during summer months and negative impact during winter months Demographic, economic conditions and natural related conservation activities are captured within the model by customer, population, Toronto unemployment rate and time trend variables. The Toronto unemployment rate reflects the level of economic fluctuations, and was found to be statistically significant in the GS <0 kw, GS kw and GS kw class models. Population and customer variables capture overall levels of demographic fluctuations, and were found to be statistically significant in the Residential, GS <0 kw, GS kw, GS kw and Large Use class models The time trend variables used in the models are intended to capture trends which are not otherwise explained by the other driver variables. The Residential model uses a simple time trend variable which captures the observed downward trend in consumption over the historical period. Since the models are based on consumption with CDM loads added back to loads, CDM activities alone cannot explain this trend For the GS<0kW and Large Use customer classes, a clear change in trend has occurred. For these two classes, Toronto Hydro has incorporated a linear spline time trend. Consumption for these two classes displays a clear change in trend between the period and the 00- period, and is captured by this type of time trend. Another factor determining energy use in the monthly model can be classified as calendar factors. For example, the number of business days in a month will impact total monthly load. To capture the different number of days in the calendar months the modelling of purchased energy was performed on a per-day basis. To reflect different numbers of business days in the month and, consequently, different number of peak

7 EB04-06 ORIGINAL Page 7 of hours, business day percentage was used in those class models. A dummy variable was also included to reflect the impact of the 00 August blackout on energy use in that month ,,, Appendix A- contains the historical and forecast load and input variable details. The model statistics for each class model are shown in,,, Appendix A-. From the regression models, the forecast of energy usage is determined by applying the model coefficients to forecasts of the input variables The forecast for heating, cooling degree-days, and dew-point temperature inputs is based on a ten-year historical average of HDD, CDD and Dew. A 0-year average was chosen over the 0-year average based on analysis of the annual HDD and CDD data that shows a definite trend in HDD and CDD (see Figure below). Using an average over the longer time period would therefore be less reflective of the most recent data and an inferior forecast of HDD and CDD. Toronto Pearson International Airport station was used as the climatological measurement point for establishing monthly HDD and CDD.

8 EB04-06 ORIGINAL Page 8 of, , HDD 0,00, CDD HDD0 CDD Linear ( HDD0 ) Linear (CDD) Figure : Historic CDD and HDD 4 The forecast of the City of Toronto unemployment rate and population was derived based on the Conference Board of Canada forecast of the Toronto CMA unemployment rate and population using a pair regression model. 6 7 The following table summarizes the variables included in each of the rate class energy models.

9 EB04-06 ORIGINAL Page 9 of Table : Regression Variables by Rate Class Residential Competitive Sector Multi-unit Residential GS<0 kw GS kw GS,000-4,999 kw Large Use Street lighting Unmetered Load HDD0 per day HDD0 per day HDD0 per day HDD0 per day HDD0 per day CDD per day CDD per day CDD per day CDD per day CDD per day Toronto City Population Time Trend Blackout dummy Normalized Average Use per Customer Dew Point Temperature Number of GS<0 kw customers Toronto Unemployment Rate Dew Point Temperature Business Days Percentage Toronto Unemployment Rate Dew Point Temperature Business Days Percentage Toronto Unemployment Rate Dew Point Temperature Business Days Percentage Number of LU customers Average use per device Simple extrapolation technique Intercept term Time Trend Number of GS kw customers Number of GS,000-4,999 kw customers Time Trend Blackout dummy Blackout dummy Blackout dummy Blackout dummy Intercept term Intercept term Intercept term Intercept term

10 EB04-06 ORIGINAL Page 0 of Normalized Average use per Customer ( NAC ) Model The load forecast for Competitive Sector Multi-unit Residential ( CSMUR ) was determined using the NAC as the most suitable model for this relatively new rate class. Historically, CSMUR customers were part of Residential rate class, however, as directed by the Ontario Energy Board in EB-00-04, Toronto Hydro established a separate rate class with rates implemented as of June, Similarly to the other rate classes, the forecast for CSMUR consumption explicitly incorporates CDM volumes. 0 4 The Normalized Average use per customer for CSMUR rate class is based on hourly load profile sample data from 0 and is weather corrected over a ten-year historical average of HDD and CDD. This average use per customer is then multiplied by the forecast of CSMUR customers to arrive at the forecast consumption for this class CLASS DEMAND FORECAST The forecast of monthly peak demand by customer class, which is used to determine revenue for those customers billed on a demand basis, is established using historical relationships between energy and demand. The demand forecast is explicitly adjusted to reflect the impacts from the cumulative estimated CDM activities and subsequently, converted based on the billing factors to the peak demand forecast (net of CDM). The cumulative CDM demand forecast consists of incremental CDM forecast as well as persistence from the CDM demand savings. The demand savings for the Demand Response ( DR ) programs were excluded from the total CDM demand savings. Toronto Hydro believes that the peak demand savings from the DR programs are not necessarily coincident with customer s individual peak demand for the demand reduction occurrence (see table with the cumulative CDM kw forecast under the section below).

11 EB04-06 Corrected: 04 Sep Page of. CDM FORECAST Consistent with the Board s CDM Guideline EB-0-000, Toronto Hydro confirms that it has explicitly included the impacts of CDM into its load forecast The cumulative CDM forecast deducted from the gross load (step of the three-step process described previously) includes the CDM savings for programs delivered in each year plus the persistence of these programs through subsequent years The forecasted CDM savings for the 0 to 09 period were developed based on the assumption that there will be a continuation of conservation programs throughout the rate filing period as announced in the Conservation First Framework released on March, 04 by the Ministry of Energy. In the absence of the framework being developed in detail, the projected conservation achievements are based on a number of assumptions that partly rely on Toronto Hydro s experience and progress toward the current provincial targets, and partly on the anticipated target assigned for the 0 to 00 conservation planning period. With respect to the timing of CDM savings in this forecast, there are significant uncertainties due to the fact that there is very little information regarding the landscape of conservation offerings, the level of funding, and target and contribution calculations. However, it is known that the new phase of programming will prioritize customer energy savings, moving away from the peak demand focus of the former saveonenergy strategies. This is most obviously reflected by the fact that the provincial target carries only an energy total, rather than energy and demand requirements. Choosing this as the most reliable starting point, Toronto Hydro forecasts achieving the required energy savings assuming it will be responsible for achieving approximately % of the provincial total of 7 TWh, or. TWh by the end of 00. /C

12 EB04-06 Corrected: 04 Sep Page of 4 6 In terms of allocating the Conservation First target alignment, the effects of new program build-up and then eventual market saturation determined the basic assignment of annual savings. From historical program experience, monthly project application patterns and realized monthly energy savings were calculated and extrapolated for the forecast. Furthermore, conservation and efficiency measure persistence has been applied, which is shown to limit the increase of the cumulative conservation totals year after year The result of the factors mentioned above produces a CDM energy reduction forecast, with the anticipated end result being a significant step towards realizing the Conservation First target of nearly. TWh by 00. It is anticipated that Toronto Hydro will be equipped with the resources to achieve this level of achievement, as is expected with the current suite of programming and the saveonenergy targets that are on track and nearing a close. Historical and estimated CDM savings used in the load forecast are gross numbers and hence, include free riders. Toronto Hydro believes that gross CDM savings are the correct values to apply in to the load forecast used to determine billing units. With respect to future lost revenue adjustment mechanism variance account ( LRAMVA ) however, it is Toronto Hydro s understanding that the CDM applied in this forecast will be the basis for the LRAMVA and that the LRAMVA balance will reflect the difference between estimated and actual CDM savings on a net basis. Tables 4 and represent the summaries of the cumulative forecast CDM consumption and demand impacts by class used for establishing the load forecast (net of CDM). /C

13 EB04-06 Corrected: 04 Sep Page of Table 4: Cumulative Forecast CDM Consumption Impacts, MWh (Gross) Year Residential CSMUR GS <0 kw GS kw GS kw Large Use Total 04 49,88,849 9,894 48,70,80 7,806,0, ,96,0 7,87 8,0 7,78 4,70,66, ,74,679 60,6 68,47 86,8 7,40,84, 07,60,9 40, 8,07 06,0 44,800,08, ,89,747 44,9 90,884,09,9,7,8 09 8,40 4,09 49,0,069,040 48,080 60,0,46,0 /C Table : Cumulative Forecast CDM Demand Impacts, MW (Gross) Year GS kw GS kw Large Use Total , , , , , ,9. 08,6...8, , ,8. /C 4 6 Table 6 includes total gross forecast CDM consumption and demand impacts per year with no prior persistence. Table 7 includes total gross forecast CDM demand impacts per year with no prior persistence for those customers billed on a demand basis.

14 EB04-06 Corrected: 04 Sep Page 4 of Table 6: Total Gross Forecast CDM Consumption Impact, MWh CDM Forecast 9,0 7,44 4,889 9,698,78 00,78 0 CDM Forecast 99,69 46,00 4,46 7,94 9, 06 CDM Forecast 0,946 98,80 9,77 88,9 07 CDM Forecast 47,8 6,0 9, CDM Forecast 4,04 48,60 09 CDM Forecast 7,66 Total 9,0 7,07 9, 909,868,,90,4,770 /C Table 7: Total Gross Forecast CDM Demand Impact, MW CDM Forecast CDM Forecast CDM Forecast CDM Forecast CDM Forecast CDM Forecast 7.7 Total ,09.08,00.70,844.9 /C CUSTOMER FORECAST The forecast of new customers for all classes is primarily based on extrapolation models for each rate class. Customer additions in the company s operating area have been fairly flat over recent history, with the exception of the customers from the newly classified CSMUR rate class (implemented on June, 0), whose rate of growth has been increasing as a result of Toronto Hydro s suite metering activities. Historically, CSMUR customers were included in the Residential rate class. With the establishment of the new CSMUR class, historical Residential customers that fall under a current definition of CSMUR class were identified, excluded from the Residential class, and forecasted independently. The detailed forecast of customers by rate class is found in, Tab,, Appendix C-.

15 EB04-06 ORIGINAL Page of 7. ACCURACY OF LOAD FORECAST AND VARIANCE ANALYSES Table 8 summarizes the variances between actual loads and the last Board-approved loads (filed in Toronto Hydro s EB rate filing). 4 Table 8: Forecast vs. Actual Purchased Energy Board- Load Actual Load Weather Normalized Actual Forecast GWh GWh Variance GWh Variance 00,74.,69..0%, % 0,8.6,8.8.%, % Year to year variances in historical loads and customers reflect the impacts of weather, economic conditions, CDM, and normal customer growth. Some year to year variance arises from re-classification of customers. Loads and customers reported for the Residential class are impacted in 0 by the creation of the new Competitive Sector Multi-Unit Residential class, which was formerly part of the Residential class. 4 For the forecast periods, year to year variances in loads and customers reflect the impact of model driver variables and CDM assumptions. In addition, some re-classification is anticipated for the General Service and Large Use classes in Tables showing year-over-year and actual vs. Board-approved loads and customers can be found in,, Schedules, Appendices B- and C-.

16 Table : Model Input Data Toronto Hydro Electric System Limited EB Appendix A Corrected: 04 Sep Page of 4 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Month Residential Competitive Sector Multi Unit Residential (CSMUR) Purchased Energy per day, kwh (by customer class) GS<0 kw GS kw GS kw Large Use Street lighting Unmetered Scattered Load Cumulative CDM impacts per day, kwh Residential CSMUR GS<0 kw GS kw HDD0 per day CDD8 per day Toronto Population ('000) GS kw Large Use Residenti al 4 Jul 00 9,04,876 8,649,8,76, 6,7,79 8,80,70 6,949 66, , ,908 0, Aug 00 8,, 8,8,94 9,604,6,7,90 8,46,09 46,77 9, , ,87 0, Sep 00 6,4,70 7,687,79 8,98,6 4,984,7 7,89,84 69,6 8, 0.0.9, ,86 0, Oct 00 4,,86 6,947,084,96,64,64,06 7,7,60 06,06, , ,89 0, Nov 00,9,00 7,, 7,6,66,90,998 7,04, 6, 8, , ,88 0, Dec 00 7,64, 7,,46 8,96,964,78,67 7,7,4 7,8 6, , ,94 0, Jan 00 8,,9 7,96,78 0,09,90 4,99,96 7,98,4 40,49 6, , ,987 0, Feb 00 7,946,87 8,,90 0,77,9 4,9,0 7,6,76 7,97 6, , ,9 0, Mar 00 6,06,690 7,6,9 8,08,88 4,0,408 7,96,898 9,070 9, , , 0, Apr 00 4,6,87 7,,777 6,707,97,80,89 7,49,67 88,09 60,68. 0., ,040 0, May 00,7,4 6,6,8 4,87,76,6,484 7,07,78 6,6, , ,6 0, Jun 00 4,77,99 7,06,9 7,040,86 4,9,6 7,68,6,69 8, , ,98 0, Jul 00 6,98,890 7,87,787 9,4,8,8,6 7,77,09,9 6, 0.0.8, ,046 0, Aug 00,7,06 7,4,6 7,79,98 4,449,68 7,48,74 8,90 9, , ,040 0, Sep 00 4,0,78 6,90,0 6,8,74 4,74,78 7,48, 79,868 7, , ,964 0, Oct 00,98,8 6,77,7,744,47,778,46 6,9,996 6,8 9, , ,08 0, Nov 00,09,66 6,999,78 6,9,0,9,69 7,09,8 8,778 6, , ,89 0, Dec 00 6,844,4 7,7,89 7,677,89,794,88 6,9,8 400, 6, , ,064 0, Jan 004 7,978,69 7,904,747 0,86,80,4, 8,77,88 40,04 67, , ,97 0, Feb 004 7,70,90 7,700,44 9,66,9 4,66,89 7,,84 6, 6, , ,046 0, Mar 004,69,667 7,6, 7,98,4 4,44,0 7,68,86 4,9 6, , ,00 0, Apr 004 4,06,79 6,860,879 6,007,84,99,97 7,4, 84,77 60, , ,90, May 004,90,60 6,697,9,467,4,6,94 6,88,79 6,779 8, , ,87, Jun 004,68,848 6,996,090 6,877,869 4,7,47 7,0,466 0,98 6, , ,789, Jul 004 4,78,7 7,40,0 8,0,,00,76 7,789,4 47,688 64, , ,7, Aug 004 4,9,7 7,,804 7,8,86 4,779,0 7,49,884,9 60, , ,7, Sep 004,9,06 7,074,7 7,7,76,4,67 7,9,00 87,88 6, , ,68, Oct 004,466,69 6,96,7,678,84,94,46 6,960,70,74 9, , ,496, Nov 004 4,74,8 6,9,86 6,94,98 4,049,87 7,04,74 80,877 6, , ,8, Dec 004 6,96,969 7,498,07 9,00,69 4,74,60 7,87,8 9,686 67, , ,0, Jan 00 7,644,488 7,884,0,067,90 4,884,09 7,0,4 4,09 6, , ,464, Feb 00 6,986,994 7,790,04 9,96,06 4,769,846 7,4,68 80,0 9, , ,68, Mar 00,704,996 7,44,0 8,9,78 4,4,49 7,9,9 7,9 7, , ,60, Apr 00,76,84 6,766,8 6,9,6,76,7 6,90,7 96,87, , ,964, May 00,79,9 6,8,0,7,4,7,84 6,8,4,600 49, , ,48, Jun 00 7,,69 7,80,80 0,8,06 6,6,447 8,4,88 9,904, , ,668, Jul 00 8,89,649 8,66,,78,64 6,,80 7,77,70 49,964 8, , ,74, Aug 00 7,48,77 7,764,78 0,49,66 6,074,4 7,8,64 4,4, , ,807, Sep 00 4,7,84 7,084,6 8,04,770,4,44 7,74,68 80,008, , ,88, Oct 00,6,49 6,,60 6,087,00 4,69,46 6,868, 0,97,9. 0., ,9, Nov 00 4,87,6 6,90,069 7,4,9 4,466,00 7,0,94 80,0 49, , ,066, Dec 00 6,64,476 7,47,90 9,7,09 4,96,00 7,0,79 90,67 6, , ,47, Jan 006 6,7,60 7,,899 8,878,874 4,408,784 6,987,66 407,6, , ,09, /C 47 Feb 006 6,84,64 7,4,777 9,98,80,09,66 7,,46 84,49 6,94, , ,8, /C 48 Mar 006,46,88 7,66,8 8,07,88 4,68,47 7,6,6 4,,07, , ,4, /C 49 Apr 006,9,6 6,47,96,4,60,,0 6,80,677 9,9 0,, , ,08, /C 0 May 006,94,4 6,470,7,888,7 4,86,44 7,84,46 7,48 0,8, , ,00,77 46 /C Jun 006,49,974 7,089,496 8,6,90,667,78 7,60,9 9,7 64,4,6 0.0., ,004,97 48 /C Jul 006 7,9, 7,80,08,08,0 6,76, 8,6,7 0,990 7,8, , ,009, /C Aug 006,9,776 7,,97 9,47,040,969,7 7,769,9 46,0 67,0 60,0 0.0., ,089,47 49 /C 4 Sep 006,47,994 6,48,984,986,4 4,7,6 7,0,9 7,4 8,60 7, , ,09, /C Oct 006,46,709 6,406,677 6,87, 4,,78 6,99, 7,4 6,87 77, , ,0,44 49 /C 6 Nov 006 4,88,4 6,77,40 7,48,9 4,48,704 7,7,7 8,4 6,0 84, , ,068,46 49 /C 7 Dec 006,70,68 4 6,86,88 7,90,7,8,7 6,798,7 86,0 6,8 7, , ,07, /C 8 Jan 007 6,684,00 4,94 7,7,9 9,6,098 4,77,49 6,87,00 4,0 6,099 77, , ,90, /C 9 Feb 007 7,8,8,07 7,777,090,97,997,446,009 7,66, 89,67 66,76 0,0,8,76,4, , ,9, /C 60 Mar 007,646,66 4,697 7,07,66 8,79,9 4,40,44 7,070,94,6 6, 90,40 4,88, 4,887 4, , ,8, /C 6 Apr 007,90,99,4 6,6,04 6,879,7,84,8 6,946,74 99,6 6, 9,78,704,89,707, , ,84, /C 6 May 007,097,78,4 6,4,897 6,0,0 4,,89 6,79,0 4,6 6,69 96,7,84 4,0,846, , ,68, /C Time Trend GS<0 kw & Large Use Blackout Dummy DewPoint Temperature Business Days Percent Toronto Unemployment Rate GS<0 kw Customer Numbers GS kw GS kw Large Use

17 Toronto Hydro Electric System Limited EB Appendix A Corrected: 04 Sep Page of 4 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Month Residential Competitive Sector Multi Unit Residential (CSMUR) Purchased Energy per day, kwh (by customer class) GS<0 kw GS kw GS kw Large Use Street lighting Unmetered Scattered Load Residential CSMUR GS<0 kw Cumulative CDM impacts per day, kwh GS kw HDD0 per day CDD8 per day Toronto Population ('000) GS kw Large Use Residenti al Time Trend GS<0 kw & Large Use Blackout Dummy DewPoint Temperature Business Days Percent Toronto Unemployment Rate GS<0 kw Customer Numbers 6 Jun 007,0,998,67 7,8,6 9,64,8,74,060 7,6,78 6,6 64,44 6,9,76 4,678,7, , ,67, /C 64 Jul 007,78,49,4 7,48,4 9,,90,078,4 6,90,0 4,8 9,8 9,76 7,9 8,400 7, 6, , ,486, /C 6 Aug 007 6,00,4,444 7,64,70 0,48,7 6,09,800 7,86,46 0,774 64,84 07,0,09,,08, , ,86, /C 66 Sep 007,97,98 7,9 6,60,46 7,6,0 4,78,0 7,,9 79,044 9,47 679, 4,0 6,8 4,68, , ,88, /C 67 Oct 007,400,600,86 6,6,09 6,9, 4,99,77 6,70,69,8 9,80 70,8 6,7 66,0 6,796 60, , ,99, /C 68 Nov 007 4,96,769 6,049 6,76,474 7,98,4 4,4,840 7,07,98 8,67 6,7 90,87 67,47 7,04 67, 66, , ,4, /C 69 Dec 007 6,46,47 7,87 7,09,79 9,0,8 4,44,46 6,99,9 89,8 64,76 609,946 44,07 4,64 44,678 4, , ,4,90 49 /C 70 Jan 008 6,669,64 7,89 7,09,07 9,946,486 4,8,64 7,0,668 4,876 6,8 66,864 6,798 7,98 6,86 60,4. 0.0, ,04, /C 7 Feb 008 6,4,408 9,99 7,9, 0,869,860 4,60,984 7,,4 84,40 64,0 679,04 7,988 84,80 7,4 7, , ,0, /C 7 Mar 008,9,86 8,800 6,860,669 9,07,6 4,7, 7,4,4 8, 6,4 6,66 6,8 7,987 67,49 64, , ,09, /C 7 Apr 008,4,6 0,489 6,46,98 6,47,06,747,990 6,94, 9,774 9,698,64 86,6 9,4 87,446 8, , ,, /C 74 May 008,678,640 0,846,9,,0,844,6,9 6,466,08 4,9 7,0,7 8,44 90,7 86,60 8, , ,094, /C 7 Jun 008 4,409,89,447 6,9,68 8,4,0 4,9,788 7,67,88,9 6,9 79,880,6 4,69,6, 0.0.4, ,, /C 76 Jul 008,46,40 4,09 7,64,768 0,78,8,06,4 7,48,96 48,4 6,898 88,749 88,48 00,67 96,644 9, , ,86, /C 77 Aug 008 4,08,60 6,4 6,687,887 8,9,4 4,4, 6,9,7 9,6 6,74 8, 88,8 00,98 97,6 9, , ,6, /C 78 Sep 008,9,6 0,08 6,46,406 7,49,8 4,7, 6,84,760 86,60 6,94 6, 0,674,6,74 06, , ,9, /C 79 Oct 008,4,460 0,479,88,99 6,09,808,664,78 6,47, 9,48 6,7 8, 0,076,040,70, , ,867, /C 80 Nov 008 4,644, 6,76 6,47,070 7,84,677,80,77 6,6,0 86,0 6,06 6,847, 0,487 9,9 6, , ,084, /C 8 Dec 008 6,7,0 40,079 6,67,60 9,,089,49,0 6,4,49 80,80 9,64 08,99,40 6,6 60,0,6. 0.0, ,97,6 47 /C 8 Jan 009 7,00,97 47,09 7,97,666,67,98 4,4,97 6,660,68 47, 66,009 09,6 7,8 64,86 6,099 8, , ,700, /C 8 Feb 009 6,8,9 6,7 6,86,980 9,978,0,84,699 6,74, 8,7 69,699 7, ,07 98,69 97,407 9, , ,, /C 84 Mar 009 4,74,877 8, 6,0, 8,464,88,84,44 6,44,460 6,76 6,0 8,04 4 6,0 7,0 7,0 68, , ,40, /C 8 Apr 009,6,6 6,00 6,0,8 6,4,699,9, 6,9,44 0,0 6, 60,797,484 8,08 40,98 47, , ,846, /C 86 May 009,9, 6,408,70,0,,040,784,6 6,06,66 6,904 8,7 4,87 4 0,44 6,488 9,8 48, , ,798,08 47 /C 87 Jun 009,90,96 6,7 6,04,6 7,7,6,84,97 6,84,04,6 64,4 648,79 4,878 49,44 7,89 80,7 0.0., ,074, 47 /C 88 Jul 009,79,78 68,047 6,047,049 7,,,6,667 6,9,78 4,648 8,77 7, ,60 404,60 4,90 448, , ,84,87 47 /C 89 Aug 009 4,8,64 69,9 6,49,7 9,687, 4,70,4 6,94,078,87 6,49 74, ,4 4,789 4, , , ,047, /C 90 Sep 009,6,764 77,94,86,4 7,74,47,90,64 6,78,894 8,097,004 7,8 9 4,84 40,48 4,07 490, , ,00, /C 9 Oct 009,8,064 76,76,684,484 6,464,9,,6 6,47,0,09 4,86 8,98 64,86 7,987 8,769 0, , ,87, /C 9 Nov 009,689,07 8,0,774,87 6,864,60,74,6 6,69,86 88,98,4 9, , 79,0 9,0, , ,8, /C 9 Dec 009 6,87, 8,88 6,7,8 9,49,,407,6 6,74,49 9,44 6,9 60, , 68,74 84,8 86, , ,88, /C 94 Jan 00 6,94,9 97,086 6,,6 0,70,76,76,88 6,46,844 48,96 6,8 666, ,6 467,47 48,77 484, , ,607, /C 9 Feb 00 6,,,48 6,498,49 0,698,8,774,06 6,40,897 86,994 60,7 74,876 9,78 6,86 44,97 4, , ,06,74 47 /C 96 Mar 00,79, 0,46,87,49 7,9,94,8, 6,6,068 7,966 7,6 676, , ,04 0,64 04,.7 0.0, ,6, /C 97 Apr 00,97,00,9,49,0 6,40,67,7,,77,68 0,06,09, ,07 49, 66,0 97, , ,99, /C 98 May 00,044,68 7,8,647,99 7,4,46,486,67 6,8,9 4,68 48,88, ,846 4, 9,89 9, , ,68,89 47 /C 99 Jun 00 4,46,44 4,6,88,774 8,6,970 4,4,478 6,49, 6,789 46,96 84,69,9 60,660 60,6 689,06 7, , ,799, /C 00 Jul 00 7,98,7 47,77 6,77,9,48,969,8,78 6,870,06,09 46,894 80,996,8 6,47 640, ,87 746,9 0.0., ,09, /C 0 Aug 00 6,,76,7 6,48,48,6,847,077,0 6,774,897 0,6 4,69 74,, 68,477 68,6 697,46 768, , ,89, /C 0 Sep 00,947,969 70,469,8,908 7,7,07,748,09 6,80,96 87,4 9,740 7,7,9 699,444 70,40 76,840 88, 0.0., ,794, /C 0 Oct 00,96,66 68,4,4,0 6,9,874,08,06,8,4,76 4,068 9, ,066 88,4 07, 47,9. 0.0, ,04, /C 04 Nov 00,777,80 78,64,64,86 7,907,96,40,6 6,,6 88,90 40,79 0, ,40 08,08 8,97 7, , ,976, /C 0 Dec 00 6,8,84 77,87 6,0,64 0,78,06,,897 6,47,64 9,78 9,0 6,6,48 60,9 6,9 69,8 644, , ,67, /C 06 Jan 0 6,87,9 80,664 6,8,7,48,76,49,704 6,8,88 48,4 9,86 64,99,8 6,989 67,879 64,96 64, , ,996, /C 07 Feb 0 6,8,099 0,79 6,4,7,4,4,664,0 6,646,4 88,767 7,6 68,,4 68,68 700,749 7,64 74, , ,94, /C 08 Mar 0 4,77,06 87,88 6,04,67 9,69,8,79,690 6,90,80 60,48,860 6,,444 66,66 66,08 64,640 6, , ,94, /C 09 Apr 0,8,90 04,97,87,6 7,99,96,7,894 6,4,44 0,774,469, ,67 40,868 4,0 68, , ,86, /C 0 May 0,89,0,,64,6 6,60,896,88,790 6,6,894 4, 8,094 07,708 84,687 4,90,847 6, , ,4, /C Jun 0,74,99,0,76,09 8,7,9,60,7 7,006,47 4,769 7,69 79,8,46 80,7 90, ,40 894, , ,68, /C Jul 0 8,,99 0,700 6,6,88,49,98 4,469,94 7,9,67,86 7, ,74,78 84,09 9,0 87,40 87, , ,7, /C Aug 0,,86 4,69 6,86,48,,790 4,09,498 7,04,4 46,9 8, ,89,644 89, 94,07 89,9 86, , ,900, /C 4 Sep 0,6,84 8,7,67, 8,408,0,,97 6,77,6 8,0,40 86,4,8 84,786 99,498 89, , , ,07, /C Oct 0,6,97 60,9,407,98 6,76,9,6,6 6,68, 4,0 6,46,0,86 4,87 40,00 7,690, , ,00,70 49 /C 6 Nov 0,40,48 7,87,766,400 7,74,0,8,0,646,80 90,8 7,47 46,07,47 70,74 449,7 84,06 7, , ,7,6 496 /C 7 Dec 0,08, 7,074,969,677 9,087,4,676,968,78,7 40,9 9,78 74,6,440 79,868,006,067 86,48 777, , ,6, /C 8 Jan 0,8,9 79,0 6,08,77 9,70,4,88,49 6,44,99 4,6,978 7,84,474 79,,04,06 87,4 777, , ,460,7 497 /C 9 Feb 0 4,796,840 07,9 6,,97 9,67,0,89,46 6,,4 9,70,97 77,80,7 8,47,09,8 874,04 80, , ,6,9 498 /C 0 Mar 0,96,994 9,66,84,849 7,4,0,798, 6,40,8 60, 7,866 78,7,6 808,47,049,04 8,08 777, , ,8, 498 /C Apr 0,99,84,40,68,89 6,8,488,099,009 6,,660,08 7,76 6,684,86 40,770 9, 40,6 88, , ,8, /C May 0,7,97 04,440,9,8 6,86,,867,064 6,08,090 8,09,8,8,88 96,089,6 98,8 76, , ,06,6 497 /C Jun 0,7, 8,78 6,64,748 9,007,9 4,7,6 6,79,77 6,99,4 898,476 4,697,00,064,9,796,009,678 9, , ,40,9 496 /C GS kw GS kw Large Use

18 Toronto Hydro Electric System Limited EB Appendix A Corrected: 04 Sep Page of 4 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Month Residential Competitive Sector Multi Unit Residential (CSMUR) Purchased Energy per day, kwh (by customer class) GS<0 kw GS kw GS kw Large Use Street lighting Unmetered Scattered Load Residential CSMUR GS<0 kw Cumulative CDM impacts per day, kwh GS kw HDD0 per day CDD8 per day Toronto Population ('000) GS kw Large Use Residenti al Time Trend GS<0 kw & Large Use Blackout Dummy DewPoint Temperature Business Days Percent Toronto Unemployment Rate GS<0 kw Customer Numbers 4 Jul 0 8,,906,904 7,06,09,40,688,049,4 7,,9,9 0,79 866,9 4,87 978,8,0, 97,9 97, , ,40,9 496 /C Aug 0,69,0,67 6,0,4 9,99,809 4,7,846 7,9,8 0,899,9 89,7 4,69 967,94,98,007 96, 90, , ,,7 49 /C 6 Sep 0,969,8 7,66,770,9 7,48,48,684,97 6,7,0 87,76 6,49 88,6 4,8 884,8,,90 87,649 86, 0.0., ,66,8 49 /C 7 Oct 0,90,6 0,06,4,890,96,4,49,47 6,4, 4,,648 48,70,9,9 49,09 46,060, , ,90, /C 8 Nov 0,74,74 0,4,98,46 7,6,966,,88 6,4,8 87,9 8,44 6,786,040 64,,94 6,08 0, , ,986,0 497 /C 9 Dec 0 4,899,0 47,76 6,068,480 7,9,8,896,4 6,4,9 90,7,694 78,60 4,406 76,4,0,80 70,00 69, , ,970, 04 /C 0 Jan 0,740,7,07 6,4,4 9,40,70,84,080 6,90,78 47,00 7, ,84 4, ,74,,99 7,8 660, , ,994,9 08 /C Feb 0,668,88 400,7 6,4,87 0,8,0,99,909 6,4,7 88,4 6,68 8,7 4, ,97,4,76 80,04 7, , ,08,6 07 /C Mar 0 4,4, 76,76 6,044, 7,74,888,68,7 6,0,79 66,0 8,9 744,906 4,4 77,66,4,79 77,748 66, , ,09,06 0 /C Apr 0,76,88 9,87,79,4 6,9,98,8,0 6,9,0 09,00,86 7,9,9 88,97 80,744 64,8, , ,06,99 /C 4 May 0,977,698 87,96,87,47,6,9,46,77 6,4,76 4,699 0,09 6,6,0 79,9 70,89 4,788, , ,7,074 /C Jun 0,489,99 404,74,866,940 7,80,7 4,0, 6,,60 8,0,9 9,66,79 97,98,474,96 904,666 89, , ,,88 6 /C 6 Jul 0 6,08,8 98,0 6,84,8 0,9,698 4,96,6 6,6,00,4,94 90,849,678 9,7,4,4 877,6 79, , ,40,94 6 /C 7 Aug 0 4,0,87 404,870 6,4,4 8,8,74 4,664,08 6,04,8,48, ,090,7 960,69,474,69 88,0 794, , ,48,9 7 /C 8 Sep 0,0,489 4,,78,7 6,690,786,99,6 6,88,7 90,79,04 90, 6,0,000,97,46,84 96,74 8, , ,66,9 7 /C 9 Oct 0,04, 4,7,4,6,80,76,76,7 6,99,4 4,67,46 68,8,40 99,7 6,69 6,89 6,.6 0.0, ,66,890 9 /C 40 Nov 0,99,799 47,88 6,7,788 7,6,69,74,9 6,9,8 9, 6,97 8,86,84 44, 67,7 8,88 40, , ,69,904 /C 4 Dec 0,789,4 47,804 6,449,09 8,88,788,46,66 6,6,7 9,98 0, ,66,0 866,67,84,7 77,4 68, , ,70,94 /C 4 Jan ,,0 869,677,9, ,00 68, , ,78,9 0 /C 4 Feb ,89,9 968,766,6,79 860,8 79, , ,68,9 6 /C 44 Mar 04 78,677,480 88,98,4,94 784,06 690, , ,7,9 6 /C 4 Apr 04 90,647,77 44,77 7,86 9,47 46, , ,799, /C 46 May 04 79,809,7 46, 7,6 8,99 7, , ,84, /C 47 Jun ,9 7,069,,8,84,96 98,6 860, , ,89, /C 48 Jul 04 97,7 6,90,09,044,804, 949,77 89, , ,97, /C 49 Aug 04 9,9 6,97,098,7,8,80 94,47 8, , ,98, /C 0 Sep 04 9,47 7,77,4,7,90,760 99, 86, , ,09, /C Oct 04 77,,96 4,6 76,64 94,066 4,87. 0., ,040, /C Nov 04 94,44,9 48,949 8,07 44, 8, , ,0, /C Dec 04 80, 6,89,00,7,7,49 8,90 7,.8 0.0, ,06, /C 4 Jan 0 79,9 6, 990,,708,9 88,66 77, , ,074, /C Feb 0 878,667 7,8,00,90,904,84 90,87 79, , ,08, /C 6 Mar 0 796,04 6,680,00,77,74,76 846,8 7, , ,097, /C 7 Apr 0 97,648,70 0, ,99 4,77 6,9. 0.0, ,08, /C 8 May 0 86,47, 49,9 864,074 4,07, , ,9, /C 9 Jun 0 979,7 8,4,7,8,,76,0,40 89, , ,, /C 60 Jul 0 940, 8,9,6,07,68,09,008,97 8, , ,4, /C 6 Aug 0 96,48 8,9,0,68,8,60,0,094 8, , ,, /C 6 Sep 0 89,9 8,78,6,8,70,7,04, , , ,64, /C 6 Oct 0 4,97,486 0, ,89 44, 48,09. 0., ,76, /C 64 Nov 0 69,00,707 9,49 96,788 44,79 6, , ,87, /C 6 Dec 0 7,64 7,78,09,00,08,406 89,96 79, , ,98, /C 66 Jan ,7 7,80,079,896,00, ,90 7, , ,0, /C 67 Feb 06 80,6 8,44,9,67,64,90 97,6 77, , ,, /C 68 Mar 06 76,6 8,009,096,968,0,48 88,644 7, , ,, /C 69 Apr 06 78,4 4,040,4,06,67 44, 64,6. 0.0, ,4, /C 70 May 06 68,7,967 9,96,08,6 4,0 4, , ,, /C 7 Jun 06 99,79 0,,8,744,60,74,0,47 899, , ,66, /C 7 Jul ,906 0,0,4,76,60,90,06,7 86, , ,77, /C 7 Aug ,70 0,0,47,448,78,,06,98 86, , ,89, /C 74 Sep 06 9,96 0,0,94,70,680,678,098, ,6 0.0., ,00, /C 7 Oct 06 66,0 4,07,68,07,4 46,696,46. 0., ,, /C 76 Nov 06 8,70 4,469 86,7,7,788 48,9 69, , ,, /C 77 Dec ,09 9,40,9,849,84,67 94,79 7, , ,4, /C 78 Jan ,664 9,99,8,00,9,907 99,4 746, , ,4, /C 79 Feb 07 87,7 0,48,,076,666,0,04,894 87, , ,6, /C 80 Mar ,9 9,600,9,0,44,74 90,770 7, , ,68, /C 8 Apr 07 97,77 4,87 6,89,,07 476,947 78, , ,79, /C 8 May 07 87,0 4,74 609,76,0,6 46,44 68, , ,90, /C 8 Jun ,88,04,66,044,0,40,9,0 99, , ,40, /C 84 Jul 07 94,884,9,499,9,07,49,7,69 880, , ,4, /C GS kw GS kw Large Use

19 Toronto Hydro Electric System Limited EB Appendix A Corrected: 04 Sep Page 4 of 4 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Month Residential Competitive Sector Multi Unit Residential (CSMUR) Purchased Energy per day, kwh (by customer class) GS<0 kw GS kw GS kw Large Use Street lighting Unmetered Scattered Load Residential CSMUR GS<0 kw Cumulative CDM impacts per day, kwh GS kw HDD0 per day CDD8 per day Toronto Population ('000) GS kw Large Use Residenti al Time Trend GS<0 kw & Large Use Blackout Dummy DewPoint Temperature Business Days Percent Toronto Unemployment Rate GS<0 kw Customer Numbers 8 Aug ,984,00,07,44,049,40,0,4 88, , ,44, /C 86 Sep ,868,06,66,77,7,908,7,6 9, 0.0., ,4, /C 87 Oct 07 87,006 4,99 64,8,68, , 6,60. 0., ,447, /C 88 Nov 07 40,86,9 66,84,48,6 49,6 80, , ,48, /C 89 Dec 07 80,,06,76,8,8,6,04,8 777,.8 0.0, ,469, /C 90 Jan 08 8,84,07,7,88,89,9,009,69 77, , ,48, /C 9 Feb 08 94,0,8,6,840,49,0,0,84 8, , ,49, /C 9 Mar 08 84,749,88,9,66,878,788,00,8 777, , ,0, /C 9 Apr 08 4,0,68 699,74,448,668,0 9, , ,4, /C 94 May 08 4,60,67 68,07,48,49 499,86 8, , ,6, /C 9 Jun 08,0,6 4,,748,98,64,76,77, 97, , ,7, /C 96 Jul 08,0,680 4,00,69,66,46,,0, 9, , ,48, /C 97 Aug 08,07,677 4,096,697,89,66,76,,469 9, , ,60, /C 98 Sep 08,06,04 4,67,76,8,707,68,77, , , ,7, /C 99 Oct 08 4,47,80 700,4,477,4 07,806 8,0. 0., ,8, /C 00 Nov 08 44,94 6,86 77,,6,04,489 40, , ,9, /C 0 Dec 08 90,7,86,,40,40,984,096,88 88, , ,60, /C 0 Jan 09 88,47,9,00,968,7,740,074,60 794, , ,66, /C 0 Feb 09 97,89 4,6,666,0,86,9,9,0 880, , ,67, /C 04 Mar ,80,06,,766,68,4,08,49 797, , ,69, /C 0 Apr 09 44,84 6,8 79,804,640,74 4,40 400, , ,60, /C 06 May 09 49,886 6,44 74,0,60,90 7,0 89, , ,66, /C 07 Jun 09,087,04 6,49,888,4 4,094,70,8, , , ,67, /C 08 Jul 09,09,66 6,074,8,74,986,770,94, , , ,684,78 44 /C 09 Aug 09,048,40 6,7,87,067 4,00,76,94,87 947, , ,69, /C 0 Sep 09,07,694 6,79,897,60 4,47,99,,4 97,8 0.0., ,706,8 44 /C Oct 09 44,4 6,680 7,0,648,74 8,79 8, , ,78,80 44 /C Nov 09 44,48 7,0 789,0,7,,08 40, , ,79, /C Dec ,76 4,8,6,66,67,46,9, 84, , ,740, /C GS kw GS kw Large Use

20 EB Appendix A- Corrected: 04 Sep Page of Residential Model Dependent Variable: RES_DAY Method: Least Squares Date: 08//4 Time: 0:4 Sample: 00M07 0M Included observations: 8 White Heteroskedasticity Consistent Standard Errors & Covariance Variable Coefficient Std. Error t Statistic Prob. HDD0_DAY 0,97 7, CDD8_DAY 988, 8, POP,06, TREND_JUL00 8,776, BLACKOUT,7,8 07, C 6,8,46,47, /C R squared 9.9% Mean dependent var,9,740.6 Adjusted R squared 9.7% S.D. dependent var,7,8.6 S.E. of regression 44,6.9 Akaike info criterion 8.84 Sum squared resid 4,904,9,06,89 Schwarz criterion 8.97 Log likelihood,984. Hannan Quinn criter F statistic 409. Durbin Watson stat.6 Prob(F statistic)

21 EB Appendix A- Corrected: 04 Sep Page of GS<0 kw Model Dependent Variable: LESS0_DAY Method: Least Squares Date: 08//4 Time: 0:9 Sample: 00M07 0M Included observations: 8 White Heteroskedasticity Consistent Standard Errors & Covariance Variable Coefficient Std. Error t Statistic Prob. HDD0_DAY,06 7, CDD8_DAY 68,64 9, DEW 9,000 6, TREND_JUL00_ 8, UNEMPL_RATE,4, CUST_NUMBERS BLACKOUT 40,9, C,77,0,478, /C R squared 9.4% Mean dependent var 6,90,66. Adjusted R squared 9.0% S.D. dependent var 66,0.94 S.E. of regression 6,6.8 Akaike info criterion 6.89 Sum squared resid,47,708,67,740 Schwarz criterion 7.06 Log likelihood,847.6 Hannan Quinn criter F statistic 6. Durbin Watson stat.9 Prob(F statistic)

22 EB Appendix A- Corrected: 04 Sep Page of GS kw Model Dependent Variable: GS0_DAY Method: Least Squares Date: 08//4 Time: 0:44 Sample: 00M07 0M Included observations: 8 White Heteroskedasticity Consistent Standard Errors & Covariance Variable Coefficient Std. Error t Statistic Prob. HDD0_DAY 44,77, CDD8_DAY 948,400 4, BUS_DAYS_PERCENT,40, DEW,744 8, CUST_NUMBERS UNEMPL_RATE 68,8 6, BLACKOUT,878,77 4, C,99,6,00, /C R squared 9.% Mean dependent var 8,646,86.8 Adjusted R squared 9.% S.D. dependent var,979,44.79 S.E. of regression 4,66.8 Akaike info criterion 8.84 Sum squared resid 4,,60,66,84 Schwarz criterion 9.0 Log likelihood,98. Hannan Quinn criter. 8.9 F statistic 9.0 Durbin Watson stat.0 Prob(F statistic)

23 EB Appendix A- Corrected: 04 Sep Page 4 of GS kw Model Dependent Variable: GS40_DAY Method: Least Squares Date: 08//4 Time: 0: Sample: 00M07 0M Included observations: 8 White Heteroskedasticity Consistent Standard Errors & Covariance Variable Coefficient Std. Error t Statistic Prob. HDD0_DAY 87,90 4, CDD8_DAY 0,9, BUS_DAYS_PERCENT 4,76 8, DEW 7,789, CUST_NUMBERS 0,08, UNEMPL_RATE 4,0 9, BLACKOUT 886,8 8, C,0,66,, /C R squared 87.7% Mean dependent var 4,4, Adjusted R squared 87.0% S.D. dependent var 8,86. S.E. of regression 00,96. Akaike info criterion 8. Sum squared resid,77,7,487,66 Schwarz criterion 8.9 Log likelihood,9. Hannan Quinn criter. 8.9 F statistic.4 Durbin Watson stat.6 Prob(F statistic)

24 EB Appendix A- Corrected: 04 Sep Page of Large Use Model Dependent Variable: LU_DAY Method: Least Squares Date: 08//4 Time: 0: Sample: 00M07 0M Included observations: 8 White Heteroskedasticity Consistent Standard Errors & Covariance Variable Coefficient Std. Error t Statistic Prob. HDD0_DAY 8,49 0, CDD8_DAY 4,786, BUS_DAYS_PERCENT 9,744 7, DEW,94 9, CUST 40,4, TREND_JUL00_ 6, BLACKOUT 47,6 67, C,488,89 84, /C R squared 7.% Mean dependent var 7,70,9.4 Adjusted R squared 74.% S.D. dependent var 478,7.0 S.E. of regression 4,87.8 Akaike info criterion 7.69 Sum squared resid 7,666,4,47,9 Schwarz criterion 7.86 Log likelihood,90.9 Hannan Quinn criter F statistic 7. Durbin Watson stat.8 Prob(F statistic)

25 Table : Loads by Class Toronto Hydro Electric System Limited EB Appendix B Corrected: 04 Sep Page of Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col. 9 Col. 0 Col. Col. Col. Col. 4 Col. Col. 6 Col. 7 Col. 8 Col Board 00 Board 0 Board 0 Board 0 Board 04 Board 04 Bridge 009 Actual 00 Actual 0 Actual 0 Actual 0 Actual Year 0 Test Year 06 Test Year 07 Test Year 08 Test Year 09 Test Year Residential kwh,87,07,866,0,8,46,08,08,66,06,86,7 4,986,768,67,7,679,4 n/a,4,7,96 n/a,007,496,09 n/a 4,9,89, 4,909,898,4 4,90,60,49 4,8,68, 4,807,77,78 4,774,97,60 /C 4 kva n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a /C Competitive Sector Multi Unit Residential (CSMUR) kwh n/a n/a n/a n/a n/a n/a n/a n/a n/a 8,,909 n/a 7,86,499,6,8,6,09 89,87,9 4,960,77 6,94,76 /C 6 kva n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a /C 7 GS <0 kw kwh,4,94,999,80,476,74,9,476,0,09,766,048,9,8,076,08,497,86 n/a,4,68,049 n/a,7,,48 n/a,4,640,,8,40,6,0,996,0,08,84,4,06,60,06,986,96, /C 8 kva n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a /C 9 GS kw kwh 9,786,6,4 9,844,680,70 0,4,40, 0,9,,07 0,6,74, 0,7,86,06 n/a 9,978,9,876 n/a 9,84,8,68 n/a 9,8,4,00 9,848,64,894 9,88,7,4 9,74,9,849 9,67,97,970 9,66,00, /C 0 kva,06,77,674,6 6,,77 6,77,77 6,9,9 6,844,7 n/a 6,409,77 n/a,980,090 n/a 6,74,6 6,9,86 6,4,4 6,,008 6,8,9 6,40,6 /C GS kw kwh,040,0,4 4,786,9,8 4,880,64,7 4,89,7,46 4,66,98,6 4,670,66,68 n/a 4,794,68,898 n/a 4,90,7,69 n/a 4,68,9,494 4,64,,7 4,669,074,09 4,6,40,9 4,640,88,6 4,64,979,494 /C kva,6,464 0,9,09,4,88 0,974,687 0,87,9 0,6,988 n/a 0,88,66 n/a,00,609 n/a 0,744,06 0,67,87 0,77,086 0,688,40 0,69,77 0,690,4 /C Large Use kwh,70,84,9,4,90,9,78,,,6,689,66,76,778,,40,746,74 n/a,67,07,6 n/a,7,06,90 n/a,46,880,,8,86,74,4,7,907,9,64,449,,0,0,9,60,68 /C 4 kva,60,90,8,884 4,974,40,68,0 4,99,7,44,844 n/a,67,06 n/a,40,906 n/a,70,8,0,00,0,68,8,8,79,8,7, /C Street Lighting kwh 09,74,97,00,096 09,98,944,749,99 0,6,06,04,004 n/a,94,97 n/a,64,8 n/a,90,87 4,09,99 4,69,00 4,47, 4,66,8 4,8,49 /C 6 kva 7,6,00,8,99,0,48 n/a,74 n/a,0 n/a,96 4,479 4,984,489,998 6,0 /C 7 Unmetered Scattered Load kwh 7,40,00 6,4,96,4,0,07,4 6,,8 4,79,00 n/a 4,4,7 n/a 4,,4 n/a 4,,4 4,,4 4,4,04 4,,4 4,,4 4,,4 /C 8 kva n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a /C 9 Total kwh,496,888,777 4,49,79,089 4,86,,48 4,7,66,664 4,4,64,088 4,70,4,48 n/a 4,64,9,88 n/a 4,44,04,046 n/a 4,,77,6 4,8,79, 4,6,6,79,98,09,60,84,9,00,760,6,68 /C 0 kva 4,67,68 4,06,408 4,949, 4,8,76 4,88,067 4,,08 n/a 4,84,90 n/a 4,80,809 n/a 4,7,69 4,697,06 4,806,84 4,6,8 4,84,47 4,9, /C Notes. Loads are after losses 4. CSMUR rate class implementation date Jun 0, 0. Prior years were included in Residential class.

An Econometric Study: The Cost of Mobile Broadband

An Econometric Study: The Cost of Mobile Broadband An Econometric Study: The Cost of Mobile Broadband Zhiwei Peng, Yongdon Shin, Adrian Raducanu IATOM13 ENAC January 16, 2014 Zhiwei Peng, Yongdon Shin, Adrian Raducanu (UCLA) The Cost of Mobile Broadband

More information

SME License Order Working Group Update - Webinar #3 Call in number:

SME License Order Working Group Update - Webinar #3 Call in number: SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under

More information

Niagara-on-the-Lake Hydro Inc. EB Exhibit 7 Cost Allocation. Page 1 of 26 Filed: August 2018

Niagara-on-the-Lake Hydro Inc. EB Exhibit 7 Cost Allocation. Page 1 of 26 Filed: August 2018 Exhibit Cost Allocation Page of Page of Table of Contents.. Cost Allocation Study Requirements...... Overview of Cost Allocation...... Specific Customer Classes...... New Customer Class...... Eliminated

More information

INTRODUCTION TO PANEL DATA ANALYSIS

INTRODUCTION TO PANEL DATA ANALYSIS INTRODUCTION TO PANEL DATA ANALYSIS USING EVIEWS FARIDAH NAJUNA MISMAN, PhD FINANCE DEPARTMENT FACULTY OF BUSINESS & MANAGEMENT UiTM JOHOR PANEL DATA WORKSHOP-23&24 MAY 2017 1 OUTLINE 1. Introduction 2.

More information

NMOSE GPCD CALCULATOR

NMOSE GPCD CALCULATOR NMOSE CALCULATOR It should be noted that all the recorded data should be from actual metered results and should not include any estimates. Gallons per Capita - v2.4 Beta Release Date: Mar, 16, 29 This

More information

UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A JUNE 2012

UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A JUNE 2012 UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A 004 11 JUNE 2012 TABLE OF CONTENTS Abstract...3 Introduction...3 Methodology...4

More information

Nigerian Telecommunications Sector

Nigerian Telecommunications Sector Nigerian Telecommunications Sector SUMMARY REPORT: Q4 and full year 2015 NATIONAL BUREAU OF STATISTICS 26th April 2016 Telecommunications Data The telecommunications data used in this report were obtained

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

Nigerian Telecommunications (Services) Sector Report Q2 2016

Nigerian Telecommunications (Services) Sector Report Q2 2016 Nigerian Telecommunications (Services) Sector Report Q2 2016 01 SEPTEMBER 2016 Telecommunications Data The telecommunications data used in this report were obtained from the National Bureau of Statistics

More information

Lab Session 1. Introduction to Eviews

Lab Session 1. Introduction to Eviews Albert-Ludwigs University Freiburg Department of Empirical Economics Time Series Analysis, Summer 2009 Dr. Sevtap Kestel To see the data of m1: 1 Lab Session 1 Introduction to Eviews We introduce the basic

More information

Quarterly Sales (in millions) FY 16 FY 15 FY 14 Q1 $706.8 $731.1 $678.5 Q Q Q

Quarterly Sales (in millions) FY 16 FY 15 FY 14 Q1 $706.8 $731.1 $678.5 Q Q Q The following represents historical unaudited financial and statistical information regarding MSC s operations. MSC does not undertake any obligation to update any of the information presented below to

More information

Nigerian Telecommunications (Services) Sector Report Q3 2016

Nigerian Telecommunications (Services) Sector Report Q3 2016 Nigerian Telecommunications (Services) Sector Report Q3 2016 24 NOVEMBER 2016 Telecommunications Data The telecommunications data used in this report were obtained from the National Bureau of Statistics

More information

2016 Market Update. Gary Keller and Jay Papasan Keller Williams Realty, Inc.

2016 Market Update. Gary Keller and Jay Papasan Keller Williams Realty, Inc. 2016 Market Update Gary Keller and Jay Papasan Housing Market Cycles 1. Home Sales The Numbers That Drive U.S. 2. Home Price 3. Months Supply of Inventory 4. Mortgage Rates Real Estate 1. Home Sales Nationally

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary November, 2016 MTD MARKET UPDATE Data Current Through: November, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 0 Active, Pending, & Months

More information

Adaptive spline autoregression threshold method in forecasting Mitsubishi car sales volume at PT Srikandi Diamond Motors

Adaptive spline autoregression threshold method in forecasting Mitsubishi car sales volume at PT Srikandi Diamond Motors IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Adaptive spline autoregression threshold method in forecasting Mitsubishi car sales volume at PT Srikandi Diamond Motors To cite

More information

Airside Congestion. Airside Congestion

Airside Congestion. Airside Congestion Airside Congestion Amedeo R. Odoni T. Wilson Professor Aeronautics and Astronautics Civil and Environmental Engineering Massachusetts Institute of Technology Objectives Airside Congestion _ Introduce fundamental

More information

All King County Summary Report

All King County Summary Report September, 2016 MTD MARKET UPDATE Data Current Through: September, 2016 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Active, Pending, & Months Supply of Inventory 15,438 14,537 6.6 6.7

More information

Table 1: Operators Authorized to Provide Public Fixed Domestic Telecommunications Services as at 2010

Table 1: Operators Authorized to Provide Public Fixed Domestic Telecommunications Services as at 2010 2. Fixed Telephony Market Data As at December 2010, there were eight (8) operators authorized to provide fixed domestic telecommunications services to the public over wired or wireless facilities. These

More information

Demand Estimation Sub Committee Ad-hoc Work Plan

Demand Estimation Sub Committee Ad-hoc Work Plan Demand Estimation Sub Committee Ad-hoc Work Plan Background The DESC Ad-hoc Work Plan was established in 2012 to capture any issues and ideas which arise during the year that DESC decide they may like

More information

The Vision Council Winds of Change

The Vision Council Winds of Change The Vision Council Winds of Change Brian Beaulieu CEO Preliminary 217 Forecast Results If you heard ITR a year ago 2 Duration Accuracy US GDP (data through Sep) 24 98.5% US Ind. Prod. (Dec) 24 96.8% Eur

More information

Model Diagnostic tests

Model Diagnostic tests Model Diagnostic tests 1. Multicollinearity a) Pairwise correlation test Quick/Group stats/ correlations b) VIF Step 1. Open the EViews workfile named Fish8.wk1. (FROM DATA FILES- TSIME) Step 2. Select

More information

Economic Outlook. William Strauss Senior Economist and Economic Advisor Federal Reserve Bank of Chicago

Economic Outlook. William Strauss Senior Economist and Economic Advisor Federal Reserve Bank of Chicago Economic Outlook Illinois Public Pension Fund Association Hoffman Estates, IL February 16, 217 William Strauss Senior Economist and Economic Advisor Federal Reserve Bank of Chicago GDP expanded by 1.9%

More information

DAS LRS Monthly Service Report

DAS LRS Monthly Service Report DAS LRS Monthly Service Report Customer Service Manager : Diploma Aggregation Service : Daniel Ward Project/document reference : DAS LRS 2010-12 Issue : 1.0 Issue date : 17 th January 2011 Reporting Period

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary September, 2016 MTD MARKET UPDATE Data Current Through: September, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary Active, Pending, & Months Supply of Inventory 5,000 4,500 4,000 3,500 4,091

More information

Economic Update German American Chamber of Commerce

Economic Update German American Chamber of Commerce Economic Update German American Chamber of Commerce Federal Reserve Bank of Chicago October 6, 2015 Paul Traub Senior Business Economist U.S. Real GDP Billions Chained $2009, % Change Q/Q at SAAR $ Billions

More information

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary October, 2016 MTD MARKET UPDATE Data Current Through: October, 2016 (NWMLS Areas: 140, 380, 385, 390,, 701, 705, 710) Summary Active, Pending, & Months Supply of Inventory 4,500 4,000 3,500 4,197 4,128

More information

Tracking the Internet s BGP Table

Tracking the Internet s BGP Table Tracking the Internet s BGP Table Geoff Huston Telstra December 2000 Methodology! The BGP table monitor uses a router at the boundary of AS1221 which has a default-free ebgp routing table 1. Capture the

More information

DESCRIPTION OF COST ALLOCATION METHODOLOGY

DESCRIPTION OF COST ALLOCATION METHODOLOGY Filed: September, 00 EB-00-00 Exhibit G Schedule Page of 0 DESCRIPTION OF COST ALLOCATION METHODOLOGY.0 INTRODUCTION This schedule provides an overview of the cost allocation methodology used to allocate

More information

Urban Land Institute. November Make Your Move. Brian Beaulieu ITR Economics.

Urban Land Institute. November Make Your Move. Brian Beaulieu ITR Economics. Urban Land Institute November 212 Make Your Move Brian Beaulieu ITR Economics Results for 211 2 Duration Forecast Actual GDP 18 $13.525 $13.332 (-1.4%) US Ind Prod. 11 93.1 (12MMA) 93.8 (.8%) EU Ind. Prod.

More information

Houston Economic Overview Presented by Patrick Jankowski, SVP Research Greater Houston Partnership

Houston Economic Overview Presented by Patrick Jankowski, SVP Research Greater Houston Partnership Houston Economic Overview Presented by Patrick Jankowski, SVP Research Greater Houston Partnership Order of the Day Order of the Day Rig count fell 80% Oil prices dropped 75% Energy layoffs spiked Office

More information

MetrixND Newsletters Contents List By Topic

MetrixND Newsletters Contents List By Topic Workshops 2012 Workshops, Meetings and Free Brown Bag Seminars Vol 38, Feb 2012 2011 Workshops, Meetings and Free Brown Bag Seminars Vol 37, May 2011 2010 Workshops, Meetings and Free Brown Bag Seminars

More information

Broadband Rate Design for Public Benefit

Broadband Rate Design for Public Benefit Broadband Rate Design for Public Benefit The transition from service-based rates to loop rates on Chelan PUD s Broadband Network Dec.19, 2016 No action required today Today s Presentation Loop Rates Final

More information

Canterbury Procurement Forum. The forward pipeline fifth edition November 2013

Canterbury Procurement Forum. The forward pipeline fifth edition November 2013 Canterbury Procurement Forum The forward pipeline fifth edition November 2013 Content National Pipeline initial results Auckland Pipeline making the two regional reports look similar Canterbury Pipeline

More information

The State of Mobile. EU5 Mobile Media Landscape and Trends. Alistair Hill, Sr. Analyst

The State of Mobile. EU5 Mobile Media Landscape and Trends. Alistair Hill, Sr. Analyst The State of Mobile EU5 Mobile Media Landscape and Trends Alistair Hill, Sr. Analyst June 10, 2010 Agenda comscore Mobile Data Mobile Media Trends Shifting Mobile Media Landscape Smartphones Summing Up

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

IAB Internet Advertising Revenue Report

IAB Internet Advertising Revenue Report IAB Internet Advertising Revenue Report Full Year 2017 and Q4 2017 May 10, 2018 IAB Internet Ad Revenue Report: Full Year 2017 and Q4 2017 Agenda Welcome Kristina Sruoginis, Research Director, IAB Full

More information

Undergraduate Admission File

Undergraduate Admission File Undergraduate Admission File June 13, 2007 Information Resources and Communications Office of the President University of California Overview Population The Undergraduate Admission File contains data on

More information

Monthly SEO Report. Example Client 16 November 2012 Scott Lawson. Date. Prepared by

Monthly SEO Report. Example Client 16 November 2012 Scott Lawson. Date. Prepared by Date Monthly SEO Report Prepared by Example Client 16 November 212 Scott Lawson Contents Thanks for using TrackPal s automated SEO and Analytics reporting template. Below is a brief explanation of the

More information

Kaufman Brothers 13 th Annual Investor Conference

Kaufman Brothers 13 th Annual Investor Conference Kaufman Brothers 13 th Annual Investor Conference Craig DeYoung, VP Investor Relations New York, New York September 14, 21 / Slide 1 Safe Harbor "Safe Harbor" Statement under the US Private Securities

More information

Streamlining Utility Billing Analysis and Reporting. Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst

Streamlining Utility Billing Analysis and Reporting. Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst Streamlining Utility Billing Analysis and Reporting Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst Who We Are Founded by the Texas Legislature in 1969 The University of Texas

More information

Economic and Housing Market Trends and Outlook

Economic and Housing Market Trends and Outlook Economic and Housing Market Trends and Outlook Lawrence Yun, Ph.D. Chief Economist NATIONAL ASSOCIATION OF REALTORS Presentation to Memphis Area Association of REALTORS Memphis, TN April 2, 213 Forecast

More information

Single Family Months of Inventory. Condo Months of Inventory. May calgary regional housing market statistics

Single Family Months of Inventory. Condo Months of Inventory. May calgary regional housing market statistics May 211 calgary regional housing market statistics INNER CITY HOUSING MARKET LEADS IN SALES Buyers find value in inner city communities Total Single Family Months of Inventory Calgary, June 1, 211 According

More information

Top 10 Established Communities

Top 10 Established Communities october 211 calgary regional housing market statistics Calgary s Housing Market Set to Outpace 21 Several Calgary Communities Get a Boost in Sales and Price Calgary, November 1, 211 According to figures

More information

Today s Vision Tomorrow s Reality. Brian Beaulieu CEO

Today s Vision Tomorrow s Reality. Brian Beaulieu CEO Canadian Institute of Plumbing and Heating Today s Vision Tomorrow s Reality Brian Beaulieu CEO 215 Forecast Results 2 Duration 215 Forecast Result Accuracy US GDP 18 $16.632 Trillion $16.442 Trillion

More information

ARKANSAS HIGH COST FUND 2013 CARRIER REVENUE REPORT& SELF INVOICE INSTRUCTIONS

ARKANSAS HIGH COST FUND 2013 CARRIER REVENUE REPORT& SELF INVOICE INSTRUCTIONS For questions or assistance with these instructions, contact Rural Telcom Solutions, LLC via Email at: ruraltelcom@ruraltelcom.com, or by mail at: ARHCF P.O. Box 608 Danville, AR 72833 I. Filing Requirements

More information

Presentation title goes here

Presentation title goes here Financial Review Presentation title goes here Fritz Joussen Chief Operating Officer, Vodafone Germany Vodafone Germany Investor & Analyst Day 14 07 2005 1 Agenda Market Overview Commercial Strategy Financial

More information

IAB Internet Advertising Revenue Report

IAB Internet Advertising Revenue Report IAB Internet Advertising Revenue Report Half Year 2018 and Q2 2018 November 2018 IAB Internet Ad Revenue Report: Half Year 2018 and Q2 2018 Agenda Welcome Intro Sue Hogan, SVP Research and Measurement,

More information

BC Hydro Customer Classification Model Using SAS 9.2

BC Hydro Customer Classification Model Using SAS 9.2 BC Hydro Customer Classification Model VanSug Business Analytics Meeting Scott Albrechtsen BC Hydro, Load Analysis November 2, 2011 Agenda Business Problem & Why We Care The Data Sources Used The Modeling

More information

CTIA s Wireless Metrics Reports

CTIA s Wireless Metrics Reports CTIA s Wireless Metrics Reports Bobby Franklin Executive Vice President CTIA-The Wireless Association April 30, 2009 Background on Semi-Annual Survey CTIA s survey began in January 1985 focusing on operational

More information

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009 Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,

More information

New Jersey Department of Children and Families Focusing on the Fundamentals Annual Update

New Jersey Department of Children and Families Focusing on the Fundamentals Annual Update New Jersey Department of Children and Families Focusing on the Fundamentals 2006 Annual Update In 2006, New Jersey made significant investments in its most vulnerable children & families. Governor Corzine

More information

2017 Q4 Earnings Conference Call

2017 Q4 Earnings Conference Call 2017 Q4 Earnings Conference Call Forward Looking Statements This presentation includes certain forward-looking statements that are made as of the date hereof and are based upon current expectations, which

More information

Proposed Increase In Rates In Water, Sewer and Reclaimed. June 9, 2009

Proposed Increase In Rates In Water, Sewer and Reclaimed. June 9, 2009 Proposed Increase In Rates In Water, Sewer and Reclaimed June 9, 2009 1 WATER 2 3 Reclaimed Water Accounts 27,500 25,000 22,500 20,000 17,500 15,000 12,500 10,000 7,500 5,000 2,500 387-24,863 4 FY 96 FY

More information

Houston Economic Outlook. Patrick Jankowski

Houston Economic Outlook. Patrick Jankowski Houston Economic Outlook Patrick Jankowski www.houston.org Follow me on Twitter @pnjankowski May 22 10:30 a.m. Hilton Post Oak It s not Christmas but... 5 It s not Christmas but... Population Estimates

More information

Silicon Valley Power Data Center Program Rebate Application

Silicon Valley Power Data Center Program Rebate Application Contact Information Tax Status (check one) Sole Proprietor Contact Name Phone Corporation Partnership Company Email address Government Not-For-Profit Customer/Facility Information Company Name SVP Account

More information

Financial Results for the Three Months Ended June 30, August 3, 2006

Financial Results for the Three Months Ended June 30, August 3, 2006 Financial Results for the Three Months Ended June 30, 2006 August 3, 2006 Disclaimer Information The forward-looking statements and projected figures on the future performance of contained herein or referred

More information

POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ)

POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ) POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ) ABRIDGED POSTAL & TELECOMMUNICATIONS SECTOR PERFORMANCE REPORT FOURTH QUARTER 2018 Disclaimer: This report has been prepared based

More information

UBS Global Technology and Services Conference New York City. Craig DeYoung VP, Investor Relations & Corporate Communications

UBS Global Technology and Services Conference New York City. Craig DeYoung VP, Investor Relations & Corporate Communications UBS Global Technology and Services Conference New York City Craig DeYoung VP, Investor Relations & Corporate Communications June 9, 2009 / Slide 1 Safe Harbor "Safe Harbor" Statement under the US Private

More information

Urban Land Institute A Bend in the Road

Urban Land Institute A Bend in the Road Urban Land Institute A Bend in the Road Brian Beaulieu CEO 216 Forecast Results 2 Duration Accuracy US GDP 15 99.1% US Ind. Prod. 1 99.9% Eur Ind. Prod. 15 99.2% Canada Ind Prod 15 99.6% China Ind Prod

More information

CHAPTER 4 STOCK PRICE PREDICTION USING MODIFIED K-NEAREST NEIGHBOR (MKNN) ALGORITHM

CHAPTER 4 STOCK PRICE PREDICTION USING MODIFIED K-NEAREST NEIGHBOR (MKNN) ALGORITHM CHAPTER 4 STOCK PRICE PREDICTION USING MODIFIED K-NEAREST NEIGHBOR (MKNN) ALGORITHM 4.1 Introduction Nowadays money investment in stock market gains major attention because of its dynamic nature. So the

More information

CRIME ANALYSIS SACRAMENTO COUNTY SHERIFF S DEPARTMENT

CRIME ANALYSIS SACRAMENTO COUNTY SHERIFF S DEPARTMENT 27 February 2018 Five Year Uniform Crime Reporting (UCR) Analysis 2013-2017 Page 1 16 SACRAMENTO COUNTY UNIFORM CRIME REPORT 2013-2017 This report provides a five-year analysis of crime trends within the

More information

The City of Seattle s Mandatory Benchmarking and Disclosure Program

The City of Seattle s Mandatory Benchmarking and Disclosure Program The City of Seattle s Mandatory Benchmarking and Disclosure Program IFMA Seattle Annual Education Symposium March 10, 2011 City of Seattle Department of Planning and Development Agenda Background Overview

More information

Contents:

Contents: Contents: Conventional/REO/Short Sale Single Family Sold Sold Properties by Cities - Properties Sold Supply Inventory Median Price Comparison by Year www.swflrealtors.com Page #. Single Family & Condo

More information

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01 MW July 26, 2017 - August 1, 2017 This report provides a summary of key market data from the IESO-administered markets. It is intended to provide a quick reference for all market stakeholders. It is composed

More information

Demand Impact Model User Manual

Demand Impact Model User Manual Final Demand Impact Model User Manual Part of the Massachusetts Residential Retrofit and Low Income Program Area Evaluation June 2012 Prepared by: The Cadmus Group, Inc. Energy Services Division 720 SW

More information

Real Estate Forecast 2015

Real Estate Forecast 2015 Real Estate Forecast 2015 No Place But Up Interest Rates Rents Prices Real Estate and the Economy Ted C. Jones, PhD Chief Economist Stewart Title Guaranty Company Thank Heavens for Global Warming Think

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY FOR APPROVAL OF ITS SMART METER UNIVERSAL DEPLOYMENT PLAN

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY FOR APPROVAL OF ITS SMART METER UNIVERSAL DEPLOYMENT PLAN PECO ENERGY COMPANY STATEMENT NO. 2 BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY FOR APPROVAL OF ITS SMART METER UNIVERSAL DEPLOYMENT PLAN DOCKET NO. M-2009-2123944

More information

3. EXCEL FORMULAS & TABLES

3. EXCEL FORMULAS & TABLES Winter 2019 CS130 - Excel Formulas & Tables 1 3. EXCEL FORMULAS & TABLES Winter 2019 Winter 2019 CS130 - Excel Formulas & Tables 2 Cell References Absolute reference - refer to cells by their fixed position.

More information

For personal use only

For personal use only FY 2014 Half-Year Results 27 February 2014 NEXTDC LIMITED ACN 143 582 521 H1 FY14 highlights for the half-year ended 31 December 2013 National network nearing completion Strong functional sales channel

More information

Energy Engineering: Tools and Trends

Energy Engineering: Tools and Trends Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and

More information

Consensus Outlook

Consensus Outlook Consensus Outlook - 219 Thirty-second Annual Economic Outlook Symposium November 3, 218 William Strauss Senior Economist and Economic Advisor Federal Reserve Bank of Chicago The views expressed herein

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period September 1, 2012 through November 30, 2012 Program Year 4, Quarter 2 For Pennsylvania Act 129 of 2008 Energy Efficiency and

More information

Peak Season Metrics Summary

Peak Season Metrics Summary Peak Season Metrics Summary Week Ending Week Ending Number Date Number Date 1 6-Jan-18 27 7-Jul-18 Current 2 13-Jan-18 28 14-Jul-18 3 2-Jan-18 29 21-Jul-18 4 27-Jan-18 3 28-Jul-18 5 3-Feb-18 Thursday,

More information

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019 Billing and Collection Agent Report For period ending January 31, 2019 To FCC Contract Oversight Sub-Committee February 11, 2019 Welch LLP - Chartered Professional Accountants 123 Slater Street, 3 rd floor,

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

Imputation for missing data through artificial intelligence 1

Imputation for missing data through artificial intelligence 1 Ninth IFC Conference on Are post-crisis statistical initiatives completed? Basel, 30-31 August 2018 Imputation for missing data through artificial intelligence 1 Byeungchun Kwon, Bank for International

More information

Section 4.1: Time Series I. Jared S. Murray The University of Texas at Austin McCombs School of Business

Section 4.1: Time Series I. Jared S. Murray The University of Texas at Austin McCombs School of Business Section 4.1: Time Series I Jared S. Murray The University of Texas at Austin McCombs School of Business 1 Time Series Data and Dependence Time-series data are simply a collection of observations gathered

More information

Peak Season Metrics Summary

Peak Season Metrics Summary Peak Season Metrics Summary Week Ending Week Ending Number Date Number Date 1 6-Jan-18 27 7-Jul-18 2 13-Jan-18 28 14-Jul-18 Current 3 2-Jan-18 29 21-Jul-18 4 27-Jan-18 3 28-Jul-18 5 3-Feb-18 Thursday,

More information

Vodafone K.K. FY04 interim results Period ended 30 September 2004

Vodafone K.K. FY04 interim results Period ended 30 September 2004 Vodafone K.K. FY04 interim results Period ended 30 September 2004 16 Nov 2004 Presented by: J. Brian Clark Representative Executive Officer, President & CEO John Durkin Representative Executive Officer,

More information

INTEGRATION OF DR INTO TITLE 20 FOR LAPTOP BATTERIES

INTEGRATION OF DR INTO TITLE 20 FOR LAPTOP BATTERIES Design & Engineering Services INTEGRATION OF DR INTO TITLE 20 FOR LAPTOP BATTERIES AND DOCKING STATIONS Phase1: Demand Response Potential DR 09.05.13 Report Prepared by: Design & Engineering Services Customer

More information

U.S. Heating and Cooling Degree Day Summary

U.S. Heating and Cooling Degree Day Summary U.S. Heating and Cooling Degree Day Summary Updated 7/6/7 AM 8 6 U.S. Gas Weighted HDD Summary U.S. Population Weighted CDD Summary Obs/ Difference in Total/Forecast from Pop Weighted Obs/ Difference in

More information

POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ)

POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ) POSTAL AND TELECOMMUNICATIONS REGULATORY AUTHORITY OF ZIMBABWE (POTRAZ) ABRIDGED POSTAL & TELECOMMUNICATIONS SECTOR PERFORMANCE REPORT FIRST QUARTER 2017 Disclaimer: This report has been prepared based

More information

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 INTRODUCTION... 4 1.1 Contact persons... 5 1.2 Guidelines the statistics... 5 1.3 Voltage levels in the

More information

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note CDM Exemption Hydro One Networks' s ONLY HYDRO ONE S Description Filed Date Note J. J. J. TO PROVIDE NUMBERS OF NON-COMPLIANT APPLICATIONS REQUIRING AND NOT REQUIRING SITE ASSESSMENTS TO PROVIDE STAFFING

More information

Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899)

Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899) Operation Name: Energy Community

More information

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling CHILLER PLANT CONTROLS The challenges of producing chilled water are not the same as those a decade

More information

SMARTPHONE LAUNCH CAMPAIGN. Australia 2017

SMARTPHONE LAUNCH CAMPAIGN. Australia 2017 SMARTPHONE LAUNCH CAMPAIGN Australia 2017 Timing is everything Changing landscape Details matter Timing is everything Changing landscape Details matter New device arrivals follow 3 key stages: pre-announcement,

More information

Economic Outlook C.F.A. West Michigan Society Luncheon

Economic Outlook C.F.A. West Michigan Society Luncheon Economic Outlook C.F.A. West Michigan Society Luncheon Federal Reserve Bank of Chicago Detroit Branch May 22, 2012 Paul Traub Overview Economy - GDP The U.S. Consumer Home Prices Inflation Employment U.S.

More information

Cost efficient procurement of solar PV assets

Cost efficient procurement of solar PV assets Cost efficient procurement of solar PV assets Transnet - CSIR Solar PV Workshop CSIR Energy Centre Energy Autonomous Campus with Energy Markets & Policy Pretoria Campus: Knowledge Commons, Ulwazi 19 May

More information

BEAM TILTED CORRELATIONS. Frank Vignola Department of Physics University of Oregon Eugene, OR

BEAM TILTED CORRELATIONS. Frank Vignola Department of Physics University of Oregon Eugene, OR BEAM TILTED CORRELATIONS Frank Vignola Department of Physics University of Oregon Eugene, OR 9743-1274 fev@uoregon.edu ABSTRACT A model is described and evaluated that calculates beam irradiance from tilted

More information

What future changes are planned to improve the performance and reliability of the Wairarapa Connection?

What future changes are planned to improve the performance and reliability of the Wairarapa Connection? By email 27 February 2017 File Ref: OIAP-7-3039 Shed 39, 2 Fryatt Quay Pipitea, Wellington 6011 PO Box 11646 Manners Street Wellington 6142 T 04 384 5708 F 04 385 6960 www.gw.govt.nz Iain Palmer fyi-request-5300-1f924c94@requests.fyi.org.nz

More information

For personal use only. Update Event & nearmap Solar

For personal use only. Update Event & nearmap Solar Update Event & nearmap Solar Update Event and nearmap Solar Paul Peterson Senior VP Product & Engineering 2 Current Clear Change Current What s on the ground now Clear Unrivalled clarity Change Monitor

More information

October Broward County Government Human Services Department. Community Partnerships Division FY2015 Provider Information

October Broward County Government Human Services Department. Community Partnerships Division FY2015 Provider Information October 2014 Broward County Government Human Services Department Community Partnerships Division FY2015 Provider Information TOPICS Provider Resources Invoicing Quarterly Reports Other Required Reports

More information

Welcome To The. Broward County Human Services Department. Community Partnerships Division FY2016 Provider Information Workshop

Welcome To The. Broward County Human Services Department. Community Partnerships Division FY2016 Provider Information Workshop Welcome To The Broward County Human Services Department Community Partnerships Division FY2016 Provider Information Workshop Topics Of Discussion Provider Resources Invoicing Quarterly Reports Other Required

More information

QUARTERLY STATISTICAL BULLETIN ON COMMUNICATIONS IN GHANA

QUARTERLY STATISTICAL BULLETIN ON COMMUNICATIONS IN GHANA QUARTERLY STATISTICAL BULLETIN ON COMMUNICATIONS IN GHANA Volume 2 Issue 1 NATIONAL COMMUNICATIONS AUTHORITY FIRST QUARTER JANUARY - MARCH, 2017 Communications for Development QUARTERLY STATISTICAL BULLETIN

More information

Tracking and Evaluating Changes to Address-Based Sampling Frames over Time

Tracking and Evaluating Changes to Address-Based Sampling Frames over Time Tracking and Evaluating Changes to Address-Based Sampling Frames over Time Jennifer Unangst 1, Joseph McMichael 1 1 RTI International, 3040 Cornwallis Road, Research Triangle Park, NC 27709 Abstract Address-based

More information

Sand Pit Utilization

Sand Pit Utilization Sand Pit Utilization A construction company obtains sand, fine gravel, and coarse gravel from three different sand pits. The pits have different average compositions for the three types of raw materials

More information

Peak Season Metrics Summary

Peak Season Metrics Summary Week Ending Week Ending Number Date Number Date 1 2-Jan-16 27 2-Jul-16 2 9-Jan-16 28 9-Jul-16 Peak Season Metrics Summary 3 16-Jan-16 29 16-Jul-16 4 23-Jan-16 3 23-Jul-16 5 3-Jan-16 31 3-Jul-16 6 6-Feb-16

More information

1.2 Characteristics of Function Graphs

1.2 Characteristics of Function Graphs 1.2 Characteristics of Function Graphs Essential Question: What are some of the attributes of a function, and how are they related to the function s graph? Resource Locker Explore Identifying Attributes

More information

Peak Season Metrics Summary

Peak Season Metrics Summary Peak Season Metrics Summary Week Ending Week Ending Number Date Number Date 1 6-Jan-18 27 7-Jul-18 2 13-Jan-18 28 14-Jul-18 3 2-Jan-18 29 21-Jul-18 4 27-Jan-18 3 28-Jul-18 Current 5 3-Feb-18 Thursday,

More information