1 Agenda for Connectivity/Long term Access to Generation projects in Northern Region A. Numbering of Connectivity and LTA Meetings of Northern Region The LTOA / LTA and Connectivity meetings of Northern Region are being held along with the Standing Committee on Power System Planning of Northern Region before However, there was no numbering of these meetings and only date of the meeting was being referred. Therefore, in order to have better reference of LTA/Connectivity meetings held after issuance of Connectivity, Medium term & Long term regulations, 2009, it is proposed to adopt numbering of these meetings in chronological order as given below: Sl. No. Meeting Date Meeting Number Proposed 1 LTA/Connectivity Meeting 29-Dec st (First) 2 LTA/Connectivity Meeting 19-Dec nd (Second) 3 LTA/Connectivity Meeting 02-Jan rd (Third) 4 LTA/Connectivity Meeting 31-Aug th (Fourth) 5 LTA/Connectivity Meeting 23-Dec th (Fifth) 6 LTA/Connectivity Meeting 08-Aug th (Sixth) 7 LTA/Connectivity Meeting 14-July th (Seventh) Members may note. B. New/ Already discussed Connectivity & LTA Applications received by POWERGRID POWERGRID has received Connectivity and Long term Access (LTA) applications for new generation projects in NR. In addition, there are certain modifications of already granted Long term Access. The list of the projects to be discussed is given below: Table-1.0 Sl. No Applicant Time frame Location IC (MW) Nuclear power Corporation of India Ltd. NSL Tidong Power Generation Private Ltd. Jaiprakash Associates Ltd. (Roorkee Unit) Aug 2020 Jun 2016 Fatehabad (Haryana) Himachal Pradesh Connectivity Sought (MW) April 2017 Uttrakhand LTA Sought (MW) Page 1 of 21

2 Sl. No Applicant Time frame Location IC (MW) 4 Jaiprakash Associates Ltd. (Panipat Unit) Connectivity Sought (MW) LTA Sought (MW) April 2017 Uttrakhand NHPC Ltd.(Kishenganga HEP) Sep 2016 J&K THDC India Ltd. Nov 2017 Uttrakhand Gama Infraprop(P) Ltd. Oct 2011 Uttrakhand NTPC Ltd. (Gidderbaha STPP) To be intimated by NTPC Punjab NTPC Ltd. (Singrauli Hydro) Feb 2014 U.P Himachal Pradesh Power Corporation Limited (Sainj HEP) Himachal Pradesh Power Corporation Limited (Sawra Kuddu) Himachal Pradesh Power Corporation Limited (Kashang HEP) Himachal Pradesh Power Corporation Limited (Shongtong HEP) April 2014 Dec 2012 Dec 2014 April Miyar HEP Company Ltd. July SELI HEP Company Ltd. Oct Indian Oil Corporation Ltd. (Mathura Refinery)-Bulk Consumer Himachal Pradesh Himachal Pradesh Himachal Pradesh Himachal Pradesh Himachal Pradesh Himachal Pradesh July 2018 Mathura, U.P NTPC Ltd. (Bilhaur STPP) Dec 2017 Bilhaur, U.P Saurya Urja Company of Rajasthan Ltd. Saurya Urja Company of Rajasthan Ltd. Chenab Valley power Projects (Pakaldul HEP) Dec 2016 Dec 2016 May 2020 (Tentative) Jaisalmer, Rajasthan Jodhpur, Rajasthan Kishtwar, J&K SJVNL Ltd. (Dhaulasidh HEP) Jan 2018 Hamirpur, H.P SJVNL Ltd.(Luhri HEP) Jan 2018 Himachal Pradesh Uttrakhand Connectivity/LTA Applications Details of the applications is given below: Page 2 of 21

3 1.0 Connectivity & LTA to GHAVP Nuclear power plant (2X700MW) of M/s NPCIL in Haryana. POWERGRID has received an application in November 2014 for connectivity as well as Long Term Access for 1400 MW from upcoming Nuclear power generator (2X700MW) of M/s NPCIL for Gorakhpur Haryana Anu Vidyut Pariyojna (GHAVP) located at Fatehabad, Haryana. Connectivity has been sought w.e.f. Sep Target Beneficiaries as mentioned in the application is Northern region. As indicated in the application, switchyard for evacuation will be at 400kV whereas the 220kV switchyard will be utilized to draw start-up power from the grid by 220/66kV transformation. No interconnection is proposed between the two switchyards. Proposal: GHAVP Nuclear plant (2X700MW) of M/s NPCIL is in proximity of Fatehbad 400/220 kv substation of POWERGRID. Hence, connectivity can be granted at Fatehbad. Presently, Fatehbad 400/220 kv S/s is connected with LILO of one circuit of Moga-Hissar 400 kv D/c line. LILO of Moga-Bhiwadi 400 kv D/c line at Hissar is under implementation and therefore another 400 kv D/c line would be available between Moga & Hissar. System studies have been carried out for 2020 time frame with the proposal as given below: Sl. No. Case Exhibit No. 1 Without considering NPCIL Generation I 2 With NPCIL generation II 3 With Outage of NPCIL-Hissar 400 kv S/c III 4 With Outage of Khedar-Kirori 400 kv S/c Line IV 5 With Outage of both circuits of Khedar-Kirori 400 kv D/c line V From the studies it has been seen that all line loadings are well within limits under normal as well as contingency situations. Therefore, following transmission system is proposed for connectivity as well as for evacuation of power from NPCIL generation: Proposal for Connectivity: Fatehbad - NPCIL generation 400 kv D/c line Proposal for Long Term Access: LILO of second circuit of Moga-Hisar 400 kv D/c line at Fatehbad LILO of both circuits of Moga-Hisar 400 kv D/c line at NPCIL generation switchyard Hence, Connectivity & Long Term Access is proposed to be granted to NPCIL Haryana as with the above mentioned Transmission system. Members may deliberate. Page 3 of 21

4 2.0 Long Term Access to NSL Tidong Power Generation Pvt. Ltd. for 88 MW of Tidong HEP in Himachal Pradesh. M/s NSL Tidong Power Generation Pvt. Ltd. has applied for LTA for 88 MW from Tidong HEP located in Himachal Pradesh for transfer of power to Southern region as target beneficiary vide LTA application dated 08/05/2015. LTA is sought from 01/06/2016 for 25 years. It is to mention that the generation is amongst the identified hydro projects of CEA in H.P and shall be connected to STU system for connectivity. For this, the applicant has also obtained the required No Objection Certificate from H.P Power Transmission Corporation Ltd. with the validity form 01/01/2016 to 31/12/2040. According to NoC, the point(s) of Connection is provided as 220/400 kv pooling station under Construction at Wangtoo (Distt. Kinnaur) by LILO of both circuits of 220 kv Kashang-Bhaba and Karcham Wangtoo Abdullapur 400 kv D/c line. It is to mention that during 30 th Standing Committee Meeting of Power system planning in Northern region held on 19/12/2011, transmission system for Satluj basin & Spiti valley hydro projects was planned by the Task Force having representatives from Govt. of HP, HPPCL, HPPTCL, CEA and POWERGRID. The transmission system proposed and agreed in comprehensive master plan made for evacuation of generation from identified hydro projects located in Sutluj Basin & Spiti Valley is as follows: 2x315 MVA (7x105 MVA units) 220/400 kv GIS Pooling Station at Jangi (with 4000 Amps. switchgear) (with space provision for 3rd ICT) LILO of one ckt. of Shongtong Wangtoo 400 kv Line at Jangi Pooling Station Tidong Jangi Pooling Station 220 kv D/c line During the meeting HPPTCL also stated that Jangi Pooling station may not come up matching with the commissioning of Tidong-I generation, therefore Tidong-I power shall be temporarily evacuated by LILO of one circuit of 220 kv D/C Kashang- Bhaba line at Tidong-I HEP if required. These works shall be carried out by HPPTCL. Later on when Jangi P.S. would be commissioned, Tidong-I - Jangi 220 kv D/c line shall be constructed. These works are proposed to be carried out by HPPTCL. HPPTCL may update the status of implementation of Wangtoo 400/220 kv substation. Therefore, in view of the above, for Northern region following transmission system is required for grant of Long Term Access to M/s NSL Tidong Power generation Pvt. Ltd. for Tidong-I HEP: Interim Arrangement: LILO of one circuit of 220 kv D/C Kashang- Bhaba line at Tidong-I HEP Final Arrangement: Page 4 of 21

5 2x315 MVA (7x105 MVA units) 220/400 kv GIS Pooling Station at Jangi (with 4000 Amps. switchgear) (with space provision for 3rd ICT) Tidong Jangi Pooling Station 220 kv D/c line According to LTA application, power transfer requirement is from Northern region to Southern region. It is to mention that the processing of pending LTA applications since Nov 2013 for power transfer to Southern region were held on litigation and now they are gradually being processed as per the priority and availability of ATC. Therefore, the above proposal for grant of LTA shall be discussed in Connectivity/LTA meeting of Southern region constituents for their concurrence also. Members may discuss 3.0 LTA Applications for 10 MW to Jaiprakash Associates Ltd. for transfer of power from Captive Thermal plant to Jaypee Cement Grinding Unit in Panipat & Uttrakhand respectively. M/s Jaiprakash Associates Ltd. has applied for LTA for 10 MW from from Jaypee Churk Industrial Complex (JCIC), Churk, 3x60 MW Captive Thermal Power Plant (A unit Jaiprakash Associates limited) in Uttar Pradesh to the Cement Grinding unit in Panipat, Haryana & Uttrakhand. (A unit of Jaiprakash Associates limited). LTA is sought from 01/04/2017 for 12 years. As per the LTA applications the injection point is connected with STU system in U.P. at 220KV bus of CHAPKA Substation, however the drawl of power is mentioned in Haryana & Uttrakhand. As per the Detailed Procedures of Central Transmission Utility under Regulation of the CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009: In case an intra-state entity is applying for LTA, concurrence of concerned State Transmission Utilities of states having injection and drawl points shall be obtained in advance in the prescribed format [FORMAT-LTA-3] and attached with the application. POWERGRID vide letter dated Feb 24, 2014 has informed the applicant that as the applicant is embedded in State Transmission Utility (STU) network at both injection & drawl ends, therefore, it is requested that No Objection Certificate from STU, for injection (UPPTCL) and drawl ends (HVPNL & PTCUL) in standard format (Format-LTA-3), may be submitted to POWERGRID at the earliest, so that both LTA applications can be processed further. However, the same has not been received till date. As all the LTA/Connectivity/MTOA applications received by CTU are to be processed in line with CERC regulations in time bound manner, therefore, it is quite difficult to hold any LTA/Connectivity application for very long period of time. Page 5 of 21

6 Hence, the above LTA applications are need to be closed. However, with the issuance of NOC from STU, the applicant can apply afresh. Members may discuss. 4.0 Connectivity & LTA to NHPC Ltd. for Kishenganga HEP for transfer of 330 MW of power. Transmission system for Kishenganga HEP has been approved in 18th Meeting of the Standing Committee on Transmission System Planning in Northern Region held on 06/06/2005 & was further modified in 33rd SCM of Northern Region held on 23/12/2013 with the following Transmission system: o Kishenganga Amargarh 220 kv D/c o Kishenganga Wagoora 220 kv D/c As per the application, the beneficiaries are Punjab, Haryana, Delhi, Rajasthan, J&K, Uttranchal & Chandigarh. Beneficiaries are requested to sign the applicable agreements. The transmission system for Kishenganga HEP is under implementation, however, to fulfill the regulatory requirement, NHPC Ltd. has now applied for Connectivity as well LTA as per CERC regulations, 2009 on 07/05/2015. Therefore in order to regularize the grant of Connectivity & LTA, it is to inform that Connectivity & LTA is being granted for the same. 5.0 Connectivity & LTA to THDC India Ltd. for Tehri PSP for transfer of 1000 MW of power. Transmission system for Tehri PSP has been approved in 18 th Meeting of the Standing Committee on Transmission System Planning in Northern Region held on 06/06/2005 with the following transmission system: o Tehri Generation Koteshwar Pooling Stn. 400 kv S/c (Quad Conductor) o Establishment of 765/400 kv, 4x800 MVA ICTs and GIS substation at Koteshwar Pooling station o Augmentation of 765/400 transformation capacity by 1x1500 MVA at Meerut o Charging of Tehri Pooling Meerut line at 765 kv level o Modification of Series Capacitors for operation at 765 kv level The transmission system for Tehri PSP is under implementation, however, to fulfill the regulatory requirement, THDC India Ltd. has now applied for Connectivity as well LTA as per CERC regulations, 2009 on 12/06/2015. As per the application, the beneficiaries are Delhi, Uttrakhand, Haryana & Rajasthan. Beneficiaries are requested to sign the applicable agreements. Page 6 of 21

7 Therefore in order to regularize the grant of Connectivity & LTA, it is to inform that Connectivity & LTA is being granted for the same. 6.0 LTA to M/s Gama Infraprop (P) Ltd., for transfer of 50 MW of power from their Gas Based CCPP in Uttarakhand. Connectivity and LTA application of M/s Gama Infraprop (P) Ltd. was discussed in the Connectivity & LTA meeting held on 29/12/2010, 19/12/2011 & 23/12/2013. In the previous meetings, PTCUL had agreed that connectivity to M/s Gama Infraprop (P) Ltd. shall be provided by them with LILO of Kashipur Pant Nagar 220 kv S/c line. The applicant had to submit the NOC from STU, i.e. PTCUL, in standard format to POWERGRID, after which LTA Intimation was to be issued. It is to be informed that NOC has not been received till date for the LTA. As all the LTA/Connectivity/MTOA applications received by CTU are to be processed in line with CERC regulations in time bound manner, therefore, it is quite difficult to hold any LTA/Connectivity application for very long period of time. Hence, the above LTA application needs to be closed. However, with the issuance of NOC from STU, the applicant can apply afresh. Members may discuss. 7.0 Connectivity & LTA grant to Gidderbaha (4x660MW) Power Project of M/s NTPC Ltd. NTPC Limited had applied for connectivity for 2640 MW and Long Term Access for MW from their 2640 MW Gidderbaha STPP project (4x660MW), in District Muktsar, Punjab. The application was discussed during the Connectivity & LTA meeting held on 19/12/2011 & 02/01/2013. NTPC informed in the above referred meetings that due to land & fuel issues, the project has been deferred and they would revert when there is a progress and the application may be kept in hold. As all the LTA/Connectivity/MTOA applications received by CTU are to be processed in line with CERC regulations in time bound manner, therefore, it is quite difficult to hold any LTA/Connectivity application for very long period of time. Hence, it is proposed to close/withdraw the above the Connectivity & LTA application. Members may discuss. 8.0 Connectivity & LTA to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC Limited in Uttar Pradesh. Page 7 of 21

8 M/s NTPC Ltd. had applied for connectivity and LTA for 8 MW Singrauli hydro Generation project located at existing Singrauli generation project of NTPC which was discussed during the Connectivity and Long term Access meeting held on 31/08/2013 & 23/12/2013. As it was discussed that NTPC has applied connectivity and LTA application for 15 MW Solar Plant at Singrauli generation project. While processing the applications, it was noted that Hydro and Solar are connected at different locations (as seen from the drawing attached with the applications) within existing Singrauli project. Therefore, the issue has been put up to CERC to decide whether the connectivity can be granted for the above renewables, when they are being pooled at two different points within the existing generation and direction was sought from CERC by CTU regarding this matter. Subsequently, NTPC has also approached to CERC with this issue. Therefore, the desired Connectivity/LTA for 8 MW from Singrauli Hydro shall be granted after directions from CERC. Till the time, the Connectivity/LTA application shall be put on hold. Members may note. 9.0 LTA to Sawra Kuddu HEP & Sainj HEP of M/s HPPCL in Himachal Pradesh. Connectivity and Long Term Access to Sawra Kuddu HEP (111MW) and Sainj HEP (100MW) in Himachal Pradesh was discussed and agreed during the Connectivity/Long Term Access meeting held with 31 st & 33 rd Standing Committee Meeting of Power System Planning of Northern Region. Intimation for the grant of Connectivity and LTA was issued on 04/05/2011 with the following transmission system: For Sawra Kuddu HEP: LILO of Nathpa Jhakri-Abdullapur/Panchkula 400kV D/c line at 2x315 MVA pooling to be established by HPPTCL. Injection of power at this substation shall be at 220kV D/c. For Sainj HEP: LILO of one circuit of Parbati-II Parbati-III line, at new 400/132kV Sainj substation of HPPTCL, wherein Sainj would be injected at 132kV It was decided during the above mentioned meetings that HPPCL shall sign all required agreements within 6 months of issue of minutes and in case required agreements are not signed then the application would be closed as per CERC regulations. HPPCL also confirmed for signing of LTA agreement within next 4 months. The LTA agreement has not been signed till date. It is to be noted here that as per the CERC regulations, 2009, the LTA Agreement has to be signed within 30 days from grant of intimation of Long Term Access. As, Page 8 of 21

9 CTU is to abide with CERC Procedures/Regulations, therefore, the granted LTA may be cancelled. However, after obtaining all the required clearances, the applicant may apply again with a fresh application. Members may deliberate Connectivity and Long Term Access (LTA) to HPPCL for transfer of 195 MW power from Kashang HEP & 450 MW from Shongtong Karcham HEP. Connectivity & Long Term Access application of HPPCL for transfer of 195 MW of power from their Kashang HEP and 450 MW of power from Shongtong Karcham HEP was discussed & agreed during the 31 st Standing Committee Meeting of Power System Planning of Northern Region. Connectivity to Shongtong Karcham HEP for transfer of 450 MW of power and Kashang HEP for 195 MW of power was granted on 16/12/2013 & 27/12/2013 respectively with the following transmission system: For Shongtong HEP: Shongtong Karcham Wangtoo 400 kv D/c Line (Quad HTLS Conductor Equivalent to about 3000MW) 18 km Proposed implementation as ISTS. Generation Switchyard to be designed with 4000 Amps switchgear. The cable capacity from Pot head yard to GIS switchyard may be augmented with generation addition in the upstream projects by generator. Provision may be kept accordingly Establishment of 220/400kV GIS Pooling Station at Wangtoo along with LILO of both circuits of 400 kv Karcham Wangtoo-Abdullapur D/c line at Wangtoo S/s - Implementation by STU. 80 MVAR Bus Reactor at Generating station by the applicant For Kashang HEP: Interim arrangement: Through HPPTCL system by a 220 kv D/c line from Bogtu to Kashang. Final arrangement: Kashang-Jangi Pooling Station 220 kv D/c line (Single HTLS- Equivalent to 300MW capacity) - Implementation as STU network 2x315 MVA (7x105 MVA units) 220/400 kv GIS Pooling Station at Jangi (with 4000 Amps. switchgear) Proposed implementation as ISTS LILO of one Ckt. of Shongtong Wangtoo 400 kv Line at Jangi-Proposed implementation as ISTS HPPCL has informed vide letter dated 16/06/2015 that Shongtong HEP is expected to be commissioned by August However, HPPCL may update the latest status of Kashang HEP also, so that intimation for grant of Long Term Access can be issued and transmission system shall be taken up for implementation. Page 9 of 21

10 Otherwise, the applications may be closed and the applicant may apply afresh when there would be clarity about the commissioning schedule. Members may discuss Long Term Access grant to 120 MW Miyar HEP of M/s Miyar Hydro Electric Power Company Ltd. in Himachal Pradesh. Long Term application for transfer of 120 MW of power from Miyar HEP was discussed and agreed during 31 st Standing Committee Meeting of Northern Region. Connectivity has already been issued to Miyar HEP on 16/12/2013 at Hamirpur S/s. Following transmission system was agreed for evacuation of power: Step up of Miyar generation at 400 kv level 400 kv D/c Line (Twin HTLS) from Miyar to the site of 400 kv Pooling Station near Sissu /Gramphu (Pooling Station shall not be constructed during this time frame) From site proposed near Sissu/Gramphu Pooling Station Hamirpur 400 kv D/c (Triple HTLS) Provision of 50 MVAR Bus Reactor at Miyar The existing/planned transmission system will be adequate for transfer of power beyond Hamirpur substation. Connectivity to Miyar HEP has been already granted, however, the transmission agreement for connectivity is yet to be signed. Further, vide letter dated 15/01/2015, the revised commissioning schedule for Miyar HEP as June Extension for postponing the signing of various applicable agreements upto Dec 16 has also been requested via this letter. Considering the above, the applicant needs to inform about the revised status of the generation project so that LTA intimations can be issued. However, after the issuance of intimation of grant of connectivity, the applicant has to sign the LTA agreement within one month, failing to which, the grant of LTA stands cancelled. Members may discuss Long Term Access to 400 MW Seli HEP of M/s Seli Hydro Electric Power Company Ltd. (M/s Moser Baer Projects Pvt. Ltd. as Promoter) in Himachal Pradesh Long Term application for transfer of 400 MW of power from Miyar HEP was discussed and agreed during 31 st Standing Committee Meeting of Northern Region. Connectivity has already been issued to Miyar HEP on 16/12/2013 at Hamirpur S/s in case Seli comes earlier than Miyar generation. Following transmission system was agreed for evacuation of power: Step up of Seli generation at 400 kv level LILO of one circuit of Miyar Hamirpur (via Rohtang) 400 kv D/c line (Twin HTLS) Page 10 of 21

11 at Seli Provision of 80 MVAR Bus Reactor at Seli The existing/planned transmission system will be adequate for transfer of power beyond Hamirpur substation. Connectivity to Seli HEP has been already granted, however, the connection agreement is yet to be signed. Further, vide letter dated 15/01/2015, the revised commissioning schedule for Miyar HEP as June Extension for postponing the signing of various applicable agreements upto Dec 16 has also been requested via this letter. Considering the above, the applicant needs to inform about the revised status of the generation project so that LTA intimations can be issued. However, after the issuance of intimation of grant of connectivity, the applicant has to sign the LTA agreement within one month, failing to which, the grant of LTA stands cancelled. Members may discuss Connectivity to Indian Oil Corporation Limited for 100 MW as bulk Consumer for their Mathura refinery. Connectivity application dated 15/06/2015 has been received from Indian Oil Corporation Limited for 100 MW quantum to Mathura refinery located in Mathura, Uttar Pradesh. Connectivity has been sought from July The refinery is already commissioned and meeting its power demand (about 64 MW) for refinery operation through captive generation having an installed capacity of 97.5 MW. As per the application, expansion of the refinery is being planned in the future with projected increase in load to the tune of 47 MW. In view of the high cost of natural gas and future load growth, Mathura Refinery has proposed to go for bulk import of reliable power from Grid as a bulk consumer for refinery operation. Mathura refinery has intended to take power connectivity from ISTS as the critical 24x7 refinery operations require un-interrupted supply of power. As per the application, the nearest substation present in the vicinity is Agra 765/400/220 kv POWERGRID substation. Therefore, the connectivity can be granted at Agra 765/400/220 kv substation of POWERGRID and in case there is any space constraint at 220 kv side of Agra substation then the Connectivity may be granted through: 220 kv D/c line from Mathura Refinery to Prithala 400/220 kv S/s However, following issues have been observed while processing the Connectivity application which needs to be addressed: 1) Connectivity is being sought as a bulk consumer, however, IOCL plans to connect the generator as it is mentioned in the application that captive power plant is proposed to be kept floating with the grid in import mode for meeting bulk power requirement and emergency backup situation. Page 11 of 21

12 2) If the applicant is already connected to the grid then in order to avoid the loop flows, the existing connectivity may have to be opened. 3) Applicant to indicate by what time the load expansion is expected and connectivity line should be matched with that time frame. 4) As the applicant is applying as a bulk consumer, therefore, it may not be allowed to inject into the grid. 5) It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Members may discuss 14.0 Connectivity to Bilhaur STPP (2X660MW) of M/s NTPC Limited in Uttar Pradesh Connectivity application for 1320 MW from coal based Bilhaur STPP (2X660MW) generation of M/s NTPC Limited located at Bilhaur, Uttar Pradesh was discussed during Connectivity/LTA meeting held with 34 th SCM of Northern region on 08/08/2014. Connectivity has been sought w.e.f. Dec for drawl of startup power and commissioning requirement. Connectivity for Bilhaur STPP (2X660MW) of M/s NTPC Ltd. was discussed and proposed to be connectd at Kanpur New 765/400kV substation of POWERGRID. Therefore, Connectivity can be provided to Bilhaur STPP with the following system: Bilhaur- Kanpur(New) 400 kv (Quad) D/c line It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. NTPC may update the latest status Connectivity to Solar Power Projects of M/s Saurya Urja Company of Rajasthan Ltd. in Jaisalmer in Rajasthan. M/s Saurya Urja Company of Rajasthan Ltd. has applied for connectivity vide application dated 24/02/2015 to Solar power projects in Rajsasthan of 1000 MW to POWERGRID. The connectivity is sought w.e.f December, As per the Connectivity application received, the applicant has applied as a generator and has informed that the generation voltage would be at 11/33 kv and Page 12 of 21

13 would be stepped up to 132/220/400 kv. However, the applicant vide letter dated 23/06/2015 has informed that Ministry of New & Renewable Energy (MNRE) has declared Saurya Urja Company of Rajasthan Ltd. (a joint venture of Govt. of Rajasthan and IL&FS Energy Development Company Ltd.) as a Solar Park Developer for Jaisalmer Phase-I Solar park of capacity 1000 MW. Therefore, as per the above mentioned reference and CERC notification dated 15 th May 2015 of Fifth Amendment to the CERC Principle Regulation 2009 to include Solar Power Park Developer under the said Regulation & the proviso namely; "Provided also that the application by the applicant defined under Regulation 2(1) (b) (i) (f) shall be considered by CTU only if the Solar Power Park Developer is authorized by the Central Government to undertake infrastructural activities including arrangement f or connectivity on behalf of the solar power generators." It is to inform that as per the application the connectivity is proposed at any nearest 400/220 kv STU substation. As per the location specified in Connectivity application, the nearest substation is Jaisalmer (New) 400/220 kv of RVPNL which is about 25 Km from the location of the plant. Jaisalmer (New) substation of RVPNL is under construction and most likely would be commission in Therefore, as there is no ISTS substation in the vicinity, the connectivity can be granted at STU substation with the following proposal: Jaisalmer Solar power plant- Jaisalmer (New) (RVPNL) 400 kv Quad D/c line In future, Jaisalmer (New) (RVPNL) 400/220 kv substation shall be connected to RVPNL s 400/220 kv Jaisalmer(Existing) & Akal-II substations. It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. However, following issues have been observed while processing the Connectivity application: 1) Applicant to inform the location of 1000 MW power injection ie. whether it is located at one place or distributed. Page 13 of 21

14 2) Modalities for construction of connectivity line to be discussed as the time availabile for coordinated planning for construction of line may take about 39 months, (CERC time lines of 30 months + 9 months) 3) RVPN may inform that whether proposed 3000 MW solar capacity (Bhadla Solar Park Phase-III (1000MW); Jaisalmer Phase-I & II Solar Park (2000MW)) proposed by RVPN as part of Green Energy Corridors-II (Part-A) includes the capacity mentioned in connectivity application submitted by M/s Surya Urja Company of Rajasthan for Bhadla and Jaisalmer or not. Members may discuss Connectivity to Solar Power Projects of M/s Saurya Urja Company of Rajasthan Ltd. in Jodhpur in Rajasthan. M/s Saurya Urja Company of Rajasthan Ltd. has applied for connectivity vide application dated 24/02/2015 to Solar power projects in Rajsasthan of 1000 MW to POWERGRID. The connectivity is sought w.e.f December, As per the Connectivity application received, the applicant has applied as a generator and has informed that the generation voltage would be at 11/33 kv and would be stepped up to 132/220/400 kv. However, the applicant vide letter dated 23/06/2015 has informed that Ministry of New & Renewable Energy (MNRE) has declared Saurya Urja Company of Rajasthan Ltd. (a joint venture of Govt. of Rajasthan and IL&FS Energy Development Company Ltd.) as a Solar Park Developer for Bhadla Phase-III Solar park of capacity 1000 MW. Therefore, as per the above mentioned reference and CERC notification dated 15 th May 2015 of Fifth Amendment to the CERC Principle Regulation 2009 to include Solar Power Park Developer under the said Regulation & the proviso namely; "Provided also that the application by the applicant defined under Regulation 2(1) (b) (i) (f) shall be considered by CTU only if the Solar Power Park Developer is authorized by the Central Government to undertake infrastructural activities including arrangement f or connectivity on behalf of the solar power generators." It is to inform that as per the application the connectivity is proposed at any nearest 400/220 kv STU substation. As per the location specified in Connectivity application, the nearest substation is Bhadla (New) 400/220 kv of RVPNL which is about 25 Km from the location of the plant. Bhadla (New) substation of RVPNL is presently charged at 220 kv level and shall be upgraded at 400 kv level by Therefore, as there is no ISTS substation in the vicinity, the connectivity needs to be provided at STU substation with the following proposal: Bhadla Phase-III(Jodhpur) Solar power plant- Bhadla (New) (RVPNL) 400 kv Quad D/c line In future, Bhadla (New) (RVPNL) shall be connected to Bhadla (POWERGRID) 400/220 kv S/s covered under Green Energy Corridors-II (Part-A). Page 14 of 21

15 It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. However, following issues have been observed while processing the Connectivity application: 1) Applicant to inform the location of 1000 MW power injection ie. whether it is located at one place or distributed. 2) Modalities for construction of connectivity line to be discussed as the time availabile for coordinated planning for construction of line may take about 39 months, (CERC time lines of 30 months + 9 months) 3) RVPN may inform that whether proposed 3000 MW solar capacity (Bhadla Solar Park Phase-III (1000MW); Jaisalmer Phase-I & II Solar Park (2000MW)) proposed by RVPN as part of Green Energy Corridors-II (Part-A) includes the capacity mentioned in connectivity application submitted by M/s Surya Urja Company of Rajasthan for Bhadla and Jaisalmer or not. Members may discuss Connectivity to Pakaldul HEP (1000 MW) of M/s Chenab Valley Power Corporation Ltd. in J&K. Connectivity application has been received from M/s CVPCL for Pakaldul HEP (1000 MW) located at Kishtwar Distt., J&K. Connectivity has been sought from May 2020 (tentatively). Proposal: During 31 st Standing Committee Meeting of Northern region Constituents held on 02/01/2013, the Perspective transmission plan along with Phased development for Hydro projects located in Chenab Basin J&K was discussed and agreed. Following composite transmission system was agreed for immediate evacuation of power from Kiru, Kawar & Pakaldul HEPs: LILO of one circuit of 400 kv D/c (Triple HTLS) line from Kiru HEP Kishtwar Pooling station at Pakaldul HEP. Establishment of 400 kv switching station at Kishtwar by LILO of Dulhasti/Ratle- Kishenpur 400 kv (Quad) D/c line Establishment of 400/220 kv, 2x315 MVA substation near Gurdaspur/Sirhand by LILO of both circuits of 765 kv (operated at 400 kv initially) Kishenpur Moga 2xS/c lines. Page 15 of 21

16 765 kv Kishtwar- Gurdaspur/Sirhand D/c line (to be operated at 400 kv initially) Switchyard Capacity etc. must be able to handle about 2300MW power generated by the generation projects located in downstream of the Kiru HEP. It is proposed that the GIS switchyard equipment and XLPE cables provided may be designed for carrying 4000 Amps current. 400 kv, 80 MVAR Bus Reactor As, many projects in the upstream network of Kishtwar are getting delayed or have not applied for Connectivity/LTA and Pakaldul HEP is the first generation to come up, Accordingly, following part of the composite scheme may be taken up for providing Connectivity to Pakaldul HEP: 400 kv D/c (Triple HTLS) line from Pakaldul HEP Kishtwar Pooling station (Further, after progressive commissioning of other hydro projects in this vicinity this line would be extended upto Kawar & Kiru HEP) Establishment of 400 kv switching station at Kishtwar Pooling station by LILO of Dulhasti/Ratle-Kishenpur 400 kv (Quad) D/c line. Switchyard Capacity etc. must be able to handle about 2300MW power generated by the generation projects located in upstream network of Pakaldul HEP. It is proposed that the GIS switchyard equipment and XLPE cables provided may be designed for carrying 4000 Amps current. 400 kv, 125 MVAR Bus Reactor at generation switchyard. It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. It is therefore, necessary that M/s Chenab Valley Power Corporation Ltd. may apply for Long Term Access and submit the required Construction Bank Guarantee. Members may deliberate Connectivity to Dhaulasidh Hydro Electric Power Project (66MW) of M/s SJVN Limited in Himachal Pradesh. M/s SJVN Ltd. has applied for connectivity for 66 MW (Plus 10% inbuilt overload capability to meet grid requirement). The connectivity is sought w.e.f. January The expected commissioning schedule of the two 33 MW units is & respectively. Applicant has informed that the project will be serving Peaking load. The LTA application is yet to be received. Page 16 of 21

17 SJVNL informed during Connectivity/LTA meeting held with 34 th SCM in NR, that land is under acquisition. Project has been referred for PIB approval. It was also informed that as per the present status the project is likely to be commissioned by July SJVNL may update the status. As per the connectivity application, the nearest substation for connectivity are 220/132kV Mattansidh(HPSEB) Substation(20.30km), 132/33kV Dehra(HPSEB) substation(22.81km) & 400/220kV Hamirpur (PGCIL) substation (40km). As the generation step up voltage as informed by the applicant is 132kV and there is no ISTS substation in the vicinity, the connectivity need to be provided at STU substation. It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. As the representative from HPPTCL or HPSEBL was not present in the meeting, it was agreed that CTU shall co-ordinate with HP to finalise the connectivity. In this regard, letter dated 23/09/2014 has been sent to HPPTCL for which no reply has been received till yet. HPPTCL/HPSEBL may inform the suitable substation for connectivity. Members may discuss Connectivity to Luhri Hydro Electric Power Project (588MW) of M/s SJVN Limited in Himachal Pradesh POWERGRID has received an application from M/s SJVN Limited for connectivity to Luhri HEP (3*196MW) located on the river Satluj in Shimla, Mandi & Kullu district of HP, in the downstream of Rampur HEP. Connectivity has been sought w.e.f. March 2023 for 588 MW (Plus 10% inbuilt overload capability to meet grid requirement). The commissioning schedule of the three units as per the Connectivity application is , & respectively.sjvnl may update the status. During the 29 th Standing Committee Meeting of Northern Region held on 29/10/2010 & Connectivity/LTA meeting held with 34 th SCM of NR held on 08/08/2014, the transmission system agreed for evacuation of power from generation plant is given as below: i) LILO of Rampur Nalagarh 400 kv D/c line at Luhri ii) Luhri Mohali 400 kv D/c (Triple Conductor) iii) Mohali-Malerkotla 400 kv D/c iv) LILO of one circuit of Nallagarh - Patiala line at Mohali 400kV D/c v) Establishment of 2x315 MVA 400/220kV GIS substation at Mohali Page 17 of 21

18 Also, during the Connectivity/LTA meeting held with 34 th SCM of NR held on 08/08/2014, CEA had following comments on power evacuation and related switchyard aspects of revised DPR of Luhri HEP (3X196 MW): Modify the bays provisions to 10 nos. (3 nos. GT bays, 1 no. Bus reactor bay and 6 nos. feeder bays). A 400 kv bus reactor of 125 MVAR is required to be provided at generating switchyard. (In case of transportation limitation, single phase Bus reactor units of 42 MVAR can be provided). 400 kv AIS switchgear and XLPE cables provided in the switchyard, have the rated current capacity of 4000 Amps. M/s SJVNL may provide the confirmation on the above. It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. However, Connectivity can be granted with the following transmission system: LILO of Rampur Nalagarh 400 kv D/c line at Luhri Members may discuss LTA/Connectivity to hydro projects in Uttarakhand Various hydro projects have been identified in Uttarakhand for development. Power from most of these projects is to be transferred out of Uttarakhand. Considering the severe ROW constraints, a comprehensive scheme was evolved by PTCUL in association with CEA. Earlier it was envisaged that the comprehensive scheme would be developed as intrastate system by PTCUL, however subsequently the nature of transmission was changed to deemed ISTS by CERC. After change in status from intra state to deemed ISTS, PTCUL had informed the generators that connectivity/ LTA may be applied to CTU, POWERGRID, as the scheme is deemed ISTS in nature. Based on the LTA/ connectivity granted, generation projects have been segregated into different categories and details are as given below: A) Projects for which LTA is granted beyond Kashipur: Tapovan Vishnugad HEP (520 MW), Alaknanda HEP (300 MW) & Phatabyung HEP (76 MW)- Page 18 of 21

19 Connectivity to these projects was agreed by PTCUL and LTA granted by CTU beyond Kashipur. Now as the system is being developed as deemed ISTS, these generators need to apply fresh for connectivity to CTU, which would be granted by CTU. Phatabyung HEP & Alaknanda HEP have signed LTAA, however based on revised connectivity applications, the injection point for LTA would also get changed to deemed ISTS network and the already signed agreement would also have to be revised. It may also be mentioned that date of start of LTA may also get changed as the new connectivity application may be with a revised date. After grant of connectivity and LTA, PTCUL would require to sign Implementation Agreement with the generators in line with CERC Regulations. M/s GMR (Badrinath) Hydro Power Generation Pvt. Ltd had been granted Long term Access, for transfer of 259 MW power from Alaknanda HEP (300MW) in Uttarakhand. The LTA Agreement was signed on 6/2/2012. Subsequently, the applicant vide letter dated 20/2/2012 and 27/11/2012 have requested postponement of effective date of LTA from Dec 14 to April 17. GMR informed during the Connectivity/LTA meeting held with 31 st Standing Committee Meeting of Northern region that most of the clearances including environment clearance have been obtained, land acquisition is in progress, however, Implementation Agreement is yet to be signed. The revised date of commissioning may be considered as October Members may discuss. B) Projects for which Connectivity and LTA applied to CTU (Kotli Bhel HEP :215 MW of NHPC) NHPC has applied for connectivity and Long Term Access for their 215 MW (including 10% overload) Kotli Bhel HEP, Stage-IA in Uttarakhand. As per the application, NHPC has indicated the commissioning schedule of the project as around Connectivity to the project was granted as below: Kotlibhel-Srinagar 220 kv D/c line to be implemented by the applicant including both 220 kv bays at both ends for immediate connectivity. However, LTA is yet to be granted. Injection point for LTA would be Srinagar 400/220kV deemed ISTS substation of PTCUL. Beyond Srinagar power would be evacuated via Srinagar-Kashipur 400kV D/c deemed ISTS line of PTCUL. From Kashipur onwards, power would be transferred over Inter State Transmission System. It may also be noted that the dedicated line shall be considered as a part of the generation project. NHPC would also sign the implementation agreement with PTCUL in line with CERC regulations. NHPC may update the status of the generation project. Members may discuss. C) Connectivity Applications Received by CTU: Singoli Bhatwari HEP (99 MW) & Bhyunder Ganga HEP (24.5 MW) Page 19 of 21

20 1) Connectivity to Singoli Bhatwari HEP (99 MW) of M/s L&T Uttaranchal Hydropower Ltd. in Uttarakhand. Connectivity application has been received in May 2015 from L&T Uttarakhand Hydropower Ltd. for 99 MW quantum of Singoli Bhatwari HEP located in Uttarakhand. Connectivity has been sought from 15 th November The commissioning schedule of the first unit is December 17. As per the application, the nearest substation present in the vicinity is Baramwari 220/33kV GIS substation under UITP (deemed ISTS). As Singoli Bhatwari generation has been identified under UITP system, therefore, the proposal of connectivity is as below: LILO of one circuit of Srinagar-Baramwari 220 kv D/c line at Singoli Bhatwari Generation switchyard. However, as other hydro generations in the vicinity of Baramwari substation are delayed and due to which Baramwari 220/33 kv substation which is to be implemented by PTCUL may also get delayed, the interim Connectivity to Singoli Bhatwar HEP may be provided as below: 220 kv D/c line from Singoli Bhatwari HEP to Srinagar 400/220/33 kv substation. LILO portion may be implemented by the applicant i.e. M/s L&T Uttarakhand Hydropower Ltd. Other portion may implemented by PTCUL. This would allow Interim Connectivity arrangement for Singoli Bhatwari generation and after the commissioning of Baramwari substation, the final arrangement as mentioned above may be taken up. It is to mention that mere connectivity does not full fills the condition of adequacy of transmission system for transfer of power to target beneficiaries and the grant of connectivity shall not entitle to interchange any power with the grid unless it obtains Long-Term Access, Medium Term Open Access or Short Term Open Access. Transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity, the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only. Members may discuss 2) Connectivity to M/s Super Hydro Electric Pvt. Ltd. for Bhyunder Ganga Small Hydro Power Project of capacity of 24.3 MW in Uttarakhand. Connectivity application has been received from Super Hydro Electric Pvt. Ltd. for 24.3 MW quantum of Bhyunder Ganga HEP located in Uttarakhand. Connectivity has been sought from October 16. Page 20 of 21

21 According to Central Electricity Regulatory Commission (Grant of Connectivity, Longterm Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009, Connectivity applicant is referred to as following: a) A generating station with installed capacity of 250 MW and above, including a captive generating plant of exportable capacity of 250 MW and above or; b) A Hydro Generating station or generating station using renewable source of energy, of installed capacity between 50 MW and 250 MW. c) One of the Hydro Generating stations or generating stations using renewable sources of energy, individually having less than 50 MW installed capacity, but collectively having an aggregate installed capacity of 50 MW and above, and acting on behalf of all these generating stations, and seeking connection from CTU at a single connection point at the pooling sub-station under CTU, termed as the lead generator As the applicant applied with quantum less than 50 MW and does not fall under any of the categories described as above, the application is considered as not in conformity with CERC regulations, 2009 for Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters. Hence, the above Connectivity application needs to be closed. Members may note. D) Other Projects: There are certain other projects who had applied connectivity to PTCUL, however they had not applied for LTA to CTU. In addition some of the generation developers have neither applied for connectivity nor LTA. PTCUL may impress upon those generators to apply for connectivity and LTA to CTU. Further, PTCUL may update the status of transmission system. Page 21 of 21

22

23

24

25

26

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi. Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi. A. CTU welcomed the participants and informed that Minutes of the 7

More information

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Agenda for Connectivity/Long term Access to Generation projects in Northern Region Agenda for Connectivity/Long term Access to Generation projects in Northern Region POWERGRID has received Connectivity and Long term Access applications for new generation projects in NR. In addition,

More information

lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise)

lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise) lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise) 91 F * --'. ----0 ~~ Qla:zRus ~ ~ : ";ffi~if?l'1"i" ~~. 2, ~ 29, ~ 122

More information

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS) Distribution List: Northern Region. Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: ) 1. Member, Secretary, NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) 4. Director (Technical), Punjab State Transmission Corperation Ltd. (PSTCL) Head

More information

Distribution List: Constituents of Northern Region.

Distribution List: Constituents of Northern Region. Distribution List: Constituents of Northern Region. 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. Chief Engineer (PSP&A-I) Central Electricity Authority Sewa

More information

Distribution List: Constituents of Northern Region

Distribution List: Constituents of Northern Region Distribution List: Constituents of Northern Region Joint Secretory MNRE Block 14, CGO Complex, Lodhi Road, New Delhi - 110003 Member Secretary NRPC 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai,

More information

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business) TABLE OF CONTENTS 1 INTRODUCTION... 5 1.1 Background... 5 1.2 EXISTING NETWORK OF TATA POWER IN MUMBAI CITY AREA...

More information

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax )

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax ) 1. Member Secretary NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-01 1-26865206) 4. Director (T&RE) NHPC Office Complex, Sector - 33, NHPC, Faridabad - 121 003 (Fax-0129-2256055)

More information

Tamil Nadu: Current Power scenario and projects in pipeline

Tamil Nadu: Current Power scenario and projects in pipeline Tamil Nadu: Current Power scenario and projects in pipeline 1. Tamil Nadu per capita consumption is over 1000 Units, which is as against 11 th plan national target of 1000 units. Presently, the national

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

Examination Guidelines for Design (Provisional translation)

Examination Guidelines for Design (Provisional translation) Examination Guidelines for Design (Provisional translation) Japan Patent Office Examination Guidelines for Design The Examination Guidelines for Design aims to ensure consistent interpretation and implementation

More information

POWER TRANSMISSION IN INDIA 2018

POWER TRANSMISSION IN INDIA 2018 Now Available POWER TRANSMISSION IN INDIA 2018 Segment Trends and Developments; Outlook and Projections Report (PDF) Data-set (Excel) India Infrastructure Research Power Transmission in India 2018 Table

More information

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) POWER SYSTEM BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Vision Statement 3. Why us? 4. Engineering Procurement Construction Services

More information

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011 Power Grid Corporation of India Limited Analysts Presentation February 9, 2011 1 Listed Company with public holding of 30.58% and balance by Government of India Central Transmission Utility of the country

More information

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION MANAGEMENT SOFTWARE Maharashtra State Load Dispatch Centre (Maharashtra State Electricity Transmission Co. Ltd.) Developed & Prepared by India s Largest

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR ********** ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR 751012 ********** Present : Shri B K Das, Chairperson Shri K C Badu, Member Shri B K Mishra, Member Case No. 101/2009

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

Standard Wind DPR: Essential Contents

Standard Wind DPR: Essential Contents Standard Wind DPR: Essential Contents [Note: The below provided sections and the sub points indicated in the table have to be mandatorily provided by the Wind Project Developers while submitting the Detailed

More information

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History RP unique number: Page GI-UKEPR-RP-01-RP 0 30/06/2011 1 of 5 Approved for EDF by: A. PETIT Approved for AREVA by: C. WOOLDRIDGE Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011 Resolution Plan

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2009/ 529-538 Date: June 05, 2009 To 1.The Member Secretary, Southern

More information

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg New Delhi, Dated, io" October, 2014 To 1. Chief Secretary(Power), Government of Arunachal Pradesh, Itanagar. 2.

More information

From: Laura Manz, Vice President of Market & Infrastructure Development

From: Laura Manz, Vice President of Market & Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional

More information

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects Proposed transmission system in WR for various generation projects in Jharkhand, Orissa, West Bengal, Chhattisgarh, M.P. and Maharashtra and other NTPC projects System studies have been carried out to

More information

Directorate of Energy, Himachal Pradesh Project wise Allotment Details

Directorate of Energy, Himachal Pradesh Project wise Allotment Details Of Directorate of Energy, Himachal Pradesh wise Details 1 Allain Duhangan 192.00 29/07/1993 No Investigation 28/08/1993 22/02/2001 Commercial Operation : 25/07/2010 2 Andhra 16.95 3 Baira Suil 180.00 No

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

ADB s Energy Program in Myanmar

ADB s Energy Program in Myanmar ADB s Energy Program in Myanmar March 2014 Chong Chi Nai Director, Energy Division Southeast Asia Regional Department 1 Current Sector Context Low electrification ratio Need to develop cost effective way

More information

MFC Power General Partner Ltd.,

MFC Power General Partner Ltd., Decision 21950-D01-2016 Preferential Sharing of Records Between, MFC Power Limited Partnership, URICA Energy Real Time Ltd., and URICA Asset Optimization Ltd. October 12, 2016 Alberta Utilities Commission

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

B-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax:

B-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax: B-- Janet L. Fraser Director, Regulatory Affairs Phone: 0-- Fax: 0-- E-mail: janet.fraser@bctc.com October 00 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission 00 Howe Street,

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION In the Matter of the Application of Getty Wind Company, LLC for a Site Permit for a Large Wind Energy Conversion System in Stearns County, Minnesota In the

More information

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 1 SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India 2 SOLAR ENERGY CORPORATION OF INDIA A Government of India Enterprise under the administrative

More information

CENTRAL MARKS DEPARTMENT III. Our Ref: CMD III/16: IS (Part 3)

CENTRAL MARKS DEPARTMENT III. Our Ref: CMD III/16: IS (Part 3) CENTRAL MARKS DEPARTMENT III Our Ref: CMD III/16: IS 16333 (Part 3) 04-08-2017 Subject: Revised Guidelines for Implementation of IS 16333 (Part 3): 2016 - Mobile Phone Handsets-Part 3 - Indian Language

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Advanced Ultra Power Transmission Consultancy

Advanced Ultra Power Transmission Consultancy 2100 Advanced Ultra Power Transmission Consultancy AUPTC the Complete Solutions to Power Infrastructure, Electrical, Electronics, Automation, HVAC Advanced Ultra Power Transmission Consultancy About AUPTC

More information

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission

More information

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding Government of India Central Electricity Authority PFA Monitoring Division Sewa Bhawan, R K Puram, New Delhi-110066 cepfacea@rediffmail.com, ce.pfam.cea@gov.in Telefax :011-2671 5396 Ph:011-2673 2607 (आई

More information

Southern Company Smart Grid

Southern Company Smart Grid Southern Company Smart Grid Smart Grid Investment Grant Update July 25, 2011 Southern Company Southern Company is one of the nations largest generators of electricity Has 4.4 million retail customers across

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART III, SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION

TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART III, SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART III, SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION New Delhi, the 25 th October, 2011 THE TELECOM COMMERCIAL COMMUNICATIONS CUSTOMER

More information

Reliance Infrastructure Limited

Reliance Infrastructure Limited Reliance Infrastructure Limited Reg. : H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections / suggestions on Reliance Infrastructure

More information

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. 1 Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. of Federal Republic of Germany. Registered as a non-profit

More information

Transmission Infrastructure Investment & Development in Vietnam

Transmission Infrastructure Investment & Development in Vietnam Transmission Infrastructure Investment & Development in Vietnam Presented by: Mr. Cao Duc Dung Expert of Technical Department National Power Transmission Corporation (NPT) 28 September, 2011 1 CONTENTS

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December

More information

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following

More information

Minnesota Hosting Capacity Analysis

Minnesota Hosting Capacity Analysis Minnesota Hosting Capacity Analysis MIPSYCON November 8, 2017 Chris Punt, P.E. Outline What is Hosting Capacity? Background DRIVE Results Visualization Accuracy Timeline Next Steps 2 What is Hosting Capacity?

More information

FORUM LOAD DESPATCHERS (FOLD)

FORUM LOAD DESPATCHERS (FOLD) CHARTER OF FORUM OF LOAD DESPATCHERS (FOLD) FOLD Secretariat NLDC,B-9 Qutab Institutional Area, New Delhi http://www.forumofld.in http://www.forumofloaddespatchers.in Table of Contents 1. Background...3

More information

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 July 30, 2010 Re: Q2 Quarterly

More information

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology Connectivity for NeGP Presented By: Anil Kumar Balani Director Department of Information Technology NeGP Connectivity Components SWAN (min 2 Mbps connectivity) Vertical Locations: 7500+ PoPs Horizontal

More information

Subject: Clarifications on Rollback Provisions of Advance Pricing Agreement Scheme

Subject: Clarifications on Rollback Provisions of Advance Pricing Agreement Scheme Circular No. 10/2015 F.No. 500/7/2015-APA-II Government of India Ministry of Finance Department of Revenue Central Board of Direct Taxes Foreign Tax and Tax Research Division-I APA-II Section New Delhi,

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

ENGINEERING SOLUTIONS INDIA PVT. LTD.

ENGINEERING SOLUTIONS INDIA PVT. LTD. Company Profile Company Overview P I N N A C L E ENGINEERING SOLUTIONS INDIA PVT. LTD. is founded in beginning of the first decade of 2000. The company is founded by Mr. Praphullachandra Ohol who has 20

More information

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot:

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot: PROCUREMENT DEPARTMENT 4 WORLD TRADE CENTER 150 GREENWICH STREET, 21ST FL. NEW YORK, NY 10007 12/7/2018 ADDENDUM # 3 To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar

More information

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee.-उक ष वव /प रच लन/106/01/2017/11499-539 ददन क: 13.10.2017 व म : प रच लन मन वय

More information

Proposed Clean and Redline for Version 2 Implementation Plan

Proposed Clean and Redline for Version 2 Implementation Plan Exhibit A Implementation Plans for CIP-002-2 through CIP-009-2 and CIP-002-3 and CIP-009-3 For Generator Owners and Generator Operators of U.S. Nuclear Power Plants Proposed Clean and Redline for Version

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (JANUARY 2017) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code CAP682-16 Version date: October 07 2016 Calendar 2017/2018 for Capacity Allocation Mechanism Network Code EXPLANATORY NOTE/DISCLAIMER The Network Code on Capacity Allocation Mechanisms in Gas Transmission

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

ITC HOLDINGS, CORP. Edison Electric Institute 9

ITC HOLDINGS, CORP. Edison Electric Institute 9 ITC HOLDINGS, CORP. Company Background: ITC Holdings, Corp. is in the business of investing in electricity transmission infrastructure as a means to improve electric reliability, connect renewable energy

More information

User Guide. March 2017

User Guide. March 2017 User Guide March 2017 Alberta Utilities Commission efiling System User Guide Fifth Avenue Place Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Phone: 403-592-4500 Email: info@auc.ab.ca www.auc.ab.ca

More information

Sub: Review of Performance of GRIDCO for the FY held on

Sub: Review of Performance of GRIDCO for the FY held on ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN, PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, BHUBANESWAR-751021 TEL. No. 2721048, 2721049, FAX : 2721053/2721057 E-mail: orierc@gmail.com, Website:

More information

Grid Interconnection of Renewable Generation

Grid Interconnection of Renewable Generation Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection

More information

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company December 29, 2016 APS Requirements for Data for Power System Modeling and Analysis Table of Contents

More information

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities

More information

TSR A & B - FACILITIES STUDY REPORT

TSR A & B - FACILITIES STUDY REPORT TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

~ 'E1'(CfiI,( Government of India fa 4 'lj (1 iii ;j I iii 'lj ..,:) Ministry of Power. ~~~~ Northern Regional Power Committee

~ 'E1'(CfiI,( Government of India fa 4 'lj (1 iii ;j I iii 'lj ..,:) Ministry of Power. ~~~~ Northern Regional Power Committee e,, '. '.- ". '.,. ~ 'E1'(CfiI,( Government of India fa 4 'lj (1 iii ;j I iii 'lj..,:) Ministry of Power ~~~~ Northern Regional Power Committee tt.'3"ewrnl SI=ct 1~'1 1108/041 2018 I L-/ L.t 85- '-151.9

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is

More information

Shyam Indus Power Solutions Pvt. Ltd. June 2014

Shyam Indus Power Solutions Pvt. Ltd. June 2014 Shyam Indus Power Solutions Pvt. Ltd June 2014 Index 1. Company Overview 2. Power Sector Overview 3. Vision,Mission & Values 4. Strength 5. Growth Plans 6. Financial Information Introduction Promoted by

More information

Indian Power Grid Developments

Indian Power Grid Developments Indian Power Grid Developments Rathin Basu Country President, Alstom Grid, March 25 th 2015 Evolution of Voltage level of Indian Grid kv Anticipated the evolution & Timely Investment in Indian Facilities

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE 1 The Short Term Open Access (STOA) in Inter State Transmission System (ISTS) was commenced in the year 2004 through a

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Airborne and Mobile LiDAR for Transport Corridor Survey Dr. Bharat Lohani Director, Geokno India Pvt. Ltd. & Professor, Geoinformatics IIT Kanpur

Airborne and Mobile LiDAR for Transport Corridor Survey Dr. Bharat Lohani Director, Geokno India Pvt. Ltd. & Professor, Geoinformatics IIT Kanpur www.geokno.com Airborne and Mobile LiDAR for Transport Corridor Survey Dr. Bharat Lohani Director, Geokno India Pvt. Ltd. & Professor, Geoinformatics IIT Kanpur Geokno has executed and is executing multiple

More information

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Public Table of contents 1 Connection Framework... 3 2 Connection Types...

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

North Gila-Imperial Valley #2 Transmission Project

North Gila-Imperial Valley #2 Transmission Project North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------

More information

Development of Infrastructure, through Private Sector participation.

Development of Infrastructure, through Private Sector participation. Uttar Pradesh Infrastructure Highest priority will now be provided, by the State to the creation of high quality infrastructural facilities. The speed, with which decisions have been taken and implemented,

More information