1 Attachment 2 Project Plans and Materials Board Note: Full size plans are available online at:

2 BLANK PAGE

3 Town of Mammoth Lakes New ommunity Multi-Use Facility Architectural Basis of Design September 5, 27 The New ommunity Multi-Use Facility (NMUF is located at the Mammoth reek Park site. The 37, square foot building was carefully located on the 5-acre parcel, and the program carefully arranged, to divert noise from neighboring houses and to take advantage of the beautiful views of Mammoth reek Park and the Sherwins beyond. The existing parking and the existing grass field are to remain. The grass is used for various events during spring and summer, and will remain as an important piece of the programming for the new facility. The existing playground will be redesigned and relocated under a different project. The new location is about forty (4 feet from the existing location, and is larger in size to accommodate an all-inclusive playground. The NMUF is located just west of the new playground and thirty (3 feet from the property line on the south to maximize the distance between the NMUF and the adjacent lots. The new parking lot to the north expands the existing parking by thirty-four (34 standard stalls and two (2 ADA stalls. New concrete paving connects the new parking lot with the front entry of the building. New asphalt paving connects the new parking lot with a service road to the west for fire access. New asphalt paving walkways throughout the site connect to the existing asphalt paving of Mammoth reek Park and the trails system. The enclosed program of the NMUF is located on the north and west sides of the open-air multi-use space to control sound and views. The service and support spaces are located to the west, these include secondary locker rooms, storage, Zamboni garage, electrical room, and chiller room. The public and private spaces are located to the north. The main entry is located slightly off center of the multi-use space. The south end of the viewing area is enclosed in glass, creating panoramic views to the mountains from both the lobby and the viewing area. To the west of the lobby are restrooms and locker rooms. To the east of the lobby is the rental and concessions area, which includes private offices and storage. The community center room is east of the concessions and anchors the corner of the building. This space will support the community s dynamic Department of Parks and Recreation s activities schedule. The community center will be able to be rented for private events and is adjacent to a warming kitchen, which will allow for catering. These spaces on the north end are elevated thirty (3 inches above the multi-use space, increasing visibility from the viewing area. Two (2 doors from the viewing area lead to ramps down to the multi-use space. The multi-use space features a 26, square foot, Olympic-sized ice rink. During the summer, a removable sports floor will be deployed that will allow the covered ice rink area to convert to an open-air gymnasium that can feature 3 full-basketball courts, in addition to other sport configurations. This space will also be used for community concerts in the park and farmer s markets that will be attended by thousands of Mammoth residents and tourists.

4 Town of Mammoth Lakes New ommunity Multi-Use Facility Architectural Basis of Design September 5, 27 Page 2 The design of the structure was inspired by modern mountain architecture, much of which is driven by the climate and heavy snow loads of the area. The structural system required for these large spans and snow load is a custom tapered steel girder. This unique element is showcased on the interior and exterior of the building. Secondary structural members are also exposed. This aesthetic of exposed structure is common in mountain architecture. Materials such as orten steel, split face concrete block, corrugated metal siding, and wood siding are elements that are prominently featured in the exterior cladding. The west elevation utilizes a heavy concrete block base to ground the building and as a functional component for the interior spaces. Above this base is corrugated or-ten steel, which wraps around to the north elevation and terminates at the restrooms and locker rooms, that are also concrete block for functional purposes. The entry is given prominence with a gable roof framed in heavy steel. A large storefront glazing system welcomes visitors. edar wood lap siding is above, and wraps both sides of the pronounced entry. oncrete block is used as a base below the windows of the community center room, and fiber cement panels and cedar wood lap siding above. This cedar siding wraps again to the east elevation and terminates at a structural column where the multi-use space becomes open-air. The structural steel is highlighted again, and vertical louvers made from perforated plate steel control sunlight and glare. The south elevation utilizes the same louvers, but in a horizontal orientation, allowing unobstructed views to the beautiful Sherwins beyond. 2

5

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`SNON"^Y"D<=@=DF""4M^_KV"Y\ WOK]_\ON"`KV_O]"WKb"NSPPO\"P\YW"PY\OMK]^ON"\O]_V^]"N_O"^Y"^YVO\KXMO]"SX"MKVM_VK^SYX"WO^RYN]$"^O]^SXQ Z\YMON_\O]$"MYWZYXOX^"Z\YMON_\O]$"MYWZYXOX^"ZO\PY\WKXMO$"WOK]_\OWOX^"^OMRXS[_O]"KXN"`K\bSXQ PSOVN"MYXNS^SYX]"]_MR"K]$"L_^"XY^"VSWS^ON"^Y$"VSXO"`YV^KQO$"^OWZO\K^_\O$"K^WY]ZRO\SM&OX`S\YXWOX^KV MYXNS^SYX]"KXN"SWZ\YZO\"Y\"_XNYM_WOX^ON"VKWZ"L_\X#SX"Z\YMON_\O]""9_\^RO\$"\YYW"NSWOX]SYX]$ =DJH"" 4QOX^ \OPVOM^KXMO]$"P_\XS^_\O"KXNK\MRS^OM^_\KV"OVOWOX^]"aS^RSX"^RO"]ZKMO"WKb"]SQXSPSMKX^Vb"KPPOM^"MKVM_VK^SYX] ARP"RQJ"#"A93 IO\SPSMK^SYX"YP"^RO"MKVM_VK^SYX]"RO\OSX$"SXMV_NSXQ"NO]SQX"KMMOZ^KLSVS^b$"KXN"MYWZVSKXMO"aS^R"KXb E">YRX]^YXO 4E6<"7 DKQO"("YP"( FZOMSPSO\ Tiffiny Mansouri - IMEG KZZVSMKLVO"VSQR^SXQ"MYNO]"S]"XY^"^RO"\O]ZYX]SLSVS^b"YP"D<=@=DF$"KXN"]RKVV"LO"^RO"\O]ZYX]SLSVS^b"YP"^RO K\MRS^OM^$"YaXO\$"Y\"YaXO\]"\OZ\O]OX^K^S`O$"K]"KZZVSMKLVO"DVOK]O"\OPO\"^Y"@_WSXKS\O"FMRON_VO"PY\"VSQR^ VY]]"PKM^Y\""@@9#"NO^KSV]"_]ON"SX"^RO"MKVM_VK^SYX] FMKVO"("SXMR2"'"9^ PROPERTY LINE '' '' '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( '( ' ' '( ' ' ' '( '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '' '( '( '( '( '' '' '' '' '' '' '' '' '' '' '' '' '' '' ''!Y"-! R^^Z&&aaa_]KVSQR^SXQZRSVSZ]MYW SXNYY\VSQR^SXQKZZVSMK^SYX]3ZRSVSZ]MYW Y_^NYY\VSQR^SXQKZZVSMK^SYX]3ZRSVSZ]MYW

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a4e88&b?@48.?b4d"4#(b.b?b"d!"#$ [4E.48(88E?,4!E( 8(88E?,4.(-"DZ4(429; ($ &M$ HROLQcPQMG KPH V]!H^QP4.MOKJ4#QJHR][9775([_HGPLKJ_KMJQ^HL$L^P 2<<7[4VV4A8,9 ( ',8,; ",? # (9$,=, >,< -.,@ 8 &,> E`"!(..4#.EE!4A.(&,! G 4<64b 3576 A."(D"4!"@." LKTQGU4?QPJHV E`"!(..4#.EE!4A.(& (LOYQPHOP3R4DHKJ HRQUGHWV LKTGV X(X 'Z?Z-A 88 -A KPHV 957 <7<; ALMNHOP4&M$ DOKJHV LKTQGU4&M$ [ (R4QGWQOKPHW ($ "DB&4"`".EA8"&?

8 9;4MGOMSLR4DPLHHP4<4EGPKLQMZ4(42[;?427242=2422[24<4TTT$Y\OKLOYQPHOPR$OM\ D8 D " # #$ $, > -. 8 & D 7$7= E&!"?"4A""D?(. 7$7!"B&#E!"4&B?48(DE&!@4D@D?"84h8iZ4A(B&?"j!"#"!4?E4D?!?!(. 79$7 "kaed"4d?!?!(.4d?"".4e.8&hdiz4a(b&?"j!"#"!4?e4d?!?!(.4ad 79$7 "kaed"4d?"".4?!"..bd4e.8&z4a(b&?"j4!"#"!4?e D?!?!(. 79$; "kaed"4(&4a(b&?"4d?"".4(&ea@4a<48?.4"-z A.@aEE4(&4DB&."4A.@4!EE#B&$ 7;$7 #?!"4(D"aE!-4h&$B$$i 7;$= "(!4aEE4DBB& 7;$2 "(!4aEE4DBB&4E<4#!!"4a(.. 7;$7 E&?B&ED4aEE4'"&,4a<4D?"".4DAAE!?D4(?4(...E-"!4D$ 7=$7 (.8B&84D?E!"#!E&?4D@D?"8 7=$7; (.8B&84D?E!"#!E&?4`B"aB&4D@D?"84?E4'" D.BB&4(&4D?(-B&Z464($#$#$4;35764, 7=$7[ "(!4'(!&4EE!Z4;35764aB" $7 'B.?5B&4E&?"!?EA4a<4&"!4E&?"!4(D"aE!- $7 =64""AZ464,B,4E&?B&ED4E&?"!?EA $ AE!?('."4'."(,"!DZ4E#EB $ D-(?"4!(-DZ4E#EB $7 #.EE!4!(B&Z4?@A$ $[ #?!"4DB&-Z4A.8'B&4D?'5E? $=?!"&,4!(B&Z4?@A$.""& 22&2((#&'(&4$&$2$6&(5#$'$&'-."&&A"("5" ;4< ; = '#(&75-2&2((#5 A'B#$'5'&56&2.B#$'5'&#A44$#&.(#'&2((#5 79$7 7$7= 7=$7?@A$ 7;$7 $ 6 (;$ (;$ 8HG3R.MOgHL!MM\!!! >=!& 8HG3R!HRPLMM\!!> ><>& am\hg3r!hrplmm\!!@ ><>& am\hg3r.moghl!mm\!!< ><=& 7;$7 7$7.MddI!,!?89& a (=$ " `QHTQGU (LHK!,>!>=8& 7=$7[ $ EcHG EeeQOH!,= >@,& "fsqc\hgp $7 EeeQOH!,?!@@& & $= 7;$7 $[ DPMLKUH< >KGQPML!,9?<&!HRPLMM\!,8 ;!& M\\SGQPI!MM\!,; ><9;& DPMLKUH!!, >?9& 3454;6 79$7 79$; 7=$7?@A$ 7;$= =34544<6 3454;4< $ (;$ $9 (;$ &E?"D!" #$$#&'(&$$'&,"!,&(#&'-.2&-34(2&56&44#$7'(5 $ 6 -HI4AJKG MGRSJPKGP4DHKJ G $ 7=$7; $7 79$7 7;$2?@A$ 4 $7 4 ALMNHOP4?QPJH &"a4e88&b?@48.?b4d"4#(b.b?b"d!"#$ [4E.48(88E?,4!E( 8(88E?,4.(-"DZ4(429; " #, > -. 8 &M$ HROLQcPQMG KPH V]!H^QP4.MOKJ4#QJHR][9775([_HGPLKJ_KMJQ^HL$L^P 2<<7[4VV4A8,9,8,;,?,=,<,@,> #.EE!4A.(&454D"8"&?4( G 4<=64b43576,! A."(D"4!"@." LKTQGU4?QPJHV #.EE!4A.(&454D"8"&?4( (LOYQPHOP3R4DHKJ HRQUGHWV ALMNHOP4&M$ [ 'Z?Z-A LKTGV 88 X(X -A KPHV 957 <7<; DOKJHV (R4QGWQOKPHW LKTQGU4&M$ ($ "DB&4"`".EA8"&?

9 9;4MGOMSLR4DPLHHP4<4EGPKLQMZ4(42[;?427242=2422[24<4TTT$Y\OKLOYQPHOPR$OM\ ( ' " #, > -. 8 & D8 -"@&E?"D D $ 6 (;$ (;$ <6 3454;6 =34544< < ; <6 7$7.E`"!D4 ('E`" EE! $2 D?E!("!>, F(8'E&B (!("!>! "."?!B(.!>> $72,B.."!!>@ D?E!("<.E-"!!!? D?E!("<.E-"!!!; D?E!("<.E-"!!!8 D?E!("<.E-"!!!9 7=$7 [ [( 2( [' $= 7=$7?@A$ 7$7[ 7$7[ ( (=$ (=$ ' B"4!B&-< 8.?B5 D"!!= `QHTQGU (LHK 7=$7;!,> & $7 DPMLKUH!!, $7 $= (;$ 79$72 9 D $ 6 7$7[ E&!"?"4!(8A 7$7!"B&#E!"4&B?48(DE&!@4D@D?"84h8iZ4A(B&?"j!"#"!4?E4D?!?!(. 79$7= ae`"&4ab!"48(&4ee!4a<4a(&b4,(!a(!" 79$72 ae`"&4ab!"4#"&"z4=35764,z4b&d?(.."4(?4"k?"!be! #("4E#4E.8&DZ4?@A$ 79$7 ae`"&4ab!"4!e..b&4(?" 7=$7 (.8B&84D?E!"#!E&?4D@D?"8 7=$7!E..4A4EE! 7=$7; (.8B&84D?E!"#!E&?4`B"aB&4D@D?"84?E4'" D.BB&4(&4D?(-B&Z464($#$#$4;35764, $72 D?E!("4!(-4h&$B$$i $7 #.EE!4!(B&Z4?@A$ $=?!"&,4!(B&Z4?@A$ $2!""DD"4E&!"?"4!(B&("4'(DB&Z435764""A$,"(?"4aB?,4!(B(&?4ABAB&$4E&&"?"4?E4D"a"!$ &E?"D -HI4AJKG MGRSJPKGP4DHKJ G $7 4 ; ; 4 ALMNHOP4?QPJH &"a4e88&b?@48.?b4d"4#(b.b?b"d!"#$ [4E.48(88E?,4!E( 8(88E?,4.(-"DZ4(429; 79$7= &M$ HROLQcPQMG KPH 79$7= V]!H^QP4.MOKJ4#QJHR][9775([_HGPLKJ_KMJQ^HL$L^P 2<<7[4VV94A8 (,9 ',8,; ",? # (9$,=,,< >,@ -,>. 8 & #.EE!4A.(&454D"8"&?4' G 4<=64b43576,! A."(D"4!"@." LKTQGU4?QPJHV #.EE!4A.(&454D"8"&?4' (LOYQPHOP3R4DHKJ HRQUGHWV ALMNHOP4&M$ [ 'Z?Z-A LKTGV 88 X(X -A KPHV 957 <7<; DOKJHV 4<=64b43576 LKTQGU4&M$ ($ "DB&4"`".EA8"&?

10 ð ïð îð ìð èð Ù ½ ͽ»

11 7?67B76!7BA75D;F7!3;7G $#'#&$(

12 Materials Board September 5, 27

CITADEL TERRACE 685 CITADEL DRIVE EAST, COLORADO SPRINGS, CO 80909

CITADEL TERRACE 685 CITADEL DRIVE EAST, COLORADO SPRINGS, CO 80909 PROPERTY DETAILS BUILDING DETAILS Property Size: 103,188 SF East Colorado Springs Submarket Internet Ready Building On-Site Lead Tech Day Porter Security System Outside Lighting Management Office at Location

More information

L-1. Free Metro Ride. Free Metro Ride. Light Rail. Light Rail. 16th Street Mall / Free Mall Ride. Skyline Park. Site.

L-1. Free Metro Ride. Free Metro Ride. Light Rail. Light Rail. 16th Street Mall / Free Mall Ride. Skyline Park. Site. Skyline Park Free Metro Ride Light Rail Light Rail Site Free Metro Ride 16th Street Mall / Free Mall Ride Convention Center Vicinity Map PROJECT NO. 17501.00.000 L-1 D-TD, UO-1 D-C, UO-1 California Street

More information

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2 River Bend 6 River Bend 11 RIVER BEND CENTER OVERVIEW 7 8 6 1 2 12 highly flexible buildings situated on 40 sprawling acres in the Springdale section

More information

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FOR LEASE > OFFICE SPACE Washington Square 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FPO 111 Washington Square > Office Space HENNEPIN AVE PARKING RAMP > Built in 1987, 111 Washington is part of a three

More information

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012 PUBLIC REALM Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012 PUBLIC REALM INSPIRATION Louis Kahn s design for the Four Freedoms Park is a powerful triangular form stretching into

More information

NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD)

NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD) NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD) Trust 8002368034, applicant. Application for major zoning relief to relocate a generator more than 2 from the principal structure where generators must be located

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL OFFERING SUMMARY Newmark Grubb Knight Frank is pleased to offer 8505 Baycenter to the market for purchase or master lease. This Robert C. Broward

More information

MIKE NOVKOV LIC #

MIKE NOVKOV LIC # 7676 Hazard Center Drive, San Diego, California 92108 7676 HAZARD CENTER DRIVE, SAN DIEGO, CALIFORNIA, 92108 BUILDING FEATURES 15-story, Class A office tower 268,645 rentable square feet Hazard Center

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL Procuring broker shall only be entitled to a commission calculated in accordance with the rates approved by our principal only if such procuring

More information

CLASS A MANUFACTURING FACILITY

CLASS A MANUFACTURING FACILITY 4151 South Pipkin Road, Lakeland, Florida Tampa Lakeland Orlando 863-682-6147 David@hauger-bunch.com PROPERTY HIGHLIGHTS LEEDS Certified, 27,600 SF Manufacturing Facility & Office Tiltwall Concrete Built

More information

The Asia Pacific Center

The Asia Pacific Center The Asia Pacific Center A modern downtown building serving all of Calgary. Managed and Leased by Bow River Management Ltd. About our Building 100 Fourth Avenue SW Located at a prime corner at 4 th Avenue

More information

of it all. Dane Hooks Managing Director T: F:

of it all. Dane Hooks Managing Director T: F: 555Oakland s City Center premier office tower at the center of it all. ±485,000 Square Feet of Class A Office in the Heart of Oakland www.555citycenter.net For more information, contact: John Dolby Executive

More information

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility. High Tech Cleanroom Laboratory & Production Facility www.technologyincubationcenter.com Jay Chmieleski 612 275 3775 mobile Dan Friedner FOR SALE OR LEASE Technology Incubation Center VADNAIS HEIGHTS, MINNESOTA

More information

FOR LEASE GATEWAY BUSINESS PARK INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV

FOR LEASE GATEWAY BUSINESS PARK INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV FOR LEASE $ ST 0.70 AR /S TIN F N G R NN AT E! INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV - 89120 ZONED: M-D, COUNTY APN: 161-31-410-031 CONSTRUCTION: 2001 GLA: 54,157 PARKING: 2.86 CAM: $0.16/SF±

More information

Timberline Office Preserve Trueman Boulevard Hilliard, Ohio 43026

Timberline Office Preserve Trueman Boulevard Hilliard, Ohio 43026 FOR LEASE Timberline Office Preserve 4635 4653 Trueman Boulevard Hilliard, Ohio 43026 2,500-8,500 SF suites available Located in a picturesque office park setting Lease rate: $12-14 SF FSG Contact: Jeff

More information

Orange County Public Schools

Orange County Public Schools 100 % Design/Construction Update Community Meeting May 23, 2016 Meeting Agenda May 23, 2016 Introductions Welcome School Board Member Kathleen Kat Butler Gordon Project Update Facilities Meeting Organizer

More information

9900 WESTPARK 9900 WESTPARK DRIVE, HOUSTON, TX 77063

9900 WESTPARK 9900 WESTPARK DRIVE, HOUSTON, TX 77063 PROPERTY DETAILS BUILDING DETAILS Property Size: 91,711 SF Southwest Houston, West Belt, West Houston, Westchase / Westpark Tollway Submarket THE BOXER ADVANTAGE Maintenance & janitorial services included

More information

2645 COLUMBUS-LANCASTER RD LANCASTER, OHIO or

2645 COLUMBUS-LANCASTER RD LANCASTER, OHIO or 740-653-2003 or 740-974-3224 SITE PREPARATIONS SITE NEEDS TO BE LEVELED, AND 2 LONGER AND WIDER THEN BUILDING AND NORMALLY 3-4 INCHES OF BERM LIMESTONE OR NO.8 LIMESTONE TO BE USED AS A BASE, OR SOLID

More information

Orange County Public Schools

Orange County Public Schools Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1 Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect:

More information

PROJECT DESCRIPTION. Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017

PROJECT DESCRIPTION. Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017 Attachment 5 PROJECT DESCRIPTION Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017 General Description: The proposed Project is to be: (1) a

More information

2017 Capital Improvement Budget Police Department

2017 Capital Improvement Budget Police Department 2017 Capital Improvement Budget Police Department (in thousands) Projects Bonds State Federal Other Total APD Headquarters Campus Perimeter Security Project 500 - - - 500 APD Investigation Interview Room

More information

Daylight and Sunlight Study 47 Gainsford Road, London E17 6QB

Daylight and Sunlight Study 47 Gainsford Road, London E17 6QB Daylight and Sunlight Study 47 Gainsford Road, London E17 6QB 4 May 2016 Right of Light Consulting Burley House 15-17 High Street Rayleigh Essex SS6 7EW Tel: 0800 197 4836 DAYLIGHT AND SUNLIGHT STUDY 47

More information

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT Jack Strollo, Broker 500 S. Florida Avenue, Suite 420 Lakeland, Florida 33801 O. 863.683.3425 x103 C. 863.640.8238 jstrollo@resbroadway.com FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

More information

98,000 sq. ft. Crescent Building For Sale. Sale Price: $5,500,000. Jim Koon, Managing Broker (208) or (208)

98,000 sq. ft. Crescent Building For Sale. Sale Price: $5,500,000. Jim Koon, Managing Broker (208) or (208) 10220 E. Sprague Ave Spokane Valley, Washington 99206 The Crescent building offers a unique opportunity to acquire a building for fraction of the replacement cost. The two story 98,000 square foot concrete

More information

INVESTMENT MEMORANDUM

INVESTMENT MEMORANDUM INVESTMENT MEMORANDUM HOUSTON, TX EXPECT THEUNEXPECTED Investment Overview G ENERAL O VERVIEW Executive Summary Prominently situated within the Northwest Inner Loop Industrial submarket, this premier location

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

41965 ECORSE ROAD VAN BUREN TOWNSHIP, MICHIGAN

41965 ECORSE ROAD VAN BUREN TOWNSHIP, MICHIGAN PROPERTY FEATURES + + Immaculate State of the Art Hi-Tech-Research-Development building with many extras! + + Located within the Beautiful community of Van Buren Twp. + + Immediate access to I-275, I-94

More information

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115 GOVERNMENT FACILITIES FY 2017 FY 2016 CIP Pages C-72 through C-115 June 16, 2016 Facilities Capital Projects Facilities Design & Construction Capital Program Mission To encompass both significant modernization

More information

CBIZ PLAZA N CENTRAL AVENUE, PHOENIX, AZ 85012

CBIZ PLAZA N CENTRAL AVENUE, PHOENIX, AZ 85012 PROPERTY DETAILS BUILDING DETAILS Property Size: 266,321 SF Airport Area, Midtown Submarket 24-Hour On-Site Security On-Site Management & Maintenance Uncle Tony's Bagels & Deli Tricee Thomas Apparel Tenant

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

9900 Westpark Drive. Schedule a Tour Today! (713) 777-RENT (7368) (713) 777-RENT (7368)

9900 Westpark Drive. Schedule a Tour Today! (713) 777-RENT (7368) (713) 777-RENT (7368) BUILDING DETAILS 9900 Westpark Drive Houston, TX 77063 Property Size: 91,711 SF Southwest Houston, West Belt, West Houston, Westchase / Westpark Tollway Submarket Large Renovated Lobby Parking Garage 24-Hour

More information

Tier IV Standards as Specified in the TIA 942 Document

Tier IV Standards as Specified in the TIA 942 Document S No Architectural Proximity of visitor parking to data 18.3 m / 60 ft minimum separation with physical barriers to prevent vehicles from 1 center perimeter building walls driving closer 2 Building Construction

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

MINNEAPOLIS PARK & RECREATION BOARD COMMUNITY ENGAGEMENT PLAN

MINNEAPOLIS PARK & RECREATION BOARD COMMUNITY ENGAGEMENT PLAN Board Plan Approval/Review Date: 9/19/2017 Last Plan Revision Date: 9/5/2017 MINNEAPOLIS PARK & RECREATION BOARD COMMUNITY ENGAGEMENT PLAN Project Title: MPRB Division: Planning Project Manager: Dana Murdoch

More information

CHAPTER 5. Special Cases

CHAPTER 5. Special Cases CHAPTER 5 Special Cases OVERHANGS To be treated as an overhang, slotted and louvered shading devices must have the slats arranged so that no direct solar radiation penetrates the overhang at any time during

More information

BENAROYA PACIFIC MARKET CENTER

BENAROYA PACIFIC MARKET CENTER BENAROYA PACIFIC MARKET CENTER 6100 FOURTH AVENUE S SEATTLE, WA 98108 Vibrant office space for growing companies Fifth floor: 40,321 RSF (divisible to 10,000 RSF) $15.00/RSF/year NNN First floor: 4,938

More information

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay Notes on the Science of Extreme Situations, Paper No. 2 AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA by Anna M. McRay Copyright 2002 by Anna M. McRay. All rights reserved. Permission

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA 203,000 SF WORLD-CLASS 18 CLEAR MANUFACTURING/DISTRIBUTION SPACE The Stubblebine Company is pleased to offer 100 Simplex Drive, Westminster, MA, a World-Class

More information

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure

GROW YOUR BRAND AND MAKE AN IMPRESSION. Unique 2-storey office building with Highway 401 exposure GROW YOUR BRAND AND MAKE AN IMPRESSION Unique 2-storey office building with Highway 401 exposure Grand entrance and great room with high ceilings Low gross up factor - 4.3%, large floor plates 2 internal

More information

EMPIRE LAKES. CORPORATE CENTER 9500 Cleveland Avenue Rancho Cucamonga, CA UP TO +51,000 SF CONTIGOUS THOMAS P. PIERIK, SIOR

EMPIRE LAKES. CORPORATE CENTER 9500 Cleveland Avenue Rancho Cucamonga, CA UP TO +51,000 SF CONTIGOUS THOMAS P. PIERIK, SIOR UP TO +51,000 SF CONTIGOUS EMPIRE LAKES CORPORATE CENTER 9500 Cleveland Avenue Rancho Cucamonga, CA 91730 THOMAS P. PIERIK, SIOR SENIOR VICE PRESIDENT 951.276.3610 // DRE# 00982027 TPIERIK@LEERIVERSIDE.COM

More information

EVLA Vertex Room (and other mechanical considerations)

EVLA Vertex Room (and other mechanical considerations) Racks, Bins & Modules PDR Paul Harden 17 June 2002 EVLA Vertex Room (and other mechanical considerations) This file has been modified from the original presentation. It has been changed from the standard

More information

Logan City GIS Master Plan. Term Project. Colton Smith. David Tarboton CEE 6440

Logan City GIS Master Plan. Term Project. Colton Smith. David Tarboton CEE 6440 Logan City GIS Master Plan Term Project Colton Smith David Tarboton CEE 6440 November 29, 2012 Introduction Logan City has lots of data available for streets, canals, trails, zoning maps, and municipalities.

More information

UNIVERSITY OF NEBRASKA OMAHA, BAXTER ARENA Omaha, Nebraska, USA

UNIVERSITY OF NEBRASKA OMAHA, BAXTER ARENA Omaha, Nebraska, USA UNIVERSITY OF NEBRASKA OMAHA, BAXTER ARENA Omaha, Nebraska, USA As the University of Nebraska Omaha s (UNO) main building for large events, the new Baxter Arena is a physical representation of UNO s athletic

More information

METRO CENTER II COMMERCIAL SPACE 555 METRO PLACE NORTH DUBLIN, OH PROPERTY DESCRIPTION

METRO CENTER II COMMERCIAL SPACE 555 METRO PLACE NORTH DUBLIN, OH PROPERTY DESCRIPTION 555 METRO PLACE NORTH DUBLIN, OH 43017 COMMERCIAL SPACE PROPERTY DESCRIPTION Located in Northern Columbus less than 1/4 mile from I-270 Exceptional signage visibility Completely remodeled in 1996 for Ohio

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FO R LEA SE 100 SIMPLEX DRIVE WESTMINSTER, MA 19,91 SF WORLD-CLASS 6 CLEAR DISTRIBUTION BUILDING Salient details include: Prominent Route visibility Institutional quality asset ensconced on a 95 acre pristine

More information

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages University of Maryland UB USPS Maintenance Facility Remaining Bid Packages Procurement Office: University of Maryland, Baltimore Owner: University of Baltimore Design-Build Contractor: The Whiting-Turner

More information

26 th Street North and Old Dominion Drive Master Planning Task Force

26 th Street North and Old Dominion Drive Master Planning Task Force 26 th Street North and Old Dominion Drive Master Planning Task Force Presentation to Arlington Joint Facilities Advisory Commission October 24, 2018 Site Master Planning Task Force On September 2018, the

More information

Installation Notes TII Model 341 Protector

Installation Notes TII Model 341 Protector Installation Notes TII Model 341 Protector (ATT-IS PEC 32918) for MERLIN Communications System In Range Out of Building (IROB) Station Installation By Trained Technician Only WARNING: Failure to follow

More information

LAKESIDE CENTER NORTH 28TH DRIVE, PHOENIX, AZ 85029

LAKESIDE CENTER NORTH 28TH DRIVE, PHOENIX, AZ 85029 PROPERTY DETAILS BUILDING DETAILS Property Size: 135,501 SF Glendale, North Phoenix Submarket On-Site Deli On-site Leasing, Management & Maintenance Common Area Conference Room Ample Surface & Covered

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

YATES IS COMPLETING CENTURYLINK S NEW TECHNOLOGY CENTER OF EXCELLENCE. BY RUSS GAGER

YATES IS COMPLETING CENTURYLINK S NEW TECHNOLOGY CENTER OF EXCELLENCE. BY RUSS GAGER Commercial YATES CONSTRUCTION CENTURYLINK TECHNOLOGY CENTER OF EXCELLENCE Future Tech YATES IS COMPLETING CENTURYLINK S NEW TECHNOLOGY CENTER OF EXCELLENCE. BY RUSS GAGER Technology is a major driver of

More information

INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS. January 18, 2013

INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS. January 18, 2013 INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS January 18, 2013 Scope of Work Building Scope 1) Year the facility was built. 2) Hurricane rating. 3) Flood Plain. 4) Future capacity. 5) Square

More information

WAREHOUSE / DISTRIBUTION EXPERIENCE

WAREHOUSE / DISTRIBUTION EXPERIENCE WAREHOUSE / DISTRIBUTION EXPERIENCE BERRY WHOLESALE DRUGS Walter Knestrick Contractor, Inc. The warehouse space includes a partial mezzanine with administrative offices and staff support areas. The mezzanine

More information

The design and construction of the facility is anticipated to cost approximately $300,000.

The design and construction of the facility is anticipated to cost approximately $300,000. Council for the Built Environment technical subcommittee August, 00 MEMORANDUM To: Subject: Dr. Douglas Palmer Chair, Council for the Built Environment Proposed Construction: Soccer Restroom RECOMMENDATION

More information

MILLENNIUM CORPORATE PARK. Where business meets open space NE Union Hill Road, Redmond WA 98052

MILLENNIUM CORPORATE PARK. Where business meets open space NE Union Hill Road, Redmond WA 98052 Where business meets open space 800 8700 Union Hill Road, Redmond WA 9805 PROJECT HIGHLIGHTS Convenient location Immediate access to SR- 50 Ample power to each building Free surface parking with a parking

More information

8330 LBJ FREEWAY LYNDON B JOHNSON FWY, DALLAS, TX 75243

8330 LBJ FREEWAY LYNDON B JOHNSON FWY, DALLAS, TX 75243 PROPERTY DETAILS BUILDING DETAILS Property Size: 381,383 SF LBJ Corridor, NE Dallas, North Dallas, Richardson Submarket Shared Conference Rooms 85-Seat Auditorium Loading Dock On-Site 24- Hour Security

More information

50 Years of Facility Operations or Rebuilding from the inside out

50 Years of Facility Operations or Rebuilding from the inside out 50 Years of Facility Operations or Rebuilding from the inside out National Optical Astronomy Observatory (NOAO) NORTH Kitt Peak National Observatory and Tucson Headquarters Facility Presented by John Dunlop

More information

North Marion School District Bond Projects

North Marion School District Bond Projects North Marion School District Bond Projects School Board Work Session: 6.4.2018 listen.design.deliver Primary School Update: Safety & security: modify Admin area to create a secure entry vestibule Staff

More information

RAPID CITY CALL CENTER 1400 TURBINE DRIVE RAPID CITY, SD FOR SALE / FOR LEASE OFFICE / CALL CENTER 133,102 SQ. FT.

RAPID CITY CALL CENTER 1400 TURBINE DRIVE RAPID CITY, SD FOR SALE / FOR LEASE OFFICE / CALL CENTER 133,102 SQ. FT. FOR SALE / FOR LEASE OFFICE / CALL CENTER 133,102 SQ. FT. PROPERTY OVERVIEW FOR SALE $12,000,000.00 FOR LEASE $12.50/SF NNN EST. NNN EXPENSES $6.33/SF BUILDING SIZE 133,102 SF LAND SIZE 15.01 acres (including

More information

StonePointe Corporate Center 2525 N. 12th Street, Reading, PA 19605

StonePointe Corporate Center 2525 N. 12th Street, Reading, PA 19605 For Lease up to 150,000 SF Industrial Flex Space StonePointe Corporate Center 2525 N. 12th Street, 19605 Property Features Open Floor Plans Low Operating Costs Heavy Infrastructure Plug and Play capabilities

More information

Reston Town Center North Development. Community Update

Reston Town Center North Development. Community Update Reston Town Center North Development Community Update May 31, 2017 1 Presentation Agenda Project Overview Site and Current Property Ownerships Development Plan/Grid of Streets Proposed Ownership Comprehensive

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline Georgia Institute of Technology Advanced Computing Technology Building Draft Program Vision Program Outline Issued April 2, 2001 I N T R O D U C T I O N Scope This document is a summary of the Vision Session

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

Lecture 4 Form & Space Form Defines Space

Lecture 4 Form & Space Form Defines Space Islamic University-Gaza Faculty of Engineering Architectural Department Principles of Architectural and Environmental Design -EARC 2417 Lecture 4 Form & Space Form Defines Space Instructor: Dr. Suheir

More information

210,000 rsf Typical floorplate 67,549 rsf

210,000 rsf Typical floorplate 67,549 rsf Under Construction 3050 SOUTH DELAWARE STREET SAN MATEO Building Features Floor Plans Elevation Site Plan Location Map Amenities Timeline Signage Gallery 210,000 rsf Typical floorplate 67,549 rsf Robert

More information

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres Sandy Springs Downtown Atlanta FULTON 400 Alpharetta 675 Sugar Hill GWINNETT Grayson Conyers Dacula Lawrenceville Loganville WALTON Oxford Covington Gwinnett County Office / WAREHOUSE for SALE - lender

More information

Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA Almaden Expressway San Jose, CA 95120

Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA Almaden Expressway San Jose, CA 95120 Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA MARK BIAGINI BRE #00847403 PEGGY OWEN BRE#01473666 Biagini Properties, Inc. 333 W. El Camino Real, Suite 240 Sunnyvale, CA 94087 1969 2/6/2018 Property

More information

PRELIMINARY FEBRUARY 23, 2018

PRELIMINARY FEBRUARY 23, 2018 PRELIMINARY FEBRUARY, 08 YOUR NEIGHBORHOOD ROAD ROAD ROAD 6 C A 6 C B A C 0 A A H 6 C B A C 8 D 0 A B J A C 6 H 8 H A C 6 J H 8 H D C 6 J B C A A H D J H B C E * H D B A D A F D F B B G G K K H H B E E

More information

THE RANCHESTER BUILDING HARWIN DRIVE, HOUSTON, TX 77036

THE RANCHESTER BUILDING HARWIN DRIVE, HOUSTON, TX 77036 PROPERTY DETAILS BUILDING DETAILS THE BOXER ADVANTAGE Maintenance & janitorial services included in rent Competitive rental rates Flexible lease terms Short & simple lease Free in-house space planning

More information

Central Michigan University. Signage Design Standards. Signage Design Standards. May 16, 2008

Central Michigan University. Signage Design Standards. Signage Design Standards. May 16, 2008 Central Michigan University External permanent signage The following specification must be followed for all external permanent signage. Fonts: Use Helvetica Medium for all external signage Visually impaired

More information

1515 IVAC WAY CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN ROOMS ±112,000 SF

1515 IVAC WAY CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN ROOMS ±112,000 SF CREEDMOOR, NORTH CAROLINA FOR SALE MANUFACTURING SPACE WITH IS0 8 CLEAN S ±112,000 SF CLEAN MANUFACTURING SPACE FOR SALE PROPERTY OVERVIEW Foundry Commercial is pleased to offer 1515 IVAC Way in Creedmoor,

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, July 19, 2017 5:30 P.M. Evanston Public Library, Community Meeting Room, 1703 Orrington Ave. 1. CALL TO ORDER 2. NEW BUSINESS AGENDA

More information

APPENDIX - 2a WEST ELEVATION PENTHOUSE SUB-PENTHOUSE FLEX FLOORS TYPICAL NORTH ENTRY ORNAMENTAL LED UP LIGHTING ELEV. PH ELEV. PH LEVEL 26 LEVEL 25

APPENDIX - 2a WEST ELEVATION PENTHOUSE SUB-PENTHOUSE FLEX FLOORS TYPICAL NORTH ENTRY ORNAMENTAL LED UP LIGHTING ELEV. PH ELEV. PH LEVEL 26 LEVEL 25 ORNAMENTAL LED UP LIGHTING PENTHOUSE SUB-PENTHOUSE FLEX FLOORS BLACK METAL CLAD DUAL PANE LOW-E ARGON CLEAR WINDOWS TYPICAL BLACK RAIL CLEAR GLASS NORTH ENTRY PARKADE/ TOWNHOUSES S2 LEVEL 26 LEVEL 25 LEVEL

More information

SALE LEASE CALL CENTER

SALE LEASE CALL CENTER SALE LEASE CALL CENTER 3500 Reynolds Road, Lakeland, FL 33803 PROPERTY HIGHLIGHTS 53,151 SF AVAILABLE CONFIGURED FOR BACK UP GENERATOR FIBER OPTIC CONNECTED WIRED FOR CALL CENTER 300 CUBICLES ON-SITE AMPLE

More information

HISTORIC AMERICAN ENGINEERING RECORD INDEX TO PHOTOGRAPHS. BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE

HISTORIC AMERICAN ENGINEERING RECORD INDEX TO PHOTOGRAPHS. BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE HISTORIC AMERICAN ENGINEERING RECORD Cerritos Channel Port oflong Beach Los Angeles County California BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE Photographer: Stephen Schafer, September 2010 CA-HEIM-l

More information

J. Alstan Jakubiec Jeff Neimasz Modeling Dynamic Shading Devices with the DIVA Advanced Shading Module 1 / 30

J. Alstan Jakubiec Jeff Neimasz Modeling Dynamic Shading Devices with the DIVA Advanced Shading Module 1 / 30 Modeling Dynamic Shading Devices with the DIVA Advanced Shading Module J. Alstan Jakubiec alstan@solemma.net Jeff Neimasz jeff@solemma.net Modeling Dynamic Shading Devices with the DIVA Advanced Shading

More information

Creating, Completing, and Utilizing B3 Benchmarking

Creating, Completing, and Utilizing B3 Benchmarking Creating, Completing, and Utilizing B3 Benchmarking CERTs MN GreenCorps member Since you can t manage what you don t measure, begin measuring your energy use with B3 Benchmarking! Introduction to B3 &

More information

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Facilities Report 2011-12 2 nd Quarter KCCD Facilities Planning & Construction February 1, 2012 Overview Facility Report

More information

THE COLONY. AT MORTON GROVE 3 bedroom / 2 Bath Condos with Single-Car Garage Priced From $179,900

THE COLONY. AT MORTON GROVE 3 bedroom / 2 Bath Condos with Single-Car Garage Priced From $179,900 THE COLONY AT MORTON GROVE bedroom / Bath Condos with Single-Car Garage Priced From $,00 Construction Features: Concrete Block Construction Marble Window Sills High Eff. Air Conditioning & Heat Stucco

More information

Lecture 3 Form & Space Form Defines Space

Lecture 3 Form & Space Form Defines Space Islamic University-Gaza Faculty of Engineering Architecture Department Principles of Architectural and Environmental Design -EARC 2417 Lecture 3 Form & Space Form Defines Space Instructor: Dr. Suheir Ammar

More information

The Summit s location is spot on. We just love it here. Bill Hancock, Executive Director College Football Playoff

The Summit s location is spot on. We just love it here. Bill Hancock, Executive Director College Football Playoff at Las Colinas The Summit s location is spot on. We just love it here. Bill Hancock, Executive Director College Football Playoff ELEVATING BUSINESS TO NEW HEIGHTS The Summit at Las Colinas has a commanding

More information

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

Section 7.I: Estimates Backup. 7.I Estimates Back-Up Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State

More information

FOR SALE OR LEASE CORPORATE RIDGE I FORMER INTEL FAB 23 BUILDING 1615 GARDEN OF THE GODS ROAD COLORADO SPRINGS, CO The Flexible Fab Building

FOR SALE OR LEASE CORPORATE RIDGE I FORMER INTEL FAB 23 BUILDING 1615 GARDEN OF THE GODS ROAD COLORADO SPRINGS, CO The Flexible Fab Building FOR SALE OR LEASE CORPORATE RIDGE I FORMER INTEL FAB 23 BUILDING 1615 GARDEN OF THE GODS ROAD COLORADO SPRINGS, CO 80907 The Flexible Fab Building Warehouse/Light Manufacturing/Distribution/FAB/Data Center

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA WAREHOUSE SPACE 198,788 SF ON 95 ACRES As the exclusive listing agent, The Stubblebine Company is pleased to present Route Commerce Park for lease. With robust

More information

A Natural Workspace. Tucked away among 35 wooded acres, located in the center of it all.

A Natural Workspace. Tucked away among 35 wooded acres, located in the center of it all. Where Nature Works Where Nature Works A Natural Workspace Tucked away among 35 wooded acres, located in the center of it all. 400,000 SF expandable to over 700,000 SF Adjacent outdoor park & nature Expansion

More information

Creating a New Plan File

Creating a New Plan File 1 Tutorial NAME Creating a New Plan File 2 The first step in creating your own design is to open and name a new plan file. 1. From the MENU BAR, select File, New Plan. 2. From the MENU BAR, select File,

More information

2,083-8,248 SF. 125 Commerce Valley Drive West AVAILABLE IMMEDIATELY. Building Highlights. Availabilities. Building Information.

2,083-8,248 SF. 125 Commerce Valley Drive West AVAILABLE IMMEDIATELY. Building Highlights. Availabilities. Building Information. 2,083-8,248 SF AVAILABLE IMMEDIATELY CLASS A SUBURBAN MULTI-TENANT SPACE Building Highlights 190,000 square foot office tower, complete with 8-storeys and concourse level, efficient floors, and surface

More information

Heavy Industrial / Corporate Office Campus

Heavy Industrial / Corporate Office Campus Heavy Industrial / Corporate Office Campus -Priced at: $80 Sq.Ft. -131,040 square feet (+/-) -8.8 Acres (+/-) -18 Megawatt Electrical Service -500,000 Gallons per-day Water Service 1270 SE Monmouth Cutoff

More information

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1 = 20'-0 ADD-002 ISSUED FOR: MB/GSB PW/R RESIDENCE O/R /R W/R W/R /R /R /R /R /R NMSD Site Improvements Phase Scale: " = 0'-0" 06.0.05 MB/GSB BO ISSUED FOR: 4-000 REF: C-306 W/R W/R W/RW/R W/R W/R W/R W/R FO ADD-00 SKC-049 W/R W FO T R NMSD Site

More information

FPX. Forest Park Ten 8333 Forest Point Boulevard Charlotte, NC Cardinal Real Estate Partners LLC

FPX. Forest Park Ten 8333 Forest Point Boulevard Charlotte, NC Cardinal Real Estate Partners LLC Forest Park Ten 8333 Forest Point Boulevard Charlotte, NC 28273 For More Information, Contact the Leasing Team at: Cardinal Real Estate Partners LLC John Culbertson, CRE, CCIM, SIOR jculbertson@cardinal-partners.com

More information

Multi-Purpose Building

Multi-Purpose Building Multi-Purpose Building Description and Goals Multi-Purpose Rooms should be large enough to accommodate 400-500 students. The main multi-purpose will be acoustically designed primarily for musical performances

More information

6500 Harry Hines Boulevard Dallas, TX 75235

6500 Harry Hines Boulevard Dallas, TX 75235 CoStar-41051 LoopNet- 17906172 Xceligent -1379536 6500 Harry Hines Boulevard Dallas, TX 75235 Dallas Medical District Unique Site 5.31 Acres 81,000 + SF Offices Offered Exclusively by JacksonCooksey For

More information

The East Bay s Premier Office Tower

The East Bay s Premier Office Tower FOR LEASING INQUIRIES CONTACT RYAN R. HATTERSLEY Executive Managing Director ryan.hattersley@cushwake.com +1 510 891 5802 Lic.. #01354553 DANIEL P. BISABRI Executive Director daniel.bisabri@cushwake.com

More information

Setting New. Standards. Skyway access allows you to walk anywhere downtown in just minutes leaving your coat behind.

Setting New. Standards. Skyway access allows you to walk anywhere downtown in just minutes leaving your coat behind. Setting New Standards. Be a part of Campbell Mithun Tower. Here in the heart of the city, we ve created a vibrant urban office experience that fits your fast-paced lifestyle. At 582 feet and 42 floors,

More information

Summary Information. Demographic Profile

Summary Information. Demographic Profile Summary Information 8526 S. W. Kansas Ave. (Unit B-4 Building B) Parcel ID: 08-39-41-005-002-00040-0 Lease amount: $12 PSF (annual) Property Taxes, Condominium Assessments, Trash Removal and Water Included.

More information

5849 PEACHTREE ROAD ATLANTA, GEORGIA T T F INNERFACESIGN.COM. ClearView SERIES SPECIFICATIONS

5849 PEACHTREE ROAD ATLANTA, GEORGIA T T F INNERFACESIGN.COM. ClearView SERIES SPECIFICATIONS 5849 PEACHTREE ROAD ATLANTA, GEORGIA 30341 T 770 921 5566 T 800 445 4796 F 770 279 1327 INNERFACESIGN.COM ClearView SERIES SPECIFICATIONS North Elevators 1L 1K 1J North Mall 1I 1G Central Elevators 1H

More information

9. a. 11. A = 30 cm 2, P = 30 cm. 12. A = 29 cm 2, P = 13. A = 72 in. 2, P = 35 in.

9. a. 11. A = 30 cm 2, P = 30 cm. 12. A = 29 cm 2, P = 13. A = 72 in. 2, P = 35 in. Answers Applications. Area = 20 cm 2 (base = 5 cm, height = cm), perimeter = 20 cm (Each side is 5 cm.) 2. Area = 9 cm 2 (base = 3 cm, height = 3 cm), perimeter 2. cm (The side lengths are 3 cm and ~ 3.2

More information