1 THE CORPORATION OF THE CITY OF STRATFORD Tender Number: T16 17 Replacement of Entrance Phone Systems, Addition of CCTV Camera Systems and Wireless Fidelity/Wireless Internet (WIFI) Systems Throughout the Building Common Areas Addendum #1, Wednesday, November 23, 2016 Social Services Department, Public Housing Division Closing Date: 2:00:00 p.m., Wednesday, November 30, 2016 DIRECTIVE This Addendum shall form an integral part of the above tender and shall be read in conjunction herewith. This Addendum shall, however, take precedence over all requirements of the previously issued drawings and specifications with which it may prove to be a variance unless otherwise clarified by the Engineer. This Addendum must be acknowledged in the appropriate space and on the Bidder s Declaration and be attached for submission. Tenders not identifying this Addendum, as required, may be rejected as informal. See attached. END OF ADDENDUM
2 ADDENDUM No. 1 Project Number: Date: 2016-NOV-23 Issued to: City of Stratford Project Description: T16-17_Entry Control System, CCTV and WiFi Project Project Location: Multi Residential buildings in Stratford Area Total Number of Pages: 4 This addendum forms part of the Contract documents and amends the original drawings, specifications, and details. CLARIFICATIONS: 1. Q1.: 45 Buckingham floorplan, in Penthouse has device labelled FAB, Not defined within drawing. A1.: FAB = Fire Alarm Booster Panel 2. Q2.: Drawing Riser diagrams state that PoE network switches shall have a Maximum 24 ports, can 48 port switches be used to reduce number of switches required? A2.: Maximum 24 ports preferred but the 48 port PoE network switches are acceptable to reduce the installation cost 3. Q2.: Are we to use patch panels for all network devices or wiring direct into network switches. A3.: Use of the patch panels for all network devices is not recommended. Wiring direct into network switches is preferred unless the site conditions permit for otherwise. NAE to review and approve shop-drawings prior to final installation. 4. Q4.: Do any/all buildings have dropped ceilings in common areas? A4.: Many of the residential building have a T-bar ceiling in corridors and common areas. Contractor to verify on site and price work accordingly. Entry System: 1. Q1.: Are Access cards to be included? If so how many per unit? A1.: Access Cards are not part of this project however, the new Entry Control system must have the capacity for the provision of future upgrades to a minimum of 2 access cards per each unit plus 10% spares for each building. 2. Q2.: Section Physical Requirements.4 Electronic door latching hardware and associated conduit and boxes shall be provided by the Security Contractor as shown on the drawings. Is the bidder considered the Security contractor? Nothing shown on the drawings as to door latching hardware. A2.: YES, the bidder or their sub is considered the Security Contractor. The existing door latching hardware is to be reused. Integrate the new Entry Control system to operate the existing door hardware. The new Entry Control system must have the capacity for the provision of future additional entrance upgrades. Rev. March, 2010 Page 1 of 4
3 (Typical for each building) 3. Q3.: None of the drawings show where card readers will be required, will these be required on all general purpose exterior doors? Is wiring currently in place for card readers? A3.: Access Cards are not part of this project. However the new Entry Control system must have the capacity for the provision of future upgrades to add card readers at main entrance, exit doors and all service rooms Wireless Network: 1. Q1.: Wireless network access points are to be capable of connecting to the City of Stratford hybrid fibre/802.11n MESH network by means of a specially designated wireless port installed by the supplier specifically for this purpose. Is there a recommended product for this installation? A1.: New Cisco Switch 2960 Series. Confirm the exact requirements with the IT department from the City of Stratford 2. Q2.: Riser diagram has Cisco Switch shown in each drawing, is this unit existing, or does it need to be supplied? If supplied is there a model number for a specific unit? A2.: New Cisco Switch 2960 Series. Confirm the exact requirements with the IT department from the City of Stratford 3. Q3.: Riser diagram has Hub Server unit shown in each drawing, is this unit existing, or does it need to be supplied? If supplied is there a make and model number for a specific unit? A3.: New Hub Server is to be supplied. Confirm the exact requirements with the IT department form the City of Stratford 4. Q4.: Is the existing MESH Wireless Infrastructure connecting the buildings a Layer2 Infrastructure, ie LAN Extension single flat network or is it routed with subnets? A4.: YES, the existing MESH Wireless is a Layer 2 Infrastructure, routed with subnets. Confirm the exact requirements with the IT department form the City of Stratford 5. Q5.: The drawings show the Access Points only in the common areas however under the Wireless Network Standard specification Part 1, Item 2- Utilization specifies Prior to the installation of any wireless devices, the network provider shall review the usage requirements for each building to determine the optimum number of wireless access points needed to efficiently support all users in the area simultaneously. For the purposes of completing this survey, it shall be assumed that each suite will be equipped with up to four (4) wireless devices which require network access. Space configuration, construction materials and potential sources of RF interference shall be taken into consideration when conducting the site survey. Also Part 2 Section 4 The number of access points required in each facility is to be determined by the supplier based on the provided estimates of demand for users and the size of the area to be covered. Rev. March, 2010 Page 2 of 4
4 A5.: The new WiFi system shall be capable for future expansion and upgrades. Exact location and quantity of the Access Points to be confirmed on site. CCTV: 1. Q1.: On Drawings Key Note 3: PROVIDE NEW POE INDUSTRIAL SWITCH EQUIVALENT TO MIRCOM MODEL: LANOLINX LNP-2602GN, As outlined within Section Network Connection.1 System shall be capable of Gigabit Ethernet (GigE) network connection, however network switch specified is only capable of gigabit connection using the two (2) Ethernet GBIC SFP Ports. Device ports are only capable of supporting 10/100 networking speed. Is gigabit networking required to each device or only between network switches and router? A1.: Min 1 gigabit networking required only between network switches and router. 2. Q2.: Section Part2: Products.4.1 Power Source: 24vac, 14watts, however all cameras specified are Power over Ethernet (PoE) A2.: All cameras to be serviced via PoE. 24V for heaters on exterior cameras. 3. Q4.: Section Part2: Products.7 Power Supplies, States Mini cameras shall be supplied with 24VDC power supply converters, Cameras specified are PoE only A3.: All cameras to be serviced via PoE. 24V for heaters on exterior cameras. 4. Q4.: Section Part2: Products.7 Power Supplies.1 states all cameras will be supplied 24VAC from power supply located on each floor, contradicts above requirement and camera requirements on building drawings stating that cameras are to be 24VDC, but are also to be PoE. A4.: All cameras to be serviced via PoE. 24V for heaters on exterior cameras. 5. Q5.: On Drawings Key Note 5: In relation to Camera Specifications, the Avigilon cameras do not specify number of Mega Pixels (MP) for each model, these cameras are available from 1-30MP A5.: 30MP 6. Q6.: How many days storage required for camera recordings? A6.: days on motion activation for camera recording 7. Q7.: What resolution are the cameras to record at (CIF, MJPEG, H.264)? A7.: H Q8.: What speed of recording is required in Frames per second (FPS) 1-30? A8.: FPS = Q9.: How are the cameras to record (24/7, Motion detection, Alarm/event recording, or combination of all)? A9.: Combination of All Rev. March, 2010 Page 3 of 4
5 10. Q10.: Are microcomputer specifications available from the City of Stratford Purchasing department for Pan/tilt and zoom Controller which is to be installed onto microcomputer. A10.: No specifications are available through the City of Stratford Purchasing department for Pan/tilt and zoom Controllers. Provide shop drawings to the consultant for approval prior to ordering. END OF ADDENDUM Rev. March, 2010 Page 4 of 4
Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030
Proposal for Services Security Camera Replacement Must be received by 10:00 a.m. on March 30, 2018 Services to be provided at Shiloh Towers 1525 27 th St. Zion, IL A Mandatory Pre-bid Meeting will be held
More informationRequest for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463
Request for Proposal Network Infrastructure and WIFI E-Rate Form 470: 170062975 Date of Bid Due: On or before March 3, 2017 at 11:00 AM is requesting bids for E-Rate Category 2 Internal Connections as
More informationCAT RFP , Addendum 2 February15, 2013 Page 1
CHATHAM AREA TRANSIT AUTHORITY RFP 2013-04, ADDENDUM NO.2 DATE: February 15, 2013 ORIGINAL RFP NUMBER: 2013-04 PROJECT: CHATHAM AREA TRANSIT AUTHORITY VOIP This Addendum forms a part of Chatham Area Transit
More informationSpecifying your McCloud Cowork
McCloud Cowork Specify your Solution Thank you for considering a Medusa McCloud system. As there are many options and variations available to fine-tune the system design to your workspace needs, we have
More informationRequest for Proposal George West Independent School District ERate
Request for Proposal ERate 2015-2016 Infrastructure for New Wings at George West High School and George West Elementary School Due: March 9, 2015 2:00 PM Superintendent: Ty Sparks ERate 2015 RFP:, George
More informationADDENDUM #1. Date: 12/21/2018
Minnesota State Colleges and Universities Request for Proposals for Architectural and Engineering Services Physical Security Enhancements at St. Cloud State University Date: 12/21/2018 ADDENDUM #1 1. The
More informationAddendum No. 1 January 7, 2015
Addendum No. 1 January 7, 2015 DISTRICT-WIDE WIRELESS UPGRADE AND CABLING: INTERNAL CONNECTIONS E-RATE YEAR 18 - RFP NO. 14-15-103 Below is the list of questions received and clarifications. The color
More informationCQUniversity Security and. CCTV Standards
CQUniversity Security and CCTV Standards September 2017 Table of Contents 1 CQUniversity Standards... 2 2 Approved Equipment... 2 2.1 Alarm and Access Control Equipment... 2 2.2 CCTV Equipment... 2 3 Installation
More informationRichland County School District One Competitive Best Value Bid Amendment No. 1
Richland County School District One Competitive Best Value Bid Amendment No. 1 Solicitation No. Date Issued Buyer Phone E-Mail Address CBVB 2019-0011 October 26, 2018 LaShonda Outing, CPPB 803.231.7037
More informationSPECIFICATIONS FOR IP BASED CCTV SYSTEM CAMERAS
SPECIFICATIONS FOR IP BASED CCTV SYSTEM SR # DETAILS Quantity CAMERAS 1 3 MEGA PIXEL NETWORK IR CAMERA 10 3 Mega Pixel Full HD Weather Proof Network IR / Night Vision Camera Minimum 3 MP (2048 x 1536)
More informationREQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/ #:
REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/2017 470 #: 170066178 The purpose of this Request for Proposal (RFP) is to solicit
More informationSPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120
DESIGN GUIDELINES PRESTO INSTALLATION & CONNECTIVITY PAGE 1 of 4 ELECTRICAL CONNECTIVITY AND WIRING Communications Conduits Conduits designated for Presto equipment data wiring shall be clearly identified
More informationCENTRAL ELECTRONICS LIMITED Material management division
CENTRAL ELECTRONICS LIMITED Material management division Corrigendum-II Dated: 04092018 Sub: Tender titled Rate Contract for Supply, Install, Testing & Commissioning and Warranty of Security System in
More informationGeneral. Exterior Cameras. Camera Towers
CAMERAS General This section explains the requirements for interior and exterior cameras. Two basic types of training ranges have cameras: Urban Ranges and Instrumented Training Ranges. Refer to the standard
More informationTABLE OF CONTENTS. I. Purpose and Scope... 2 II. Standards... 3
Rev. Date: Technical Team: CFM Group Approval: Page 1 of 18 Rev. No.: R0 TABLE OF CONTENTS I. Purpose and Scope... 2 II. Standards... 3 1. Section 1: Mandatory Requirements... 3 2. Section 2: Functional
More informationTender No: MUST/ 011/
MERU UNIVERSITY OF SCIENCE AND TECHNOLOGY NETWORK INFRASTRUCTURE ADDENDUM Tender No: MUST/ 0/207-208. SERVER ROOM The 30 kva UPS SOCOMEC and the 30 KVA AVR SOCOMEC makes should be provided. Concrete sealing
More informationRequest for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS
Request for Proposals 05 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS Notice to Vendors Notice is hereby given to interested vendors that the Riverton Unified School District 404
More informationAddendum # 1 Cumberland County, PA CPE RFP Clarifications January
. Request for Submittal Extension ANSWER: All date references listed in the document for submittal deadline shall now be FRIDAY FEBRUARY, 20 at 2:00 PM. All other requirements remain the same. 2. Are we
More informationw w w. s i g n a m a x. c o m Power over Ethernet PoE A P P L I C A T I O N S G U I D E
TM w w w. s i g n a m a x. c o m Power over Ethernet PoE A P P L I C A T I O N S G U I D E Your Guide to PoE Table of Contents Your Guide to PoE...1 PoE Background...1 A Brief History...2 PoE Device Types...3
More information210 SERIES WEBSMART NETWORK SWITCHES Quick Start Guide AN-210-SW-F/R-8-POE AN-210-SW-F/R-16-POE AN-210-SW-F/R-24-POE AN-210-SW-F-48-POE
210 SERIES WEBSMART NETWORK SWITCHES AN-210-SW-F/R-8-POE AN-210-SW-F/R-16-POE AN-210-SW-F/R-24-POE AN-210-SW-F-48-POE Araknis Networks 210 Series Websmart Network Switches FCC Warning Changes or modifications
More informationREQUEST FOR PROPOSAL (RFP)
REQUEST FOR PROPOSAL (RFP) Walla Walla Regional Airport Bid Project No. Security Camera System Proposals are due to the Port of Walla Walla by Thursday, March 2, 2017 at 4:00 PM. Results of the proposals
More informationBROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS
BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS All noted standards apply to the current revisions applicable at the time of construction or intended construction. NO SUBSTITUTIONS
More informationData Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center
Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management
More informationSUB STATION SURVEILLANCE SYSTEM
SUB STATION SURVEILLANCE SYSTEM February 2016 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.
More informationf) Telecommunications Equipment Rooms
SECTION 270000 - COMMUNICATIONS PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification
More informationVendor Questions and Responses Ongwanada RFP #08-06
Vendor Questions and Responses Ongwanada RFP #08-06 1, 2, 3 yr options can only be offered on all EWP service agreements. Will you revise the RFP and accept these as compliant since the Manufactures will
More informationSPECIAL SPECIFICATION 1303 Lifelink
1993 Specifications CSJ 0024-08-110 SPECIAL SPECIFICATION 1303 Lifelink 1. Description. This Item shall govern for the furnishing and installation of LifeLink equipment in Fiber Hubs (existing and proposed)
More informationSPECIFICATION FOR IP FIXED BOX TYPE BULLET OUTDOOR TYPE IR CAMERA( 20 nos)
Bharat Heavy Electricals Limited ( A Government of India Undertaking) BOILER AUXILIARIES PLANT RANIPET 632 406, INDIA Phone No: 04172-284621 E-mail:tvgopal@bhelrpt.co.in CORRIGENDUM TO ANNEXURE - A Ref:
More information*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F:
ADDENDUM COVER & RECEIPT CONFIRMATION SHEET 169 Main Street 700 Plaza Middlesex Middletown, CT 06457 T: 860-343-8297 F: 860-343-9504 www.wright-pierce.com DATE: 9/6/16 ADDENDUM CONSISTS OF (Including this
More informationRequest for Proposal
January 23, 2017 Rev. 1 F 470 #170062033 BREITUNG TONSHIP SHOOL DISTRIT 2000 Pyle Drive Kingsford, MI 49802 906-779-2650 ifi and Network Upgrades NOTIE OF BIDDERS The Breitung Township School District
More informationREQUEST FOR PROPOSAL (RFP)
REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade Issue Date: 11/06/2017 Bids Due 12/04/2017 470 #180003001 The purpose of this Request for Proposal (RFP) is to solicit sealed proposals to establish
More informationCommunications. UNM IT/Telecommunications Guide Specification Communications
The material below covers specific information we definitely want to be included in the contract documents and may not be a completed specification section. This material is to be highlighted in your preliminary
More informationNVT Phybridge, Inc Superior Court, Unit 3 Oakville, ON, L6L 0C4 Phone: Web:
NVT Phybridge enables our customers to transform their existing infrastructure and migrate to IP with confidence. NVT Phybridge products offer technologically advanced features including power over long
More informationREQUEST FOR PROPOSAL CITY OF WARRENSBURG 102 SOUTH HOLDEN STREET WARRENSBURG, MISSOURI 64093
REQUEST FOR PROPOSAL CITY OF WARRENSBURG 102 SOUTH HOLDEN STREET WARRENSBURG, MISSOURI 64093 PROPOSAL CLOSING: September 15, 2017 DATE OF PROPOSAL: August 14, 2017 CONTACT PERSON: GARY SWANSON, COMPUTER
More informationCisco Exam Conducting Cisco Unified Wireless Site Survey V2 Version: 10.0 [ Total Questions: 193 ]
s@lm@n Cisco Exam 642-732 Conducting Cisco Unified Wireless Site Survey V2 Version: 10.0 [ Total Questions: 193 ] Cisco 642-732 : Practice Test Question No : 1 During the site survey kick-off meeting with
More informationADDENDUM No. 1. Request for Proposals (RFP) VoIP Telephone System April 18, 2011
ADDENDUM No. 1 Request for Proposals (RFP) 11168 VoIP Telephone System April 18, 2011 A. CLARIFICATIONS AND MODIFICATIONS TO THE RFP 1. This Addendum is posted on the West Virginia Higher Education Policy
More informationGrant Parish School Board 512 Main Street P.O. Box 208 Colfax, LA 71417
Grant Parish School Board 512 Main Street P.O. Box 208 Colfax, LA 71417 Request for Proposals Wireless Network Upgrade and Expansion Grant Parish School Board (GPSB) is soliciting proposals for the products/services
More informationData and Voice Line Installation Procedure. Revision History
Data and Voice Line Installation Procedure OBJECTIVE SCOPE Data and Voice Line Installation Procedure Information Services Technical Revision History Date Detail of Change Change Made By 1/14/11 Revision
More informationROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) GORMAN POST RD GORMAN, CA RFB-IS
ROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) 49530 GORMAN POST RD GORMAN, CA 93243 1 PURPOSE 4 2 GENERAL 4 3 ACCEPTANCE POLICY 4 4 STANDARDS 4 5 SCOPE OF SERVICES 4 6 MAIN LOCATION
More informationResponse to RFIs/Questions Updated January 26, 2015
RFP 14/15 0002 IT Local Area Network and Wireless Request for Proposals 14/15-0002 IT: Local Area Network and Wireless Response to RFIs/Questions Updated January 26, 2015 Q1. Is there a pre-bid meeting
More informationREQUEST FOR PROPOSAL (RFP) Issue Date: January 30, 2015 Wireless Network Infrastructure Upgrade
REQUEST FOR PROPOSAL (RFP) Issue Date: January 0, 015 Wireless Network Infrastructure Upgrade The purpose of this Request for Proposal (RFP) is to solicit sealed proposals to establish a contract through
More information77% 56% 74% 52% PACKAGING WORLD SURVEY: Ethernet And Wireless In Production Facilities
Ethernet Usage + Strategy Survey 2012 A joint survey by Packaging World and XYZ Company was conducted in late 2012 to obtain insight into current engineering and management applications and opinions surrounding
More informationAccess Control Technology Ltd. reserve the right to change the contents of this manual and the system it applies to without prior notice.
Installation Manual Operating & Installation Instructions This manual refers to the ACTpro elock Hub, a TCP/IP based control unit supporting up to 32 elock doors. Access Control Technology Ltd. reserve
More informationA/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS
A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS May 1, 2016 Reviewers should - Be aware that these checklists are not allinclusive but only provide important review items. Reviewers should - Use Checklists
More informationRequest for Proposal: Wireless System
Request for Proposal: Wireless System December 19, 2014 Diller-Odell Public Schools 506 Perry Street Diller, NE 68415 Erate Identifier: Category Two RFP Wireless 1 Table of Contents Overview...3 1.1 Description
More informationREQUEST FOR PROPOSAL:
REQUEST FOR PROPOSAL: FIBER CABLING INSTALLATION TO CONNECT SIX ADDITIONAL VIEWING STATIONS AT THE EMERGENCY OPERATION CENTER (EOC) WITH THE REGIONAL VIDEO COMMAND CENTER (RVCC) VIDEO FEED I. DESCRIPTION
More informationFREQUENTLY ASKED QUESTIONS (FAQs)
FREQUENTLY ASKED QUESTIONS (FAQs) Q. What is the standard that governs Power over Ethernet? The standard governing Powered Ethernet is IEEE 802.3af Data Terminal Equipment (DTE) Power via Media Dependent
More informationWIRELESS NETWORK: BID Montville Public Schools High School
WIRELESS NETWORK: BID2015-01 Montville Public Schools High School 800 Old Colchester Road Oakdale, CT 06370 Phone: (860) 848-1228 Fax: (601) 587-2221 Website: http://www.montvilleschools.org Issued: February
More informationQs & As from CSD RFP pre-submission conference
Qs & As from CSD RFP 19-503 pre-submission conference Q: Who was there? A: The attendance sheet follows. Q: There are 4 exterior cameras on light poles shown in the prints, are 3 of those 360 cameras and
More informationOverview. Product Terminology. Autonomous Access Points. Lightweight Access Points CHAPTER
CHAPTER 1 The Cisco Aironet Cisco Aironet 1100 Series Access Point series access point is available in autonomous and lightweight configurations. The autonomous access points can support standalone network
More informationGoverning Standards. All wiring and components shall meet the applicable requirements of the NEC.
1.1 SCOPE. This section covers the furnishing and installation of Video Surveillance Systems (VSS), including Video Management System (VMS) software, Cameras, and all associated equipment, devices, and
More informationNetGen Hardware Installation Guide. for NetGen Ethernet Door Controllers
NetGen Hardware Installation Guide for NetGen Ethernet Door Controllers 0613 Table of Contents BLUEWAVE SYSTEM OVERVIEW...2 THE WI-FI LOCK AND SECURITY COMPANY...2 NETGEN DOOR CONTROLLERS...2 INSTALLATION
More informationTHE SCHOOL DISTRICT OF LEE COUNTY
THE SCHOOL DISTRICT OF LEE COUNTY --- PROCUREMENT SERVICES DEPARTMENT Joe Marody, Procurement Coordinator ADDENDUM TO CONTRACT DOCUMENTS ADDENDUM NO.: 1 PROJECT NAME: RFP No. R157215JM - E-Rate Network
More informationNOTE: THIS ADDENDUM SHOULD BE SIGNED AS ACKNOWLEDGMENT OF ITS RECEIPT AND RETURNED WITH YOUR BID. SIGNATURE COMPANY NAME
DATE: December 2, 2015 TO: FROM: Vendors Linda M. Balcombe, CPPO, CPPB Director of Purchasing SUBJECT: ADDENDUM NO. 1, BID NO. 16-968-090 NOTE: THIS ADDENDUM SHOULD BE SIGNED AS ACKNOWLEDGMENT OF ITS RECEIPT
More informationNVT Phybridge, Inc Superior Court, Unit 3 Oakville, ON, L6L 0C4 Phone: Web:
NVT Phybridge enables our customers to transform their existing infrastructure and migrate to IP with confidence. NVT Phybridge products offer technologically advanced features including power over long
More informationNVT Phybridge, Inc Superior Court, Unit 3 Oakville, ON, L6L 0C4 Phone: Web:
NVT Phybridge enables our customers to transform their existing infrastructure and migrate to IP with confidence. NVT Phybridge products offer technologically advanced features including power over long
More informationSECTION COMMUNICATIONS NETWORKS
SECTION 17790 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for the Caltrain WAN/LAN network equipment and components required to connect station system and service to the assigned Central
More informationA. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent.
Section 00000 SECURITY ACCESS AND SURVEILLANCE ADEMCO VIDEO VARIFOCAL MANUAL IRIS LENS PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the design, supply,
More information310 SERIES LAYER 2 MANAGED NETWORK SWITCHES Quick Start Guide
310 SERIES LAYER 2 MANAGED NETWORK SWITCHES AN-310-SW-F/R-8 AN-310-SW-F/R-16 AN-310-SW-F/R-24 AN-310-SW-F/R-8-POE AN-310-SW-F/R-16-POE AN-310-SW-F/R-24-POE FCC Warning Changes or modifications not expressly
More informationRoughneck V920D Series Camera Domes XX Quick Guide
Quick Guide XX258-20-06 Roughneck V920D Series Camera Domes Vicon Industries Inc. Tel: 631-952-2288 Fax: 631-951-2288 Toll Free: 800-645-9116 24-Hour Technical Support: 800-34-VICON (800-348-4266) UK:
More information3. If so, was this taken into consideration when designing the RFP?
9770 Culver Boulevard, Culver City, California 90232 Charles D. Herbertson, P.E., LS Public Works Director and City Engineer Mate Gaspar, P.E. Engineering Services Manager (310) 253-5600 FAX (310) 253-5626
More informationADDENDUM NO. 1. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri Point to Point Fiber Connection
Issue Date: December 9, 2016 ADDENDUM NO. 1 Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri 64108 Project #16-7029-25 This Addendum is hereby made a part of
More informationAddendum No. 1 Invitation to Bid DOH Web-based Video Surveillance/Recording System (Four Buildings) Division of Disability Determinations
Rick Scott Governor John H. Armstrong, MD State Surgeon General Addendum No. 1 Invitation to Bid DOH12-033 Web-based Video Surveillance/Recording System (Four Buildings) Division of Disability Determinations
More informationE-Plex Enterprise Access Control System. (Version 3) with Wireless Option
Enterprise Access Control System (Version 3) with Wireless Option CityCenter Las Vegas, NV 2 Engineered for Flexibility Modular Solution The Enterprise Access Control System is a modular solution for managing
More informationCenteris Data Centers - Security Procedure. Revision Date: 2/28/2018 Effective Date: 2/28/2018. Site Information
Section 01 Document Information Creation Date: 12/1/2016 Centeris Data Centers - Security Procedure Revision Date: 2/28/2018 Effective Date: 2/28/2018 Section 02 Site Information Site Information Document
More informationAnswers to questions asked prior to the deadline of 5pm, November 14, 2018;
Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 November
More informationThis manual describes how to prepare a site for the CTL 9712 DPS 7000 Integrated Library Unit (ILU).
January 1997 7 Preface PURPOSE OF THIS MANUAL This manual describes how to prepare a site for the CTL 9712 DPS 7000 Integrated Library Unit (ILU). It gives the specific site requirements for the following
More informationSUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT
SUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT CAPACITY WITH OPTION TO SEGMENT CHANNELS FIBER CABLE TO UPGRADE CURRENT BUILDING NETWORK
More informationSCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS
1.0 PROJECT ADMINISTRATION SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS Project Administration services shall consist of project management and other support services for
More informationCore Network Switch RFP. Harrison School District Two 1060 Harrison Road Colorado Springs, CO
Core Network Switch RFP Harrison School District Two 1060 Harrison Road Colorado Springs, CO 80905 Email: rfp@hsd2.org Technology Supervisor: Mike Peterson Bids DUE DATE: March 15th, 2017 Table of Contents
More informationADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service
CITY OF CONCORD, CALIFORNIA March 13, 2013 ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service NOTICE TO PROPOSERS
More informationPIONEERS OF The Structured Cabling Systems
ems t s y gs F n O i l S b EER red Ca N O I P uctu r t S The w w w. n c c - k s a. n e t Network Code Company (Ncc) is one of the Well Known Establishments & Companies Under M/s AlMuhkam Contracting Group
More informationUsing Laser-Optimized Multimode Fiber for 1 and 10 Gigabit Campus Backbone Applications
Using Laser-Optimized Multimode Fiber for 1 and 10 Gigabit Campus Backbone Applications David Kozischek, Market Manager Enterprise Networks, Corning Optical Communications Systems engineers at Corning
More informationThis Special Provision refers to the following standards, specifications or publications:
OUTDOOR CLOSED CIRCUIT TELEVISION CAMERAS - Item No. Special Provision No. 684S01 September 2007 1. SCOPE This Special Provision covers the requirements for the installation and testing of CCTV camera
More informationEtherSeries. EtherSeries CR-2. CR-2-Opto. User s Guide. Revised October 7, 2013 Firmware Version 1.X
EtherSeries EtherSeries CR-2 & CR-2-Opto User s Guide Revised October 7, 2013 Firmware Version 1.X TABLE OF CONTENTS SECTION 1 - DESCRIPTION... 2 SECTION 2 - SPECIFICATIONS... 4 SECTION 3 - INSTALLATION...
More informationWhat is the total IP bandwidth being used from the core router handling the current network?
TECHNICAL CLARIFICATIONS FOR THE VSAT CONTRACT 2 ND BATCH What is the total IP bandwidth being used from the core router handling the current network? A) The table in section 3.2 provides the information.
More informationWinncom Video Solution
Winncom Video Solution Crafting the Future 2010 Security Industry Migration Market Size ($ million) Trend: systems become closer and closer to the Ethernet networking devices vs. analog or semi-analog
More information2. Will a new wireless router be issued when I sign up for the 2Gbps Fibre Home Bundle?
2Gbps Fibre Home Bundle Frequently Asked Questions 1. What is offered in the 2Gbps Fibre Home Bundle? The 2Gbps Fibre Home Bundle offers you a combined 2Gbps bandwidth on a single Fibre Broadband network
More informationvendors valid for this tender? Does this include relevant certifications as well?
ADDITIONAL CONSOLIDATED LIST OF CLARIFICATION RAISED AND RESPONSES- TENDER NO. ICTA/NCB/01/2017-2018 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF GOVERNMENT DATA CENTER UPGRADE S/NO. Requirement
More informationWiredScore Report. Tanfield. 1 Tanfield, Edinburgh, EH3 5DA. Audit Reported Points. Building Connectivity 37 / 45. Building Infrastructure 28 / 41
WiredScore Report Tanfield 1 Tanfield Edinburgh, EH3 5DA Building Location Building Profile Address: 1 Tanfield, Edinburgh, EH3 5DA Rentable Sqft(k): 191 Section Audit Reported Points Building Connectivity
More informationRice University Security Camera
RICE UNIVERSITY Rice University Security Camera Statement of Work (SOW) for IP Security Cameras 7-16-2017 1 Table of Contents Table of Contents... 2 Project Introduction / Overview... 3 Scope of Services...
More informationComputer Network Design Guide Existing Systems 1 / 6
COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should
More informationDEE JASPAR & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS 2730 UNICORN ROAD, BLDG A BAKERSFIELD, CA PHONE (661) FAX (661)
DEE JASPAR & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS 2730 UNICORN ROAD, BLDG A BAKERSFIELD, CA 93308 PHONE (661) 393-4796 FAX (661) 393-4799 ARVIN COMMUNITY SERVICES DISTRICT NOTICE TO PLANHOLDERS
More informationMINUTES OF PRE BID MEETING
MINUTES OF PRE BID MEETING Tender for Supply, Delivery, Installation & Commissioning of Computer & Computer Related Equipment for Department of Computer Science, Faculty of Science and Technology and Technology
More informationSmartCube 300W. Quick Installation Guide. Intelligent 3MP Wireless Cube IPCAM with Temperature and Humidity Sensor
Setup using Smartphone and router without WPS push button. Please check if your wireless router has "WPS Push Button" shown as an example in the picture below. If it doesn't, please use this guide. If
More informationJohnson City ITS Project Pre-Bid Meeting Minutes State Pin #
Speakers: 1. Anthony Todd City of Johnson City 2. Mark Washing Gresham Smith and Partners 3. Ed Turbyfill Gresham Smith and Partners Company name needs to be noted on sign-in sheet Anthony Todd Contractual
More informationBusiness Customer Demarcation Information
Business Customer Demarcation Information The intent of this document is to clearly define Communications terminology and deployment with reference to business data customers and services. 1. What is a
More informationCLIQ Remote - System description and requirements
CLIQ Remote - System description and requirements 1. Introduction CLIQ Remote - Access at a distance CLIQ Remote is an electromechanical lock system with an additional level of security and flexibility,
More informationSecurity Systems. Security Technologies Database RUTGERS PUBLIC SAFETY. November 16, 2007 Volume 1, Issue 1. Procedures for Database Utilization
Security Systems Security Technologies Database November 16, 2007 Volume 1, Issue 1 RUTGERS PUBLIC SAFETY Procedures for Database Utilization Table of Contents University Consumer Procedures... 1-9 Signing
More informationAnna Independent School District
Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology
More informationLevel 2 Control and security systems for the digital home technology integrator ( )
Level 2 Control and security systems for the digital home technology integrator (7575-005) www.cityandguilds.com December 2011 Version 1.0 Assignment guide for Candidates Assignment B About City & Guilds
More informationMERU WIRELESS NETWORK DESIGN SERVICE
MERU WIRELESS NETWORK DESIGN SERVICE INTRODUCTION. It is worth investing a little in the design phase to ensure that the Meru network infrastructure technical design meets or exceeds the specification
More informationINVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)
INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) BID SUBMITTAL DATE, TIME, & LOCATION: EMAIL QUESTIONS TO: December 8, 2017 @ 2:00 PM Mount Pleasant Waterworks Operations Center 1619
More informationTarget Interface / Construction Compliance Inspection Checklist
TES A. Roads-Service, Lanes Common Items Trails and service roads provide adequate access to buildings for maintenance B. Testing Results-provided to the local government construction representative Data
More informationRequest for Proposal
311 South East Street Telephone: (912) 729-5687 Kingsland, GA 31548 Fax: (912) 729-1489 Dr. William C. Hardin, Superintendent Request for Proposal Project: Camden County Schools (CCS) is accepting proposals
More informationADDENDUM NO. 02 INVITATION NUMBER:
ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT
More informationADDENDUM #1 RFP # , Districtwide Network Refresh Design
ADDENDUM #1 RFP #1718-03, Districtwide Network Refresh Design This Addendum forms a part of the Contract Documents and modifies the original Contract Documents. Acknowledge receipt of this Addendum in
More informationSeries 8000 RF Signal Switch Solution
RF Signal Switch Solution Operation Manual Operation Manual, Part Number 07508000-006, Rev. A, May 17, 2013 All technical data and specifications in this publication are subject to change without prior
More informationRequest for Proposal
January 30, 2015 Form 470 Application#: 898560001312602 BREITUNG TOWNSHIP SCHOOL DISTRICT 2000 Pyle Drive Kingsford, MI 49802 906-779-2650 WIFI in Classrooms Project NOTICE OF BIDDERS The Breitung Township
More informationPassive Optical Networking
Passive Optical Networking Greg Dawes Zhone Technologies Sr. Sales Engineer Fiber to the Room Workgroup Chair Fiber to the Room Workgroup Passive Optical Networking 101 Agenda What is Passive Optical Networking
More information