4 SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 75 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 28 th June, Introduction 2. Confirmation of Minutes of last PCSC meeting Confirmation of minutes of 74 th Protection Coordination Sub-Committee meeting held on Grid Occurrences 3.1 Grid Disturbances (GD), Grid Incidences (GI), and trippings due to failure of Autoreclosing (A/R), and mal-operation of PLCC equipment that occurred during the period May-June, 2018 given at Annexure-I would be discussed in the PCSC meeting. Constituents are requested to furnish the following information in respect of the above grid occurrences to have fruitful discussions. (a) Single line diagram of the station with switching devices, CT, PT and relay details. (b) Cause of the tripping & Remedial Action taken (c) Relay setting details Constituents are requested to bring/ furnish full particulars of the tripping events pertaining to their system. 3.2 In compliance of Regulations 5.2 (r) of IEGC, the Constituents are required to furnish the following information in respect of Grid Occurrences within 24 of occurrence of the same to SRLDC/ SRPC: (a) First Information Report (FIR) (b) Event Logger (EL) output (c) Disturbance Recorder (DR) output (d) Trip event analysis report (with pre and post fault system conditions) Non-furnishing of tripping details (FIR/DR/EL/TR) for the period had been brought to Constituents notice vide letters (i) No. SRPC/ SE-III/ PCSC/ 2018/ dated , (ii) No. SRPC/ SE-III/ PCSC/ 2018/ dated Non-compliance in this regard would be discussed in the meeting. 4. Submission of Reports/ Compliance by Constituents 4.1 Status of implementation of pending Protection Coordination Sub-Committee (PCSC) Recommendations The status of implementation of pending PCSC recommendations (up to 74 th PCSC meeting) is given at. The latest status on the same may please be sent latest by Agenda for the 75 th Meeting of PCSC scheduled to be held on 28 th June, 2018 Page 1

5 4.2 Remedial measures for "Transmission Elements under Forced Outage" The Constituents are requested to furnish the remedial measures/ action taken by them for the tripping events as circulated vide our s. (I) The tripping events are based on the daily reports at SRLDC website under the menu: Reports->Daily-> "TL under Forced Outage") 4.3 Certificate for Healthiness of Batteries As per the MoP direction given in pursuant to recommendations of the Enquiry Committee (NEW grid disturbance on 30 th & 31 st July, 2012), RPC s are required to obtain from their respective Constituents the monthly certificate for healthiness of batteries, installed at 220 KV and above voltage level Substations (for power supply to Relays, RTUs and PLCC equipment) and furnish the same to CEA/ MoP. With reference to above, the Constituents have been requested to submit the certificate on healthiness of batteries on monthly basis (i.e. status for a month shall be sent by the 7 th day of the following month) to SRPC Secretariat. The sought status for the months of May, 2018 is awaited from the following SR-Constituents: TSGENCO (Hydro & Thermal), KPTCL, TANGEDCO, Puducherry, NLCIL, UPCL & JSWEL 5. Revision of Special Protection Scheme (SPS) implemented at UPCL s plant at Udupi Based on the deliberations in PCSC-65, PCSC-66, PCSC-68 and PCSC-69 meetings, the SPS at UPCL s Udupi plant was modified as given below for implementation: Agenda for the 75 th Meeting of PCSC scheduled to be held on 28 th June, 2018 Page 2

6 However, UPCL vide their mails dated & has sought to incorporate few changes as mentioned below, and requested to approve the same: 2 x 600 MW Units of UPCL has outlets via two 400 kv lines to Hassan and two 220 kv lines to Kemar via two ICTs of 315 MVA each. Till recently, around 65% of the ex-bus generation at UPCL was off-loaded on 400 kv Network to Hassan, and the remaining 35% via 220 kv lines to Kemar. However, since March, 2018 it was observed that loading on 220 kv UPCL-Kemar lines had been substantially higher, bordering thermal ratings of the conductor since March, There had also been corresponding overloading of ICTs, operating sometimes very close to be rated MVA capacity of the transformers and beyond. With Loadings on 220kV lines to Kemar remaining high, possibility of complete isolation of 220 kv side of the UPCL switchyard remains high in case of tripping of one of the 220kV Lines. But since neither the generating units be subjected to frequent backing down actions, nor the power system equipment be subjected to conditions leading to potential failures, the existing SPS has been reviewed with respect to overloading of 220 kv lines. Accordingly, it is proposed to include Stage-2 for (i) ICT overloading from 400 kv side in Contingency-2 & Contingency-3, and (ii) Overloading of any 220 kv line in Contingency-4 as mentioned below: Agenda for the 75 th Meeting of PCSC scheduled to be held on 28 th June, 2018 Page 3

7 The above proposal of UPCL would be discussed in the meeting. UPCL, SRLDC, and SLDC (KPTCL) are requested to put forth their views. 6. Using Data Modification Notification System (DMNS) of PMS Project DMNS is a system primarily aimed at bridging the gap between Utility Users and Data Modeling Team (DMT). It enables Utility Users to communicate to DMT about any changes (additions/ modifications) in Network Elements (Buses/ Generators/ Generator Transformers/ Transmission lines/ Cables/ Inter-connecting Transformers/ Reactors/ Capacitors/ etc.) and/ or Protection Elements (Relays, CT s, PT s/ CVT s, Breakers, and Isolators, etc.), and ensures that requests raised are duly processed. A brief on using various features of DMNS will be illustrated. 7. Submission of PMS Data by the Utilities of Tamil Nadu & Kerala You are kindly aware that as part of PMS project data collection by physical field visits of the stations in Tamil Nadu, Puducherry, and Kerala has been undertaken by PRDC. Even though this process has been completed, all the data sought as per stipulated formats for modeling them in PMS has been pending from certain stations. As informed by PRDC, even though they have been religiously pursuing (for past few months) with the concerned Constituents/ Personnel to obtain pending data, the progress has not been on the expected lines. In this regard, the pending data details from the stations in Tamil Nadu and Kerala are enclosed at Annexure-IV for kind reference. It is requested from all concerned Nodal Officers of Utilities of Tamil Nadu & Kerala to take steps to ensure that the pending data are furnished to PRDC positively by Non-compliance in this regard would be discussed in the meeting. 8. Other Protection Issues, if any, with the permission of the Chair 9. Sending Agenda items for the PCSC meetings As per the Guidelines of CEA/MOP, it has been decided to conduct the PCSC meetings on monthly basis. It is requested that Agenda Items for the PCSC meetings, if any, may please be sent latest by 5 th working day of the month to SRPC Secretariat to compile and circulate the same so as to have fruitful discussions in the PCSC meetings. Agenda for the 75 th Meeting of PCSC scheduled to be held on 28 th June, 2018 Page 4

8 10. Date of next PCSC meeting It is informed that the 76 th meeting of PCSC will be held on 26 th July, 2018 (Thursday) from 10:30 onwards in the Conference Hall of SRPC Secretariat, Bengaluru. Further, in view of the time-bound nature of PMS project, it is also intimated that a review-meeting on submission of pending PMS Data to PRDC would be conducted with concerned Nodal Officers of the Utilities on 27 th July, 2018 (Friday) from 10:30 onwards in the Conference Hall of SRPC Secretariat, Bengaluru. ***** Agenda for the 75 th Meeting of PCSC scheduled to be held on 28 th June, 2018 Page 5

9 Grid Occurrences - 75 For all tripping events involving failure of substation equipment, Constituents are requested to kindly furnish the SLD or equivalent pictorial representation showing (i) Location of the fault, and (ii) Bus-bar arrangement/ Configuration of feeders and other connected equipment with proper CB positions (OPEN/ CLOSE) at the time of occurrence of the fault. I. Details of Grid Disturbances: Sl. No. Details of Event Date &Time Reason Remarks Category Complete outage of 220kv Kadra Station Complete outage of 400kV Kalikiri and 400kV RYTPP station Complete outage of 400kV Kalikiri and 400kV RYTPP station Complete outage of 220kV Villianur station Complete outage of 400 kv Uravakonda SS and 400kV Jammalamadugu SS of APTRANSCO 21:54 on :08 on :24 on :40 on :37 on Triggering incident was snapping of tower earth guard conductor above 220kV bus. Bus bar protection operated resulting in complete outage of 220kV Kadra station. 220kV Kadra station was on single bus operation. Triggering incident was R-N fault in 400kV RTPP- Kalikiri Ckt-1. Auto reclose(ar) was successful at Kalikiri end but didn t operate at RTPP end. This led to tripping of running unit at RYTPP due to tripping of evacuating line and complete outage of RYTPP. At the same time 400kV Chittoor-Kalikiri line 1&2 got tripped from Chittoor end on operation of Z3 (mal-operation) resulting in loss of supply to Kalikiri station. Triggering incident was R-N fault in 400kV RTPP- Kalikiri Ckt-1. Autoreclose(AR) was unsuccessful at Kalikiri end. This led to tripping of running unit at RYTPP due to tripping of evacuating line and complete outage of RYTPP. At the same time 400kV Chittoor-Kalikiri line 1&2 got tripped from Chittoor end on operation of Z3 (mal-operation) resulting in loss of supply to Kalikiri station. Triggering incident was failure of R- Phase CT of 230kV/ of ICT -2 at 230kV Villianur station. 230 kv Neyveli - Villanur and 230kV Pondy - Villianur lines tripped from Neyvelli end and Pondycherry end respectively.this led to loss of supply to 230kV Villianur station. 400kV Jammalamadugu UV Konda line- 1, Narnoor-2 and 400kV UV Konda Mahabubnagar line-1 got tripped on overvoltage protection. This led to the loss of supply to 400kV UV Konda and 400kV Jammalamadugu stations. Subsequently due to loss of 400kV evacuating lines, wind generators at Gen Loss: 318 MW Gen Loss: 293 MW Load Loss: 130 MW Gen Loss: 275 MW GD-1 GD-1 GD-1 GD-1 GD-1 Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

10 6 7 Complete outage of 230 kv Villianur SS of PED Complete outage of 400 kv Uravakonda SS of APTRANSCO 11:23 on :34 on kV level got tripped, resulting in the loss of supply to 400/220kV UV Konda and 400/ 220 kv Jammalamadugu stations Triggerring incident was the failure of R-ph breaker of Kalappet Villianur line got failed at Villianur end. Fault was cleared by tripping of the upstream feeders. 230kV NLC st-2 Villianur tripped at NLC end and 230kV Pondy Villianur line tripped at Pondy end on zone 3 distance operation, resulting in the loss of supply to 230kV Villinanur station. 400kV UV Konda- Jammalmadugu line- 1 and 400kV UV Konda Mahabubnagar line-1 tripped at due to over voltage protection operation. Since 400kV UV Konda Jammalmadugu line-2, Mahabubnagar 2 were in open condition, after the tripping of lines, 400/220kV ICT #1,2,3 and 4 at 400kV UV Konda were hand tripped due to loss of evacuating lines. Load Loss: 120 MW Gen Loss: 500 MW GD-1 GD-1 II. Details of Grid Incidents: Sl. No. Details of Event Date &Time Reason Category 1 2 Tripping of 400 kv Vijayawada Vemagiri line-1 Tripping of 400kV Hinduja-K.V.Kota line-2 01-May-2018 at 16:09 01-May-2018 at 10:12 Line tripped on operation of Over-voltage at Vijayawada and direct trip receive at Vemagiri. The voltages recorded in Vijayawada end DR kv, 249 kv, 243 kv. The Y-phase voltage was observed to be higher when compared to R & B phases. Line-2 tripped on direct trip receive at K.V.Kota end. At the same time there was an un-successful auto-reclose attempt in line due to persistent fault in B-phase. GI-2 GI-2 3 Tripping of 400/220kV ICT-4 at Uravakonda 03-May-2018 at 17:57 ICT-4 at Uravakonda tripped without any relay indication GI-2 4 Tripping of HVDC Talcher-Kolar Pole May-2018 at 19:34 Line fault occurred in HVDC Pole-1. Wave front and undervoltage protection end operated to Kolar end, initiating DC line fault recovery sequence. After three attempts pole-1 got tripped. Pole-2 went to ground return mode after the tripping of pole-1 Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

11 5 6 7 Tripping of 400 kv Kolar Tiruvelam line Multiple tripping at 400 kv Raichur-PG SS Tripping of 400 kv Nelamangala-Mysore line-1 03-May-2018 at 23:40 03-May-2018 at 18:03 04-May-2018 at 01:28 Line tripped on operation of over-voltage stg-1 protection at Kolar and direct trip was received at Tiruvelam. It Y phase voltage is 5kV higher when compared to to R & B phase at Kolar. 400 kv RTPS Raichur PG line-2 tripped due failure of LA in B-phase. 400 kv RTPS Raichur PG line-1 & 400 kv Raichur(PG) - Gooty line-1 tripped on operation of overvoltage. Suspected mal-operation of over Voltage Stage 2 at Nelamangala end and direct trip sent to Mysore end. At same time, Y-phase to earth fault had occurred in 400 kv Nelamangala-Hassan Line. GI-2 GI-2 GI-2 8 Tripping of 400/220 kv ICT-3 at Trichur 09-May-2018 at 22:26 ICT tripped on operation of REF protection. Along with ICT-3, 220KV Lower periyar- Madakathara line-1&2 also got tripped. GI Tripping of 400 kv BTPS-JSWEL Tripping of HVDC Talcher-Kolar Pole-1 11-May :32:00 16-May-2018 at 15:35 Over voltage stg-1 operated at BTPS and DT received at JSWEL. Voltage difference was observed between R, Y &B phases (R- 253kV, Y-233kV & B-234kV). Line fault occurred in HVDC Talcher-Kolar. Pole-1 got tripped at Talcher end and ESOF was sent to Kolar end. Pole-2 went to ground return mode after the tripping of pole-1 GI-2 11 Tripping of 400/230 kv ICT-2 at S.V.Chatram 20-May-2018 at 12:30 ICT-2, R-Ph. Unit Bucholz operated due to suspected oil surge during SLG faults in 230 kv NOKIA and 230KV SIPCOT lines. GI Tripping of HVDC TALCHER - KOLAR LINE 2 Multiple trippings at 400/ 220 kv Guttur sub-station Multiple trippings at 400/ 220 kv Madakathara substation of KSEB 26-May-2018 at 17: at 00: at 16:26 Talcher Kolar Pole -2 tripped on external protection trip operation at Talcher end. ESOF signal was received at Kolar end. Pole- 1 went to metallic return mode Triggering incident was failure of rigid bus of isolator of 220kV Guttur -Haveri line-1 at 220kV Guttur end. This resulted in bus fault and 220kV Bus bar protection operated resulting in the tripping of all elements connected to 220kV Guttur Bus kV Guttur was on single bus operation. 400/220 kv ICT-3 tripped on REF protection, 220kV Madakathara-Areakode, 220kV Madakathara-Shoranur tripped due to earthwire snapping. GI-1 GI-2 15 Tripping of 400kV JSWEL -BPS-2 29-May-2018 at 17:41 Line tripped at JSW end only on maloperation of SOTF protection in Main#2 distance protection relay. Line was in service from BPS end. GI-2 Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

12 16 Tripping of 400/220 kv ICT-1 at BTPS 29-May-2018 at 18:15 ICT got tripped on operation of backup over current protection (high set) during R-N fault in 220kV BTPS-Lingapur line. GI-2 17 Tripping of 400 kv Kurnool-Srisailam line 31-May-2018 at 01:41 Line tripped on operation of over-voltage stg-1 protection at Srisailam and direct trip was received at Narnoor. Voltage recorder in Srisailam end DR (R:254 kv, Y:247 kv, B:234 kv) GI Tripping of 400 kv Satenapalli-Srisailam line-2 Tripping of HVDC Talchce Kolar Pole-2 31-May-2018 at 16:41 31-May-2018 at 18:19 Line tripped at Srisailma end only and was holding from Satenapally end.. HVDC Talcher-Kolar Pole-2 tripped on fault. DC line fault recovery sequence was not successful. Pole-1 went to ground return mode after the tripping of pole-2 GI-2 III. Details of Trippings due to Failure or Non-operation of Auto-Reclose: Sl. No. Element Date & Time Reason 1 Tripping of 400kV VTPS- Satenapalli line-1 01-May-2018 at 15:40 Line tripped on R-phase to earth fault. Auto-reclose was successful at Satenapalli end and breakers got tripped at VTPS (R,Y, B pole trip) Tripping of 765kV Srikakulam-Angul line-2 Tripping of 400 kv Alamathy-Vallur line-2 Tripping of 400 kv Neyveli TS 2 (Exp.) Pugalur line Tripping 765kV Srikakulam Vemagiri line -1 Tripping of 400 kv Warangal- Boopalapalli line-2 Tripping of 765 KV Raichur - Kurnool line- 1 Tripping of 220kV Sedam-Tandur line-1 01-May-2018 at 06:36 01-May-2018 at 19:58 03-May-2018 at 05:49 03-May-2018 at 05:51 03-May :56:00 03-May-2018 at 17:17 06-May-2018 at 14:24 B-phase to earth fault occurred in line. Auto-reclose was successful at Srikakulam and breakers got tripped at Angul. Line was holding from Srikakulam end after auto-reclose. Line tripped on R-phase to earth fault. Auto-reclose did not operate at Alamathy end as Main-2 distance protection relay issued 3-phase trip. Direct trip was received at Vallur end. R-phase to earth fault occurred in line. Auto-reclose did not operate at Pugalur as direct trip was received from NLC end. At NLC end over-voltage stg-2 operation. Y-phase to earth fault occurred in line. Autoreclose was successful at Vemagiri end and breakers got tripped at Srikakulam end without A/r attempt. B-phase to earth fault occurred in line. Auto-reclose was successful at warangal. At Bhoopalapalli end A/R did not operate due to direct trip receive (observed in DR event log) B-phase to earth fault occurred in line. Auto-reclose was successful at Kurnool and A/R did not operate at Raichur. R-phase to earth fault occurred in line. Zone-1 indications at Tandur end. A/R not operated at Tandur end as Main-1 relay is unhealthy/ damaged in which Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

13 A/R function is enabled Tripping of 400 kv Kaiga - Guttur line-1 Tripping of 400 kv Narasapur Shankarapally line Tripping of 220 kv Regulapadu-Alipura line Tripping of 400 kv Gajuwaka-Vemagiri(PG) Tripping of 400 KV Kudgi(PG) -Kudgi(NTPC) line-4 Tripping of 400 kv Nelamangala-Hoody line-1 Tripping of 400 KV Uravakonda- Jamalamadugu line - 1 Tripping of 400kV Pavagada-Gooty line-2 17 Tripping of 400KV Hinduja-K.V.Kota line-1 18 Tripping of 220 kv Regulapadu-Alipura line Tripping of 400 KV Thiruvelam-Palavadi line-2 Tripping of 400 kv Kaiga-Guttur line-2 Tripping of 400 kv VTPS IV - Satenapalli line kv GAJWEL - SHANKARPALLY line-1 08-May-2018 at 17:54 09-May-2018 at 16:15 10-May-2018 at 17:55 11-May-2018 at 22:43 11-May-2018 at 16:08 18-May-2018 at 16:28 19-May-2018 at 18:57 21-May-2018 at 21:48 21-May-2018 at 10:28 21-May-2018 at 07:52 25-May-2018 at 18:35 27-May-2018 at 18:39 31-May-2018 at 16:41 31-May-2018 at 02:15 B-phase to earth fault occurred in line. Auto-reclose not operated at Kaiga end due to DT receipt. B-phase to earth fault occurred in line. Auto-reclose was successful at Shankarapalli and breakers tripped at Narsapur end R-phase to earth fault occurred in line. Auto-reclose was not attempted at Alipura end. At Regulapadu end, relay sensed the fault as Y-N fault. Y-phase to earth fault occurred in line. Over voltage stg-2 got operated at Vemagiri (PG) end during autoreclose dead time resulting in a 3 phase trip and direct trip sent to Gazuwaka. line tripped on Y-phase to earth fault. Auto-reclose did not operate at Kudgi (PG) due to direct trip receive Y-phase to earth fault occurred in line due to jumper snapping. Auto-reclose was not attempted as there was DT receive at Nelamangala from Hoody end Y-phase to earth fault occurred in line. Auto-reclose was not attempted at both ends. B-phase to earth fault occurred in line. Auto-reclose was successful at Pavagada and breakers at Gooty end got tripped. B-phase to earth fault occurred in line. Auto-reclose attempt was not-successful at HNPCL due to persistent fault. At K.V.Kota end a/r was not attempted Y-phase to earth fault occurred in line. Auto-reclose was not successful at regulapadu as fault was persistent. At Alipura end line tripped in zone-2. Y-N fault was sensed at Alipura and as B-N fault at Regulapadu. R-phase to earth fault occurred in line. Autoreclose was successful at Thiruvelam and did not operate at Palavadi. R-phase to earth fault occurred in line. Auto-reclose was successful at Guttur end. A/r not operated at Kaiga Line tripped on R-phase to earth fault. Auto-reclose did not operate at VTPS R-phase to earth fault occurred in line. Auto-reclose was successful at Shankarapally end. In Gajwel end A/R operated and again tripped on operation of Group A/ B relay. Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

14 IV. Details of Trippings due to PLCC mal-operation: Sl. No. Element Date & Time Reason Tripping of 400 kv Khammam Mamidapally- 2 Tripping of 400 kv Ramagundam-Gajwel line Tripping of 400 KV Kudgi(PG) -Kudgi(NTPC) line-4. Tripping of 400 KV KUDGI(PG) - KUDGI(NTPC) line KV KUDGI(PG) - KUDGI(NTPC) 4 Tripping of 400 kv Vemagiri-Simhadiri line- 2 Tripping of 400 kv NEYVELI TS 2- SALEM line-2 03-May :19 08-May :07 12-May-2018 at 21:33 22:37, 22:24 &17:12 on 13-May May-2018 at 16:03 17-May :15:00 22-May-2018 at 09:37 Line tripped on direct trip receive at both ends. Line tripped at Gajwel end & was holding from Ramagundam end. When N'Sagar line-2 tie Breaker was being hand tripped, Direct trip incremented for Gajwel Line in one channel which resulted in tripping of breakers at Gajwel. Line tripped at Kudgi(NTPC) end only and was in service from Kudgi(PG). Suspected PLCC maloperation. line tripped at Kudgi(PG) end on direct trip receive at 1712 and 22:24 from Kudgi(NTPC). At 22:37 line tripped at Kudgi(NTPC) end only. The tripping occurred due to suspected PLCC maloperation. Line tripped on DT receive from KUDGI, NTPC end. Suspected PLCC mal-operation. Vemagiri end breaker tripped on DT receive from Simahadri due to suspected mal-operation of Digital Protection coupler. Line was in charged condition from Simhadri end. line tripped at NLC end only on direct trip receive and was in in service from Salem. Suspected PLCC mal-operation. ***** Grid Occurrences to be discussed in the 75 th Meeting of PCSC scheduled to be held on 28 th June, /5

15 Status of Implementation of PCSC Recommendations as on (up to 74th Meeting) Meeting No / Index Details of Event Date & Time Reason PCSC Recommendations Utility responsible for Implementation Status of Implementation of PCSC Recommendations Remarks Multi-Utilities 34/I/6 400/220 kv ICT-1 & 2 at Munirabad As reported directional over current relay of ICT s operated due to snapping of line jumper in 220kV Lingapur line. 1. Bus bar protection shall be provided by asset owner ( i.e KPTCL). 2. Settings for main distance protection & Overcurrent protection shall be examined and reviewed. 3. Time synchronization of the Substation shall be ensured. KPTCL/ PGCIL (SR-I) KPTCL Mail dated : 1. KPTCL has taken action to provide bus bar protection to 220kV buses Over current relay Settings of ICTs to be reviewed by PGCIL KPTCL Mail dated : 1. Initial Tendering stage (with KPTCL) KPTCL Mail dated on : 1. Detailed estimate prepared for taking up the work. CEE, Transmission Zone, Gulbarga will take up necessary procurement and further execution with PGCIL (SR-I) PGCIL (SR-I) Mail dated : 2. Relay settings of all the stations in SRTS-1 were derived as per Ramakrishna Commettee recomendations and implemented" --- Completed. KPTCL Mail dated : 1) & 3). DPR is approved. Tender is to be called by CEE,TZ Kalaburgi KPTCL informed that Tenders for providing BBP would be called in Jan-Feb, 2018; Supply of the same is targeted by September, 2018; Erection & Commissioning is targeted by January, PGCIL (SR-I) informed that time-synchronization of 220 kv side is in place. --- Completed. 47/I/2 Complete outage of As per FIR submitted, CT damage observed in Chitoor- 1. APGENCO to furnish to PCSC forum (i) A3-size Single Line APGENCO/ APGENCO letter dated : Krishnapatnam TPS at 18:20 Diagram of SDSTPS, and (ii) the sequence of events with time PGCIL (SR-I) stamp showing the protection that opened Tie-CB (405) at SDSTPS. Main bay (404). Main breakers connected to bus-1 (401, 404, 407, 410) got tripped on operation of bus bar protection. Unit-1 tripped on operation of MFT. Unit-2 was not in service 2. APGENCO to review STUB/TEED protection in all dias at SDSTPS and ensure that they are configured for instantaneous operation. 3. APGENCO to properly configure the STATE of the tripping events so that they get recorded appropriately like TRIP/ OPERATED in their corresponding Event Loggers. 4. APGENCO to ensure time sync of all DR s and EL s at SDSTPS. 5. PGCIL (SR-I) to provide line differential protection for 400 kv NPS Nellore-PG lines 1 & 2. 1.SOE and SLD are attached. The DR of 405 CB is not generated during the incident. Now the problem is identified and rectified Completed 2.All the 3 lines i.e CHTR-2, MNBL-I & II tripped in zone protection. The fault was in Blind zone i.e P2 side of CT, where it was covered under Bus fault by the time fault moved on to P1 side when the fault comes under STUB/TEED zone after 330msec all the feeders expect CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the 405 TIE CB opens and clear the fault. As a remedial the STUB protection operation also checked and found OK Completed 3.The Time Sync was missed on the day and found there was problem with LAN Timer same was rectified. Now found OK Completed 4.Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post fault and STATE of events are corrected wherever found wrong/or misguiding during analysis completed. PGCIL-SR1 RVMD : 5. Procurement of differential protection for 400kV NPS-NLR D/C and 400kV RCR-RTPS-D/C is under tendering. PGCIL-SR1 RVMD : 5. The proposal for procurement of Line differential Protections for 400kV Raichur - RTPS-1 & 2 and 400kV Nellore - NPS - 1 & 2 lines has been approved and tender is under technical evaluation [with PGCIL (SR-I)] Page 1 of 44

16 evaluation PGCIL (SR-I) Mail dated : PGCIL: On LDP relays commissioned in place of Main-1 distance relay in 400kV NPS- Nellore line-2 & In line-1 installation of LDP relay is planned in Dec-2017/Jan PGCIL (SR-I) informed that LDP commissioning on both lines would be completed by February, In this regard, PCSC made it clear that the recommendation pertains to providing LDP as both Main-I & Main-II on both the lines, and asked PGCIL (SR-I) to ensure & comply with the same. 47/II/7 Tripping of 220 kv Kadra-Karwar at 220kV Kadra-Karwar lines-1&2 tripped 1. KPTCL/ KPCL to see the possibility of implementing Weak KPTCL/ KPCL/ KPTCL Mail recieved on : lines - 1&2 and 220kV Kaiga- 11:44 Infeed logic with Echo feature enabled by Under NPCIL (KGS) Kadra line Voltage (27) element on Kadra-Karwar lines 1 &2, and implement the same if feasible. on earth fault in B-phase in zone-2. Kaiga-Kadra line tripped at Kaiga end only on operation of directional eath fault protection. 2. NPCIL to time-coordinate Kaiga s DEFR settings with (i) Zone-2 settings at Kaiga, and (ii) primary protections of the lines emanating from Kadra and Kodasalli. 1. Availability of week end infeed with eco feature to be confirmed by SEE,RTC,Hubli ---. NPCIL (KGA) Mail recieved on : 2. The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga Kodasally lines were disabled. IDMT DEFR is retained. The 200 ms Definite time back up o/c element in both Kaiga Kadra and Kaiga Kodasally lines were disabled. IDMT is retained. --- Completed. [with KPTCL] 3. KPCL to ensure time-sync of EL s, and healthiness of the Fault Locators at Kadra. Status received vide KPCL mail dated & : 1. Since PT blasted (B phase) at Karwar end, resistive over reach occurred. hence Backup protecion operated at Kadra end (zone-2 not sensed) Completed 3.Newly commissioned micom P444 relay time synchronised with GPS Completed. KPTCL Mail dated : 1. Week end infeed logic will be enabled in the new numerical relays supplied to Karwar under R&U during retrofitting works KPTCL informed that since the line is a double circuit, there may not be need for implementing Weak Infeed logic with Echo feature at Karwar end. However, the same would be looked into w.r.t. the newly commissioned NR's at Karwar, and final action taken would be informed by March, /I/2 Complete outage of TPCIL power station at 06:02 Running units at Thermal Powertech power Station tripped due to tripping of 400kV Nellore pooling station (NPS)-TPCIL line and 400kV Nellore pooling station (NPS)- NCC line 1.PGCIL (SR-I) to furnish Action Taken Report on the findings of OEM on relay mal-operation at NPS end on 400 kv NPS NCC line to PCSC forum. 2. PGCIL (SR-I) to appropriately configure Station Event Logger at NPS to record events at msec interval. 3. PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination with TPCIL for 400 kv NPS TPCIL line. 4.PGCIL (SR-I), MEPL, SEL, TPCIL & NCC to take steps to provide line differential protection at their respective ends on all 400 kv lines (except Gooty line) emanating from Nellore Pooling Station, and furnish an action plan to implement the same. PGCIL (SR-I), MEPL, SEL, TPCIL, NCC PGCIL (SR-I) mail received on : 1. The firmware of REL670 is being upgraded Completed. 2. The recording of events in msec interval is being taken up with OEM. Henceforth, for analysis purpose, we will provide larm list which has msec time stamp Completed. 3. End to end testing of PLCC code transmision and tuning of channels carried out Completed. 4. Procurement of differential protection for 400kV NPS-NLR D/C and 400kV RCR-RTPS-D/C is under tendering. The legends modified in Event/alarm list. Provision of diff. relay for all short lines emanating from NPS is being taken up with our corporate PGCIL(SR-I) RVMD : 4. The proposal for procurement of Line differential Protections for 400kV Raichur - RTPS-1 & 2 and 400kV Nellore - NPS - 1 & 2 lines has been approved and tender is under technical evaluation --- Page 2 of 44

17 PGCIL (SR-I) Mail dated : 4. LDP relays procurement is under process. Procurement will be completed by Feb TPCIL has to give written confirmation for LDP relay procurement. For want of written confirmation from TPCIL, PGCIL approving authority has withheld the LDP proposal. 4. PGCIL (SR-I) informed that they are waiting for written confirmation from TPCIL to complete procurement of LDP relays. To this, PCSC forum asked TPCIL to submit written confirmation to PGCIL (SR-I) by PGCIL (SR-I) assured that with receipt of above confirmation from TPCIL by Dec, 2017, they would be able to complete the work by FEbruary, APTRANSCO informed that they would be able to implement LDP from their & APGENCO side by April, In this regard, PCSC forum made it clear that the recommendation is about providing LDP as both Main-I & Main-II relays on all stated lines in Nellore Complex, ans asked all stakeholders to ensure & comply with the same. Page 3 of 44

18 51/II/6 Tripping of 400kV Sattenapalli- Vijayawada line at 3:01 Line tripped due to operation of over voltage protection at Vijayawada end and Direct Trip was received at Sattenapalli end 1. PGCIL (SR-I), in co-ordination with APTRANSCO, to address the problem with CB at the earliest opportune time. 2. APTRANSCO to take steps to replace the faulty Event Logger at Vijayawada (Nunna) SS. PGCIL (SR-I)/ APTRANSCO PGCIL mail received on : Being pursued with APTRANSCO APTRANSCO mail dated on : AS maintenance being carrired out by PGCIL(SR-1), the required relay replacement (wiring/programming) may also be carried out by PGCIL(SR-1). PGCIL RVMD : 1. The CB problem has been attended by POWERGRID by using OEM M/s BHEL services & POWERGRID's O&M spares Completed. 2. Being pursued with APTRANSCO to replace the faulty Event Logger at Vijayawada (Nunna) SS APTRANSCO mail dated on & & : As maintenance being carrired out by PGCIL(SR-1), the required relay replacement (wiring/programming) may also be carried out by PGCIL(SR-1). APTRANSCO mail dated : May be coordinated with PGCIL APTRANSCO mail dated : PGCIL may be requested to take necessary action [with PGCIL (SR-I)] APTRANSCO mail dated : 2. EL procured and drawn. Configuration to be done by Alstorm company engineer. Will be configured in four weeks. --- PGCIL (SR-I) Mail dated : 2. APTRANSCO is to replace the faulty/outdated relays & POWERGRID has to maintain the relays after retrofitting. 2. APTRANSCO informed that the recommended works would be completed in one-month period. APTRANSCO Mail dated & As per the requirement of PGCIL.Event logger(bcu) with data base is configured and handed over to PGCIL/Nunna on 27 th dec 17.PGCIL is requested to take action for taking event logger (BCU) into service. 56/I/2 Complete outage of 220kV Sedam Substation of KPTCL at 15:27 220kV Sedam-Humnabad-2 tripped at Sedam on Distance protection, Zone-2. Sedam-RTPS-1 &2 lines tripped at RTPS end only. 220kV Tandoor inter-state line was hand tripped due to incoming supply failure KPTCL and TSTRANSCO to take steps to provide A/R feature on 220 kv Sedam Tandur inter-state line at their respective ends at the earliest. KPTCL/ TSTRANSCO KPTCL Mail dated : Carrier protection is to be restored. B/U OC and EF relay is to be replaced by M-II distance relay. Required materials like wave trap, M-II distance relay are already supplied. The work will be taken up on top priority through GE Ltd. --- [with KPTCL] TSTRANSCO informed that they have kept A/R in service from Tandur end. KPTCL informed that the works relating to put A/R in service are going on at their Sedam SS, and assured that it would be put into service by February, Page 4 of 44

19 56/II/13 Tripping at 220 kv Gooty Substation of APTRANSCO at 16:04 LBB protection got operated for 400/220kV ICT-2 breaker which had resulted in tripping of 220kV Bus-2 at 220kV Gooty Substation 1.APTRANSCO to check the healthiness of the connecting cable between Gooty (PGCIL) and Gooty (APTRANSCO), and replace it, if required. 2.APTRANSCO to ensure that the distributed architecture employed in implementing busbar protection at their Gooty 220 kv SS does not introduce any unwarranted delays in transmitting the triggering signals to the Central Unit. APTRANSCO/ PGCIL (SR-I) APTRANSCO mail dated on : [ with To avoid the unwanted malopeartions due to the external LBB trip initiation from PGCIL, Vide PGCIL (SR-I) ] letter Dt: , APTRANSCO has requsted the PGCIL to arrange the Master trip relay and breaker contacts of ICT-1 &2 LV side to enable the internal LBB feature in the Busbar protection scheme at 220kV Gooty Switching station. Waiting for the PGCIL response. APTRANSCO mail dated on : To avoid the unwanted maloperations due to the external LBB trip initiation from PGCIL, vide letter Dt: , ARTRANSCO has requested the PGCIL to arrange the Master trip relay and breaker contacts of ICT-1&2 LV side to enable the internal LBB feature in the Busbar protection scheme at 220kV Gooty Switching station. Waiting for the PGCIL response. APTRANSCO mail dated on : Waiting for the PGCIL response. APTRANSCO mail dated & SRPC is requested to coordinate with PGCIL in takind necessary action. APTRANSCO mail dated & PGCIL may be requested to take necessary action APTRANSCO maild ated : 1. Cable healthiness checked and found ok. But it is proposed to replace the cable with armored cable. --Completed 2. After replacing the cable contactors will be removed so as to avoid unwarrented delays in transmitting trigging signal to the central unit. --- APTRANSCO informed that replacement of the existing cable with armoured cable and subsequent removal of cable contactors would be completed by In this regard, PGCIL (SR-I) also assured that they would render all required help from their side to complete the stated works in time. APTRANSCO Mail Dated : New armoured cable is laid from 220 kv Gooty (AP) to 400/220 kv Gooty (PGCIL) for replacing the existing cable connected to ICT-2.PGCIL is requested to provide spare contacts from trip relays of 315 mva LV-1 and LV-2 for providing internal CB failure in busbar protection scheme. APTRANSCO Mail Dated & : As requested by PGCIL the busbar drawings Were submitted for providing spare contacts from trip relays of 315 mva LV-1 and LV-2 for providing LBB in busbar protection scheme. 56/III/4 Tripping of 220 kv Sedam-Tandur line at 21:52 Line tripped on B-phase to earth fault. Auto-reclose is not enabled for line. KPTCL and TSTRANSCO to fast-track providing A/R on 220 kv Sedam Tandur line, and furnish an action plan of providing the same by next PCSC meeting (PCSC-57). KPTCL/ TSTRANSCO KPTCL Mail dated : Carrier protection is to be restored. B/U OC and EF relay is to be replaced by M-II distance relay. Required materials like wave trap, M-II distance relay are already supplied. The work will be taken up on top priority through GE Ltd. (With KPTCL) TSTRANSCO informed that they have kept A/R in service from Tandur end. KPTCL informed that the works relating to put A/R in service are gonig on at their Sedam SS, and assured that it would be put into service by February, TSTRANSCO MAIL DATED : As discussed in the review meeting on , A/R is kept in service from Tandur(TSTRANSCO) end.--- TSTRANSCO MAIL DATED : Issue is not pending from TSTRANSCO side. Page 5 of 44

20 57/I/1 Complete outage of 220 kv Karwar Substation of KPTCL at 11:36 Triggering incident was failure of R phase PT in Bus-1 at 220kV Karwar substation. 220kV Kaiga-Kodasalli tripped during the incident. Also bus shut down occurred at Kadra and Kodasally stations. 1.NPCIL (KAPS) to disable DefiniteTime O/C relay, and put in its place by IDMT O/C relay for backup protection on both 220 kv Kaiga Kadra line and 220 kv Kaiga Kodasalli line at Kaiga end. 2.KPTCL to put bus bar protection in service at their 220 kv Karwar SS at the earliest. KPTCL/ KPCL/ NPCIL (KGS) NPCIL(KGS) mail dated on & : 1.The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga Kodasally lines were disabled. IDMT DEFR is retained. --- Completed [with KPCL & KPTCL] 3.KPCL/ KPTCL to implement Weak In-feed Logic with Echo feature enabled by Under Voltage (27) element on Kadra Karwar lines 1 & 2. 4.KPTCL to furnish equipment failure report of the current incident to PSE&TD Division of CEA with a copy marked to SRPC. KPTCL Mail dated : 2) Bus-bar protection panel is supplied under R&U. Replacement work will be taken up after priority Sub stations ] Weak end Infeed logic available in new relays supplied; Will be enabled During R&U works ] Equipement failure reports are being sent to CEA regularly. --- Completed 2. KPTCL informed that the works relating to providing BBP are targeted to be completed by March, KPTCL informed that since the line is a double circuit, there may not be need for implementing Weak Infeed logic with Echo feature at Karwar end. However, the same would be looked into w.r.t. the newly commissioned NR's at Karwar, and final action taken would be informed by March, /II/9 Tripping of 400 kv Nellore (PG) - NPS line-1, 400 kv Krishnapatnam-Nellore (AP) lines -1&2 and 400kV NPS - MEPL line at 19:05 Triggering incident was snapping of Y phase conductor in 400kV Nellore (PG) - NPS line-1. Distance relay at Krishnapatnam end over-reached in Zone-1, and resulted in tripping of 400kV Krishnapatnam Nellore (AP) lines - 1&2 from Krishnapatnam end. Distance relay at MEPL over-reached and resulted in tripping of MEPL-NPS line from MEPL end. PGCIL (SR-I), TPCIL, MEPL, SEL, SGPL, APTRANSCO, APGENCO and SDSTPS to implement line differential protection on all 400 kv transmission lines (of length less than 50 km) emanating from Nellore PS, Nellore (PG) SS, and Nellore (AP) SS. [It may be noted here that the cut-off length of 50 km has been specified with a view to exclude only long transmission lines]. APGENCO/ PGCIL(SR-I)/ TPCIL/MEPL/SEL/ SGPL/ APTRANSCO APTRANSCO mail dated on : Issue was addressed to the concerned for necessary action. APTRANSCO mail dated on : Meeting was conducted and the relays procurement for all the loctions is under progress. APTRANSCO mail dated on & : Relays procurement for all the locations is under progress. APTRANSCO Mail dated : Technical bids opened. PQ evaluation under progress. Price bids expected to open in next week. PGCIL (SR-I) Mail dated : LDP relays procurement is under process. Procurement will be completed by Feb TPCIL has to give written confirmation for LDP relay procurement. For want of written confirmation from TPCIL, PGCIL approving authority has withheld the LDP proposal. PGCIL (SR-I) informed that they are waiting for written confirmation from TPCIL to complete procurement of LDP relays. To this, PCSC forum asked TPCIL to submit written confirmation to PGCIL (SR-I) by PGCIL (SR-I) assured that with receipt of above confirmation from TPCIL by Dec, 2017, they would be able to complete the work by FEbruary, APTRANSCO informed that they would be able to implement LDP from their & APGENCO side by April, In this regard, PCSC forum made it clear that the recommendation is about providing LDP as both Main-I & Main-II relays on all stated lines in Nellore Complex, ans asked all stakeholders to ensure & comply with the same. APTRANSCO MAIL DATED Technical & financial bids are opened. Tenders will be awarded shortly. APTRANSCO Mail Dated : ABB make LDP relays inspection is completed. SNEIDER make LDP relays inspection yet to be completed. Delivery of relays expected in the 1st weak of May APTRANSCO Mail Dated : SNEIDER make LDP relays inspection yet to be completed.delivery of relays expected in the month of june Page 6 of 44

21 63/II/9 Tripping of 400 kv YTPS-BTPS line and 400 kv BTPS-JSWEL line at 19:11 R-phase to earth had occurred in 400kV BTPS-JSWEL line and protection issued a 3 phase trip 1. JSWEL to follow file naming terminology provided by SRPC for various tripping files uploaded in SRLDC s TMS portal. 2.JSWEL to furnish reasons for AR-BLOCK observed during the instant tripping and remedial action taken by them to keep A/R in service. 3. KPCL to configure DR & EL properly to record OVR Stage-I & Stage-II protections at their BTPS station. KPCL/ JSWEL Status received vide mail dated : 1. JSWEL will follow the file naming terminology provided by SRPC during future uploads Completed 2. Auto-reclosure is in service for JSW BTPS line. The reason for AR-Block was due to carrier fail signal which was after the fault clearance. As per the attached event list, the fault occurred at 7:11:21:550 PM & the AR block appeared around 7:11:21:586 PM, after the clearance of the fault at around 7:11:21:583 PM (3PH-TRIP) -----Completed with KPCL 3. KPCL informed that DR's & EL's had been configured for OVR (Stage-I & Stage-II) protections at their BTPS sttaion, and the exact date of completion of the same would be intimated soon. JSWEL Status received vide mail dated : 1. JSWEL will follow the file naming terminology provided by SRPC during future uploads. 2. Auto-reclosure is in service for JSW BTPS line. The reason for AR-Block was due to carrier fail signal which was after the fault clearance. As per the attached event list, the fault occurred at 7:11:21:550 PM & the AR block appeared around 7:11:21:586 PM, after the clearance of the fault at around 7:11:21:583 PM (3PH-TRIP) Page 7 of 44

22 64/I/1 Complete outage of North Chennai TPS STG at 21:02 Tripping of evacuating lines due to fault led to tripping of Units TANTRANSCO and PGCIL (SR-II) to take steps to complete insulator replacement works on the 400 kv lines owned by them in Chennai area within 3 months. TANTRANSCO/ PGCIL(SR-II) Status received vide TANTRANSCO mail dated & & & : 1. All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1&2 were replaced with Polymer insulators by Completed 2. Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer insulators in a phased manner. --- [with TANTRANSCO] PGCIL (SR-II) Mail dated : Pertaining to POWERGRID all the porceleing insulators in the polluted streches has been completed. - Completed. 64/I/2 Complete outage of North Chennai TPS STG at 18:27 Tripping of evacuating lines due to fault led to tripping of Unit TANTRANSCO informed that a total of 597 insulators ahd alreeady been replaced, and the total replacement would take another 9-month period. In this regard, TANTRANSCO was asked to furnish detailed plan of action regarding replacement of insulators on all 400 kv lines owned by them in Chennai area. 64/I/3 Complete outage of North Chennai TPS STG at 21:09 Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2 TANTRANSCO MAIL DATED : Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer insulators in a phased manner. Timeline: Sep Detailed plan of action will be submitted. TANTRANSCO MAIL DATED : Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer insulators in a phased manner. Timeline: Sep Detailed plan of action will be submitted. TANTRANSCO MAIL DATED : Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer insulators in a phased manner. Timeline: Sep Detailed plan of action will be submitted. Page 8 of 44

23 66/ II/ 8 Tripping of 400 kv Khammam KTPS lines 1 & at 18:32 Lines 1 & 2 tripped on B-phase to earth faults 1. TSGENCO to keep uniform A/R dead-time of 1 sec on the lines emanating from their KPTS station. 2. PGCIL (SR-I) to enable Trip-on-Reclose (TOR) functionality for Zone-2 faults for Khammam KTPS lines at Khammam end, if such a feature is available in the concerned relay, and to configure it for sending Direct Trip (DT) Command to KTPS end. 3. PGCIL (SR-I) to set right time-sync issues w.r.t. Khammam end Event Loggers on Khammam KTPS lines. 4. For 400 kv Khammam KTPS line-1, PGCIL (SR-I), in coordination with TSGENCO, shall carry out the following: (i) End-to-end communication for DT/ permissive & other signals may be ensured by testing at both the ends. (ii) Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components shall be repaired/ replaced. TSGENCO/ PGCIL (SR-I) with TSGENCO PGCIL (SR-I) Mail dated : 2). TOR feature in MiCOM P444 relay enabled for 400kV KMM-KTPS lines at Khammam end. DT send on TOR trip is not as per protection philosopy. However if SRPC/SRLDC gives separate instructions exclusively for this line, the same shall be imoplemented after getting our CC approval ). At Khammam SS all DR & ELs are time synched. --- Completed. 4). --- TSGENCO Mail dated : 1). If the auto reclose function dead time kept same at both ends as 1 sec uniformly. In case of persistent fault, it leads to feed the fault from both ends and cause the generator breaker switching on to high fault current and chances of pole slip. To avoid this time differentiated A/R scheme to be implemented. In KTPS 400KV Line I & II at KTPS end dead time is 1.2sec and at KMM end it is 1sec. In our relay 7SA522 does not have the adaptive dead time function A/R. Hence, it is requested to send DT in case of on 3-phase trip and A/R unsuccessful at KMM end to avoid reclose attempt from KTPS end after dead time (1.2Sec) for persistent faults. [with PGCIL (SR-I)] We communicated to M/s Siemens to upgrade the firmware version regarding adaptive dead time. Hence, it is requested to review these settings to reduce the stress on Generating Station --- Completed 2. It was made clear to PGCIL (SR-I) that this is a specific case of those 400 kv lines where one one of the ends is a generating station, and the other end is grid-connected substation having TOR feature in line protection relays. The said recommendation of enabling TOR along with sending DT to the other end is basically to ensure safety of Generating Units at the other end. Accordingly, PGCIL (SR-I) was asked to take steps to ensure the same PGCIL (SR-I) informed that shutdown was availed by TSGENCO on , and all issues relating to PLCC including end-to-end testing were carried out. --- Completed Page 9 of 44

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 72 nd Meeting of Protection Coordination Sub-Committee of SRPC to be held on 15 th March, 2018 1. Introduction 2. Confirmation of Minutes of last

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Additional Agenda for the 80 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 20-21 December, 2018 1. Grid Occurrences Additional Grid

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 69 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 23 rd November, 2017 1. Introduction 2. Confirmation of Minutes of

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 62 nd Meeting of Protection Coordination Sub-Committee of SRPC to be held on 15 th March, 2017 (Wednesday) 1. Introduction 2. Confirmation of

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 59 th Meeting of Protection Coordination Sub-Committee of SRPC to be held on 22 nd November, 2016 (Tuesday) 1. Introduction 2. Confirmation of

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Agenda for the 56 th Meeting of Protection Coordination Sub- Committee of SRPC to be held on 28 th July, 2016 (Thursday) 1. Introduction 2. Confirmation of Minutes

More information

पत स च / Address List

पत स च / Address List पत स च / Address List 1. म ख य अ भय त (एचप स व जल पKरय जन ) एप ज नक, ह दर ब द/ Chief Engineer (Generation I), APGENCO, Hyderabad 2. म ख य अ भय त (पKरय जन ), एप ज नक, ह दर ब द/ Chief Engineer (Projects),

More information

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on Minutes of the Special Meeting on URTDSM / SCADA / Communication held on 13.03.2018 1. Introduction A Special Meeting on URTDSM / SCADA / Communication was held on 13.03.2018 at SR-II, PGCIL, Bengaluru.

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services A Meeting to discuss disruption of power supply affecting BMRCL services

More information

पत स च / Address List

पत स च / Address List पत स च / Address List 1. म ख य अमभय त ( ए प स जऱ पररय जन ) एप ज नक, ह दर ब द / Chief Engineer (Generation I), APGENCO, Hyderabad 2. म ख य अमभय त (पररय जन ), एप ज नक, ह दर ब द/ Chief Engineer (Projects),

More information

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4(40 th )/PSPA-II/2016/ Date: 17-Nov-2016 Sub: 40th meeting of the Standing Committee on Power System Planning

More information

1. Project Description

1. Project Description Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal

More information

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016 (To be discussed along with Agenda for Follow up Meeting

More information

2. म ख य अभय त (परय जन ), एप ज नक, 4व म जल, ग णदल, #वजयव ड आ & / Chief Engineer (Projects),

2. म ख य अभय त (परय जन ), एप ज नक, 4व म जल, ग णदल, #वजयव ड आ & / Chief Engineer (Projects), पत स च / Address List 1. म ख य अभय त (एचप स व जल परय जन ) एप ज नक, 4व म जल, ग णदल, #वजयव ड आ & 520004/ Chief Engineer (Generation), APGENCO, 4 th Floor, Vidyut Soudha, Eluru Road, Gunadala, Vijayawada,

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Distribution List: Southern Region. 1. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003 3. Director (Transmission) Transmission Corp. of Andhra

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2009/ 529-538 Date: June 05, 2009 To 1.The Member Secretary, Southern

More information

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

Web site: Ph: Fax:

Web site:     Ph: Fax: भ रत सरक र क द र य व द य त प र व करण दव ण त र य व द य त सव वत ब गल र 550 065 - Website Government of India Central Electricity Authority Southern Regional Power Committee Bengaluru - 560 009 Web site:

More information

Substation Automation Products. Line differential protection RED670 Relion 670 series

Substation Automation Products. Line differential protection RED670 Relion 670 series Substation Automation Products Line differential protection RED670 Relion 670 series For maximum reliability of your power system The RED670 IED (Intelligent Electronic Device) is designed for protection,

More information

IMP/ 001 / 014 Policy for the Protection of Distribution Networks

IMP/ 001 / 014 Policy for the Protection of Distribution Networks Version:- 1.1 Date of Issue:- July 2016 Page 1 of 39 IMP/ 001 / 014 Policy for the Protection of Distribution Networks 1. Purpose The purpose of this document is to detail the network protection philosophy

More information

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4.

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4. Branch Procedure Document No. Issue No. : : CEOP8012 5 Approved By : Specialist Engineering NETWORK : Manager Approval Date Review Date : : 29/06/2018 29/06/2021 (Supersedes CEOP8012, Generation Connection:

More information

Busbar protection REB 670

Busbar protection REB 670 Gunnar Stranne Busbar protection REB 670 Rio de Janeiro April 23-25, 2006 ABB Power Technologies AB 2 3 4 REB 500 is enabled for use with IEC61850 communication Benefits of REB 670 outstanding features

More information

Use of frame agreement to standardize Protection in Digital Substation Automation Systems, Cooperation between Statnett and ABB

Use of frame agreement to standardize Protection in Digital Substation Automation Systems, Cooperation between Statnett and ABB Use of frame agreement to standardize Protection in Digital Substation Automation Systems, Cooperation between Statnett and ABB R. Loken*, R. Mangelrød*, M.M. Saha, A. Ling *Statnett, Norway, Rannveig.Loken@statnett.no,

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

Tamil Nadu: Current Power scenario and projects in pipeline

Tamil Nadu: Current Power scenario and projects in pipeline Tamil Nadu: Current Power scenario and projects in pipeline 1. Tamil Nadu per capita consumption is over 1000 Units, which is as against 11 th plan national target of 1000 units. Presently, the national

More information

Specification Voltage Limiting Device

Specification Voltage Limiting Device Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,

More information

Outage Management System Pilot Roll-out: Division User Manual

Outage Management System Pilot Roll-out: Division User Manual Outage Management System Pilot Roll-out: Division User Manual February 2017 Table of Contents 1. Outage Management System... 2 1.1. Overall Objective... 2 1.2. Outage Categories... 2 1.3. Division User

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected Generation (DCG)]

CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected Generation (DCG)] Project Name: Kitchener-Wilmot Hydro Inc. 301 Victoria Street South Kitchener, Ontario, Canada N2G 4L2 Appendix F2: Form DG06 CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected

More information

ELG4125: System Protection

ELG4125: System Protection ELG4125: System Protection System Protection Any power system is prone to 'faults', (also called short-circuits), which occur mostly as a result of insulation failure and sometimes due to external causes.

More information

Supplemental Information

Supplemental Information Retirement of NPCC Directory# 3 Supplemental Information On April 1, 2015, NPCC Directory# 3 was retired upon the effective date of PRC-005-2 Protection System Maintenance which is subject to a 12 year

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, integrity, and innovation. Our mission is to offer the safest,

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 102904-ICX-CMOS-E-2006 Electrical / I&C Engineer Holds a B. Sc. in Electronics & Electrical Communications Engineering and has over 9 years hands-on experience working in I&C field. Has extensive experience

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Substation Automation Products. Line distance protection REL670/650 Relion 670 and 650 series

Substation Automation Products. Line distance protection REL670/650 Relion 670 and 650 series Substation Automation Products Line distance protection REL670/650 Relion 670 and 650 series For maximum reliability of your power system REL670 and REL650 line distance protection IEDs (Intelligent Electronic

More information

Substation Automation Products. Bay control REC670/650 Relion 670 and 650 series

Substation Automation Products. Bay control REC670/650 Relion 670 and 650 series Substation Automation Products Bay control REC670/650 Relion 670 and 650 series For optimized control and reliable operation of your switchyard The REC670 and REC650 Bay control IEDs (Intelligent Electronic

More information

Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation

Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation 111 Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation Z. Gajić (ABB, Sweden) JP Wang / PW Gong / YS Xu (ABB China) ZX Zhou (CERPI, China) Summary Power utilities

More information

SIPROTEC 5 Application Note. Breaker-and-a-half solutions. SIP5-APN-002, Edition 2.

SIPROTEC 5 Application Note. Breaker-and-a-half solutions. SIP5-APN-002, Edition 2. -and-a-half solutions SIP5-APN-002, Edition 2 www.siemens.com/protection SIPROTEC 5 Application Note -and-a half solutions SIP5-APN-002, Edition 2 -and-a-half solution Content 1 -and-a-half solutions 3

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER Parsons Brinckerhoff Associates OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER A report prepared for 23 March 2007 Disclaimer Notice Report for

More information

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network.

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network. Landsnet-Icegrid Requirements for protection and control systems. Principles for the Icelandic power transmission network. Introduction.... 4 System requirements... 6 Validity:... 6 Requirements for protection:...

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

MiCOM P521. Fast Feeder Differential Protection

MiCOM P521. Fast Feeder Differential Protection 01 Fast Feeder Differential Protection The relay provides high-speed two-ended current differential unit protection of overhead lines and underground cables in applications such as ring mains and parallel

More information

Power Systems Communications Implementation of IEC61850 in a Substation Environment

Power Systems Communications Implementation of IEC61850 in a Substation Environment Power Systems Communications Implementation of IEC61850 in a Substation Environment 26 October 2009 Reference VEE4700-01 Revision 0 Document Control Document ID: DOCUMENT1 Rev No Date Revision Details

More information

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution

More information

Advanced Protection and Control Technologies for T&D Grid Modernization

Advanced Protection and Control Technologies for T&D Grid Modernization Advanced Protection and Control Technologies for T&D Grid Modernization i-pcgrid Workshop San Francisco, CA March 31, 2016 Jeff Shiles, Principal Manager Protection & Automation Engineering Southern California

More information

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION Exercise 2 Single Bus Scheme EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with electric power substations using the single bus scheme with bus section circuit breakers.

More information

Power Transmission Division Link between power generation and distribution

Power Transmission Division Link between power generation and distribution Power Transmission Division Link between power generation and distribution Seite 4 High Voltage Substations Schemes, Devices and Types of AIS Installation Content Link between power generation and distribution

More information

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power

More information

Overcurrent and Arc Protection by Reyrolle Alexander Erokhin. 21, 2017 I Berlin

Overcurrent and Arc Protection by Reyrolle Alexander Erokhin. 21, 2017 I Berlin Overcurrent and Arc Protection by Reyrolle Alexander Erokhin VAR Partner Day September 20-21, 21, 2017 I Berlin Reyrolle Product Range by SIEMENS Challenges We Meet for our Customers Easy-to-use protection

More information

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB 80 CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB 4.1 INTRODUCTION The preliminary study conducted to evaluate the potential due to the application of SVC and STATCOM on the

More information

Substation Automation Products. High impedance differential busbar protection REB650 Relion 650 series

Substation Automation Products. High impedance differential busbar protection REB650 Relion 650 series Substation Automation Products High impedance differential busbar protection REB650 Relion 650 series One IED for a wide range of high impedance differential protection applications ABB introduces a new,

More information

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project ) Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project 2007-17.2) Please DO NOT use this form for submitting comments. Please use the electronic

More information

Bus Protection Application Challenges

Bus Protection Application Challenges Bus Protection Application Challenges KN Dinesh Babu - Megger JC Theron, Lubomir Sevov GE Grid Solutions 2017 Texas A&M Protective Relay Conference Content Introduction Application Challenges Increase

More information

PRC Coordination of Protection Systems for Performance During Faults

PRC Coordination of Protection Systems for Performance During Faults PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To

More information

Using the Bitronics 70 Series to Improve Local Monitoring and Control

Using the Bitronics 70 Series to Improve Local Monitoring and Control Automate a Substation and Preserve the Electromechanical Relay Investment Part Two of Four Using the Bitronics 70 Series to Improve Local Monitoring and Control Paul Grabowski - Bitronics Senior Application

More information

IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems

IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems Alexandre Oudalov, ABB Switzerland Ltd., Corporate Research, 2014-04-30 Microgrid Protection IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems Microgrid Protection

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification

More information

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field DTRV-EP COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS Application field The DTRV type of complex transformer protection is designed to protect 120 kv / medium voltage transformers,

More information

MiCOM P521. Fast feeder differential protection

MiCOM P521. Fast feeder differential protection 01 Fast feeder differential protection The relay provides high-speed two-ended current differential unit protection of overhead lines and underground cables in applications such as ring mains and parallel

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines Authors: Dr. Brett Watson, Siemens Ltd., PO Box 4833, Loganholme, QLD 4129, Australia

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS Armando Guzmán Schweitzer Engineering Laboratories, Inc. Pullman, WA 99163 A reliable power system maintains frequency and voltage

More information

p. 1 p. 9 p. 26 p. 56 p. 62 p. 68

p. 1 p. 9 p. 26 p. 56 p. 62 p. 68 The Challenges and Opportunities Faced by Utilities using Modern Protection and Control Systems - Paper Unavailable Trends in Protection and Substation Automation Systems and Feed-backs from CIGRE Activities

More information

HV SUBSTATION PROJECT

HV SUBSTATION PROJECT Network & Substations HV SUBSTATION PROJECT Speaker : SIMON BATTANI & NICOLAS CHIDIAC Company : MATELEC 1 CONFERENCE OUTLINE - ENGINEERING & CONTRACTING DIVISION HISTORY. - ACTIVITIES PROCESS: MANAGEMENT

More information

Overvoltage Protection Devices

Overvoltage Protection Devices Siemens AG 2010 Overvoltage Protection Devices /2 Introduction /3 Lightning Arresters, Type 1 /5 Combination Surge Arresters, Type 1 and Type 2 /7 Surge Arresters, Type 2 /11 Surge Arresters, Type 3 /12

More information

Critical Cyber Asset Identification Security Management Controls

Critical Cyber Asset Identification Security Management Controls Implementation Plan Purpose On January 18, 2008, FERC (or Commission ) issued Order. 706 that approved Version 1 of the Critical Infrastructure Protection Reliability Standards, CIP-002-1 through CIP-009-1.

More information

Transmission Infrastructure Investment & Development in Vietnam

Transmission Infrastructure Investment & Development in Vietnam Transmission Infrastructure Investment & Development in Vietnam Presented by: Mr. Cao Duc Dung Expert of Technical Department National Power Transmission Corporation (NPT) 28 September, 2011 1 CONTENTS

More information

MiCOM P521. Fast Feeder Differential Protection. Protection Relays. MiCOM P521 CUSTOMER BENEFITS

MiCOM P521. Fast Feeder Differential Protection. Protection Relays. MiCOM P521 CUSTOMER BENEFITS MiCOM 01 MiCOM Fast Feeder Differential Protection The MiCOM relay provides high-speed two-ended current differential unit protection of overhead lines and underground cables in applications such as ring

More information

MiCOM P124 T&D. Self and Dual Powered Overcurrent Relays

MiCOM P124 T&D. Self and Dual Powered Overcurrent Relays PROTECTION MiCOM P124 Self and Dual Powered Overcurrent Relays MiCOM P124 are numerical relays designed to offer complete overcurrent protection without requiring any external auxiliary supply. They can

More information

Sapphire Wind Farm 330/33kV Substation

Sapphire Wind Farm 330/33kV Substation Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire

More information

DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field

DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION The digital galvanic longitudinal differential protection of type DGSZV-EP is part of device family named EuroProt. This short description

More information

ADVANCED. Protection Co-ordination. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

ADVANCED. Protection Co-ordination. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E ADVANCED Protection Co-ordination H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Distribution Networks are designed to serve loads in a

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Equipment Strategy For High Voltage Circuit Breakers

Equipment Strategy For High Voltage Circuit Breakers Current version: 23/05/2018 EXTERNAL USE Page 1 of 7 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References... 3 1.4 Defined terms... 3 1.5 Monitoring and compliance... 3

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

ABB Data Center Forum 2017

ABB Data Center Forum 2017 ABB DATA CENTER FORUM 2017, 11 TH JULY 2017 ABB Data Center Forum 2017 Perfecting Data Center availability with Ultra-Fast Protection Devices Barbara Schlegel ABB DATA CENTER FORUM 2017, 11 TH JULY 2017

More information

MiCOM P122C Time-Overcurrent Protection

MiCOM P122C Time-Overcurrent Protection Protection Relays 01 MiCOM P122C Time-Overcurrent Protection Customer Benefits 1A/5A software setting 4 function keys Compact unit for flush and wall-surface mounting Comprehensive measurements Disturbance

More information

HVDC in CSG Challenges and Solutions

HVDC in CSG Challenges and Solutions HVDC in CSG Challenges and Solutions LI, Licheng lilc@csg.cn LI, Peng lipeng@csg.cn China Southern Power Grid Co., Ltd June 2013 1 Outline I. Overview of CSG II. Overview of HVDC&UHVDC in CSG III. Challenges

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are

More information

Standard CIP-006-4c Cyber Security Physical Security

Standard CIP-006-4c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security

More information

Products Portfolio. Pole mounted Vacuum Recloser

Products Portfolio. Pole mounted Vacuum Recloser Products Portfolio Pole mounted Vacuum Recloser Efacec Switchgear Efacec Switchgear is a leading company in Portugal and a worldwide reference in the development of solutions for power generation, transmission,

More information

Issued February DATA SHEET 5SX2 MCB. Based on Siemens Industrial Control Catalog

Issued February DATA SHEET 5SX2 MCB. Based on Siemens Industrial Control Catalog Issued February 2011 DATA SHEET 5SX2 MCB Based on Siemens Industrial Control Catalog General Data Trip characteristics Tripping characteristics acc. to EN 60 898 Tripping characteristic A, -5 Type A characteristic

More information

It is the job of the protection system equipment to recognize and remove the fault.

It is the job of the protection system equipment to recognize and remove the fault. Protection 1 (read section 13.0 of text) 1.0 Introduction Faults do not occur that frequently 1/year/100 miles of transmission is typical. Distribution systems may see more than this. However, when they

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

ABB Surge Arresters Contribution to Power Quality Line Side Protection

ABB Surge Arresters Contribution to Power Quality Line Side Protection James Taylor, Technology Support Manager / Principal Specialist May 2013 ABB Surge Arresters Contribution to Power Quality Line Side Protection May 6, 2013 Slide 1 Availability of electric power supply

More information

MV Network Switchgear, Protection and Control

MV Network Switchgear, Protection and Control MV Network Switchgear, Protection and Control Ravinder Negi Manager, Services Execution INDIA Schneider Electric, New Delhi. Agenda An Overview MV Network Basic Definitions Circuit breaker Switchgear Control

More information

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Kuwait - November 2011 GCC Cigre, is pleased to announce its 7 th International Conference GCC

More information

Date of Publication: THREE PHASE LINE FAULT DETECTION ON DISTRIBUTION LINES USING GSM TECHNIQUE

Date of Publication: THREE PHASE LINE FAULT DETECTION ON DISTRIBUTION LINES USING GSM TECHNIQUE International Journal of Emerging Technology and Innovative Volume 2, Issue 3, March 2016 (ISSN: 2394 6598) Date of Publication: 29.03.2016 THREE PHASE LINE FAULT DETECTION ON DISTRIBUTION LINES USING

More information

Grid Automation Controller COM600 How it fits into the Smart Grid?

Grid Automation Controller COM600 How it fits into the Smart Grid? ABB Oy Distribution Automation Grid Automation Controller How it fits into the Smart Grid? May 27, 2014 Slide 1 1MRS756763 E Content Technical Presentation May 27, 2014 Slide 2 Description Grid Automation

More information

Information Document PRC-001-AB3-1.1(ii) Protection System Coordination ID # RS

Information Document PRC-001-AB3-1.1(ii) Protection System Coordination ID # RS Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document