1 A subsidiary of Pinnacle West Capital Corporation XXXXX XXXX Wind Generation Project XXXX XXXXX XXXXXXX Co., Inc. Interconnection System Impact Study Final Report Prepared By Arizona Public Service Company Transmission Planning January, Prepared by Jason Spitzkoff Jonathan Stahlhut

2 Final Report Interconnection System Impact Study Interconnection Project Q Table of Contents. Executive Summary.... Study Assumptions.... Power Flow Cases.... Study Methodology..... Power Flow Analysis Voltage Flicker Analysis..... Transient Stability Analysis.... Study Results..... Power Flow Voltage Flicker..... Transient Stability..... Mitigation.... Cost and Construction Schedule Estimates.... Siting Discussion For informational purposes only... Appendix A - Contingency List Appendix B - Power Flow Results Appendix C - Power Flow Plots Appendix D Voltage Flicker Results Appendix E - Transient Stability Switching Sequences Appendix F - Transient Stability Modeling Appendix G - Transient Stability Analysis Results Appendix H - Transient Stability Plots Page of

3 Final Report Interconnection System Impact Study Interconnection Project Q. Executive Summary XXXX XXXXXXX XXXXXXX Co. Inc. (Customer) plans to interconnect a wind generation project, the XXXX XXXX Wind Generation Project (Project Q), to the Adams Tap-Mural kv line with expected commercial operation in December. An Interconnection Feasibility Study (IFeS) was performed for Project Q. The project has requested Energy Resource (ER) Interconnection Service. Project Q is MW net of wind generation located approximately miles north of the Mural substation in Cochise County, Arizona near the town of Bisbee, Arizona. Project Q is expected to start achieving commercial operation around December, however desire interconnection facilities to be completed by October. In accordance with Federal Energy Regulatory Commission (FERC) Large Generator Interconnection Procedures (LGIP), APS performed an Interconnection System Impact Study (ISIS). The ISIS determined the following:. Preliminary identification of any thermal overload, voltage limits violations or transient stability violations resulting from the interconnection of the project.. Preliminary identification of any circuit breaker short circuit capability limits exceeded as a result of the interconnection of clustered projects.. Preliminary list of facilities, a non-binding good faith estimate of cost responsibility and a non-binding good faith estimated time to construct facilities necessary to interconnect the projects in the cluster. The power flow results concluded that the addition of MW of generation in the Bisbee area caused thermal overloads on one () facility for selected National Electric Reliability Corporation (NERC)/Western Electricity Coordinating Council (WECC) Category B contingencies. The results of the voltage flicker analysis performed in the power flow study concluded that the potential voltage swings that a wind farm could cause would not create any bus voltage swings outside of APS s criteria. APS determined that a short circuit study would not be required for this project. The APS Technical Projects and Protection, Metering, and Automated Control departments concluded that the characteristics of the wind turbines proposed to be utilized for this project would not add any significant fault current to the system. The transient stability analysis concluded that the WECC transmission system remained stable for all contingency simulations and there were no NERC/WECC criteria violations in the APS or WECC transmission system. For the loss of Western s Apache - Pantano kv line Project Q becomes islanded with the APS load served out of the Mural substation. Project Q will also be islanded with the APS Page of

4 Final Report Interconnection System Impact Study Interconnection Project Q load served out of the Mural substation for the loss of the APS kv line from the Point of Interconnection (POI) to Adams Tap. The project will be required to trip-off for either of those outages. Table shows the upgrade requirements for MW injection levels in the Adams Tap-Mural kv line based on the power flow and transient stability results. This approach shows what upgrades would be required for a given MW injection and simultaneously shows the maximum net generation output allowed for each mitigation component. Table : Upgrade Requirements for MW Injection Levels MW injection into POI kv bus Upgrade Requirements < MW None MW - MW Raise two spans on the Adams Tap-Mural kv line and replace a CT at Adams Tap Disclaimer Nothing in this report constitutes an offer of transmission service or confers upon the Interconnection Customer, any right to receive transmission service. APS and other interconnected utilities may not have the Available Transmission Capacity to support the interconnection described in this report.. Study Assumptions The following general assumptions were used for this study:. Project Q a. Consists of. mw C- Platform Liberty Turbines with a maximum total net output of MW b. Modeled in the power flow case as four MW equivalent generators held at unity power factor c. Interconnected to the Adams Tap Mural kv line through a mile kv line terminating at a three breaker ring bus at the POI. Regional transmission and sub-transmission projects and proposed generation projects that will be operational by were modeled in the power flow cases Figure shows a high level single line diagram of the Q project and the transmission system in the vicinity. Page of

5 Final Report Interconnection System Impact Study Interconnection Project Q Figure : Single Line Diagram Project Q and Vicinity Pantano Adams Tap Apache Western kv Line Point of Interconnection (POI) Sub Boothill Tap Boothill Project Q MW Mural. Power Flow Cases Two () pre-project power flow cases were developed using available Western Electricity Coordinating Council (WECC) base cases.. Heavy Summer Arizona Regional Pre-Project Power Flow Case. Heavy Summer Bulk System Pre-Project Power Flow Case Both cases were derived from the WECC Heavy Summer (hsb) power flow cases dated January,. The Arizona regional power flow case (sm#.sav) includes updated and detailed modeling of the Arizona transmission and sub-transmission system (reviewed and updated by AZ utilities through CATS-EHV) and was used for power flow studies. The bulk system case (hsb_q.sav) includes updated modeling of the Arizona bulk transmission system and the kv sub-transmission system around Bisbee that is served from Mural kv substation. This case was used for transient stability studies. Two () post-project cases were developed from the pre-project cases:. Heavy Summer Arizona Regional Post-Project Power Flow Case with MW modeled at the interconnection point in the Adams Tap Mural kv line. Heavy Summer Bulk System Post-Project Power Flow Case with MW modeled at the interconnection point in the Adams Tap Mural kv line Gila River generation was reduced by MW to balance Arizona resources due to the addition of the proposed project in the post-project power flow cases. Page of

6 Final Report Interconnection System Impact Study Interconnection Project Q. Study Methodology This ISIS consists of power flow and transient stability studies in order to identify a preliminary list of facilities, a non-binding good faith estimate of cost responsibility and a non-binding good faith estimated time to construct facilities necessary to interconnect the projects in the cluster... Power Flow Analysis For normal conditions, automatic transformer taps, SVD s and phase-shifting transformers (PST) were allowed to adjust in solving the power flow cases. For contingency simulations, the power flow analysis considers a snapshot in time where automatic transformer taps and SVD s are allowed to adjust; in addition, a system swing bus balances the system during each contingency scenario. Power flow analysis was performed using the NERC/WECC planning standards. Power flow analysis was used to evaluate thermal and voltage performance of the transmission system for NERC/WECC Category A normal (all elements in-service) conditions and NERC/WECC Category B emergency (one element out of service) conditions. Category A (N-) normal overloads are those that exceed % of normal ratings that occur with all facilities in service. Category B emergency overloads are those that exceed % of emergency ratings that occur due to a Category B contingency. Reported normal thermal loading was limited to the condition where a modeled transmission component was loaded above % of the normal MVA rating (Rating as entered in the power flow case), and the incremental increase in component loading, between pre-project and postproject, exceeded %. Reported emergency thermal loading was limited to the condition where a modeled transmission component was loaded over % of its appropriate emergency MVA rating (Rating as entered in the power flow case), and the incremental increase in component loading, between pre-project and post-project, exceeded %. Reported normal voltage violations were limited to the conditions where per unit (pu) voltages were less than. or greater than.. Reported emergency voltage violations were limited to the conditions where per unit voltages were less than. or greater than.. In addition, only voltage deviations greater than % between the pre and post-contingency and a % increase in voltage deviation between the pre and post-project power flow cases were recorded.... Voltage Flicker Analysis Voltage Flicker analysis is performed by APS for Wind Farm Interconnections. It consists of modeling the wind farm at full output, at % output, at % output, at % output, and at % output. The voltages of all of the buses in the area of the interconnection are then compared across those output ranges and the deviations are calculated. This is an attempt to determine the effect to voltages on the system due to the potential variability of the output of a wind farm. To minimize the impact of wind farm output variations on the customers in the area, a wind farm should not cause a voltage deviation of greater than % on any kv bus. Page of

7 Final Report Interconnection System Impact Study Interconnection Project Q.. Transient Stability Analysis Transient stability analysis is a time-based simulation that assesses the performance of the power system during (and shortly following) a contingency. Transient stability studies were performed to ensure system stability following critical faults on the system. The system is considered stable if the following conditions are met:. All machines in the WECC interconnected system must remain in synchronism as demonstrated by relative rotor angles.. System stability is evaluated based on the damping of the relative rotor angles and the damping of the voltage magnitude swings. a. A stability simulation will be deemed to exhibit positive damping if a line defined by the peaks of the machine relative rotor angle swing curves tends to intersect a second line connecting the valleys of the curves with the passing of time. b. Corresponding lines on bus voltage swing curves will likewise tend to intersect.. Transient voltage dips and duration requirements must meet the criteria of the WECC/NERC Planning Standards.. Study Results.. Power Flow Power flow analysis was performed on the Arizona regional pre-project and post-project cases. The results were compared to determine the impacts caused solely by the addition of the Project and to identify the system reinforcements necessary to mitigate the adverse impacts. Approximately contingencies were applied to the previously described pre- and post-project cases, and the results were compared. Simulated outages were predominantly (though not explicitly limited to) N- outages of transmission lines, transformers or generators connected at voltages kv in Arizona, Area as defined in the power flow cases, located in the electrical vicinity of the Project. A complete listing of all contingencies studied is included in Appendix A. This project does not cause any Category A normal overloads and there was one () facility that has Category B post-project overloads caused by the interconnection of MW of generation in the Adams Tap Mural kv line. Table shows a summary of the Category B overloads. However, there are two outages that require the Project to trip off-line. An outage of the POI Adams Tap kv line or the Apache Pantano kv line would leave the Project islanded with the APS load served in the Bisbee/Tombstone area through the Adams Tap kv line. For those two outages the Project will be required to trip off-line so as to avoid being islanded with a load pocket. There are no breakers at Adams Tap. Western s kv line would trip at the Apache and Pantano ends, therefore islanding the Adams Tap- Mural kv line. Page of

8 Final Report Interconnection System Impact Study Interconnection Project Q Table : Category B Overloads for MW Generation in the Adams Tap - Mural kv line Pre-Project Post-Project Overloaded Element Contingency Description Rating Loading Loading Adams Tap.-POI. POI-Mural kv Line A % % Adams Tap.-POI. POI-Mural kv Line & drop MW A N/A % Adams Tap.-POI. Mural / kv Transformer A % % Adams Tap.-POI. Mural / kv Transformer & drop MW A N/A % Adams Tap.-POI. Mural-San Pedro Tap kv Line A % % Adams Tap.-POI. Mural-San Pedro Tap kv Line & drop MW A N/A % Adams Tap.-POI. San Pedro Tap-Fairview kv Line A % % Adams Tap.-POI. San Pedro Tap-Fairview kv Line & drop MW A N/A % As Table shows, whenever the load served through the Mural / kv transformer drops below MW the Adams Tap-POI kv line will load above its A ( MVA) rating. The values showing the amount of generation that needs to be dropped, in Table., are based upon the loads that are in the study case. In general, the amount of generation injected at the POI cannot exceed MW plus the flow through the Mural / kv transformer. Complete listings of all power flow results and power flow plots are included in Appendix B and Appendix C. All power flow analysis was conducted with version._ of General Electric s PSLF/PSDS/SCSC software.... Voltage Flicker Voltage flicker analysis was performed on the Arizona regional post-project case with the output of Project varied from % to %. The results were compared to determine the impacts caused by the variation of the output of the Project and to identify the system reinforcements necessary to mitigate the adverse impacts. The Project output was studied at % of maximum output ( MW), % output, % output, % output, and % output. Comparing the bus voltages across those output level did not produce any voltage variations beyond APS s criteria. Therefore, there are no system reinforcements that are necessary to mitigate for any adverse impacts. A complete listing of all voltage flicker results is included in Appendix D... Transient Stability Transient stability analysis was performed on the bulk system pre-project and post-project cases. The results were compared to determine the impacts caused solely by the addition of the Project and to identify the system reinforcements, if any, necessary to mitigate the adverse impacts. In the pre-project case the outage would be Adams Tap-Mural, but the outage was taken in the pre-project case for comparison purposes. For this outage in the pre-project, the only load served is at Boothill Tap. Page of

9 Final Report Interconnection System Impact Study Interconnection Project Q Transient stability simulations, with four () cycle clearing, included:. Three-phase fault on Adams- Apache kv line, near Adams. Three-phase fault on Adams- Apache kv line, near Apache. Three-phase fault on Adams- Nogales kv line, near Adams. Three-phase fault on Adams- Nogales kv line, near Nogales. Three-phase fault on Copper Ridge - Mural kv line, near Copper Ridge. Three-phase fault on Copper Ridge - Mural kv line, near Mural. Three-phase fault on Don Luis - Mural kv line, near Don Luis. Three-phase fault on Don Luis - Mural kv line, near Mural. Three-phase fault on Don Luis Palomnas kv line, near Don Luis. Three-phase fault on Don Luis Palomnas kv line, near Palomnas. Three-phase fault on Fairview San Pedro kv line, near Fairview. Three-phase fault on Fairview San Pedro kv line, near San Pedro. Three-phase fault on San Pedro - Mural kv line, near Mural. Three-phase fault on San Pedro - Mural kv line, near San Pedro Switching sequences for the transient stability simulations are included in Appendix E. The duration of each stability simulation run was ten seconds. The transient performance analysis started - cycles after fault clearing and concluded at the end of the simulation. Switching sequences for the transient stability simulations will be included in the final report. The project dynamic model was provided by the IC and consists of a user-written generator model. The Q project dynamic model was provided by the IC and consists of generator, excitation system, power system stabilizer and governor models. Details of both projects machine dynamics are included in Appendix F. The transient stability analysis concluded that the WECC transmission system remained stable for all contingency simulations and there were no NERC/WECC criteria violations in the APS or WECC transmission system. The transmission system was adequately damped and all generators remained synchronized for all transient stability simulations studied. Transient stability worst condition analysis results and plots are included in Appendix G and Appendix H. All transient stability analysis was conducted with version._ of General Electric s PSLF/PSDS/SCSC software... Mitigation Mitigation for the overloaded elements, as described in the power flow results section, was created based on the amount of MW injected at the kv substation at the POI. This approach shows what upgrades would be required for a given MW injection and simultaneously shows the maximum output allowed for each mitigation component. Page of

10 Final Report Interconnection System Impact Study Interconnection Project Q Table shows the upgrade requirements for MW injection levels at the kv substation at the POI based on the power flow results. Table : Upgrade Requirements for MW Injection Levels MW injection into POI kv bus Upgrade Requirements < MW None MW - MW Raise two spans on the Adams Tap-Mural kv line and replace a CT at Adams Tap The Adams Tap - POI kv line only overloads when the load being served through the Mural / kv transformer is less than MW. The Adams Tap Mural kv line is rated at MVA. Due to the load APS serves from the Mural substation, the flow from the output of the Project will split, with some of the flow heading south to the load served out of Mural and the rest of the flow heading north toward Adams Tap. The four outages listed in Table drop enough load in the Bisbee area, which APS serves through the Mural substation, to cause enough of the MW output of the Project to flow toward Adams Tap and overload the Adams Tap POI kv line. Therefore, the Adams Tap POI kv line needs to be upgraded to eliminate any potential overloads, either do to the outages listed or just for an extremely low load scenario in the Bisbee area. The system upgrades that would be required to allow the maximum output of the Project consists of raising two spans on the Adams Tap POI kv line and replacing a DOE metering CT at Adams Tap. These upgrades would be considered system upgrades eligible for Transmission Credits. The Project will be limited to MW if no upgrades are performed. However, if a communications/relay scheme is installed, the Project may be able to output greater than MW without any system upgrades. The project could output MW plus the load being served through the Mural /kv transformer. The load served in the local APS Bisbee system is typically not less than MW, thereby allowing the Project to output its maximum level of MW. However, if an outage occurs on a kv line internal to the local APS Bisbee system or other conditions occur that reduces the load served through Mural below MW, a reduction in the Project output would need to occur. And if an outage on the POI Mural kv line or the Mural / kv transformer occurs the Project would need to reduce its output to MW.. Cost and Construction Schedule Estimates Cost to interconnect will include a new kv substation at the Point of Interconnection on the Adams Tap Mural kv line. The cost of the substation will be for a new three breaker ring bus adjacent to the existing line, but does not include any costs for land that may be required. The interconnection customer will be expected to provide a suitable site for the interconnection substation. Also, a trip scheme will need to be implemented for the Project that will trip the project off-line for the outages of the Adams Tap-POI kv line and/or the Apache-Pantano kv line. Beyond the cost for the interconnection facilities are the costs associated with the system upgrades that would be necessary to achieve the full output of the Project. Cost estimates for Page of

11 Final Report Interconnection System Impact Study Interconnection Project Q system upgrades will include all of the facilities listed in Table.. Costs for the implementation of a Special Protection Scheme (SPS), if that option is chosen, would be developed in the Facility Study. Table : Cost and Construction Estimates for Interconnection Facilities and System Upgrades Estimated Cost Estimated Permitting, Construction, and Procurement Time (months) New Breaker kv ring bus at POI $,, Adams Tap-Mural kv upgrade raise two spans $, Replace CT at Adams Tap $, Total $,, Figure, below, is a more detailed drawing of the interconnection facilities that would be required for Project Q.. Siting Discussion For informational purposes only Based on available information, the project site appears to be located in an area of predominantly state and private land and it is unlikely that any federal National Environmental Policy Act compliance would be required. The proposed MW generating facility and kv transmission line interconnection both necessitate the receipt of a Certificate of Environmental Compatibility (CEC) from the Arizona Corporation Commission (ACC). It is typically the developer s preference as to whether separate CEC Applications are prepared for the plant site and the transmission line or combined into a single Application covering both facilities. Issues such as long-term facility ownership and transferability should be considered in making that determination. Information about the State of Arizona s requirements for CEC Applications and hearings before the Arizona Power Plant and Transmission Line Siting Committee can be found at: Estimated times may vary depending upon the ability to schedule equipment outages. Page of

12 Final Report Interconnection System Impact Study Interconnection Project Q Figure Page of

13 Appendix A CONTINGENCY LIST

14 List of Applied Contingencies: BASECASE CASE ID CASE NAME Q_pre.sav Q- POI - Boothill Tap KV Outage Q_pre.sav Q- ADAMS Tap - Boothill Tap KV Q_pre.sav Q- ADAMS Tap - KV Outage Q_pre.sav Q- ADAMS Tap - KV Outage Q_pre.sav Q- NOGALES - KV Outage Q_pre.sav Q- BUTTERFIELD - KV Outage Q_pre.sav Q- / XMFR Outage Q_pre.sav Q- - SLOAN KV Outage Q_pre.sav Q- - BUTTERFIELD KV Outage Q_pre.sav Q- / XFMR Outage Q_pre.sav Q- / XFMR # Outage Q_pre.sav Q- / XFMR # Outage Q_pre.sav Q- - SAN MANUAL KV LINE Outage Q_pre.sav Q- HAYDENAZ - SAN MANUAL KV LINE Outage Q_pre.sav Q- SAG.WEST - SAN MANUAL KV LINE Outage Q_pre.sav Q- S.BRKRCH - SAN MANUAL KV LINE Outage Q_pre.sav Q- - RED TAIL KV LINE Outage Q_pre.sav Q- - WINCHSTR KV LINE Outage Q_pre.sav Q- /KV XFMR OUTAGE Q_pre.sav Q- - SAN PEDRO TAP KV LINE OUTAGE Q_pre.sav Q- - DON LUIS KV LINE OUTAGE Q_pre.sav Q- FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE Q_pre.sav Q- PALOMNAS - DON LUIS KV LINE OUTAGE Q_pre.sav Q- SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE Q_pre.sav Q- POI - Mural KV Outage BASECASE CASE ID CASE NAME Q_post.sav Q- POI - Boothill Tap KV Outage & Drop Q Q_post.sav Q- ADAMS Tap - Boothill Tap KV Outage & Drop Q Q_post.sav Q- ADAMS Tap - KV Outage Q_post.sav Q- ADAMS Tap - KV Outage Q_post.sav Q- NOGALES - KV Outage Q_post.sav Q- BUTTERFIELD - KV Outage Q_post.sav Q- / XMFR Outage Q_post.sav Q- - SLOAN KV Outage Q_post.sav Q- - BUTTERFIELD KV Outage Q_post.sav Q- / XFMR Outage Q_post.sav Q- / XFMR # Outage Q_post.sav Q- / XFMR # Outage Q_post.sav Q- - SAN MANUAL KV LINE Outage Q_post.sav Q- HAYDENAZ - SAN MANUAL KV LINE Outage Q_post.sav Q- SAG.WEST - SAN MANUAL KV LINE Outage Q_post.sav Q- S.BRKRCH - SAN MANUAL KV LINE Outage Q_post.sav Q- - RED TAIL KV LINE Outage

15 Q_post.sav Q- - WINCHSTR KV LINE Outage Q_post.sav Q- /KV XFMR OUTAGE Q_post.sav Q- /KV XFMR OUTAGE & Drop MW Q_post.sav Q- - SAN PEDRO TAP KV LINE OUTAGE Q_post.sav Q- - SAN PEDRO TAP KV LINE OUTAGE & Drop MW Q_post.sav Q- - DON LUIS KV LINE OUTAGE Q_post.sav Q- FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE Q_post.sav Q- FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE & Drop MW Q_post.sav Q- PALOMNAS - DON LUIS KV LINE OUTAGE Q_post.sav Q- SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE Q_post.sav Q- POI - Mural KV Outage Q_post.sav Q- POI - Mural KV Outage & Drop MW

16 Appendix B Power Flow Results

17 Pre-Project Results

18 Q- POI - Boothill Tap KV Outage From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- ADAMS Tap - Boothill Tap KV ADAMS Tap - KV Outage ADAMS Tap - KV Outage NOGALES - KV Outage BUTTERFIELD - KV Outage / XMFR Outage - SLOAN KV Outage - BUTTERFIELD KV Outage / XFMR Outage / XFMR # Outage / XFMR # Outage - SAN MANUAL KV LINE Outage HAYDENAZ - SAN MANUAL KV LINE Outage SAG.WEST - SAN MANUAL KV LINE Outage S.BRKRCH - SAN MANUAL KV LINE Outage From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%)

19 Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- - RED TAIL KV LINE Outage - WINCHSTR KV LINE Outage /KV XFMR OUTAGE - SAN PEDRO TAP KV LINE OUTAGE - DON LUIS KV LINE OUTAGE FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE PALOMNAS - DON LUIS KV LINE OUTAGE SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- POI - Mural KV Outage From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%)

20 Post-Project Results

21 Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- POI - Boothill Tap KV Outage & Drop Q ADAMS Tap - Boothill Tap KV Outage & Drop Q ADAMS Tap - KV Outage ADAMS Tap - KV Outage NOGALES - KV Outage BUTTERFIELD - KV Outage / XMFR Outage - SLOAN KV Outage - BUTTERFIELD KV Outage / XFMR Outage / XFMR # Outage / XFMR # Outage - SAN MANUAL KV LINE Outage HAYDENAZ - SAN MANUAL KV LINE Outage SAG.WEST - SAN MANUAL KV LINE Outage S.BRKRCH - SAN MANUAL KV LINE Outage - RED TAIL KV LINE Outage From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%)

22 Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) Q- - WINCHSTR KV LINE Outage /KV XFMR OUTAGE /KV XFMR OUTAGE & Drop MW - SAN PEDRO TAP KV LINE OUTAGE - SAN PEDRO TAP KV LINE OUTAGE & Drop MW - DON LUIS KV LINE OUTAGE FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE & Drop MW PALOMNAS - DON LUIS KV LINE OUTAGE SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE POI - Mural KV Outage From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%)

23 BOOTHILL. ADAMS % BOOTHILL. Q POI % Q- POI - Mural KV Outage & Drop MW From Bus Name Base kv To Bus Name Base kv Circuit Section Area Zone Rating Basecase Flow MVA MW MVAR Amps Loading (%) BOOTHILL. ADAMS % BOOTHILL. Q POI %

24 Appendix C Power Flow Plots

25 Pre-Project Results

26 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case POI - Boothill Tap KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

27 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case ADAMS Tap - Boothill Tap KV AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

28 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case ADAMS Tap - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

29 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case ADAMS Tap - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

30 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case NOGALES - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

31 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case BUTTERFIELD - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

32 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case / XMFR Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

33 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - SLOAN KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

34 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - BUTTERFIELD KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

35 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case / XFMR Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

36 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case / XFMR # Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

37 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case / XFMR # Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

38 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

39 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case HAYDENAZ - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

40 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case SAG.WEST - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

41 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case S.BRKRCH - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

42 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - RED TAIL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

43 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - WINCHSTR KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

44 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case /KV XFMR OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

45 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

46 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case - DON LUIS KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

47 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

48 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case PALOMNAS - DON LUIS KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

49 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP CHARLSTN To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

50 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_pre.wrk Summer Planning Case POI - Mural KV Outage & Drop Q AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

51 Post-Project Results

52 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case POI - Boothill Tap KV Outage & Drop Q AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

53 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT - Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case ADAMS Tap - Boothill Tap KV Outage & Drop Q AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

54 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case ADAMS Tap - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

55 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case ADAMS Tap - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

56 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case NOGALES - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

57 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case BUTTERFIELD - KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

58 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case / XMFR Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

59 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - SLOAN KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

60 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - BUTTERFIELD KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

61 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case / XFMR Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

62 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail To San Manuel. Apache ST,CT. APACH-SW. Q Wind Farm. KANSAS S Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case / XFMR # Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

63 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case / XFMR # Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

64 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

65 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case HAYDENAZ - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

66 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case SAG.WEST - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

67 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case S.BRKRCH - SAN MANUAL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

68 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - RED TAIL KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

69 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - WINCHSTR KV LINE Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

70 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case /KV XFMR OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

71 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case /KV XFMR OUTAGE & Drop MW AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

72 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

73 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - SAN PEDRO TAP KV LINE OUTAGE & Drop MW AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

74 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case - DON LUIS KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

75 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

76 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case FAIRVIEW - SAN PEDRO TAP KV LINE OUTAGE & Drop MW AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

77 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case PALOMNAS - DON LUIS KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

78 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP CHARLSTN To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case SAN PEDRO - SAN PEDRO TAP KV LINE OUTAGE AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

79 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case POI - Mural KV Outage AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

80 To Sahuarito To Nogales To Sonoita To S. Vista.. To Keat Jct.. To HUACHWST To David Jct HUACHEST. TOMB JCT... SLOAN. WEBB To kv.. PUEBLO. TOMBSTON... MCNEAL BUTERFLD. To BVISTATP To Fairview To Winchester Apache ST,ST,CT To RAMSYTP To RAMSYTP. PALOMNAS DON LUIS. To San Pedro CHARLSTN To Hereford SPEDROTP.. ADAMS. BOOTHILL. Q POI... CHIRICAH.. Q To Red Tail.. APACH-SW. To San Manuel Q Wind Farm. KANSAS S Apache ST,CT Apache CT,CT To Cochise To WILCOXJT General Electric International, Inc. PSLF Program Sun Aug :: Q_post.wrk Summer Planning Case POI - Mural KV Outage & Drop MW AZ Detailed System Rep. Q- MW/MVAR Q.drw Rating =

81 Appendix D Voltage Flicker Results

82 % Generations (base) Generation % Generation % Generation % Generation % Bus Name Base kv Voltage (pu) Voltage (pu) Deviation Voltage (pu) Deviation Voltage (pu) Deviation Voltage (pu) Deviation ADAMS APACH-SW ARTESIA BONITA BONITATP BOOTHILL BOWIE BOWIE BUTERFLD BUTERFLD CACTUSAE CHIRICAH COCHISE COPPERVR COPPERVR CORK CORK TAP Q Q POI DON LUIS DOSCONDO DOSCONDO FAIRVIEW FREEMAN FRISCO GREENLEE GREEN-SW GREEN-SW HACKBERY HACKBERY HOOKER HOOKERTP

83 JOHN JCT JOHNMINE KANSAS S MCNEAL MORENCI MORT TAP MORTENSN N.THATCH NOGALES PALOMNAS PD-MORNC RED TAIL RED TAIL ROMNEY SAFFORD SAFFORD SAFFTAP SAFFTAP SAN JOSE SANPEDRO SANSIMON SNJOSETP SNMANUEL SPEDROTP SPRINGR STEWART THATCHER WEBB WILCOXJT WILLCOX

84 WILLOW WINCHSTR WINCHSTR

85 Appendix E Transient Stability Switching Sequences

86 . Three-phase fault on Adams- Apache kv line, near Adams RUN FB. "ADAMS ". CFB. "ADAMS ". DL. "ADAMS ". " ". " ". Three-phase fault on Adams- Apache kv line, near Apache RUN FB. " ". CFB. " ". DL. "ADAMS ". " ". " ". Three-phase fault on Adams- Nogales kv line, near Adams RUN FB. "ADAMS ". CFB. "ADAMS ". DL. "ADAMS ". "NOGALES ". " ". Three-phase fault on Adams- Nogales kv line, near Nogales RUN FB. "NOGALES ". CFB. "NOGALES ". DL. "ADAMS ". "NOGALES ". " ". Three-phase fault on Q POI - Mural kv line, near Q POI RUN FB. "POI ". CFB. " POI ". DL. " POI ". " ". " ". Three-phase fault on Q POI - Mural kv line, near Mural RUN FB. " ". CFB. " ". DL. " POI ". " ". " "

87 . Three-phase fault on Don Luis - Mural kv line, near Don Luis RUN FB. "DON LUIS". CFB. "DON LUIS". DL. "DON LUIS". " ". " ". Three-phase fault on Don Luis - Mural kv line, near Mural RUN FB. " ". CFB. " ". DL. "DON LUIS". " ". " ". Three-phase fault on Don Luis Palomnas kv line, near Don Luis RUN FB. "DON LUIS". CFB. "DON LUIS". DL. "DON LUIS". "PALOMNAS". " ". Three-phase fault on Don Luis Palomnas kv line, near Palomnas RUN FB. "PALOMNAS". CFB. "PALOMNAS". DL. "DON LUIS". "PALOMNAS". " ". Three-phase fault on Fairview San Pedro kv line, near Fairview RUN FB. "FAIRVIEW". CFB. "FAIRVIEW". DL. "FAIRVIEW". "SPEDROTP". " ". Three-phase fault on Fairview San Pedro kv line, near San Pedro RUN FB. "SPEDROTP". CFB. "SPEDROTP". DL. "FAIRVIEW". "SPEDROTP". " "

88 . Three-phase fault on San Pedro - Mural kv line, near Mural RUN FB. " ". CFB. " ". DL. " ". "SPEDROTP". " ". Three-phase fault on San Pedro - Mural kv line, near San Pedro RUN FB. "SPEDROTP". CFB. "SPEDROTP". DL. " ". "SPEDROTP". " "

89 Appendix F Transient Stability Modeling

90 Document.txt // epcgen "Q". " " : # mva=. "clippergn.p". "rsrc". "xsrc". "H". "Kpll". "TAUpll". "RSinit". epctrb "Q". " " : # "clippertr.p". "Kpp". "Kpi". "PAmax". "PAmin". "PAinit". epcgen "Q". " " : # mva=. "clippergn.p". "rsrc". "xsrc". "H". "Kpll". "TAUpll". "RSinit". epctrb "Q". " " : # "clippertr.p". "Kpp". "Kpi". "PAmax". "PAmin". "PAinit". epcgen "Q". " " : # mva=. "clippergn.p". "rsrc". "xsrc". "H". "Kpll". "TAUpll". "RSinit". epctrb "Q". " " : # "clippertr.p". "Kpp". "Kpi". "PAmax". "PAmin". "PAinit". epcgen "Q". " " : # mva=. "clippergn.p". "rsrc". "xsrc". "H". "Kpll". "TAUpll". "RSinit". epctrb "Q". " " : # "clippertr.p". "Kpp". "Kpi". "PAmax". "PAmin". "PAinit".

91 clippergn.p // /*****************************************************************************/ /********* clippergn - Clipper Liberty Series Generator/Inverter Model *******/ /*****************************************************************************/ /***** Michael R. Behnke, BEW Engineering, Inc., San Ramon, CA *********/ /************* Revision C -- September, ********************/ /*****************************************************************************/ /* This epcl computes the commanded generator torque and determines network */ /* current injection for the turbine's inverter output. Single rigid-mass */ /* drivetrain representation is used. */ /*****************************************************************************/ /*****************************************************************************/ /* Prerequisite: Generator present in load flow solution, xsrc = */ /* */ /* /* Input parameters: States: */ */ /* Storage variables: */ /* */ /* Input parameters: */ /* epcgen[@mx].rsrc = source resistance, pu (.) */ /* /* epcgen[@mx].xsrc = source reactance, pu (.) epcgen[@mx].h = machine inertia constant, sec (.) */ */ /* epcgen[@mx].kpll = PLL gain, pu (.) */ /* epcgen[@mx].taupll = PLL time constant, sec (.) */ /* epcgen[@mx].rsinit = initial rotor speed, pu (.) */ /* */ /* State variables: */ /* epcgen[@mx].s = rotor speed, pu */ /* epcgen[@mx].s = active power controller integrator output */ /* epcgen[@mx].s = reactive power controller integrator output */ /* */ /* Storage variables: */ /* epcgen[@mx].v = mechanical torque, pu on windplant base */ /* epcgen[@mx].v = electrical torque, pu on windplant base */ /* epcgen[@mx].v = generator status, = on line, = off line */ /* epcgen[@mx].v = inverter power factor */ /* epcgen[@mx].v = desired active power, pu on windplant base */ /* epcgen[@mx].v = desired reactive power, pu on windplant base */ /* epcgen[@mx].v = actual reactive power, pu on windplant base */ /* epcgen[@mx].v = memory for overvoltage timer # */ /* epcgen[@mx].v = memory for overvoltage timer # */ /* epcgen[@mx].v = memory for undervoltage timer # */ /* /* epcgen[@mx].v = memory for over/under frequency timer # */ */ /* /* Input from clippertr model: genbc[@k].pmech = mechanical power, pu on windplant base */ */ /* */ /* Output channels: */ /* epcgen[@mx].v = electrical output power, pu on windplant base */ /* epcgen[@mx].v = output reactive power, pu on windplant base */ /* epcgen[@mx].v = terminal voltage magnitude, pu */ /* epcgen[@mx].v = terminal current magnitude, pu on windplant base */ /* epcgen[@mx].v = rotor speed, pu */ /* */ /* /* Invocation in dyd file: epcgen bus_number bus_name bus_kv model_id : # "clippergn.p" / */ */ /* "rsrc". "xsrc". "H". "Kpll". "TAUpll". / */ /* "RSinit". */ /* */ /*****************************************************************************/ define INIT define SORC define ALGE define RATE define OUTP

92 clippergn.p = dypar[].mode /* determine run-time mode = dypar[].cmi /* current model index in edds table = model[@mx].k /* genbc table index = = model[@mx].bus /* gens table index */ /* internal bus number = = epcgen[@mx].kpll /* mva base of this model */ /* PLL proportional gain /* PLL integral gain */ switch (@mode) case INIT: /* flag to indicate generator status, = on line, = off line */ epcgen[@mx].v = /* initiate over and under voltage timers */ epcgen[@mx].v = dypar[].time epcgen[@mx].v = dypar[].time epcgen[@mx].v = dypar[].time epcgen[@mx].v = dypar[].time /* set initial speed from dyd invocation */ genbc[@k].speed = epcgen[@mx].rsinit /* set initial powers and torques from load flow solution */ genbc[@k].pelec = gens[@kgen].pgen / gens[@kgen].mbase genbc[@k].pmech = genbc[@k].pelec epcgen[@mx].v = genbc[@k].pmech/genbc[@k].speed /* mechanical torque */ epcgen[@mx].v = epcgen[@mx].v /* electrical torque */ /* Set and fix power factor from load flow solution. Positive power factor represents overexcited operation; negative power factor is underexcited. Inverter runs at fixed power factor, only. */ epcgen[@mx].v = genbc[@k].pelec /* desired active power */ epcgen[@mx].v = gens[@kgen].qgen / gens[@kgen].mbase /* actual reactive power */ epcgen[@mx].v = epcgen[@mx].v /* desired reactive power */ epcgen[@mx].v = cos(arctan(gens[@kgen].qgen/gens[@kgen].pgen)) if (gens[@kgen].qgen < ) epcgen[@mx].v = -epcgen[@mx].v /* power factor */ endif /* initialize state variables */ epcgen[@mx].s = genbc[@k].speed /* rotor speed */ epcgen[@mx].s = genbc[@k].pelec / epcgen[@mx].vt /* active power controller integrator */ epcgen[@mx].s = epcgen[@mx].v / epcgen[@mx].vt /* reactive power controller integrator */ /* output channel heading definition */ channel_head[].type = "pg" channel_head[].cmin =. channel_head[].cmax =. channel_head[].type = "qg" channel_head[].cmin = -. channel_head[].cmax =. channel_head[].type = "vt" channel_head[].cmin =. channel_head[].cmax =. channel_head[].type = "it" channel_head[].cmin =. channel_head[].cmax =. channel_head[].type = "spd" channel_head[].cmin =. channel_head[].cmax =. break

93 clippergn.p // case SORC: /* calculate desired real and reactive power output */ = * epcgen[@mx].v = epcgen[@mx].v * tan(arccos(epcgen[@mx].v)) /* set desired quadrature and direct axis inverter current (on terminal bus axes) = epcgen[@mx].v - = epcgen[@mx].v - epcgen[@mx].v if (gens[@kgen].st = ) epcgen[@mx].pcur + epcgen[@mx].s epcgen[@mx].qcur + epcgen[@mx].s endif /* apply current limit = hypot(epcgen[@mx].pcur,epcgen[@mx].qcur) if (@imag epcgen[@mx].pcur = epcgen[@mx].pcur epcgen[@mx].qcur = epcgen[@mx].qcur endif break case ALGE: /* measure generator bus voltage and frequency = = (netw[@busnum].f +.) * dypar[].omegao/. /* reset timers, if appropriate */ if (@vbus <.) epcgen[@mx].v = dypar[].time endif if (@vbus <.) epcgen[@mx].v = dypar[].time endif if (@vbus >.) epcgen[@mx].v = dypar[].time endif if ((@fbus >.) or (@fbus <.) or (@vbus >=.) or (@vbus <=.)) epcgen[@mx].v = dypar[].time endif /* check for timer expirations */ if ((@vbus >=.) and ((dypar[].time - epcgen[@mx].v) >.)) gens[@kgen].st = endif if ((@vbus >=.) and ((dypar[].time - epcgen[@mx].v) >.)) gens[@kgen].st = endif if ((@vbus <=.) and ((dypar[].time - epcgen[@mx].v) >.)) gens[@kgen].st = endif if (((@fbus <=.) or (@fbus >=.) or (@vbus >=.) or (@vbus <=.)) and ((dypar[].time - epcgen[@mx].v) >.)) gens[@kgen].st = endif /* check if machine is out of service */ if (gens[@kgen].st = ) epcgen[@mx].pcur =. epcgen[@mx].qcur =. epcgen[@mx].v =. if (epcgen[@mx].v = ) logterm("clippergn tripped at t =",dypar[].time::," sec<") epcgen[@mx].v = endif

94 clippergn.p // endif /* determine commanded torque from control law */ if <.) =. elseif >.) =. / genbc[@k].speed else epcgen[@mx].v = genbc[@k].speed * genbc[@k].speed endif /* limit commanded electrical torque =. * abs(epcgen[@mx].v) * hypot(epcgen[@mx].er,epcgen[@mx].ei)/ genbc[@k].speed if (epcgen[@mx].v epcgen[@mx].v endif /* update speed and compute new mechanical torque; pmech updated by clippertr.p */ genbc[@k].speed = epcgen[@mx].s epcgen[@mx].v = genbc[@k].pmech / genbc[@k].speed break case RATE: /* calculate speed change = epcgen[@mx].v - epcgen[@mx].v epcgen[@mx].ds / (. * epcgen[@mx].h) /* determine active power regulator integrator change */ epcgen[@mx].ds * (epcgen[@mx].v - genbc[@k].pelec) /* anti-windup for active power regulator =. * abs(epcgen[@mx].v) - (epcgen[@mx].v - =. - (epcgen[@mx].v - genbc[@k].pelec) if (epcgen[@mx].s epcgen[@mx].s epcgen[@mx].zs = epcgen[@mx].s endif if (epcgen[@mx].s epcgen[@mx].s epcgen[@mx].zs = epcgen[@mx].s endif if ((epcgen[@mx].s and (epcgen[@mx].ds >.)) epcgen[@mx].ds =. endif if ((epcgen[@mx].s and (epcgen[@mx].ds <.)) epcgen[@mx].ds =. endif /* determine reactive power regulator integrator change */ epcgen[@mx].ds * (epcgen[@mx].v - epcgen[@mx].v) /* anti-windup for reactive power regulator =. * abs(tan(arccos(epcgen[@mx].v))) - (epcgen[@mx].v - = -. * abs(tan(arccos(epcgen[@mx].v))) - (epcgen[@mx].v - epcgen[@mx].v) if (epcgen[@mx].s epcgen[@mx].s epcgen[@mx].zs = epcgen[@mx].s endif if (epcgen[@mx].s epcgen[@mx].s epcgen[@mx].zs = epcgen[@mx].s endif if ((epcgen[@mx].s and (epcgen[@mx].ds >.)) epcgen[@mx].ds =. endif

95 clippergn.p // end if and <.)) =. endif /* compute new active and reactive power output */ = * + * epcgen[@mx].v = epcgen[@mx].ei * epcgen[@mx].itr - epcgen[@mx].er * epcgen[@mx].iti break case OUTP: /* create plot outputs */ epcgen[@mx].v = genbc[@k].pelec /* active power */ epcgen[@mx].v = epcgen[@mx].v /* reactive power */ epcgen[@mx].v = volt[@busnum].vm /* terminal voltage magnitude */ epcgen[@mx].v = hypot(epcgen[@mx].itr, epcgen[@mx].iti) /*terminal current magnitude */ epcgen[@mx].v = genbc[@k].speed /* speed */ break endcase

96 clippertr.p // /*****************************************************************************/ /********* clippertr - Clipper Liberty Series Turbine Model ***********/ /*****************************************************************************/ /***** Michael R. Behnke, BEW Engineering, Inc., San Ramon, CA *********/ /************* Revision C -- September, ********************/ /****************************************************************************** * This epcl simulates the mechanical control of the Liberty series wind * * turbine. The initial available power in the wind is set through input * parameter PWinit. If GE wind gust model windgust.p is present in the * * * dynamics model table, that model governs available wind power (refer to * * PSLF documentation.) If windgust.p is not present, a constant wind power * * equal to the per unit electrical power from the load flow solution is * * maintained through duration of the the simulation. * /****************************************************************************** Prerequisite: Preceeded by generator model epcgen (clippergn.p) in dynamics table Input parameters: States: Storage variables: Input parameters: epctrb[@mx].kpp Pitch controller proportional gain, pu (.) epctrb[@mx].kpi Pitch controller integral gain, pu (.) epctrb[@mx].pamax Maximum pitch angle, deg () epctrb[@mx].pamin Maximum pitch angle, deg () epctrb[@mx].painit Initial pitch angle, deg () Input from clippergn model: genbc[@k].speed = generator speed, pu State variables: s Pitch controller integrator output, deg Storage variables: epcmod[@mx].v genbc index Output channels: v Mechanical power, pu on wind plant base Invocation in dyd file: epctrb bus_number bus_name bus_kv model_id : # "clippertr.p" "Kpp"./ "Kpi". "PAmax". "PAmin". "PAinit". ************* End of Model Comments and Data Description ********************/ define INIT define SORC define ALGE define RATE define = = dypar[].cmi /* current model index */ if > = epcmod[@mx].v /* genbc index number */ endif switch (@mode) case INIT: /* getting the genbc index number and store it in epcmod[].v = = busd[@intnum].extnum $id = = = model[@indx_model].k

97 clippertr.p // = = genbc[@k].kgen /* initialize state variable; speed is initialized in epcgen = genbc[@k].speed -. epctrb[@mx].s = epctrb[@mx].painit - epctrb[@mx].kpp /* set initial available wind power */ genbc[@k].glimv = genbc[@k].pmech /* output variable initialization */ epctrb[@mx].v = gens[@kgen].pgen / gens[@kgen].mbase /* mechanical power */ /* output channel heading definition */ channel_head[].type = "pmec" channel_head[].cmin =. channel_head[].cmax =. break case RATE: /* calculate speed error = genbc[@k].speed -. /* calculate pitch demand = epctrb[@mx].kpp + epctrb[@mx].s /* limit and anti-windup */ if > epctrb[@mx].pamax = epctrb[@mx].pamax epctrb[@mx].s = epctrb[@mx].pamax - epctrb[@mx].kpp epctrb[@mx].zs = epctrb[@mx].s endif if < epctrb[@mx].pamin = epctrb[@mx].pamin epctrb[@mx].s = epctrb[@mx].pamin - epctrb[@mx].kpp epctrb[@mx].zs = epctrb[@mx].s endif /* derivative of state s */ epctrb[@mx].ds = epctrb[@mx].kpi if (( epctrb[@mx].s >= epctrb[@mx].pamax ) and (epctrb[@mx].ds > )) epctrb[@mx].ds = endif if (( epctrb[@mx].s <= epctrb[@mx].pamin ) and (epctrb[@mx].ds < )) epctrb[@mx].ds = endif break case ALGE: /* calculate mechanical power from available wind power and pitch angle = genbc[@k].speed = epctrb[@mx].kpp + epctrb[@mx].s genbc[@k].pmech = genbc[@k].glimv * cos(@pdem *.) /* output variables for plotting */ epctrb[@mx].v = genbc[@k].pmech /* mechanical power */ break endcase

98 Appendix G Transient Stability Analysis Results

99 -Φ Fault bus Line Out Transnet Voltage Dip Violations Transient Frequency Dip Violations Post Transnet Voltage Violations Damping Adams Adams - Apache > Apache Adams - Apache > Adams Adams - Nogales > Nogales Adams - Nogales > Mural Mural - POI > POI Mural - POI > Don Luis Don Luis - Mural > Mural Don Luis - Mural > Don Luis Don Luis - Palmonas > Palmonas Don Luis - Palmonas > Fairview Fairview - SanPedro Tap > SanPedro Fairview - SanPedro Tap > SanPedro Mural - SanPedro Tap > Mural Mural - SanPedro Tap > SanPedro San Pedro - SanPedro Tap > San Pedro San Pedro - SanPedro Tap >

100 Appendix H Transient Stability Plots

101 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_adams_apache.chf Page c:\upslf\mypslf Wed May ::

102 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_adams_apache.chf Page c:\upslf\mypslf Wed May ::

103 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_apache_adams.chf Page f\mypslf\channel files Wed May ::

104 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_apache_adams.chf Page f\mypslf\channel files Wed May ::

105 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_adams_nogales.chf Page f\mypslf\channel files Wed May ::

106 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_adams_nogales.chf Page f\mypslf\channel files Wed May ::

107 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_nogales_adams.chf Page f\mypslf\channel files Wed May ::

108 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_nogales_adams.chf Page f\mypslf\channel files Wed May ::

109 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_cp_mur.chf Page f\mypslf\channel files Wed May ::

110 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_cp_mur.chf Page f\mypslf\channel files Wed May ::

111 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_cp.chf Page f\mypslf\channel files Wed May ::

112 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_cp.chf Page f\mypslf\channel files Wed May ::

113 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_dl_mur.chf Page f\mypslf\channel files Wed May ::

114 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_dl_mur.chf Page f\mypslf\channel files Wed May ::

115 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_dl.chf Page f\mypslf\channel files Wed May ::

116 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_dl.chf Page f\mypslf\channel files Wed May ::

117 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_dl_pal.chf Page f\mypslf\channel files Wed May ::

118 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_dl_pal.chf Page f\mypslf\channel files Wed May ::

119 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_pal_dl.chf Page f\mypslf\channel files Wed May ::

120 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_pal_dl.chf Page f\mypslf\channel files Wed May ::

121 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_fair_sped.chf Page f\mypslf\channel files Wed May ::

122 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_fair_sped.chf Page f\mypslf\channel files Wed May ::

123 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_sped_fair.chf Page f\mypslf\channel files Wed May ::

124 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_sped_fair.chf Page f\mypslf\channel files Wed May ::

125 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_sped.chf Page f\mypslf\channel files Wed May ::

126 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_mur_sped.chf Page f\mypslf\channel files Wed May ::

127 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): WW(black), PP(red), CG(green), KYX(blue), RUX(magenta).. EHV_voltages ( kv): FC(black), NV(red), PLX(green), McCullough(blue), KYX(magenta), WW(cyan)..... Rotorangles: CH#(black), FC#(red), NV#(green), PLX#(blue), SG#(magenta), (cyan) Frequencies ( kv): FC(black), NV(red), PLX(green), (blue), KYX(magenta), WW(cyan)... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_sped_mur.chf Page f\mypslf\channel files Wed May ::

128 Heavy Summer WECC Power Flow ARIZONA_voltages ( kv): Adams(black), Boothill(red), Apache(green), Nogales(blue), Mural(magenta).... kv_voltages: Boothill(black), Mural(red), Don Luis(green), SPedro(blue), Fairview(magenta)..... Rotorangles: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan) -.. Frequencies: COP(black), (red), (green), Saguaro(blue), SG#(magenta), (cyan), Mur... WESTERN ELECTRICITY COORDINATING COUNCIL HSB APPROVED BASE CASE JANUARY, ALL COMMENTS FROM THE TSS REVIEW ARE INCLUDED. coopstab_final_sped_mur.chf Page f\mypslf\channel files Wed May ::

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection

More information

Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities. Non-Tariff System Impact Study

Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities. Non-Tariff System Impact Study Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities Non-Tariff System Impact Study March 204 Prepared by: Utility System Efficiencies, Inc (USE) Under Contract with:

More information

Q44 Generation Interconnection

Q44 Generation Interconnection A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path

System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path Report No: NPP2000-21 September 13, 2001 Network Performance Planning Department T&D Engineering Executive Summary BC Hydro Power

More information

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company December 29, 2016 APS Requirements for Data for Power System Modeling and Analysis Table of Contents

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Grid Interconnection of Renewable Generation

Grid Interconnection of Renewable Generation Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection

More information

ISO New England Data Modeling Requirements

ISO New England Data Modeling Requirements A U G U S T 1 5, 2 0 1 6 B O S T O N, M A ISO New England Data Modeling Requirements Renew Northeast Meeting Al McBride D I R E C T O R, T R A N S M I S S I O N S T R A T E G Y & S E R V I C E S Agenda

More information

TSR A & B - FACILITIES STUDY REPORT

TSR A & B - FACILITIES STUDY REPORT TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345

More information

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer ) Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original

More information

PRC Coordination of Protection Systems for Performance During Faults

PRC Coordination of Protection Systems for Performance During Faults PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2 SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:

More information

Public Service Company of New Mexico

Public Service Company of New Mexico Public Service Company of New Mexico Open Transmission Planning Meeting November 2, 2017 Albuquerque, NM INTRODUCTION Public Stakeholder Meeting Order 890 Objective to improve transparency and stakeholder

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1

Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1 Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms May 22, 2009 Slide 1 FACTS Applications Flexible AC Transmission Systems May 22, 2009 Slide 4 System Studies - Grid Codes

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

SRP Ten Year Transmission Plan

SRP Ten Year Transmission Plan 2018 SRP Ten Year Transmission Plan 2018-2027 Prepared for the Arizona Corporation Commission January 2018 Docket No. E-00000D-17-0001 Page1 Page1 Table of Contents 1. Introduction... 1 2. Planning Organizations...

More information

Western DSW Planning St k er eeti ting (Western OATT Attachment P) June 9, 2011

Western DSW Planning St k er eeti ting (Western OATT Attachment P) June 9, 2011 Western DSW Planning Stakeholder Meeting (Western OATT Attachment P) June 9, 2011 Agenda: 1. Welcome and Introductions of Attendees 2. Planning Process 3. Interconnection Requests 4. Comments/questions

More information

1. Description of purpose/cause of hold/curtailment: Flowgate 6023 flow gate consists of the following elements.

1. Description of purpose/cause of hold/curtailment: Flowgate 6023 flow gate consists of the following elements. MISO Investigation Report on the NERC TLR Level 5 Event North Platte Stockville 115kV for the loss of the Gentleman Red Willow 345kV Flowgate 6023 August 22 nd / 23 rd, 2002 Report issued: September 3

More information

Supplemental Information

Supplemental Information Retirement of NPCC Directory# 3 Supplemental Information On April 1, 2015, NPCC Directory# 3 was retired upon the effective date of PRC-005-2 Protection System Maintenance which is subject to a 12 year

More information

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC September 21, 2018 Penelec Transmission Zone Need Number: PN-2018-001 Consider upgrading transmission line equipment (switches, conductor, splices,

More information

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning Application No.: Exhibit No.: Witnesses: A.1-0- SCE-0, Vol. 0 R E. Takayesu A (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume R System Planning Before the nd Errata Public Utilities

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

PacifiCorp Transmission Technical Workshop

PacifiCorp Transmission Technical Workshop PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

2016 Fall ITO Stakeholder Meeting. Topics in Operations

2016 Fall ITO Stakeholder Meeting. Topics in Operations 2016 Fall ITO Stakeholder Meeting Topics in Operations 11/17/2016 TOP-003-3 Requirement R1. Each Transmission Operator shall maintain a documented specification for the data necessary for it to perform

More information

Arizona Public Service Company Ten-Year Transmission System Plan Docket No. E-00000D

Arizona Public Service Company Ten-Year Transmission System Plan Docket No. E-00000D (.laps Lisa Malagon Leader Federal and State Compliance Mail Station 9704 PO Box 53999 Phoenix, Arizona 85072-3999 Tel 602-250- 5671 Elisa.Malagon@aps.com January 31, 2014 Docket Control Arizona Corporation

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

System Studies for American Transmission Co. s Benson Lake SVC Project

System Studies for American Transmission Co. s Benson Lake SVC Project Helping to keep the lights on, businesses running and communities strong System Studies for American Transmission Co. s Benson Lake SVC Project Adam Manty, Transmission Planning Engineer, ATC Outline Introduction

More information

RFP Attachment 13. January 2010

RFP Attachment 13. January 2010 PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

TransWest Express and Gateway South

TransWest Express and Gateway South TransWest Express and Gateway South Co-developed by four leading entities: Arizona Public Service PacifiCorp National Grid Wyoming Infrastructure Authority Regional Stakeholder Meeting January 23, 2008

More information

FACTS and HVDC for Grid Connection of Large Wind Farms

FACTS and HVDC for Grid Connection of Large Wind Farms David Larsson Power-Gen Europe 2005 Milan, Italy FACTS and HVDC for Grid Connection of Large Wind Farms www.abb.com/facts FACTS Agenda Wind Generators Response to Grid Faults PICTURE JPG-FORMAT WEB OPTIMIZED

More information

Facility Connection Requirements

Facility Connection Requirements SEMINOLE ELECTRIC COOPERATIVE, INC. Facility Connection Requirements BULK ELECTRIC SYSTEM FACILITIES Facility Connection Requirements Page 1 of 19 Table of Contents 1. GENERAL CONNECTION REQUIREMENTS...

More information

Small Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662

Small Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662 Small Generator Interconnection Tier 4 Facilities Study Report Completed for ( Interconnection Customer ) A Qualifying Facility Q0662 Proposed Interconnection Klamath Falls-Fishhole 69 kv line at approximately

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

Power System Studies. The Power of Trust. The Future of Energy.

Power System Studies. The Power of Trust. The Future of Energy. The Power of Trust. The Future of Energy. POWER SYSTEM ANALYSIS Consulting studies to investigate system events and optimize power system performance In todays competitive and rapidly changing operating

More information

North Gila-Imperial Valley #2 Transmission Project

North Gila-Imperial Valley #2 Transmission Project North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------

More information

Studies Overview and Data Requirements. Robert Pan

Studies Overview and Data Requirements. Robert Pan Studies Overview and Data Requirements Robert Pan Outline 1. Introduction 2. BC Transmission System 3. BCTC Studies for Clean Power Call 4. Data Requirements for Interconnection Studies 5. Application

More information

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW The Customer Generator applicant ("Applicant") hereby makes application to the T &

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

Enhanced Curtailment Calculator Update

Enhanced Curtailment Calculator Update Enhanced Curtailment Calculator Update December 13, 2017 Member Advisory Committee Meeting Brett Wangen Chief Engineering and Technology Officer Jeremy West Manager, Interconnection Reliability Initiatives

More information

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project ) Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project 2007-17.2) Please DO NOT use this form for submitting comments. Please use the electronic

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is

More information

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Introduction to Generation Availability Data System (GADS) Wind Reporting

Introduction to Generation Availability Data System (GADS) Wind Reporting Introduction to Generation Availability Data System (GADS) Wind Reporting Registration and Reporting Fundamentals Donna Pratt, Performance Analysis Manager-Data Analytics NERC Webinar April 26, 2017 Topics

More information

From: Laura Manz, Vice President of Market & Infrastructure Development

From: Laura Manz, Vice President of Market & Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional

More information

Dominion Supplemental Projects

Dominion Supplemental Projects Dominion Supplemental Projects Transmission Expansion Advisory Committee October 11, 2018 Needs Need Number: DOM-2018-0017 Meeting Date: 10/11/2018 Process Stage: NEED Supplemental Project Driver: Customer

More information

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean

More information

Unofficial Comment Form Project Disturbance Monitoring

Unofficial Comment Form Project Disturbance Monitoring Unofficial Comment Form Project 2007-11 Disturbance Monitoring Please DO NOT use this form for submitting comments. Please use the electronic form to submit comments on the Standard Authorization Request

More information

Year Assessment Preliminary Needs

Year Assessment Preliminary Needs 2018 10-Year Assessment Preliminary Needs Stakeholder and Customer Presentation March 1, 2018 Jeremy Voigt Purpose Key Study Assumptions Reminder Summarize Preliminary Changes to Needs Solicit Input on

More information

JEA. Facility Connection Requirements

JEA. Facility Connection Requirements JEA Facility Connection Requirements April 2008 January 14 th, 2006 1/22 JEA Facility Connection Requirements TABLE OF CONTENTS 1.0 Introduction and Scope 1.1 Generation Facilities 1.2 Transmission Facilities

More information

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015 Order No. 754 Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request System Protection and Control Subcommittee (SPCS) and System Modeling and Analysis Subcommittee

More information

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document Western Area Power Administration (WAPA) Transmission System Policy Document This Business Practice documents the Western Area Power Administration (WAPA) policy, as implemented by WAPA s Power System

More information

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator T14: Large-Scale Simulation Examples 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613 Comparison of Shunt Facts Devices for the Improvement of Transient Stability of Two Machine

More information

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form) Attachment 2 Transmission Provider: SMALL GENERATOR INTERCONNECTION REQUEST Designated Contact Person: Address: Telephone Number: (Application Form) An Interconnection Request is considered complete when

More information

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/

More information

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs) Appendix A DSO Functions (Version 7) No. DSO Functions 1 System Coordination Description Activities Description Operate local and regional areas and co-ordinate energy and power transfers with other networks

More information

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: _Cleco Power LLC Designated Contact Person: Cindy Guillot Address: P.O Box 70, (2180 St. Landry Hwy) St. Landry, LA 71367

More information

Electric Utility Facility Connection Requirements

Electric Utility Facility Connection Requirements City of Coffeyville Municipal Light and Power Electric Utility Facility Connection Requirements Approved: Date: Version Date Change Tracking Reviewer/Editor 1.0 June, 2010 Original document. Steve McGie

More information

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models Problem Statement With the proliferation of distributed energy resources (DER), Transmission Planners must adapt

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

Dynamic Load Models in PowerWorld Simulator

Dynamic Load Models in PowerWorld Simulator Dynamic Load Models in PowerWorld Simulator Jamie Weber (weber@powerworld.com) Director of Software Development 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

2009 SPP TransCanada Pipeline Study Report

2009 SPP TransCanada Pipeline Study Report 2009 SPP TransCanada Pipeline Study Report SPP Engineering Department, Planning Section PUBLISHED: 7/9/2009 LATEST REVISION: 7/9/2009 Copyright 2009 by Southwest Power Pool, Inc. All rights reserved. Table

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

The NYISO shall assign a Queue Position based upon the date and time of receipt of the 30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection

More information

Minnesota Hosting Capacity Analysis

Minnesota Hosting Capacity Analysis Minnesota Hosting Capacity Analysis MIPSYCON November 8, 2017 Chris Punt, P.E. Outline What is Hosting Capacity? Background DRIVE Results Visualization Accuracy Timeline Next Steps 2 What is Hosting Capacity?

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection System Protection and Control Subcommittee

More information

OVERVIEW: KEY APPLICATIONS

OVERVIEW: KEY APPLICATIONS WECC Reliability Coordinator Website OVERVIEW: KEY APPLICATIONS presented by Kirk Stewart, Manager Applications Agenda WECCRC.org Website Wide-Area Views (WAV) Historical Data Archiving and Reporting My

More information

Facilities Study for XXXXXXXXXXXX 50 MW PV

Facilities Study for XXXXXXXXXXXX 50 MW PV Final Report on the Facilities Study for XXXXXXXXXXXX 50 MW PV Project No. 67270 July 2012 Facilities Study for XXXXXXXXXXXX 50 MW PV Prepared for Copany El Paso, Texas July 2012 Project No. 67270 Prepared

More information

Project Presentation April, 2017

Project Presentation April, 2017 Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia Page 1 of 15 British Columbia Utilities Reliability Standards with s adopted in British Columbia BAL-001-2 Standard Real Power Balancing Control Performance R-14-16 July 1, 2016 BAL-002-1 1 Disturbance

More information