Datacenter Cooling. DC Cooling Efficiency and Project experience. Osman Uzuner. Vakıfbank Central Systems Management Datacenter Operations

Size: px
Start display at page:

Download "Datacenter Cooling. DC Cooling Efficiency and Project experience. Osman Uzuner. Vakıfbank Central Systems Management Datacenter Operations"

Transcription

1 Datacenter Cooling DC Cooling Efficiency and Project experience Osman Uzuner Vakıfbank Central Systems Management Datacenter Operations

2 Agenda Agenda and Intro About Vakıfbank DC Energy Consumption breakdown DC Cooling Efficiency in DC Project phases Strategy and Site selection Design and Specifications Implementation and Tests Management and Operation Vakıfbank Datacenter Project Vakıfbank DC Project Views 2

3 Vakıfbank Intro Purpose of Establishment Established on Jan Best utilizing the foundations monies. Contributing to the savings of the country Use modern banking practices An initial capital of 50 million TL Reaching Corporate and individual customers in a most efficient manner through its internet and telephone banking services. Size 7th Largest Bank in Turkey 900+ Branches 3400 ATMs units of POS International Branches ; New York, Bahrain and Arbil VakıfBank operates in Austria with a subsidiary, VakıfBank International AG, which has branches in Vienna, Cologne and Frankfurt

4 Datacenter Consumption Breakdown 4

5 DC Cooling efficiency and Project Phases DC Roadmap Site Selection Datacenter Design and Specifications Datacenter implementation Test and Commissioning Datacenter Management & Operations 5

6 DC Roadmap / Strategy and Site Selection IT Growth and Business of the organization Right sizing DC to meet IT growth Invest on Energy efficiency or not? Site selection by considering Energy Efficiency metrics Location, Climate, Availability of water, wind and other natural resources Water storage Shape and size of the site/building Permits Green field vs Brown field? 6

7 DC Design and Specifications DC Sizing ; Space, Power, Cooling Technologies to be used for max efficiency Datacenter layout Air and water quality, filtering needs and costs Water availability, storage and cost Free cooling + Mechanical cooling needs (Direct/İndirect air, adiabatic, DX, chilled water cooling? Available free cooling / Energy efficient solutions in the market Products Standard/Custom Air duct / Pipes Risks Capacity, Purchase, Service Maintenance and Operations 7

8 Implementation, Test and Commisioning Implementation should be done according to design to meet energy efficiency targets. Installation quality and easşness of operation should be considered. T&C Should be done to check system performance and compliance to design targets Systems should be tuned to perform targeted efficeinecy metrics 8

9 Datacenter Management and Operations DC Cooling set points (ASHRAE-Guidelines and more ) Operate DC close to the upper limit of the recommended range (27 C). Every degree can save or waste energy Observe and evaluate outdoor temperature to maximize free cooling Maintenance of Free cooling equipment and filter cleaning/replacement. Consider IT Equipment and IT Load while deciding on set temperatures. Automation Deciding on cooling scenarios for max. efficiency Operating at high outdoor temperature Operating at transition times (Spring, Fall seasons) Operating at Winter/Cold seasons 9

10 Vakifbank Project development DC should meet Bank s 10+ years needs Vakıfbank VIT Project requirement analysis; Network Server Storage Defining infrastructure components to meet IT needs MV Transformers Generators UPSs Cooling systems Structured data cabling White space Others VM Tier level, Availability, Reliability UI, TIA, Ashrae, Cobit DS12 like standards and Industrial best practices. Certifications DC Maturity Model and Operations

11 DC Design criterias in brief Datacenter should meet Vakıfbank 10+ years needs Energy efficiency metrics Energy efficient Infrastructure components. (Cooling Chiller/CRAH/CRAC/Pumps, UPS, TR, etc ) High set points (>24 C) Cold aisle containment Electrical cable sizing, Data cabling on the ceiling. EC Fans and VSD Pumps /Motors <1,5 PUE target Compliance to standards Min UI Tier III Design, Construction and Operations Upgradable to Tier IV. Running DC operations on a level equivalent to UI Operational Sustainability Gold level Comply to TIA 942 specs except site limitations TIA942 compliant data cabling and labelling (Tier IV) Comply to COBIT DS12, ISO 27001, PCI like physical security needs.

12 Source: GreenGrid

13 Vakıfbank Project some specs. Tier III + 2N Infrastructure Intelligent Structured data cabling to support 10/40/100Gbit speeds Approx. 400m2 White space Cabinets@5kW 2x MV paths Traditional and VESDA fire detection 2xTranformer Novec 1230, Foam and Water mist suppression systems 2x Genset Multi-level Access control up to cabinet level. 2xLV Distribution IP CCTV, No blind points on critical spaces 2x Modular UPS Seismic and high loading capacity RAF 2x FC Chiller ve Dual Coil CRAHs SCADA/BMS/DCIM Quality Control during design, implementation Test and Commissioning 13

14 Infrastructure Equipments and Models MV Schneider Blockset MV Cells LV Schneider Blockset and Prisma Plus MDPs and UDPs TR 1600kVA Schneider Transformer Generators 1200 ekw CR CAT Generator Chiller 920kW Schneider Free Cooling Chiller UPS 4xPX500 Modular UPS (Schneider) CRAH/CRAC Dual coil CRAH, all units with EC Fan (Schneider) Cabinets APC cabinets with cold aisle containment solution Cabling Commscope Intelligent data cabling BMS/PMS Schneider Smart Struxure / Power Scada Expert DCIM Schneider Structureware 14

15

16

17

18

19

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System A Data Center Heat Removal System That Saves... Infrastructure Power Water up to 40% up to 80% up to 85% Discover Inertech s Award-winning Data Center Heat Removal System A Cool Solution; A Breakthrough

More information

18 th National Award for Excellence in Energy Management. July 27, 2017

18 th National Award for Excellence in Energy Management. July 27, 2017 18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

Integralna rešenja Infrastrukture Data Centra

Integralna rešenja Infrastrukture Data Centra 1 2 Integralna rešenja Infrastrukture Data Centra Jason Dodier, Solutions Business Development Manager - Global Sales (Schneider Electric) Overview of Prefabricated DC's market Prefab - needs to be satisfied

More information

Efficiency of Data Center cooling

Efficiency of Data Center cooling Efficiency of Data Center cooling Comparison of data room layouts and cooling systems Bohumil Cimbal Product manager for Cooling Systems in CONTEG Company Objective Basic questions between investor and

More information

Ecolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001

Ecolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001 Ecolibrium OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001 Cloud control Keeping data centres cool. COVER FEATURE Cloud control Such is the growth in data centres globally

More information

APC InRow Cooler Prototype Initial Report - Test Setup Verification. H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011

APC InRow Cooler Prototype Initial Report - Test Setup Verification. H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011 APC InRow Cooler Prototype Initial Report - Test Setup Verification H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011 1 Introduction Contents Technology Description/Attributes Installation

More information

Data Center Trends: How the Customer Drives Industry Advances and Design Development

Data Center Trends: How the Customer Drives Industry Advances and Design Development Bablu Kazi, PE MORRISON HERSHFIELD MISSION CRITICAL Data Center Trends: How the Customer Drives Industry Advances and Design Development What does the Customer Need? Scalability P U E Latest Technology

More information

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director Energy Logic: A Roadmap for Reducing Energy Consumption in the Data Center Emerson Network Power Ross Hammond Managing Director Agenda Energy efficiency Where We Are Today What Data Center Managers Are

More information

Continuity Insights Chicago: Evolving Data Center Trends & Design Standards. 19 June Jose Hernandez, 30+ years of design/build experience

Continuity Insights Chicago: Evolving Data Center Trends & Design Standards. 19 June Jose Hernandez, 30+ years of design/build experience Continuity Insights Chicago: Evolving Data Center Trends & Design Standards Technology Management, Inc. 1911 Rohlwing Rd., Suite E Rolling Meadows, IL 60008 847 394 8900 19 June 2013 www.tmiamerica.com

More information

Data Center Energy Savings By the numbers

Data Center Energy Savings By the numbers Data Center Energy Savings By the numbers Chris Kurkjian, PE HP Critical Facility Services provided by EYP Mission Critical Facilities 2008 Hewlett-Packard Development Company, L.P. The information contained

More information

84 kw, Tier 3, Direct Expansion, 937 ft 2

84 kw, Tier 3, Direct Expansion, 937 ft 2 [Reference Design 42] 84 kw, Tier 3, Direct Expansion, 937 ft 2 DESIGN OVERVIEW Data Center IT Capacity 84 kw Target Availability Tier 3 Annualized PUE at 100% Load 1.712 Total Racks and Average Density

More information

Green Data Centers A Guideline

Green Data Centers A Guideline Green Data Centers A Guideline Sekhar Kondepudi Ph.D Associate Professor Smart Buildings & Smart Cities Vice Chair Focus Group on Smart Sustainable Cities ITU-TRCSL Workshop on Greening the Future: Bridging

More information

Industry leading low energy evaporative fresh air cooling.

Industry leading low energy evaporative fresh air cooling. Industry leading low energy evaporative fresh air cooling. Freecool Evaporative Free Air Cooling by Workspace Technology delivers innovative low energy cooling for a range of applications including data

More information

1.0 Executive Summary. 2.0 Available Features & Benefits

1.0 Executive Summary. 2.0 Available Features & Benefits Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions

More information

DCIM Solutions to improve planning and reduce operational cost across IT & Facilities

DCIM Solutions to improve planning and reduce operational cost across IT & Facilities DCIM Solutions to improve planning and reduce operational cost across IT & Facilities Presented by: Chi Sen, Director, Data Centre Software Solutions, APJ & EMEA Schneider Electric Data Center Solutions

More information

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP This case study will evaluate the feasibility of data center free cooling in the Middle East using indirect

More information

2000 kw, Tier 3, Chilled Water, Prefabricated, sq. ft.

2000 kw, Tier 3, Chilled Water, Prefabricated, sq. ft. [Reference Design 64] 2000 kw, Tier 3, Chilled Water, refabricated, 23700 sq. ft. DESIGN OVERVIEW Data Center IT Capacity 2000 kw Target Availability Tier 3 Annualized E at 100% Load 1.64 in Miami, FL

More information

Prefabricated Data Center Solutions: Coming of Age

Prefabricated Data Center Solutions: Coming of Age Prefabricated Data Center Solutions: Coming of Age Steven Carlini - Global Data Center Marketing Director April 2014 Schneider Electric 1 Schneider Electric 2 Your ability to compete relies on the design,

More information

3300 kw, Tier 3, Chilled Water, 70,000 ft 2

3300 kw, Tier 3, Chilled Water, 70,000 ft 2 [Reference Design 22] 3300 kw, Tier 3, Chilled Water, 70,000 ft 2 DESIGN OVERVIEW Data Center IT Capacity 1100 kw per Data Hall 3 Independent Data Halls Design Application Range This design can be applied

More information

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview Contents 1. Document Purpose... 2 2. Facility Overview... 2 2.1 Technical Space... 2 2.2 Load Density... 2 2.3 Resilience... 2 2.4 Engineering Plant Maintenance & Service Restoration... 3 3. Engineering

More information

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016 STATE DATA CENTER DRAFT PROPOSAL 1 PROJECT TEAM 2 SERA Architects, Inc George Hager Patrick Sullivan PAE Engineers Dave Williams Doug Nachtrieb Michael Yee JMB Consulting Group Jon Bayles MEETING GOALS

More information

Schneider Electric Cooling Portfolio. Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions

Schneider Electric Cooling Portfolio. Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions Schneider Electric Cooling Portfolio Jim Tubbesing Heath Wilson APC/Schneider North Texas Rep Tubbesing Solutions Data Center Cooling Agenda 1. How to size data center, server rooms, IDF rooms, etc in

More information

M+W Group s Visionary Delta Datacenter

M+W Group s Visionary Delta Datacenter Region Central Europe M+W Germany GmbH A Company of the M+W Group 23 rd April 2014 M+W Group s Visionary Delta Datacenter IKS Data Center Design & Engineering Conference 2014 Moscow, Russia M+W Group at

More information

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw IT COOLING CLOSE CONTROL AIR CONDITIONERS CHILLED WATER HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw 3 Versions available Single chilled water coil Double chilled water coil High temperature IT COOLING

More information

Aquaflair. BREC/F and BCEC/F kw

Aquaflair. BREC/F and BCEC/F kw Aquaflair Air-cooled chillers and free-cooling chillers with screw or oil-free centrifugal compressors equipped with adiabatic system BREC/F and BCEC/F 350-1350 kw Dualism for evolution: the combination

More information

IT infrastructure Next level for data center. Rittal The System Yavor Panayotov Data center Day

IT infrastructure Next level for data center. Rittal The System Yavor Panayotov Data center Day IT infrastructure Next level for data center Rittal The System Yavor Panayotov Data center Day - 2018 1 Rittal The System - Solutions Enclosures Enclosures Small enclosures Command Panel & support arm

More information

CLIMATE. CUSTOMIZED. CyberHandler2 from 30KW to 520 KW. The indirect evaporative free-cooling Air Handling Unit

CLIMATE. CUSTOMIZED. CyberHandler2 from 30KW to 520 KW. The indirect evaporative free-cooling Air Handling Unit CLIMATE. CUSTOMIZED. CyberHandler2 from 30KW to 520 KW The indirect evaporative free-cooling Air Handling Unit Flexible & Efficient 11 sizes from 30 kw up to 520 kw to fit your needs with maximum efficiency

More information

DATA CENTER EFFICIENCY: Data Center Temperature Set-point Impact on Cooling Efficiency

DATA CENTER EFFICIENCY: Data Center Temperature Set-point Impact on Cooling Efficiency DATA CENTER EFFICIENCY: Data Center Temperature Set-point Impact on Cooling Efficiency September 27 th, 2013 Tejas Desai, PE CEM CEA LEED AP Sameer Behere, PE CEM LEED AP Agenda Problem: Quick fixes can

More information

Welcome Association of Energy Engineers to the Microsoft Technology Center

Welcome Association of Energy Engineers to the Microsoft Technology Center Welcome Association of Energy Engineers to the Microsoft Technology Center Today s Agenda 10:00 10:30 What s new in data center energy efficiency planning and implementation? 10:30 11:00 ASHRAE data center

More information

ZTE ZXCR Series DX In-Row Air Conditioning Product Description

ZTE ZXCR Series DX In-Row Air Conditioning Product Description ZTE ZXCR Series DX In-Row Air Conditioning Product Description Requirements & Challenges Due to the rapid development of telecommunication technology, the related IT equipment s power consumption is increase

More information

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101 Nick Gangemi Regional Sales Manager Data Aire Agenda Exactly what are we talking about ASHRAE TC 9.9 Design best practices

More information

1008 kw, Tier 2, Chilled Water, ft 2

1008 kw, Tier 2, Chilled Water, ft 2 [eference Design 81] 1008 kw, Tier 2, hilled Water, 18115 ft 2 DESIGN OVEVIEW Data enter IT apacity 1008 kw Adaptable from 200 kw to 3024 kw Target Availability Tier 2 Annualized PUE at 100% Load 1.65

More information

Scalable, Secure. Jason Rylands

Scalable, Secure. Jason Rylands Energy Efficient, Modular, Scalable, Secure Jason Rylands The planning, construction and operation of IT infrastructure for mission critical applications in reliable Datacentres represents a real challenge.

More information

MSYS 4480 AC Systems Winter 2015

MSYS 4480 AC Systems Winter 2015 MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and

More information

Recapture Capacity for Existing. and Airflow Optimization

Recapture Capacity for Existing. and Airflow Optimization Recapture Capacity for Existing Data Centers Through Cooling and Airflow Optimization Introduction Challenges and Trends Agenda Cooling & Airflow Optimization Takeaways Learning Objectives Recognize opportunities

More information

Microsoft s Cloud. Delivering operational excellence in the cloud Infrastructure. Erik Jan van Vuuren Azure Lead Microsoft Netherlands

Microsoft s Cloud. Delivering operational excellence in the cloud Infrastructure. Erik Jan van Vuuren Azure Lead Microsoft Netherlands Microsoft s Cloud Delivering operational excellence in the cloud Infrastructure Erik Jan van Vuuren Azure Lead Microsoft Netherlands 4 Megatrends are driving a revolution 44% of users (350M people) access

More information

High Efficient Data Center Cooling

High Efficient Data Center Cooling Nordborg High Efficient Data Center Cooling Copenhagen Center on Energy Efficiency webinar 12. July 2017 Jörg Saar, Danfoss Cooling 1 Danfoss Cooling Contents 1. Short intro to Danfoss Cooling 2. Introduction

More information

QuickSpecs. HP Performance Optimized Datacenter (POD) 20ce. Overview. Retired

QuickSpecs. HP Performance Optimized Datacenter (POD) 20ce. Overview. Retired Overview The HP Performance-Optimized Data Center (HP POD) is a containerized datacenter equipped with power infrastructure, cooling and IT power distribution. The HP POD can be deployed within weeks instead

More information

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC)

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC) How much power?! Data Centre Efficiency The US EPA found in 2006 data centres used 1.5% of total US consumption (5) For Bangor University data centres use approximately 5-10% of the total university electricity

More information

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data

More information

The Shared Data Centre Project

The Shared Data Centre Project David Birds - Data Centre Manager Oxford University Computing Services Networkshop 39 13 th April 2011 Why do we need it? 1. Additional data centre capacity. 2. The opportunity to provide a higher level

More information

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Future of Cooling High Density Equipment Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Agenda Issues facing the Data Center Managing the explosive

More information

HIGH DENSITY RACK COOLING CHOICES

HIGH DENSITY RACK COOLING CHOICES WATERCOOLED HIGH PERFORMANCE COMPUTING SYSTEMS AQUILA WHITE PAPER HIGH DENSITY RACK COOLING CHOICES by Phil Hughes Reprinted with permission of Clustered Systems Company, Inc 1 THIS WHITE PAPER DISCUSSES

More information

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is located

More information

Datacentre Newbridge Data sheet

Datacentre Newbridge Data sheet Datacentre Newbridge Data sheet Data sheet Datacentre Newbridge Find us 7 Claylands Road Edinburgh EH28 8LF Scotland With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our

More information

Virtualization and consolidation

Virtualization and consolidation Virtualization and consolidation Choosing a density strategy Implementing a high-density environment Maximizing the efficiency benefit Anticipating the dynamic data center Schneider Electric 1 Topical

More information

Impact of Air Containment Systems

Impact of Air Containment Systems White Paper June 2012 WP-20 Impact of Air Containment Systems Reducing Energy Consumption Introduction: The Importance of Maintaining Data Center Cooling Energy Efficiency Data centers are mission-critical

More information

Ecoflair Air Economizers

Ecoflair Air Economizers Ecoflair Air Economizers Cooling to maximize value for the cloud schneider-electric.com/ecoflair Life is On Schneider Electric 1 Ecoflair takes data center efficiency to new heights 2 Imagine cooling your

More information

Data Center Infrastructure Management (D.C.I.M.)

Data Center Infrastructure Management (D.C.I.M.) Data Center Infrastructure Management (D.C.I.M.) Garies Chong, RCDD, DCDC. BICSI Southeast Asia District Chair Managing Director of EMS Wiring Systems Pte Ltd Data Center Infrastructure Management (D.C.I.M.)

More information

IT Air Conditioning Units

IT Air Conditioning Units IT Air Conditioning Units Modern Flexible Effective Energy Saving CoolTeg Plus and CoolTop overview CoolTeg Plus CW CoolTeg Plus DX CoolTeg Plus XC CoolTop Installation Between IT racks On top of IT rack

More information

Datacentre Reading East 2 Data sheet

Datacentre Reading East 2 Data sheet Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the

More information

INT 492 : Selected Topic in IT II (Data Center System Design) 3(3-0-6)

INT 492 : Selected Topic in IT II (Data Center System Design) 3(3-0-6) INT 492 : Selected Topic in IT II (Data Center Design) 3(3-0-6) การออกแบบระบบศ นย สารสนเทศ Overview The American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) Technical Committee

More information

Fact sheet FRANKFURT DATA CENTRE CAMPUS. Connect, transact and grow

Fact sheet FRANKFURT DATA CENTRE CAMPUS. Connect, transact and grow Fact sheet FRANKFURT DATA CENTRE CAMPUS Connect, transact and grow WELCOME TO FRANKFURT On the infrastructure side, the location Frankfurt am Main is the backbone of the digital business in Germany. As

More information

Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services

Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services EMEA Roll-out 2 Main Mirror UK Swindon/Newbury area (15,000m 2 ) Germany Russelsheim(main)/

More information

FREECOOLING, EVAPORATIVE AND ADIABATIC COOLING TECHNOLOGIES IN DATA CENTER. Applications in Diverse Climates within Europe, Middle East and Africa

FREECOOLING, EVAPORATIVE AND ADIABATIC COOLING TECHNOLOGIES IN DATA CENTER. Applications in Diverse Climates within Europe, Middle East and Africa FREECOOLING, EVAPORATIVE AND ADIABATIC COOLING TECHNOLOGIES IN DATA CENTER Applications in Diverse Climates within Europe, Middle East and Africa Freecooling, Evaporative and Adiabatic Cooling Technologies

More information

Switch to Perfection

Switch to Perfection Switch to Perfection Traditional Data Centre - Temperatures Ideal Air Temperature: 22 C Chilled Water: 7-9 C Heat Load per Rack: Up to 4,5 Chilling & Pump Set The challenge a thermal image Front View of

More information

Data Center Checklist

Data Center Checklist Data Center Checklist The use of colocation and services has continued to increase, rapidly becoming the solution of choice for organizations requiring an efficient, secure, cost-effective way to manage

More information

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency

More information

DC Energy, Efficiency Challenges

DC Energy, Efficiency Challenges DC Energy, Efficiency Challenges Choosing a density strategy Implementing a high density environment Maximizing the efficiency benefit Anticipating the dynamic data center Key points on energy usage in

More information

Rack Colocation Hosting. Data Centre Solutions Expertly Engineered

Rack Colocation Hosting.   Data Centre Solutions Expertly Engineered Rack Colocation Hosting www.workspace-technology.com Data Centre Solutions Expertly Engineered We are committed to ensuring the very best data centre environment for your business Rack Colocation Hosting

More information

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling While CRAH cooling has been

More information

Close-coupled cooling

Close-coupled cooling Close-coupled cooling Intelligently controlled high-performance InRow cooling for the IT environment APC TM by Schneider Electric close-coupled cooling products provide a modular, scalable, and predictable

More information

<Insert Picture Here> Austin Data Center 6Sigma DC CFD Model

<Insert Picture Here> Austin Data Center 6Sigma DC CFD Model Austin Data Center 6Sigma DC CFD Model Keith Ward Keith Ward Data Center Facilities Engineering and Logistics Design Austin Data Center Statistics - Space Original AT&T Designed and

More information

Data Center Temperature Design Tutorial. Ian Seaton Chatsworth Products

Data Center Temperature Design Tutorial. Ian Seaton Chatsworth Products Data Center Temperature Design Tutorial Ian Seaton Chatsworth Products What are we going to do today? Explore a process for determining what data center operating temperature will deliver the best total

More information

Case Study The University of Warwick

Case Study The University of Warwick Data Centre Solutions...energy efficient by design Case Study The University of Warwick Workspace Technology deploys industry leading Indirect Fresh Air Cooling for the University of Warwick Workspace

More information

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings WHITE PAPER AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies, Inc.

More information

Rack cooling solutions for high density racks management, from 10 to 75 kw

Rack cooling solutions for high density racks management, from 10 to 75 kw Rack cooling solutions for high density racks management, from 10 to 75 Superior efficiency, high reliability, low energy consumption Modern data center are characterized by 24/7 operation all year long.

More information

Towards the Green Data Centre. Lex Coors Vice President Data Center Technology & Engineering Group

Towards the Green Data Centre. Lex Coors Vice President Data Center Technology & Engineering Group Towards the Green Data Centre Lex Coors Vice President Data Center Technology & Engineering Group DC Emissions: We Have Lift-Off! Data Centre Greenhouse Gas Emissions are projected to quadruple by 2020

More information

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary Datacenter Efficiency Trends Cary Roberts Tellme, a Microsoft Subsidiary Power Slashing Tools P3 Kill-A-WATT Measures min, max, and instantaneous voltage and current draw Calculates power (watts), kilowatt

More information

5.2 MW, Pod-based build, Chilled Water, ft 2

5.2 MW, Pod-based build, Chilled Water, ft 2 [Reference Design 65] 5.2 MW, Pod-based build, hilled Water, 85000 ft 2 DESIGN OVERVIEW Data enter apacity 5.2 MW Target Availability Tier III with 2N power distribution and less-redundant generator configuration

More information

Practical Lessons from Data Centre Design and Testing Zac Potts

Practical Lessons from Data Centre Design and Testing Zac Potts Practical Lessons from Data Centre Design and Testing Zac Potts Associate Director of Data Centre Design Introduction and Overview of Data Centre Design and Engineering Principles Tier Ratings and Standards

More information

How High-Density Colocation and Enhanced Visibility Improve Business Performance

How High-Density Colocation and Enhanced Visibility Improve Business Performance How High-Density Colocation and Enhanced Visibility Improve Business Performance Steven So Vice President Data Center Business Cloud Business Division NTT Com Asia Limited 11 Sep 2015 NTT Communications

More information

PISCATAWAY, NEW JERSEY NJ1 DATA CENTERS POWERED BY TRUST

PISCATAWAY, NEW JERSEY NJ1 DATA CENTERS POWERED BY TRUST PISCATAWAY, NEW JERSEY NJ1 DATA CENTERS POWERED BY TRUST THE CENTER THAT NEVER SLEEPS The greater New York metro area is a pulsing capital of industry and finance alive 24 x 7 x 365 with critical transactions

More information

Data Center SC1. Santa Clara, CA

Data Center SC1. Santa Clara, CA Data Center SC1 Santa Clara, CA powerful/ efficient /reliable solutions > Data Center SC1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale data centers.

More information

Planning a Green Datacenter

Planning a Green Datacenter Planning a Green Datacenter Dr. Dominique Singy Contribution to: Green IT Crash Course Organisator: Green IT Special Interest Group of the Swiss Informatics Society ETH-Zurich / February 13, Green Data

More information

ANSI/BICSI Data Center Design and Implementation Best Practices

ANSI/BICSI Data Center Design and Implementation Best Practices ANSI/BICSI 002-2014 Data Center Design and Implementation Best Practices Risk, Reliability & Availability Selecting a Data Center Design Class Bob Camerino RCDD DCDC CT Vice Chair BICSI Mainland Europe

More information

Application of Green Technology For Data Centre

Application of Green Technology For Data Centre Application of Green Technology For Data Centre Steven So Vice President Data Centre Business Cloud Business Division NTT Com Asia Limited 25 Sep 2013 Today s Agenda Why? How? What? Business Drivers

More information

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. TelecityGroup Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se

More information

Server room guide helps energy managers reduce server consumption

Server room guide helps energy managers reduce server consumption Server room guide helps energy managers reduce server consumption Jan Viegand Viegand Maagøe Nr. Farimagsgade 37 1364 Copenhagen K Denmark jv@viegandmaagoe.dk Keywords servers, guidelines, server rooms,

More information

IT COOLING EVAPORATIVE COOLING SYSTEM. 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 80 TO 320 kw

IT COOLING EVAPORATIVE COOLING SYSTEM. 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 80 TO 320 kw IT COOLING EVAPORATIVE COOLING SYSTEM 2 STAGE INDIRECT ADIABATIC COOLING SYSTEM FOR LARGE DATA CENTERS FROM 8 TO 3 kw IT COOLING EVAPORATIVE COOLING SYSTEM ADIABATIC COOLING FOR HIGH EFFICIENCY - Variable

More information

Beyond BREEAM Excellent DCs. Cobalt Data Centre Campus

Beyond BREEAM Excellent DCs. Cobalt Data Centre Campus Beyond BREEAM Excellent DCs Cobalt Data Centre Campus Campus Location - Newcastle Campus Site Plan Data Centre 2 Data Centre 1 Data Centre 3 Cobalt Business Park Power Delivery to Site National Grid Tynemouth

More information

Next Generation Cooling

Next Generation Cooling Next Generation Cooling Server Manufacturer Perspective Practical and Cost Effective David Moss Data Center Strategist Dell 1 Why Chip, Row, or Rack? Density? Energy Don t be scared; I don t see 50kW/rack

More information

ANSI/BICSI Data Center Design and Implementation Best Practices

ANSI/BICSI Data Center Design and Implementation Best Practices ANSI/BICSI 002-2014 Data Center Design and Implementation Best Practices Risk, Reliability & Availability Selecting a Data Center Design Class Bob Camerino RCDD DCDC CT Secretary BICSI Mainland Europe

More information

TIER 3+ CARRIER NEUTRAL DATA CENTER TELEPOINT SOFIA EAST THE LATEST ADDITION TO OUR FAST-GROWING DATA CENTER LOCATIONS.

TIER 3+ CARRIER NEUTRAL DATA CENTER TELEPOINT SOFIA EAST THE LATEST ADDITION TO OUR FAST-GROWING DATA CENTER LOCATIONS. TIER 3+ CARRIER NEUTRAL DATA CENTER TELEPOINT SOFIA EAST THE LATEST ADDITION TO OUR FAST-GROWING DATA CENTER LOCATIONS www.telepoint.bg INTRODUCTION Telepoint is a TIER 3+ Carrier Neutral Data Center in

More information

Data Center. Tai Po Data Center

Data Center. Tai Po Data Center Data Center Tai Po Data Center TAI PO DATA CENTER Nexcenter The Global Data Center Vision NTT Communications offers data center services at hundreds of locations worldwide under the brand name Nexcenter.

More information

Green IT and Green DC

Green IT and Green DC Green IT and Green DC Alex SL Tay Regional Service Product Line Manager Site & Facilities Services, IBM ASEAN 1 What our clients are telling us We are running out of space in our data center We have environmental

More information

Datacentre Milton Keynes Data sheet

Datacentre Milton Keynes Data sheet Datacentre Milton Keynes Data sheet Data sheet Datacentre Milton Keynes Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the

More information

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC :: Module Title Duration : Course CTDC : Certified TIA-942 Design Consultant : 3 days Course Description Data centres are at the core of many organisations. Downtime of the data centre could lead to major

More information

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work Ft Worth Data Center Power Metering for Real Time PUE Calculation Scope of Work Prepared for the General Services Administration By Lawrence Berkeley National Laboratory Rod Mahdavi December 13, 2010 Executive

More information

Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc.

Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc. Cooling on Demand - scalable and smart cooling solutions Marcus Edwards B.Sc. Schroff UK Limited Data Centre cooling what a waste of money! A 1MW data center needs 177,000,000 kwh in its lifetime of 10

More information

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres Product Brochure DENCO Close Control Units Row-DENCO High Density Cooling for Data Centres Data Centre Cooling Through a history in close control, we have developed a broad and deep understanding of how

More information

CLOSE CONTROL AIR CONDITIONERS DATA CENTERS DESIGN SIDE NOTES

CLOSE CONTROL AIR CONDITIONERS DATA CENTERS DESIGN SIDE NOTES CLOSE CONTROL AIR CONDITIONERS DATA CENTERS DESIGN SIDE NOTES DATA CENTER NEEDS A MINUTE IN THE LIFE OF INTERNET Evolving technology has created the necessity for ever greater exchange of data, increasing

More information

Data Center NJ1. Piscataway, NJ

Data Center NJ1. Piscataway, NJ Data Center NJ1 Piscataway, NJ powerful/ efficient /reliable solutions > Data Center NJ1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale data centers.

More information

Phil Tuma, Application Development Engineer John Gross, Mechanical Engineering Director Kar-Wing Lau, CEO Charles Benge, Director Mission Critical

Phil Tuma, Application Development Engineer John Gross, Mechanical Engineering Director Kar-Wing Lau, CEO Charles Benge, Director Mission Critical E n g i n e e r i n g W o r k s h o p : A d v a n c e d C o o l i n g S o l v i n g t h e E n e r g y C h a l l e n g e t h r o u g h I n n o v a t i o n s i n D a t a C e n t e r C o o l i n g 3m.com/immersion

More information

DUB4. An innovative data centre. Resilience. Power. Flexibility AT NORTHWEST BUSINESS PARK

DUB4. An innovative data centre. Resilience. Power. Flexibility AT NORTHWEST BUSINESS PARK DUB4 AT NORTHWEST BUSINESS PARK An innovative data centre Resilience. Power. Flexibility Unit 14 Northwest Business Park, Ballycoolin, Dublin 14 +353 1 4611200 ie.info@telecity.com www.telecity.ie Introducing

More information

Green IT Project: The Business Case

Green IT Project: The Business Case Green IT Project: The Business Case Indumathi Lnu University at Albany DATE We will discuss Identifying green IT projects Funding green IT projects Building the business case Case study: University at

More information

Ten Cooling Solutions to Support High-density Server Deployment. Schneider Electric Data Center Science Center White Paper #42

Ten Cooling Solutions to Support High-density Server Deployment. Schneider Electric Data Center Science Center White Paper #42 Ten Cooling Solutions to Support High-density Server Deployment Schneider Electric Data Center Science Center White Paper #42 1 Introduction 2 Introduction This paper provides 10 approaches for increasing

More information

30 th September Always Right Size Modular Data Centres. Cannon Technologies Ltd (2015)

30 th September Always Right Size Modular Data Centres. Cannon Technologies Ltd (2015) 30 th September 2015 Glenn Conlon Always Right Size Modular Data Centres Traditional DC Build: Image courtesy of ENP Traditional DC: IRO 20 million + @ T2/3 Image courtesy of ENP DC Halls x 2, 500 Cabinets

More information

DATA CENTER AIR HANDLING COOLING SOLUTIONS

DATA CENTER AIR HANDLING COOLING SOLUTIONS DATA CENTER AIR HANDLING COOLING SOLUTIONS World-class performance and reliability from YORK As data storage and protection needs grow, so can costs and complexity. That s why having the right partner

More information